Loading...
HomeMy WebLinkAbout310576_Correspondence_201804053(_ s 7-' April 3, 2018 Jonathan Miller Agriment Services, Inc P.O. Box 1096 Beulaville, NC 28518 RE: Sludge Survey Testing Dates Dear Mr. Miller: ROY COOPER Gowrnor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director RECEIVER/NCDENR/M APR 0 8 2018 Water Quality Regional Operations Section Wilmington Regional Office The Division of Water Resources (Division) received your sludge survey information for many of the Agriment serviced farms on January 12, 2018. With the survey results, you requested an extension of the sludge survey requirement for the lagoons at those facilities. Due to the amounts of treatment volume available, the Division agrees that a sludge survey is not needed for some of the lagoons until 2019, 2020, 2021 or 2022. See the attached table to determine the allowed extension date for each lagoon. However, due to the amount of treatment volume available, and the rate of sludge accumulation, the Division feels that an extension is not appropriate for lagoon #2 at facility, # 31-371, lagoon #1 at facility # 52-9, lagoon #1 at facility #31-576, lagoon #1 at facility #24-76, and lagoon #2 at facility #31-376. The next sludge survey for these lagoons should be performed before December 31, 2018. Thank you for your attention to this matter. If you have any questions, please call me at (919) 807-6340. Sincerely, Miressa D. Garoma Animal Feeding Operations Program Attachment: Extension List cc: jWih iington Regional -Office; W-a e&vOuahty Regional Operarions Section Washington Regional -Office; Water Quality Regional Operations Section Central Files ---' Nathing Compares"-« State of North Carolina I Fnvuonmeetal Quality l [Anson of WaterResourm Water Quality Regional Operations Section 1636 Matt Se cc Center I Raleigh, North Carolina 27699-1636 a, List of Agriment Services, Inc facilities granted sludge survey extension. Date of Survey Farm Facitly # Lagoon # Extension Until 8/4/2017 James Brown 31-371 1 12/31/2020 8/4/2017 James Brown 31-371 2 No Extension- 12/31/2018 8/11/2017 Glenn Haddock Front Big Prima 74-6 3 (FBP) 12/31/2022 1/13/2017 Ann Herrin 31-685 1 12/31/2020 6/18/2017 JC Howard (Taylor Farm 5241 Ta or 2 12/31/2021 5/18/2017 JC Howard No Name Farm 52-9 1 Front No Extension- 12/3 1/2018 5/1812017 JC Howard No Name Farm 52-9 2 Back 12/31/2020 5/18/2017 JC Howard Zimmerman Farm 54-144 1 12/31/2022 7/18/2017 Graham Kennedy 31-133 2 12/31/2019 10/20/2017 Gerald Knowles PLT 2319 31-285 1 12/31/2019 9/29/2017 OK Farms Inc. 31-138 2 12/31/2019 6/2/2017 The Piq Ranch Front Farm 54-4 1 Front 12/31/2022 6/2/2017 The Pig Ranch Front Farm 3 Front 12/31/2022 6f2/2017 The Pi Ranch Front Farm)4 Front 12/31/2022 6/2/2017 The PI Ranch Back Farm 2 Back 12/31/2022 9/2212017 Renewable Transport (Pipeline Farm K31-576 1 No Extension- 12/31/2018 9/22/2017 Renewable Trans ort Pi eline Farm 2 12/31/2022 11/17/2017 Ward Stokes State Line #1 1 est No Extension-12/31/2018 11/1712017 Ward Stokes State Line #2 2 East 1213112022 4/1712017 Dwi ht Walker 31-530 1 12/31/2021 12/15/2017 Mike Wallace Old Farm 31-440 1 12/31/2022 3/20/2017 WBW Sow Farm LLC Du lin 1 &2 31-376 2 No Extension-12/31/2018 Only the lagoons specifically mentioned above for these facilities have been evaluated at this time. Any other lagoons must have sludge evaluations performed by December 31, 2018 unless granted an extension under separate letter.