HomeMy WebLinkAbout310576_Correspondence_201804053(_ s 7-'
April 3, 2018
Jonathan Miller
Agriment Services, Inc
P.O. Box 1096
Beulaville, NC 28518
RE: Sludge Survey Testing Dates
Dear Mr. Miller:
ROY COOPER
Gowrnor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
RECEIVER/NCDENR/M
APR 0 8 2018
Water Quality Regional
Operations Section
Wilmington Regional Office
The Division of Water Resources (Division) received your sludge survey information for many of the
Agriment serviced farms on January 12, 2018. With the survey results, you requested an extension of the
sludge survey requirement for the lagoons at those facilities. Due to the amounts of treatment volume
available, the Division agrees that a sludge survey is not needed for some of the lagoons until 2019, 2020,
2021 or 2022. See the attached table to determine the allowed extension date for each lagoon.
However, due to the amount of treatment volume available, and the rate of sludge accumulation, the
Division feels that an extension is not appropriate for lagoon #2 at facility, # 31-371, lagoon #1 at facility
# 52-9, lagoon #1 at facility #31-576, lagoon #1 at facility #24-76, and lagoon #2 at facility #31-376. The
next sludge survey for these lagoons should be performed before December 31, 2018.
Thank you for your attention to this matter. If you have any questions, please call me at (919) 807-6340.
Sincerely,
Miressa D. Garoma
Animal Feeding Operations Program
Attachment: Extension List
cc: jWih iington Regional -Office; W-a e&vOuahty Regional Operarions Section
Washington Regional -Office; Water Quality Regional Operations Section
Central Files
---' Nathing Compares"-«
State of North Carolina I Fnvuonmeetal Quality l [Anson of WaterResourm
Water Quality Regional Operations Section
1636 Matt Se cc Center I Raleigh, North Carolina 27699-1636
a,
List of Agriment Services, Inc facilities granted sludge survey extension.
Date of
Survey
Farm
Facitly #
Lagoon
#
Extension
Until
8/4/2017
James Brown
31-371
1
12/31/2020
8/4/2017
James Brown
31-371
2
No Extension- 12/31/2018
8/11/2017
Glenn Haddock Front Big Prima
74-6
3 (FBP)
12/31/2022
1/13/2017
Ann Herrin
31-685
1
12/31/2020
6/18/2017
JC Howard (Taylor Farm
5241
Ta or 2
12/31/2021
5/18/2017
JC Howard No Name Farm
52-9
1 Front
No Extension- 12/3 1/2018
5/1812017
JC Howard No Name Farm
52-9
2 Back
12/31/2020
5/18/2017
JC Howard Zimmerman Farm
54-144
1
12/31/2022
7/18/2017
Graham Kennedy
31-133
2
12/31/2019
10/20/2017
Gerald Knowles PLT 2319
31-285
1
12/31/2019
9/29/2017
OK Farms Inc.
31-138
2
12/31/2019
6/2/2017
The Piq Ranch Front Farm
54-4
1 Front
12/31/2022
6/2/2017
The Pig Ranch Front Farm
3 Front
12/31/2022
6f2/2017
The Pi Ranch Front Farm)4
Front
12/31/2022
6/2/2017
The PI Ranch Back Farm
2 Back
12/31/2022
9/2212017
Renewable Transport (Pipeline Farm
K31-576
1
No Extension- 12/31/2018
9/22/2017
Renewable Trans ort Pi eline Farm
2
12/31/2022
11/17/2017
Ward Stokes State Line #1
1 est
No Extension-12/31/2018
11/1712017
Ward Stokes State Line #2
2 East
1213112022
4/1712017
Dwi ht Walker
31-530
1
12/31/2021
12/15/2017
Mike Wallace Old Farm
31-440
1
12/31/2022
3/20/2017
WBW Sow Farm LLC Du lin 1 &2
31-376
2
No Extension-12/31/2018
Only the lagoons specifically mentioned above for these facilities have been evaluated at this time.
Any other lagoons must have sludge evaluations performed by December 31, 2018 unless granted