HomeMy WebLinkAbout310576_Plan of Action_20180531AM 6 a-,s - 31 � U c 1 �(? 1/1 � 2c�1 5 GDP 5-3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 5/31 /2018 1 Structure Name/Identifier (ID): Renewable Transport LL$J21� Pipeline Farm v 2 Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a current liquid level according to marker 18.0 inches b designed 25 yr /24 hr storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e line G12 x lined x 7.48 gallons/ft' 3 Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 19.5 inches 1.5 inches 61886 ft2 57863 gallons 180 days g volume of waste produced according to structural design 72538.7 ft3 h current herd # DO certified herd # 686 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j excess rainfall over evaporation according to design k. (lines h + i + 1) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8Y21/2017 m. ((lines"e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100 , ft' Oft3 37916 7 ft3 47269 gallons 0.08 Ibs/1000 gal. 8.4 Ibs PAN 7 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 14 5/31/2018 1. Structure Name/Identifier (ID) Renewable Transport, LLC d9 Pipeline Farm W 2. Current liquid volume in 25 yr /24 hr stone storage & structural freeboard a. current liquid level according to marker 18 0 inches b designed 25 yr /24 hr. stone & structural freeboard 19 5 inches c line b - line a (inches in red zone) = 1 5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 69156 ftZ e. line c/12 x line d x 7 48 gallons/ft3 64661 gallons 3 Protected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 160 days g. volume of waste produced according to structural design 72538.7 ft3 h. current herd # certified herd # 714 actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 37916.7 ft3 k (lines h + i + j) x 7 48 x 30 days/line f= 47269 gallons 4 Total PAN to be land applied during draw down period I. current waste analysis dated 8/21/2017 0.08 Ibs/1000 gal m. ((lines e + k)/1000) x line I = 9.0 Ibs PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 5/31/2018 Line y must show as a deficit If line y does not show as a defeat, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be Included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility This farm has no hogs at this time. Also this farm has 2 lagoons that are connected with pipe. As soon as weather permits I will resume pumping operation to get lagoon level back in compliance: PoA (30 Day) 5/31/2018 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID Renewable Transport, LLC (1) line m = 9 0 lb PAN 2 Structure ID. Renewable Transport, LLC (2) line m = 8.4 lb PAN 3 Structure ID line in = lb PAN 4 Structure ID line m = lb PAN 5 Structure ID 6 Structure ID line m = lb PAN line m = lb PAN n.lines 1+2+3+4+5+6= 174lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o tract # p field # q Crop r acres s remaining IRR 2 PAN balance (Ib/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u application windoW Parker 1-A Bermudagrass Hay 2.73 170.00 4641 3/1-9/30 Parker 1-B HALF Bermudagrass Hay 2.32 170 00 394.4 311 - 9/30 Parker 2-A . Bermudagrass Hay 2.73 17000 464.1 3/1 - 9/30 Parker 2-B HALF Bermudagrass Hay 2.26 170.00 384.2 3/1-9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1706 8 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 17.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1706.8 lb. PAN y. Overall PAN balance (w - x) _ -1689 lb. PAN PoA (30 Day) 5/31/2018 i