Loading...
HomeMy WebLinkAbout310573_Inspection_20180329Facility'+ Number '3 l - ©3 U Division of Water Resources O Division of Soil and Water Conservation O Other Agency Type of Visit: ®Compliance Inspection Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: __j Arrival Time: �Departure Time: County: Farm Name: 01111V-'Nu a CSlytU l l�{ "' �{�`2_ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Phone: Title: Onsite Representative: cL ecz�MJ4 Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feedc Other Other Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- La er Design Current Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Region: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes [� No ❑ NA ❑ NE ❑ Yes ❑ No -�fl NA ❑ NE ❑ Yes ❑ No ® NA ❑ NE ❑ Yes ❑ No ❑ Yes -B No ❑ Yes and No [5j NA ❑ NE ❑NA ❑NE ❑NA ❑NE Page 1 of 21412015 Continued Facill Number: Date ofInspection: 9 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes n No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? �rne d� o,�y I Seure structure ❑ Yes ❑ No �D NA TT ❑ NE I 2 I/ Structure 2 Shucture 3 Structure 4 Structure 5 Structure 6 Identifier. Spillway?: Designed Freeboard (in): Z 30 Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes []� No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes EP No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an Immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ® Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes © No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) T 9. Does any part of the waste management system other than the waste structures require ❑ Yes E� No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [�No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E�ANo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN> 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): qLe�" CL 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ICI No 7❑" ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA E�,NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA Ep NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ® NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes BE No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. 7 ❑WUP ❑Checklists ❑Design ❑Maps ❑LeaseAgreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 10 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22 Did the facility fail to install and maintain a rain gauge? ❑ Yes E51 No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA [A NE Page 2 of 3 21412015 Continued Facili Number: 13 L - Date of Inspection: 24. Did the taacility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [—]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes `i No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA jP NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ` ] No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [�No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [] No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [g No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E� No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawingsiof facility to better explain situations (use additional pages as necessary). 0 � \ I �" , l I ( R-( n C ono- d! Cl cSThti o 1'_, s\J4 tZ 123yY7 C 3.2, Iq .7?) ?riK*w-7 3§' f-',0S) sec-,, 4-r-n NZ_l 3y asF 1-�e� s SL, C Jy�__ Reviewer/Inspector Name: Reviewer/Inspector Signaun , Page 3 oj3 Phone: Cj)C)7gkI�41 Date: TI I V 2/4/2015