No preview available
HomeMy WebLinkAbout510004_PERMIT FILE_20171231�11( Q�i�11st i l I A'Dwi§iori"of W a t t r_j Reso'uices Facility Number ® ®Divisiof Soil and Water It onservation tea?( Hi1Il217,{Itidli! r ®tOtAgency Type of Visit: 18 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: a Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit }}� a Arrival Time: Departure Time: , S County: Region: Farm Name: L Owner Email: Owner Name: . ��yyo Mailing Address: Phone: Physical Address: NG }+T, A)ewf -e Facility Contact: Fod Lpp-- Title: Ow Phone: Onsite Representative: _E&I Lem Integrator: Certified Operator: Edd YV, be - Certification Number: )/aY33` Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Design Current Design Current Current S �i°�s �°Puai Pls°�� Cit it C���s��l d # pi i'ty �' iarupa �nn� iWe V is flu n . i' Wean to Finish Layer Dairy Cow Wean to Feeder j 3 Non -La er I Dairy Calf Feeder to Finish &IaQ &Q21 Dairy Heifer Farrowto Wean @2Qa 01 Design Current D Cow Farrow to Feeder D , 1?ou[t . fi'orn ILn Ca aci Po p Non -Dairy Farrowto Finish La ers Beef Stocker Gilts Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other, Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes No ❑NA ❑NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ Yes ® No [] Yes ® No ❑NA ❑NE ❑NA ❑NE ❑NA ❑NE Page I of 3 21412015 Continued Faci31 Number: 51 - OQ Lt Date of Ins ection:'6a Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: SOW AjvfseuiS Sd1! !h Spillway?: Designed Freeboard (in): Observed Freeboard (in): `� ate_ _ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes f5d No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [5d No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [0 No ❑ NA ❑ NE maintenance or improvement? l l . Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes F�] No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Coadal ells-Ll_ Nay` SmaIfl arc! OvY19jewd - 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [5 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes] No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA [:IN E 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? Ifyes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis 0 Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ® No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes ❑ No ® NA 11) NE Page 2 of 3 21412015 Continued Facilit Nuraber: - 060 Date of Inspection: qjaj 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [�g No ❑ NA ❑ NE the appropriate box(es) below, ❑ Failure to complete annual sludge survey 0 Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑Yes ISNo ❑NA ❑NE ❑ Yes ❑ No ❑ NA ® NE ❑ Yes �s] No ❑ NA ❑ NE ❑Yes ®No ❑NA ❑NE 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [g No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? Ifycs, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes C] No ❑ NA ❑ NE alF, Para w'r t l ►leek3 has C04nu� bAfwe_ +lie e4 of­�e yeaA. aS, Sl J e wv-- ala0It7 n S(� � , Iso NV'r s)ul'o a,q 313 a s -3,0 LA �3 ( ) CHID} ay, CO WOj AMIys-e1 liholr> w00@7?S 7)la119 !,, ra. I I$ rvoaoa7� nraa bqa o 0a,117 wool L47 y 31��115 wonsfo y -7I10117 WOOD1aq lll�il� 1,v003*3 Sjj,)Jp w00700� Goads jo b o,) r-e_ c odi- farm Is de la*U 8;)/1�4 IS U10to dale Reviewer/Inspector Name: T0924 �h D2)'4_ Reviewer/Inspector Signature: Page 3 of 3 qaye se-Alys; �ocn.sohn,�l�Q)�cd�ln�o FKtie e l el a�1 Lsoi r a�alysl�� dMe. jn 4C107� ao 17 � 1Naiers aid, Ex�he 1,i mr-� hm e_ 4 o uh P-eco; m a'h`a,f c-d *2 roc levels rve-e le, 1 �f o / 1 P ela/s Phone: n�JQ-74 �— WY Date: iYv a 0 1JW 015 Type of visit: UCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: !(Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ® Arrival Time: ivaorn::] Departure Time: Qa County: Region: Farm Name: L&I Ea/23 Owner Name: nrl illhop& L Mailing Address: Physical Address: M WAW4 5-09 . New, brove- Owner Email: Phone: Facility Contact: EK I Title: Phone: Onsite Representative: G1 Ir Integrator: ile�Certified Operator: tf Lpe— Certification Number: I6g35 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design CurrentlilililiImlimesign Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I ILayer I Dairy Cow Wean to Feeder 09 D 1 INon-Layer I Dairy Calf Feeder to Finish Lj�iS;i DairyHeifer Farrow to Wean a Q { / Design Current D Cow Farrow to Feeder Non -Dairy Farrow to Finish Layers RNon-Layers Beef Stocker Gilts Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges_ and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes W No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No [DNA ❑ NE ❑ Yes []No ❑ Yes ® No ❑ Yes VNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412015 Continued Facilit' Number: 51 - OWX jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes N No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: FA SOS! Spillway?: Designed Freeboard (in): Observed Freeboard (in): �� QA 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [A No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes M No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 5 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit'? ❑ Yes "No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes N No ❑ NA ❑ NE maintenance or improvement`? Waste Application 10. Are there any required butlers, setbacks, or compliance alternatives that need ❑ Yes � No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? if yes, check the appropriate box below. ❑ Yes � No ❑ NA [] NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes W No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [g No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes X No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 5d No ❑ NA ❑ NE Required Records &_Documents 19, Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes R No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available'? If yes, check ❑ Yes [5a No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design []Maps ❑ Lease Agreements ❑Other. 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 5D No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis []Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 5D No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑NA [3 NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ® NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: - 0001 Date of Inspection: S a 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA CR NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? if yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes W No []NA []NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes [& No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes M No 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 91 No 34. Does the facility require a follow-up visit by the same agency? ❑ Yes RNo ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE Comments (refer;to,question.4 :Xxplain any YES answers and/or.any additional: recommendations,or'any other.comments:: ` Use drawings of facility tobetter `explain situations (use additionalpa2es as necessary), a6.1304 1V'111 by ialarlaof8 = es✓rut ��aslt� Fin Sow .130 kur SIVdje7 a4 33 51 3, 1�-t! lS Trf Vol I y.a 43 9,s (_�+) ay. �'o t��ral; a�lol3�li�_ Coc t Lim? col ep -2lk ov f 0e = Hew Ie re4li)Jf -0a i- 6a�^ � Per, at. � a✓s) wO& A-nalpej So(( T��t00561j 10j i1r'�6. y 3107 woo 510Y k*r . cro f IvAdOw eK4PSr07 ��C4'0-1* 1 ► a 11a*7 Vvooy t" 3I,f1~7 ao11p [ems) CfQ aay) 101I a�I� VVoQ a*p i� evet a.0 hW( cui,e MOfge►►- 101 g IIP), (u�13�I{p VV00 lb Is al�ti�lp W009ggo a r I rhg is up to da4e Reviewer/Inspector Name: —jo� schof f �f Phone: � 3 Reviewer/Inspector Signature: Page 3 of 3 _j 06h "Sch"Woncdfnr3ov' Date: 3d 30 21412015 -�us-brjq� o&fagr(j� Type of Visit: -0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: ; Departure Time: IYI� County: Region: PM Farm Name: LIP ��a-�'h �+; Pdf.4l Owner Email:'� Owner Name: Edo i Le f, Phone: Mailing Address: Physical Address: ft & NC i Irv' 50,5 0V Facility Contact: Title: o Wlw"- Phone: Onsite Representative: V fI Lee, Integrator: )1)d— Certified Operator: BUJ Lee, Certification Number: J toS Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current sign Current Design Current Swine Capacity Pop. Wet Poultry CDeity p. apacPo Cattle Capacity Pop. Wean to Finish I ILayer DairyCow Wean to Feeder �+ Non -La er Dairy Calf Feeder to Finish 0 Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dr. P.oultr. Ca aci P,o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turke Pouits Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? ❑ Yes [g No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE Page 1 of 3 21412014 Continued Facility Number: jDate of inspection: j Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [2 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Fywatv / A Spillway?: Designed Freeboard (in): Observed Freeboard (in): c 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes n No [DNA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes C!R No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [S No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes N No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes ®No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 12 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): C-1001 Q) 861447 6tl SM1011 gfoi1 ovePet 13. Soil Type(s): PV11-A Syl ' Ucr IS -- --- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [N No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ®No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [2 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [2 No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes (2 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP []Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. r5g Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ® Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [Z No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No E4 NA ❑ NE Page 2 of 3 21412014 Continued Facili ' Number: - Ej Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes C@ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey El Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [2 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ® No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ErNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes O No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to -question #) Exolam any;YES answers and/,or any additionalirecominendations�ortany other comments ; � , Use drawings of facilityto better explain sif6ations (use3:additional pagesas necessary).o j,,1 a,t7of h45 3 hr5 cmfiinui� ed- by �e Pi9, of a 0 I S' 7, e Yvorko7 rau a,'5' -e as,s! i/7dje- �ey - ©�w1 za F in�►d_ f a h a'� ► i�h�, / 3 $,a 3.0 3, 3 y r, q 1 y I�p Woo Ll q90 1,55' 0,11 Ij r�INI�� rvoal �� �•aa oq a•a9 �'�� VVOO77$ a,a� a� 17 3'�r- a'aI I�s� Woo y.so3 f. Yy �,� � 1:a7 1 Iro1Jy, �o� 3 },ens, L't, co frq zinc. l��e�sa-eye 50 J I TCOr�sz ass0 a � r�as� l �- V UM#O,,r s !Q eVeAr ,l qo l�j 9 ©� s ra Ih acrl�fl a 'elds 4 k +� r� �'''�• �y P 100 1,b5 -For Urs�L. s L C W `s Noo � *4 �-o b in tin -��yne� va)� Ond i sil L Noy -ao«- �c� oar v,7 t'/ y �► sw �� M rW r r�ch�°s belows'l Pr row" Reviewer/Inspector Name: _Jlo ark '_�-_111ywiPl- Phone: - - 3 Reviewer/Inspector Signature:%915�1Date: _JU1 p [ % a of Page 3 of 3 21412014 Dlvlslon,of Water.Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 51 0004 Facility Status: Inpsectlon Type: Structure Evaluation Reason for Visit: Routine Active . Permit: AWS510004 [] Denied Access Inactive Or Closed Date: County: Johnston Date of Visit: 02/29/2016 EntryTime: 11:10 am Exit Time: 12:00 pm Farm Name: Lee.Brothers Form Owner: Earl Wood Lee Mailing Address: 853 Oak Forest Rd Physical Address: 8828 NC Hwy 50 S Region: Raleigh Incident # Owner E;mall: leebrothers®ncwisp.net Phone: 919-894-2688 Four Oaks NC 275248592 Newton Grove NC 28366 Facility Status: Compliant ❑ Not Compliant Integrator: Location of Farm: Latitude: 35° 17` 45" Longitude: 78° 26' 10" 1-40 Exit 334. S on NC 96, 07 ml.Left on NC 50, Just past Intersection of Godwin Lake Rd, turn right on entrance rd. Office on other farm, 51-52, Question Areas: Certified Operator: Earl Wood Lee Operator Certification Number: 16435 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Earl Lee Phone: On -site representative Earl Lee Phone Primary Inspector: Inspector Signature: Joan Schneier _^ Phone: QJf �`7qf' yd Date: CJ11 d0/ Secondary Inspector(s): inspection Summary: page, 1 Permit: AWS510004 Owner - Facility : Earl Wood Lee Facility Number: 510004 Inspection Date: 02/29/16 Inpsection Type: Structure Evaluation Reason for Visit: Routine i Wastq StructMros Dlslgnated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon FINISHER 26.00 Lagoon ISOLATION 27.00 Lagoon NURSERY 22.00 Lagoon SOW 25.00 page: 2 (Type of Visit: Q9 Compliance inspection U Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: 10 Routine 0 Complaint O Follow-up O Referral Q Emergency Q Other Q Denied Access Date of Visit: Arrival Time: Q.q? Departure Time: County: Farm Name: Owner Email: Owner Name:/ (� _ Lip - ^T Phone: Mailing Address: Region: R p n Physical Address: %'6DL NC, f yvy 90S VPh4✓t77j &Q11P Facility Contact: L? iVj�Title: Ayapl Phone: Onsite Representative: F/'lLee Integrator: Certified Operator: tdy1 _ h/11 >& Certification Number: _�%4,35 0 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current x Design .Current Design Current Swine Capacity Pop. Wet Poulyry Capacity Pop. C*attle Capacity Pop. Wean to Finish La er DairyCow Wean to Feeder Non -La er Dai Calf Feeder to Finish d Q Dairy Heifer �( Farrow to Wean 10 Design Current Dry Cow Farrow to Feeder D . P■Dull . Ca aci P■o Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turke Poults Other Other Discharses and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Yes ® No 0 NA NE Yes []No QNA EjNE Yes [] No NA NE Yes No Yes ® No Yes No NA NE NA NE NA NE Page I of 3 21412011 Continued Facility Number: �1 - (� Date of Inspection: Slara= Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes C@ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No D NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ::Sbw — l5 I,SO 51�h Spillway?: Designed Freeboard (in): Observed Freeboard (in): 33_ 3�I. 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ZR No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ® No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E) No ❑ NA ❑ NE maintenance or improvement? 1 L Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Ca I �P/4,1 V. SIVII &,016 13. Soil Type(s): P11 A S , V C C-11 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes U No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Dg No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [X No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes (2. No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [5�No [] NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes C No ❑ NA ❑ NE the appropriate box. ❑ WUP []Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [A Yes ❑ No ❑ NA ❑ NE Waste Application ❑ Weekly Freeboard OWaste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22, Did the facility fail to install and maintain a rain gauge? ❑ Yes � No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ® NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: - Date of Ins ection: 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE [:]Yes [;@ No ❑ NA ❑ NE ❑ Yes M No ❑ NA ❑ NE ❑ Yes K71 No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes P;7r No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes � No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes M No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes V] No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or anyadditional recommendations or, any other comments. Use drawings of facility to better explain situations (use.. additional pages as necessary). c16,tcrl hus- CQh-`'q✓ J ek nova -ftr - hij /e4r i� h,t'i1 h�. & � ovrs soy7e0ne betw1*9 t er da - �PrPm b ao 18 ,C!jp y� Annwp w kss exegto c.�w ,F►m ash f Uvfs so , as.sl ,,Ve Ial/lly57&D.�rt7vr a rr�df. 9� s 1Ud9e- 340 3,a 3.0 TtiVole 511 OI4 54 010 31 A 31 a? 'D ,' ati b/VV01 1al,7 1+q, Ne�+dw in a010 �s,� �vcl� ya�O divl�hI stoma- amy , kt1Fh j►l� - ` VVMf e- Soq bpi Sow R, jfh � s �,a7 SO evf * o[Lwy l�l a bCt Mys &trc al alalrs 1. .$ . ry pp45.0 yy 1 9 I VV00 oat 1 �ol4l�y 1,,a0 Z4 t' o$ I yy yvoo PO all fq !r &3 3k3 y ?� 3 S f� aCO%'&5,1-2kC_ 1 �PIJ Oq' s�,fI sa„f le- sL. ��s�a r Ito j►y� F'�e�ds w� rr n�L sm, 11, Got job r fi� s Qy � � Gtclw P;.etds 7, nisll� } r b Q%r cam (� fYrsfcle !�'� e�+han k (hPaihooey , W11I n e4 *r a' 1r V J 4avx;wr l! �s fi�lls}S, )oO its', i ring is UP'10 0(afe � -SS vwv •r w.� Reviewer/Inspector Name: �� Schn,�l,Pr Phone: q� rq 1— 4 Reviewer/Inspector Signature: Date: Q Page 3 of 3 /4/20I4 i ype of visit: C>,ruompttance inspection v operation Keview V structure r,vamarion V i ecnntcal Assistance Reason for Visit: Q'Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency Q Other 0 Denied Access Date of Visit: 3- Arrival Timer Departure Time: :Qd County: l h� Region: Farm Name: Lee_ 1Rrdth*-_c P /z3 Owner Email: Owner Name: —041 VQed_._1'Po Phone: Mailing Address: Physical Address: Facility Contact: RozI j hlI/ �, Title: OWn& -- Phone: 919-4�a,3)(7i C1 Onsite Representative: o L Integrator: -ie)d-pmd Ott Certified Operator: Ed/ I Yyoad L2e. Certification Number: 104 3,r Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design C*urren# Swine Capacity Pop. Wet Pott`ry Capacity Pop. Cattle C►aPd a C I t--VjmmFop. Wean to Finish La er DaiEZ Cow Wean to Feeder Non -La er Dairy Calf X Feeder to Finish Dairy Heifer ><I Farrow to Wean 000 Design C►urgent Dry Cow Farrow to Feeder Dr.. P.oultr. Ca aci P.o Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Qther Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? ❑ Yes [Z No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWQ) C] Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes C No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes tg No ❑ NA [] NE of the State other than from a discharge? Page I of 3 21412011 Continued Facifi Number: jDate of Inspection: 13141 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Identifier: fQF6a&4 Numervs(9W Spillway?: Designed Freeboard (in): Observed Freeboard (in): �' 7�t; l — s 5. Are there affy immediate threats to the integrity f any of the st %res observed? a J (i.e., large trees, severe erosion, seepage, etc.) Structure 5 ®No ❑NA ❑NE ❑No ❑NA ❑NE Structure 6 []Yes [5? No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [,;Z No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes LLB No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [�j No ❑ NA ❑ NE maintenance or improvement? Waste Application M. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [�] No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes � No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence ofWindDrift ❑ Application Outside of Approved Area 12. Crop Type(s): Call,"# I 'Qj I J n 'ay .�%�'all)q,, 1) ft1'"PIJ .S - - - Ics - /, J- - 13. Soil Type(s): _U i&y'�yrh-P{� of ix- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ® No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [5g No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes EZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis [] Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking D Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes g No ❑ NA []NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ® NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Inspection: 571 j 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes CS No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [3 No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [5D No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes C� No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes N No 0 NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes I] No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes N No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes EJCNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes M No [] NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes JoNo []NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [�] No ❑ NA ❑ NE Comments= refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use'drawings'of facility to better explain situations (use additional pages as necessary). a(o, 0 1 C heeds ct�-f�A+�,t� ecl' la ) 3) I Is-, 01, Y►1G)ie Arg �1mv / N'r ISO 5nls 5I111� I.la3 ?,03 I•u9 3,3y 1N0000 a 0a j,qg s, )o VVOOWOI � 913113 J,00 5410113 Ir$3, Collb(*o, -fil}), Ira, sb; l 111011 q SL Ca-7 . NO [.ice n•efd4- , correl4-3 k- GYM. P41h10 NP6, W(11 l'}4 so" s"441)1 In � ✓iP . 7ah w1,11 Cb1*hyd1adic Wd� "l I. aq 1, 0 1,7 (a� a� aiC ®Ids w��4e a, (oS ,q0 3, V3 yv00730/ r foils specs, n/011 n-ef44p be -Noll t5l�dyes-live ia14113 7SoIV V./ Aso Ski 3, y '33 Zi�-y� forte !�(3 S,) 5� 1 )I, P63e- Coll, L4 s �bon PleajyYyy'h tn51! a ks si�tlnXll a' 61*10 cress Cv'P_ h'W VI©o 1551 t7l'o 3.0 ` shade , Reviewer/Inspector Name: Ui1 5c'-ha ehot Reviewer/Inspector Signature: Page 3 of 3 Phone: qjq 7qi—�(��0ll,cr/ Date: /4/2011 Type of Visit: Compliance Inspection U Operation Review p Structure Evaluation Q Technical Assistance Reason for Visi� J, Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: i Arrival Time: Departure Time: County Region: Farm Name: Owner Name: eh.A I '�_U Mailing Address: Physical Address: Owner Email: Phone: q[q H CQ a a 1 G Facility Contact: Title: Phone: Onsite Representative: Integrator: C , Certified Operator: Certification Number: Back-up Operator: Location of Farm: Certification Number: Latitude: Longitude: in =apsaity Pop. Wean to Finish n Cur]rrentSine Wet Poultry C**opacity Pop. La er C«attle Capacity Dai Cow Wean to Feeder Non -La er Dai CaFeeder to Finish Dai Heifer Farrow to Wean l Design Current D Cow Farrow to Feeder D P,oult Ca acit P,o Non-DairyFarrow to Finish La ers Beef StockerGilts Non -La ers Beef Feeder Boars Pullets s Turke Poults OtherrI Beef Brood CowTurke EL10—ther Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State'? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? 01 ❑ Yes ;2'_No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes �I fo ❑ YesirNo ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 21412011 Continued v Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ONo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: J'QhL4_ 1L)1Vwg&j� Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 I o� t I 3-,T ! f-5 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [,-a No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes P No [3NA [3NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [!I No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ONo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes �No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes , fNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes P] No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes T1No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes eNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes PTNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes P No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design [] Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections [:]Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �VN o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facilit Number: -0<4 jDate of inspection: X- 24. Did h! facility fail to calibrate waste application equipment as required by the permit? ❑Yes �j-No ❑ NA ❑ NE 25. s the fac1ili out of compliance with permii conditions related to sludge? If yes, check ❑ Yes T No ❑ NA ❑ NE the appropriate box(es) below. )-Q ) `9L d�LA-A— P ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Wxgo ❑ NA ❑ NE Other Issues T 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ;3"No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes PNo ❑ Yes o ❑ Yes PNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ZNo ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency'? ❑ Yes VNo ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility tto .hetter explain /situations (use additional pages /as necessary). ' -a4 -OL a, t 9 b 1 FT►x):X5 a: S �1 v a - 4 - f CD a , $ (,).1 (v w� 3 Ll fi 0 N� � - ai.,- _ ca-� I f Reviewer/Inspector Name: Reviewer/Inspector Signaturf Page 3 of 3 Phone; 7 / ) 9341 Date: 21412011 Type of Visit: ompliance lnspection 0 Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: outine Q Complaintt O FFol�low, -up O Referral O Emergency 0 Outer 0 Denied Access Date of Visit: Arrival Time: l t•/ Departure Time: C0unty:n_5 A) Region:& Farm Name: Lg ,--- G4- o + h rS Fa.-e-rn Owner Email: Owner Name: 6 tit A L, a.c Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: &l,C 1Le je Certification Number: ALA? 8_1_L_1-Y_ 3s Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Swine Wean to Finish Design C*apacity C►urrent Pop. Wet Poultry Layer Non -La er Design Capacity Current Pop. Design Current Cattle Capacity Pop. DairyCow DairyCalf Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder 1 2 0 2000 Design Current DairyHeifer Dry Cow Non -Dairy Farrow to Finish Layers FrSE���Gilts Non-La ers eef F Boars Pullets Turke s urke Poults Other Beef Brood Cow Other Other HT Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes []No ❑ NA [] NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes [] No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation'? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes P3 No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued �S�l 1 Facili Number: - Date of Ins ection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ,._ lNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes l 40 ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 maint enance or Structure 5 Structure 6 Identifier: 1=1'p►S hOltj rseC- V Sax Spillway?: Designed Freeboard (in):1 Observed Freeboard (in): C, J N 9 t ar.&2 5. Are there any immediate threats to the integrity of any of the structures observed? 0 Yes o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ro ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �'No ❑ NA ❑ NE & Do any of the structures lack adequate markers as required by the permit? ❑ Yes ;2-11qo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes );D'No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZfNo ❑ NA ❑ NE ;0 mprovemen . 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes VNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 19. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes �❑/'"No ❑ NA ❑ NE ❑ Yes 2 'No ❑ NA ❑ NE ❑ Yes 4e o ❑ NA ❑ NE ❑ Yes ,L TrNo ❑ NA ❑ NE ❑ Yese,�o ❑ NA ❑ NE ❑ Yes�o ❑ NA ❑ NE ❑ Yes PNo ❑ NA ❑ NE ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ED'No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall [:]Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �' o 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YesAn-No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: S I 1 Oq Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit. ❑ Yes z'No ❑ NA ❑ NE � 25.IIs thel facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �No ❑ NA ❑ NE the appropriate box(es) below. 11- 1 q — 42 0 10 Sew = Y 4 07.0 S'so = 430,70 F,'n = 3 o Ajom=35IN ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes,E:rNo ❑ NA ❑ NE ❑ Yes ,EErTA ❑ NA ❑ NE ❑ Yes" ❑ NA ❑ NE ❑ Yes F�o ❑ NA ❑ NE ❑ Yes �I o ❑ NA ❑ NE ❑ Yes EfNo ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes f4�1_No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ( ❑ Yes Rio ❑ NA ❑ NE Comments (refer to question-#): Explain any YES answers and/or any additional recommendations or, a,ny other co'mments'��. Use drawings of facility to betterexplain% situations�(use-additional pages as necessary). oy 441C '0 . CA I ! a4) ri 1 a 1 C Pry a a 33) F#Cva.h Q hfor 9r S aCa tAul Reviewer/inspector Name: Reviewer/Inspector Signature Page 3 of 3 I R o l 9% 1 Phone: C% % — r)Q Date: 1412011 Type of Visit: 9f Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ORoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: r Departure Time: County:ypl-Irtsf eeV Region: "Y'i22'(-'� Farm Name: „ �;, e.: re) Emr VV- Owner Email: Owner Name: �(T is L 0 p C) 6 _. _ 1 p Phone: r Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Integrator: Certification Number: Certification Number: Longitude: Swine Wean to Finish Wean to Feeder Design Current Capacity Pap. Wet Poultry La er Non -La er Design Capacity C►orient Pop. Cattle DairyCow DairyCalf Design Capacity Current Pop. Feeder to Finish Farrow to Wean al �°r..t7r> piC ,�� D ©r, P.oultt, Design Ca aci Current P,o P. DairyHeifer D Cow Non -Dairy Farrow to Feeder Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Other Other L Pullets Turkeys Turkey Poults Other Beef Brood Cow _Discharses and Stream Imoacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes E/No ❑ NA ❑ NE [—]Yes [:]No [:]Yes [:]No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes Wf No ❑ NA ❑ NE Page 1 of 3 21412011 Continued r Facili Number: - Date of Inspection: 24. Did the facility mil to'c�>�r ate waste $application equipment as required by the permit? ❑ Yes No [DNA ❑ NE cat 25. Is the facility out of compliance with pen -nit conditions )elated to sludge? if yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to property dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑ Yes I f J No ❑ Yes No ❑ NA D. NE ❑ NA ❑ NE 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [ No ❑ NA ❑ NE permit'? (i.e., discharge, freeboard problems, over -application) T 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other; 4 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewerllnspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #):,Explain any YES ansi er's and/or any Add Mona Vrecommendations or,'an other comments Use drawing's ofacilit to'better explain situations (use`additional :51 u &%a SLc,%,t� ao I o sow .T-5 0 r--Crt 1"5 1% K_QAJ"A.T . yt t�o�( Jaz�t a o I o - cm•a ,� c.�,..+ h i9. Ls� SOUJ Lf Ll d70 L, 3 °Id F•X� 3 7 alv rJ tmko 35�J I1/9J,o CIVAIL _,t�t Reviewer/inspector Name: Reviewer/Inspector Signature Page 3 of 3 Phone: rW [_ y al-9 Date: 21412011 Facili Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ YesXNo ❑ NA ❑ NE a. if yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: i rYt a J),k Qx 4 tAAP i U Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes Z No ❑ NA ❑ NE waste management or closure plan? r If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes eNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes P^No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes eNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Vl�o [DNA ❑ NE maintenance or improvement? l 1. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s) 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [;�No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for Iand application? ❑ Yes I /I No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment'? ❑ Yes No ❑ NA ❑ NE Required Records & Documents Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other. 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes VNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE Page 2 of 3 21412011 Continued Type of Visit P Compliance Inspection Q Operation Review 0 Structure Evaluation O Technical Assistance Reason for Visit jzfRoutine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: I / County: U (J Region: ` Farm Name: t �i----.���� ;-l_5L]C Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: I Phone No: Onsite Representative: Certified Operator: Back-up Operator: Integrator: Operator Certification Number: Back-up Certification Number: g Location of Farm: Latitude: = = =ds Longitude: mor7i 01d 35 1 a9513fJ Design C►urrent Design Qs urrent Design Current Swine Capacity Population Wet Pltrpacity Population ouy Ca Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ DairyCow Wean to Feeder ❑ Non -Layer ❑ DairyCalf Feeder to Finish El Dairy Heifer Farrow to Wean Dry Poultry ❑ D Cow ❑ Farrow to Feeder El Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑Gilts ❑Non -La ers ❑ Beef Feeder ❑ Boars ❑ Pullets ❑Beef Brood Cow ❑ Turkeys Other ❑ Turkey Poults ❑ Other ❑Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ZNo. ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑NA El NE [I Yes [I No ❑ Yes No ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE Page I of .3 xi_ 10C, 12128104 Continued In Facility Number: —Cj Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier; rU/yV2 A � Spillway?: Designed Freeboard (in): Observed Freeboard (in); 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes J2 No ❑ Yes ❑ No Structure 5 [I NA El NE ❑ NA ❑ NE Structure 6 [:]Yes .10'No ❑ NA ❑ NE ❑ Yes 0No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 2rNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes El No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes [3 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soii ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 1'06LK__l U. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes V'_No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes PNo El NA El NE I& Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE '` l.t '..:�z;; „��.��s.-. Y::r.-t_1�9„`,#) � t �ys�xplain:any',, _�'`'�:�,:��`-=.�s�*�:.���..-_ `��-'8�',�.�'�x':��V:�.�:".. � .�:�,�r ::"',4�i�'��`Sk � :�'sa'i-a:� Comments {refer to yuestian EYI,9§ answcr..s:and/or�any recommendations or any other comments ��Useldrawings;of'facility'to<better' ziolain situations us6addij ioaltpagcs as necessary): AL T Reviewer/inspector Name Phone: qrl —90 13 Reviewer/Inspector Signature: Date: p 2 o f ? 12128104 Continued age Facility Number: Date of Inspection l / Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes �' o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes (r No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps ElOther 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 112<0 ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes P—No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [-No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0"No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes PINo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes VTNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes P�No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes PrNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes VNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes eNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 4 No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes 1� No ❑ NA ❑ NE Additional Comments andlor.Drawings;".��.� 58- ao vo c�,t 1 a j III as -- , a Q_ f o 9 nytoa+ C LQ'-1\ -- Sc O = 311 = n 4 1 07o 0 1-I l Ujd a �4a S7or Page 3 of 3 I'll a ) o "1 55W `d / U 9 q 12128104 Division of Water Quality Facility Number 90 Division of Soil and Water Conservation M I - � Other Agency Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit / Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County. Region Farm Name:% Owner Email: Owner Name: Phone: M) (?I gt I a a a 3 12 Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: Integrator: Certified Operator: I Operator Certification Number: Back-up Operator: Location of Farm: Design Current Swine Capacity Population ❑ Wean to Finish ❑ Wean to Feeder a ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Back-up Certification Number: Latitude: = O = 6 = Longitude: ❑ ° = ' ❑ Design Current Wet Poultry Capacity Population Non -La ec �-(15 t�OTry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ urkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current. Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl I Number of Structures: �I b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes /No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes �No ❑ NA ❑ NE ❑ Yes ❑4o ❑ NA ❑ NE 12128104 Continued Facility Number: 5F-CR Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes�No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes eNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Z5 n IF A P7ro Spillway?: Designed Freeboard (in): r�] Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2TNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes P"No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes P'1Qo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2 No ❑ NA ❑ NE maintenance or improvement? Waste Application Zr 10. Are there any required buffers, setbacks, or compliance alternatives that need El Yes Z No ❑ NA ❑ NE maintenance/improvement? IL Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes dNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 121"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes L31No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes ZNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes 5?rNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes eNo ❑ NA ❑ NE �edr4F1. �'. Y f's-5.%s£$` wtA 'f�Cen� er to��estan#)rExplatnanyY15 answers ,and/or anrecammendations or anytnthercUa�wmgsoffaLty�toett�rxplantuations'`(use addittofn page.asnecessay w Reviewer/Inspector Name e Phone: Qf� Reviewer/Inspector Signat e: Date: Page 2 of 3 12128104 Continued L �i Facility Number: f 1 —M Date of Inspection �[Jg Reuuired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes �No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes PNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes VNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E/No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes V No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes IV No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 71 No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes V No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes 7 No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes V No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes �eNo ❑ NA ❑ NE and report the mortality rates that were higher than normal'? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [jNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by El Yes [�No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes El NA ❑ NE 33. Does facility require a follow-up visit by same agency? ElI( Yes �VNo No ❑ NA ❑ NE Adiiitional Cominents'anillor'Draryin s"h i - - 1'; ��a T,S0 51L110q 314 g 12L1104? @.q I I I-a010�.r 9 sloa F14 1y1cq �a a aIa41og II t0 0E-, 514109 a, 1 al-Q4109 all KiO s 109 L4 to 'D I -a Lobs -3 t Cj r I a I s i 4 g WoLir - jGg �tue I.atio4' d- C T 0 3, y= 3 0C176 Page 3 of 3 12128104 Type of Visit 7Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Vlsit LRoutine o Complaint O Follow up 0 Referral O Emergency 0 Other ❑Dye�nJied Access Date of Visit: rrival Time: Departure Time: County: ��i7 INSV "Region: Farm Name: too an.rptl\p !11 Owner Email: 1 Owner -Name: Phone: q19 '+ Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Phone No: Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: [= c 0 4 = Longitude: = ° = ' 0 Discharees & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes �No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ;;YNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ErNo ❑ Yes Z No ❑ NA ❑ NE ❑ Yes J2<0 ❑ NA ❑ NE 12128104 Continued Facility Number: Date Inspection of Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes )21 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ,0 No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: _T�70 k) LAR Spillway?: Designed Freeboard (in): n'} _ Observed Freeboard (in): 0?1+} 5 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ,rNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ONo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes O No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes PNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0"No ❑ NA ❑ NE maintenance or improvement? Waste Application ,�,/ 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes LQ No ❑ NA ❑ NE maintenance/improvement? � 11. Is there evidence of incorrect application? If yes, check the appropriate box below. El2 Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > l0% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 2No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 1214o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes ON ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes [ErNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes J2<o ❑ NA ❑ NE di_,,}41�y...;: §+•..�;j>`;i.'1LFY L}'r &.Er�i-? , CominentsF(refer to questton,#). ExplarnFanyYIJS;answers, andlor�any recommendattons o.r any othercommen.ts. f#r . ' f t. Use drawings oftfaahiy�to better,explatn situations. (use addtttonaPpages�as necessary}: -to F1 <lt. i€tl_;. X 11 R 17 :.� i Reviewer/inspector Name �rti e 1 Phone: rZ L Reviewer/Inspector Signature: aam Date: Page 2 of 3 / 12128104 Continued Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ICJ No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE ❑ Yes YNo ❑ NA ❑ NE ❑ Yes RfNo ❑ NA ❑ NE ❑ Yes [:1 NA [:1 NE [I Yes ��No [3 No ❑ NA ❑ NE ❑ Yes EJ'No ❑ NA ❑ NE ❑ Yes LQ No ❑ NA ❑ NE ❑ Yes E�No ❑ NA ❑ NE ❑ Yes EfNo ❑ NA ❑ NE ❑ Yes ff No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE Additional Comments and/oC DraWin S (o'�(o-0 , 3 _ r. 3-0'% 11 15- - ; �-On ) Sy a a +0 7 a - is -O 1 p Jam'° y . 4 5-W-V _ �, Fajv%k� - 5 ,1 PJ -C S, ass a a/4 attwnA55wz�ta� age 3 of 3 12128104 0. Division of Water Quality Facility Number ( Q Division of Soil and Water Conservation O Other Agency Type of Visit Q Compliance Inspection O Operation Review O Structure Evaluation 0 Technical Assistance Reason for Visit O Routine O Complaint O Fallow up O Referral 0 Emergency O Other ❑ Denied Access Date of Visit: JI (// �T Arrival Time: Departure Time: County: Region: J�� Farm Name: LEE B RCTHE S F 14 Em Owner Email: Owner Name: EnAI _I c) *36 A Q 4 Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: f fill.% AD o TPk a b' t >-Q Back-up Operator: Title: Phone No: Integrator: Operator Certification Number: A (D 14 I Lq a5 Back-up Certification Number: Location of Farm: Latitude: = o = i =61 Longitude: = o = A 0 « Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Design Current Design Current Capacity Population ' Wet Poultry Capacity Population ❑ La er ❑ Non -La ei in Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current-:_ Cattle Capacity Population ; ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the Statc other than from a discharge? ❑ Yes ip�No ❑ NA ❑ NE ❑ Yes F(No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes /11 No ❑ NA ❑ NE 12128104 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ti s Identifier: I-N �0 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3, r ' (.� t� t 5. Are there any immediate thUs to the integrit o any of the struct'u s observed? 5 J (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan'? ❑ Yes 40 ❑ Yes dNo Structure 5 ❑ NA ❑ NE ❑ NA ❑ NE Structure 6 ❑ Yes P(No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? . ❑ Yes VNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes OfNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes VfNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance/improvement? ❑ Yes ❑ENO ❑ NA ❑ NE 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes V1 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drill ❑ Application Outside of Area 12. Crop type(s) U 13. Soil type(s) Pun 10 n— CL O I () C, h gj _ -- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ;!fNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [;�No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes _ No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes L� I o El NA [I NE 18. is there a lack of properly operating waste application equipment`? El yes [ NNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/inspector Name Phone: Reviewer/Inspector Signature: Date: 12128104 Continued 'Eacility'Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 5�� c O c ) a� Nft�20. Doesthefacility failto haveal components CA MP readily available? If yes, check ❑yes ;2(No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Doe record keeping need improvement? If yes, chec the appropriate box below. ElYes 2 No ElNA ❑ NE Waste Applica 'on ❑Weekly Freeboard Waste Analysis L, /s, Analysis PrW aste Transfers Annual Certification Rainfall Xfstocking Arop Yield 120 Minute Inspections X]Monthly and 1" Rain Inspections VWeather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ONo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 0 ElNA [INE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes P(No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ONo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ZNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes VNo ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Additional Comments and/or Drawings: D U7 m - + C yu Nf- CO W-Mh OF 9pump AT£ eoC_ L713 �C7 L'0 00 9 S3 I J `j C) (o a q D L(90-f a I tc�c nA ra 10(e D t C&1&tdaeV5 UWAZLOCCt 30pssr G5A#7C aOOS- ®Ovfo Cahn bl atfoa 1, aQ -va30 a40 270 cte+V1AAflh-,e Arms — e4 a® 6 � L 7 � Lis, 0)a o1 r) �70 a S -So#Ai y L� z � W � �, , 2. ,. t. t7 1 z . U .a► < ' s v 12128104 T_fN1'S`1 FAX COVER SHEET r""^ NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES NCDENR Raleigh Regional Office +Aw^M F.�wme 162$ Mal! Service Center Raleigh, NC 27699-1628 Pages, including cover sheet TO: HafN &Lc4 FAX: 9 1 L/ - �a/a3 07 FROM: rb rn Q o _. �� _ .. DATE: SUBJECT: MESSAGE: If you do not receive all pages, call 912. 791.4200 or fax back to 4 I q - TO - '7159 �s _ * 0 ' ■ # Z. O t 1. : , ❑ Division of Water Quality Division of Soil and Water Conservation ❑ Other Agency Facility Number: 510004 Facility Status: Active I Permit: NCA251004 1 0 Denied Access Inspection Type: Operations Review Inactive or Closed Date: Reason for Visit: Routine County: Johnston Region: Raleigh Date of Visit: 01/17/2007 Entry Time:10900 AM Exit Time: 11:00 AM Incident #: Farm Name: Lee Brothers Farm Owner Email: Owner: Earl Wood Lee Phone: 919-894-8330 Mailing Address: 1245 Oak Forest Rd Four Oaks NC 27524 Physical Address: 1245 Oak Forest Rd Four Oaks NC 27524 Facility Status: 0 Compliant ❑ Not Compliant Integrator: Location of Farm: Latitude: 35"17'45 __ Longitude: 78°26'10" From the intersection of 96 and 50 go South on 50 for 1.4 miles to the intersection of SR 1116. Go past the intersection for 150 feet and turn Rt. on the path, Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Technical Assistance Certified Operator: Earl Wood Lee Secondary OIC(s): Operator Certification Number: 16435 On -Site Representative(s): Name Title Phone Primary Inspector: Inspector Signature: John N Hunt Secondary Inspector(s): Phone: 919-571-4700 Ext.238 Date: Inspection Summary: Records are required for 5 years, older records may be removed. Be sure to up date freeboard log (last entry 1/712007. 21) Must include weather code and initial system was checked at least every two hours of operation during waste applications. Page: 1 Permit: NCA251004 Owner - Facility: Earl Wood Lee Facility Number : 510004 Inspection Date: 0111712007 Inspection Type: Operations Review Reason for Visit: Routine Waste Structures Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard agoon FINISHER 27.00 agoon ISOLATION 27.00 agoon NURSERY 32.00 agoon SOW 27.00 Page: 2 Type of Visit i$1 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit( �31I11outine O Complaint O Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: 114- C-L Arrival Time: g Departure Time: County: c �% of Region: 9RC)_ Farm Name: ' ' f-Y1 G YV+- Owner Email: r Owner Name:' 1 Y� Lje� Phone: i1 Mailing Address: IZ f.-s— oak= 4Qyq%-k— IAA ' Y 0a �,f Physical Address: Facility Contact: f Title: V � e r Phone No: 9 1 C� !22 ~ C31 n Onsite Representative: Vee- -e-, Integrator: 1 ,,� r 2 k 1i Certified Operator: l V �' ' Operator Certification Number: ` Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: ❑ e ❑ ' = Longitude: 0 ° =' = c�vv� ✓ f ¢ fr �` tf C� o, A So r 5 4 t� � �a 1'4 m � 2P i o ` yj C)r, �-y, �� i GN-.:, past- k62, r}e YrP_ c. �� cr, l 5� e n� C` ti ✓ �. Design C►urgent Design Current Design Current Swine C►apacity Population Wet Poultry Capacity Population Cattle C•apac':ty Population ❑ Wean to Finish ❑ La er ❑ Dairy Cow Wean to Feeder b ❑ Non -Layer ❑ Dairy Calf Feeder to Finish ❑ Dairy Heifer Farrow to Wean 26'Do Dry Poultry ❑ Da Cow Farrow to Feeder ❑ Layers ElNon-Dairy ❑ Farrow to Finish El Beef Stocker ❑ Gilts ❑Non -La Non -Layers El Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Co ❑ Turke s Ot e JE3 Turkey Poults ❑ Other 100ther Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes MNo ElNA ElNE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes 10 No ❑ NA ❑ NE ❑ Yes J�)No ❑ NA ❑ NE Page 1 of 3 12128104 Continued I Facility Number: - Date of Inspection I t! I I Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structl4re 2�� Structure 3 Stru ture 4 Structure 5 Structure 6 Identifier: ` y 301 a Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ElNA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ElYes ❑ NA ❑ NE through a waste management or closure plan? MNo If any of questions 4-6 were answered yes, and the situation poses an immediate puhlic health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 1� No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ElNA ElNE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No [INA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 1�No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window Evidence of Wi d Drift ❑^!Application Outsi e of Area 12. Crope s ��� type(s) / 13. Soil type(s) %kc j_v- ` Tyt GY`�e j a C 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes TNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes EfNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 4� No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Comments refer to aestion # : E ( q ) xplain any YES answers and/or any recommendations or any othmr"comments a Use drawings of facility to better explain situations. (use.additional pages as necessary) La 41 r1�.r���Ce�, SX t.+ Av' -L_ y \ 1 Reviewer/Inspector Name ` —1 Phone: FI3 Reviewer/Inspector Signature: Date: a Page 2 of 3 (J - 12128104 Continued Facility Number: — Date of Inspection l 1 [ 1 ! Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes 'EpNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ yes 'PNo ❑ NA ElNE El Design El El the appropriate box. ❑ WUP Checklists II 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes q9 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 'E�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA *E 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 'o ❑ NA r NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ No ❑ NA 1ANE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes �9 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes '®No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes If No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes -E�?No ❑ NA ❑ NE Additional Comments and/or Drawings: �q,�yy,. C-11> L ok ea , ��� rf , C_ A N,--� 3 t \ _NIn wc)'f� .7A cl La. v\ �Q-l�`f d Y��r 11 �2C��� .�- �J� 1" ���1�fr1 jrGl►^ e.�r` ' F1 Pa e I of 3 11 ` j 12128104 q Y ✓r ❑ Division of Water Quality Division of Soil and Water Conservation ❑ Other Agency Facility Number: 510004 Facility Status: Active Permit: NCA251004 1 ❑ Denied Access Inspection Type: Operations Review Inactive or Closed Date: Reason for Visit: Routine I County: Johnston Region: Raleigh Date of Visit: 03/29/2006 Entry Time:08:10 AM Exit Time: 09:00 AM Incident #: Farm Name: Lee Brothers Farm Owner Email: Owner: Earl W Lee _ Mailing Address: 1245 Oak Forest Rd Four Oaks NC,27524 Physical Address: Facility Status: E Compliant ❑ Not Compliant Integrator: Location of Farm: Latitude: 35°17'45" Longitude. 78°26'10" From the intersection of 96 and 50 go South on 50 for 1.4 miles to the intersection of SR 1116. Go past the intersection for 150 feet and turn Rt. on the path. Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: Earl W Lee Operator Certification Number: 16435 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Earl Lee Phone: Primary Inspector: John N Hunt Phone: 919-571-4700 Ext.238 Inspector Signature: Secondary Inspector(s): Date: Inspection Summary: POA for sludge maintenance, 7/26/04 Soil samples 417/04 Waters Lab 3/13106 Waters Lab WU Plan Lanton soils hydraulic limit is 0.48"/event needs to initial for inspections at least every two hQurs. 7) Take goo oo a a spo s w ere agi a or was placed that no erosion of lagoon liner has occurred. Records are require for 5 years. Page: 1 Permit: NCA251004 Owner - Facility: Earl W Lee Facility Number: 510004 Inspection Date: 03/29/2006 Inspection Type: Operations Review Reason for Visit: Routine Waste Structures Type Identifler Closed Date Start Date Designed Freeboard Observed Freeboard Lagoon FINISHER 48.00 agoon ISOLATION 36.00 agoon NURSERY 42.00 agoon SOW 51.00 Page: 2 Permit: NCA251004 Owner - Facility: Earl W Lee Facility Number. 510004 Inspection Date: 03/29/2006 Inspection Type: Operations Review Reason for Visit: Routine Dischar9es & Stream Impacts ..................................................... ................. Yes No NA NE 1. Is any discharge observed from any part of the operation? 1101111 Discharge originated at: Structure Cl Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. is there evidence of a past discharge from any part of the operation? 1101111 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 3 Permit: NCA251004 Owner - Facility: Earl W Lee Inspection Date: 03129/2006 Inspection Type: Operations Review Facility Number : 510004 Reason for Visit: Routine Waste. _Application Yes No NA NE PAN? ❑ Is PAN n 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Coastal Bermuda Grass (Hay) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Blanton Soil Type 2 Uchee Sail Type 3 130jac Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ Cl ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17. Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ■ Cl ❑ If yes, check the appropriate box below. WUP? ❑ Page: 4 Permit: NCA251004 Owner - Facility: Earl W Lee Facility Number: 510004 Inspection Date: 03/29/2006 Inspection Type: Operations Review Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ❑ Inspections after> 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ❑ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ■ ❑ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ■ ❑ ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ■ ❑ ❑ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 5 Permit: NCA251004 Owner -Facility: Earl W Lee Inspection Date: 03/29/2006 Inspection Type: Operations Review Facility Number : 510004 Reason for Visit: Routine Other Issues Yes No NA NE 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ ■ ❑ ❑ 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ ■ ❑ ❑ 33. Does facility require a follow-up visit by same agency? ❑ ■ ❑ ❑ Page: 6 I Type of Visit,W Compliance Inspection O Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint O Follow up O Referral 0 Emergency O Other ❑ Denied Access Date of Visit: a Arrival Time: Departure Time: County: �+-� "� Region:/"` Farm Name: L� -100z- Owner Email: Owner Name: — Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: _Clgfu �L-r_ Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine Phone No: Operator Certification Number: Back-up Certification Number: Latitude: 0 0 = ' = Longitude: = o = ' Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer 2.Ztj ❑ Non -Layer ❑ Wean to Finish ❑ Wean to Feeder ElFeeder to Finish t(!;2(!> ❑ Farrow to Wean cQD ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ElBoars Other ❑ Other i Dry Poultry ElLayers El Non- Layers ❑ Pullets ElTurkeys El Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ElApplication Field ElOther a. Was the conveyance man-made? Design Current Cattle Capacity Population El Dairy Cow El Dairy Calf El Dairy Heifer El Dry Cow ElNon-Dairy ElBeef Stocker ElBeef Feeder ElBeef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2, Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 12128104 Continued .,t- Facility Number: 51 — Date of Inspection /$ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 a -! LD 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes [ No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes VN. ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit'? ❑ Yes �rNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes VfNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [ No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes INo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) G.. 13. Soil type(s) j= 144. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination',[] Yes []No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Reviewer/Inspector Name �l..f: 1� +1 �i� �; � ' Phone: 7f/ c%Z 5/0 Reviewer/Inspector Signature: Date: 2 '� 12128104 Continued Facility Number: S(— Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE it 03 20. Does the facility fail to have all components of the aj P readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ g Other 10 p 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑Weeklyz" Yreeboard ❑Waste A�YAysis ❑ 2 Anna zis ❑ Waste Transfers ❑ Annual Certification ❑ Raifall ❑ Stocying ❑ Crop/field ❑ 120 Minute Inspections ❑ Monthly and l" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? `/�aq ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? Yes ❑ No ❑ NA El NE 26. Did the facility fail to have an actively certified operator in charge?Y ❑ Yes ❑ No ❑ NA ❑ NE 2T Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? 7117/-', `I ❑ Yes 2�No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or.air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ,� No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Adtlitianal Comments and/or Drawings z� T-s-Cacs-9 S &" �� c+' A-ED �!L_ � iF �4i���s �Il � A114-1 r, G a LDEf—, CA 34 £rn a,rED !t a! ti/ES i • �f A T't� S Z h � G E A b'� l.a CA-�r `� �S' T' I-��R-"7` t�.T E'arLF ' �'� (_l_.o � � G� I j B� /aSug srrr�rh.t. rf�GA-T°IV_ v(A�csZ '40e UT rl'o +` .� L� z s'r �. �'� taP— 0 vj Q,- 12128104 Type of Visit Snompliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit Ooutine O Complaint O Follow up Q Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: P Time: ' 3 Nat O erational O Below Threshold P4�ermltted J'Certtified [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: ...... FarmName: .............G.i ...ld '' 1 ... �r...........--•-.-•--••-----------------.--------------...... County:........�Lr.�''. ....�.................... ... Owner Name: Phone No:........ MailingAddress:........................................................---•-........................................................................................................... .............. .......................... FacilityContact:.............................................................................. Tide; ................................................................ Phone No:. '+ � ..Z..-.. z.3. 1............ Onsite Representative: K- Integrator: t p 14( i.........c......................................................................... ................................................................... Certified Operator: Location of Farm: Operator Certification Number: Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • & 46 Longitude • ' 64 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes /0 'No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes iNo b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes E!rNo c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: lk) i, - Freeboard (inches): 3 121.12103 ❑ Yes I— No ❑ Yes XNo ❑ Yes eo No ❑ Yes RrNo Structure 6 Continued Facility Number: r(— Date of Inspection i z 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑ NO seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes FINo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes o No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes A No elevation markings? Waste Application 10. Are there any buffers that need maintenancelimprovement? ❑ Yes No 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Ov oad ❑SFrozen Ground ❑ Copper and/or Zinc 40b 12. Crop type G ,�F-M U v 14- is eti S' - 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes �' o 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes P No 16. is there a lack of adequate waste application equipment? ❑ Yes j;rNo Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ;:Wo liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes PNo 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes PNo roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes JZNo Air Quality representative immediately. Reviewer/Inspector Name Reviewer/Inspector Signature: Field Copy ❑ Final Notes Date: I I 17/17/117 I'-fi.-A Facility Number: — Date of Inspection 11 dz- Required Records & Document. No 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? []Yes P 22. Does the facility fail to have all components of the Certified Animal Management Plan readily available? Waste Oe/ WUP, checklists, design, maps, etc.) 744 az ❑ Yes ;'No 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ONO ❑ Waste Application ❑ Fre,�fioard ❑ Waste App ysis ❑ Soil Sampling 1115 JIQ4 24. Is facility not in compliance with any applicAle setback criteria in effect at the time of design? ❑ Yes &NO 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes 9To 26. Fail to notify regional DWQ of emergency situations as required by General Permit? El_ Yes / o (ie/ discharge, freeboard problems, over application) 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes PIKO 28. Does facility require a follow-up visit by same agency? ❑ Yes 0"No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 01No NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) 13'fes [:]No 31. I€ selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Q-No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑�I�o fi 34. Did the facility fail to calibrate waste application equipment? 4 j 1 aq ❑ Yes // 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes <o ❑ StockinbXorm ❑ Crop YielgFro*rm ❑ R Afall ❑ Inspection After I" Rain 11120 Minute Inspections ❑ Annual Certif-on Form tZ No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. 9--U xt'ri J" k � orT S L �4 g S �r 1cA t► in o �' 4D A -w-q f T•-Q P— C,,t P 1} S in c M J�>} brt — cuazJ Ftzt aCd'FW fE. Fc - a r>a .S- 1;+ 9CLP'5' J" "Vk' r r `r►k'V-,J Ton �7 � NHS S.�IS r.i 1t'"r.D P�.A-.,� v� �tfii" 0►.1 Fes_ S t. V QG E R'�AJC-"r�`a n% Jo t1,.?S-rc-Kr S vW CA 14LL, F-t-�;_,Lt.S R INM<_'�> ' L o sA '. Iz) C.iA-sV__ for ra ,.JsrALS-- r.`.) ;3izX� KAQA 5 12112103 Type of Visit gompliance Inspection Q Operation Review 0 Lagoon Evaluation Reason for Visit ,ORoutine Q Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit: Facility Number 0 'plFe`rmitted Cer//tif��ied [3 C/onditionally Certified [3 Registered 3 Pnrm Namr. 4 Owner Name: Mailing Address: Time: 9 Date Last Operated or Above Threshold: County: '4g10 A—t r - ft./ Phone No: Facility Contact: ritle: Phone No: Onsite Representative: Integrator: 1 6 4` 35-'- __ Certified Operator: Location of Farm: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude a ° 44 Longitude 0 �� �44 Design, Current Design Current Design Current Swine Ca acft vi''Population Poultry Capacity Po ulation";y Cattle Capacity Population ❑ Wean to Feeder ❑ Layer'� ❑Dai El Feeder to Finish ❑ Non -Layer I I on -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW of Lagoons ❑ Subsurface Drains Present gtP nds /.Soltd`Fr`aps�_ .K❑ No Liquid Waste Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. 11'discharge is observed, what is the estimated flow in gal/min'? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? Area U Spray Field Area t F• ir,� i ::+ 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: l�JCSi� r� "t IF t 5C 1_Ao 1111 Freeboard (inches): 3/_ ❑ Yes No ❑ Yes j0"No ❑ Yes P No ❑ Yes o ❑ Yes VNo ❑ Yes ❑ Yes Io tfJ No Structure 6 05103101 1Continued Facility Number: Sf — Date of Inspection Z c� 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste AIRplication 10. Are there any buffers that need maintenance/improvement? 11. Is there evident e�of�over application? ❑Excessive Pending El PAN ❑ Hydraulic Overload 11 0 12. Crop type 4CO- gasp 13. Do the receiving crops differ with th se designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents ,,��ff�� 17. Fail to have Certificate of Coveragd�&C� geral Permit0t�or other Permit readily available? `s 'f 5� w 18, Does the facility fail to have all components of the Cetrtl1ed7Anurial Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) _9.��6 b � 19. Does record keeping need improvement? (ie/ irri�on, fre�ard, AA anza.i lyslisx;L &isoiisar446 reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22 F'l t' IDW f 4t' ' III,I-IP 49 ❑ Yes VNo ❑ Yes �ffNo ❑ Yes )ZfNo ❑ Yes ZNo ❑ Yes ""0 ❑ Yes _01No ❑ Yes '�_drNo El Yes 16 No El Yes P(No ❑ Yes ❑ No ❑ Yes ❑ No El Yes �_'Ko [I Yes ErNo El Yes XNo ElJQ Yes No [:]Yes 2rNo El Yes ;2"No El Yes e No ai to no �fy regiona Q o emergency si ua ions as require y enera erin ❑ Yes f2"N'o (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ,LJ No 24. Does facility require a follow-up visit by same agency? ❑ Yes �lo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 10 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Use;dre ritloni'Aus d Copy ❑ Final Notes 'Dr., T-A I\-t0 f4-Tf s o3� P(; . 3 '50 - „f j � t T_ R44 s a _"r.r+" �s qEw 7-. L3E initpu._m�erw 4;l , w T)N- t ss A'4cE� ?3� TAB PXp"tT-, Reviewer/inspector Name Reviewer/Inspector Signature: JNr A Date: 05103101 Continued Facility Number:) — bate of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge atior below ❑ Yes P(No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes Vo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, El Yes;'No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes 14 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes o 31. Do the animals feed storage bins fail to have appropriate cover? ❑/es No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ No �. �huna . °ommentsMan ors Faw nhg.• ;.... .:. ^''� ..... � +w�.�f r aCAz. S tiati 4 AL �Q IF %P J f3C-r.�C.) L -fQArJS F 'S aF- W A 5 t '� 54c-if�ry �►���� Sys QGt` Ceti r--;chi W-a ; 4 MPt a� T• y3L� �.�Q���a.C4> w�1r4 L.Eltf.�4 i S iSSD ' . a c91- # 0.i G L4 r% C-r£/Z- R4 pp a ,Z 05103101 -71 ►6/02 Type of Visit (Xtompliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit 12)/Routine 0 Complaint C) Follow up (:) Emergency Notification 0 Other ❑ Denied Access ©ate of Visit: �l oZ time: ' J S Facility Number �1 Not O erational Below Threshold O ermitted 9-certified O Conditionally Certified 0 Registered Date Last Operated or Above Thr hold: Farm Name: L £ County: —11baha Owner Name: Mailing Address: Facility Contact: Title: Phone No: Onsite Representative: E.4tz_t . "E-Fi Integrator: Phone No: Certified Operator: Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0a 4 GG Longitude 0 06 0« Design Current Design Current Design Current a aci P,o u[ation to Feeder P,oultr...: , Ca aci ❑ La er P.o ulWean ❑ DairyFeeder to Finish ❑ Non -La er ❑ Non-DaiFarrow to Wean Farrow to Feeder rEl Other Farrow to Finish i2 2iB Total Design Ca�aCitGilts Total SSLW Boars Number of is ❑ Subsurface Drains Present ❑ La oon Area ❑ Spray Field Area Holding Ponds / Selid Traps ❑ No Liquid Waste Management System Discharges $c Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts"or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus s�brm rage) less than adequate? ❑ Spillway tructure 1 ' .Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Ad a�✓ 2s z�-.� c�._d Freeboard (inches): .j y' A�@ ❑ Yes �1 ❑ Yes [Io ❑ Yes fo ❑ Yes FZrNo ❑ Yes P110 ❑ Yes 124o ❑ Yes � O Structure 6 05103101 I Continued Facillty Number: S —ZI Date of Inspection 7 t 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste ADnlication ❑ Yes ONo ❑ Yes 40 No ❑ Yes ;ifNo ❑ Yes ONO ❑ Yes 2 No 10. Are there any buffers that need maintenance/improvement? ❑ Yes �plf4o 11, Is there evidence of over application? 4dD El Excesses Ponding El PAN El Hydraulic Overload ❑ Yes �J No 12. Crop type C , 9�MA?P, Aftl / S &- _ 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes j'eTNo 14, a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes 12''Io 16. Is there a lack of adequate waste application equipment? ❑ Yes E'1<0 Required Records & Documents Certificate ,,�__,/ 17. Fail to have of Coverage & General Permit or other Pe g�i readily available? ❑ Yes idNo 18. Does the facility fail to have all components of the Certified An nal W0 to Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 1, ❑ Yes ,,��,,�� n s q J e�,�/ Z keeping wam ��soif El ,P<O No 19. Does record need improvement? (ie/ irr tion, fre6 ard, anali eampale r¢�b5ts) Yes 20, Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes [;Vl o 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ONO 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes N (ie/ discharge, freeboard problems, over application) ', 23. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? ❑ Yes J:;Ko 24, Does facility require a follow-up visit by same agency? ❑ Yes 21Io 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 2<0 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Carriments (refer In quest€on'#) Expplain any YES answers,and/or any,recommendations orlany other,comments y r Use drawingsof facilitytobe'tter,explaln {nse addttionalpages=as necessary) r .re teld Copv mal Notes T--q, N%14.r_ C-jMA_C,. Y 'bi� C-b,14P Reviewer/Inspector Name Reviewer/Inspector Signature: a, U Date: 05/03/01 1 Continued Facility Number: —TO Date of Inspection '% r Printed on: 1/9/2001 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes 1plqo liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes )21110 28, Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt_, ❑ Yes ,Q�No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes ,®Mo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes 12Wo 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes J2No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ZW6 5100 type of Visit Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit 94foutine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number 1 Date c)r visit: � fi � ► 'Time: 10 Not Operational Q Below Threshold El' -permitted ;Kertified 0 Conditionally Certified [3 Registered Date Last Operated or Above Threshold: .................. Farm Name: C- E-e- 7-g-zx . County: J A'4 .ra-a,.t ................I—,..........................................................................p ..................................................._........ . OwnerName: ................................................... ....................................................................... Phone No:....................................................................................... Facility Contact:........................................................ .Title: Phone No:.................................................... MailingAddress: ................................................ . .. . .............................................................................................................................. ........................ ........................... Onsite Representative: 9C.Er.... Integrator: ....................................................................................... Certified Operator:................................................................................................................ Operator Certification Number:......................................... Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude a • ii Longitude 0 4 b4 L Design Current Swine Canacitv Ponulation ❑ Wean to Feeder q 1 e $ Z a+s ❑ Feeder to Finish 6 IZD .5 `f q a ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer ❑ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity TatAl SSLW. „Number of Lagoons ; [] Subsurface Drains Present ❑ Lagoon Area ID Spray Field Area Holding Ponds / Sohd Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes "NNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes Pf"No h. If discharge is ohserved, did it reach Water of the State'? (If yes, notify DWQ) ❑ Yes xfNo c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes j2NO 2. Is there evidence of past discharge from any part of the operation? ❑ Yes XNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ; N 01 /01/01 Continued r Facility Number: 5� — Date of Inspection Z- o Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes ;eNo Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structurc 6 Identifier: �i° � � (,3 o LA rI'a.! fb, 4" ..................... 0 Frecboart[ (inches) ...................................�.1..............,.......�.�...............................��...................................................................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes XNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes ❑ NO (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes VfNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes Z No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes gNo _Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes Fl fqo 11. is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes P'No 12. Crop type G , 43C4^ j(,.)A OA-% / s- (P�-,1 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes P No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination`? ❑ Yes ❑ No No c) This facility is pended for a wettable acre determination? ❑ Yes fZ 15. Does the receiving crop need improvement? ❑ Yes ONO 16. Is there a lack of adequate waste application equipment? ❑ Yes eNo 17. Are rock outcrops present? ❑ Yes ❑ No 18. Is there a water supply well within 250 feet of the sprayfteld boundary? ❑ Unknown ❑ Yes ❑ No ❑ On -site ❑ Off -site Required Records & Documents 19. Fail to have Certificate of Coverage & Genera PJA or other Permit readily available? ❑ Yes ;3 No zj r OD 20. Does the facility fail to have all components of the Certified Antmil Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes Z_No all 21. Does record keeping need improvement? (ie/ irri tion, fre board, wa,ste analysis & soil'�� sarttphe reports) ElYes No 22. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes , No 23. Did the facility fail to have a actively certified operator in charge? ❑ Yes ❑ No 24. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ONO 25. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes VNo 26. Does facility require a follow-up visit by satue agency? ❑ Yes ,(No 27. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 2"�Io Odor Issues 28. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes No liquid level of lagoon or storage pond with no agitation? 29. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ; No 01/01/01 Continued Facility Number: S) - I Date of inspection z a Printed on: 1/4/2001 30. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 31. Is the land application spray system intake not located near the liquid surface of the lagoon? 32. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 33. Do the animals feed storage bins fail to have appropriate cover? 34. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? []Yes ,fNo ❑ Yes VNo ❑ Yes J'No ❑ Yes [ZNo ❑ Yes d No No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Reviewer/Inspector Name r% Reviewer/Inspector Signature: Date: OUOI/01 , a D:Dtrns�on of Soelrarid Water,Conservahvu =. Co�ruplj'hCe InSpect>Eo t d *SI rR ! . ��y '" 'ai( . >E.d .3'.1 ,:i:' i', 3 ,a€i, n3 Dev><ston Water3 , uale -, Com IianceIns ectaon 6 < € {ili d d d t3'; , F P ttF 1 .. �.. 7,.f �,?'rB d� ther'A ' O e' ation Revlevr g. yr p.. % s1� } ry h 3 It Yi IT -. iili h�tt 4 E k (d „. ': �i, �. f'fi •l.i } 3 �, �': .��-. i43 iir�}��i1 R 3: °K'. 5�.'itl�$k ...F outine 0 Com taint 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review 0 Other Facility Number $" Date of Inspection Cz Time of Inspection o; 0 24 hr. (hh:mm) Aw fe Per fitted [] Certified © Conditionally Certified [3 Registered 10 Not O erational Date Last Operated: ....................................... ..................................................................... Farm Name: Lam- �Rt�'i}1 E- I`g. County: 4i..f?.`..'S'r'.�?.^4....................... ........ Owner Name :............................... ....................... ....... ...... Phone No FacilityContact: .............................................................................. Title: ................................................................ Phone No:................................................... MailingAddress: ..................................................................................................................... ..................................................................................... .......................... Onsite Representative:..... f9PaL-...(, E................................................................... Integrator: ............................................... Certified Operator:.................................................:.............................................................. Operator Certification Number: ........ ....... ........................... Location of Farm: .......... ... .............. ..... ............. ......... Latitude 0 9 Longitude 0 ° 64 Destgq _; Cur�kit Design Curireot,- 3ik'i' Destgn Current Swine Capacity,Po ulation Poultry Capacity- Po `illation Cattle Ca "aci "'`Po„''nlatton' Wean to Feeder ❑ Layer ❑ Dairy t; Feeder to Finish ❑ Non -Layer ❑ Non -Dairy Farrow to Wean < ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish 41 Total Design. Capacity,;,,i ❑ Gilts ❑ Boars :•Total $SLW> Number,4'La erns ❑Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area Holding Ponds'/Solid Tra i No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? % Discharge originated at: El Lagoon ❑Spray Field Other a. If dis barge is observed, was the conveyance man-made'? a. If di+ b. If discharge is obscrved, did it reach Water of the State'? (If ycs, notify DWQ) c. If disch ai&Js observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (ll'yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure l Structure 2 Structure 3 Structure 4 Structure 5 Identifier: s.� 6 rJ2� ft�I'�1-I rSo Frcebottrd (inches): .................................... ............................. ............................. .` ....................4i:..------------- --- ............................. ... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Ycvl ylCro seepage, etc.) "� 3/23/99 Continued on back ,ryes ❑ No ❑ Yes 12'lgo ❑ Yes �o ChAS4-n .`Yes ❑ No ❑ Yes ZNo ❑ Yes PNo ❑ Yes to Structure 6 Facility Number: — Date of Inspection 6. Are there structures on -site which are not property addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type 13. Do the recei, 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This 'facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available'? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste am sis & soil s441e reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did ReviewerAnspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? Rio iola�igris:o de ficiencies were h,0*(01• ii(ir'ing 3;his'visit; • Yoi1_. ili•>cec.. trio; . ... . • , . CID res' orideit& about: this :visit: Vol ❑ Yes )!fNo ❑ Yes •ZNo 0yes ❑ No ❑ Yes ;2_1q0 ❑ Yes z4�!rNo ❑ Yes 21 o ❑ Yes 2No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ro ❑ Yes eNo ❑ Yes ONO ❑ Yes eNo ❑ Yes ❑ No ❑ Yes ZN' o ❑ Yes Pf10 ❑ Yes ,0/No ❑ Yes PING ❑ Yes1"ITO ❑Yes 42No I� �,K0LfC., t OF FI.(ASlJ 9`A,dk-- Af -r,aLA aae.,4 D+D J01- AZE4c.." 14444"�A C49 bJ Asa To WAI(Lfl,"21 Tics TIaaT Set- �s�+Ar fs CQ,4'r4.^rCP AL44G wr'T�l aAA } 4,p Q-4Cd..5eV_V Qkb FS& es!;rIvr e To 'F�-D 7 r> - Atx.'F� �S L�S`S + a�1 ?s- is �`A-c� �Pt.C. Ar ..;e-o rrf oz-n)GGo2) rt.c,,my ni RA R., Sv P£ r APY c,i M c �o �� �5 AS R 7 SC A-J X. 4 0L r , Reviewer/Inspector Name �. Reviewer/Inspector Signature: - /f�_, r4 . I&V —It— Date: Facility Number: — Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ;?"No liquid level of lagoon or storage pond with no agitation? 27. Arc there any dead animals not disposed of properly within 24 hours? ❑ Yes PN 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes P 0 roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes dNo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes ;5�No "o 31. Do the animals feed storage bins fail to have appropriate cover? El Yes 32. Do the flush tanks lack a submerged till pipe or a permanent/temporary cover? ❑ Yes -,E!fNo r i' Division'of Soil and Water Conservation, - Operation Review ` O'Drvisyorr,of Soil and Water Conservation -Compliance Inspection [3`Division,of Water Quality - Compliance.Inspection '1 Other'Agency-Operation Review �. Routine Q Cum laint Q Follow-up of DWQ inspection 0 Follow -tie of DSWC review Q Other Facility Number � Date of Inspection Time of Inspection 24 br. (hh:mm) © Permitted C3 Certified © Conditionally Certified Q Registered 113 Not O erational Date Last Operated: FarmName . ......................... ................................................................................... County:... .................................... Owner Name: Phone No: .................................................: FacilityContact: .............................................................................. Title:................................................................ I'Itone No: ................................................... MailingAddress:.................................................................................................................................... .......................... OnSite Representative: ..�.Ifr�.... '^ integrator:....................................................... ........Z.�.g...... ..........................A Certified Operator : ................................................... ............................................................. Operator Certification Number:.......................................... Location of Farm: 11 Latitude ° •° Longitude I t • : Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer ❑ Dairy ❑ Feeder to Finish ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑Other Farrow to Finish Total Design Capacity Gilts ❑ Boars. Total SSLW Number of Lagoons I'l 10 Subsurface Drains Prese2LJICI Lagoon Area ID Spray Field Area Holding Ponds / Solid Traps , ❑ No Liquid Waste Management System Disch_ argU & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: El Lagoon [I Spray Field Zother A, y ,eyes ❑ No a. If discharge is observed, was the conveyance man-made? � GY GL ❑ Yes �TNo b. If discharge is obscrved, did it reach Water of the State? (It' yes, n+)lify DWQ) ❑ Yes alloj c. if discharge is observed. what is the estimated tiow in gal/min'? S TO P16-0 W)+EAJ - &0 { hTq d. Does discharge bypass a lagoon system? (Il'yes, notil'y DWQ) [ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? /❑ Yes ❑ o 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 14�No Wastc Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes o Structure I Structure 2 Structure 3 Structure 4 Su•ucture S Structure Identifier: Freeboard(inches): ...r� ..................................11.....................".1... ............................ ..v...... I..... ... ........... I.................... ................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑40 seepage, etc.) 3/23/99 Continued on back Facility Number: j- / — %' Date of Inspection , 6. Are there structures on -sire which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes dNo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement'? ❑ Yes VNo 8. Does any part of the waste management systc other than waste�uctures require maintenance/improvems� ent? Yes []No �f-•A;Ns c1 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes /`1No Waste Application 10. Are there any buffers that need maintenance/improvement'? ❑ Yes P10 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes/No 12. Crop type 13. Do the receiving crops differ'with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes o 14. a) Does the facility lack adequate acreage for land application? El Yes No b) Does the facility need a wettable acre determination'? ❑ Yes /No c) This facility is pended for a wettabie acre determination? El Yes (�,NI o 15, Does the receiving crop need improvement? ❑ Yes Q�1V0 16. Is there a lack of adequate waste application equipment'? ❑ Yes jA Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes o 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ YesNo 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes o 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes 1,11 0 23. Did Reviewer[Inspector fail to discuss review/inspection with on -site representative? ❑ Yes // Vo 24. Does facility require a follow-up visit by same agency? ElYes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes �fo �; i'Nd •yiolations;o;r dgficiertcies Were bot;ed• during 4t is;visit' • :You wiil•>^eeeiye tid further COI'reSpond(enCe. about this :visit' : . ' . ' : ' . ' : ': ': : ' : ' : : . C43Fk1 �F H w' ajk, z,d. "1L'� �tz it li,j YES"answersand/or an .recommendationstor an othrcomments omments {refie.to9uestion#) Ex lain an onapaesarexpEamsiaevvng'sf failiqetteations. (use additigsecsary) D)`�L1f13,CG g �J-Gt✓Ep A(/t�ini �A �/�rlr r E�✓1'c7t try Ct ��4 �T��iji9i�1•� 7 1b(,( ¢2G1 '� G,9��0.✓5 , )DID t/oT !Z� .gc1t S u,er�e�f1Lve, (iDT i�A) E`f Le!%}(re�,4) Oto I�ISGI{/3/ZG fQ I�OY, %9�ji/,�t/GC]l4 �` 1 Vi 0r1 P 13 Reviewer/inspector Name - L Reviewer/Inspector Signature .ZO2/4,1,-V. Z__ Date: 3123/99 ' Facility Number, Date of Irsspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ;ZNo liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours'? ❑ Yes VNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes GF`No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes [lo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes ;?"'No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes VIo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover'? ❑ Yes ONo 'AdditIona , oinmen nn or, ravings .s a's';�,,I}tir.`.�`''�, �?�`khEl fo w 3/23/99 r 1 Division of Soil and Water Conservation Operation Review 4 QD1VISlon Of sotl an[I Water -Conservation -, Co1np11:InCe inspection- tvision of Water; Quality Compliance Inspection h 3 1 Other Agency -Operation Review. O Routine O Complaint O FoltoNv-tip of 1DWQ inspeetit)n O Follo+ti'-up of t)S%VC review O Other Facility Number Date of Inspection /6 Time EMI' Inspection z =30 24 hr. (hh:mm) 77 &PermittedCertified [] Conditionally Certified [3 Registered [3 Not Operational Date Last Operated: Farm Name: .............oT}�E-(Z. S C onnry:........ Jan/S. Tb"t........................................... ............................................................................................. Owner Name: Phone No: . Facility Contact: Title• Phone No: MailingAddress...................................................................................... Onsite Representative:.4.I� R,.t.. ,.,.5... .k...................... .... ... Integrator:....! 11-� �L/.1.......................................... Certified Operator:................................................................................................................ Operator Certification Number:.......................................... Location of Farm: Latitude Longitude • �' �" Swine Capacity Population ❑ Wean to Feeder 3 O7 ❑ Feeder to Finish I Zo ❑ Farrow to Wean 5� ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars .... ...... ------------- Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer JE1 Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other Total. Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present I ❑ Lagoon Area 10 Spray Field Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System 71 Discharges & Stream Impact�4 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. II` discharge is observed, was the conveyance man-made:' h. If discharge is observed. did it reach: ❑ Surface Waters ❑ Waters of the State c. If discharge is ohserved. what is the estimated [low in gal/thin? d. Does discharge bypass a lagoon system? 2. Is there evidence of past discharge from any part of the operation'? 3. Were there any adverse impacts to the waters of the State other than from a discharge'? Waste Collection & 'Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Structure 3 Structure 4 Structure 5 ldentificr: IJgAS£di 47AX"e.jrOIG i-1,J'5NI :I(, 1Se L.AT'ca/I Freeboard (inches)..............�3,.,�5...,..................3.:..Z•. ..............'Z-;2'. .r.................. -...................._.................... ......... ❑ Yes zNo ❑ Yes Z No [:]Yes VNo ❑ Yes 0 No ❑ Yes XNo ❑ Yes [a'No ❑ Yes PNo Structure 6 1/6/99 Continued on back 3. Facility Number:. 151 — Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? S. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and rninimum liquid level elevation markings? 16 ❑ Yes PK ❑ Yes 2fNo ❑ Yes ,rNo ❑ Yes No ❑ Yes �No Waste Application 10, Are there any buffers that need maintenance/improvement? ❑ Yes WNo 11. Is there evidence of over application'? ❑ Ponding ❑ Nitrogen ❑Yes PTIo • B zszn J O ll� 12. Crop type ......................................................................................................................................................................................................................................... 13, Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. Does the facility lack wettable acreage for land application? (footprint) 15. Does the receiving crop need improvement'? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ic/ irrigation, freeboard, waste analysis & soil sample reports) 20. is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a certified operator in responsible charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ic/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency'? N�o.v'Wations -or. deficiencies .were rioted. during .this-visit...You valfretceive na further. -... eorrespaidenee; about; this visit :..:.. : . . . . Uqa ) p any y,eco mmen ationY s or any.other Comments r, omme sea(fflrawirigs oacity to better ex lain'stuatons {use additio al ages as necessary): ❑ Yes ,&No ❑ Yes ;YNo ❑ Yes 2No ❑ Yes ONO 2''Yes ❑ No ❑ Yes 2 No ❑ Yes ;2 No ❑ Yes Vl' o ❑ Yes Ofio ❑ Yes Ca"No ❑ Yes ONo ❑ Yes ,`No 1 Pc� A -,q or r--Aar 4jj Gz04C.R_,4 t~ 'PCR,,, r, dN trAf- FPAM. 3� S,r,o.V- 'rd r—M♦ UP 01'_rM OEIEl-Ly r4q--0, AQD L,"Ct ILoG . t2><tAt-i %CAI SmAet., 01 `OE)r�'r_p r/ t,,s.u, P. W4. TrCP.l FD(L- F"U_, AC� �+va Wo LAy�� d-Iw— ts,n.r Pl'PE Ar N 'l-2AUrC_UEa-] i?r. R-A66fp qz�a2 wcvf-A6(t c Ate, 3E soe_� ra ALLoW �F-- 17Afti -- tool 4;;F(--� Fezo^ a-,Li-S n1640./,.' SPxAll P►'P& r;/Ta L►46on•✓.r Reviewer/inspector Name 'ro J �j 4 . A UA T- S 7 1 tf'--ro Revi ewer/[ nspector Signature: ta4c_- ,) ' i ,,,,,,---- Date: 3J rb� Qq 11/6/99 [ 0 / 15 Gcl=0� >,)4, (e� QrRoutine O Complaint O Follow-up of DWQ inspection O Follow-up of DSWC review O Other J Facility Number l Date of Inspection Time of Inspection E= 24 hr. (hh:mm) D Registered E2rCertified 0 Applied for Permit E Permitted 113 Not Operational I Date Last Operated; Farm Name: ........ '-�%�..... ...................................F:.!'a-m...................... County:..........,. ?.`'l.R .. ................... Owner Name:........... 1^il„Y 4........... 4-�.,.......................... ....................................... Phone No:...�. .J� ....5.�. ... ....... ................. Facility Contact: ....... EJYJ......... .. Title: .......................... Phone No: 2 4 S �D�!'eS �^ Mailing Address: 1 '�. .......... .... ..... .ur....�C ........M-C, .2�.7.2y Onsite Representative:........i........ �— ........... Integrator :.............. ............. Certified Operator, .............. 1..--.w..L .L�............................................ Operator Certification Number ;...... ----........- Location of Farm: F........................................... .............................................. ....................................................................... .......................................................................................................... , , Latitude ©a ' " Longitude ®• ©S " General 1. Are there any buffers that need maintenance/improvement? ❑ Yes 12<0 2. Is any discharge observed from any part of the operation? ❑ Yes [ No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/hoiding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the. facility fail to have a certified operator in responsible charge? 7/25/97 ❑ Yes ®No ❑ Yes ONO ❑ Yes O/No ❑ Yes Q/No ❑ Yes Mo ❑ Yes GI-fio ❑ Yes Mo ❑ Yes No Continued on back a L., Facility Number: — 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes [INo Structures (Laeoons.Holdini! Ponds. -Flush Pits. etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes d No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:..i'+lr .... M ..3i.{r�....................................................................... ........ .....0 ��. -. ".......c r Freeboard(ft): R...........0....................f ��..... I ............. ............... �:.•..3.......... ........`[a.5.............. ........................... ......... .................................... 10. Is seepage observed from any of the structures? ❑ Yes E1 No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes UNo 12. Do any of the structures need maintenance/improvement? ❑ Yes ❑No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes 0 No Waste Application 14. Is there physical evidence of over application? ❑ Yes O No (If in excess of WMP or runoff entering waters of the State, notify DWQ) Jd�,4,�-ram 15. Crap type G.............................. ......... .....................-................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ElYes [No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes Ld'No 18. Does the receiving crop need improvement? ❑ Yes Q No 19. Is there a lack of available waste application equipment? ❑ Yes BNo 20. Does facility require a follow-up visit by same'agency? ❑ Yes 9-/Io 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes [allo 22. Does record keeping need improvement? ❑ Yes B/No For Ceilified or Permitted Facilities Only,.,� 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes M No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes Q,, o 25, Zere any additional problems noted which cause noncompliance of the Permit? ❑ Yes f5NO No.vitilitions.az dif ciencies.were-noted-dufiiig this: visit. , Yoit.�iil1, i-&eive,rta_further,: :. correspbndeitce about -this: visit:- : - : - :::.: - , - . : :. - . ; ; . - ; . ' • .. - . . • . . , . • : • ... • - -', - : . Reviewer/Inspector Name Reviewer/Inspector Signature: u M . ]SL,_,411 Date: ti Division of'Soil and Water Conservation ❑ Other Agency ❑ Division U NN"ater Quality O Routine O Cont laint O Fi)llmti-u at' DNN"Q inspt•ction O Follow-u of DS"'C review O Other i Date of Inspection Facility .\"umber Time of Inspection / , / l 24 hr. (hh:mm) ❑ Registered ❑ Certified ❑ Applied for Permit Q Permitted JE3 Not Operational Date Last Operated: Z' Farm Name,. ........................... `%" County: ............/!.r. L... ..................................................... 1:...L..!!....::../..�..!7 Owrner Name: ................................................. Phone \a:............... Facility Contact: ......................................... ........ Title...................,. .... Phrrne No: MailingAddress: ............... ............... .................. ................. ............................................................................... .......................... 1 � Onsite Representative, ..... ,...4.P %.........^:............ Integrator:......... f:....��................................................. Certified Operator;..........."..........."............................................................ ... Operator Certification Number Location of Farm: Latitude �• �� �: Longitude �• �` �`: Swine.-:: Q Wean to Fe Design "Current Design; - Current Design, ',.Current.,,., Capacity Population, . Poultry Capacity Population. , Cattle Capacity,, Population, eder 1 p ; Feeder to Finish Zj O-Varrow to Wean [ r ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Number of Lagoons l HnldtngsPonds ❑ subsurface Drains Present ❑Lagoon Area ❑Spray Feld Area No Liquid Waste Management System r 1 General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ElLagoon ElSpray Field ElOther a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) 3, Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Dues any pan of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes VNo ❑ Yes dNo ❑ Yes 0 No ❑ Yes dNo ❑ Yes No ❑ Yes [,No ❑ Yes EfNo ❑ Yes ['No ❑ Yes PNo ❑ Yes 0 No 7. Did the facility fail to have a certified operator in responsible charge? Facility Number: LL78. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoonsaolding Ponds Flush Pits etc. 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Structure 3 Structure 4 Identifier: U ytj l- l�1 ........... ...........................��.........� ............................� ... Freeboard(ft):.... :n...... Z�............... ... ....... . t...I....................!...... �..:............ ..........`:........ .... 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes ❑ No ❑ Yes 0 No Structure 5 Structure 6 Waste Application 14. Is there physical evidence of over application? (If in excess of%WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type , of... ..�'1. ... U..Q..---,A ............................................................................................................................... 16. Do the receiving crops differ with those designated.in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities Onh 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? 0 No.violations or deficiencies.were,itoted;during this. visit., You.wi11 recei've_no further,:: corresp6hdeke about this:visit:: ❑ Yes ,EfNo ❑ Yes ,5 No OYes ❑ No ❑ Yes J3`No ❑ Yes No ❑ Yes b No ❑ Yes LI No Yes ❑ No ❑ Yes F]"No ❑ Yes &No ❑ Yes J� No ❑ Yes A�No ❑ Yes [ T<o ❑ Yes E�No ❑ Yes dNo �x lcf�>%C�t? /i� .4bll T` �~i�5lX.v � ,N e N{D 1'l'1 U h G-lh, %, /11Lf3`,45 Al 65,V r7ia-O �L- t4-5 7- P/3 Tz- D >11/ ] s o, 77 �-J 1 G-o oti r"ff/�r ti-� G� r� s ES 1-79i$ C L! . �U P i� f N ✓"I 4 p _ �ii��h! ov�1 ��+� tl�y� 7/25/97 Reviewer/Inspector Name MW 99s is: 26 ERor9 DEM WATER QUALITY SECTION TO RRO P•02/02 Site Requires immediate Attend on _ Facility No. _ 5- Dl VISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SI`M VISITATION RECORD DATE: 0Z �, 1995 Time: _ i Name/owner: if' of r eC ing Address: 12 lfs Ga-& _vr�7_14 +9.,1IV C .,11,7S��1 County- _ Y k Hs 7'—flL_.Y„ — — 1. T� a-- ` ]- Integrator: _ . Ta A h "cC4 - - - Phone: f 9 - s-&83 On Site Representative: _ L Phone: _ 909 e9* 8w Physical AddresslLocadon: J�ida, r .%.s���r G•, w 9G` d- Nwi /�v o E '�4 •. , roy is- 1ST sue( SR l /CL� .- jZa f " ( �. a% Got c i1sr Type of Operation Swine _LZ� Poultry Cattle Design Capacity. 22'2:• Number of Animals on Site: DEM Certification Number: ACE DEM Certification Number: ACNE*r Latitude: Longitude: _ Elevation: eet Circle Yes or No Des the Animal Waste Lagoon have sufficient freeboard of I Foot + 25 year 24 hour storm event (approximately I Foot + 7 inches) & or No Actual Freeboard: Ft. Inches Was any seepage observed from the lagoon(s)? Yes or& Was any erosion observed? Yes or(9 Is adequate land available for spray? or No Is the cover crop adequate? 0 or No Crop(s) being utilized: Does the facility meet SCS minimum setback criteria?200 Feet from Dwellings? (D or No 100 Feet from Wells? Yes or No nv s -el/s spp ti a: zImal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes or animal waste land applied or spray irrigated within 25 Feet of a USGS Nlap Blue Line? Yes or No if y hkl-11�k ani.r-nal waste discharged into waters of the state by inan-made ditch, flushing system, or other .0mila.r rnan-anode devices? Yes or If Y ws. Please Explain. uic facility in=' lain adequate waste niauaberncrzt records (v011ill]es of rzianuze, land applied. spray it igated' on spccific acreage with cover crop)'? Yes or No 4 Y kk� Additional Comments: e,, s;ie S•,A, e a S cc: Facility Assessment Unit Sign e a_40&�_ Use Attachments if Needed. TOTAL. P.02 State of North Carolina Department of Environment and Natural Resources �is Raleigh Regional Office James B. Hunt, Jr., Governor MCDENR Wayne McDevitt, Secretary NORT►, cAROuNA DEPnRTMeNT or ENVIRONMENT AND NAURAL Rr-scmJRcEs DIVISION OF WATER QUALITY November 6, 1997 Mr. Earl Lee 1245 Oak Forest Road Four Oaks, North Carolina 27524 Subject: Compliance Evaluation Inspection Facility # 51-4 Lee Brothers Swine Farm Johnston County Dear Mr. Lee: On October 3, 1997, Mr. Charles Alvarez from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. The inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that your swine operation was not discharging wastewater into waters of the State and that your waste lagoons had the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal waste nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. The Raleigh Regional Office appreciates your cooperation and compliance. If you have any questions regarding this inspection please call Mr. Charles Alvarez at (919) 571-4700. Sincerely, IIA u y arrett, Water Quality Section Supervisor cc: Johnston County Health Department Johnston Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC-RRO RRO Files 3800 Barrett Drive, Suite 101, Raleigh, NC 27609 Telephone 919-5714700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 50% recycledl10% pod -consumer paper Facility Number Date of Inspection !o } 1 J Time of Inspection /S 24 hr. (hh:mm) Total Time (in fraction of hours Farm Status: ❑,Registered ❑ Applied for Permit (ex:L25 for 1 hr 15 min)) Spent on Review [( Certified ❑ Permitted or Inspection includes travel and rocessin ❑ Not Operational Date Last Operated: ............ __................ _..... _...... .........__.............................. _..... _........ ........ ...................... FarmName: ............. � %re r&'. 1 County:..........�s..............._......................................................._. p.................._....................................... Land Owner Name:...._ �..._.�.. N -s........ L c:.e:................................, Phone No:..._lil..........4...��.Y..:.. 3 D................ ............ Facility Conctact:.......Elf ... (.......... 1:Kt'__............................... _... Title: Phone No: ..... i9.....�.i..'8��� IVfailingAddress:.....� Z`1 �..5.........Q- r.......��`. 2y « !t................................................ ........ Onsite Representative::..... t.:.'..i............ Lt.fr......................................................... Integrator:...........4.ae/!.es z.J�...................................... Certified Operator:......._! f..l......LS'.�.......... Location of Farm: Operator Certification Number: Latitude =*='=" Longitude =* =, =,, vcHyK ai 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface W,.ter? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/9? maintenance/improvement? ❑ Yes B<e ❑ Yes M*o ❑ Yes E]-T o ❑ Yes BJ" o ❑ Yes MV6 ❑ Yes �LQNo ❑ Yes 21� 0 ❑ Yes 2-go' Continued on back k Facility Number: _(" — 6. Is facility not in compliance with any applicable setback criteria in effect at the'time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed'? Structures (Lagoons and/or Holding- Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 S.o ...........� :0.......................� -. ........................... .........................4...�.............I tvKrS< < f Sa LJ 10. Is seepage observed from any of the structures? 11. is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenancelimprovement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify D"1Q) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes 63/No ❑ Yes No ❑ Yes No ❑ Yes No Structure 5 Structure 6 ............. ...... ........ I ................... .,... ❑ Yes E lJo ❑ Yes B- o ❑ Yes Bi o Waste Application 14, Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type `.i.............................................................................................................................................................. 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? , Reviewer/inspector Name Reviewer/Inspector Signati ❑ Yes No ❑ Yes E3No ................................... ❑ Yes ❑ Yes �io ED No ❑ Yes BNo~ ❑ Yes 6 tvo ❑ Yes RK10 ❑ Yes No ❑ Yes &'No ❑ Yes No ❑ Yes RNO cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit ' 4/30/97 ,7UL-14-1995 15:26 FROI R Q.UALITY SECTIO RRO P.02/02 Site Requires-Imme&ate A,tennicn. Facility No. DIVTSION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE' VISITATION RECORD DATE: , 1995 Farm Narne/Owiat Mailing Address:. r ,/ Kr.(' . - _ �o u � - 524,f'y 1J C G 7Sz �f County: _ S_ ��n_ Integrator.. Pnone: . On Site Representative: �.15 _ _ __ -- Phone: f i - Physical AddressfLocadon: Type of Operation: Swine ✓ Poultsy Cattle Design Capacity: A0, mi-p , _ _ Number of Ariitnals on Site; DELI Certification Number: ACE DEM Certification Number: ACNEW Latitude: ' �' Longitude: Elevation: Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient. free -board of I Foot + 25 year 24 hour storm event (approximately 1 Foot + 7 inches) Gor No Actual Freeboard: 2 Ft. �- - Inches Was any seepage observed from the lagoon(s)? Yes or @ Was any erosion observed? Yes ore Is adequate land available for spray? �or No 1s the cover crop adequate? Yes . No , Cmp(s) being utilized: Scs. Does the facility meet S S minimum setback criteria? 200 Feet from- Dwellings?' Yes' or No 100 Feet from Wells?` Yes or No -Xehe anirnat waste stockpiled within, 100 Feet of USGS Blue Line Stream? Yes.or No xtimal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line'? Yes:orNo ani-mal waste discharged into waters of the state. by inan-made ditch, flushing system; or other ;!Tnilax man -made -de -vices? Yes ot(�;y If Yes. Please Explain. 4. Dae6ihc: f_tcility maintain adequate waste managerncllt records (volumes of'rxianure, land°applied spt uy angated on specific acreage with cover. crop) : Yes Additional Corrunents: f cc: Facility Assessment Unit Signature -Use Attachments if Needed: TOTAL P.O2 JUL-14-1995 15:26 FROM DEM WATER QUALITY SECTION TO RRO R.02ie2 Site Requires Immediate Attendor Facility No. .S'1 N _ DIVISION OF ENVIRONMENTAL MANA.GENMNFT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: 0 7 2C S , 1995 Time: Rarm Name/Owner: -e 4 at` v'-r 1 2 a e Mailing Address: ,,. 124f�' C7QkF rFeyl`R _ Fopr C101b Z 2572y County- I�ryt_ - Tc �a1y7PC /a�co+ts_ o r1 Sit Integrator. __ ,rn M yrreA0g,- Phone:-? On Site Representative: A -ePhone: 7(�r/ 9 33'C, Physical Address/Location: Fr i�fevsrc '�ti hr�. _96_ X,-n-,yN_a� oceerbx /so f'ficiff _sR h '- is fir &raoel la. an r;c 47� . Type of Operation: Swine Poultry Cattle Design Capacity: �1 22 2 Number of Animals on Site: DEM-Certification Number: ACE DEM Certification Number: ACNEW Latitude: Longitude: Elevation:Fee[ Circle Yes or No Does the .Animal Waste Lagoon have sufficient freeboard of 1 Foot -t 25 year 24 hour storm event (approximately 1 Foot + 7 inches) 9 or No Actual Freeboard: ._.__Ft. Inches Was any seepage observed froth the lagoou(s)? Yes or No Was any emsidn observed? Yes or1 Is adequate land available for spray? Uee or No Is the cover crop adequate? 0 or No Crop(s) being utilized: �:;,q hu�a eS Does the facility meet SCS minimum setback criteria"? 200 Feet from Dwellings? Ge or No 100 Feet from Wells? Yes or No no wells xe's-1 animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes ore animal waste land applied or spray irrigated within 25 Feet of a USGS i11ap Blue Line'? Yes or Na u h hrt---� animal waste discharged into waters of the slate by inan-made ditch, flushing system, or ocher -iiTni13T man-made devices? Yes or(9 if Yts, Please Explain. r:te:ility tuaimain adequate Waste managemenr records (volumes of manure, land applied, spray irrigated on specific acreage with cover crop)? Yes or No Additional Comments: _ - k�90141 dw s, a cc: Facility Assessment Unit Si ure Use Attachments if Needed. TOTAL P.02 AN PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 51-4 County: Johnston Facility Name: Lee Brothers Farm Certified Operator Name: Earl Lee Operator Number: 16435 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Finish Nur ISO Sow N N N N 17 14 18 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with 'related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation cif animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 1011312016 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. POA & Plan Amendment completed by Curtis Barwick, Technical Specialist Earl Lee Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) 919422-2319 11/7/2016 r II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Finish line m = 1295.0 lb PAN 2. Structure ID: Nur line m = 302.9 lb PAN 3. Structure ID: ISO line m = 18.5 lb PAN 4. Structure 1D: Sow line m = 411.9 lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN in. lines 1+2+3+4+5+6= 2028.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r, acres s. remaining IRR 2 PAN balance (lblacre) It. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 1A small grain overseeed 2.09 50.00 104.5 SEP-APR 1 B small grain overseeed 8.57 50.00 428.5 SEP-APR 1 C small grain overseeed 5.71 50.00 285.5 SEP-APR 1 D small grain overseeed 4.93 50.00 246.5 SEP-APR 2A small grain overseeed 3.50 50.00 175.0 2B small grain overseeed 3.81 50.00 190.5 2C small. rain overseeed 4.76 50.00 238.0 2D small grain overseeed 4.38 50.00 219.0 2E small grain overseeed 4.17 50.00 208.5 2F small grain overseeed 3.92 50.00 196.0 2G small grain overseeed 4.52 50.00 226.0 2H small grain overseeed 0.71 50.00 35.5 21 small grain overseeed 1.45 50.00 72.5 2J small grain overseeed 1.54 50.00 77.0 2N small grain overseeed 0.59 50.00 29.5 3A small grain overseeed 4.12 50.00 206.0 313 small grain overseeed 1.56 50.00 78.0 3C small grain overseeed 1.45 50.00 72.5 3D small grain overseeed 0.721 50.001 36.0 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3125.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 2028.3 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section 111) = 3125.0 lb. PAN y. Overall PAN balance (w - x) -1097 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Application onto existing spray fields began as weather and field conditions permited. All lagoons are now in compliance. PoA (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 13.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 6.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 64666 1ft2 e. line c112 x line d x 7.48 gallonslft3 241851 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 84593 ft3 h, current herd # 800 certified herd # 800 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/7/2016 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 84593 ft' L 0Jft3 39783 ft3 155055 gallons 1.067 Ibs11000 gal. 420.7 lbs. PAN PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 47952 ft2 e. line c112 x line d x 7.48 gallons/ft' 209231 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 84593 ft3 h. current herd # 800 certified herd #1 800 actual waste produced = current herd # x line g = 84593 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/7/2016 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Oft3 29925 ft3 142766 gallons 1.06 Ibs11000 gal. 373.1 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 51-4 Facility Name: Lee Brothers Farm County: Johnston Certified Operator Name: Earl Lee Operator Number: 16435 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Finish Nur ISO Sow N N N N 17 14 18 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site•locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation cif animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 10/13/2016 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. POA & Plan Amendment completed by Curtis Barwick, Technical Specialist Earl Lee Phone: 919-422-2319 Facility Owner/Manager (print) Date: 11 /7/2016 Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 12 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 47952 ftz e. line c/12 x line d x 7.48 gallons/W 209231 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 84593 ft3 h. current herd # 8001 certified herd #1 800 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j, excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 dayslline f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/7/2016 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 84593 ft's ft3 29925 ft3 142766 gallons 1 -061 Ibs11000 gal. 373.1 lbs. PAN PoA (30 Day) 2/21100 .eh A Po 0 WORKSHEET FOR CALCULATING PAN AND TONS OF WASTE FROM COMBINATION SWINE OPERATIONS Operation Code: 6 Combination Swine Farm APPLICATION METHOD: I Irrigation Type Operation Number Tons Waste PAN Animals per Animal per an. NUMBER OF -WEAN TO FEEDER PIGS: 4108 .40 .48 NUMBER OF FEEDER TO FINISH HOGS: 6120 1.9 2.3 NUMBER OF FARROW TO WEAN SOWS: 2000 6.1 5.4 NUMBER OF FARROW TO FEEDER SOWS: 0 7.3 6.5 NUMBER OF FARROW TO FINISH SOWS: 0 19.9 26 TOTAL NUMBER ANIMALS: 12228 TONS OF WASTE PRODUCED PER YEAR: RECEIVED ! DENR ! DWQ WEAN TO FEEDER: 1643.2 tons AQU ff R'PRAMT10 RECTION FEEDER TO FINISH: 11628 tons MAR 23 2009 FARROW TO WEAN: 12200 tons FARROW TO FEEDER: 0 tons FARROW TO FINISH: 0 tons TOTAL WASTE: 25471.2 tons PAN PRODUCED PER YEAR: WEAN TO FEEDER: 1971.84 lbs FEEDER TO FINISH: 14076 lbs FARROW TO WEAN: 10800 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL PAN: 26847 AVERAGE TONS OF WASTE PER ANIMAL PER YEAR: 2.08300621524 AVERAGE PAN PRODUCED PER ANIMAL PER YEAR: 2.19553483808 ;LUDGE PAN PRODUCED PER YEAR: BROADCAST WEAN TO FEEDER: 312.208 lbs FEEDER TO FINISH: 2264.4 lbs FARROW TO WEAN: 1760 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL SLUDGE PAN: 4336.608 lbs VERAGE SLUDGE PAN PER ANIMAL PER YEAR: 0.354645731109 ANIMAL WASTE UTILIZATION PLAN Producer: EARL LEE Location: 124S OAK FOREST ROAD FOUR OAKS NC 27524 Telephone: 919-894-3248 Type Operation: Existing Combination swine Farm Number of Animals: 12228.00 swine (Design capacity) STORAGE STRUCTURE: APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if for compliance with 15A NCAC 2H Management Commission. carried out, meets the requirements .0217 adopted by the Environmental AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 12228 swine x 2.08300621524 tons waste/swine/year = 25471 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 12228 swine x 2.19553483808 lbs PAN/swine/year = 26847 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED --- or ------- APPLY RESID. APPLIC METH N TIME 3752 1A BnA BH 8 400 0 2.09 836 I APR-SEP 3752 1A BnA SG 1 0 I 150 12.09 1104.5 OCT.MAR 3752 1B BnA BH 8 0 8.57 li 1400 13428 APR-SEP 3752 --1B BnA 5G 1 0 T 150 18-57 1428.5 OCT.MAR "752,469 1C BnA BH 8 0 I 1400 15.71 12284 APR-SEP 3752,469 -1C BnA SG 1 50 0 T 15.71 1285.5 OCT.MAR 3752,469 1D BnA BH 8 0 I 1400 14.93 11972 APR-SEP 3752,469 BnA SG 1 0 1-ID li 150 14.93 1246.5 OCT.MAR 3752 2A BnA BH $ 0 I 1400 �3.5 11400 APR-SEP 3752 �2A BnA SG 1 0 li 150 13.5 1175 OCT.MAR 3752 2B BnA BH 8 0 I 1400 1-3-81 11524 APR-SEP 3752 �2B __jBnA SG 1 0 li 150 13.81 1190.5 OCT.MAR 2752 2C BnA 8 0 r. I JBH I 1400 �4.76 11904 APR-SEP j-752 --2C jBnA JSG 11 150 10 14.76 1238 Page: 3 ANIMAL WASTE UTILIZATION PLAN I I j I I IOCT. MAR 3752 2D BnA BH 8 0 I 1400 14.38 11752 APR-SEP 3752 -2D BnA SG 1 0 li 150 14.38 1219 OCT.MAR 3752 2E BnA BH 8 0 li 1400 14-17 11668 APR-SEP 3752 �2E BnA SG 1 0 I 150 14.17 1208.5 OCT.MAR 3752 2F BnA 8 0 JBH I 1400 13.92 11568 APR-SEP 3752 -2F BnA SG I li 15b jo 13-92 1196 OCT.MAR 3752 2G BnA BH 8 0 I 1400 14.52 11808 APR--SEP "-752 -2G BnA SG 1 0 I 150 14.52 1226 OCT.MAR 3752 2H UCC BH $ 0 I 1400 10.71 1284 APR.SEP 3752,469 21 UCC BH 8 0 I 4 1400 11-45 1590 APR.SEP 3752,469 2J { BH 8 0 jUcC )1 I 1400 11.54 1616 APR.SEP 3752 2L BnA BH 0 I IS 1400 10.68 1352 APR-SEP 3752 2N BnA BH 8 400 0 li I I 10-59 1236 APR-SEP 3752 3A BnA BH 0 I IS 1400 14.12 11648 APR-SEP 3752 -3A BnA SG 1 0 I 150 14.12 1206 OCT.MAR 3752 3B UcC BH 8 400 0 I 11.56 1624 APR.SEP 3752 13C jBnA JBH 18 J400 10 1.45 1580 Page: 4 i ANIMAL WASTE UTILIZATION PLAN iI I I I IAPR-SEP 3752 3D Ucc BH IS 1400 0 10.72 1288 I APR.SEP END I _kc,4 TOTAL128076 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 5 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL 10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to'be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand -of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Page: 6 ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. : * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT 50 50 BH SG HYBRID BERMUDAGRASS-HAY SMALL GRAIN OVERSEEDED TONS TABLE 1 1-1� TABLE 2 TOTAL *-A TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 63.38 28076 0 0 63.38 28076 * BALANCE -1229 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. �,�4.0 /C � T7�.✓ � �' Gr/f�s � i S G a m �c r- x � �r � � r�-� �ufi��' ati' �ri'iG�'t`"•'r .�/� �� �c-3 � �•��3s4r�� ETC TfiS/�� ���" ?�lwii�'rz,; .� �C �rG:Zo03 G•- e Tr`f 6 t/�-7�'�✓ �'u r �S �,,f E .s'�`T e7/`! T�J /¢%A�� R/1 �e"'�� T�9�/ D •. �5 l'11� � /,rC3 /ac=�' �yk�►q' f�-rv'� j �i+/�h� �'��' ,¢,�,Pcr cf�'rTirY �jvG— %—�� ��,�iyl�rlc�'n'!✓,✓71F5, fir/�°L'�c-�i �ilU.y!/'{� bs�E�E /��+�.�i�-� ir77 �� ���,E c*�-Cruel' �.a�F r���Er�r�z7� c f��°��-y Gt•�' ;a �- r � page: 7 ANIMAL WASTE UTILIZATION PLAN ** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter straps along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type 2752 2C BnA 1 3752 lA BnA Crop f BH 1 BH Application Rate[Applic. Amount (in/hr) I (inches) 0.75 0.75 *1 *1 Page: a ANIMAL WASTE UTILIZATION PLAN 3752 f 1B f I BnA I BH 3752 2A I I BnA I BH 3752 I 12B 1 f BnA BH 3752 f 2D I BnA I BH 3752 I j 2E 1 BnA I BH 3752 f 2F BnA BH 3752 12G I BnA I BH 3752 12H f Ucc BH 3752 f 2L f BnA I BH 3752 f 2N 1 I BnA BH 3752 f 3A I BnA f BH 3752 I 13B I Ucc � I I BH I I 0.75 I *1 I I 0.75 I I *1 I 0.75 I *1 0.75 I *1 0.75 I *1 0.75 I *1 I f 0.75 *1 I 0.6 I I *1 f 0_75 I *1 I I 0.75 I *1 I I 0.75 *1 I 0.6 I *1 Page: 9 ANIMAL WASTE UTILIZATION PLAN 3752 3C BnA I BH I 0.75 I *1 3752 3D UCC I BH 0.6 I *1 3752 -1A BnA SG 0.75 I *0.5 3752 --1B BnA j SG 0.75 *0.5 3752 -2A BnA SG 0.75 *0.5 1 3752 -2B I BnA I SG I 0.75 1 *0.5 ~�52 --2C 1 BnA SG 0.75 *0.5 3752 -2D BnA j SG 0.75 *0.5 3752 -2E BnA I SG 0.75 I *0.5 t 3752 -2F � BnA f SG 0.75 *0.5 3752 I -2G BnA SG I 0.75 *0.5 3752 I -3A BnA SG 0.75 I *0.5 3752,41 1C I BnA BH I 0.75 *1 Page: 10 ANIMAL WASTE UTILIZATION PLAN I— N 3752,41 1D 1 1 3752,41 21 1 1 1 3752,41 2J I 1 1 3752,41 -1C I 1 3752,41 -ID I 1 BnA Ucc Ucc BnA BnA BH 0.75 I *1 � 1 BH 1 0.6 I *1 BH 1 0.6 I *1 i I SG I I 0.75 I 1 *0.5 1 I SG I I 0.75 i 1 *0.5 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 11 ANIMAL WASTE UTILIZATION PLAN �f7Li s � �.Hr✓ i y ��-�` rvr° is <r s� .yd d /6s ��= .ter �'dr-,cn� .���P ���t . l r7 i %�'� L.�i✓�4c�,yC�' .5' L: - ,� �-r��' .; ia~rf-T�� T ,�'��.�rrl/•7 �'�� rl� r �%✓�kl..ylrsivl L2-7J es�% %- ,i�vG'cr C- c / �-d,-✓ �1,� �f�� �vr • � ��d 1' d� 5r-17�CC.. ]-[i ..t �E" lG- h`/may S ��d ✓ r �y.¢T T Ham' .� Ev�'h`'L �'E7L� 5 T/�il'alrJ ��rl•��-C ,��Yld �r.v; � d.� ici.3�-S� i�� tyc:e�/L.,�fi�✓a � .m/�"/�r.vir 7 �vc�i/d�-�y✓ey v � �'rJG—Tc�¢�y', J �h`�' !J t�7`S'/dam or✓ —� �(a t,~ / „-4 S �'!�" a c�.�TS dam• lri, i 4;"3EC"c_ r�s 6AP Cl/ AJ Al 7- Page: 12 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 13 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. An new swtine facility sited on or after October 1 1995 shall Y Y comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine wastelfrom facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 -- Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 14 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct. human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: is ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:LEE SWINE FARM Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. ,--� Name of Facility Owner: EARL LEE (Please print)-00 Signature: �` Date: f U Name of Manager(If different from owner): Signature: Date: Name of Person Preparing Plan: (please print)Kenneth York Affiliation:NRCS Phone No. 919-989-5381 Address (Agency): 806 North Street Smithfield NC 27577 Signature: 2 �` Date: /;�?, " /~ Cd Page: 16 ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) I, , hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. 1-1, I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Date: Waste Producer: Date: Technical Representative: SWCD Representative: Term of Agreement: Date: Date: ,19 to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 17 ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this , 19 My commission expires (SEAL) day of Notary Public. Page: i8 ANIMAL WASTE UTILIZATION PLAN waste Utilization - Third Party Receiver Agreement I, hereby agree to apply waste generated by in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF I, , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of , 19 My commission expires (SEAL) Notary Public. Page: 19 T 'fit ��_6 .-. o�s�'{E� �tp� - - •gyps a �._._._��� .... 7g- rp 36o I ro . Ire) a 9 .71 f ly gam�-- 2 A/ f ___-.3 3 ' L5 y ��F W arFpP Michael F. Easley, Governor `o G William G. Ross Jr., Secretary O Uj North Carolina Department of Environment and Natural Resources �\ Coleen H. Sullins Director Division of Water Quality August 11, 2008 Earl Lee Lee Brothers Farm 1245 Oak Forest Rd Four Oaks, NC 27524 Subject: Sludge Compliance Requirement Change Dear Permittee: __ —1? IF- 1 1 a;_ G 13 I DMIR RAt_LIG[{ RLG,4; OFFICE In accordance with Condition I1I.19 of State General Permit AWG 100000, your facility is required to maintain compliance regarding sludge accumulation in your animal waste treatment lagoon(s). As you know, the previous compliance limit was to have a minimum of four (4) feet of treatment depth between the designed stop pump and the average elevation of the top of the sludge blanket. This requirement was based on NRCS Standard No. 359, which was recently modified. As of July 2008, Standard No. 359 does not use the 4-foot requirement. Sludge compliance is now to be based on the sludge volume as a percentage of the total treatment volume. The revised Standard states that sludge accumulation in the permanent treatment zone must be less than 50% of the planned treatment volume. Also, there must be a minimum of 2.5 feet of liquid above the sludge at the pump intake location. If either of these conditions is not met then sludge must be removed or managed in accordance with an approved Plan of Action for Lagoon Sludge Reduction (POA). A new sludge survey worksheet has been developed to calculate sludge and treatment volumes to determine compliance. Our records indicate that you have filed a Sludge POA for one or more of the lagoons at your facility. Based on the changes to the sludge requirements in Standard No. 359, your lagoon(s) may already be in compliance without any sludge removal. Using your lagoon design (or as - built information) and current sludge survey measurements, complete the NEW sludge survey workshect. If you have any difficulty in locating or understanding your lagoon design information, please contact your technical specialist or county Soil & Water office. Nnne r hcarolina Naturallil Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Internet: www.ncwatMuality.org Location: 2728 Capital Boulevard Raleigh, NC 27604 Fax 1: (919) 715-0588 Fax 2: (919) 715-6048 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110%a Post Consumer Paper Send both sludge survey worksheets, OLD and NEW, to the address below if you feel that your lagoon(s) is in compliance and wish to withdraw your POA. Our staff will review the information and notify you of our decision. NCDENR -- DWQ Animal Feeding Operations Unit 1636 Mail Service Center , Raleigh, North Carolina 27699-1636 Telephone number: (919) 733-3221 If you have any questions about the new sludge requirement, sludge survey worksheet, or any related matter please feel free to contact the Animal Feeding Operations Unit staff at 919-733- 3221. Sincerely, Tad &�- �- Keith Larick, Supervisor Animal Feeding Operations Unit Enclosures cc (w/o enclosures): Johnston County Soil and Water Conservation District Raleigh Regional Office, Aquifer Protection Section AFO Unit Central Files - AWS510004 AOF W A r�RQG Michael F. Easley, Governor illiam G, Ross Jr., Secretary North Carolina Department of Environment andNatural Resources -� Coleen H. Sullins, Director Division of Water Quality 1 July 1, 2007 Earl Wood Lee I" �U� Lee Brothers Farm L 1245 Oak Forest Rd �1l __ J Four Oaks, NC 27524 I___-- R RAL[iGH'AL uFFlCE Subject: Certificate of Coverage No. AWS510004 Lee Brothers Farm Animal Waste Management System Johnston County Dear Earl Wood Lee: In accordance with your application received on 30-Jan-07, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Earl Wood Lee, authorizing the operation of the subject animal waste management system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the Lee Brothers Farm, located in Johnston County, with an animal capacity of no greater than the following swine annual averages: Wean to Finish: 0 Feeder to Finish: 6120 f Boar/Stud: 0 Wean to Feeder: 4108 ' Farrow to Wean: 2000 � Gilts: 0 Farrow to Finish: 0 Farrow to Feeder: 0 If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009 and replaces the NPDES COC issued to this facility with an expiration date of July 1, 2007. You are required to continue conducting annual surveys of sludge accumulation in all lagoons at your facility; the one-year extension in Condition 111.19 does not apply. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this permit. Aquifer Protection Section 1636 Mail Service Center Internet: www.ncwaterqualitY.or> Location: 2728 Capital Boulevard An Equal opportunitylAffirmative Action Employer— 50% Recycledl10% Post Consumer Paper Nam` Carolina Natima!!y Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Raleigh, NC 27604 Fax 1: (919) 715-0588 Fax 2: (919) 715-6048 Customer Service: (877) 623-6748 If your Waste Utilization Plan has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 02T .0111(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100-foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Per 15A NCAC 02T .1306, any containment basin, such as a lagoon or waste storage structure, shall continue to be subject to the conditions and requirements of the facility's permit until closed to NRCS standards and the permit is rescinded by the Division. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Aquifer Protection staff may be reached at 919-791-4200. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Unit staff at (919) 733-3221. Sincerely, for Coleen H. Sullins Enclosures (General Permit AWG100000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Johnston County Health Department Johnston County Soil and Water Conservation District Raleigh Regional Office, Aquifer Protection Section AFO Unit Central Files Permit File AWS510004 j d y lam �j '� (t , � vt- � f f � ! / / Y e( c -1 c' " v`.� ►roc / 1 f d� ��-dli[ �t l Wan 7� �-e f -� k15. Nutrient Management For Animal Waste Utilization This plan -has been prepared for: Lee Brothers Farm Earl Lee 1245' Oak Forest Road Four Oaks, NC 27524 919-894-3248 02-11-2003 This plan has been developed by: Edward Humphrey NRCS 806 North Street Smithfield, NC 27577 919-934-7156 x. 3 Developer Signature k Type of Plan: . Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Signature (owner) Signature (manager or producer) Date Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture- Natural Resources Conservation Service or the standard of practices adopted by the Soil and Wgter CIonservati4—car"iission. Plan Approved By: ---------------------- - . Preview Database Version 2.0 Date Printed: 02-11-2003 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S5 Swine Nursery Lagoon Liquid waste generated 784,628 gals/year by a 4,108 animal Swine Nursery Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 1807 Incorporated 3104 Injected 3418 Irrigated 1964 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 2,115.62 845,064 -60,436 S7 Swine Feeder -Finish Lagoon Liquid waste generated 5,673,240 gals/year by a 6,120 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 13067 Incorporated 22441 Injected 24713 Irrigated 14203 i Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 14,682.58 5,864,825 -191,585 ----------------------------------------------------------- ----- Note: In source ID, S means standard source, U means user defined source. 425274 ' Database Version 2.0 Date Printed: 01-17-2003 Source Page I of 2 I S9 Swine Farrowing-Weanling Lagoon Liquid waste generated 6,406,000 gals/year by a 2,000 animal Swine Farrowing-Weanling Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 9885 Incorporated 16977 Injected 18696 Irrigated 10745 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 1 i,198.80 6,676,506 -270,506 -`-----------------------------------------------------------------------------------------------------------------------------. Note: 1n source ID, S means standard source, U means user defined source. 425274 1 1 Database Version 2.0 Date Printed: 01-17-2003 Source Page 2 of 2 3 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crons Summary Tract Field Leaching index (LI) Soil Series Crop Sequence RYE 3752 IA N/A Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 1B N/A jBlanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 lC NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 lD NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2A NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagmss Hay *8.0 Tons 3752 2B NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2C NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 21) NIA Boiac Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2E NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2F NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 37521 2G NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2H NIA Uchee Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 21 NIA Uchee Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 21 NIA Uchee Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 21, NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2N N/A Blanton Small Grain Overseed L0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 3A NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 3B NIA Uchee Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons '25274 Database Version 2.0 NOTE: Symbol * means user entered data. I Date Printed: 01-17-2003 PCS Page 1 of 2 Planned Crops Summary Tract Field Leaching Index (LI) Soil Series Crop Se uence RYE 3752 3C NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8,0 Tons 3752 3D N/A Blanton Small Crain Overseed 1,0 Tons Hybrid Bermudagrass Hay *8.0 Tons L1 Potential Leaching Technical Guidance Low potential to contribute to None < 2 soluble nutrient leaching below the root zone. > = 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. <= 10 soluble nutrient leaching below the root zone. High potential to contribute to utrient Management (590) should be planned. Other conservation practices that improve soluble nutrient leaching below the the soils available water holding capacity and improve nutrient use efficiency should be > 10 root zone. considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). ;25274 Database Version 2.0 Date Printed: 01-17-2003 PCS Page 2 of 2 NOTE: Symbol * means user entered data. I The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure -applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Depending on the requirements of the crop and the nutrient content of the waste, some nutrients will likely be over or under applied if animal waste is being utilized. Waste should be analyzed before each application cycle and annual soil tests are required if animal waste is being applied. Soil tests should be used to balance the nutrient application amounts with the realistic yields of the crop to be grown. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. Waste Utilization Table Year l Tract I Field Source I.D. I Soil Series Total Acre Use. Acres I Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fen. Nutrient Applied Res. (lbs/A) Applic, Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) I N N I N I Ibs/A 1000 gal1A I tons 1000 gals toffs 3752 ]A S5 Blanton 2.25 2.09 Small Grain Overseed 1.0 Tons 10/1-3/311 50 0 0 brig. 4 1.60 0 3.34 0.00 3752 IA S7 Blanton 2.25 2.09 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 26 10.39 0 21.71 0.00 3752 IA S9 Blanton 2.25 2.09 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 20 11.92 0 24.92 0.00 3752 IA S5 Blanton 2.25 2.09 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 1 *400 0 0 Irrig. 30 11.98 0 25.05 0.00 3752 IA S7 Blanton 2.25 2.09 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 175.32 0.00 3752 IA S9 Blanton 2.25 2.09 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 brig. 160 95.39 0 199.36 0.00 3752 1B S5 I Blanton 9.00 8.57 1 Small Grain Overseed LO Tons 1011-3131 50 0 0 Irrip. 4 1.60 0 13.69 0.00 37521 1B S7 Blanton 9.00 8.57 Small Grain Overseed 1.0 Tonsl 1011-3/31 50 0 0 Irrig. 261 10.39 D 89.00 0.00 3752 1B S9 Blanton 9.00 8.57 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 20 11.92 0 102.19 0.00 3752 1B S5 Blanton 9.00 8.57 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Imp. 30 11.98 0 102.70 0.00 3752 1B S7 Blanton 9.00 8.57 Hybrid Bennudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 210 83.88 0 718.87 0.00 ------------------------------------ -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page i CN N _�_ 0 C'-' , __,� f Waste Utilization Table Year 1 Tract I Field Source I.D. i Soil Series Total Acre Use, Acres 1 Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (1bs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N IbslA 1000 gaUA tons 1000 eals I tons 3752 1B S9 Blanton 9.00 8.57 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 160 95.39 0 817.48 0.00 3752 IC SS Blanton 6.00 5.71 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 4 1.60 0 9.12 0.00 3752 1C S7 Blanton 6.00 5.71 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 26 10.39 0 . 59.30 0.00 3752 1C S9 Blanton 6.00 5.71 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 20 I L92 0 68.08 0.00 3752 1C S5 Blanton 6.00 5.71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 68.42 0.00 3752 1C S7 Blanton 6.00 5.71 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *400 0 0 Irrig. 210 83.88 0 478.97 0.00 3752 1C S9 - Blanton 6.00 5.71 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 160 95.39 0 544.67 0.00 37521 1D SS Blanton 5.25 4.93 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig, 4 1.60 0 7.88 0.00 3752 1D S7 Blanton 5.25 4.93 1 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 26 1039 0 51.20 0.00 3752 1D S9 Blanton 5.25 4.93 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 58.78 0.00 3752 I S5 Blanton 5.25 4.93 Hybrid Bermudagrass Hay •8.0 Tons 311-9130 •400 0 0 Irrig, 30 11.98 0 59.08 0.00 37521 1D S7 Blanton 5.25 4.93 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *400 0 0 Irrig_ 210 83.88 0 413.54 0.00 3752 lD S9 IRIanton 5.25 4.93 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 160 95.39 0 470.27 0.00 3752 2A S5 Blanton 3.80 3.50 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 Q Irrig. 4 1.60 0 5.59 0.00 3752 2A S7 Blanton 3.80 3.50 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 26 10.39 0 36.35 0.00 3752 2A S9 Blanton 3.80 3.50 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 20 11.92 0 4133 0.00 3752 2A S5 Blanton 3.80 3.50 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *400 0 0 Irrig. 30 11.98 0 41.94 0.00 3752 2A S7 Hlanton 3.80 3.50 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 293.59 0.00 3752 2A S9 Blanton 3.80 3.50 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 •400 0 0 lrrig. 160 95.39 01 333.86 0.00 3752 2B SS Blanton 4.10 3.81 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 4 1.60 0 6.09 0.00 3752 2B S7 Blanton 4.10 3.81 1 Small Grain Overseed 1.0 Tons 1 1011-3131 50 a Q Irrig. 26 10.39 0 39.57 0.00 3752 213 S9 Blanton 4.10 3.81 1 Small Grain Overseed 1.0 Tans 1011-3/31 50 0 0 Img. 20 11.92 Of 45.43 0.00 ------------------------------ 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page 2 Waste []tili7ation Table Year l Tract I Field Source I.D. I Soil Series Total Acre Use. Acres 1 Crop RYE Applic. Period I Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (Ibs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N I N lbs/A I 1000 gal/A tons 1000 gals tons 3752 2B S5 Blanton 4.10 3.81 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 34 11.98 0 45.66 0.00 3752 2B S7 Blanton 4.10 3.81 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 319.59 0,00 3752 2B S9 Blanton 4.10 3.81 Hybrid Bcrmudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig, 160 95.39 0 - 363.43 0-00 3752 2G SS IBlanton 5.251 4,761 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 4 1,60 0 7.61 0.00 3752 2C S7 Blanton 5.25 4.76 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 D Irrilf. 26 10.39 0 49.44 0.00 3752 2C S9 Blanton 5.25 4.76 Small Grain Overseed I.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 56.76 0.00 3752 2C S5 Blanton 5,25 4.76 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11,98 0 57.04 0,00 3752 2G S7 Blanton 5,25 4,76 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83,88 0 399.29 0.00 3752 2C S9 Blanton 5.25 4.76 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 454.05 0.00 3752 2D S5 Bojac 4.65 4.38 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 4 1.60 0 7.00 0.00 3752 2D S7 Bojac 4.65 4.38 Small Grain Overseed 1.0 Tons 1011-3/3 t 50 0 0 Irrig. 26 10.39 0 45.49 0.00 3752 2D S9 Bojac 4.65 4.38 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 20 11.92 0 52.23 0.00 3752 2D S5 Bojac. 4,65 4-38 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11,98 0 52.49 0.00 3752 2D S7 Bojac 4.65 4.38 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *400 0 0 Irrig. 210 83.88 0 367.41 1 0-00 3752 2D S9 Bojac 4.65 4.38 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 417.80 0.00 3752 2H S5 Blanton 4.50 4.17 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 4 E,50 0 6,66 0.00 3752 2E S7 Blanton 4.50 4,17 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 43.31 0.00 3752 2E S9 Blanton 4.50 4,17 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig- 20 11.92 0 49,72 0.00 3752 2E SS Blanton 4.50 4,17 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 49,97 0.00 3752 2E S7 Blanton 4,50 4,17 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 349.79 0.00 3752 2E S9 Blanton 4,50 4.17 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 160 95.39 p 397.77 0.00 3752 2F S5 Blanton 1 4.20 3.92 1 Small Grain Overseed 1.0 Tons 10/1-3131 1 50 0 0 Irrig. 4 1.60 0 6.26 0.00 ---------------------------- -- ------ ---- - ---------- ----- ....------- -------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: IA7/03 WUT Page 3 0 Waste Utilization Table Year l Tract Field Source I.D. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fen. Nutrient Applied Res. (lbs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N I N Ibs/A 1000 gal/A tons 1000 eals tons 3752 2F S7 Blanton 4.20 3.92 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 26 1039 0 40.71 0.00 3752 2F S9 Blanton 4.20 3.92 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 46.74 0.00 3752 2F S5 Blanton 4.20 3.92 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 30 11.98 0 46.97 0.00 3752 2F S7 Blanton 4.20 3.92 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 01 lrrig. 210 83.88 0 328.82 0.00 3752 2F S9 Blanton 4.20 3,92 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig, 160 95.39 0 373.92 0.00 3752 2G S5 Blanton 4.80 4.52 1 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 4 1.60 0 7.22 0.00 3752 2G S7 Blanton 4.80 4.52 1 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 46.94 0-00 3752 2G S9 Blanton 4.80 4.52 Small Grain Overseed 1.0 Tons 10/1-3/31 501 0 0 brig 20 11.92 0 53.90 0.00 3752 2G S5 Blanton 4.80 4.52 Hybrid Bermudagrass Hay *8.0 Tons 3A-9130 *400 0 0 Irrip. 30 11.98 0 54.16 0.00 3752 2G S7 Blanton 4.80 4.52 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 379.15 0.00 3752 2G S9 Blanton 4.80 4.52 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 4 431.16 0.00 3752 2H S5 I Uchee 1.00 0.71 1 Small Grain Overseed 1.0 Tons 10/1-3/31 501 0 0 Irrig. 4 1.60 0 1.13 0.00 3752 2H S7 Uchee 1.00 0.71 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 25 10.39 0 7.37 0.00 3752 2H S9 Uchee 1.00 0.71 Small Grain Overseed 1.0 Tons 1011 -3/3 1 50 0 0 Irrig- 20 11.92 0 8.47 0.00 3752 2H S5 Uchee 1.00 0.71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig. 30 11.98 0 8,51 0,00 3752 2H S7 Uchee 1.00 0.71 Hybrid Bermudagrass Hay *8.0 Tans 3/1-9/30 *400 0 0 Irrig, 210 83.88 0 59.56 0.00 3752 2H S9 Uchee 1.00 0.71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 4 Irrig. 160 95.39 0 67.73 0.00 3752 21 S5 Uchee 1.60 1,45 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 4 1.60 0 2.32 0,00 3752 2I S7 Uchee 1.60 1,45 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 26 10.391 0 15.06 0,00 3752 2I S9 Uchee 1.60 1.45 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 17.29 0.00 3752 21 S5 Uchee 1.60 1.45 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irng. 30 11.98 0 17.38 0.00 3752 2I S7 Uchee 1.60 1.45 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 1 210 83.88 0 121.63 0.00 ----------------------------------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Paste 4 Wncta ITfiii7ntinn Tah)P Vwar I Tract I Field Souree I.D. Soil Series Total Acre Use. Acres Crop RYE Applic, Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (lbs/A) Applic- Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N Ibs/A I 1000 gal/A tons 1000 gals tons 3752 2I S9 Uchee 1.60 1.45 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 138.31 0.00 3752 2J SS i Uchee 1.75 1.54 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 4 1.60 0 2.46 0.00 3752 2J S7 Uchee 1.75 1.54 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 - 15.99 0.00 3752 2J S9 Uchee 1.75 1.54 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 01 Irrig. 20 11.92 0 18.36 0.00 3752 2J SS Uchee 1.75 1.54 Hybrid Bennudagrass Hay *9.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 18.45 0.00 3752 2J S7 I Uchee 1.75 1.54 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 210 83.88 0 129.18 0-00 3752 2J S9 Uebee 1.75 1.54 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig, 160 95.39 0 146.90 0.00 3752 2L S5 Blanton 1.00 0-88 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 4 1.60 0 141 0.00 3752 2L S7 Blanton 1.00 0.88 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 brig. 26 10.39 0 9.14 0.00 3752 2L S9 Blanton 1.00 0.88 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig, 20 11.92 0 10.49 0.00 3752 2LI S5 Blanton 1.00 0.88 Hybrid Berntudagrass Hay *8.0 Tons 3/1-9/30 *400 01 0 Irrig. 1 30 11.98 0 10.551 0.00 3752 2L S7 Blanton 1.00 0.88 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig, 210 83.88 0 73.82 0.00 3752 2L S9 Blanton 1.00 0.8$ Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 83.94 0.00 3752 2N SS lBlanton 0.75 0.59 Small Grain Overseed 1.0 Tons 10/1-3/3) 50 0 0 Irrig. 4 1.60 0 0.94 0.00 3752 2N S7 Blanton 0.75 0.59 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig, 26 10.39 0 6.13 0.00 3752 2N S9 Blanton 0.75 0.59 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 7.04 0.00 3752 2N S5 Blanton 0.75 0.59 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 0 0.00 0 0.00 0.00 3752 2N S7 Blanton 0.75 0.59 Hybrid Bermudagrass Hay *8.0 Tons 3/I 9/30 *400 0 0 Irrig. 0 0.00 0 0.00 0.00 3752 2N S9 I Blanton 0.75 0.59 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 0 0.00 0 0.001 0.00 3752 3A SS Blanton 4.50 4.12 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 4 1.60 0 6.58 0.00 3752 3A S7 Blanton 4.50 4.12 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 42.79 0.00 3752 3A S9 Blanton 4.50 4.12 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 20 11.92 0 49.13 0.00 ------------------------------------------------------ ---- -- ---- -- --- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Pale 5 Waste Utilization Table Year l Tract I Field Source LD. I Soil Series Total Acre Use. Acres 1 Crop RYE Applic. Period I Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (lbs/A) Applic. Method I Manure PA Nutrient Applied Liquid I Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N I N lbs/A 1000 gal/A I tons 1000 gals tons 3752 3A SS Blanton 4.50 4.12 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 30 11,98 0 49.37 0.00 3752 3A S7 Blanton 4,50 4.12 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig. 210 83.88 0 345.60 0.00 3752 3A S9 Blanton 4.50 4.12 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 393,00 0.00 3752 3B S5 Uchee 1.751 1.56 Small Grain Overseed 1.0 Tons 10/1-3I31 50 0 0 Irrig. 4 1.60 0 2.491 0.00 3752 3B S7 Uchee 1.75 1.56 Sma11 Grain 0verseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 26 10.39 0 16,20 0.00 3752 3B S9 Uchee 1,75 1,56 1 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 18.60 0.00 3752 3B SS I Uchee 1.75 1.56 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 30 11.98 0 18.69 0.00 3752 3B S7 Uchee 1.75 1.56 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 Q Irrig. 210 83.88 0 130.86 0,00 3752 3B S9 I Uchee 1.75 1.56 Hybrid Bermudagrass Hay *8.0 Tons 3l1-9/30 *400 0 0 Irrig. 160 95.39 D 148.81 0.00 3752 3C S5 Blanton 1.75 1,45 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 4 1.60 0 2-32 0.00 3752 3C S7 Blanton 1.75 1,45 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 15.06 0.00 3752 3C S9 Blanton 1.75 1.45 1 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 17,29 0,00 37521 3C S5 Blanton 1.75 1.45 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 17.38 0.00 3752 3C S7 Blanton 1-75 1.45 Hybrid Bermudagrass Hay 1 *8.0 Tons 3/1-9/30 *400 0 0 Inig. 210 83.88 0 121.63 0.00 3752 3C S9 Blanton 1.75 1.45 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig, 160 95.39 0 138.31 0.00 3752 3D S5 Blanton 1.04 0.72 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig, 4 1.60 0 1.15 0.00 3752 3D . S7 Blanton 1.00 0.72 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig, 26 10.39 0 7.48 0.00 3752 3D S9 Blanton 1.00 0.72 Small Grain Overseed 1.0 Tons 10/1-3/31 50 D 0 Irrig. 20 1192 0 8.59 0.00 3752 3D S5 Blanton 1.00 0.72 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 0 0,00 0 0.001 0.00 3752 3D S7 Blanton 1.00 0.72 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 1 *400 0 0 Irrig. 0 0.00 0 0.00 0.00 3752 3D S9 Blanton 1.00 0.72 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 brig. 0 0.00 0 0.00 0.00 --------------------------------------....---------- ------- 425274 Database Version 2.0 . Date Printed: 1/17103 WUT Page 6 WactP TTtili,7atinn Tnhh- Year 1 Tract Field Source I.D. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert, Nutrient Applied Res. Obs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 ga1/A tons 1000 gals tons Total Applied, 1000 gallons 13,386.39 Lagoon Liquids Total Produced, 1000 gallons 12,863.87 T - Balance, 1000 gallons -522.52 . Total Applied, tans 0.00 Manure Solids Total Produced, tons 0.00 Balance, tons 0,00 Notes: 1. In the tract column, symbol -- means leased, otherwise, owned. 2. Symbol * means user entered data. ------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page 7 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. .5 Irrigation Application Factors YNo� r .�" rc Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 3752 1 A Blanton 0.75 0.48 3752 113 Blanton 0.75 0.48 3752 1C Blanton 0.75 0.48 3752 1 D Blanton 0.75 0.48 3752 2A Blanton 0.75 0.48 3752 2B Blanton 0.75 0.49 3752 12C Blanton 0.75 0.48 3752 2D Bojac 0.50 0.96 3752 2F Blanton 0.75 0.49 3752 2F Blanton 0.75 0.48 3752 20 Blanton 0.75 0.48 3752 2H Uchee 0.60 0.72 3752 2I Uchee 0.60 0.72 3752 2J Uchee 0.60 0.72 3752. 2L Blanton 0.75 0.48 3752 2N Blanton 0.75 0.49 3752 3A Blanton 0.75 0.48 3752 3B Uchee 0.60 0.72 3752 3C Blanton 0.75 0.48 3752 3D Blanton 0.75 0.48 ----------------------------------•-----.- --------------------- -- 425274 Database Version 2.0 Date Printed: 01-17-2003 IAF Page I of I The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Farrowing-Weanling Lagoon Sludge- Standard om 120 bu 150 13.16 59.26 118.53 177.79 ..ay 6 ton R.Y.E. 300 26.32 29.63 59.26 88.89 Soybean 40 bu 160 ! 14.04 55.56 111.12 166.68 Swine Nursery Lagoon Sludge - Standard Com 120 bu 150 13.16 10.46 20.91 31.37 Hay 6 ton R.Y.E. 300 26.32 5.23 10.46 15.68 Soybean 40 bu 160 s 14.04 9.80 19.60 29.41 j Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 76.72 153.45 230.17 Hay 6 ton R.Y.E. 300 26.32 38.36 76.72 115.08 Soybean 40 bu 160 14.04 71.93 143.86 215.78 c I --------- -------------- ----------------- 425274 Database Yersion 2.0 i i --------- ---------- --------- -------- Date Printed: 01-17-2003 Sludge Page 1 of 1 k1` Availphie WnetP Ctnrnva Cnnacity Source Name Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 11/01 180 Plan Year Month Available Storage Capacity (Days) 1 1 118 1 2 96 ! 3 122 1 4 142 1 5 161 1 6 180 1 7 180 1 8 180 1 9 180 1 10 157 1 11 133 1 12 108 * Available Storage Capacity is calculated as of the end of each month. ------------------ 425274 Database Version 2,0 { ------------------------------------ Date Printed: 0 1- 17-2003 Capacity Page 2 of 3 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storave Canacitv Source Name Swine Farrowing-WcanljEE Lagoon Li Hid Design Storage Ca acit (Days) Start Date l 1/0l 180 Plan Year Month Available Storage Capacity (Days) 1 1 117 1 2 95 1 3 123 1 4 144 1 5 164 1 6 180 1 7 180 i 8 180 1 9 180 1 10 158 1 11 134 1 12 109 * Available Storage Capacity is calculated as of the end of each month. i ------------ =--------------------------------------------------------------------------------------------------------- -------------------------------------------- 425274 Database Version 2.0 Date Printed: 01-17-2003 Capacity Page 1 of 3 l6 Available Waste Storaee Canacitv Source Name I Swine Nursery Lagoon Liquid I Design Storage Ca aci (Days) Start Date 1110 l 180 Plan Year Month Available Storage Capacity (Days) 1 1 120 1 2 99 1 3 129 I 4 151 1 5 172 1 6 180 1 7 180 1 8 180 1 9 180 1 10 158 I 11 135 1 12 Ill * Available Storage Capacity is calculated as of the end of each month. -------------------------------------------- --------------------------------------------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: 01-17-2003 Capacity Page 3 of 3 l*� Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be.applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations'° that restrict the rate of applications for other nutrients. 1 4. Animal waste shall be applied to land eroding less than 5 tons per acre 'per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, MRCS Field Office Teclinical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 1 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). --------------------------------------------------------------------------------------------------- .. .._ .. .. 425274 Database Version 2.0 Date Printed: 1/17/03 Specification Page 1 La 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other thanaswine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. ------------------ 425274 Database Version 2.0 ------------------------------------------------------------------.-------------- Date Printed: 1/17/03 Specification Pa,Re 2 II 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. ' Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the V owner is responsible for obtaining and implementing a "closure plan" which will `eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption, However, -if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. --------------------------------------------------------------------------------------------------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 Specification Page 3 ;LO 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate'than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. __ ; 425274 Database Version 2.0 i i ----- ----------------------- ---- -- - ---------------------- Date Printed: 1117/03 Specification Pale 4 aI Crop Notes The following crop note applies to field(s): IA, 1B, 1C, 1D, 2A, 2B, 2C, 2E, 2F, 2G, 2L, 2N, 3A, 3C, 3D Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 2D Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain,, hybrid berrnudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal).'Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bia/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. ----------------------------------------------------------------------------------- •-------------------------------------------------------------------- •- 425274 Database Version 2.0 Date Printed: 01-17-2003 Crop Note Page 1 of 3 The following crop note applies to field(s): 2H, 2I, 2J, 3B Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermuclagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs I" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): IA, 1B, 1C, 1D, 2A, 2B, 2C, 2E, 2F, 2G, 2L, 2N, 3A, 3C, 3D Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1.-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review,theNCSU Official Variety "green book'.' and information from privatecompanies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. ----------------- --------------------------------------------------------------------------------------1------------------------------------- 425274 Database Version 2.0 Date Printed: 01-17-2003 Crop Note Page 2 of 3 a The following crop note applies to field(s): 2D Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 Ibs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 2H, 2I, 2J, 3S Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 Ibs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. •--------------------•---------------------------------------------------- -------------------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: 01-17-2003 Crop Note Page 3 of 3 ANIMAL WASTE UTILIZATION PLAN * Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT 50 50 BH SG HYBRID BERMUDAGRASS-HAY SMALL GRAIN OVERSEEDED TONS TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES I AND 2 ACRES LBS AW N USED 63.38 28076 0 0 63.38 28076 * BALANCE -1229 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. �r%l'.L /Gff T7o.✓ U F A145 r 4,�u�� !%I�FQPE''r .g/aZzcr-3 /•ry�si•� ETc ThS��E '�'���ifev_ ,�CC r�-Z,OS G•• r i t/ �6 G,417X✓ .Sums �W C SET Z7� T7J /4--' i!/V !17✓;a / I've- f /eT f�i+�crc/�'r7drre[�-r%l/�/r►-G— �`fF� C��.nvr m� s. Wr�✓� tv�i / w E ���,�.�-� ; r � S im L C& (1. S I �G ��� f���L f c,��/o •✓ . Tt`f �S w�S �lJrv�� 77 /kwo G E` % �f,¢ zr¢�D G� �N�✓°r-.� ��1 ozdr�=� G�rr� Al u.' T %/Y :��� GYIi✓T�'t' elJvn"T"/f�S �S <c?"'� i¢'S �Gl'ir/df�' r yU i � �. ���,/-'�' 7?J 7-� c � 3 v •� � �rir��i��-•� f✓c.�,,• Page: 7 ANIMAL WASTE UTILIZATION PLAN %-/rid/5 f �° 7� J� ��rw���- h/!�s'/� G! /'l.C.rFf'! j7o.tJ Y'C./�s✓ /�d� %ri`� �/.`��/�'! iAFT 14,0 opts c_r¢i'7�rr✓ r S .*irT �y ,¢ t �'i �� /� �5 Ste" � rr� • r � /S /�rl�'if�i ✓T � � S G/¢�•O O H i !�� i�G�- rye.✓ S �'1�4c. G-/i'fir� SEvE��L ^ 4G 4 S T�}Tarti/ S. n. G c /¢iY1lJ c /H% S tl.� cr/r TE /� rr/ryrJ���ra�✓ 7715o�lE is ��I�/I✓!� ��TZr/��7✓ T/rl�L� �GfGC. /�''Y.d f ffZ� Lt/VV44.�S✓d lJct,TS1��c- /;P7P6--Y 0r✓ 771S-ec---54 �' �C � � ✓� S ��-�- r5�� D cr�rS dry Gr�i9-�i � . ���3E.A�Cc. h' h� �S w /f'EG i /L---7 Eft°- i Page: 12 100 03:50PM JOHNSTON CO. COOP EX 0-0rKV57-?1W C U- P.1/5 mendment to Include S& WCC Chronic Rainfall Practices and Standards through March 31, 2000 1. If this facility can comply with its existing permit and CAWMP it must do so, 2. Temporary Addition.of New 5prayfiadds O-(Check appropriate boxes.) (] A. acres of cropland. List crop types used: (] B. acres of hardwood woodland @ 100 lbs PAN / acre added. [] C. acres of pine woodland added @ 60 lbs PAN J acre added. 3. summer Perennial Grass (Check appropriate box.) 0 A. Application window extended for.1acres of perennial grass until first killing frost. [] B. An additional 50 lbs of PAN applied to 7 1 acres of perennial gaass prior to killing frost. 4. PAN Application Increased for Small Grains & Winter Grasses Lobe harvested. (Check appropriate box.) [] A. PAN application increased up to 200 lbs per acre for acres of small grains or winter gasses to be harvested. [] B. PAN application increased up to 150 lbs per acre for 'L acres of overseeded summer perennial included in 3. B. 5_ Waste Analysis (Check appropriate box.) [] A. Prior to December 1"', 1999 the calculation of PAN will be based on a 35% reduction of the last analysis taken -ior to the first 25 year 24 hour storm event. (Current waste analysis must be used after Dec.)" .) B. Use current waste analysis to determine PAN. 6. Reauired - Maximum Nitrogen Utilization Measures for Small Grains and Winter Grasses. A. Use of hieher seeding rates. B. Timely ha -vest of forage to increase yield, and C. irigatina during- periods of Warmer weather. !. 32e_quired - Irrigation Management Techniques to Reduce Runoff and Pondinp Potential. A. Makin_ frequent, light irrigation applications. and B. Not irrigating irnmcdiateiy before predicted rainfall. 8. The owner/ manager is required to manage the movement of animals to and from the faciiity to minimi2c environmental impacts, ensure compliance with the facility's permit and amended CAW -MP, and avoid discitar_e to surface waters. 9. Authorization to use the additional practices included in this amendment expires if a facility dis_har,es to surface waters. Any discharge is a violation and may result in an enforcement action. 10. The owner / operator is required to keep records of all waste applications. 11. This revision must include a mao or sketch of new land application areas. Facility :vurnbL .! � Facility Name Facility Owner / Manager Name (PRINT) ethnical S ecialist ame J N'Tj Facility Owner / Manbecr Signature Techni 7-pecialist Signaturo Date f �i 7 Dace ,z i This document must be filed at the SIVCD office and be attached to'the facilities CAW'IN7P and be available for inspection at the facility. ("`) ;vcw tcmporar}• sprayFicids n:t:st »7ect applicable buffer and setback requirements. Waste must rot oe _pplicd to wetlands_ 11/12/1999 DRAFT Draft - Revised January 20, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION FacilityNumber - l/ Operation is flagged fora wettable .�.L_ ..�� gg Farm Name: t_ E-*- ovum-s acre determination due to failure of On -Site Representative: e L-r-g- Part/1 eligibility item(s) F9 F2, F3-f�/ Inspector/Reviewer's Name: T_Pu-Jf Date of site visit: 3 )b zr Date of most recent WUP: Operation not required to secure WA determination at this time based on exemption El E2 E3 E4 3/13 Annual farm PAN deficit: —-- pounds Irrigation System(s) - circle and -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system w/permanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary gun system wlpermanent pipe; 7. stationary gun system wlportable pipe PART I. WA Determination Exemptions (Eligibility failure, Part II, overrides Part I exemption.) . E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D203 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres,'is complete and signed by a WUP. E4 75% rule exemption as verified in Part 111. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part II - F1 F2 F3, before completing computational table in Part III). PART II. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (_PAN) on spray field(s) according to farm's last two years of irrigation records. ,-,F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/_setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field's acres G (s a in excess) g of 75% of the respective field's total acreage as noted in table in Part 111. DRAFT Draft - Revised January 20, 1999 Facility Number ' -'S / -�Z_ Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER' 2 TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 3 7 S z r yo.�- r� d` J Z. a � 6 uw( o.S . V„/Z 2, FIELD NUMBER' - hydrant. pull. zone. or point numbers may be used in glace of field numbers deoendino on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption if possible; otherwise operation will be subject to WA determination. FIELD NUMBER - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. 7 f ' 06/24/2009 15:01 9199895659 JOHNSTON SWCD i Fax Transmittal Sheet From: Edward Humphrey, Johnston SWCD Fax Number: 919-989-5659 Phone Number: 919-934-7156 ext. 3 Email: edwaxd.hum hre nc.nacdnet.net To: Jane Bernard Fax Number: 919-571-4718 Re: Earl Lee Lagoon Total Pages: 4 Comments: Jerry Raynor asked me to fax this to you regarding Earl Lee spillway. Any questions please call. PAGE 01 i I 06/24/20091 15:01 9199895659 JOHNSTON SWCD PAGE 02 IjOLD3301RO AO PAGE 01!03 Smith Mr - Chris - Ooldii S. Freer' Smith, Chris - Goldsboro. ^iC 9ont Wednrdday. Jere 24, 2009 9:30 AM Tn: I�eynof, .tarry . Smithlieid, NG Binghem. Dean - Goldsboro, NC; Hines, Lee - Goldsboro. NC ubleM: Ernsl$ing: N0339WTLFeb09 ..I i LY0� nk t:hi9 will an.ewer your qulatio»S on the Earl- 1.0e lagvvns. aea'e+ pagoF 369-8 ana 339-•16. Plenra•nA t!?e standards have Changed, back thou -de di.d sot have to store but one 25 year Ihtcirm, I ;,h* ,r.h.,tached drawinq chows tw*. : kno,4 Earl Lee'ss lagoons may wit have AktCside drainage ara,4,s, but: is was coim"on pract:i.re to put emefgoney spillways an jagnona in Johr-et-on co. a.t 1 + *liar t ire . {t7i f fere nt area engineer , l T. do not knee wit! ou, locking at the dpgigne brtt I th.irk -veI planned about a .5 fact of 4.low through the epi.11wdy.'The free -board would be the i r?Evsti.on 9i -he @tart rumpirs elaYaClan to the crest rf the emergency spi.tlwa),, the ?r5lrage of t1ne, 25 yr, etor.m and the sgl.11way could have been in. the top fact of the sttclRO t,>Q of, dam.NoteI In pond rw,strurtiot the real Prey board is the difference it the si4rgery 3glii3.way flowing fUll rind tha top of, tYm gett�,Cd top Of dam.5o on a lagoon_ with a :rte3^gency Ap.il l,way it may jult be tl a difference' in a ervatlan between Vne evert pumping -neik and the nremr of the emergency spillwo.y, which meybo something less rhnn a Loo:•G�nn nat found some. 1986- 159 standard* that mays the gpilkway seeds to be at least. 1 foa: 6nl- • t!ie 9ett'I,ed top of e"- ankment-1 will fax ,you this. Z never co --Id find a old drawing, If yrna h3•rr nny cf the old 359 otanda,rds on tile ood I think the drawing that showed this was on green rapax , `I hope Chia will clear th_la up. r�hxio nh mrsAtae i.s el 4dy to be sent with the following file or litm attachments: Ah-"l-teat `.a: hetp:!/Veag.n.rc3.-jsda,gov/ reference o/pu61ic/NC/NC3S9W-.LFeb0q.pde Not:-?n protect. aga-not computer viruses, a -mail programs may prevetE sending or j rer.ei i.nra certain types of file attaehmants. Chcok your a -mail, xercurity aettingt to let-.nrmiue iaow attachments are h*rldled. I } I I I I i i � r j I I it 1 i 06/24/2009 15:01 9199895659 JOHNSTON SWCD PAGE 03 r519875 30k.D590RC :+0 PAGE 0'%03 Red. Ort. 14$Q 350-7 : Ian ajditian to the required eteaCment,welums, waeea treatment 1 ageOA shall be provided 'with temporary scotage. The ralnimum volume of tvaporary storage'is t.hq total of the following! � Dr sins a Area With OuKaide Dral�a&e,�Arsa Without Outside i �l. Maot:xe,lweete eater and normal. 1. Manure awe waste water' ruroif 2. Normal precipitation lvsa 2. Normal praQipi.ration less evayoration oe'poid'surfaco. evaporation ott pond surfacel 3, 25-year, 24-hour runoff 3. 25-year, 24-hour procipirRtion on pond surface iACCOeuiated during 61.■ p4 rtsd haeaaae timeo of Pxrwen effluent removal (normalLy by pumping). ;Additional storage may be provided to ingot mena;ement goals or replariohs. I r I Mitt Wears t.0armon~ lagoons Ahal,1 nat dischargR to surface waters unjeFR the owner dece"Ines through tha state regulatory agency that such dischdrgv will not orcravene seteblished water quality stendtirde. Lagoous having a maximum design 114uld level of 3 feat or more above natural ground shall be provided with en rmsrgency spillway to prrvo.nt averiopping during a 25-year. 24-bour storm ocrvrring when th& design volume is filled, The crest of the emergency spillway shall be at least 1 loot below the top of the settled embanlCnent. Th11 emergency spillway shall have a minimum bottom vidrh of 4 feet and shall paea 4 25-year. 24-houc storti wtthout overcopping the embanknent, Where lagveno R.npty 1ntn aaace storage ponds and the liquid level .a positively i controlled by at adequately aized over -flow pipe -- no emergency spillway le _jgnired. ! a r Emergency spillvsys ott lagoons without a drainage area may be omitted pzcvided the minimum elavatiurt of the seLt.led embankment top is one toot or more above J 'the elevation of the water lava! associated with the required creatment voluike !� ltl."• thW ere tiirec try storage, �W . _ ....,......-___. 1 I 1 G j] c,vr�taL^r ARV W�a Mph 1�L IUD l I t,a i I � Ike 6eq v Fred e�f �re. o-P e rm� e fi 06/24/2009` 15:01 9199895659 JOHNSTON SWCD PAGE 04 l`.i1F1ti is :S; ' F a19751 %r E. �r�"JLU530FtL' AO PAGE; �33lE33 159 8 Rev. oat 1966 •A Whale sx. ess effluent !a not to be removed from the lagoon, by punxpi.ng. an I va to ,� � raverlioy pipe shall be inatailed to diotharge irta seethes lagoon or s e . rteragi pond. The overf low papa shall have a minlium diameter of 5 inches Red shall have oufficiant capacity to pravaut wvbrtbppLaq' of the IagM during ptiak inflov periods. The ovsrfloa pipe shall be installed so Chat'affluent is diacharled [tom a minimum ref 6 inches below she surface. A "tee" pipe fitting nt similar device an the In Let and of the averilov pipe tray be used for this � i . � piscpoao. �•Prctectinn l;f the lagoon will ereate u safety hazard, It shall be fenced and worning .,igne posted to prevent cbildr■a and others from using it fet purposea other ;i!d 'than -intended. A prttective cover of vegetation will ba established 01% all disturbed areas. Temporary vegetation may be used until permanent vegetation •cwn he Mote6l.iahed, Vegetation mill be established in coppliance vith 'Crit- Seal Area tr.eetr►ene standards (342-iI) of the Technical Auide, The Lagoon e10N, be fenced, if nQnassat:y. to protect the vegetation. Vegetative screens or other emethods should be used to ahivld the Iagoon From public view and to 4tnnrade visual Aondi,tionn, i ova ration and Maintenanc peratinn and mai.ncQnance shall be performed accatding to the written opera lt•ien plan providoid for In the ovatall waste management plan. Plans and. Racificatiotta Plane end for installing waste treatment lagoona stall be in keerine with this tscAndard and shall dascribe the requirements for applying lthA prxettce to achieve its intended purpose. Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality April 9, 2003 Earl Lee Lee Brothers Farm 1245 Oak Forest Rd Four Oaks NC 27524 Subject: Certificate of Coverage No. NCA251004 Lee Brothers Farm Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear Earl Lee: On March 14, 2003, the North Carolina Division of Water Quality (Division) issued an NPDES General Permit for swine facilities. The General Permit was issued to enable swine facilities in North Carolina to obtain coverage under a single permit that addresses both State and Federal requirements. In accordance with your application received on February 20, 2003, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Earl Lee, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with NPDES General Permit NCA200000. The issuance of this COC supercedes and terminates your COC Number AWS510004 to operate under State Non -Discharge Permit AWGI00000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Lee Brothers Farm, located in Johnston County, with an animal capacity of no greater than an annual average of 4I08 Wean to Feeder, 6120 Feeder to Finish, 2000 Farrow to Wean swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until July 1, 2007. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring. data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully ,read this COC and the enclosed General Permit. Since this is a new joint State and Federal general permit it contains many new requirements in addition to most of the conditions contained in the current State general permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this_Mi-mit.__The Devices to Automatically _Stop irrigation Events Form must be returned to the Division of Water Quality no later than 120 days following receipt of the Certificate of Coverage. The Animal Facility Annual Certification Form must be completed and returned to the Division of Water Quality by no later than March 1st of each year. Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Customer Service Center An Equal Opportunity Action Employer S% NCDENR Internet httpVh2o.enr.state.nc.us/ndpu Telephone (919) 733-5083 Fax (919)715-6048 Telephone 1 800 623-7748 50% recycled/10% post -consumer paper If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C, the Clean Water Act and 40 CFR 122.41 including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual NPDES Permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Michelle Barnett at (919) 733-5083 ext. 544. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit NCA200000, Record Keeping and Reporting cc: (Certificate of Coverage only for all cc's) Johnston County Health Department Raleigh Regional Office, Water Quality Section Johnston County Soil and Water Conservation District Permit File NCA251004 Permit File AWS510004 NDPU Files JA, CL..L/c ' i 1 Lcl 8-/t w L U 1,4j etvi Ct dd '! aOvt ct Wan r agNutrient Mana ement For This plan has been prepared for: Lee Brothers Farm Earl Lee 1245 Oak Forest Road Four Oaks, NC 27524 919-894-3248 6.0 w& o j t Cam} r 4 s S rL vI ( 30 1, (6 W 10 -o S-e v`e v'a( Ole Y-5 Animal Waste Utilization 02-11-2003 This plan has been developed by: Edward Humphrey NRCS 806 North Street Smithf eld, NC 27577 919-934-7156 x.3 Developer Signature Type of Plan: Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Signature (owner) Date Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Wgter (Ionservatidi-CbrWssion. Plan Approved By: - -----------------------I-------------------------------------------------------------------------------------------------------------------------- Preview Database Version 2.0 Date Printed: 02-11-2003 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S5 Swine Nursery Lagoon Liquid waste generated 784,628 gals/year by a 4,108 animal Swine Nursery Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 1807 Incorporated 3104 Injected 3418 Irrigated 1964 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 2,115.62 845,064 -60,436 S7 Swine Feeder -Finish Lagoon Liquid waste generated 5,673,240 gals/year by a 6,120 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 13067 Incorporated 22441 Injected 24713 Irrigated 14203 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 14,682.58 5,864,825 -191,585 ---------- ------------------------------------------------ Note: In source ID, S means standard source, U means user defined source. 425274 Database Version 2.0 Date Printed: 01-17-2003 Source Page 1 of 2 S9 Swine Farrowing-Weanling Lagoon Liquid waste generated 6,406,000 gals/year by a 2,000 animal Swine Farrowing-Weanling Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 9885 Incorporated 16977 Injected 18696 Irrigated 10745 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 11,198.80 6,676,506 -270,506 ------------------------------------------------------------------------------------ Note: In source 1D, S means standard source, U means user defined source. 425274 Database Version 2.0 Date Printed: 01-17-2003 Source Page 2 of 2 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crop s Summary Tract Field Leaching Index (1.I) Soil Series Crc)E Sequence RYE 3752 IA NIA Blanton Small Grain Overseed L0 Tons Hybrid Bermudagrass Hay *8.0 Tons 37521 1 B NIA 1131anton Small. Grain Overseed L0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 1C NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8,0 Tons 3752 1 D NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2A NIA Blanton Small Grain Overseed L0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2B NIA Blanton Small Grain Overseed . 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2C NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 21) NIA Boiac Small Grain Overseed LO Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2E NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8,0 Tons 3752 2F NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2G NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2H NIA Uchee Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 21 NIA Uchee Small Grain Overseed L0 Tons Hybrid Bermudagrass Nay *8.0 Tons 3752 2I NIA Uchee Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 2L NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8,0 Tons 3752 2N NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 3A NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 3752 3B NIA j7hee Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay 1*8.0 Tons 425274 Database Version 2.0 Date Printed: 01-17-2003 PCS Page 1 of 2 NOTE: Symbol * means user entered data. Planned Crops Summary Tract Field Leaching Index (LI) Soil Series Crop Sequence RYE 3752 3C NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons 37521 3D NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay *8.0 Tons LI Potential Leachin& Technical Guidance Low potential to contribute to None 2 soluble nutrient leaching below the root zone. > = 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. < = 10 soluble nutrient leaching below the root zone. High potential to contribute to Nutrient Management (590) should be planned. Other conservation practices that improve soluble nutrient leaching below the the soils available water holding capacity and improve nutrient use efficiency should be > 10 root zone. considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and parian Forest Buffers (39I). 425274 Database Version 2.0 Date Printed: 01-17-2003 PCs Page 2 of 2 NOTE: Svmbol * means user entered data. The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Depending on the requirements of the crop and the nutrient content of the waste, some nutrients will likely be over or under applied if animal waste is being utilized. Waste should be analyzed before each application cycle and annual soil tests are required if animal waste is being applied. Soil tests should be used to balance the nutrient application amounts with the realistic yields of the crop to be grown. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. Waste Utilization Table Year 1 Tract I Field Source 1-17. I Soil Series Total Acre Use. Acres crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (lbslA) Applic. I Method Manure I PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs1A 1000 I gallA tons 1 1000 gals tons 3752 IA SS Blanton 2.25 2.09 Small Grain Overseed 1.0 Tons 10l1-3131 50 0 D IrriR. 4 1.60 0 3.34 0.00 3752 IA S7 Blanton 2,25 2.09 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Inig, 26 10.39 0 21.71 0.00 3752 lA S9 Blanton 2,25 2.09 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 20 11.92 0 24.92 0.00 3752 lA S5 Blanton 2.25 2.09 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 4 0 brig. 30 11-98 0 25.05 0.00 3752 lA S7 Blanton 2.25 2,09 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irria. 210 83.88 0 175-32 0.00 3752 IA S9 Blanton 2.25 2-09 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irriq. 160 95.39 0 199.36 0.00 3752 IB SS Blanton 9.00 8.57 Small Grain Overseed 1-0 Tons 1011-3131 50 0 0 Irris. 4 1.60 0 13.69 0.00 3752 1B S7 I Blanton 9.00 8.57 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Imq, 26 10.39 0 89.00 0.00 3752 1B S9 Blanton 9.00 8.57 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrilr. 20 11.92 0 102.19 0,00 3752 1B S5 Blanton 9.00 8.57 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irriv. 30 11.99 0 102.70 0.00 3752 1B S7 Blanton 1 9.00 8.57 Hybrid Betmudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 210i 83.88 0 718.87 0.00 ----------------------------------------------------------------------------------------------•------------------------ --------------------------------------------------------- ...--------------------------------------------------------------------•- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page 1 4- � 1 Waste Utilization Table Year l Tract I Field Source I.D. I Soil Series Total Acre Use. Acres I Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (ibs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N I N I lbs1A 1000 RallA I tons 1000 gals tons 3752 IB S9 Blanton 9.00 8.57 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 IrriR. 160 95.39 0 817.48 0.00 3752 IC S5 Blanton 6.00 5.71 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig, 4 1.60 0 9.12 0.00 3752 1C S7 Blanton 6.00 5,71 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 IrriR. 26 10.39 0 59.30 0.00 3752 1C S9 Blanton 6.00 5.71 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 IrriR. 20 11.92 01 68.09 0.00 3752 IC S5 Blanton 6.00 5.71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.99 0 68.42 0.00 3752 1C S7 Blanton 6.00 5.71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 478.97 0,00 3752 1C S9 Blanton 6,00 5.71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 IrriR. 160 95.39 0 544.67 0.00 3752 1 D S5 Blanton 5-25 4-93 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 IrriR, 4 1.60 0 7-88 0.00 3752 1D S7 Blanton 5-25 4.93 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 brig. 26 10.39 0 51.20 0.00 3752 1D S9 Blanton 5.25 4.93 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 20 11.92 0 58.78 0,00 3752 1D 35 Blanton 5.25 4,93 Hybrid Bermudagrass Hay *8.0 Tons 311-9)30 *400 0 0 brig. 30 11.98 0 59.08 0.00 37521 1D S7 Blanton 5,25 4.93 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *400 0 0 Irrig. 210 83,88 0 413.54 0.00 3752 1 D S9 I Blanton 5.25 4.93 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig. 160 95.39 0 470.27 0.00 3752 2A SS Blanton 3.80 3.50 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 4 1.60 0 5.59 0.00 3752 2A S7 Blanton 3.80 3.50 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig, 26 10.39 0 36.35 0.00 3752 2A S9 Blanton 3.80 3.50 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 41.73 0.00 3752 2A SS Blanton 3.80 3.50 Hybrid BerTnudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11,98 0 41,94 0.00 3752 2A S7 Blanton 3.80 3,50 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *400 0 0 Irrig. 210 83.88 0 29359 0.00 3752 2A S9 Blanton 3.80 3.50 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 333.86 0.00 3752 2B S5 Blanton 4.10 3.81 Small Grain Overseed 1.0 Tons 10/1-3/31 54 0 0 Irrig. 4 1.60 0 6.09 0.00 3752 2B S7 Blanton 4.10 3.81 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 D brig. 26 10.39 0 39.57 0.00 3752 2B S9 I Blanton 4.10 3.81 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig, L 20 11.92 0 45.43 0.00 - Waste Utilization Table Year l Tract Field Source I.D. Soil Series Total Acre Use. Acres Crop RYE Applic, Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. Obs/A) y Applic. Method _Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) I N N N Ibs/A 1000 gal/A tons 1000 gals tons 3752 2B S5 Blanton 4.10 3.81 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 45.66 0.00 3752 2B S7 Blanton 4.10 3.81 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 319-59 0.00 3752 2B S9 Blanton 4.10 3.81 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 363.43 0.00 3752 2C S5 Blanton 5.25 4.76 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 01 brig. 4 1.60 0 7.61 0.00 3752 2C S7 Blanton 5.25 4.76 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 brig. 26 10.39 0 49.44 0.00 3752 2C S9 Blanton 5.25 4.76 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 56.76 0.00 3752 2C S5 Blanton 5.25 4.76 Hybrid Bermudograss Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 5T04 0.00 3752 2C S7 Blanton 5.25 4.76 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig. 210 83.88 0 399.28 0,00 3752 2C S9 Blanton 5.25 4.76 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig. 160 95.39 0 454.05 0,00 3752 2D S5 Bojac 4.65 4.38 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig, 4 1,60 0 7.00 0.00 3752 2D S7 Bojac 4.65 4,38 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 26 10.39 0 45.49 0,00 3752 2D S9 Bojac 4,65 4.38 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 20 11.92 0 52.23 0-00 3752 2D S5 Bojac 4.65 4.38 1 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 301 I L98 0 52.49 0.00 3752 2D S7 Bojac 4.65 4.38 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *4001 0 01 Irrig. 210 83.981 0 367,41 0.00 3752 2D S9 Bojac 4.65 4.38 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 brig. 160 95.39 0 417.80 0.00 3752 2E S5 Blanton 4.50 4.17 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 4 1.60 0 6.66 0.00 37521 2E S7 Blanton 4.50 4.17 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 26 10.39 0 43.31 0.00 3752 2E S9 Blanton 4.50 4,17 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 49.72 0.00 3752 2E S5 Blanton 4.50 4.17 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig, 30 11.98 0 49.97 0.00 3752 2E S7 Blanton 4,50 4.17 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 210 83.88 0 349.79 0.00 3752 2E S9 Blanton 1 4.50 4.17 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 1 160 95,39 ❑ 397.77 0.00 3752 2F SS Blanton 4.20 3.92 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 D Irrig. 4 1.60 ----OF 6.26 O.DO ------------------------------- -------- --- ------ ---------- -------------...-----------------g- --------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page 3 Waste Utilization Table Year 1 Tract Field Source I.D. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (Ibs/A) Applic. Method aanure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 ga11A tans 1000 gals tons 3752 2F S7 Blanton 4.20 3.92 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 brig. 26 10,39 0 40.71 0.00 3752 2F S9 Blanton 4.261 3,92 Small. Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 20 I L92 0 46.74 0.00 3752 2F S5 Blanton 4.20 3.92 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 brig. 30 11.98 0 46.97 0.00 3752 2F S7 Blanton 4.201 3.92 1 Hybrid Bermudagrass Hay * .8-0 Tons 3/1-9130 *400 0 0 Irrig. 210 83.88 01 328.82 0.00 3752 2F S9 Blanton 4.20 3.92 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irri.¢. 160 95,39 0 373.92 0.00 3752 20 SS Blanton 4.80 4.52 Small Grain Overseed 1.0 Tonsi 1011-3131 50 0 0 Irrig. 4 1.60 01 7.22 0.00 3752 2G S7 Blanton 4.80 4.52 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig, 26 10.39 0 46.94 0.00 3752 2G S9 Blanton 4.80 4.52 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 20 11.92 p 53.90 0.00 3752 2G S5 Blanton 4,80 4.52 Hybrid Bermudagrass Hay *8.0 Tons 3/I-9/30 *400 0 0 brig. 30 11.98 0 54.16 0.00 3752 2G S7 Blanton 4,80 4.52 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig, 210 83.98 0 379.15 0.00 3752 2G S9 Blanton 4.80 4,52 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *400 0 0 Irrig. 160 95.39 0 431.16 0.00 3752 2H S5 Uchee LOU 0.71 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 01 Irrig. 4 1.60 01 1.13 0.00 3752 2H S7 Uchee 1.00 0.71 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 26 1039 0 7.371 0.00 3752 2H S9 Uchee 1.00 0.71 Small Grain Overseed 1.0 Tons I 1011-3131 50 0 0 Irrig. 20 11.92 0 8.47 0.00 3752 211 S5 Uchee 1.00 0-71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 D 0 Irrig. 30 11.98 0 8.51 0.00 3752 2H S7 Uchee 1.00 0.71 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 D brig. 210 83.88 0 59.56 0.00 3752 2H S9 Uchee I.00 0-7 1 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 160 95.39 0 67.73 0.00 3752 21 S5 Uchee 1.60 1.45 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 4 1.60 0 2.32 0.00 3752 21 S7 Uchee 1.60 1,45 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig- 26 10.39 0 15,06 0.00 3752 21 S9 Uchee 1.60 1.45 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11.92 0 17.29 0.00 3752 21 S5 Uchee 1.60 1.45 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 01 0 brig. 30 11.98 0 17,38 0,00 3752 2I S7 I Uchee 1.60 1.45 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 210 83.8- p 121,63 0,00 --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page 4 Waste IJtiII7.ation Table Year 1 Tract Field Source I.D. I Soil Series Total Acre Use, Acres I Crop RYE Applic, I Period Nitrogen PA Nutrient Req'd Comm. Fen. Nutrient Applied Res. Obs/A) Applic- Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N I N I Ibs/A 1000 gal/A I tons 1000 gals tons 3752 2I S9 Uchee 1.60 1A5 Hybrid Berrnudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 160 9539 0 138.31 0.00 3752 2J S5 Uchee 1.75 1.54 Small Grain Overseed 1-0 Tons 10/1-3/31 50 0 0 Irrig. 4 L60 0 2.46 0.00 3752 21 S7 Uchee 1.75 1.54 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 15.99 0.00 3752 2J S9 Uchee 1.75 1.541 Small Grain Overseed 1.0 Tons 10/1-3/31 501 0 0 Irrig. 20 11.92 01 18.36 0.00 3752 2J S5 Uchee 1.75 1.54 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 18.45 0.00 3752 2J S7 Uchee 1.75 1.54 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 210 83.88 0 129.18 0.00 3752 21 S9 Uchee 1.75 1.54 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 160 95.39 0 146.90 0.00 3752 2L SS Blanton 1.00 0.88 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 4 L60 0 1.41 0.00 3752 2L S7 Blanton 1.00 0.88 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 9.14 0.00 3752 2L S9 Blanton 1.00 0.88 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 20 11-92 0 10.49 0.00 3752 2L SS Blanton 1.00 0.88 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 10.55 0.00 3752 2L S7 Blanton 1.00 0.88 Hybrid Bermudagrass Hay *8.0 Tons 311-9130 *4001 0 0 hTig. 210 83.88 0 73.82 0.00 3752 2L S9 Blanton 1.00 0.88 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 brig. 160 95.39 0 83.94 0.00 3752 2N S5 Blanton 0.75 0.59 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 01 brig. 4 L60 01 0.94 0.00 3752 2N S7 I Blanton 0.75 0.59 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 26 10.39 0 6.13 0.00 3752 2N S9 Blanton 0.75 0.59 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig, 20 11.92 0 7.04 0.00 3752 2N SS Blanton 035 0.59 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 01 0 Irrig. 0 0.00 0 0.00 0.00 3752 2N S7 Blanton 0.75 0.59 1 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 0 0.00 0 0.00 0.00 3752 2N S9 Blanton 0.75 0.59 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 0 0.00 0 0.00 0.00 37521 3A S5 Blanton 4.50 4.12 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 brig. 4 1.60 0 6.58 0.00 3752 3A S7 Blanton 4.50 4.12 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 26 10.39 0 42.79 0.00 3752 3A S9 Blanton 4.50 4.12 Small Grain Overseed 1.0 Tons 10/1-3/31 50 D 0 brig. 20 11.92 0 49.13 0.00 ------------------------------------ -- ----------- --- - ----- --------- ­ ----------------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Pale 5 Waste Utili7.ation Table Year l Tract Field Source I.D. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (1bs/A) Applic. Method Manure PA Nutrient Applied Liquid 1 Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 gaUA a tons 1000 gals tons 3752 3A SS Blanton 4.50 4.12 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig. 30 11.98 0 49.37 0.00 3752 3A S7 Blanton 4.50 4.12 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 210 83.88 0 345.60 0.00 3752 3A S9 Blanton 4.50 4.12 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 brig. 160 95.39 0 393.00 0.00 3752 3B SS I Uchee 1.75 1.56 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 01 Irrig, 4 1.60 01 2.49 0.00 3752 3B S7 I Uchee L75 1.56 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 brig. 26 1039 0 16.20 0.00 3752 3B S9 Uchee 1.75 1.56 Small Grain Overseed 1.0 Tons 10/1-3/31 Sol 0 0 Irrig. 20 11.92 0 18.60 0.00 3752 3B S5 Uchec 1,75 1.56 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 30 11.98 0 18.69 0.00 3752 3B S7 Uchee 1.75 1.56 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig. 1 210 83.88 0 130,86 0.00 3752 3B S4 Uchee 1.75 1.56 1 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9130 *400 0 0 Irrig. 160 9539 0 148.81 0.00 37521 3C S5 Blanton 1.75 1.45 1 Small Grain Overseed 1-0 Tons 10/1-3/31 501 0 0 Irrig. 4 L60 0 2.32 0.00 37521 3C 57 Blanton 1.75 1.45 Small Grain Overseed 1.0 Tons 10/1-3/31 1 50 0 0 Irk. 26 10.39 0 15.06 0.00 3752 3C S9 Blanton 1.75 1.45 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 01 Irrig. 20 11.92 0 17.29 0.00 3752 3C S5 Blanton 1,751 1.45 Hybrid Bermudagrass May *8.0 Tons 3/1.9/30 *400 0 0 brig. 30 11.98 01 17.38 0.00 3752 3C S7 Blanton 1.75 1.45 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 Irrig- 210 83.88 0 121.63 1 0.00 3752 3C S9 Blanton 1.75 1.45 1 Hybrid Bermudagrass Hay *8.0 Tons 311-9/30 *400 0 0 Irrig. 160 95.39 0 138.31 0.00 3752 3D SS Blanton 1.00 0.72 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Irrig. 4 1.60 0 1.15 0.00 3752 3D . S7 Blanton 1.00 0.72 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 brig. 261 10,39 0 7.48 0.00 3752 3D S9 Blanton 1.00 0.72 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 brig. 20 11.92 0 8.59 0.00 3752 3D S5 Blanton 1.00 0.72 Hybrid Bermudagrass Hay *8.0 Tons 3/1-9/30 *400 0 0 irfig. 0 0-00 0 0.00 0.00 3752 3➢ S7 Blanton 1.00 0.72 Hybrid Bermudagrass Hay *8.0 Tans 3/1-9/30 *400 0 0 brig- 0 0.00 0 0.00 0.00 3752 313 S9 Blanton 1.00 0.72 1 Hybrid Bermudagrass Hay *8.OTons 3/1-9/30 1 *400 0 0 brig- 0 0.00 0 0.00 0.00 ---------------------------------------------------------------------------- - - ------ I ---------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page 6 Waste i Tfili7.atinn Table Year l Tract Field Source LD. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (]bslA) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 Ral/A 1 tons 1000 Rals tons Total Applied, 1000 gallons 13,386.39 Lagoon Liquids Total Produced, 1000 gallons 12,963.87'; .:. . Balance, 1000 gallons -522.52 Total Applied, tons 0.00 Manure Solids Total Produced, tons 4.40 Balance, tons 0.00 Notes: 1. In the tract column, symbol — means ]eased, otherwise, owned. 2. Symbol * means user entered data. --------- ----------------------------------------------------------------------•--------------------------------•--------------- -------- --------- -------- ------------.----------- ---------- ----------------------------- --------------- 425274 Database Version 2.0 Date Printed: 1/17/03 WUT Page 7 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also Iists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 3752 IA Blanton 0.75 0.48 3752 113 Blanton 0.75 0,48 3752 1C Blanton, 0.75 0.48 3752 1D Blanton 0.75 0,48 3752 2A Blanton 0.75 0.48 3752 213 Blanton 0.75 0.48 3752 2C Blanton 0.75 0,48 3752 2D Bojac 0.50 0.96 3752 2E Blanton 0.75 0,48 3752 2F Blanton • 0.75 0.48 3752 2G Blanton 0.75 0.48 3752 2H Uchee 0.60 0.72 3752 121 Uchee 0.60 0.72 3752 121 Uchee 0.60 0.72 3752 2L Blanton 0.75 0.48 3752 2N Blanton 0.75 0.49 3752 3A Blanton 0.75 0.48 3752 3B Uchee 0.60 0.72 3752 3C Blanton 0.75 0.48 3752 3D IBlantn 0.75 0.48 -----------------------------------•----------------------------------------- ---- ---- g ---... 425274 Database Version 2.0 Date Printed: 01-17-2003 IAF Page 1 of The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should betaken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Farrowing-Weanling Lagoon Sludge - Standard Corn 120 bu 150 13.16 59.26 118.53 177.79 Hay 6 ton R.Y.E. 300 26.32 29.63 59.26 88.89 Soybean 40 bu 160 14.04 55.56 111.12 166.68 Swine Nursery Lagoon Sludge - Standard Corn 120 bu 150 13.16 10.46 20.91 31.37 Hay 6 ton R.Y.E. 300 26.32 5.23 10.46 15.68 Soybean 40 bu 160 14.04 9.90 19.60 29.41 Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 76.72 153.45 230.17 Hay 6 ton R.Y.E. 300 26.32 38.36 76.72 115.08 Soybean 40 bu 160 14.04 71.93 143.86 215.78 ------------ •----------------------------------------------------------------------------------- --------------------•---------------------------------------------------------• • ------ 425274 Database Version 2.0 Date Printed: 01-17-2003 Sludge Page 1 of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste StoraRe CaDacitv Source Name Swine Farrowing-Weanling Lagoon Liquid Design Storage Capacity (Days) Start Date 11/01 180 Plan Year Month Available Storage Capacity (Days) 1 1 117 1 2 95 1 3 123 1 4 144 1 5 164 1 6 180 1 7 180 1 8 ISO 1 9 180 1 10 158 1 11 134 1 12 109 * Available Storage Capacity is calculated as of the end of each month. ------------------------------------------------------------------------------------ ------------- --------------------- 425274 Database Version 2.0 Date Printed: 01-17-2003 Capacity Page 1 of 3 Available Waste Storage Canacitv Source Name Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 11101 180 Plan Year Month Available Storage Capacity (Days) 1 1 118 1 2 96 1 3 122 1 4 142 1 5 16I 1 6 180 1 7 180 1 8 180 1 9 180 1 10 157 1 11 133 1 12 108 * Available Storage Capacity is calculated as of the end of each month. -------------------------------------------------------------- ----------- - --------- 425274 Database Version 2.0 Date Printed: 0 1- 17-2003 Capacity Page 2 of 3 Available Waste Storage Caoacity Source Name I Swine Nurse La oon Liquid Design Storage Capacity (Days) Start Date 11/01 180 Plan Year Month Available Storage Capacity (Days) 1 1 120 1 2 99 1 3 129 1 4 151 I 5 172 1 6 180 1 7 180 1 8 180 1 9 180 1 10 158 1 11 135 1 12 111 * Available Storage Capacity is calculated as of the end of each month. ---------------------------------------------------------------------------------1-- -------------------------...------------------------------ 425274 Database Version 2.0 Date Printed: 01-17-2003 Capacity Page 3 of 3 Required Speciflcations For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, MRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). --------------------------------------------------------------------------- -- -- --------------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 Specification Page 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,19959 shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. ---------------------------------------------------------------------------------------------------------------------------------------------------- 425274 Database Version 2.0 Date Printed: 1/17/03 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge„ pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. ..----------------------------------------------- I ---- -------------------------- ----------------- 425274 Database Version 2.0 Date Printed: 1/17/03 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years.. 23. Dead animals will be disposed of in'a manner that meets North Carolina regulations. -------------------------------------------------------------------------------------------------------------------------------- ------------------------ I-------- 425274 Database Version 2.0 Date Printed: 1/17/03 Specification Page 4 Crop Notes The following crop note applies to field(s): IA, 113, 1C, 1D, 2A, 2B, 2C, 2E, 2F, 2G, 2L, 2N, 3A, 3C, 3D Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. I to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced F to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb1ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 Iblac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 2D Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced I' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. ----------------------------------------------------•---------------------------------- ------- ------------•----------------- 425274 Database Version 2.0 Date Printed: 01-17-2003 CropNote Page 1 of 3 The following crop note applies to field(s): 2H, 2I, 27, 3B Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (L5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 Ib/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1A, 113, 1C, 113, 2A, 213, 2C, 2E, 2F, 2G, 2L, 2N, 3A, 3C, 3D Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. ----------------------------------------------------------•--------------- _------------------ ----------------------------------------------------- 425274 Database Version 2.0 Date Printed: 0I-17-2003 Crop Note Page 2 of 3 The following crop note applies to field(s): 2D Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 2H, 2I, 2J, 3B Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains'at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. ---------••------------------------------------------------------------ ------g-------------- 425274 Database Version 2.0 Date Printed: 01 - 17-2003 Crop Note Page 3 of 3 I ANIMAL WASTE UTILIZATION PLAN * Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH SG HYBRID BERMUDAGRASS-HAY SMALL GRAIN OVERSEEDED TONS 50 50 TABLE 1 TABLE 2 TOTAL ** TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 63.38 28076 0 0 63.38 28076 * BALANCE -1229 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. y�Q�.0 /G� T7a,✓ 0 C✓ff5 / s c�-�.°«Jr �y �' mE yufi��i <GicgP�,,.r r✓O Z Z cr3 /'�{ s-rT ETG Tf/,�� ��E 4' i/cV. r�ZAS �.- TN a L.4r7i v S o res �,s�E SET 0r1J /A!'�Ly Ald 1Wc#fC 77x~ ���.�vr w1��7""Ff f, G✓ N IWOIV r/,s wE7f� 1���.�n-� i r � Sef4,0E' �`xtr7'i %Q dAEG[{ ��"�° �p��l �.¢�'ia•✓ , i t`f /rs W"f-s �J�/� 77 c E' TrfL'_ 0� �N�°•�i`, K=� c f����y u,� 7-0 � err S 9 i 7 r.v� f /4� � SS y� ���V �o �f°E �� �T�. Page: 7 ANIMAL WASTE UTILIZATION PLAN �/f-r s e° tf�i✓ / s sc�` � P jr/ /! 5� �d d /6s / /' ,�// �v�� �� .5�.(t�'; 7`/S�rS r s 7 r`r� �� � v r/'��- W�Sr"� H T /.c.rF�i-7o.d y'vi�✓ fr1'P %`t ���i r T �i�Prrl .� L s �f�s ,�.as Ti �.=•�� c ,yx.-,.' 4" t Td •0.�i'f7 ryE j/lFz,� It/ f�E� D v�l �I �✓v S ✓!i/�� L (�-/(�'/�/ / ' rs /QG G U��y /►i��►�IJC�! % �I /;�f I'll cti.+q /'c-lf�'✓r !� r� rtry so war s� s /�1�Y G° •� ��• ,vh /s L-5 sue":.. . �ffi�T T �� ✓`�� ® . /¢-GL dw .✓ iyffyc.t_ d-iJ /1i�/� 7`� SC��,O d �l i %h�� �C+h7/�/�✓!r1/l� � "7 7r/L�7✓ Tfl`L� /�G/4 L �y� Tff Gr�U/ocl.9i✓ram !� AIC- r4'n/�J. Tftc� �J��T3�vc� �P ate✓ ; ,5�c- � ��s��s a.✓ " L � � ✓c S �Jf}-u- �i,� o uwrS d� Gci�Tr . �P�E�t'c. hr /� �S cj f7 tr/.t/ Ti�A I 7 —/115- rJLrT�7� l4 d/ : ff c✓r77� D M "I cif/ iGL074ir�yi( e C rYJ' Page: 12 State of North Carolina Department of Environment and Natural Resources • Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary NCDENR Kerr T. Stevens, Director NORTH CAROLINA DEPARTMENT OF ENVIRONMENT_, AND NATURAL-, RESOURCES December 30, 1999 Earl Lee Lee Brothers Farm kfc,laN�� OFF . 1245 Oak Forest Rd Four Oaks NC 27524 Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 5.1-4- 4ohnston-County Dear Earl Lee: This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRRi, IRR2, DRY], DRY2, DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact -Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerely, s Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Johnston County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural. Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director June 26, 1998 Earl Lee Lee Brothers Farm 1245 Oak Forest Rd Four Oaks NC 27524 Ai • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Reissuance of Certificate of Coverage No.AWS510004 Lee Brothers Farm Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear Earl Lee: The Division of Water Quality modified the Swine Waste Operation General Permit originally issued to this facility on April 21, 1997. In accordance with the issuance of the revised General Permit, we are forwarding this Certificate of Coverage (COC) to Earl Lee, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG 100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Lee Brothers Farm, located in Johnston County, with an animal capacity of no greater than 4108 Wean to Feeder, 6120 Feeder to Finish and 2000 Farrow to Wean and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003, and shall hereby void COC No AWS510004 dated April 21, 1997. The COC shall hereby incorporate by reference any specific conditions of the previous COC issued to this facility. The purpose of this COC is to allow coverage under the revised General Permit. Please review the revised General Permit (enclosed) and pay particular attention to Condition II.10 regarding tree removal from lagoon embankments, Condition I13.1 regarding inspection frequency of the waste treatment, storage and collection system and Condition II1.6 regarding notification requirements for system failures, spills and emergencies. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed.prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS510004 Lee Brothers Farm Page 2 Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the D WQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. Sincerely, for A. Preston Howard, Jr., E. cc: (Certificate of Coverage only for all cc's) Johnston County Health Department Raleigh Regional Office, Water Quality Section Johnston County Soil and Water Conservation District Permit File State of North Carolina Department of Environment, Health and Natural Resources 4 F?WA 0 Raleigh Regional Office7a James B. Hunt, Jr., Governor IDE�HNFZ Jonathan B. Howes, Secretary Division of Soil and Water Conservation July 16, 1997 Earl Lee 1245 Oak Forest Rd. Four Oaks, NC 27524 SUBJECT: Operation Review Summaries and Corrective Action! Recommendations Lee Brothers Farm Facility No. 51-4 Johnson County Harold W. Lee and Sons Farm Facility No. 51-52 Johnson County Dear Mr. Lee, On July 15, Operation Reviews were conducted of Lee Brothers Farm, facility no. 51-4 and Harold Lee and Sons Farm, facility no. 51-52. These Reviews, undertaken in accordance with G.S. 143-215.10D, are one of two visits scheduled for all registered livestock operations during the 1997 calendar year. The Division of WateriQuality will conduct a second site inspection. During the Reviews, it was determined that waste was not being discharged to the waters of the State, and the animal waste collection, treatment, storage and disposal systems were properly maintained and operated under the responsible charge of a certified operator. Copies of the completed review forms are enclosed for your information. The following observances and questions were discovered and noted for corrective action or response: 1. The vegetation around lagoon #2 on the Harold Lee and Sons Farm needs to be mowed to permit easy visual inspection and vegetation established on the bare areas at the comer. 2. Remove dead tree limbs from the backside of lagoon #1 on the Lee and Sons Farm. 3. The built up side of lagoon #3 on the Lee Bros. Farm has uneven areas I the rainfall diversion pathway. Please even this into a gently sloping pathway for the rainwater to follow and avoid the possibility of excess rainfall entering the lagoon. 4. Lagoon #4 has some channels present on the sides. Please establish vegetation to avoid further erosion. 5. Both farms are certified and permitted with the permit number being the C.O.C. number on the letters. The Division of Soil and Water Conservation appreciates your cooperation with this Operation Review. Please do not hesitate to call me at 919/571-4700 ext. 208 if you have any questions, concerns or need additional information. Sincerely, Margaret C�"Keefe Environmental Engineer I cc: Johnson Soil and Water Conservation District Judy Garrett, Water Quality Regional Supervisor DSWC Regional Files 3800 Barrett Drive, Suite 101, � FAX 919-571-4718 Raleigh, North Carolina 27609 N%4w C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700EIRMINMEMM� 50% recycled/ I Tlo post -consumer paper y 'a State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality Non -Discharge Permit Application Form / Survey (779S FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Liquid Animal Waste Operations The following questions have been completed utlUzing information on file with the Division. Please review the tnfonmation for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please Complete as best as possible_ Do not leave any question unanswered. �j Application Dale: `" I �7' ? _ _ I . REQUIRED ITEMS CHECKLIST Please Indicate that you have Lead rite following list of requkewnts by sung your initials in the space provided neu to ch L _µ Atrizil� Tfirialg r.:. � 1. One completed and signed original and one copy of the application for General Permit - Animal Waste Operatio=, 2. Two copies of a general location map indicating the locadoa of the animal wasta hdIl bes and field locations where animal waste is disposed; 3 Two copies of the Ccrdried Animal Waste Management Plan (CAW MP). If the facility does not have a CAWW, sae muse be completed prior to sabmilW of a general permit vplication y �� for animal wasp; operations. If. GENFJL4,L DWORMATTON: I. Farm's aamc:lar BzojhW Farm �. - 2. Print Land Owner's name= Earl Lee d- 1eA art IL- v.-C-I Land Owne $ Minim addregs: 1245 Oait Foxest Rd Oily; Fonr O jC ... ZIP- 27MA Telephone Nmnber, 894,1330 _ 4. County where farm is locate rohaston 5_ Farm Location (Dbecdous from nearestmajor highw4y. Pleat include 5R numbers for state :aafs_ Please include a cWy of a county road map with the location of the farm ideas fief From thf intersection of 96 and 50 ga South on 50 for 1..4 6. Print Farm Managees name (f different ftwn Land Owner): 7_ Lessee's ! intesrator's same (if applicable; please circle which type is listed)_ i3SDA--MRCS, FORM: AWO-G-E 2l97 Page 1 of 3 III'. OMR ATTON INFORMATION: 1. Farm No.:.U-A 2. Operation Description_ Swine Operation Farrow to Finish 1800 - CerOcdDCOP Copacity Is the above information cotreet? 0 yes; ED n - If no, correct below us4 the design capacity of the facility 0 Wean to Fboder 0 Feeder to Finish 0 Farrow to Wean (# sow) 0 Farrow to Feeder (# sow) No- of AnimaIr. Jl-- clx a 014W 0 Non -Layer 0 Turfy L= of Cattle No. of Animals '"any 0 WI 0 Fatrorw to Fmish (# sow) -`A Other Type of Livestock on the Nrmn ____No. of Animals 3. Acreage r3ewed and available for application_ -68 Required Acreage (as listed in the CAWMP): 0 4. Number ofI.Agoon9_ ; Total Capadry: �cr- 1 53 Cubic Feet (ft3) Vic; �r Nwnber of Storar Ponds- ; Total Capacdy_ Cubic Feet 00 S. Is animal waste being applied on any field which bas sable chains? YES or O (please ci;ffle ana} 6. Arm subsurface dralas Mmut in Ow vicinity of or under the lagoon? YES or O (please drelc one) IV. APPLICANT'S CERTIFICATION: I, , (Laud Owner's name listed in question 11.2). a#test that this applicarolon for -- j -me•e [err -e r 5 I-5i1,,e— bus been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all tegtdned parts of tines application are not completed and that if all rained svppot#ing hhfiatm don and attachments are not included, this application parlmge will be returned to me as incomplete. ignatuTe Date V . MANAGER'S CERTMCATION: (compl= only If diffcrcut from the Land Owner) I. (Mana,Qet's uatoe listed in question 11.6), anest that this applicatiAn for has been reviewed by me and is accurate and complew w the best of my knowledge. I understand thx if all rupirod pans of this application are not completed wA that if all required supporting information and attachments are not included, thls application package will be retarmd as incomplete. Signature THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MA ER M S, SHOULD BE SENT TO THE FOLLOWING ADDRESS_ NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION PERMITS AND ENGINEERING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5093 FORM: AWO-G-E 2197 Page 2 of 3 State of North Carolina Department of Environment, Health and Natural Resources Division of Wafer Quality Nan -Discharge Permit Application Form t Survey (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Liquid Animal Waste Operations DIVISION OF WATER QUALITY REGIONAL OFFICES (2197) Asheville Regional WQ Supervisor 59 Wioodfin Place AsbevilleE, NC 28901 (704) 251-6208 Fax (704) 2SI-6452 Avery Macon Buncombe Madison Budte McDowell Caldwell Mitchell Chemkm Polk Clay Ruthmfard Graham Swain Haywood TTWM4vtmia Hermon Yancey IscUon Fayemeviile Regional WQ Supervisor Wach.ovia$nilding, Suite 714 FayetievWe, NC 28301 . (910) 456-1541 Fax (910) 48"707 Washington Regional WQ Supervisor 943 Washington Square Mall Washington. NC 27999 (919) 94b-6481 Fax (919) 975.3716 BcBufmt lanes Barrie Lmdir Camden Martin Chowan Pamlico Craven Pesaluotank Curdtuck Perquimans Dace Pitt 09M Tyre11 Greene wasltirtgron Herdbrd R7"M Hyde Mooresville Regional WC) Supervisor 919 North Main Smat Mooresville, NC 281 I5 (704) 663-1699 Fax (704) 6M-6040 Raleigh Regional WQ Supervisor 3804 Bamtt sir. Raleigh, NC 27609 (919) 571-4700 Fax (919) 511-4718 Chadmn Nash Durham Northampton Edgecombe Otanse Franklin Person Ciranville Vance 1wfax Waage Johumn Warren LM W'dson Wilmington Regional WQ supervisor 127 Cardinal Drive 1lxmnsian Wilrniugm, NC 2M5-3845 (910) 395-3900 Fax (910) 350.2004 Anson Moore Alexandra Lincoln Bmnswick New Hanover Baden Richmond CAbanus Mecldenburg Can mt onslow Cumbedand Robeson Catawba Rowan Columbus Perrier Harnett Sampson Ckeveland 5tauiy Dnpft Hc" scodw Gaston union 1vioagamery Rears Winston-Salem Regional WQ Supervisor 535 Waughtown Suet Winston-Salem, NC 27107 (910) 7714600 Fax (910) 7714632 Alamance Rockingham Allegbany Randolph Ashe Stokes Caswell Sony Davidsm Wamsa Davie Winces Forsyth Yad1# in Guilford FORM: AWO-GE V97 Page 3 of 3 State of North Carolina Department of Environment, Health and Natural Resources . • Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary p FE NF- A. Preston Howard, Jr., P.E., Director April 21, 1997 Earl Lee Lee Brothers Farm 1245 Oak Forest Rd Four Oaks NC 27524 Subject: Certificate of Coverage No. AWS510004 Lee Brothers Farm Swine Waste Collectiori, Treatment, Storage and Application System Johnston County Dear Earl Lee: In accordance with your application received on March'24, 1997, we are forwarding this Certificate of Coverage (COC) to Farm No. 51-4, authorizing the operation of an animal waste collection, treatment, storage and land application system in accordance with the State's General Permit (attached). This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Lee Brothers Farm with an animal capacity of no greater than 4108 Wean to Feeder, 6120 Feeder to Finish, and 2000 Farrow to Wean and the application to 94 acres of land. The facility shall be located in Johnston County with no discharge of wastes to the surface waters. The COC shall be -effective from the date of issuance until December 31, 2001. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's Certified Animal Waste Management- Plan (CAWMP), and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. In accordance with General Statue 143-215.1 OC, Animal Waste Management Plans shall include the following components: - A checklist of odor sources and best management practices to minimize these sources. - A checklist of insect sources and best management practices to minimize these sources. - Provisions set forth for acceptable methods of disposing of mortalities. - Provisions regE&ftg emergency action plans. Your existing Certified Animal Waste Management Plan must include the above elements, by December 31, 1998. Documentation of the certification must be available to inspectors onsite..Submittal of the amended certification statement shall be required upon renewal of your permit coverage in 2001. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-oonsumer paper Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division, This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700, if you need additional information concerning this COC or the General Permit, please contact Mike Lewandowski at (919) 733-5083 ext. 362. q C C � Sincerely, APR �l "l/'1�. Preston 9waryd, Jr., P.E. 1 RMiONAL OFOC # cc: (Certificate of Coverage only for all cc's) Johnston County Health Department Raleigh Regional Office,. Water Quality Section Johnston County Soil and Water Conservation District Facilities Assessment Unit Central Files State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary November 13, 1996 Earl Lee Lee Brothers Farm 1245 Oak Forest Rd Four Oaks NC 27524 SUBJECT: Operator In Charge Designation Facility: Lee Brothers Farm Facility ID#: 51-4 Johnston County Dear Mr. Lee; Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator, The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 919/733-0026. Sincerely, 2 A. Preston Howard, Jr., P.E., Diarc-To—r` Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files P.O. Box 27687, �y�C Raleigh, North Carolina 2761 1-7687 An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 50% recycled/100k post -consumer paper %. 14 A mri vij ,"d Copy tv s na g A�td i � r'a n a ) Jac rc S � ' .hd .eh .po 0 WORKSHEET FOR CALCULATING PAN AND TONS OF WASTE FROM COMBINATION SWINE OPERATIONS Operation Code: 6 Combination Swine Farm APPLICATION METHOD: I Irrigation Type Operation Number Tons Waste PAN Animals per Animal per an. NUMBER OF WEAN TO FEEDER PIGS: 4108 .40 .48 NUMBER OF FEEDER TO FINISH HOGS: 6120 1.9 2.3 NUMBER OF FARROW TO WEAN SOWS: 2000 6.1 5.4 NUMBER OF FARROW TO FEEDER SOWS: 7.3 6.5 NUMBER OF FARROW TO FINISH SOWS: 19.9 26 TOTAL NUMBER ANIMALS: 12228 TONS OF WASTE PRODUCED PER YEAR: WEAN TO FEEDER: 1643.2 tons FEEDER TO FINISH: 11628 tons FARROW TO WEAN: 12200 tons ✓ FARROW TO FEEDER: 0 tons FARROW TO FINISH: 0 tons TOTAL WASTE: 25471.2 tons r� PAN PRODUCED PER YEAR: n WEAN TO FEEDER: 1971.84 lbs:: FEEDER TO FINISH: 14076 lbs FARROW TO WEAN: 10800 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL PAN: 26847 AVERAGE TONS OF WASTE PER ANIMAL PER YEAR: 2.08300621524 AVERAGE PAN PRODUCED PER ANIMAL PER YEAR: 2.19553483808 SLUDGE PAN PRODUCED PER YEAR: BROADCAST WEAN TO FEEDER: 312.208 lbs FEEDER TO FINISH: 2264.4 lbs FARROW TO WEAN: 1760 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL SLUDGE PAN: 4336.608 lbs AVERAGE SLUDGE PAN PER ANIMAL PER YEAR: 0.354645731109 ' f�rme.hJecf C'o T sboa) /gc�cJi7ion�/ P.� ANIMAL WASTE UTILIZATION PLAN Producer: EARL AND DENNIS LEE Location: 1245 OAK FOREST RD. FOUR OAKS NC 27524 Telephone: 1-919-894-3248 Type operation: Existing Combination Swine Farra Number of Animals: 12228.00 swine (Design Capacity) l ri STORAGE STRUCTURE: P n 0.e-r o b r c, � H c) r) T l o J 1►7 )Dan j0 APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 12228 swine x 2.08300621524 tons waste/swine/year = 25471 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 12228 swine x 2.19553483808 lbs PAN/swine/year = 26847 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME 3752 1 BnA BH 8 400 0 18.5 7400 I APR-SEP 3752 I2 3752 13 New P"'P 4699 J �APR.SEP. BnA BnA UN2 IUcC BH 0 18 1400 1 140.5 116200 P BH 8 0 1400 I 112.8 �5120 APR-SEP BH 8 1400 0 1.5 1200 I APR-SEP I I jEND II TOTAL129960 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL 10 .. Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY TONS 50 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 74.9 29960 Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2 TOTAL 0 1 0 74.9 1 29960 *** BALANCE 1 -3113 1 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. (Tract I Field I Soil Type 3752 I 1 I BnA 3752 I (Application RatelApplic. Amount Crop 1 BH 12 I BnA I BH I .50 (in/hr) I (inches) *1 Page: 6 0 ANIMAL WASTE UTILIZATION PLAN 3752 4699 4699 c UN1 UN2 BnA BnA UcC BH .50 I *1 BH I .50 BH .35 *1 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 7 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 10 ANIMAL WASTE UTILIZATION PLAN Name of Farm:LEE BROTHERS Owner/Manager agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we] also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25--year, 24-hour storm. The approved plan will be filed on ---site at the farm office and at the office of the local Soil and Water conservation District and will be available for review by NCDWQ upon request_ Name of Paaility Owner: EARL AID DENNIS LSE fPleasa print) `�' ` fj Signature: /�r// ��y�� ate: Name of manager (If different from owner) i S ignature , . - Date t Name of person preparing Plan. (Please print)Chris We Smith AffiliationlyRcs Phone No. 919-989-5381 Address (Agency) : 806 Worth street Smithfield NC 27577 Signature: r Date: : / I l 5 ,o %� fi&i en /7e •" 7�chec/I W QsTc IAI Aie . rT7 -S Aok�� P, � r0 pe, ANIMAL WASTE UTILIZATION PLAN I, ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional Iand has to be leased, etc.) , hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Date: Waste Producer: Date: Technical Representative: SWCD Representative: Date: Date: Term of Agreement: ,19 to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 12 ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this , 19 My commission expires (SEAL) day of Notary Public. Page: 13 A V ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement I, generated by hereby agree to apply waste in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF I, , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this 19 My commission expires (SEAL) day of Notary Public. Page: 14 Q tuan0, d"17 xt��szLTOLS= JVMaM3MT PLAN C3RTXF=&TZOA Pax MW OR M=A=ED FE MOTS PIOMAA retd= tb& cc=Plwtad foxes to the Divl.@ic= of tal M=M1r0=aat at the addreea an the xvvWCsa (side of thiia fog►. Name of farm (Please print;: ! � ,.-AKQ- 0?,7, _ .. Phone No_- - o County- Tah.• ,, Farm location: Latitude and Longitudem „� mod•/ 4U & (rimed) . Also, please attach a copy of a county road map with location identified. Type of operation (swine, layer, dai=y• ate.) : w Design capacity (rsumber of animals) s Average size of operation` (12 month popular -far, avg. } :4 1 7..f Average acreage needed for land application of, waste (Wires) s �dq�Caatrafn�asa�rs�c�r�w[rassa�e�.at�es�a=r�resss�o+s:raa�cr:rseswaR�eae=��r:�a[fr�xv�v����v tsar Technical Spec iall ,st Cartificatloa As a technical specialist designated by the marth Carolina soil and Water Conservation Commissian piursuaac tel 1SA NCAC GF _COOS, I Certify that the er or expanded azixmI waste management system as installed for tha farm named has an animal waste management plan chat meets the design, construc 3 operation and maimtenance standards e=d specificatiaas of the Divisi viroaaQenr_al Ka=aUs sut and the 4St.-Sail Conservation Service and/or the Carolina soil and water Conservation Commission pursuant to 15A NCAC 2H.021 15A NCAC 6F _0001-.0005. The following elements and their correspondias criteria i�au ,een verified by me or other designated technical specialints are included in the plan as applicable: mini- separations (buffers) : liner: equivalent for lagoons or waste storage ponds: haste storage capacity-rade4u quantity and amm mz of Ind for waste utilization (or use of third party) s aec or cue, nership of proper waste application equipment: schedule for timing applications: application rates loading rates; and the control of the disah8 of pollutants from stogyrater runoff events less severe than the 25 year, 24 b Storm. Nana Of TechUjaZLj 3 I t (Please 7C Iit1 a Agfiliation; Ifl F� sr ,rr Address (Agenayk:_906 AlodjzStrrxt% Phone No �laa Igo4f1a,,, '?_00 and 1 001 Elm ar to f t e % Sigrsat'ure: '2Date:,�-- seta�enmsy�ta�taeaaa�c�q;acaa�� aic�stttr�as��=aste��a=�s>:-�=�aaa��mttraats�=�rttra�a�waa��+ra� Cwner/XAnftUar Agraemsnt I (we) understand the aperation and vaintenaince procedures established in the, approved animal waste ma.nagemant plan for the fay named above and will implement these procedures. Z (we) )=ow that any additional expansion to the exicting design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Enviro=antal Management before the new animals are stocked_ X (we) also understand that there =art be no discharge of aniuml waste from this system to surface waters of the state either through a man --made conveyance or dough XU=Zi from a stogy event less severe tbsa the 25-yeax, 24-hour storm. The approved plays will be filed at the fax= and at tha office of the local Soil and Water Conservation District. i r p jgT10-�. 0 ��aw ti p �} Cf p U Name of Lead ownwv (Please Print) Signatvxe= _ .:tS+ Bate: N=a of Hagar, if different from owner (Please print) �a11,-- signAture: - . Date: Ngtez A change in laud -ownership requires notification or a new certification (if the approved plan is changed) to be sut=ityted to the Division of EnvironmenCal Hanag4ment within 60 days of a title transfer. DEK USE ONLY:f ACN WO �i � e_ +' 3ra'Rers WASTE UTILIZATIQNJ PLAN -2AMS . � eal t old Pl �m Qb 'i� � Ale w Rw Forms Owners name--: t✓. h+F-e. ma TnY\+S Sounty: O o LL . j _ 4CS' d AI�C �rras'TfC�'t Mail Address-: r, e„ �, h _ Type Of production unit-=--: Type of waste facility-- Ak�Na_aa Your animal waste management facility has been designed for a - giver+ storage capacity. When Vie waste reaches the designed level, it must be land applied at a specified rate to prevent , pollution of surface and/or ground water. The plant nutrients ' in the animal waste should be used to reduce the amount of �f commercial fertilizer required for the crops an the fields Where the waste is to be applied. This waste utilisation plan uses nitrogen as the limiting nutriant. Waste should be analyzed before each application cycle and annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize, the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of ttie crop to bQ grown and'the nutrient content of the waste. Do not apply more nitrogen than the crap can utilize. Scil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greator than 5 toms per acre per year. Do not apply waste on saturated soils or on land whert the surface iS frozen. Either of these conditions may result in ruraff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied tc a growing crap or not more then 30 days prior to planting. injecting the waste or disking will conserve nutrients and reduce odor problems. The acres needed to apply the animal waste is based on typical nutrient Cantent for this type of facility. Acreage requirements may be more or less based on tha waste analysis report from your waste management facility. The design or your waste management facility is based on th6' following: Amount of Waste Produced For Year: ! ` .Lanima. ls x tons waste/animal/yr� Iq ' tons total waste Amount,❑f Plant Available Nitrogen Produced Per Year: animals ` x lbs. N/animal/year NUAII Ac - y, Available N Applying the abave amount of waste is a big ,lob. You should plan time and have appropriate equipment to apply the waste in a. timely manner_ Your facility is designed for i$o days of storage. Therefore, it will need to be pumped every 6 months. Tract Field Soil Crop Yield Lbs_ N Acres Lb s. N Month to No. No. Type Per Ac. �r Used Apply Total Avallal7le Nitrogen �4 Surplus Or Deficit t ,� � k' O'L I YvLeZi" Narrative of Operation: � 1 receive waste analysis report to obtain the ams]urlt per acre to apply and the irrigation application rate prior to applying waste. Prepared dy: iitie date G} Concurred in by: " Producer Date (Copy t❑ producer and copy to case file) 0-.� iL,v 7 �4_4 i 4++- '1777 %",c 1 ' �� �G� '. � � � �� .na .ah .p0 0 WORKSHEET FOR CALCULATING PAN AND TONS OF WASTE FROM COMBINATION SWINE OPERATIONS Operation Cade: 6 Combination Swine Farm APPLICATION METHOD: I irrigation Type Operation Number Animals NUMBER OF WEAN TO FEEDER PIGS: 4108 NUMBER OF FEEDER TO FINISH HOGS: 6120 NUMBER of FARROW TO WEAN SOWS: 2000 00 NUMBER OF FARROW TO FEEDER. SOWS: NUMBER OF FARROW TO FINISH SOWS: TOTAL NUMBER ANIMALS: 12228 TONS OF WASTE PRODUCED PER YEAR: WEAN TO FEEDER: 1643.2 tons FEEDER TO FINISH: 11628 tons FARROW TO WEAN: 12200 tons FARROW TO FEEDER: 0 tons FARROW TO FINISH: 0 tons TOTAL WASTE: 25471.2 tons PAN PRODUCED PER YEAR: WEAN TO FEEDER: 1971.84 lbs FEEDER TO FINISH: 14076 lbs FARROW TO WEAN: 10800 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL PAN: 26847 Tans Wasta PAN per Animal per an. .40 .48 1.9 2.3 6.1 3.4 7.3 6.5 19.9 26 AVERAGE TONS OF WASTE PER ANIMAL PER YEAR: 2.08300621524 AVERAGE PAN PRODUCED PER ANIMAL PER YEAR: 2.19353483808 SLUDGE PAN PRODUCED PER YEAR: BROADCAST WEAN TO FEEDER: 312.208 lbs FEEDER TO FINISH: 2264.4 lbs FARROW TO WEAN; 1760 lbs FARROW To FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL SLUDGE PAN: 4336.609 lbs AVERAGE SLUDGE PAN PER ANIMAL PER YEAR: 0.354645731109 ANIMAL WASTE UTILIZATION PLAT ---------------------------------------------------------------------- Producer: EARL AND DENNIS LEE Location: Aef.S- 04K dyr�.s i FOUR OARS NC' 27524 Telephone: 894-3248 Type Operation: Existing combination swine Farm Number of Animals: 12228.00 swine (Design capacity) I II d�y STORAGE STRUCTURE: finae-rorG hAaoh eP.:, APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or g-aundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer regitired for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. several factors are impportant in implementing your waste utilization plan in order to maxz.mize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop,can utilize. 2. soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tans per acre per yyear providing that adequate: filter strips are establishes. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. ---------------------------------------------------------------------- ]pm ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shoian above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply thia animal waste is based on typical nutrient content for this type of facility. Acrea a requirements should be based on the waste analysis report from your waste management facility in some cases you may want to have plant analysis made, which could allow additional waste to be applied. provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT of WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 12228 swine x 2.08300621524 tons waste/swine/year = 25471 tons AMOUNT OF pLMT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 12228 swine x 2.19553483808 lbs PAN/swine/year — 26847 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. '-• -------------------------------------------_-------_-----_ _ _-----_ ]pm ANIMAL WASTE UTILIZATION PLAN -------------------------------------.---------_--_-----_------------ TABLE 1: ACRES OWNED BY PRODUCER NOTE TYPE CROPYlELD LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY REST-D. APPLIC META - N TDO I APR•--SEP 3752 2 1,Bnh BH 8 1400116200 I APR-SEP I I APR-SEP TOTAL128720 �- - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. I Pm ANIMAL WASTE UTILIZATION PLAN ----------------.------------------------------------------------------ TABLE Z: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not, own adequate land. see required specification 2.) CFIELD-& CROP YIVT,n LB9—'COMM* * BS' DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED -_-- or ------ APPLY RESID. APPLIC METH N TIME END Indicates that this field is being overseeded (i.e. interplanted) or w annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: EZ100P UN ITS PER UNIT BE HYBRID BERMUDAGR,ASS-HAY TONS 5o TOTALS FROM TABLES 1 AND 2 S LES AV N USED TABLE 1 71.8 n720 TABLE 2 Jpm ANIMAL WASTE UTILIZATION FLAN ---------------------------------------------------------------------- ToTAI. � 71.8 28720 -1871 CE *** This number must be less than or equal to a in order to fully utilize the animal waste- N produced. Ipm ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to O in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables_ See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available waster holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irri ation system is installed to properly irrigate the acres shown in Tabyes 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type crop Application Rate (in/hr) App zc, oun (inches) 3152 3752 1 13rXA BE 3 *1 3752 Enk* l * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot 1Pm ANIMAL WASTE UTILIZATION PLAN be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions_ Your fac:.11ty is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the Waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in detarmining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION ]pm WASTE UTILIZATION FLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. if the producer does not own adequate land to properly dispose of waste, he/ache shall, provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the waste utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to most, but not exceed, the nitrogen needs for realistic crop yields based on $oil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding Less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter stripe are installed where runoff leaves the field.. (See FOTG Standard 393 -Filter Strip) S. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. when animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. when applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina's for guidance.) 7. Lisfuid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page. a ----------------- ---------_ _------------------- _---------- WASTE UTILTZATION PLAN ------------------------------------------------------------------- REQUIRED SPECIFICATIONS 10. [paste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. waste nutrient loading rates on these soils should be head to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the followinV: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irri ation ditch or canal. Animal waste other than swine waste rom facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial raters., (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shah. not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-af-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not he applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessaryy, to protract the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Barns and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 9 --------------------------------------------,____-....__...-------------- WASTE UTILIZATION PLAN ------------------------------------------------------------------- RE UIRED SPECIFICATIONS Is. If .animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and "closure a "closue plan which will eliminate the possibility of an illegal discharge, -pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal Waste Can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible im xkara shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to maxk the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zipc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 10 ANIMA, WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:LEE BROTHERS owner/Manager-Agreement I (we) understand and will follow and implement the specifications and the operation and maintenarice procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Environmental Management (NCDEN) before the new animals are stacked. I (we) also understand that there must be no discharge of animal waste from this systeant to surface wasters of the state from a storm event leas severe than the 25- year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDEN upon request. Name of Facility owner: EARL AND DENNIS LEE (Please print) �y Signature: Date: ��yf Name of Manager(If different from owner): Signature-. Date; - - - Name of Person Preparing Plan: (Please print) Chris W. Smith Affiliation;NRCS Phone No. 919-989-5391 Address (Agency): 806 North Street Smithfield NC 27577 Signature: Date: -IQ e. 4L A/4 rhe- ------_---------__..-_---------.._ ��� ..----------------------- Page: 11 N/� ANIMAL WASTE UTILIZATION PLAN ----------------------------------------------------------------- ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased etc. I, , hereby give permission to apply animal waste from his Waste Utilization System an acres of py land for the duration of time shown below. The field(&) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, Potassium, and other trace elem"ts and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: - Date: Waste Producer: Date: Technical. Representative: Date: SWCD Representative: Date: Term of Agreement: ,19 to M n mwm o Ten ears on Cos Notary ----------------------------- -------______-----------_---_--_-_ - Page: 12 N/A ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement 1, _ hereby agree to apply waste generated by in a manger that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the. Division of Environmental Management. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten ears on os -s are Y ems o ary ----- ----------------------------------------------------------------- Page: 13 EMERGENCY ACTION FLAN PHONE N-U-NME-RS This plan will, be implemented in the event that wastes arom your over --anion are leaking_ overflowing, orzunaing off site. You Should not wait unti[ w'aszes r =n sue, ace waters or Ieava vour prop=y to consider tkar you have a problem_ You should make every efforS to e:rsurr that this does not happen- This plan should be posted in an acz=siole locution for all employees at ncc facility. The following are some action aenss you Should take. l _ Stoo the release of wastes. Depending on the situation. rhis may or may riot be possible. Suggested responses to some possible probleras are listed below. A. Lagoon overflow -possible soIudons are: a. Add soil to burn to increase e.'evaden of dam. b_ Pump wastes to fields at an accenzable rate. c- Stop all flows ro the lagoon irn)nediarelr. d- C4 apurnpinz contractor. e. flake sure no surface water is entering lagoon. B: F uTioff from waste application f ell actions include_ a_ Immediately stop waste application.- b. Create a temmoorary diversion to contain waste. C. Incorporate waste to reduce runoff. d. E,valuaze and eliminate the re sons) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprin-1 e:s-action include: a. Stop recycle pump. b_ Stop im-earion pump. c. Close valves ro elsrrunate lur-Lte:' 4LSC", rCr?. d_ Repair all Ie_ks p-ior to resmrrin; pumps. r7: Leakage from Elfish systems. ncuses solid a. Stop recycle puftlp. b Slop irri�auon pump, Make sure no siphon occurs_ Scot) Ill :lock in che. iatltiL'.:�ii_ff 6: Cgmacl the technical specialist who certified the lagoon (MRCS, Consul tins Engsneer- etc.) ^ t a. Name: b. Phone: -- _ 7: Implement procedures as advised by DW Q and teciunicaJ-assismrice agencies to rectify the damage, repnir the system, and reassess the waste management plan to keep probiems with release of wastes from happening again. 7��r _-. ,ram• .. .. ....•� .. .. J ijj• r I loci Yiry amft c711lN 3!0! i r 1 �` �a7Ti Fl vivo JimIIM :. s• Y .p f ti• _ .. 100■ �% I ~: IQUR OWS..— +iw tom. ! w+ •3 � "7� / 'Is' IEMObfMLIE ;rt01'. 1.OIP .r^^/+11t4 Jam_ - - �. • ` _ JI'f'•w4 r . k � '4 . MAL }+ptMorlOPln .ti ; J2iV:.' .t y ♦ 1 SMidllald R _ ! , _>� WIN not le171l1 a s. i 4�!! 11N• OL.__ qp ail _ � '+ 4 � • ; � i+�� 7c7 ~ •r .1.7.E 1142 •� •I' `A. • ,;ri •'•: -+ •' ^ �R PI • 11 ` � 11l� by .. �,�.; ,. ;'•, ' -- i ,.. J �� ? v�r. lean PIS S1fV 3iJt ~ s� !� iMi um J171 s21 ! to t� ar ,f•�C6 I .Y. { C1�Inlan � � -: a , 1' r•gig :., • �, -• ._ .+� i / IRQ! �A :�� 1!N ! GI�r°mh F„-��•11s'`. 'Ei#" aua j \ r .. Mom us 96 pit I Ire JM TAT f Ilax SD �C110p/Oe17+• Ifii ri•�,"'•'�•".�+J�' >IR '.: s• �� _ �.t .,;r.•�r' t I 11711 � N f i .►h` ,3� '� _ �+. '�'�•� Ili,1 100! ' •' 1 EIa14M •.y; .. _ �� DEMON �L a1 i 'f'��• ,J �. ti ` 11 Waad►- .a•�-.+ti i��si' 1�"x't�_� J � P 1 � � � �'• .�I�- - 'gyp � ! Ilo► fa• '.� lti4 �'. lice rJr y ` 1 t '-f•� - ,� . t ` � _ ~;.: :: � - +' r r ! t- r�'�' nYF jar 6� ,"s + l+• - - ,' IJ wr•' 14 ,.�1 �3Si - t 1'�� �ti_.� �y�•�L�� }�':_: � ` !�11�'f}4 l ' 1 - - - yr�t`� .:.f ,. ���'s �4 _ ''�5:��'T �:1, r:.�.a. (}��IS'� ' c,r i a,a h S� _J. •�r,( � - - ��ti• I �.. ir,„' r ,; r'r}�`,. J ��.. ti-�-. �r'�•T:F i � r S +.�,�-!r I.. �I.r - � t I �_ J i t.'^ s I �r i' *�i'• a is"�--•CAS.+�'1 � i f�L • •.� ! .'•_ ,; C� .• r.� r � ��r 1 Fir, rf�.cr• . . L} f' '. }�. �. �7'I�S '!'are- ,'-�� .r• � �� r l JN`i• _ � '` 7- ? r r I CAWMP Components Permitted Facility; Date: Completed Certification Form; Date: 7-7-a'?l sw; „r4 ca,.,nC-N Waste Utilization Plan; Date: 9/z, ll1 Amount of plant available nitrogen produced/used annually Ibs) Dominant soil series: f3, pr Crops to be grown: u. s� . P-aY C�o� ILI 4� Field Maps Based on usable (Total= Usable= ) Present day format w/RYES or actual records; application windows 2/1 /93; Standard #633 required specifications Emergency Action Plan Odor Control Checklists (effective 1/97) Insect Control Checklist (effective 1/97) Mortality Checklist (effective 1 /97) _-y Type of irrigation: velin n Solid -Set Small Gun Center Pivot Linear Move Other (description): NRCS irrigation parameters usable field size, max. application rate, max. application rate per cycle (effective 9/1/96) or Calibration information or Land application system design information (after 9/1/96) including parameters, equipment type, system layout and settings Show design needs (storage & treatment calculations) Operation & Maintenance Plan Site schematic Site evaluation, after 2/96 (NRCS NC-CPA-17) includes wetlands determination Hazard classification Construction inspection notes, including liner inspection & observation trench (after 9/1/96) Consideration for emergency spillway (after 6/21/96) REQUIRED RECORDS effective 9/1/96 ��„�Waste application records (IRR 1&2) .1 5 9l Annual soil sample reports for 1999 (Cu index: ZZ - 1 07 ) (Zn index: PERMITTED FACILITIES General Permit & COC on site -- weekly lagoon level records Waste analysis - date last taken . It 117 7�8 F, 4, 0 Cnr�i r� PAN lbs/1000 gals. for structure #1 f 3-7 1. 7 '2 - S PAN lbs/1000 gals. for structure #2 1-1 2_j - - .A� ,�, - , , -, �- .­�;,_-, --�:. r 2,-_,.;� :'-._ -, _�Z� _- in - - , - -� �� �,,,_, - "I' ;, � �jt� , � A -, 1, W.� �, ��- :,�,-!rL�q; ,� .,%,_.?.. 4:., �,n,;�.� — � - - , . v I — ,�, 7-1 .. - 5 � __ --.--.---- , ift_:__zV� ,iE ` _- / - , - , �-�,:�,�,­�kT��I� - � - . , . . , -, . � _. - lf�u�­ -, , . , . '�' F�__ - - I - - , - . . 4�.. :�----�- -_ A