Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
420023_PERMIT FILE_20171231
State of North Carolina Department of Environment . and Natural Resources A&4 Iva Raleigh Regional Office Michael F. Easley,Governor NCDENft NORTH C^RouP4^ DEF% TmEorr of William G. (Bill) Ross, Secretary ENVIRONMENT AND NRUR.►L REsouraCF-S Alan W. Klimek, P.E., Director Division of water Quality January 10, 2003 CERTIFIED MAIL RETURN RECEIPT REQUESTEn NPD; Farm No.63 Matthew Mehlenbacher 385 Highway 158 Roanoke Rapids, North Carolina 27870 Subject: Notice of violation Recormnendation for Enforcement NPD Farm No. 63 Facility #42-23 Halifax County Dear Mr. Mehlenbacher: On December 16, 2002 the Raleigh Regional Office conducted aerial surveilance for several counties served by this region. Aerial surveilance indicated a potential for improper waste application occurring on Farm No. 63. This facility was investigated and confirmed application of animal wastes into heavily saturated soils and standing water under the center pivot irrigation system. Mr. Kelvin Terry met with Mr. John Hunt of this office and discussed that this was in violation of the animal waste permit for this facility. The Certified Animal Waste Mangement Plan (CAWMP) specifies that waste applications should not be conducted on saturated soils. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters. Any violation of the Certified Animal Waste Mangement Plan shall be considered a violation of the general permit and subject to enforcement actions. The Raleigh Regional Office is considering recommending an enforcement action for the application of animal waste onto saturated soils. The Raleigh Regional office appreciates your cooperation with this matter. If you have any questions please call at (919) 571-4700. 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone 1919) 571-4700 FAX (919)571-470o An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper Page 2; NPD Farm No. 63 NOV, Recommendation for Enforcement January 10, 2003 Sincerely, A , P.E. Regional Water Quality Supervisor cc: Dawn Williamson; Murphy -Brown Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil & Water Conservation District Ms. Margaret O'Keefe, DSWC--RRO DWQ Compliance Group RRO File ME 40 THE HOUSE OF GENETICS® Office: 385 Highway 158 Roanoke Rapids, NC 27870 December 20, 2002 Mr. John Hunt 1628 Mail Service Center Raleigh, N.C. 27699-1628 Dear Mr. Hunt } DEC 2 3 2002 Tel: (252) 537-9710 Fax: (252) 537-9798 This letter is intended to explain the events leading up to our violation at our Farm 63 in Halifax County this past Monday, 12/16/02, and the actions we are taking to reduce the risk of recurring in the future. This past year, NPD has invested in additional irrigating equipment in order to increase and then maintain our freeboard levels at all of our farms. We had the lagoon at Farm 63 up to 90" of freeboard'in early August. As you are aware we had an extremely dry summer and we were able to take advantage in order to achieve these levels. However, the,rains this past fall rapidly diminished this freeboard across many of our lagoons. Farm 63 was most dramatically affected due to the design of the primary and secondary lagoon. Our primary has twice the surface area of the secondary. Therefore for every inch of rain we received, the secondary went up three inches. We made every attempt to irrigate every day possible but the rains not only filled the lagoons, it also kept the ground wet. The week of November 18'' we were stuck between having to irrigate on wet land or to have our freeboard go below 19". We contacted Buster Trowel and received verbal permission to irrigate. This past week our Land Management division felt that our freeboard was again at risk of going below 19" and decided to irrigate once again. This was done with the intent of being proactive but proved to be an error in judgment. We have had numerous discussions within our group addressing this matter. We have scheduled additional training from the Murphy -Brown land management -division and Dawn Wells will be leading that meeting scheduled for 1/3/03 at 10:00 a.m. in our Roanoke Rapids office. We are looking into options for minimizing the affect rain has on the secondary lagoon at Farm 63. We are establishing weekly irrigating targets to comply with our WUP and maintain maximum freeboard levels in all of our lagoons at the end of the summer crop season next year. We have certified ten additional NPD employees,this past fall so that more of our team will be aware of environmental issues. Please be assured that an incident like the one this past Monday will not happen again. NPD had never had a violation in its 12 years of operation. We sincerely expect that this will be the only violation ever. n� Sincerely, Matthew Mehlenbacher Operations Manager, NPD(USA) DEC-18-02 11:08 AM P . al 00-qsA f-3 �,F yiz-Z3 za"�--3 DEC-18-02 11:09 AM F. 02 FORA IM•7 Lagoon Uquld lrrtgation Fields Record One Fans for Each Field per Crop GyCle Hydrant 4 F1014 0 4 Faplity Number 43 ' F1ild Size (acme) a I+e) 4.41 Pei m Owner NPp U Form 8 Owners Addw 385 H" 158 :RoarokeRe ids NC 27010 Owner's Pr onrr r 2d - 37-971 Fmm waipe U0Ik=%*A PLm Crop Type Fesew I4000mmended PAN .. , I.oaelnq Itd'ecre)' (B1 + 2 x R 5) (01 011L1I Des (mm*Odryr} Irrig loon wow Ana11We PAN' (wom OW) PAN AppliBa (to7ACfe) is (os IDOD NllrngRrj 6111nnoc" {Ibleue) (gl (101 81ar1 TMna Rnd TIP" Total Mnytae (3) - M Y of ePIvk" Open" FIM Rita (aW7min) Total volume {pallor}f) (a) K (5) r (A) volume par Acre (g0acre) (7) I (A) 187,16 1IIV 7:3 5'.00 570 10 7695 1744B.98 1,2 20.04 160.22 02 10M 8; 1 L5 4 14093.88 1 14.59 11127 ;00 0 ! 130 7 900 16533-61 1.2 19,84 122.75 121t 10!4 3:30 286 1 260 71250 10158.48 1,2 19.39 103.18 roul n 16761 Cf" Cyce Tqfifil 265900( PAN AppIWO 177.79591U4 Owrnrs Slp pure 0"Tmore S+Qwwre -- Cortilled Operatar (Pnni) Operalore CaMrombon NO, NCnA Waste Aniyla* or Etrw A*d ar NRC6 Edlmo a, Taannloet GJ6e eacom SM, Gf%W tni rah* naehrtd by M7bC7dt+1p aalurnn (1 C) ham (9). Cw tMtw k t wkig oplume (10) mom wdumn 01) fgtlprAnp aacn +rrgaaon Want. DEC-16-02 11:09 AM P_03 FORM lRR-2 lagoon Llquid lrrtpaW Fields Record Or1e Form for Each Field per Crop Cycle Hydrant 2 Fleld 0 4 FecAity Num wr 42 - 23 FwId SO (acres) ■ (A) I,f Farm Owner NMIUW farts �9 Ownars Address 385 Hwy 15$ an N 770 Owner's Ptm�e # k Rae252- 7- 710 Rrpp1 wafts UtIllretlon Plan Gro0 Type Recanmended PAN Lofd4np (QYGM) m (BI (3) (4) (al (5) I7) (8) (a) (101 (111-- - Dale (mrnroo+yr) WOIJ& ArWy" PAN' (6l1000 gal) PAN Applied 1Vb(anre) (@)JA ti000 Wropen Baluow- (ibeuni (a), o1 l start TW* End Thme Tom( (A*Ut" (f) - (21 001 Sprinwers Op rwq Flaw PA" (pstwmin) Tolil Volume lgalionel (p) x (5) a (4) plume ;er Aaxe (qai/Bup) (7) 1 (A) a 181.1t3 1111 2 ;30 5.301 3% 136 81000. 41B, 0 1,2 1110 19.86 1111 ID:30 SW 420 1 131 56700 059LU 1 7.91 161,95 11120102 11 300 1 155 40600 470D 30 1,2 5155 15 .29 12112/02 GOD 1 135 64800 7534.68 1,2 9. a 147,25 royal 101"Ut" 1 11 Crop Eyck ToUlai 2443000 Tatol PAN App"00 33 90e97571 Owrlors Bipnature Operator's $(gnsture Celli lwd Qp"br (PMMI) - r . .. Operaws Cart katton No ' NCOA wade Angytsb or EgJY94M or MRCS Estimate, Tpmrko Gtrlds lis wn 033. Emar 4ts voles ru ovW W ahtr a.* Column (10) from fl). C-9m++N w,Elrsatlr+a a m"(7m (10) "M O*Mn (11) k&A*V "ch w0ati a twsnt. DEC-18-02 11:10 AM P.04 FORM IRA-= Lagoon Uquld trNstign Flslds Record One Form for Farb Fleid per Cmp Cycle I "rant Hold a 4 F*UQW Number 23 FiAb Sine (acres) j1A} 2.34 Form Owmef PD U Firm 83 OwMIWO Addrom 385 Hwy 158 .Ropnohe Ra ido NC 2787 0v+ 6 Pt�a+e 0 2b2-8 7.4710 From Woo UtIlir ftm Pion Crop Type FaaC4 R"Omrnf ww PAN ?Ob Lo"Inp Ub+acro) = Il11 —Al i9l ctcL L r ■■r�rr� �� wow �� wMr�r �� � �r� �■ r■�r �r .. ni ��l=ram Ownaro $fgnowre covw 00snlor (Pmfltl Op"wo t3pnatufe Owltwq Certitkwt+on No. _. ' wC4� Wants Miy1W a fiqulvaier+l or NRG6 Elprrytq, Teel Q�,�idrf Berrien ti�.1. ` Enter v,. vakra recahre4 by Kt�trprtt,q oofumn I 1 op hom (Y). CnnWw+a �btrradh+C miumn t 14j Avm aoh+n+n {t 1) tbUaMfip oBe, rrtp.lbn avant, DEC-18-02 11:10 AM P.05 FORM )RR-3 Lagoon Uqu+d INOOon F)etda Record One Form for Each field par Crop Cycie Trtic1 / a3 F»= / 4 Floury Number 73 Fuld SO (araea) ■ (A) 2754 Farm Oymer p-6 Farm 87 Owners A04M" 3sd 1iwY 1 be Roanojg Rapids NC 77 7 OwnarePt+onea 262 7.g7�0 p2n Waste UdMEWn Plan cropTypo eeaaa ROOM M nded PAN Loading (IWacre) ■ (g)� (1) (2) (3) (4) fM 181 (n ref M (10) (11) mammon Owners Signature OparatDr'5 knore Cervnod Overator (pnnq Ka(vl^Tamr � . Operows Ceditot)on No. 1 r 4 _r NCOA Waste Maylala or EVuiv&A or NRCS EOMMO, TwO rkO Oitlde Seaton M EMW 010 V" rWWO@d by r1r(rW" 05iwmn (10) hom (0), CerWha(a WOO= Nq oO(urrero (10) ham O* mn (11) IOWwkV Dad+ Mputlun avant. Owners Signature OparatDr'5 knore Cervnod Overator (pnnq Ka(vl^Tamr � . Operows Ceditot)on No. 1 r 4 _r NCOA Waste Maylala or EVuiv&A or NRCS EOMMO, TwO rkO Oitlde Seaton M EMW 010 V" rWWO@d by r1r(rW" 05iwmn (10) hom (0), CerWha(a WOO= Nq oO(urrero (10) ham O* mn (11) IOWwkV Dad+ Mputlun avant. DEC-16-02 11:11 AM P. 06 FORM IRR-2 lagoon Oqukl Irrigation Fields Rmord One FOtm W Each Field per Crop Cycle Hydr@At 1 Field • 2 Fa:114 Number FIItd bite (acres) v (A) 4.41 Perm Owner NPO• lJ Faun 53 Owners Addrols W Hwy 158 ftoropke R01DWs INC 27e7 C++wWI Phone f 252- 7- 1010 FMM wwta uulwftn p(an Crop Type W11eat R*Wnor*rxW PAN so Loading (Iblacre) - 111 f91 f31 ILI Iir1 rwI 071 flit flit Ifni 1111 ry i errnKyw rU vrop9yma Tpaul radaU}TGUI rM W1119a l LU,daa� rw� Ownere %nature � �- OperlLr>F's "uture c4f"ed Ope S Or (PMO Operators CwoflwdOn No MCDA WpOe ArwNsr or EgWyekwd a NRea Eatlmele, T@Chn at aud. SecOW an f�Msr HIe re11w reGIM90 by sublrtMhp cqumn (10} tram {�), Centlrm SLA& ON wkmm (10) Rvm f ksm (11) 1010v pelt kr 04M &VWK. P . 07 DEC-18-02 11:11 AM FORM lRR•2 lagoon L4uld lrngatlon Fields Re6ard One Form for Each Field per Crop Cycle Hygror+t 2 Flfrp 1 3 Facility Numbs 42 23 F414 arts (acne) - (A).18 Pam+ Owner NP I A Form 93 0wner1A.dOvu 305 Hwy 158 Rgsnokq Roap NC 2787 Ownarp Phone S 252• 7 0114 rmm waste Vol wrom Pion Crop Typo YVh1"t ROOOmrnwxW PAN .oading (rq mm) a (a) + 2 3 )AN a e 1 o 1a ++ raTal MinuE� - m ew cft 11 4 Fipi -d Ownew Nmeturt Ope wwev signature Cart w Op law (Pent) OPO swo CatfAl ew No KuA Wawa Meylelp Or Equlrolprlt or MRCS 1 ummo, Tovy a 611ya 89mm Lu. " "or Ih vakm romod by v Mnfel" Wkm+R (10) from t9). Canr xm a ftrwY18 "mn (14)rmm w&mn (11) f km1 rQ 000 irTw4n weM. DEC-18-02 11:11 AM P.08 FORM IRA-2 Lagoon Ligtjo Irrigation Fields Record Ona Form for Each Field per Crop Cycle Tract 0 03-7 Fi sd e i Fsdl4 Number FII(d Six* (ease) a (A) 3,92 form Owner NP U5A Farm 63 Owners Address 3$5 H" 158 oanoke RmgNt NC U870 Owneee Pnons d 25 •537.8710 F= wseeo �lelllufion Plan Crop type rmuda Rw mmendod PAN a% L04041 tltwmicjs) ■ (s) {�) (2) (3) (4) (e) (a) 17) (e) 1) (10) (11) DoW (mnvd&INf) a Wam Analysis PAN` (1CJ1000 pew) PAN Applied (Ibrave) (S) M I@l 1000 NI i nen Ealsfnce- (ICraure) lea - WA Stan Tbma Erd T" Total AAko" (d) - (2) tot s;,v*jara OWmIng Flaw Rah (O"Im) TORN volume (p811011y (8) x (8) % (a) volurss per Acfa (gellatrO) (1) r (A) 35a BW02 9: :00 540 10 13,2 71280 18183.67 20.D0 330.00 54JO2 8: 8,00 10 1 91080 23234,89 1.1 25.b8 304.44 2 ll 1U3 108353,7 7641.25 1 30.41 274.0 �B(42 B 13 10 13.23 1312 1062V3 7 83160 2,7641.25 VP 29 1.1 11 30.41 23,34 243,83 220.20 61=2 7:00 510 30 2 2 6:30 5:00 830 13 13.23 108353,7 27041,W5 1.1 3Q.41 189.89 7/1102 13 13,23 82355.2 1 0.00 1,1 23.17 188,72 7aM2 7.SO B00 10 13,2 79220 20204.08 1.1 22.22 144.50 7! 3 13 1 ,23 39500 108353.7 1 102.04 27641. 5 1,1 1.1 11.11 30.41 133...39 102,9 VIM fir rrlrnusss [ 5^7.660 Crop Cycle Toi 580,290jTOW PAN App4ls4 L 247,02� Orwr+ar'4 Signeve Operalnr'e Slgnalurs CerhW 09"lor {P(int} !Stvip Terry OWSlors CerdRo rbn No. 16314 R NCt)A waft Anposls or EQWV&WM or NRCa eal m l . Te"toel Gwlde t OMM sa3, Erwe► the v■lue realvad av sub rsding eoYUmn (10) frVm 18). C Onwe wbtr v ky cotumr! (10) from column (it) fo(lowtng mch 090pn evem. DEC-18--02 11 : 12 AM P.09 FORM II1R•2 Lagoon Uquld lni 00v fields Reaord One Form for Each Field per Crop Cycle Try p 01 fialQ A Z Fatally Numt�er � - 23 Hold t3lre (acres) a (A) 4,41 Farm Owner N A- Farm 8 Owners Address 38S Hwy 158 BoyUghg Ra s NC 27870 Ownpr's t}Nprw N 26 � 37-971 From W+eq ut11Rec on Plan � p TYAa uda ReoWnmended PAN 7S0 Loading (Ibldve) ■ (a) _ rel rot 001 (t11- Doe (nlrNdgl)f) e M914Ana"@ PANS Ob(iom pf0) PAN Applied (Ib(aore) u Lklp� 1000 N11rooll po IA-' tUpc* (el - (1U) 8W T1me Em 71ms Total Ap mit f3) (9) tog Spnnkkart Operaung now Rale [Winlnl Tolel Volume (pallon6) (6) x (6) a (4) Volume per acre (gallurC (7) ((A) 350 4181 0: 5:30 450 1 154 80 00 t 87 .47 1.4 24.61 325,39 4 :30 480 111 134 JL320 14685. 29,25 2 3.1 7: :00 900 1 1 00400 1891129 1. 3282 200.32 OZ 8; 0 1 134 72 380 18408,16 1,1 18.05 248 27 614102 8:30 1 1 92,480 20999 1.1 23.09 225.21 5:00, 134 84.420 19142,86 1.1 21.06 204.15 2 100 5101 1 Ib 14 47 0 19142,88 1.1 2100118�.D9 fo411 Mlnum Crop 5�3818601T*Ml PAN AppW I 155,61 Owner's Signature ODereiofs Signature CeVed Operator (Prmnv Operatofa CortWO W4 No tg614 ' KpC k Wallt Aneytals or F,QLOVWM Of MRCS 6samale, Tec nkO GYft geoUon e33, Erns Ih* valve rva6v 4 by k0trad1 V oolpmn (10) from (a). CWORM a ma" odumn (fo) from Wa+mn (11) faeoWrp soon frriQaocn avant, DEC-16-02 11:12 AM P. 10 FORM JR14•2 Lagoon l.)gtW IrVotlon Flel le Record One Farm Tor Each Field per Crop CyOe Mydrent 2 P" N 3 Facility Humber Field Sloe (&me) + (A; 0.16 Fam+ Owner NP U Farm 63 Owners Address 385 Hwy 155 Roanoke Ra Ids NC 2757 Owner's Phone N 252.53?-9710 FrOM Wfeft Milw m Plan Crop Type rm(+de ReoomrMe(XW PAN W Loodirog (tWKm) ■ (B) (1) W (3) (4) f6f r61 {7S tat tat (10) (11) Do (mlvfty) e n WaH1 AnO Wa PAN' gat) PAN Appllod ()prncru) ILLO] lom NAtoqun 9a'mtiu," 00p z ra) (0)-(1U). t3tart Tints End Time Taw hOr"" M-0) Not "kAM Opel+g Flow Rats (gaUmw Ta;alVOWIre (ganonc) (6)x(5)■(A) VOlum9 per Acre re) (WOVAr (1)I(A) 8■ 350 W2&02 7:00 5:30 630 1 247 165610 25281.19 Ill 27 79 322.21 6:001ail 155,010 26251,36 1 1 27,79 294,4 711102 480 1 247 11B 660 1924 .7 1.1 21.17 273-26 7002 7:00 5:00 m1 47 148,200 24056,44 1,1 25.46 240.79 7M P 1 1 247 74100 12029.22 1.1 13.23 233.68 7f113102 0:30 5:00 S 1 47 155814 26261.36 11 27.79 205.77 Topr rttnut" 1 _.__3270 Crop Craw Taatef Sp .890 Oat Puri App1ted l 144.2 J Owners Signature Operators Signature _ GrtMlyd Operator (Pr1nl) Ki lvin TM OwaWe Cert(beapon No. 18514 NCDA wash Af1hAeK w EWJvWaN or NRC5 EKk+ralo, Tedmloal GlM Sop" W ~ FAW er vO- MOWVW by liutbeotkV OcA—n (10) from (0), CwOmm v*redtna oaturrin (10) ftm COvm (11) fokm" GOO Vriestw avw11. `1 State of North Carolina Department of Environment, Health and Natural Resources 74iFA Raleigh Regional Office James B. Hunt, Jr., Governor p E H N F� Jonathan B, Howes, Secretary Boyce A. Hudson, Regional Manager Division of Environmental Management August 23, 1995 Mr. Rudy Grammer Smithfield-Carrolls P.O. Box 1240 Waverly, Virginia 23690 Subject: Management Deficiency Notification; Smithfield-Carrolls Farm # 63 Halifax County SR 1240 Dear Mr. Grammer: On July 25, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's effort to determine potential problems associated with animal waste disposal systems. Mr. Towell's site visit determined that wastewater from your facility was not discharging to the surface waters of the state, nor were any manmade pipes, ditches, or other prohibited conveyances (for.the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: Animal waste was observed in a ditch that was downhill from a nearby solid set sprinkler head. This riser was approximately 16 feet from the center line of the drainage ditch. This ditch would be a conveyance to surface waters during either, over spraying or substantial rainfall events. In addition to continued facility waste management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. You should specifically address how you plan to correct this problem and submit a schedule (with dates) stating when these management deficiencies will be corrected. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper Carrolls # 63 Hog Farm Page 2 Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges to surface waters of the State are subject to civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take the opportunity to remind you that you are required to have an approved animal_ waste management plan by December;'1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Supervisor cc: Halifax County Health Department Fishing Creek Conservation District (Halifax County) Steve Bennett -Regional Coordinator, DSWC .� State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager Division of Environmental Management August 23, 1995 Mr. Rudy Grammer Smithfield-Carrolls P.O. Box 1240 Waverly, Virginia 23890 Subject: Management Deficiency Notification Smithfield-Carrolls Farm # 63 4' Halifax County SR 1240 Dear Mr. Grammer: On July 25, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's effort to determine potential problems associated with animal waste disposal systems. Mr. Towell's site visit determined that wastewater from your facility was not discharging to the surface waters of the state, nor were any manmade pipes, ditches, or other- prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: Animal waste was observed in a ditch that was downhill from a nearby solid set sprinkler head. This riser was approximately 16 feet from the center line of the drainage ditch. This ditch would be a conveyance to surface waters during either, over spraying or substantial rainfall events. In addition to continued facility waste management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. You should specifically address how you plan to correct this problem and submit a schedule (with dates) stating when these management deficiencies will be corrected. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 An Equal Opportunity Affirmative Action Employer Telephone 919-571-4700 FAX 919-571-4718 50% recycled/ 10% post -consumer paper Carrolls # 63 Hog Farm Page 2 Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges to surface waters of the State are subject to civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take the opportunity to remind you that you are required to have an approved animal waste management__p_lan by December 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste. management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Supervisor cc: Halifax County Health Department Fishing Creek Conservation District (Halifax County) Steve Bennett -Regional Coordinator, DSWC F, State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager I a XF.WMA 0F1 NR Division of Environmental Management August 23, 1995 Mr. Rudy Grammer Smithfield-Carrolls P.Q. Box 1240 Waverly, Virginia 23890 Subject: Management Deficiency Notification Smithfield-Carrolls Farm # 63 Halifax County SR 1240 Dear Mr. Grammer: On July 25, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's effort to determine potential problems associated with animal waste disposal systems. Mr. Towell's site visit determined that wastewater from your facility was not discharging to the surface waters of the state, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: Animal waste was observed in a ditch that was downhill from a nearby solid set sprinkler head. This riser was approximately 16 feet from the center line of the drainage ditch. This ditch would be a conveyance to surface waters during either, over spraying or substantial rainfall events. In addition to continued facility waste management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. You should specifically address how you plan to correct this problem and submit a schedule {with dates} stating when these management deficiencies will be corrected. 3800 Barrett Drive. Suite 101; Raleigh, North Ca►ollna 27609 An Equal Opportunity Affirmative Action Employer Telephone 919-571-4700 FAX 919-571-4718 50%recycled/ 10%post-consumer paper Carrolls' # 63 Hog Farm Page 2 Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to'protect the natural resources of the State. Accordingly, illegal discharges to surface waters of the State are subject to civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take the opportunity to remind you that you are required to have an approved animal waste management plan by December1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Buster Towell at (919) 571-4700: Sincerely, Kenneth Schuster, P.E. Regional Supervisor cc: Halifax County Health Department Fishing Creek Conservation District (Halifax County) Steve Bennett -Regional Coordinator, DSWC SMITH FIELD-CARROLL'S FARMS P.O. Box 1240 WAVERLY, VIRGINNIA 23890 Q� September 22, 1995 Mr. Kenneth Schuster DEHNR, Raleigh Regional Office 3800 Barrett Dr- Suite 101 Raleigh, NC 27609 RE: Management Deficiency Notification; Smithfield- Carroll's Farm # 63, Halifax Co. SR 1240 Dear Mr. Schuster: I am in receipt of your letter of August 23, 1995 regarding a management deficiency at Smithfield- Carroll's Farm #63. The description of the observations by Mr, Buster Towell, are misleading. The described sprinkler head is not a fixed sprinkler, but an irrigation hydrant where portable irrigators, such as hard hose travelers or towable center pivots may be positioned for land application purposes. This hydrant is located more than 23 feet from the center line of the adiacent drainage area; not 16 feet as indicated in the deficiency notification. As with any portable irrigation, small amounts of liquid will be spilled from connecting hoses, and irrigators when irrigation is ceased and/or the irrigator is being prepared for transport. Apparently, extreme caution was not taken by our employees, to prevent this liquid from reaching the described drainage area after an application event. Our farm personnel have been informed of this situation and they understand the potential impact of such actions. Periodic reminders will be included in future staff meetings to assure environmental quality. Should you require additional information, 1 may be reached at (804) 834-2109. Sincerely, 1 Rudy Grammer Manager of Farming Environmental Affairs cc: Adolph Miller, Carroll's Foods of Va. Halifax Co. Health Dept. Fishing Creek Conservation District Y2-23 1SAL November 15, 1995 Mr. Jeff Dillard, R.S. Environmental Health Super isor Halifax County Health Dept. P.O. Box 10 Halifax. North Carolina 27939 RE: Noncompliant Condition Letter Dated 1 1-2 95 Smithfield-CarrolI's Farm #63 SR 11 1 3. Halifax Count\,. NC Dear Mr. Dillard: CARROLL'S FOODS OF VIRGINIA, INC. P. O. Box I240 WAVERLY, VIRGINIA 23890 �j,T This letter is in response to your letter dated November 2. 1995. concerning a noncompliant condition at Smithfield-CarrolI's Farm 963. Following our telephone conversation on November 2. 1995, we immediately began an investigation into this matter, As we discussed on the phone. there was speculation that possible a pipe was cracked or broken underground allowing seepage of recycled lagoon liquid. This was found not to be the case. Ironically, it was a partially dogged safety overflow drain that was the problem. The drain, designed to prevent spillage, by directing effluent back to the lagoon, was partially clogged on one of the farms flush tanks. Subsequently, small, varying amounts of effluent were bypassing the safety drain. This by had to be irregular in both timeliness and amounts, as several tanks are refilled by the same pump at different intervals. This action would alter the flow rate to the problem tank and make it difficult to detect a leak. In response to this event. the following actions have been perfonmed. - Removed every overflow drain to inspect and repair any blockage that exist. - Inspected all flush tanks and timers to insure proper operating condition. - Increased frequency of flushing operations to prevent possibility of overfilling of tanks. - Performed a complete farm inspection for leaks or other potential problem areas. In addition. weekly inspections of tanks and timers will be performed to assure proper operating conditions and prevent future occurrences. We welcome you to revisit the farm for a follow-up to this action. Please feel free to schedule a visit with me at (804) 834-2109 or possibly more conveniently; Mr. Matt Miles at our North Carolina office, (919) 537-9710. If I may be of any assistance. please feel free to call. Sincerely. Ru. Rude Graimner Manager of Farming & Environmental Affairs cc: Mr. Adolph Miller Mr. Matt Miles Ms. Merle Grcen Mr. Buster Towell V111 �lz - 2-3 Animal Control Immunization Cancer Detection t Maternal & Child Health Environmental I1'ealthL Family Planning j tl� .7i� 1 'Ii-1 �` � Orthopedic Glaucoma -Diabetes School Health Health Education Post Office Box 10 Tuberculosis Health Screening STD/HIV Home Health Hospice Halifax, N.C. 27839 Vital Statistics Hypertension Merle C. Green, MPH, R.H.Ed. Home Health Hospice Health Department Health Director (919) 308-0700 Information: (919) 583-5021 Fax Number Fax Number: (919) 583-2975 (919) 537-1872 November 2, 1995 Mr. Rudy Grammar Manager of Farming & Environmental Affairs Smithfield-Carroll's Farms P.O. Box 1240 Waverly, VA 23890 Dear Mr. Grammar: Our office received a complaint on October 31, 1995 that wastewater, from Farm #63 located at the end of SRI 123 near Tillery, NC, was possibly entering a tributary of Looking Glass Run. Mr. Moulton Bailey, R.S. and 1 proceded to investigate this complaint on October 31, 1995. We followed the tributary until we reached the farm on SR 1123. We decided to contact anyone present in the farm office, but on the way to the office we had to cross a grassed waterway. This waterway had lush fescue growth. As we followed the waterway up the hill to the farm, we noticed pools of pinkish purple liquid (water the same color as lagoon water). This liquid was entering the swale through a pipe that ran under the road circling the farm. No one was present at the office, so we left without contact. We revisited the site on November 1, 1995 with Mr. Buster Towell from the Division of Environmental Management. After speaking with employees in the office, we proceded to walk around the farm. Pinkish purple liquid was still in the diversion ditch. The source of this liquid appeared to originate somewhere between the first and second buildings. There was a steady stream of wastewater flowing in the surface water diversion during the entire time of our visit. The farm manager looked for the source of the waste but could not find any. We did not go inside the clean area to look for the leak. Another item of concern was the condition of the irrigation area south and west of the farm. Standing water was commonplace and appeared to have waste in it. This could not be confirmed. Also, the diversion around the back side of the lagoon showed signs that irrigation effluent had been allowed to runoff the irrigation site to the extent of leaving waste deposits in the diversion ditch. Be reminded that runoff is not allowed. This problem area has very impermeable and high water table soils; consequently, irrigation application should be minimal. Also, the crop in this area appeared to be mainly weeds or native grasses. If this area is to be used in the future, reseeding needs to be done. "We are building a county of people to be as healthy as they can be. " rj r This letter is to officially notify you that the above noncompliant condition must be repaired within fifteen (15) days. Contact this office as soon as repair has been made so we can schedule a followup inspection. Failure to promptly repair the situation will result in further action by this office. Please call me if you have any questions at (919) 583-6651. Thank you for your cooperation. Sincerely, eff i ard, R.S. Environmental Health Supervisor cc: Ms. Merle Green, Halifax County Health Director Mr. Adolph Miller, Carroll's Foods of Virginia Mr. Neal Phillips, Halifax County Manager Mr. Buster Towell, DEM ✓ PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION Facility Number: r-42=023— 7= _ County: rHaIifdx—__._!-- Facllity Name: 73631 Certified Operator Name: Murphy -Brown, LLC Operator #k *Attach a copy of Lagoon Sludge Survey Form and volume worksheets Note: A certified Sludge Management Plan may be submitted in lieu of this POA. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 La oon 6 a. Lagoon Name/ Identifier 73631 b. Total Sludge Depth (ft) 5.93 c, Sludge Depth to be Removed for Compliance 1.03 ft d. Sludge Volume to be Removed (gallons) 2,000,000 e. Sludge PAN (lbs/1000 gal) 10 ' f. Liquid PAN (Ibs/1000 gal) 2 g. PAN of Sludge (lbs) (d x e)/1000 20,000 Compliance Timeframes: If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge [eve] results in an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey. If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in sludge levels, DWR may require the owner to develop a sludge management plan that meets the requirements of SIB Interagency Group Guidance Document 1.27. SPOA 9-15-2016 Page 1 of 3 NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge depth. If microbe use Is planned, specify the product to be used. 1) Sludge Management Plan (In accordance with NRCS Standard 359, Sludge Management Guidance): Continue current lagoon management and monitoring of sludge as long as: A) the sludge level is less than the stop pump level of the lagoon, B) nutrient values of the lagoon effluent are within the normal operating range, C) there is no noticeable increase in lagoon odor, D) a minimum 2.5 ft deep zone, free of sludge, at the pump intake is maintained, and E) nutrients applied from lagoon are properly accounted for in the application plan (NUP). 2) Sludge Removal - Within 90 days of not maintaining the items listed in the above sludge management plan, one of the following options will commence: A) Mechanical Removal by Pump and Haul - a sludge utilizationlapplication plan will be developed that identifies land in the vicinity of the lagoon that will allow for the application of the agitated/mixed sludge layer of the lagoon. I mplementation of the plan will commence within another 180 days. Records will be kept of these applications as required by the permit. B) Mechanical Removal by Dewatering - sludge will be removed by dredge or lagoon agitator pump then mixed with polymer and pumped into geolextile tubes (bags) for dewatering, ai outlined in the Management Plan of the Distribution of Animal Residual Solids Permit, #W00037487. After curing for approximately 6 months solids will be distributed within 2 years either i) as a Class A material in accordance with permit #WQ0037487, or ii) if the soilds do not meet Class A standards, in accordance with a sludge utilization/application plan for land application. I hereby certify that I have reviewed the information listed above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and . correct. I further certify and acknowledge that compliance with regard to sludge accumulation must be achieved within two years of the original sludge survey Indlcating non-compliance. Sludge Survey Date: 10/23/18 Murphy -Brown, LLC Facility OwnerlManager (print) Z'Lta=L�= -'�- i4c Facility Owner/Manager (signature) NPDES Permitted Facilities Return this form to: Animal Feeding Operations Program NC Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-1636 SPOA 9-15-2016 Page 2 of 3 Compliance Due Date: 10/23/20 Phone: 910-293-3434 Date: 16 J31 lJelr State Permitted Facilities Return this form to: NC Division of Water Resources at the appropriate Regional Office (see following page) DIVISION OF WATER RESOURCES REGIONAL OFFICES (09/2016) Counties served by each Regional Office Asheville Regional Supervisor 2090 U.S. Highway 70 Swannanoa, NC 28778 (828) 296-4500 Fax (828) 299-7043 Avery Macon Buncombe Madison Burke McDowell Caldwell Mitchell Cherokee Polk Clay Rutherford Graham Swain Haywood Transylvania Henderson Yancey Jackson Fayetteville Regional Supervisor 225 Green Street, Suite 714 Fayetteville, NC 28301-5094 (910) 433-3300 Fax (910) 486-0707 Anson Moore Bladen Richmond Cumberland Robeson Harnett Sampson Hoke Scotland Montgomery Winston-Salem Regional Supervisor 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 (336)776-9800 Fax (336) 776-9797 Alamance Rockingham Alleghany Randolph Ashe Stokes Caswell Surry Davidson Watauga Davie Wilkes Forsyth Yadkin Guilford SPOA 9-15-2016 Washington Regional Supervisor 943 Washington Square Mall Washington, NC 27889 (252)946-6481 Fax (252) 975-3716 Raleigh Regional Supervisor 1628 Mail Service Center Raleigh, NC 27699-1628 (919)791-4200 Fax (919) 571-4718 Beaufort Jones Chatham Bertie Lenoir Durham Camden Martin Fdgecombe Chowan Pamlico Franklin Craven Pasquotank Granville Currituck Perquimans Halifax Dare Pitt Johnston Gates Tyrell Lee Greene Washington Hertford Wayne Hyde Mooresville Regional Supervisor 610 East Center Avenue, Suite 301 Mooresville, NC 28115 (704)663-1699 Fax (704) 663-6040 Alexander Lincoln Cabarrus Mecklenburg Catawba Rowan Cleveland Stanly Gaston Union f redell Page 3 of 3 Nash Northampton Orange Person Vance Wake Warren Wilson Wilmington Region Supervisor 127 Cardinal Drive Extension Wilmington, NC 29405-3845 (910)796-7215 Fax (910) 350-2004 Brunswick New Hanover Carteret Onslow Columbus Pender Duplin 1 -rtifica..'te of Coverage AWS420023 -Farm 63 V Page 2 If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 5714700. If you need additional information concerning this COC or the General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. ,,,yA. Preston Howard, Jr., P cc: (Certificate of Coverage only for all cc's) Halifax County Health Department cRal eiglf Regional;Office,-Water_Quality-S ection-�, Halifax County Soil and Water Conservation District Permit File State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director August 24, 1998 Smithfield Carroll's Farms Farm 63 PO Box 1240 Waverly VA 23890 Attn: Adolph Miller i � • NCDENR NoRTI.1 C.AROLINA DEPARTMENT of ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWS420023 Farm 63 Swine Waste Collection, Treatment, Storage and Application System Halifax County Dear Adolph Miller: In accordance with your application received on April 27, 1998, we are forwarding this Certificate of Coverage (COC) issued to Smithfield Carroll's Farms, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm 63, located in Halifax County, with an animal capacity of no greater than 500 Farrow to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer- 50% recycled/ 10% post -consumer paper Stbte of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director July 10, 1998 CERTIFIED MAIL _RETURN RECUFT REQUESTED A_Tolpli V+ er Farm 63 PO Box 1240 Waverly VA 23890 4 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Application No. 42-0023 Additional Information Request Farm 63 Animal Waste Operation Halifax County Dear Adolph Miller: The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. A request for additional information was sent May 7, 1998, and to date this information has not been received. Please address the following by August 10, 1998: 1) The Nitrogen application amount per acre for Bermudagrass Hay is greater than NRCS Standards recommendations for a Waste Utilization Plan signed in September 1997. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter, must be submitted on or before August 10, 1998 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 502. S' erely, Sue Homewood Environmental Engineer Non -Discharge Permitting Unit cc: Raleigh Regional Office Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-715-6048 An Equal Opportunity Affirmative Action Empioyer 50% recycled/ 10% post -consumer paper . .N "f ;# State of North Carolina Department of Environment and Natural Resources Division of Water Quality Non -Discharge Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Existing Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: 1.1 Facility Name: Farm 63 1.2 Print Land Owner's name: Smithfield Carroll's Farms 1.3 Mailing address: PO Box 1240 City, State: Waverly Va Zip: 23890 Telephone Number (include area code): 834-2109 1.4 County where facility is located: Halifax 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): SR 1123, end of road, left(S.E.) side. 1.6 Print Farm Manager's name (if different from Land Owner): -Robert -i�� Pdo lflh Millar 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): Smithfield Carroll's 1.8 Date Facility Originally Began Operation: 01/01/92 1.9 Date(s) of Facility Expansion(s) (if applicable): NZA 2. OPERATION INFORMATION: 2.1 Facility No.: 42 (county number); 23 (facility number). 2.2 Operation Descriiption: Swine operation Farrow to Finish 500- Certified Design Capacity Is the above information correct? = yes; no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum num er or which the waste management structures were designed. Type of Swine No. of Animals Wean to Feeder Feeder to Finish Farrow to Wean (# sow) Farrow to Feeder (# sow) Farrow to Finish (# sow) Other Type of Livestock on the farm: Type of Poultry No. of Animals Layer Non -Layer Turkey Type of Cattle No. of Animals Dairy. Beef No. of Animals: FORM: AWO-G-E 1/28/98 Page 1 of 4 42 - 23 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 65.5 ; Required Acreage (as listed in the AWMP): 65.5 2.4 Are subsurface drains present within 100' of any of the application fields? YES or NO (please circle one) 2.5 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or O (please circle one) 2.6 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS tandards, etc.) (Swine Only) ffEor NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? _J OA I f +f .. What was the date that this facility's land application areas were sited? 3. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicants Initia_!s 3.I One completed and signed original and one copy of the application for General Permit - Animal Waste Operations;'' 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.11 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.) If your CAWMP includes components not shown on this list, such as an irrigation design, or site evaluation, please include the additional components with your submittal. FORM: AWO-G-E 1/28/98 Page 2 of 4 42 - 23 Facility Number: 42 - 23 Facility Name: Farm 63 4. APPLICANT'S CERTIFICATION: ADc tat{ L LFo_FPP— SM +1Z4F+mac D - GA944,LL' S (Land Owners name listed in question 1.2), attest that this application for _ SM c rp F #l:ZC�6 -- �cu- 1� FAQM 5 "- !q3 (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to as tncomplet . �j J Signature J, f%`i ;u ,1" �it Date 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) AbOLi')N _ MILLS, C-,FN I�G12. (Manager's name listed in question 1.6), attest that this application for (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature THE Date ' 2- ITNG INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 1/28/98 Page 3 of 4 42 - 23 DINISION OF WATER QUALITY REGIONAL OFFICES (1/98) Asheville Regional WQ Supervisor 59 NVOo dfin Place Asheville, NC 28801 (704) 25 1-6208 Fax (704) 25I-6452 Avery Macon Buncombe Madison Burke McDowell Caldwell Mitchell Cherokee Polk Clay Rutherford Graham Swain Ha,,u-ood Transylvania Henderson Yancey Jackson - Fayeneville Regional',+'Q Supervisor Wachovia Building, Suite 714 Favettevilie. NC 25301 (910) 486.1541 Fax(910)-186-0707 Washington Regional WQ Supervisor 943 Washington Square Mall Washington, NC 27889 (919) 946-6481 Fax (919)975-3716 Beaufort Jones Bertie Lenoir Camden Martin Chowan Pamlico Craven Pasquotank Currituck Perquimans Dare Pitt Gates Tyre]] Greene Washington :I rtford Wa},,r Hyde Mooresville Regional WQ Supervisor 919 North Main Street Mooresville, NC 28115 (704) 663-1699 Fax (704) 663-6040 Raleigh Regional WQ Supervisor 3800 Barrett Dr, Raleigh, NC 27611 (919)571-4700 Fax (919) 733-7072 Chatham Nash Durham Northampton Edgecombe Orange Franklin Person Granville Vance Halifax Wake Johnston Warren Lee Wilson Wilmington Region. 'kA'Q Supervisor 127 Cardinal Drive Extension Wilmington, NC 28405-3845 (910) 395-3900 Fax (910) 350-2004 Anson Moore Alexander Lincoln Brunswick New Hanover Biaden Richmond Cabarrus Mecklenburg Carteret Onslow Curnbe-land Robeson Catawba Rowan Columbus Pender Han, en Sampson Cleveland Sternly Duplin Hoke Scotland Gaston Union NlontQomer, 1.redell Winston-Salem Regional WQ Supervisor 585 Wauehtown Street Winston-Salem. NC 27107 (910) 7 71-4600 Fax (910)771-4631 Alamance Rockingham Alleghany Randolph Ash Stokes Caswell Sum• Davidson R'atauea Davie Wilkes Fors%Th Yadkin Guilford FOR -NI: ANVO-G-E 1/28/98 Page 4 of 4 1% WASTE UTILIZATION PLAN Producer: Carroll's Foods of Virginia, inc. Location: Southwest of Tillery off of Rte. 1123 Telephone: (804) 834-2109 Type Operation: Farrow to Finish Number of Animals: 500 sows (Design Capacity) The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This,waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potential, cation exchange capabilities, and available water holding capabilities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached, you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out; meets the requirements for compliance with 15A NCAC 21-1.0217 adopted by the Environmental Management Commission. WASTE UTILIZATION PLAN Amount of Waste Produced Per Year(gallons, ft3, tons, etc.) 500 animals x 10,585 gal (amt.) waste/animallyear = 5,292,500 gal (amt.) waste/year. Amount of Plant Available Nitrogen (PAN) Produced Per Year 500 animals x 26 lbs. PAN/animal/year = 13,000 lbs. PAN/year. (PAN from N. C. Tech Guide Std. 633) Amount of Plant Available Nitrogen (PAN) From Secondary Lagoon 13,000lbs. PAN/year x 80% = 10,400 lbs. PAN/year. Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown and surface application: Table 1: ACRES OWNED BY PRODUCER Tract # Field Soil Type Crop Lbs. N per Ac. " Acres Lbs. N Utilized Month of Application 2864 1 Marlboro Bermudagrass Hay 350 6.4 2,240 Apr -Oct Small Grain 50 6.4 320 Feb -Apr &Nov 2 Gritney Bermudagrass Hay 350 7.0 2,450 Apr -Oct Small Grain 50 7.0 350 Feb -Apr &Nov 3 Emporia Bermudagrass Hay 350 14.6 5,110 Apr -Oct Small Grain 50 14.6 730 Feb -Apr &Nov 4 Goldsboro Fescue 200 36.6 7,320 Mar -Jun & Sep -Nov Total 1 64.61 _1 8,5201 * This N is from animal waste only. If nutrients from other sources such as commercial fertilizers are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. WASTE UTILIZATION PLAN Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land [See Required Specification 21) Tract Field Soil Crop Lbs. N Acres Lbs, N Month of * See footnote for Table 1. Table 1 Table 2 Total •- Per Ac. Itilized Application Totals from above Tables Acres Lbs. N Utilized 64.6 18,520 0 0 64.6 18,520 Amount of N Produced Surplus or Deficit 10,400 8,120 NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. 3 WASTE UTILIZATION PLAN See attached map showing the fields to be used for the utilization of waste water. Application of Waste by Irrigation Field No. Soil Type Crop Application Rate (In/Hr) Application Amount (in.) 1 Marlboro Bermuda/Small Grain 0.35 5.9 2 Gritney Bermuda/Small Grain 0.35 5.9 3 Emporia Bermuda/Small Grain 0.35 5.9 4 Goldsboro Fescue 0.35 2.9 THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL BE NEEDED FOR DRY LITTER OR SLURRY. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation 124.9 ft. . Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. Narrative of Operation: This operation is located off of Rte. 1123 southwest of Tillery in Halifax County. The operation is located on CFSA tract 2864. The swine operation is farrow to finish with a design capacity _of, 500 active sows. It is estimated that 5,292,500 -gallons of animal waste will be produced annually for land application. There are 64.6 acres of cropland available for land application. The _waste from the swine houses is stored in a primary and secondary anaerobic treatment lagoon system. The secondary lagoon is used to further reduce the nitrogen content of the waste before it is land -app lied. Fre uent sampling of our secondary lagoons of similar capacity and geographic location, indicates that nitrogen levels are reduced_ an additional 40% see attached analyses). A reduction of 20% was used to determine nitrogen production for this plan. The waste is land applied to bermud_agras_s and fescue havland using_ irrigation. _A_small grain cover crop may be planted in the bermudagrass fields in the fall for fail and early spring applications if needed The small grain cover crop will be removed as hay. Before sludge is applied, samples will be taken to determine its nutrient content. Application rates for the sludge will be based on the nutrient content of the sludge so that it is applied at agronomic rates. a WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to the assessment of civil penalties of $10,000 per day by the Division of Environmental Management for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement (sample enclosed) with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. Animal waste shall be applied to meet, but not to exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field, These filter strips will be in addition to "Buffers" required by the DEM. [See FOTG Standard 393 - Filter Strips and Standard 390 (Interim) - Riparian Forest Buffers.] 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when the wind is blowing. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina' in the Technical Reference - Environment file for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that no more than 20 to 25 percent of the leaf area is covered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop on bare soil. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 11. Animal waste shall not be applied closer than 50 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present. (See Standard 393 - Filter Strips) 12, Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by overspraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses. Animal waste may be applied at agronomic rates to grassed waterways that do not discharge directly into water courses provided the application causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. Lagoons and other uncovered waste containment structures must maintain a maximum operating level to provide adequate storage for a 25-year, 24-hour storm event in addition to the one (1) foot mandatory freeboard. 18. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 19. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a 'closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 20. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 21. Wastewater should be analyzed at least twice annually to determine nutrient content. 22. Fields receiving wastewater should be soil sampled each year to monitor micronutrients, phosphorous, potash, and lime levels. 23. The crops, on which wastewater is applied, should be removed from the farm. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 24. Crop yields should be recorded and meet yield targets shown in the waste utilization plan, 25. Records should be kept to document when, where, and how much waste water is applied. 26. Waste analyses and soil sample reports should be kept for at least three years. 27. Daily rainfall amounts should be recorded. WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Smithfield-Carroll's Farm 63 Owner/Manager Agreement I (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. 1 (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner. Smithfield-carrnll's Farms- by Adolph Miller (Please print) Signature: AVC/4 Date: d - /3 . S-G Name of Manager (If different from owner): Signature: Date: Name of Technical Specialist: (Please print) 0. Affiliation: 1J S Address Signatur TTwr IT TPT7 II wr 0 Twrr mm TrIT UT yridr 7,nT amw wnib rwr wn up rrrr W7. _M7. 1w 71r, 'Em TTmn rr 11 rtf-i d, . . I ";I wTr W mom TIM jivis . 01-1 V*l 19 qW IN [il a ROANOKE JJ 1 � i J - PS . J� 9 r U rZI l '� oil l _ f V 9 ❑1 o�0F W A ��R4G Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Q Coleen H. Sullins, Director Division of Water Quality July 1, 2007 Murphy -Brown, LLC Farm 63 PO Box 856 Warsaw, NC 28398 Subject: Certificate of Coverage No. AWS420023 Farm 63 Animal Waste Management System Halifax County Dear Murphy -Brown, LLC: In accordance with your application received on II-Jun-07, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Murphy -Brown, LLC, authorizing the operation of the subject animal waste management system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the Farm 63, located in Halifax County, with an animal capacity of no greater than the following swine annual averages: Wean to Finish: 0 Feeder to Finish: 0 Boar/Stud: 0 Wean to Feeder: 0 Farrow to Wean: 0 Gilts: 0 Farrow to Finish: 500 Farrow to Feeder: 0 If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows, Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009 and replaces the NPDES COC issued to this facility with an expiration date of July 1, 2007. You are required to continue conducting annual surveys of sludge accumulation in all lagoons at your facility; the one-year extension in Condition III.19 does not apply. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please Pay careful attention to the record keeping and monitoring -conditions in this permit. Aquifer Protection Section 1636 Mail Service Center Internet: www.ncwaterquality.org Location: 2728 Capital Boulevard An Equal Opportunity/Affirmative Action Employer- 50°% Recyded110°% Post Consumer Paper NamNa` Carolina turally Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Raleigh, NC 27604 Fax 1: (919) 715-0588 Fax 2: (919) 715-6048 Customer Service: (877) 623-6748 If your Waste Utilization Plan has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 02T .01 I l(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100-foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Per 15A NCAC 02T .1306, any containment basin, such as a lagoon or waste storage structure, shall continue to be subject to the conditions and requirements of the facility's permit until closed to NRCS standards and the permit is rescinded by the Division. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Aquifer Protection staff may be reached at 919-791-4200. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Unit staff at (919) 733-3221. Sincerely, for Coleen H. Sullins Enclosures (General Permit AWG100000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Halifax County Health Department Halifax County Soil and Water Conservation District Raleigh Regional Office, Aquifer Protection Section AFO Unit Central Files Permit File AWS420023 Murphy -Brown, LLC 4/9/2009 P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Farm Name: Murphy -Brown, LLC SPG Farm 63 County: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 500 Wean to Feeder Feeder to Finish Storage Structure: Anaerobic Storage Period: Application Method: >180 days Irrigation h r-�.OL , _ - --v:1 i LJVVQ Ai*uifQr Prrrt--.bnn Sertion APR o 9 2009. .agoon '/,� 3 The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 JAL This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft', tons, etc.): Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr Farrow to Feeder 4015 gallyr gallyr 500 Farrow to Finish 10585 gallyr 5,292,500 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gallyr gallyr Total 5,292,500 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): 'Based on site specific data Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibslyr Ibslyr Farrow to Feeder 6.5 Ibslyr Ibslyr 500 Farrow to Finish 12.98 lbslyr 6,490 Ibslyr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibslyr Ibslyr Total 6,490 Ibslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 64.56 Total N Required 1st Year: 16866.25 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 16,866.25 Total Nitrogen Produced by Farm: 6,490.00 Nitrogen Balance for Crops: (10,376.25) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 Reception Area Specifications Tract Field Irrigated Soil 1st Crop Timeto, IstCrop 1stCrop LbsN/Ac Lbs N Total lbs N 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total lbs N JI&JEEM OrPlIF-M Acreage Type Code Apply Yield lbs N/Unit Residual /Ac Utilized Code Apply Yield lbs N/Unit Residual /Ac Utilized 3(b) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue - Grazed H Fescue- Hay I Oats J Rye K Small Grain - Grazed L Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Lbs N utilized I unit yield 1.6 lbs N / bushel 50 lbs N 1 ton •50 lbs N 1 ton 1.25 lbs N 1 bushel 12 lbs N 1 ton 0.12 lbs N 1 lbs lint 50 lbs N 1 ton 50 lbs N I ton 1.3 lbs N 1 bushel 2.4 lbs N 1 bushel 50 lbs N 1 acre 50 lbs N 1 acre 2.5 lbs N l cwt 2.4 lbs N 1 bushel 4.0 lbs N 1 bushel 40 lbs N 1 acre 1 yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT r/animal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 500 Farrow to Finish 4.1 2050 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2050 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10250 pounds of plant. available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 34 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 82 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs, This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid, Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr * inches SS1. Marlboro C 0.65 1 SS2 Marlboro C 0.65 1 A Gritney C 0.5 1 B Emporia C 0.4 1 C Emporia C 0.4 1 D Goldsboro H 0.4 1 E Goldsboro H 0A 1 #REF! F Goldsboro H 0.4 1 G Goldsboro H 0.4 1 H Goldsboro H 0.4 1 Sub2 Gritney C 0.5 1 Sub3 Emporia C 0.4 1 Sub4 Goldsboro H 0.4 1 6of8 Additional Comments: The acreage listed in this plan as subfields is the balance of the total field acres minus the wet acres at this site. This acreage will be claimed when making application with an aerway machine. 7of8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: SPG Farm 63 Owner: Murphy -Brown, LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Murphy -Brown, LLC Signature: -- -- A771� - -- - Name of Manager (if different from owner): Signature: Name of Technical Specialist: Dawn Williamson Affiliation: Murphy -Brown, LLC Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw. NC 28398 Signature: Telephone: (910) 293-3434 Date Date Date 8of8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. if the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist'. Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3 of 3 Murphy -Brown, LLC 4/3/2009 P.O. sox 856 Warsaw, NC 28398 Grower(s): Farm Name: NUTRIENT UTILIZATION PLAN 4/a ��--3 Murphy -Brown, LLC SPG Farm 63 County: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 500 Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. =� CV) 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. RECEIVED I DENR I DWO 1 of 8 aQUIrFR'PPnTFrTIr1N SECTION APR 0 7 ?nng This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission, AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, W, tons, etc.): Capacity Type Waste Produced er Animal Total Farrow to Wean 3212 gallyr gal/yr Farrow to Feeder 4015 gallyr gallyr 500 Farrow to Finish 10585 gallyr 5,292,500 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gallyr gallyr Total 5,292,500 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs). 'Based on site specific data Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibslyr Ibslyr Farrow to Feeder 6.5 Ibslyr Ibslyr 500 Farrow to Finish 12.98 Ibslyr 6,490 Ibslyr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibslyr Ibslyr Total 6,490 Ibslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. MIND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 64.56 Total N Required 1st Year: 16866.25 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 16,866.25 Total Nitrogen Produced by Farm: 6,490.00 Nitrogen Balance for Crops: (10,376,25) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 'Reception Area Specifications Tract Field Irrigated Soil 1st Crop Time to 1stCrop 1stCrop LbsN/Ac Lbs N Total lbs Acrea2e Type Code Apply Yield lbs N/Unit Residual jAc Utilized :.• ®®���s�o� 11 �o�'*J00�0�■mom ------------------- - ------------------- - 3(a) of 8 Reception Area Specifications Tract Field Irrigated Soil I st Crop Time to Ist Crop Ist Crop Lbs N/Ac Lbs N Total lbs N I Acreage Type Code Apply Yield lbs N/Urtit Residual /Ac Utilized wrn r1111111111l I -PROILI M11111 U-T-Y. PM 3(h) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. frilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yield A Barley 1.6 Ibs N 1 bushel B Hybrid Bermudagrass - Grazed 50 Ibs N 1 ton C Hybrid Bermudagrass - Hay 50 Ibs N 1 ton D Corn - Grain 1.25 Ibs N / bushel E Corn - Silage 12 Ibs N 1 ton F Cotton 0.12 Ibs N / Ibs lint G Fescue - Grazed 50 Ibs N / ton H Fescue - Hay 50 Ibs N / ton I Oats 1.3 Ibs N / bushel J Rye 2.4 Ibs N / bushel K Small Grain - Grazed 50 Ibs N / acre L Small Grain - Hay 50 Ibs N / acre M Grain Sorghum 2.5 Ibs N / cwt N Wheat 2.4 Ibs N / bushel O Soybean 4.0 Ibs N / bushel P Pine Trees 40 Ibs N I acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT rlanimal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 500 Farrow to Finish 4.1 2050 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2050 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10250 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid Bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 34 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 82 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant _Type Crop inlhr * inches SS1 Marlboro C 0.65 1 SS2 Marlboro C 0.65 1 A Gritney C 0.5 1 B Emporia C 0.4 1 C Emporia C 0.4 1 D Goldsboro H 0.4 1 E Goldsboro H 0.4 1 #REF! F Goldsboro H 0.4 1 G Goldsboro H 0.4 1 H Goldsboro H 0.4 1 Sub2 Gritney C 0.5 1 Sub3 Emporia C 0.4 1 Sub4 Goldsboro H 0.4 1 6of8 Additional Comments: The acreage listed in this plan as subfields is the balance of the total field acres minus the wet acres at this site. This acreage will be claimed when making application with an aerway machine. 7 of 8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: SPG Farm 63 Owner: Murphy -Brown, LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that i must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Murphy -Brown, LLC Signature: Name of Manager (if different from owner): Signature: Date Date Name of Technical Specialist: Dawn Williamson Affiliation: Murphy -Brown, LLC Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: Date 8of8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to Flooding (See "Weather and Climate in North Carolina" for guidance). Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. t3 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen, 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those . owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills.• A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 it Murphy -Brown, LLC 4/22/2005 , �e- C�' 4� P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Murphy -Brown, LLC Farm Name: SPG Farm 63 , County: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 500 Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, fk tons, etc.): Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr Farrow to Feeder 4015 gallyr gallyr 500 Farrow to Finish 10585 gallyr 5,292,500 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gallyr allyr Total 5,292,500 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): "Based on site specific data Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibslyr Ibs/yr Farrow to Feeder 6.5 Ibslyr Ibslyr 500 Farrow to Finish 12.98 Ibslyr 6,490 Ibslyr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibsl r Ibslyr Total 6,490 Ibslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 65.13 Total N Required 1st Year: 16980.25 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 16,980.25 Total Nitrogen Produced by Farm: 6,490.00 Nitrogen Balance for Crops: (10,490.25) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 Reception Area Specifications Tract Field Irrigated Soil 1st Crop Timeto 1stCrop IstCrop LbsN/Ac Lbs N Total lbs N Acreage Type Code Apply Yield lbs WILInit. Residual )Ac Utilized NEW '-0�L'ikLLJJIL-i©SI'iGJrClySls��- 11 '�'.'• � - OQ-Q��®' -------------------- ------------------- - ------------------- - .1 1 3(a) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue - Grazed H Fescue - Hay I Oats J Rye K Small Grain - Grazed L Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Lbs N utilized / unit yield 1.6 lbs N 1 bushel 50 Ibs N 1 ton 50 Ibs N / ton 1.25 Ibs N 1 bushel 12 Ibs N / ton 0.12 Ibs N / Ibs lint 50 Ibs N I ton 501bs N / ton 1.3 Ibs N / bushel 2.4 Ibs N 1 bushel 50 Ibs N / acre 50 Ibs N / acre 2.5 Ibs N / cwt 2.4 Ibs N / bushel 4.0 Ibs N 1 bushel 40 Ibs N / acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT r/animal Farm Total/ r Farrow to Wean 0.84 Farrow to Feeder 1 500 Farrow to Finish 4.1 2050 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2050 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10250 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid Bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 34 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 82 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. 'This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm, It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop Whir * inches SS1 Marlboro C 0.65 1 SS2 Marlboro C 0.65 1 A Gritney C 0.5 1 B Emporia C 0.4 1 C Emporia C 0.4 1 © Goldsboro H 0A 1 E Goldsboro H 0.4 1 #REF! F Goldsboro H 0.4 1 G Goldsboro H 0.4 1 H Goldsboro H 0.4 1 Sub2 Gritney C 0.5 1 Sub3 Emporia C 0.4 1 Sub4 Goldsboro H 0.4 1 6 of 8 Additional Comments: The acreage listed in this plan as subfields is the balance of the total field acres minus the wet acres at this site. Thisbe will be claimed when making application with an aerway machine. 7of8 04-27-2005 10:51 SPG 2524452695 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: SFG Farm 63 Owner: Murp"rown, LLC Manager: Owned Manager Agreement: Itwe understand and will follow and Implement the specifications and the operation and maintenance procedures established In the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. th" understand that I must own or have access to equipment, primarily irrigation equipmeni. to land apply the animal waste described in this nutrient management plan_ This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner. Murphy -Brown, LLC ^ Signature: . , -- �/c `77 � s Name of Manager (if different from owner): Signature: Name of Technical Specie fte Dawn Williamson Affiliation: Mu rows LLC Address: 2822 Hw4Wes#, PO Orawar 856 _ Warsaw, NC 28398 Telephone: 910293-3434 Signature: u; a of$ Zz NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2of3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 A'A 0 Smithfield Carroll's Farms Farm 63 385 Highway 158 Roanoke Rapids NC 27870 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality May 1, 2003 Subject: Certificate of Coverage No. AWS420023 Farm 63 Swine Waste Collection, Treatment, Storage and Application System Halifax County Dear Smithfield Carroll's Farms: On April 28, 2003, the North Carolina General Assembly ratified Senate Bill 733 which directs the - -Division of Water Quality .(Division) to extend the expiration date of the Swine Waste Operation General - Permit AWG I00000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In accordance with your application received on February 13, 2003 and in accordance with the directive • of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Smithfield Carroll's Farms, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS420023 which expired on April 30, 2003. -This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm 63, located in Halifax County, with arf animal capacity of no greater than an annual average of 500 Farrow to Finish swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, 2004: Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary.. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. • The issuance of this COC does not excuse the Permittee from the obligation to 'comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to �ate v ronerty Lights in either real or versonal groverty. EhtA Non -Discharge Permitting Unit Internet httpl/h2o.enr.state.nc.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 Fax (919)715.6048 Customer Service Center Telephone 1-877-623-6748 An Equal Opportunity Action Employer 50% recycled/10% post -consumer paper LM Upon abandonment or depopulation for a period of four years or more, the Permittee must submit . documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity pemvtted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 5714700. If you need additional information concerning this COC or the General Permit, please contact Michelle Barnett at (919) 733-5093 ext. 544. - Sincerely, • for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Water Quality Section Halifax County Health Department Halifax County Soil and Water Conservation District Permit File AWS420023 NDPU Files CJ WASTE UTILIZATION PLAN . Producer: NPD(USA) 385 HWY 158 Roanoke Rapids, NC 27870 Location: Southwest of Tillery off of Rte. 1123 Telephone: (252) 537-9710 Administrative Office (252) 826-5447 Farm Type Operation: Farrow to Finish Number of Animals: 500 sows (Design Capacity) NCDENR Facility ID: 42-23 The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they • have different infiltration rates, leaching potential, cation exchange capabilities, and available water holding capabilities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached, you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out; meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. 0 WASTE UTILIZATION PLAN • Amount of Waste Produced Per,Year(gallons, TYPICAL) 500 animals x 10,585 gal (amt.) waste/animal/year = 5,292,500 gal (amt.) waste/year. Amount of Plant Available Nitrogen (PAN) Produced Per Year(TYPICAL) 500 animals x 26 lbs. PAN/animal/year = 13,000 lbs. PAN/year. (PAN from N. C. Tech Guide Std. 633) SITE SPECIFIC HISTORICAL DATA 1998-2000 (Documentation Enclosed) Amount of Waste Applied & Plant Available Nitrogen (PAN) from Secondary Lagoon Average Volume of Wastewater Applied Annually 1998-2000: 5,.743,190 aal/year. Average Plant Available Nitrogen Concentration 1998-2000: 6,490 # PAN (1.13 # PAN11000 gal.) Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. - The following acreage will'be needed for waste- application based on the -crop to'be"grown-and- ' _. surface application: Table 1: ACRES OWNED BY PRODUCER Tract # Field Predominate Soil Type Crop Lbs. N per Ac. * Wet Acres Lbs. N Utilized. Month of Application 2864 1 Marlboro Bermuda Hay Small Grain 350 50 3.92 1,372 196 Mar -Sept Sept -April 2 Gritney Bermuda Hay Small Grain 350 50 4.41 1,544 220 Mar -Sept Sept -April 3 Emporia Bermuda Hay Small Grain 350 50 10.42 3,647 521 Mar -Sept Sept -April 4 JGoldsboro lFescue Flay 200 27-841 5,668 fatal 1 46.591 13,168 * During Severe winters when small grain has little or no growth during December and January, no nitrogen should be applied. *For small grain -Recommend split application with no application in December and January in severe winters. • *Small grain should be removed by April 15 and no later than May 1. `Application to Fescue, recommend no more than 25 lbs. PAN per acre be applied during June and July if moisture not limiting growth. In severe winters apply zero nitrogen during December and January. This N is from animal waste only. If nutrients from other sources such as commercial fertilizers are applied, they must be accounted for. N must be based on realistic yield expectation. • NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. This plan only addresses Nitrogen. WASTE UTILIZATION PLAN • Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land (See Required Specification 21) Tract Field Soil Crop Lbs. N Acres Lbs. N Month of # Type Per Ac. Utilized Application Total * See footnote for Table 1. Table 1 Table 2 Total Totals from above Tables Acres Lbs. N Utilized 46.59 13,168 0 0 46.59 13,168 Amount of N Produced Surplus or Deficit 6,490 6,678 NOTE; The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. 40 WASTE UTILIZATION PLAN 0 See attached map showing the fields to be used for the utilization of waste water. Application of Waste by Irrigation Field No. Soil Type Crop Application Rate (In/Hr) Application Amount (In.) 1 Marlboro Bermuda/Small Grain 0.35 1.0 2 Gritney Bermuda/Small Grain 0.35 1.0 3 Emporia Bermuda/Small Grain 0.35 1.0 4 Goldsboro Fescue 0.35 1.0 THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL BE NEEDED FOR DRY LITTER OR SLURRY. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation 124.9 ft. Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. Narrative of Operation: This operation is located on CSFA tract 2864, off of Rte. 1123 southwest of Tillery in Halifax County. The swine operation is farrow to finish with a design capacityof 500 active sows. It is estimated that 5,743,190 gallons of animal waste will be produced annually for land application. This is_an_annual average derived from actual -land_ application records for this site 1.998-2000. There are 45.33 acres of cropland available for land application under the current irrigation configuration._ The waste is currently land applied to Bermuda and Fescue Hay using towable center pivot and solid set„ sprinkler combination. A small, grain cover crop is not required to meet nutrient production under this plan. The owner may choose not to plant small grain cover on any or all acreage. It is recommended that small grain be seeded to some acreage each year, so_that fields mays _ be rotated into .. mall grain every 2-3 years. This would allow for off season maintenance of crops and/or fields as needed. It is to be understood that should afield not be seeded in small grain, there should be no application of waste to that particular field during the anaaLatlon window for the cover crop. And the nutrient utilization for small grain cannot be included in the total yearly allowance for that - field. The waste from the swine houses is stored in a pnmarylsecondary , anaerobic treatment. lagoon system. This plan is prepared for land application taking place from the secondary lagoon only. The secondary lagoon further reduces nitrogen concentration of the waste on averse 51 before it is land applied. The historical average of waste concentration in the secondary lagoon for years 1998-2000 was used in the calculation of annual PAN. Reference NC Cooperative Extension publication AG-439-42, Use of On Farm_ Records for Modify/ng A Certified Anima/ Waste Management Plan, D. A. Krouse, et al. Site specific records and data used in the preparation of this plan are included to support this document. WASTE UTILIZATION PLAN General Considerations: *Any crop which is to receive animal waste must be included in the Waste Utilization Plan or _by conditional amendment. Any deviation from this plan must be approved by a Technical Specialist with proper designation. if cropping change occurs without a revised Waste Utilization Plan (WUP) or conditional amendment it may be considered noncompliant with the facility's Certified Animal Waste Management Plan (CAWMP) and subiect to enforcement action by NCDENR. *Waste application windows must be strictly adhered to unless_ a variance is included in the narrative or by conditional amendment to the Waste Utilization Plan, and approved by a Technical Specialist. Otherwise application outside specified window may be considered noncompliant with the facility's Certified Animal Waste Management Plan (CAWMP) and subject to enforcement action by NCDENR. *Any crop which receives animal waste roust be removed either by having, or grazing as_specified_in the Waste Utilization Plan. Burning_of_baled hay or straw is not considered an acceptable removal method and is in violation of North Carolina Air Quality Regulations. * If waste is applied to a cover crap it should be removed for hay or residual credit applied toward - next crop. *All nitrogen applications (animal waste, commercial fertilizer, compost, sludges, etc.) must be documented and its related PAN amount deducted from overall PAN balance for the receiving . crop. - *Planting dates must be recorded on land application records (IRR-2, etc.) to justify initial application, where applicable. * In the event of crop failure, the producer should contact a Technical Specialist to determine if the operation can meet it's overall PAN balance based on remaining crop(s) and/or waste stora e capacity. Or the producer may seek to secure a conditional amendment approving other receivinq crops which may not be included in the WUP to meet overall PAN balance. *Before sludge is applied, samples will betaken to determine its nutrient content. , pplication rates for the sludge will be based on the nutrient content of the sludge so that it is applied at agronomic rates. U REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application?, or direct discharge during operation o, land application. MY discharge of waste W ich reaches surface water is prohibited. 2. '"here must be documentation in the design folder that the producer either owns or has a notarized agreement for use of adequate_ land on which to properly amply the waste_ if the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of a notarized agreement with a landowner who is within a reasonable proximity, allowing him/her the use, of the .land...±or .waste. application. it is -the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. �. animal waste shall be applied to meet but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. Actual yields may be used in, lieu of realistic yield tables at the discretion of the planner. 4. Animal waste shall be applied on land eroding less than 5 ton per acre per year. Waste may be applied to land that is eroding at more than 5 tons but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. S . Odors ':can be reduced by injecting application. Waste should not be from the irrigation field. the' waste on disking after waste applied when there is danger of drift G. When animi'l waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally ti Lled cropland. When applied to -conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. 71 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur off site or to. -surface waters and in a method which does not cause drift .from the site during application. No ponding should occur in order to control odor and flips. b. Animal waste shall not .be applied to saturated soils, during rainfal? events, or when the surface is frozen. • W",.S:7`E- 9. 10. Waste nutrients shall not be applied in Tall or winter for spring planted crops on soils with a high potential. for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a Suitable winter cove" crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to punting of a crop or forages braking dormancy. 11. A-ny new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimiter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and any perennial_ strum or river other, than. an- irr.i gat ion -ditch -or -canal.— -- - -- Animal Waste Otr3er than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that ar! not perannial provided adequate vegetative filter strips are present. •2. Animal waste shall not be applied closer than 100 feet from wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by overspraying. Animal waste may be applied to prior converted cropland provided it has been approved as a land applications site by a "technical specialist". Animal waste applied on grassed waterways shall be at agronomic rates and in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.) . Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to .areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 3 . , ni mal �roduct'_on at the facility =s to be or t _rCil? nata r the owner i g _ eSpQl? s? ble f oZ Qbtain, ncr and implementing a �� Clcsur� elan" whic!i will el im?nate the nosslbil7 ty of an illegal di sch.arge, ao'_lution and erosion_. 19. Waste dandling structures, U?n?ng, pumps, -eels, EtC., should be i nspeCted on a regular basis to pre -.,rant breakdowns, leaks, and sn' lls , 4_ raaular mai ntanazce checklist should be kept on site. 20. Animal waste can be used in a rotation that includas veg sables and other crOAs for direct human_ consumption. However, if animal waste is used on craps for direct human consumption it should only be applied prenlant with no further applications of animal waste during c.he crop sEascn. 21. Highly visible permanent markers shall he installed to mark the top and bottom elevations of the temporary storage _{pumping_-y_alumQ}_ waste t=ea�fient 3agoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be recxuired to mark the maximum storage volume for waste storage ponds. .22. Soil tests shall be made every two years and a liquid waste analysis be taken at least twice each year consistent with waste utilization plan. Poultry litter shall be tested prior to applicat.ion. Soil ad waste analysis records shall be kept for five years.. 23. Dead animals will be disposed of in a manner that meets N.C. regulations. 0 WASTE UTILIZATION PLAN • WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Smithfield-Carroll's Farm 63 Owner/Manager Agreement (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: Smithfield-Carroll's Farms A Virginia General Partnershi (Please print) Signature: 8 E/4Date: Mar. 10, 2001 Name of Manager (If different from owner): Mg-r - �n Signatu Date: Mar. 10, 2001 Name of Technical Specialist: (Please print) Rudy Grammer WUP-WA Manager of Farming and Environmental Affairs Affiliation: Carroll's Foods of Virginia, Inc. Address (Agency): P.C. Box 1240 Waverly, Virginia 23890 Sign a�: . Date: Mar 10, 2001 21� V • 0 Smithfield-Carroll's Farms (dba NPD-USA) Lagoon Analyses for Farm 63 Secondary Lagoon Actual lagoon analyses, 1998-2000. Data from NCDA, Agronomic Division Lab Month/Year Lagoon 63S PAN11000 gal Feb-98 1.70 Apr-981 Jun-98 2D, { rMKTR 1 ; 1 6El 61 Aug-98 0.43 Oct-98 Feb-99 0 7 sir s 1K20F j Apr-99 Jun-99 � x 1 eO VE. a k� 1 20 tFf .4 Aug-991 Oct-99 Dec-99 DI66 �0;93't�` Feb -DO 1.80 Apr-00 _ Jun-00 Aug-00 a,-I�a 0:99f,�'' Oct-00 0.53 Lagoon Average 1.12 Farm Average 1.12 Std. Deviation = .48 x avg. PAN Std. Deviation = .48 x 1.12 #11000 gal Std. Deviation = .54 #11000 gal Range = 1.12 ± .54 #1100D gal Range = .58 to 1.66 #11000 gal (Shaded) Revised avg.= 1.13 # PAN11000 gal Total PAN = Vol, Dastewater X lb - -PAN Year Year 1000 gal IC MIMA1i: • 1 • . ' = l Year Year 00E gal -- Total PAN = 6,490 Ibs. ------ _. _. Year *PAN/1000 gal. #PAN11DOD gal. Annual Wastewater Application Summary Total Wastewater Aoglied Per Year Year Total Gallons 1996 7,512,300 1997 5,144, 250 1998 7,219,095 1999 5.730,000 2000 4,280,475 Avg.1996-2000 5,977,224 Avg.1998-2000 5,743,190 NCCES Publication AG-439-42 Requires 3 years data to modify CAWMP site specific • 0 Smithfield-Carroll's Farms Lagoon Analyses for Halifax County Farms Farm 63 Data hom North Carolina DeDartment of Aorimlbie Aw aric Derision Date Lagoon Laboratory Results TKN P K m m m N Ibs.11000 Nutrients Available for First Crop P2O5 K2O al. Ibs.11000 al. Ibs.11000 al. Nitrogen Reduction % Apr-93 63P 500 100 200 2.00 1.43 1.50 63S 300 0 100 1.20 0,00 0.75 40.00 Apr-94 63P 800 100 600 3.20 1 A3 4.50 63S 500 100 400 2.00 1 A3 3.00 37.50 Apr-95 63P 900 100 700 3.60 1.43 5.25 63S 500 100 600 2.00 1.43 4.50 44.44 Sep-95 63P 560 104 666 2.10 1.40 5.30 63S 336 105 706 1.30 1.40 5.70 38.10 Apr-96 63P 644 116 543 2.40 1.60 4.40 63S 434 73.2 450 1.60 0.98 3.60 33.33 Sep-96 63P 581 130 608 2.20 1.70 4.90 63S 308 111 564 1.20 1.50 4.50 45.45 Apr-97 63P 903 107 687 3.40 1,40 5.50 63S 560 75.4 531 2.10 1.00 4.30 36.24 Jun-97 63P 763 102 714 2.90 1.40 5.70 - - - 63S- 378,. 78.6 589 - 1.40 -- -_- 1.10 4:70-• -. 51:72 Sep-97 63P 581 133 776 2.20 1.80 6.20 63S 161 96.7 656 0.60 1.30 5.30 72.73 Feb-98 63P 742 139 754 2.80 1.90 6.00 63S 462 94 667 1.70 1.30 5.30 39.29 Apr-98 63P 707 120 744 3.00 1,60 6.00 63S 280 91.6 676 1.20 1.20 5.40 60.00 Jun-98 63P 756 103.0 763 3.20 1.40 6.10 63S 371 80.0 680 1.60 1.10 5.40 50.00 Aug-98 63P 514 125.0 747 2.10 1.70 6.00 63S 104 108.0 799 0.43 1.40 6.40 79.52 Oct-98 63P 598 118.0 777 2.50 1.60 6.20 63S 180 98.7 713 0.75 1.30 5,70 70.00 Feb-99 63P 703 109.0 745 2.90 1.50 6.00 63S 278 78.3 614 1.20 1.10 4.90 58.62 Apr-99 63P 712 98.6 717 3.00 1.30 5.70 63S 246 70.5 611 1.00 0.94 4.90 66.67 Jun-99 63P 738 106.0 1037 3.10 1.40 8.30 63S 278 87.2 837 1.20 1.20 6.70 61.29 Aug-99 63P 469 135 870 2.00 1.80 7.00 63S 157 90 849 0.66 1.20 6.80 67.00 Oct-99 63P 380 96.5 642 1.60 1.30 5.10 63S 224 76.3 544 0.93 1.00 4.40 41.88 Dec-99 63P 428 98.5 709 1,80 1.30 5.70 63S 250 76.3 610 1.00 1.00 4.90 44.44 Feb-00 63P 597 106 752 2.50 1.40 6.00 63S 333 87.7 668 1.40 1.20 5.40 44.00 Apr-00 63P 708 122 814 3.00 1.60 6.50 63S 424 97.7 721 1.80 1,30 5.80 40.00 Jun-00 63P 815 2.78 47A 3.40 0.04 0.38 63S 390 96.4 733 1.60 1.30 5.90 52.94 Aug-00 63P 656 106 896 2.70 1.40 7.20 63S 237 84.1 824 0.99 1,10 6.60 63.33 Oct-00 63P 224 122 955 0.93 1.60 7.70 63S 127 90.2 770 0.53 1,20 6.20 43.01 Avg. 51.34 State of North Carolina Department of Environment and Natural Resources Division of Water Quality .fames B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director April 17, 1998 CERTIFIED MAIL RETURN RECEIPT REQUESTED Smithfield arro s Farms Farm 63 PO Box 1240 Waverly Va 23890 Farm Number: 42 - 23 Dear Smithfield Carroll's Farms: hit"T. 0 FAA You are hereby notified that Farm 63, in accordance with G.S. 143-215.10C, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has sixty (60) days to submit the attached application and all supporting documentation. In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call Mike Lewandowski at (919)733-5083 extension 362 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700. Sincerely, r 'A. Preston Howard, Jr., P.E. cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr„ Governor Jonathan B; Howes, Secretary Smithfield Carroll's Farms Farm 63 PO Box 1240 Waverly Va 23890 �EHNR November 12, 1996 SUBJECT: Operator In Charge Designation Facility: Farm 63 Facility ID#: 42-23 Halifax County Dear Farm Owner: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 91gn33-0026. Sincerely, A. Preston Howard, Jr., P. ., ector Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files P.C. Box 27687, FAX 919-715-3060 Raleigh, North Carolina 2761 1-7687 �� An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 50% recycled/10% post -consumer paper Revised April 20, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number 1(7,_- 7-3 Operation is flagged for a wettable Farm Name: C!#re-v its r..ot-►'- acre determination due to failure of On -Site Representative: jr+1c/j -L- Part 11 eligibility item(s) F1 F2 F3 F4 Inspector/Reviewer's Name: oLj X, I Date of site visit:Zy Date of most recent WUP: R `15-9 Annual farm PAN deficit: __U 7•a pounds Operation not required to secure WA determination at this time based on exemption El E2 E3 E4 Operation pended for wettable acre determination based on P1 P2 P3 Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system w/permanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary gun system w/permanent pipe; 7. stationary gun system w/portable pipe PART i. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) El Adequate irrigation design, including map depicting wettable acres, is complete and signed by an i or PE. E2 Adequate D, and D203 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part Ill. (NOTE: 75 % exemption cannot be applied to farms that.fail the eligibility checklist in Part 11. Complete eligibility checklist, Part 11 - F1 F2 F3, before completing computational table in Part 111). PART 11. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over.appiication of wastewater (PAN) on spray field(s) according to farm's last two years of -irrigation Tecords. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure fo.deduct required bufferlsetback acreage; or 25% of total acreage -identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers- or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. /I Revised April 20, 1999 aciiity Number - !;� L-- 6 3 Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER'.2 TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS 36 o� Vf FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption; otherwise operation will be subject to WA determination. FIELD NUMBER' - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. �f S, f— Part IV. Pending WA Determinations show roc.--�.r r�l���r-.�41 h�c�s r►,A-p. ll� Lra S P1 Plan lacks following information: P2 Plan revision may satisfy 75% rule based on adequate overall PAN deficit and by adjusting all field acreage to below 75% use rate P3 Other (ielin process of installing new irrigation system): i/' State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Smithfield Carroll's Farms Farm 63 PO Box 1240 Waverly VA 23890 Dear Smithfield Carroll's Farms: ;'r r=4 • M 6 0 NCDENR NORTH CAROL-INA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 30, 1999 1AW 10 2ff'rr RALEIG � ....._ _ +� --- --.��. _SUN OFF! Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number�_42=23.> ,Ha lifax°County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRY1, DRY2, DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of.Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review aIl recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. cc: Raleigh Regional Office Halifax County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 An Equal Opportunity Affirmative Action Employer SincereI , Kerr T. Stevens, Director Division of Water Quality Telephone 919-733-5083 Fax 919-715-6048 50% recycled/10% post -consumer paper Tr a� c�•MT l ri,iF r � � , t` • ,�� 1 ♦' r T `�- c '•��a�;� �� tier., 77� `• r �rJ�j per '• prof ; 1 ti3r �+kY.a' �,;:�' �,Cdldr+.fa.�,y�•.. �i;,','" fly, v ,rJ .h �K; ,{ } f iF•1Ii . ` ��c ,r' .-.•, - i� a J'T� `�y�� lA H • ``/i �'. ' �tilT�y �` �1 . ; ! r T � - ��4 I l• 'Y .r �� ply !, f.} t •��" l - � . ilSrtti'r1r- O�'i s• c v''s r'_L yJ.' - �--'mot—�� r � �.��\ � ;ire-r ��4•;'t�.+•��`a,..�y_ (_�• � i _ .. , Y '. i.-i�� fir¢.' .�C � • 1+ _ ' a r_ 1 ,' �.� `� �.r IrMK'� R,� '� �L .rf•, Y.y3n +'�•. t'i1-. r - •� ,. :7 r '.- - .r(- :r%y;�f�' {'mot, b i ,�•:� 'r. y��'�� r - +'f sr. .i2.. '•r�x ��'9E" � � 'rf � R_ •sr-• .`•, 'i+r (•� r 'S: �vt ... .��� - t�i� ����" a �',- '". ;. � Ft �. ,� li..•. -mot' r� - ' - •+�''' - -t• �� �• �f a �� -�1. �°. i' *:.'�•r rr -� '-'may^ + •��'' � a, y •t` •'" �7"- � ;mot, a:ut.�.. y `.-.,r . •` .r^ -T J � _ ,' � ' `� rr ::•� .��j �.-� - _ - ryyj 4��+i r i�,. J S , ,: � f. I ��, pHAtLS TU VAM woODS I,�• �a ; ,,•. ACSES aw j 'JS J ' I s • � +}' 1 `at S.V.0 rJyj , ACRES c> a trAiE to. 735 J9, i,�y '«: OPEN fys ) e c;. T't iyr1L. ZFb LAt-OS fJri ' +, . •'+ °F I ++y• r ) It1G r a 'j•,r 1 � � •j�.s — r a 1,• ? r7• j0.• , f Irr° fi i�i Ilt.A 1•Z e. 'lot )`r • li[QOD4 '4 1/ 1 'G a AJ Iei , 1r� _ ! � s I_s• �+`}A+ �t F)t 1 !)r) r VIR r rIa) OPE K It, 1 <a +' WOODS - 'rti+� ,_•~ oPr,{i\ �,', r.st I, A. � r.. ... • _+ram .r '�J }a L y rrt , r r SITE EVALUATION REPORT Producer: County: lld%iTuV Da te: /01/5I71 Type and Size Operati on: 50D 40u)S -arrow -,k") Av)ish SCS Jab Class: Distance to the Nearest Residence Other Than Owner or Public Facility: 5 �+e Fac,n near E ► .'el -A) — ya rl",ke 14carr, s Far-W, ena o� (aPprcx.) Distance to wells and other eua ter sources: 5-.+e 1 - approx, ya •Y te- 514-e a — -7 1a,oc 4-� !award Cl assi fi cati op: 3o.I-h ,`// b e ci breuC% 3ho,-& aC[ u` 1 ,�2 u=raS14e v: /l ?0-/- O f/Prfop any •`mP/"a��cyrPi The t.4.a5 ' worn or1 --'r /e 'l l -o i ll `//ow i it o 6 ewe ? .SL,;,x, rn o. flouji no Faci l i ty: 6JuhrCr -4/-CS h recycle wash war• �ra,n .3Pror�e /a1` MTh 9rRV A 'O,.0 i t7-/":' /layPOti Lagoon S CCi i C5: 4 V 4 7 (y{cepe�) D0 i Mn .0-) ; n7 u /rl � rI .S�Q�e s "CZ& .S ICp2 17" Qr I�ori2o rrf� f 7/0 / ✓cry cQ / sha K/d b� cf f� oiler4t// 67)&nkene-r71- .S,�)6 t ir�5rcx'e ��LfS,{ 5.�4 .S'/D C'or�'lfiirJ o74' chart �p / YPr�. .'um i n cycle: /�r0 C/GYs SITE EVALUATION REPORT page Z Land A l i cats on of Waste (acres available. —crops): SD = (aO acres tcVa;/4/aie C<PPJ�c4�or, an .6Pr�*+Sa p�ifnar,`/}/ l 33 ctc. rr:�rl rrecl f fz ee,, ?; n4V,'0rn a�' ielyruda Oor� rya}/ 6 P c[s� Waste Irrigation Equipment: Permi is Re ui red: 4 kc yO rrse 4, vio Lno..4� j perm,'-1-5 be re91ti rerf; : �a' lag pops Sunrm"y of Soils Investizati on: rPVPgI� Sor/l pif P Y cJ / 1L Tar ,�PPPa oa !� /�00✓1 Q077v wr . SIC( one ,oaf e.tCavayeal bolkm or ir15ia4¢ S/a,e, r4-%hou/d 6`-e u Orgcc� �;nrkzs ando7P 6 L •mover"ter%, 7"fx1 ,-rrJOara ry sri�ra92' rnc�s� be 4lv►C' Y/a .seas / A''; A fcx?. d/e. �1�_ 3a,�-From Sur P� -S� a Very -o u� ,gab /2 so l ► i 9tc/>� % `�or Pm�rr�,�rr 1�. /i!a rTcu7-cr�'ct� �r4 eneoarl#reri �f�i'� S 4 i: -al Al �►'�p or4 r lricL i Misc. Ito be l42P� abbVe --se A; IA�07f - -{d6/c (/71�—d Sui tabi l i_t_y of si te(s> for stai ne operati on: -F)ep,e,+ by : 1 + SCS•538 U. S. DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE 10.56 cnrl InIVF-qTlr.ATl0N To DETERMINE SUITA9ILITY OF PROPOSED POND SITE WATERSHED AREA MEASUREMENTS CROPLAND -ACRES PASTURE -ACRE-., r - WOODLAND—ACRESTOTAL—. .• SKETCH OF PROPOSED POND SHOWING WHERE BORINGS WERE MADEI Locate refentnce point an center line of dam and Identify on -skstc& -/-a- s MEMO MOSSIMEMEEMME, it I ■■■■■■■■■■■■r■■■■■■ee■eM VIA M ■■■■tee■■■■■■■■■■r■■■r■■e■■ ■■e■■■■■�■r■■■e■ee■e�r■■e■■ ■■■■■■■e�■■■■i■�■■■r��■ere■■ ■■■■■■rr�r■■■■■■r■�r■r■err■ ■■MeerSOMEONE ■ ■eerier■■■■■■■■■■■ ■■■■r■■■■■■■■■■ems■e■■■i■es■■ eel■ii■■■■■■■i■fie■e■/�L�■■■■ ■eei■i'�■Mil■■■■�■■e■e�I�■err ■■■ers`wr�:.-arr�r��rrrt�■■ 1r71©I©1il :,.: r. r . .. (condnued on back whom naccuarld SAow water table clevallons an dam-slis"WX UIMIN= 0113= 21® 11 1=110131010010 eiMEMO1! MIKE ■( Nil (I 1-11=1ffli ElelleltMERZ!.II=IN �y■��Ie�■������f • l�i■i!�l�s�i�1■i■I■I■�!�R�i':■IF�1■ Ifl�A■1�11�(■lrl■(�1�■�■��..�' (�'���(■Iri■lei■1■1■1■(■ ®e�jrf■ ■f■�r�■ ■!■f■fea■f■f■f■fef■■!11!■frf■ �■?■!■�lr�ie�■1■(r,■!■tzer�ra■i■�r�1■tl■ir�■��■r1■�rr ■■■�!■�■!■�■(■!■lam;■►el■1■1■E■!■!el■(■■!■. ■1■1■ ■■rle�el■►■r■�.�r■,■�■I■1■■1■1r1ei■;■1■.�il■li� BORINGS MADE BY—C&C—P SIGNATURE & TITLE �b�� s ,4j& 64nu e. ) SCF No.: 63 Date erator:Carroll's Foods VA County: Halifax 01/10/92 Distance to nearest residence (other than owner): 2000.0 feet I. STEADY STATE LIVE WEIGHT 500 sows (farrow to finish) x 1417 lbs. = 708500 lbs 0 sows (farrow to feeder) x 522 lbs. 0 lbs 0 head (finishing only) x 135 lbs. = 0 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 708500 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 708500 lbs. SSLW x Treatment Volume(CF)/lb. SSLW Treatment Voiume(CF)/lb. SSLW= 1 CF/lb. SSLW Volume = 708500 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet: Owner requests no sludge storage. Sludge will be removed as needed. TOTAL DESIGN VOLUME for PRIMARY LAGOON Inside top length 500.0 feet ; Inside top width 210.0 feet Top of dike at elevation 126.5 feet Freeboard 1.0 feet ; Side slopes 2.0 : 1 (Inside lagoon) Total design lagoon liquid level at elevation 125.5 feet Bottom of lagoon elevation 116.5 feet Seasonal high water table elevation 116.0 feet Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 2.0 2.0 2.0 2.5 496.0 205.5 9.0 AREA OF TOP LENGTH * WIDTH 496.0 205.5 AREA OF BOTTOM LENGTH * WIDTH 460.0 165.0 101928.0 (AREA OF TOP) 75900.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 478.0 185.3 354198.0 (AREA OF MIDSECTION * 4) CU. FT. = (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] 101928.0 354198.0 75900.0 DEPTH/6 1.5 DESIGN VOLUME FOR PRIMARY LAGOON = 798039 CU. FT. 4. TOTAL DESIGN VOLUME for SECONDARY LAGOON Inside top length 280.0 feet ; Inside top width 210.0 feet Top of dike at elevation 126.5 feet Freeboard 1.0 feet ; Side slopes 2.0 : 1 (Inside lagoon) Total design lagoon liquid level at elevation 125.5 feet Bottom of lagoon elevation 116.5 feet Seasonal high water table elevation 116.0 feet Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 2.0 2.0 2.0 2.5 276.0 205.5 9.0 AREA OF TOP LENGTH * WIDTH -= 276.0 205.5 AREA OF BOTTOM LENGTH * WIDTH = 240.0 165.0 56718.0 (AREA OF TOP) 39600.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 258.0 185.3 191178.0 (AREA OF MIDSECTION * 4) CU. FT. (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] 56718.0 191178.0 39600.0 DESIGN VOLUME for SECONDARY LAGOON = 431244 CU. FT. DEPTH/6 1.5 5. TEMPORARY STORAGE REQUIRED PRIMARY LAGOON DRAINAGE AREA: Lagoon (top of dike) Length * Width = square feet 500.0 210.0 105000.0 SECONDARY LAGOON DRAINAGE AREA: Lagoon (top of dike) Length * Width = square feet 280.0 210.0 58800.0 Drainage for dike between Primary & Secondary Lagoons Length * Width = square feet Length * Width = square feet 210.0 5.0 1050.0 210.0 5.0 1050.0 TOTAL DA 106050.0 TOTAL DA 59850.0 Design temporary storage period to be 180 days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 Volume = 708500 Lbs. SSLW * CF of Waste/Lb./Day * 180 days Volume = 173020 cubic feet 50. Volume of wash water This is the.amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * Volume = 0.0 cubic feet 180 days storage/7.48 gallons per CF 5C. Volume of rainfall in excess of evaporation Location of weather station used : Enfield Rainfall exceeds evaporation 6 months used: Oct -Mar 180 days excess rainfall = 12.0 inches Volume = 12.0 in * DA / 12 inches per foot Primary Lagoon Secondary Lagoon Volume = 106050.0 cubic feet 59850.0 cubic feet 5D. Volume of 25 year -- 24 hour storm Volume = 6.7 inches / 12 inches per foot * DA PRIMARY LAGOON SECONDARY LAGOON Volume = 59211.3 cubic feet 33416.3 cubic feet TOTAL REQUIRED TEMPORARY STORAGE Primary Secondary 5A waste produced. 173020 cubic feet 5B wash water. 0 cubic feet 5C rainfall. 106050 59850 cubic feet 5D 25yr-24hr. 59211 33416 cubic feet TOTAL 431547 cubic feet 6. SUMMARY Total required volume 1140047 cubic feet Total design volume avail. 1229283 cubic feet Min. req. treatment volume plus sludge accumulation 708500 cubic ft Total design volume less 25yr-24hr storm is 1136656 cubic feet At elev. 125.0 feet primary and 116.0 feet secondary Lagoon volume is 727873 cubic feet (end pumping). At elev. 125.0 feet ; Volume is 1150598 cubic feet (start pumping) Seasonal high water table elevation 116.0 feet 7. DESIGNED BY: DATE: APPROVED BY: DATE: NOTE: WASTE UTILIZATION PLAN ATTACHED. OPERATION AND MAINTENANCE PLAN ------------------------------ This lagoon'is designed for waste treatment with minimum odor control. The time required for the planned fluid level to be reached may vary due to soil conditions,flushing operations, and the amount of fresh water added to the system. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent runoff from the field or damage to crops. The following items are to be carried out: 1.. The primary lagoon will be pre -charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at -all times. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (.see Attachment H) before land application. 3. Begin pump -out of the lagoon when fluid level reaches eleva- tion 125.0 in the secondary lagoon as marked by permanent markers. Stop pump -out when the fluid level reaches elevation 116.0 in the secondary lagoon and 125.0 in the primary lagoon. 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. Smithfield-Carroll's Farms Lagoon Analyses for Halifax County Farms Farm 63 Data from North Carolina Oepartment of Agriculture Agronomic Division Date Lagoon Laboratory Results r TKN P K m ( m) m N ibsJ1000 Nutrients Available for First Crop P205 K20 al.) IbsJ1000 al.j ibsJ1000 al. Nitrogen Reduction % Apr-93 63P 500 100 200 2.00 1.43 1.50 63S 300 0 100 1.20 0.00 0.75 40.00 Apr-94 63P 800 100 600 3.20 1.43 4.50 63S 500 100 400 2.00 1.43 3.00 37.50 Apr-95 63P 900 100 700 3.60 1.43 5.25 63S 500 100 600 2.00 1.43 4.50 44.44 Sep-95 63P 560 104 666 2.10 1.40 5.30 63S 336 105 706 1.30 1.40 5.70 38.10 Apr-96 63P 644 116 543 2.40 1.60 4.40 63S 434 73.2 450 1.60 0.98 3.60 33.33 Sep-96 63P 581 130 608 2.20 1.70 4.90 63S 308 111 564 1.20 1.50 4.50 45.45 Apr-97 63P 903 107 687 3.40 1.40 5.50 63S 560 75.4 531 2.10 1.00 4.30 38.24 Jun-97 63P 763 102 714 2.90 1.40 5.70 63S 378 78.6 589 1.40 1.10 4.70 51.72 Sep-97 63P 581 133 778 2.20 1.80 6.20 63S t 61 96.7 656 0.60 1.30 5.30 72.73 Feb-98 63P 742 139 754 2.80 1.90 6.00 63S 462 94 667 1.70 1.30 5.30 39.29 Avg. 44.05 ATTACHMENT B I o f 3al'a•al Ex _ ..fait Agri -Waste Management Biological and Agricultural Engineering North Carolina State t.lnive:Si;",r r LL4ESTOCK WASTE SAMPLING, AW?:SIS AND CALCULATION OF LAND APPLICATZOH RATES Janes C. Barker I. SA.`W CaLT..rCTION A. Se=i-Sol& Loc Manure L. Scraped directly from loc into spreader a. From loaded spreader,. collect about 2 lbs a! manure from d0ferenc locations using nor_ecallic collectors. A. From storage a. Collect about 2 Ibs of manure from under the surface crust avoiding bedding materials and using nor= ecallic collecrors. B. Liquid Manure Slurry i. Under -dotted -Boor pia a. Extend a 1/2" nonnecal'_ic ccnduia open on bock ends into manu,e,za pit floor. b. Seal upper end of canduic (e.g., by placing a czu=b over end of conduit) trapping manure chac has entered lover end, remove and ezpcy slurry into plastic buckee or nonw callic container. c. Take subsarales ..00 5 or note locations or ac least l qua__. d. H:x and add about 3/4 pinc co noncecaLVc sz.ale dor..a?ner. xi. Exterior storage basin or cask a. Make sure manure has been well mixed with a liquid r•ar.u_e ct' pper•agitator pu., or rr_petler a3_tscb=. b. i.lite suisa-. -es from about i p_: locations, E__m agitator rung or From manure spreader and dace in a plas__c bucket. * Professor and _x:ans-on Specialist, Wo'_ogi:al and Agr-c_1___al En;inee__ng DeYar:_e. No:_.. C4 o._na Scaw Cniyer;i:y. Raleigh. W. 2of3 c..liix and add 3/4 pint Co a non=ecallic sample container. C. Lagoon Liquid L. Collect about 3/4 pint of recycled Lagoon ltquid from Lnfla_ pLpe to flush tanks in a nonmetallic sample container. ii. From lagoon a. Place a s=all bocce (1/2 pine or less) on and of 10-15, pole. b. Excsnd bocc?e LO-15' away fro= bark edge. C. Brush a -ay floacing sc.-M or debr!s, d. 5ubmerye bact'_e v:ch_n L of 1i�u'd su_face. e. Enpcy .-:co a pas::.-- buCka_. re;eat abcuc 5 tries 'arYur.d lagcon, ni:t, and add 3/4- p;.nc ca r,ar:^c". .__ sar-ple cor.ca.ner 0. 3roUer or Turkey W:tz= L. Foust Better a. Visual!! insD±C_ L--_e. _7r areas of varying gual_tf. areas sra_nd f_ederz and lacare7a , and esti;acz percent of floor surface Ln each area. b. Take.abouc 5 ::_ter subsar_ales ac loeacions praport'-onaee to Lttim a. E 3 .= 20% a. !-tter of similar visual qual. is around (elders and .t2r_r5, cake 1 SUL�Sar-ple cher2 and the Ocher fr= re=aindar of floor surface. c. eft each -_ -art, c=1Lec, L.C_zr from a 6 by 6- area dou-1 cc earth floor and puce in a pLascic bucket. d. AF-ar 5 iubsa-:plss have been added to the bucket, mix, and add about -2-3 lbs 1°.far to a nor=ecallic sar_rle container such as a 1-gallon !rsefar bag and seal. U. From scockpild it. Take svb on;!-cs frrm about 5 locations a; lease 13- Into b. Mix, ac- : : ibs ca nar_-eca?'__c sar..pla __..earner and sea_. ATTACHMENT B 3 of 3 II. SAMPLE P.IR—E?ARATION A -NU TRANSFER A. Place sample into an expandable container that can be sealed. Rinse residues from cor.caine_ with dean water but do not use disinfectants, soaps, or Creac in an" other way. B. Pack saz?Le in ice. _e=_igerace, freeze, or transfer to lab quickly, C. Hand-del'-ve_f is =ost reliable way of sample transfer. D. If mailed, pracect sar..c'_z container with packing material such as newspaper, box or pac'3e with wrapping paper, and Cape. E. Ca=erc'_al sample and mailers are also available. Contacts: i. AFL East__.. Ag=_._w; ,al Lab, Znc 7621 Vhi_aaine Rcad Rich --and, VA 2�1__7 Ph: (904)743-94C'_ ii. Fisher Scienci=-c Co. 3315 Vinton Road Raleigh, NC 27604 Ph: (9L9)376-2?tli Polyfoam Packers Corp. 2320 S. Foster Avenue WheeLing, IL 60090 Ph: (312)398-0110 iv. NASCO 901 Janesville Avenue Fort Atkinson, VI 53538 Ph: (414)563-2446 F. Privaca analytical labs are available, but sample analyses are costly. G. the NCQA provides t:,is service for North Carolina residents. i. Address: North Carolina Depa= rent of Ag_icultsre Agronomic Division Plant/;7aste/Solution Advisory Section Blue Ridge Road Censer P.Q. Box 27647 Raleigh, NC 27611 (919)733-2655 .lt_,: Dr. Ray Campbell i_. tarlari �4 a_anc :i_L the, sample ii_. Include the following idenc__icat_on information with sample. a. .•ivectack s;•ecias (da;=�, swine, Curkev, etc.) b. L-'ve=tcck ..sa_e (s-1ine-nursery, finishing; curkey-breeders, `�roode_k-cus=. g:c%-e_, number flocks grovrt on litter, etc.) c. '"asta type (da_ Lot scraped manure, liquid slurry; 51ine-p.t sL•_rry laonc- _iq :w, s__cge, broila:-house L?rre stockpile i•:. Routine anaLysas performed on all s=ples: N, P, K, Ca, Fg, Na, s, Fe, !n, Zn, Cu, 5 v. Additional analyses per=armed upon request. OM, Mo. Ca, Ni. Pb Operations and Maintenance Plan INSPECTION/ DOCUMENTATION SPECIFICATIONS Each CAWMP has included an Emergency Action Plan. In the event that effluent is discharged from the waste management system, farm personnel should refer to the Emergency Action Plan for remediation procedures. All components of the waste management system are to be inspected weekly by the certified operator in charge. Each week the certified operator will visually inspect each component of the waste management system and document his/her findings on a weekly inspection checklist. This checklist will be kept on file by the operator in charge for presentation to Division of Water Quality personnel upon request. Inspections should include the following: La oon: Pool Area- inspect the lagoon pool area for undesirable vegetative growth and excessive foreign material or debris. Foreign material should be removed on an as needed basis and vegetation on the inside of lagoon banks controlled by mowing, chopping, or chemicals. Embankment: The operator will walk each lagoon and inspect lagoon embankment for integrity. Vegetation on the lagoon embankment must be properly maintained in order to accurately access its integrity. Routine mowing of embankments is suggested as a means to best manage these areas. Specific items to note include, but are not limited to, extreme settlement or low points along the lagoon berm, side slope stability, seepage, or wet areas on back slope, erosion; and rodent damage. Inspection findings will be documented on the weekly inspection report. Should repairs be required to the lagoon, the operator in charge should contact a qualified technical specialist before commencing any activities that affect the lagoon structures. Pipes: All pipes should be inspected weekly for cracks, separation, or any potential restrictions of flow. Where pipes enter the lagoon, they should be extended such that erosion of the liner cannot occur. These pipe extensions should have proper supports to prevent sagging. Pipes leading to irrigators, including connections, should be inspected to assure proper waste transport, and to prevent leakage that may result in uneven application of effluent. Pumps: All pumps will be inspected weekly. The certified operator shall indicate if each pump was operating in a normal or abnormal condition. The inspection should also indicate if any leaks from loose fittings or seals were detected and indicate repair action. Irrigators: Each irrigation unit will be visually inspected for loose fittings, poor seals, or other methods of waste leakage to ensure proper application of swine effluent. Operations and Maintenance Plan INSPECTION/DOCUMENTATION SPECIFICATIONS (continued) All repairs and maintenance to the waste collection, treatment, storage, and transmission structures shall be documented in a maintenance and repair manual. The operator shall keep an informal record, in chronological order, of all repairs made to the waste management system or equipment. The certified operator should consult a technical specialist in the event changes are made to equipment that will alter the operating capacity of the waste management system. This maintenance manual shall be made available to the Division of Water Quality at its request. EMERGENCY ACTION PLAN PHONE NUMBERS DWQ (919) 946-6481 EMERGENCY MANAGEMENT SYSTEM 919 536-6545 SWCD (91.91-583-3481 NRCS (919) 583-3481 This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at this facility. The following are some action items you should take. I. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rules for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks -possible action. a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. Contact company person: Senior Production Mgr. - M. Miles H - (R4) 658-3205, W - (919) 537-9710 Complex Mgr. - Kelvin Terry H - (919) 589-2481, W - (919) 445-2695 Farming Mgr. - Alvin Lane H - (919) 587-4881, W - (919) 587-2109. b. During normal business hours, call your DWQ (Division of Water Quality) regional office. Phone 919-946-6481. After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. c. If spill leaves property or enters surface waters, call local EMS Phone Number 919-536-6545. d. Instruct EMS to contact local Health Department. e. Contact local SWCD office phone number 919-583-3481, and local NRCS office for advicettechnical assistance phone number 919-583-3481. 4. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair of problem to minimize off - site damage. a. Contractor's Name: Johnny Sykes b. Contractor's Address: Conway. NC c. Contractor's Phone: (919) 585-1565 6. Contact the technical specialist who certified the lagoon and/or Waste Utilization Plan. (NRCS, Consulting Engineer, etc.) a. Name: Rudy Grammer b. Phone: (804) 834-2109 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. Swine )harm Waste Management Odor Control Checklist Source Came RAM's to Minimize Odors Site Specific Practices 1; rillsicad • Sv('iuc prtkluctiou I t Vegetative air ►vo(xlcd buffers; II Recullimended liest managemelll pracliceS, I 1 (iot)(l judgment .1u(1 conunon SCIISe Aninl.d NON' surlilccS • Dim- manure -covered unintals 1l3'f)rx11(mrs How sullaces • Wel manor(' -covered animals . lolled 111k1rs, I;,tnvaterers located over slotted ilo(1rs-, FI Feeders at high end of solid Iloors; 0 Soup(: rnanitre buildup from floors; - - C"Tuderll(klr venliiation lily drying Manuic collcclion pils thine,- Lkfretluem manure removal by flush, pil recharge, • httrll.lt microbial Coil) ll(1siIioll or �, 'rape" 711derlhwr ventilation `� illllalwn cxhau t Iall1 • Vtliallle gasc%-, 11 fill) I nallllellalILC, !)list •,r� ti-1"I:Illclenl air 111ovell1CIll 111dool surfaces • Dust - avashdU1.%1l 11elween groUI)S 01'at11I11aIs; H Feed additives; I 1 Feeder covers; mild delivety dmilsplmt emeuders to feeder F lush tails a A914llioil of uccycled lagnoil I I Flush 1,111k covers; liquid while tanks are filling f1 I'MCM fill IineS near htlltonl of lalgks with cull-511111OIl YC111S I III-lt:plicl, a Agilaliun timing % astewuter _ I' ud.rll(wr !!lull ►c111, rinde f ow venlilatiuu C0n1►'c1'aL1CC Pit rcchalgc points • Agilatioo of recycled lago(nl I 1 I?xlend recharge IineS to near Ixptlonl of Ails ►cith anli-Siphon veulS liquid %villle pits are fillip' Lift il:llftilii • AgitUti(ltl LIMilIg S(I111I) lank il;, tlinp tank covers tilling; and dra►vdo►m OutsiJc (Train collection • Agitation during ►vasie►valer 11 Box covers Ol lllllclion IX)\CS clnveyal1Ce r i Suurce Cause RAIPs to NIinindic Odors Site Specific- Praclice% I :rld of d1:6l1p1lk:s m 0 Agitation during trastcx%aler I i Fxleud discll.uge point of pifx:s undclncrlih la goon conveyance la lMn lip uid Itvcl l.agooll surt'aces • Volatile gas emissions; LyProp er ]again liquid capmcily, • Hiological mixing; I I Collect Iat!W11 slarlup prlwcdurcs. • Agitation UINfiuiIII till] agitation tyhell pulnpilig; [ 1 Minimum sarface area-lo-yohllne ratio; I'1 Mechanical acraiiolr, - I I Proven biulgical additives — — — — — — — — — Inigaliun sprinkler • l ligh pressure agiallioa; -IYrrrigale oil dry ways ttith little or no ttind; no/Acs • Wind drifi f I Mininuun recommended operating pressure: L�,Vnrap ilu:ake near lag,wn liquid St1rl;ICC: i1 4/ 141111) frUlll SC(:olld-slat!c limooll slorage tank or hasill • 1'a11ia1 trliclobial deconlix►silion; I I Ilollonl or midlevel loading. surface 0 Mixing while filling; I I 'fall covers; • Agitation tshcu ClnPltiillg I I Ifasin s11rlilce mats ol•Solids: I I Proven hioln jical additives or oxidants setlIing ba"In sm taco • Parllal microbial decomIx)silion, I I EAtend drainpipe oullels underlleatlt hllnid • Mixing chile filling; level; • At!ilation t%lttlt clnnly ice I 1 Itenulyc settled solids regularly hl.nulIC, shnn or sludge • Agitation tyhcn Spreudiug; I I Soil injection of Slum)/SludgcS; spreader outicls • Volatile gas emissions I i W,ISh reSidtlol IMUltirC faun Spreader alto use; I-i Proven biological additives or oxidants l lucnver.:d m:Ilalle. . Volatile gas CnliS%iuns chile I : Soil iujeclioo of shil Iy/sludges --hurN or sludge on field .trying i I Soil iucortwrdion tsitllin •18 llrs; surllaces I I Spread ill thin Imili)lul hlyers lire r;lpid dnillg: H Proven biological additives or oxidants Dead 'minrds • Carcass decomposition 'roper disposition of eaMiSseS Dead animals • Carlass decomlx)sllion Ia Complete cowling of carcasses in burial pill: L"!` 0 Proper locatioldconsiruclinn of dislumud pil; IIlk: IIlei alors 0 ]nconq)letc touthuSlion I I Secondary slack barbers Insect Control Checklist for Animal Operations Saurcc Cruse HNIPs to Nfluimize Odors Site Specific Practices Liquid Syst mms I lush t411te1; • Accunwhilion ol'solids ush systems is designed and operaled Rouline ux ol-iusecticido srl(iicienll)' to rentore accumulated solids liolli Hiring spring/summer glitters as designed. nluntlls. ""'' nVrcc illnvc bridging of acctiliullatCd solids at Iluntulg use of rodC1111611C discharge your IOHIO. 1 . ip S aml Pili m1 • CULISled SUhds �� 111.lOLnnlain lagoons, settling busins and pits "litre Ixst breeding is apluircul to. minimize the crusting of .Aids to a depth of uo more than 6- 8 inches over nmro than 30% of surlalce. FxcCss111l Vepclal I%c • I )CCaling vegetation U-fAaintain vegetalive col►irol along hanks or l;m%%tit higimus and other impmIldilleals to prevcIll uccunud.11 f}l dCCa)911h' vegelalive maller along waler's edge oll iIII lxfiuldnicnl's Ix rilncler. Dry S 'lems I cC�icl; Fccd Spillage IiVPlLsign, operate and maintain t'Ced sySlcans (t:.g., NIIIkCrs and troughs) to Illitliulize the itCL'iltlllllalla111 of decaying waslage. olefean up Spillage on :I romine basis (e g., 7-III day interval during Sulnnic:r, 15-30 duly interval cturilig M iI11LA 1. l ccd tituragc • nccimmiatiums of leed residues ! I Mutate uuli,turC accuunllati011 Within and ^ arottlld immediate perimeter of teed storage areas by insuring drainage away tram site mud/or providing; adcquane comaimtcul fe.g., covered No lilt brewer's grain and similar high Inoisitre grain products). fl Inspect tier :Ind remove or break up accumulated solids iu litter strips around feed storage as needed. bi Source ('ausr BMPs to )Minimize Odom Site Specific Pruclicel, AnimA I lt)Ming Aicai • AccumulatrinS oI ailillial "'USI4:S i I Eliminate low aicas lhal Irap umisime along and Iced wastage fences and olller lou:aiions where wasic accanudales and distill hance by animals is f ami ilnal. +taiivain )aloe rows and filter strips around unimul holding areas to minimize accumulations of wastes (i.e., insivel for and remove: or break up accumulated solids as needed). I )i � NLmurc I hild[inp • AccumUlaiions of animal wasics I I Remove spillage on a routine ikisis (e.g., 7-III day iuterrd duriIIg suninter; 15-31) dap interval during wimer) where Manure is loaded for larld application or disrwsal. I I Provide liir udeuµgile drainage around manure sil>Lkpiles. n Inspect liar and remove or break ill) accuimdated wastes ill liner strips around sloxkpiles and manure handlink areas as needed. Source Cause BMPs to Minimize Odor Site Specific Practices Standing water around • Improper drainage; Pr Grade and landscape such that water drains facilities • Microbial decomposition of away from facilities organic matter Manure tracked onto • Poorly maintained access roads Farm access road maintenance public roads from farm access Additional Information: Available From Swine Manure Management; 0200 Rule/BMP Packet NCSU, County Extension Center Swine Production Farm Potential Odor Sources and Remedies; EBAE Fact Sheet NCSU - BAE Swine Production Facility Manure Management: Pit Recharge - Lagoon Treatment; EBAE 128-88 NCSU - BAE Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment ; EBAE 129-88 NCSU - BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU - BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU - BAE Controlling Odors from Swine Buil'dings ; PIH-33 NCSU - Swine Extension Environmental Assurance Program ; NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings Florida Cooperative Extension' AMOC - November 11, 1996, Page 5 Mortality ,Management Methods (check which method(s) arc being implemented) u Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300 feet from any flowing stream of public body of water. Q Rendering at a rendering plant licensed under G.S. 106-168.7. C/�omplete incineration. ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture. 1: Any method which is in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached). System Calibration Information presented in manufacturer's charts are based on average operating conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing -the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of _ coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reasons, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every thr 's recommended. Calibration involves o ecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect'perpendicular to the direction of pull. Set out collection container 25 feet a art long the transect on both sides of the gun cart. You s ould compute the average application rate for all collection containers. You should also look for evidence of nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contagt your irrigation dealer or- technical specialist for assistance. 1 1 _ r: rtto. �� lxr, fx'° >.n 814i : 2 14A1LS 20 OAK txzs�`�r� ^eta IxzL1",V, 129.82 I +;, ►;fie r2 9 12�e r;a;! 7, r p lx2C ! !;7 7 r 6 121 12le b' "rye I WOODS rzn 'x>! lz7A i'.ym • !2e.s ! I rpt It Try 'aE3 r2 2e.o 12, 7 a r 7¢ t i2r T / tie's ($ 1 r?!.! rze,y 77; +27.7 % -, s; t2g•s 1 rxe z �'ry�Ie•jl I +xa.a 2 I xa.s ! � z•+ r 2 z � � sae/ 'ta r rx !tr C 2 I S• ! x e, e. 11 r r I i !rl� jJ 12� '1pb r2r•s !'"•� Sates PIT .� e 2,�, la r 12.S '2a IS �x2iad qj lz p i� IY;. a 4'Sp•2 I pip, Ize 130. J w ry r q 2 + r!t•0 9 f� f o ,p n ..._ !'II I x 3 o fk T Is'! Ie ! � -- 22 ! 2 3 + 1 r1 1w2 1284l2 ! p9.i F:V 71 OPEN ° +2a i Iz oe 'gar f} , 1 l e{ R e --� '? 19 flea"��le �srjw !$ i +2D``� i f !2r' 2l.0 lit "Ca V lR2' !z 28t 1. 1 7 128 r2z, ;a•O '20 4uY A +2e•7 G U Y a h rIE p 4 p* e,�h it a Ise o Uzi 4 $���4 tso,x K. , l lE g �r 31 rT ! 3 �� �`� ti 11g,OPEN +:o.x trz e k .►''3 a �(xa iME S p Ili,y ill p +22.a 12 ALE Jr y' '�2• a r' � i f M •. 2 N AILS P ,le.. +xx•t rt>.3 �x Tit +2l•• a• 1 ELEV, -- !le'z ���_M�--.r._...-.. ._ �tMa3�t'".l. N A,'' t!9 �" 9 " •i • 120.R N �! Iz r,7 • . +guy d� j V. ! h '2I.! rep too N� I:4. 4 g4 fN.s 4yEtAL Hfl8 NCIIS � I � 1 f Y/ r d a 3 • % Cs O '? to . r v w N i. - (Type of Visit: ®Complice inspection U Operation Review U Structure Evaluation Q Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergencv 0 Other 0 Denied Access 11 Date of Visit: i�!.df Arrival Time: 11'L_-- Departure Time: County: Region: Farm Name: fS 2 P-> it Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Dgn Current. Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop Cattle Capacity Pop. titan a i iiti%lwwl[C tl6�li? i ii ffA �llI1W tl# �€Il�dAi �9i7„t eE?�pu dut iri li J{, td iGi�i f f t t h i;r m N lie Wean to Finish airy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design @urgent, Dry Cow F ow to Feeder D , Poult Ca�aci Po Non -Dairy Farrow to Finish 3v Layers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other ` " �" Pouets Other x —.Turkey Other Discharizes and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes Ce�00 NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) [:]Yes VNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA rNo[o:] ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued j Facili Number: 2 - Date of Inspection: —G Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ZD NA a. If yes, is waste level into the structural freeboard? ❑ Yesg�No ❑ NA Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes JZNoo NA ❑ Yes No ❑ NA ❑ NE ❑ NE 0 NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta rest, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes LAJ VNo, ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require D Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes VN ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. [] Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): De- / nl ,,cJA 13. Soil Type(s): / 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes❑ 711-NX NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes �❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE th t b e appropria a ox. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfe s ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspection ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: 2 S I Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0 NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: zz 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes KOO ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [:]Yes NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [] No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA [] NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [] No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE �%✓� l t �j r&- -- OK 3' 1 5- 11 S� s � p t ✓ v i-s 2zeA IV % S h �► (2Q NtoVa � 0 ccxr i v Reviewer/Inspector Name: p Reviewer/Inspector Signature: j?L. $ Qr to ht�L-1 Page 3 of 3 n t sa Y r=wa u r e Phone: 7 2 OG Date: �1 ` q — I'$ 21412015 7 7 - 2- Type of Visit: ® Com nee Inspection U Operation Review U Structure Evaluation 0 Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emerizency O Other O Denied Access Date of Visit: Arrival Time:-lam--� Departure Time: County: Farm Name: F:0+izh, 613 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: l��GYr y Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Region: Design Current Swine Capacity Pop. Wean to Finish Wet Poultry ILayer Design Capacity Current Pop. Design Current Cattle Capacity Pop. Dairy Cow Wean to Feeder Non -La er I I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D , P,outt , C•.a aci P,o Non -Dairy Farrow to Finish ILayers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turkey Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes VNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes o ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA VN ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [] Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued facility Number: -5-- - ;_ Date of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2T No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Noo NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes /No[:] NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > l0% or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): i'C h s' da, 4 "'n-j 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ YesVNo ❑ NA ❑ NE 16, Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes6N�o [] NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes eN ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design [] Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transf ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspectio ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 7�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412014 Continued lFaollity Number: Z - Date of Ins ection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA [] NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes KNo❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Ye ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No 0 NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. [] Yes [] No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments.(refer to question #) Explain anytYES answers and/or any additional recommendations;or_ any other" Mrnents 3 Use drawings of..`faciiitytoi -be'tte`r.'ezplain situation`s' (use additional pag'es as necessary] Reviewer/Inspector Name: Phone: Cl M 7 � ( � zoo Reviewer/Inspector Signature: 4e S Date Page 3 of 3 21412015 �. • Divi"sion of Water Resources Faci�ity Number � - � � Division of Soil and Water Conservation Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit. 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: J Farm Name: - 6Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: ORSite Representative: TGyV Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current +Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. �m 0.r IN C*at#le Capacity Pap. Wean to Finish La er Dairy Cow Wean to Feeder Non -Layer Dairy Calf airy He Feeder to Finish Farrow to Wean Dcsign Current D Cow Farrow to Feeder llr, iP,oultr Ca aci. Po Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ YesgNo ❑ NA ❑ NE c. What is the estimated volume that reached waters ol'the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes A ❑ NE 2. Isthere evidence of a past discharge from any part of the operation? ❑ YesA VE:] ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: V Z___ Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2rNo NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): .- rr O 5. Are there any immediate threats to the integrity of any of the structures observed? 0 Yes 12<0 ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t reat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Zf No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): & r wt iL e 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes VN �] NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes�] NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes KNo NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No -NA ❑ NE Reaulred Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall InspectieNo ludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes NA ❑ NE Page 2 of 3 21412015 Continued Facilit Number: t4- 7r__j Date of Inspection: r 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesVNo NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes VN�o�JNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any°YES ansrwers`and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary).' h A, �Se Su. eve y /a -IS- IS 3 r O-I�-I sn Q n T ✓fY +r n� 4 t;c s c A "g . Zo cl PP t2 P- . t) a Cn fe—i—W4•ems wn A PC 5111 [�w+t re<51 Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: 13 ti S J6t 7*c.f e ( I _ Page 3 of 3 Date: c 1 Z- f a 21412015 Type of Visit: $Catoutine ance Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance sit: Reason for Vi0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: I� Xi.✓� Integrator: Certified Operator: Phone: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Region: Design C►urrent Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Wean to Finish La er Design Current Cattle Capacity Pop. Dai Cow Wean to Feeder Non -La er DairyCalf Feeder to Finish Dairy Heifer Wean Deign Current D Cow Non -Dairy o Feeder Di, P.Ouiti, Ca aci P,o o Finish La ers Beef Stocker Non -La ers Beef Feeder !Farrowo Pullets s Turke Pouets Other Beef BrodTurke Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes 0 01 ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes N ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? [] Yes ❑ NA vol r] NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page I of 3 21412014 Continued Facility Number: - Z Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes E21INo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t eat, notify DWR 7, Do any of the structures need maintenance or improvement? ❑ Yes VNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [�]'No D NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑Yes o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑Yes No ❑ NA ❑ NE Required Records & Documents t9. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 0 Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facility Number: -Z- Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 2 <No[:] NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes ❑ No ❑ NA ❑ NE Y ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAW -MP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA" ❑ NE i 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question:#) Explain anyYES answersandlpr any�additipnal recommendations orany othercomments:_ Use drawings of facility to better explain situations (use additional pages as necessary).,. su ry y 16 1A vi 1 6 4() U`Le r'�'05 t n 4'C3 Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 h & J. 4� "e 0" oLc sa e s /441e, 134-(dte D II Phone: ?7ql — I/ Z-ob Date: ! — q -/ 21412014 Ali (Type of Visit: "=Q3 =utine ia pection U Operation Review Q Structure Evaluation O Technical Assistance j Reason for Visit: Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access I Date of Visit: Arrival Time: Z - Q Departure Time: County: Farm Name: sew t2,�., �� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Region: Design Current Design C«urgent Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer airyCow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Pry Cow Farrow to Feeder Dr, P,o_ultr, Ca aci P,a . Non-Dalry Farrow to Finish Layers Beef Stocker Gilts ers Beef Feeder Boars Beef Brood CowOther PoultsOther Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? [:]Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) [—]Yes ' - ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) [:]Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? []Yes ❑ No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes o ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facili 'Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural frceboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): y 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 9410 ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ElYes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2rNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [vo ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or'10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): C� �''� d� �A , �Sh 4 �►4+ �s J' 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �;No,,❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes N ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ YesjNo❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code Sludge Survey ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and i" Rainfall InspectiVNo 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA ❑ NE Page 2 of 3 21412011 Continued 6�Facilit 'Number: - Z Date of Ins ection: :r- 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No DNA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments: Use drawings of facility to better explain situations (use additional pages as necessary). t,A �� Y Reviewer/Inspector Name: Phone: ?I(- (" V 2-00 Reviewer/Inspector Signature: Page 3 of 3 Date: / ?_ "/ G z 21412011 -z-7_ (2 ' Type of Visit. Q Coroutine nee Inspection Q Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit: 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: LQ Departure Time: County: Farm Name: S �2 P-,+, Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Phone: Title: Phone: Onsite Representative: 1l� �r?i�Y�- j Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Certification Number: Certification Number: Longitude: Region: Design Current Design Current Design Current Swine Ca aci Po Wet Pouf; Ca aci Po P tY P• lY P tY P• Cattle Cii aci Po P tY P- Wean to Finish La er Wean to Feeder Non -La er Dairy Cow Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design C•urcent Dry Cow Farrow to Feeder D , P.oult , Ca aci P.o P. Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets F 113eef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes ;rNo' ❑ NA ❑ NE ❑ Yes ❑ NA [] NE ❑ Yes o ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 21412011 Continued lFacHity Nuigber: Z Z - Date of Inspection: 121 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes eNo NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑Yes a ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EJONo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [] No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No [:]Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer, to.question #): _Explain anyYES answers and/or any additional: rec6inmendations ors any other comments" a � P, ;0"a Use' drawings of facility to better explain situations -(use additional pages as necessary).,; j CAL'i b re"- 54w,��t Wt6 -.[ Reviewer/Inspector Name: Phone: ? / I ` y Z6 fj Reviewer/inspector Signature: Page 3 of 3 s P_/e —ze�z' e Date: f D J 2/ / (3 21412011 Facility Number: - Date of Inspection: O Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): ❑ Yes No NA ❑ NE No ❑ NA ❑ NE Structure 5 Structure 6 Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ID Yes No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes - /No' ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [] Yes N ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 1 2,e r tel 6... 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes2"No, ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0 No ❑ A ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis . ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspection Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued /I- a(— I L (Type of Visit: AD Com a Inspection U Operation Review Q Structure Evaluation Q Technical Assistance I Reason for Visit: Routine Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: rrival Time: Departure Time: County: Farm Name: {�i ��/t/ �i Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact; Onsite Representative: Title: Phone: Integrator: Phone: Certified Operator: �� /�,y-t, Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Region: Design Current Swine Capacity Pop. Wean to Finish Design Current Wet Poultry Capacity Pop. La er Cattle iry Cow Design Capacity C«urrent Pop. Wean to Feeder on -Layer iry Calf iry Heifer Feeder to Finish Farrow to Wean Fa to Feeder Design Current Ih, P,oultr Ca acit P.o D Cow Non -Dairy arrow to Finish ' Layers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Other Other Turke s Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes Ef No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No21"-0NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) [:]YesNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) [] Yes No . NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued P7Lr: C/Z - �_ 3 Date of Inspection: \ ,te Collection & Treatment 4tls storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ YesI�NANo ❑ ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): g7 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t a , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes [—]No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s):y Cy , 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Z No NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA [] NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ YesgNo No NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Q NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes gNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes dNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" RainfaIl Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued r t 61? Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 31 <o� 25. is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Vo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes VNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes gyNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [] No ❑ Yes ❑ No ❑ Yes [] No ❑NA ONE ❑NA ❑NE ❑NA ❑NE lComments (refer to question ##): Explain any YES answers and/or any additional recommendations or any other comments. Useidrawing's of facility to better explain situations use additional pales as necessary) .. :, a, .. ; . } ik , Vul Reviewer/Inspector Name: Reviewer/Inspector Signature Phone: —V — yZd 6 Date: </ / / ; 21412011 Page 3 of 3 93 ► I I :-,) r i Type of Visit: Q Compliance Inspection Q Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: `-` Arrival Time: Departure Time: 1 County: Farm Name: Litt Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Phone: Integrator: Phone: Certified Operator: Imil Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Region: Design Current Current Design Current Swine Capacity Pop. WetOWDesigin cty Pop. Cattle Capacity Pap. Wean to Finish La er Dai Cow Wean to Feeder on -Layer Dai Calf Feeder to Finish Dai Heifer Farrow to Wean Design Current D Cow Farrow to Feeder Dr P.oultr Ca aci P,o Non-Dai arrow to Finish ILayers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets 113eef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ETNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes o ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) [:]Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes N ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �N ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facilit Number: - Z Date of Inspection: L�f Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes Ej No ❑ NA ❑ NE Structure i Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? [—]Yes No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments hreat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes j No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ YesF2/No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? - Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes fo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA 0 NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14, Do the receiving crops differ from those designated in the CAWMP? ❑Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes F2 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes rNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application`? ❑ Yes ❑ NA ❑ NE 18, Is there a lack of properly operating waste application equipment? ❑ Yes VNo❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ YestNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge'? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: 2. - Z Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o _ NA [] NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check 0 Yes E3<o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? []Yes E O NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern'? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/]nspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency'? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ Yes ❑ No ❑ Yes ❑ No ❑NA ONE ❑ NA ❑ NE ❑NA ❑NE Comments (refer toquestion##) Explain any YES answers±andlor any additional recommendations 6ir'any other 6mmen Use c raWings of.facility"tn better explain 'situ ations `(uw additional pages as necessary)= Reviewer/Inspector Name: Reviewer/Inspector Signature: <,lowT V �[ Page 3 of 3 Phone: 7g I- c( Zd 0 Date: / D f Z 1 j♦ 21412011 Type of Visit QfCo ante Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Vis Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: _ �P�� FkP-A-, &-.5, Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: r� Integrator: Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: 0 0 = 6 = Longitude: = ° 0 ` 0 Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population ❑ Layer C*attle Capacity Population ❑Dai Cow ❑ Wean to Finish ❑ Wean to Feeder ❑ Non -Layer ❑Dai Calf ❑ Feeder to Finish ❑ DairyHeifer ❑ Farrow to Wean Dry Poultry ❑ D Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Gilts ❑ Non -Layers ❑Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys Other ❑ Turkey Poults ❑ Other ❑OtherI umber of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes �No❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ElNA ElNE 2. Is there evidence of a past discharge from dny part of the operation? ❑ YesVNo f [INA El NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued Facility Number: Or — Date of Inspection 46-.? Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure l Structure 2 Structure 3 Structure 4 ❑ Yes VNo[E:ll NA El NE El YesNA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): cc Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat notify DWQ 7. Do any of the structures need maintenance or improvement? ElYes to❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes:�No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) _ �� 11ct h c_ A. 5" 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes 21N ❑NA ❑NE ❑ NA ❑ NE 7 ❑NA ONE /0 ❑ NA ❑ NE ❑No ❑NA El NE Reviewer/Inspector Name 7Phone: `fy �(Z L'-a Reviewer/Inspector Signature: S '�2 � Date: . if [ (S / I o Page 2 of 3 1Z/Zdf/U4 Continued ! + 63 l Facility Number: - Lrj Date of Inspection �s ReQuired Records & Documents 19, Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes R<01NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o El NA [3 NE the appropirate box. ❑ WUp ❑ Checklists ❑ Design [I Maps ❑Other 21. Does record keeping need improvement? If yes, the appropriate box below. Yes No NA ❑NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22, Did the facility fail to install and maintain a rain gauge? ❑ Yes No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Ko ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ❑ NE 26, Did the facility fail to have an actively certified operator in charge? El Yes NA FNo[D:l ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? El YesNA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31, Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE 4" nalCaigmetsan810 lAdditi' i d ) _: 1z Page 3 of 3 12128104 117( F-r Q 7_ H 2- Type of Visit 0 Co lance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: b Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator:. Phone: Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: = o = 6 = Longitude: Q ° = ` = Design Current Design Current Design trylOpacity C►urrent Swine C++opacity Population Wet Population @attic Capacity Population ❑ Wean to Finish ❑ La er ❑Non -La er ❑ Dairy Cow ❑ Wean to Feeder ❑ Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Dry Cow ❑ Non -Dairy ❑ Farrow to Feeder ❑ Farrow to Finish ❑ La ers ❑ Beef Stocker ❑ Non -Layers ❑ Beef Feeder ElGilts [I Boars ❑ Pullets ❑ Turkeys El Beef Brood Cow Other ❑ Turkey Poults ❑ Other ❑Other Number of Structures: MIN Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) El Yes VNoNA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes 'NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes NA rNo ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure l Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z t 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No NA ❑ NE El Yes o ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes ONo -NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental tbre , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes I . N NA El NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑Yes �No - NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �NoNA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [--]PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift El Application Outside of Area c� 12. Crop type(s) C A- r.% S h- k-jsI 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes V NA NA ❑ No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Reviewer/Inspector Name I-- T--- �- - I Phone: Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number:L Z — ?31 Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWM P readily available? If yes, check the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other ❑ Yes No ❑ NA ❑ NE ❑ Yes io ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE []Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes � ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes �No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes lLl No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE AdditionalCoin eints.Andlor-Dr a�vin'rs �C � i Page 3 of 3 12128104 Facility Number Z Z� 0 Division of Water Quality 0 Division of Soil and Water Conservation 0 Other Agency t:- (Type of Visit PrCom ' nce inspection Q Operation Review O Structure Evaluation 0 Technical Assistance I Reason for Visit PARoutine O Complaint 0 Follow up 0 Referral O Emergency O Other ❑ Denied Access Date of Visit: L 1p Arrival Time: Departure Time: County: Farm Name: a 3 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: / Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Other ❑ Other Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: [=] c =' = Longitude: = 0 = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non -Layer Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ElTurkey Pouits ❑ Other Discharges & Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current::- Cattle Capacity." Populations. ❑ Dairy Cow ❑ Daia Calf ❑ Dairy HeifeE ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocket ❑ Beef Feeder ❑ Beef Brood Cow, Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ■ ❑ Yes No ❑ NA ❑ NE ❑ Yes o NA ❑ NE ❑ Yes No ❑ NA ❑ NE _�; ❑ Yes No A 'NE ❑ Yes No A ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued F l Facility Number: Date of Inspection Z 0 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 ❑ Yes o NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes EfNo NA ❑ NE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Y e Jallo NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes o NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N 10 NA ❑ NE maintenance/improvement? / It. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) Qr M r 13. SoiI type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes EFNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE �'N 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes ❑ NA El NE 17. Does the facility lack adequate acreage for land application? ElYes N NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary)': Reviewer/Inspector Name �^ Phone: Reviewer/Inspector Signature: Date: I2128104 Continued Facility Number: t12 — Date of Inspection I Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ONo NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 2< ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ t20 Minute Inspections ❑ Monthly and 1" Rain InspectionjN0 ❑ eather Code 22, Did the facility fail to install and maintain a rain gauge? ❑ YesNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30, At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit'? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? Additional Comments and/or Drawings: ❑ Yes No ❑ NA ElNE ❑ Yes No ❑ NA ElNE ElYes No -NA ElNE ❑ Yes o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 12128104 Type of Visit OCZ`uti�ne plia-Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Z a Arrival Time: �p�cca Departure Time: � County: Farm Name: P C �T Z!^_ ?' �� Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: 0 c= 6= Longitude: = 0 0= Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Wean to Finish 10 Layer ❑ Dairy Cow ❑ Wean to Feeder ❑ Non -La er I ❑ Daia Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Dry Cow ❑ F tow to Feeder ❑ Layers ❑ Non -Dairy Farrow to Finish ❑Non -La ers ❑ Beef Stocker El Gilts ❑Beef Feeder El Boars El Pullets ❑ Beef Brood Cowl ❑ Turke s Other ❑Turke Points ❑ Other ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes ❑"No ❑ NA ❑ NE ❑ Yes o NA ❑ NE El Yes o P NA ❑ NE ❑ NE ❑ NE ❑ NE 12128104 Continued Facility Number: L -- Date of Inspection G o Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 40 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No A ❑ NE ElYes o ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes 2rNo ❑,NA ❑ NE ❑ Yes to ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental) threat notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes I o NA ElNE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E?�No[__] NA❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. El Yes NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable/ Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) -Jet-1'. S m �} / +pl r n s . e s Gt -e- 13. Soil type(s) 14, Do the receiving crops differ from those designated in the CAWMP? ❑ Yes allo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes !�'lvo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes I No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �ZNo ❑ NA ❑ NE .Comments.(refer to question #): Explain any YES answers and/or any recommendations or any other comments 6 Use.drawings of facility to better explain situations. (use additional pages,as , AL Reviewer/Inspector Name — — -- -- - ..-- -- -- — — _ — — -- — - Phone: Reviewer/Inspector Signature: '7g Date: O Page 2 of 3 f 12128104 Continued Date of Inspection Z Facility Number: Z — 7-3 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ZNo,0NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. []Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No -NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes NNQ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ��Oo_[] NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes nN❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3 12128104 Type of Visit CJCompliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit outine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: O C Arrival Time: Departure Time: County: Region: Farm Name: 0�`�7 ?7 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: X'1'i! Back-up Operator: Location of Farm: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: =]' =' ❑ Longitude: = c ❑ ❑ Design Current Design Current Swine Capacity Population Wet Poultry Cjpacity Population ❑ Wean to Finish ❑ La er ❑ Wean to Feeder ❑ Non -Layer ❑ Feeder to Finish ❑ Farrow to Wean Dry Poultry ❑ Fa w to Feeder ❑ Layers Gilts Boars Other ❑ Other ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Pou Its ❑ Other Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stockei RBeef Feeder Beef Brood Cow Number of Structures: = Discharp,es & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ONo EE,] NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes N ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ YesKNEI ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ❑ NE other than from a discharge? 12128104 Continued Facility Number: — 'Z Date of inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: ❑ Yes NA ❑ NE ❑ Yes o ❑ NA ❑ NE Structure 5 Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): -5 5. Are there any immediate threats to the integrity of any of the structures observed? =� ❑ Yes Rio ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta7No t, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes EINA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �`No❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes J2 <oEl NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? IL Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) []PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) Sg,•� �� �. r n 3' 13. Soil type(s) CA) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �No�❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 1;No ' o ❑� .NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination,[] Yes o NA ❑ NE 17. Does the facility lack adequate acreage for land application? El Yesw❑.NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ®'No ❑ NA ❑ NE Reviewer/Inspector Name �, r' r, w ' V k . Phone: Reviewer/Inspector Signature: Date: p (! 1212810 Continued .. a Facility Number: ?- — Date of Inspection G Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ElYes No ❑ NA ❑ NE the appropirate box. ❑ WDp ❑ Checklists ❑ Design ❑Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes zNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No - NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? [:]Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes M<o ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ��No ❑.NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification'? ❑ Yes _ to ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes [--]No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments.and/or Drawings 12128104 Z3 F f Visit Co=ple Inspection O Operation Review O Structure Evaluation O Technical Assistancen for Visit O Complaint O Follow up O Referral O Emergency Q Other ❑ Denied Access Date of Visit: 1 31(V j 1 Arrival Time: Z / s Departure Time: County: Farm Name: ;�P_ 6 �4lill, 63 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: lill &-h1lill Back-up Operator: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: = e = 4 = « Longitude: ❑ ° ❑ f ❑ {/ Design Swine Capacity C•ur:rent Design Current Population Wet PanitJ Cap. ci, pnlation Cattle Design Current Capacity Population ❑ Wean to Finish ❑ Layer ❑ Dairy Cow ❑ Wean to Feeder ❑ Non -La et ❑ Dairy Calf ❑ Feeder to Finish ❑ Farrow to Wean Dr Poultr ❑ Farrow to Feeder y-;may arrow to Finish El Layers ❑ Gilts ❑ Non -Layers ❑ Boars ❑Pullets ❑ Turkeys Otber ❑ Turkey Poultr ❑Dai Heifer ❑ Dry Cow ❑ Non -Dairy ❑Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: ❑ Other ❑OtherI I Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ;_2 KoE3NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes PNo NA El NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes Ro N ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ElYeso NA ❑NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: Z Date of Inspection Dt Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes to ❑ NA ❑ NE a. I.f yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier; Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ic/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ZrNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �<No -NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes FTNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. [1-Y-e-s ❑ No ❑ NA ❑ NE ❑ Excessive Ponding 2 ydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) � 4- / M"J n-. 5 h.-A w4 r" n v . r-'e s Gt,{. 13. Soil type(s) 2" eA-0M.-' -4N 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes fffNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No .❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination i❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes IJ No ❑ NA El NE 18. Is there a lack of properly operating waste application equipment'? ❑ Yes No ❑ NA ❑ NE Phone: Reviewer/Inspector Name Reviewer/Inspector Signature: Dater 1 k /-�- 12/28/04 Continued . .. ; Facility Number: Z —Z S Date of Inspection k r7 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the approprrate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ONo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes N ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ;No❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No RYNSFA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ,❑ E f o ❑ NA ❑ NE 27, Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 2 o ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ETNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ENo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ONo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ElNE 33. Does facility require a follow-up visit by same agency? ElYes ;"O/ ❑ NA ❑ NE Additional Comments and/or Drawings: ',P'pL3 r +� i� oCcU►-• � e /o L r-�S'c� Sot la'yf� 'fir' �� •a.- r• r= 41 ze -1 4,) 4o f-� 1v(aA S' FAC. (.-1�a s /�y+c-c � �� � !f I C.c�L��ar� S ('k cJyz S� .�ys. 12128104 Type of Visit QVCompjwT6e Inspection O Operation Review O Lagoon Evaluation IReason for Visit'�"outine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Z Date of Visit: Time: /z3� O Not Operational O Below Threshold © Permitted [3 Certified © Conditionally Certified 0 Registered Date Last Operated or Above Threshold: ......................... FarmName: .... ..{.....1 .... %r`� ...... A ...... -3 .............................................. County:..................................................................................... OwnerName:.... .�J?7.:...�?.�f !. D.l.1........................................................................... Phone No:....................................................................................... MailingAddress:.......................................................................................................................................................................................................... .......................... FacilityContact: ..............................................................................Title:................................................... Phone No Onsite Representative: ........ Integrator:...---•............................................ Certified Operator:-----.).r .... ?..R.............................................................. Operator Certification Number:---....................................... Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0• 4 66 Longitude • 1 « Discharses $. Stream Facts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: ........ s.................................................... ................................... ........... ...... Freeboard (inches): 12112103 ❑ Yes ❑ Yes r/o ❑ Yes ❑ Yes ro ❑ Yes ❑ Yes No ❑Y ❑No Structure 6 Continued Facility Number: 61 Z — Date of Inspection // 3 5. Are there an immediate threats to the integrity of an of the structures observed? ie/ trees, severe erosion, Y ItY Y ( ❑Yes o seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes J 3 0 r closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes o y 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes o elevation markings? Waste Application / I0. Are there any buffers that need maintenance/improvement? ❑ Yes M-W l I . Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type 1, r rn L JA , SSA--+4v1 + •-t J / 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAVVW . 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? J Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. :51-29/oLr r &-'q"j APB. sue; U` - 1 11 r.3/ // CLeAz ov, ;54744&_!r ot-- Reviewer/Inspector Name Reviewer/Inspector Signature: ❑ Field Date: ❑ Yes �lo ❑ Yes Nov ❑ Yes No ❑ Yes y`"" ❑ Yes ❑ Yes o ` No ❑ Yes o ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Final Notes 12112103 Continued Facility Number: t. Z — Date of Inspection r Required Records & Documents 21. Fail to have Certificate of Coverage &. General Permit or other Permit readily available? ❑ Yes o 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes o 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with an applicable setback criteria in effect at the time of design? ❑ Yes No P Y PP g 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes o 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) ❑ Yes No 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 0 28. Does facility require a follow-up visit by same agency? ❑ Yes o ' 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes o NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) Yes ❑ No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes 34. Did the facility fail to calibrate waste application equipment? ❑ Yes rN9,'_ 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After 1" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 113 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. 12112103 Type of Visit O'Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit 9<0utine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number Date of Visit: Time: i ='E s rO �/ Not Operational Below Threshold Permitted �ertifiedr rr Conditionally C 'fled [3 Registered Date Last Operated r A ove Threshold: Farm Name: �� � �L l4 {-03 County: Owner Name: Phone No: Mailing Address: 3 � �fWl �5. �1y __ f �1f.�f , Ne 778 70 Facility Contact: Title: Onsite Representative:: j} Certified Operator: �IJ�r ' LO-a Location of Farm: Phone No: Integrator: Operator Certification Number: Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0 �� �44 Longitude ' 6 1. Design Current Design Current Design Current Swine Capacio Population Poultry Capacity Population Cattle Capacitv Population ❑ Wean to Feeder JE1 Layer I ❑ Dairy ❑ Feeder to Finish 10 Non -Layer I ❑ Non -Dairy Farrow to Wean El Farrow to Feeder ❑Other 2ffarrow to Finish �tJ Total Design Capacity ❑ Gilts ❑ Boars Total SSLW a Number of Lag oohs ❑ Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area �R MOM❑ Holdin Points LSolid,Tra s g..-.P �0 � No Li Liquid Waste Management S stems j Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. is there evidence of past discharge from any part of the operation? . 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Wastg Cgllection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: _�_ -re L Freeboard (inches): 77_ 05103101 ❑ Yes f"' No ❑ Yes PNo El Yes //lPNo ❑ Yes ?,!No ❑ Yes VNo ❑ Yes �z No ❑ Yes /EfNo Structure 6 Condnued Facility Number:Z — 2. Date of Inspection �—.... � 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No (If any of questions 4-5 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes AIN o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes IVNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes No Waste Application 10. Are there any buffers that need maintenance/improvement? - ❑ Yes No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN El Hydraulic Overload El Yes //// <o 12. Crop type '_Lp rAm J.,k- , CM 6k 13. Do the receiving crops differkith ith those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes /❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes No 15. Does the receiving crop need improvement? El Yes , 16, Is there a lack of adequate waste application equipment? ❑ Yes XJ'No No Renuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 18. Does the facility fail to have all components of the Certified Animal�W�ast IVlanagement Plan readily available? (iel WUP, checklists, design, maps, etc.) 4cfe�?'/Vthc `Z'1oNkV❑ Yes ZNo19. Does record keeping need improvement? (ie/ irrigation, freeboard,nqlaalysis & sgi psganple reports) ❑ Yes No20. Is facility not in compliance with any applicable setback criteria in time odes gn? ❑ Yes I�lo 21. Did the facility fail to have a actively certified operator in charge? '1� 03 El Yes 22. Fail to notify regional DWQ of emergency situations as required by G �fral Permit? (ie/ discharge, freeboard problems, over application) RJ !O ❑ Yes 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 24. Does facility require a follow-up visit by same agency? ElX Yes o 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes .No 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Comments (refer to question #): Explain any;YES.ansrvers and/or any recommendattonssorany othycomments ;,, s r.use: dditional pages" 1Xield Copy ❑ Final Notes 1 G t ?,0Z - lutN I I N�3 �P - ?.� PON a ts,J 5 (AI(r24& A414 � CAL) h-U TLC A � -'4t1'0'Z44 V 4 64w4 �U&k AA� CLU � W fit" ti� "tj 17"- yy� (letzo Reviewer/Inspector Name 1k Reviewerllnspecter Signature: Date: O5103101 Continued . . 6 Facility Number: Z — zj pate of Inspection S a Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29, Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or d permanent/temporary cover? ❑ Yes XNo ❑ Yes,,A/'0 El Yes Ld ❑ Yes �No ❑ Yes VqO ❑ Yes VNo ❑ Yes 10 No AddItionali,Goniinentslu�dlorkpcawings: 05103101 05103101 Facility Number: -L-- Z3 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ❑ No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ❑ No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ❑ No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes ❑ No Waste Application 10. Are there any buffers that need maintenancelimprovement? ❑Yes ❑ No 11. is there evidence of over application? Excessive Pending ❑ PAN �2 Hydraulic Overload Yes ❑ No 12. Crop type 4=r S uM f - 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ❑ No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Reouired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes ❑ No 18, Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ❑ No 19. Does record keeping need improvement? (iel irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ❑ No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ❑ No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ❑ No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? Yes El No (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes XNo 24, Does facility require a follow-up visit by same agency? ❑ Yes [--]No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Copy ❑ Final Notes vie 1L {� � Q� S � �7 5 sw.f L� l rate- Q_k £Xtr1 , e I W q r c r l� it SNu�L o1' �4 "W04 vJc1'�U5 �a W eA P S) - Reviewer/Inspector Name Reviewer/Inspector Signature: 05103101 Date: Continued Type of Visit /0 Compliance Inspection O Operation Review Q Lagoon Evaluation Reason for Visit Routine O Complaint Q Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number Z date of Visit: D q 6L Time: ti `• a` Not O erational 0 Below Threshold Q-Permitted J Certified [3 Conditionally Certified 0 Registered Date Last Operat d r bove Threshold: [[Farm Name: _. t03 County: Owner Name: Phone No: Mailing Address: J S /V(_ Facility Contact: Onsite Representative: Certified Operator: Location of Farm: Title: Phone No: Integrator: Operator Certification Number: ,1spq wine 0 Poultry ❑ Cattle ❑ Horse Latitude 0a 0� �44 Longitude ' ' 0" Wean to Feeder Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder L—Ifla-rrow to Finish ❑ Gilts ❑ Boars No Liquid Waste Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection -& Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Identifier: -9G, Freeboard (inches): 05103101 Structure 5 ❑ Yes XrNo ❑ Yes Vo ❑ Yes ;- o ❑ Yes No ❑ Yes ,0 No ❑ Yes No ❑ Yes / 2<0 Structure 6 Continued Facility Number: Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ETNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or .,/ closure plan? El Yes L/f No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes P<o Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes Lf<No 11. is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes 2 No 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes �TNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes P l�O 16. Is there a lack of adequate waste application equipment? ❑ Yes )�TNo Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 19. Does the facility fail to have all components of the Certified Animal ail; ement Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 8 Z�tl �x, _ jr ❑ Yes ,'No ✓ l� 0�0 19. Does record keeping need improvement? (ie/ irrigation, freeboard, w to analysis &soil sample reports) ❑ Yes 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ��o22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes fNo (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes A-- No 24. Does facility require a follow-up visit by same agency? ❑ Yes Oo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? El yes �o No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. } yy;f i°1°. r i - } i (.: �. �'... -.n; p ...13?.,ir ! !, - �,� ! r tlu 11 9 Comments:(refer to #) Explain any1!ES any recommendations or anvr comments° �' question $oswet s`and/or, er '_Yxi' -s s.• i.w. u al E _,ti.i•. .......s„� .,,,.r,.<x. r CJse cirawtngs of facility to better explain situations' (yuse addiyho>vi�yl pages'as neees`sary) 3 EE Field Conv ❑Final Notes .�t�.' 1z.�".i�}.�'"d:4 Aft� ��4 w Z 7'-r Reviewer(InspectorNameLL 3'(� I Alp, Reviewer/Inspector Signature/Date: fa 05103101 Continued Facility Number: 14z, —Z Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes 4o ❑ Yes 9Yes�P<o o ❑ Yes / ❑ Yes �o ElYes�VN ElYes Additional Coinments and/6r Drawings: AL 05103101 tr i ' t .. �€ iia;iiitil%NK SklS1§� tiafi�°' IIII ' ° Davison of#$Wuter"`�Qualityq ei .u€aP4iliila(S � � i � [i pl�fvislo�n�oi�5oi'eridiV�nter uonservaion p Qther3Agency Type of Visit p Compliance Inspection p Operation Review p Lagoon Evaluation Reason for Visit p Routine p Complaint p Follow up p Emergency Notification p Other ❑ Denied Access Facility Number Date of Visit: f ZI16/2402 Tirne: 15:30 o of perahona p Below I hresgold Permitted 0 Certified 13 Conditionally Certified p Registered Date Last Operated or Above Threshold: ......................... Farm Name: Farm 63 County: Halifax ............................................... R). O............ Owner Name: Smithfield Carroll's Farms Phone No: 834-2109 Mailing Address: 385.Hig)away..1.5.8................................................................................. Roanoke.Rapids... N.C......................................... 178.7.Q .............. FacilityContact: Kel.Tet:ry.........................................................Title:............................................................... Phone No: 252-:589:4298 ....................... Onsite Representative: Ke1..T.erry...................................................................................... Integrator: Carro11's.F.onds..of.VA,.Inc.............................. Certified Operator:Kelvain.R............................... .T.erry.................................................. Operator Certification Number: l8SI.4............................. Location of Farm: ® Swine ❑ Poultry ❑ Cattle ❑ Horse I� Latitude Longitude �� � ❑ Wean to Feeder m ❑ Feeder to is ❑ Farrow to Wean p Farrow to Fee er ® Farrow to Finish ❑ Gilts Li Boars ❑ Layer i;'a; a.,. ❑ _ airy. ❑ Non -Layer p Non -Dairy € tv`,,, 500 708,500 Discharges & Stream Impact 1. Is any discharge observed from any part of the operation? ® Yes p No Discharge originated at: [3Lagoon ® Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ® No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) []Yes ® No c. If discharge is observed, what is the estimated flow in gal/min'! d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ® No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes N No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ® No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway p Yes p No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ..........Primaq ................ s=arxdau....... ................................. ... ......................................................................................................... Freeboard(inches): ...............20...............................22............................................................................................................................................................... 05103101 Continued 05103101 Facility Number: 42_23 Date of Inspection Continued 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste APPlication 10• Are there any buffers that need maintenancelimprovement? 11. Is there evidence of over application? ® Excessive Ponding ❑ PAN H Hydraulic Overload 12. Crop type Fescue (Hay) [].Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No p Yes ❑ No ❑ Yes ❑ No N Yes ❑ No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? p Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ❑ No 16. Is there a lack of adequate waste application equipment? Required .Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) I9. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24• Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? p Yes p No ❑ Yes ❑ No ❑ Yes p No ❑ Yes Cl No ❑ Yes © No ❑ Yes p No ® Yes []No ❑ Yes ® No []Yes ❑ No ❑ Yes ❑ No p No vio a sons or deficiencies were noted urmg this visit. You will receive no further correspondence about is visit. rn "..-t. yere.a�uwwq»w.t».�.:. s m. .�.�.. .•... .ey. ..... .�. M. � .•....m.no-. .w,. . ..... ...w.rmur �..�•�:�n�.<... x: # '..raw.ae- "_� ^: tnh�. 3::'.l.:.H Co�m�9metl1ttn(SStsc�(�refer$("to,quttestion#)cjjjNN{{l!�WNEugqz¢pw1#in'lany(pYEfHS1kansw9ers�afij o (any$y�r�ecomm9e-YngdF{aptidn orfaxi(ny�other,IcEomS meinSt}s tl [ F i{kM Eizi{{'pfH6fYee ��a�9'9a9s�.�3L..)!1{YF°�3:5R!=S3'Ta3af3" 96�f8�E RFE{�a.Y€T=x�ilES€{{6!)ty;ESEIi{e°�19���i i"�iid4i5ts9pdE�3s!813�!3}figi �fl R 41414$�:i;3$'�E @I: {IiElb4B 6edB •{:.44FiR:! { {' " "i6 {: i6.� R .$41i ¢�fi "'3 seiYd$rawingsof�facr[ityEteEtE;ter,�explatit si99tnattonsj:j(ue.':,adttEEdfiti((ona3lpagl.asne9cessary):.;{$+,_ �Eg' Pe6'.¢§j s i ii i3393,9 8{�j9d}'- d 9j i i 3 3yL;f£¢?4tft]= �,[,�q?ijf!Y'{.Y3 3§43.3 E)93(�d} F�41d Copi ® I' Llal NOte.] 3 pTi{3i{,"y`{} 1 3 9 ! E j gjggE jp $ s 9'3's } i jj 1 j?r� j! F jF jg ¢p g7$� 3L{!. E � FE[E4`jt {jE( [¢ f68§E i£i4F,bb@j lair EIaIga9.�i�'sdk�399&dl{i4dihik7�-¢�t lli�E�i3��h��66I61If�I Ij3�li ux!•8Fj�1��3aaE��l"iS�E-Iarz¢aE91e��1"�E9%%¢; c,n1t. �E , i't!LS3(iG f3t=f8 i7Ht A£ iS» VTR€f`! A4441._ .. •.ems" iti-S):35 Investigation in response to very wet conditions as observed from aerial surveilance. Extremely wet conditions, particularly for field ##4• Pivot spraying into already ponded water directly into and in immediate areas of the ivot. Water did not appear to have but only minimal movement and was not observed during this visit to be leaving the field. Obviously with any drainage the waste would be mixed with any liquids that were drained. Pump started about 10:30; shut off about 3:15. Pivot indicated to make a revolution approximately every 2 hours and a substantial percentage of the spray area is under standing water. There is definite mixing of waste and surface water as observed on the field. End gun programmed to shut off to avoid wooded area, but would have contributed substantially when restarted and spraying into the saturated areas. NOV and recommendation for enforcement action is warranted. Reviewer/Inspector Name .Iolin,°N' Hunt 77 rF' 1�r lf`j` € ` `jj i(({pp999F9t a,�` i {r�ri�:nn; ,sq3 IIy �', e. ;Cff(ji? :¢ r,3s`? EIjjSEyt,jn }�Ji7 1k .ifF4kt ;`7f fafisFt:�. Nh.E Reviewer/Inspector Signature: Date: Type of Visit omp ' nce Inspection O Operation Review O Lagoon Evaluation Reason for aIt outine O Complaint O Follow up O Emergency Notification O Other [3Denied Access ZFacility Number Z 2 Date of Visit: Time: Q Not Operational Q Below Threshold Permitted 0 Certified [r Conditionally Certified 0 Registered Date Last Operated or Above Threshold: ............... FarmName: ..N a.+............t�i?+-............6:3.................. County:..................................................................................... OwnerName: ................................................... ........................................................................ Phone No:....................................................................................... FacilityContact: .....................:........................................................ Title: .................................................. I ............. Phone No:................................................... MailingAddress:............................................................................................0"'"""0"'".................................................... .......................... OnsiteRepresentative:........................................................................................................... Integrator: ....ka. r..l.._0..............................4......................... Certified Operator: ......... /4/1....... f Operator Certification Number: ... 4 ...................................... Location of Farm: f ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' ' " Longitude • S is Desige : Current , Eurre'nf' ;� Design 'Current i'' Swiiae Ca aci Po ulation, Poultry : , ;Ca aci Po ulalion Cattle - , Ca aci :; Po elation _' ❑ Wean to Feeder ❑ Layer ❑Dairy []Feeder to Finish ❑ Non -Layer ❑Non -Dairy �] Farrow to Wean ❑Other ' ❑ F ow to Feeder 1 El Farrow to Finish Total Design Capacity •' ❑ Gilts ❑ Boars : `Totailss • Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area I[] Spray Field Area ti Holrlrng Ponds'/ Sohd-Traps,` ❑ No Liquid Waste Management System 1 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed. did it reach Water of the State? (If yes, notify DWQ) c, If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3, Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4, Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2y Structure 3 Structure 4 Structure 5 Identifier: .................. ..Q... �...................4.. �.............................................. .................................... ..... I....................... Freeboard (inches): 5/Op ❑ Yes !>o ❑ Yes ;>No �o ❑ Yes ❑ Yes ❑ Yes�No ❑ Yes ❑ Yes ❑ No Structure 6 Continued on back acilit3*umber: ( z — 2 Date of Inspection 7 C1 Printed on: 1/9/2001 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes o seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Yes ❑ (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑Yes o 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes o Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes L'� ry 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes No 12. Crop type ' � PSG(,a, & l Ar e, S - / 13. Do the receiving crops Differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? Oe/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility rcgmee a follow-up visit by same agency? 25. Were A r�additional problems noted which cause noncompliance of the Certified AWMP? yiQllGitj>s:oi- defc�ei�cie reQte� �1><rriti9 thjs;vs�ti Yo!wXi� �e��iyeti fut��r _ .. • ctirresporicience: abau� this visit: • .. ' : - : • :::..... . :.........:..... . ....... . piny ❑ Yes IKo ❑ Yes t O ❑ Yes L7 No ❑ Yes o ❑ Yes o ❑ Yes o ❑ Yes o ❑ Yes VZ- El❑ Yes Yes N ❑ Yes No ❑ Yes N;;� ❑ Yes jNo ❑ Yes ❑ Yes No' Reviewer/Inspector Name w,a rf ,,�,�1.,.""a�T.'"r" .wYy , �. 4 Reviewer/Inspector Signature: Date: '•t / / 7 r d / s/1�' Facility Number: L/ Z — Zj Date of I nspection / 9 p Printed on: 1 0/26/2000 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge atlor below es ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 28. Is there an evidence of wind drift during land application? (ix, residue on neighboring vegetation, asphalt, ❑ Yes �No Y g PP P roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? El Yes '�`"'" 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes o 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes o / 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑ I�er 'Uomments and/or urawings: � Bona - 5100 OlRoutine O Complaint O Follow-up of DWQ inspection O Follow-up of DSWC review Q Other Facility Number �� Date of Inspection Time of Inspection �L=�L�t 24 hr. (hh:mm) © Permitted 0 Certified [3 0 Conditionally Certified [3 Registered Q Not Opera tionall Date Last Operated: Farm Name: Zfi1rrr.11 � - County:...,1. ..tL.r ..r ...................................................... Owner Name:... ...................... Facility Contact: ..(? L .... Z.e!,'..M... i...................Title• Mailing Address: PhoneNo........................................................................................ Phone No:... ................................... Onsite Representative:/ d i/� ^..(.. Q.!v..a................................................ Integrator:...................................................................................... ............. ................ Certified Operator:............ ....... .........vtr......................................................6............. Operator Certification Number:.......................................... Location of Farm: .................................................. .... ... ....... ..................... ...... w Latitude �• �' 0�z Longitude �• �' 0's Dt �gn yE Current Destgri Current f nne Ca ace o `illation Poultry Ca aci ;,Po ulataon, ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ F aCv to Feeder EjTarr6y to Finish B-0 ❑ Gilts ❑ Boars Numberof AL' agoon-s ❑ Layer j,.J ❑ Dai �.: ❑ Non -Layer" ❑ Noy sa'� ❑`Other ,Total Design Cap. r• a kTotal SS '❑ Subsurface Drains Present 11C1 Lagoon Area I❑ Spray 10 No Liquid Waste Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/thin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): ............... ............................. ..r....................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 3/23/99 ❑ Yes . ❑ Yes ;�� No El Yes ❑ Yes o ❑ Yes l ❑ Yes L�' 0 ❑ Yes ZNo Structure 6 ❑ Yes >nback Continued Facility Number: C Z — 7_ Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type crr��i 13. Do the receiving crops differ with those 4esignated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents IT. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20: Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility r uke a follow-up visit by same agency? 25. Wer y additional problems noted which cause noncompliance of the Certified AWMP? ��io •yiQla�tQn�s;o� d�f�eieni:ies •vt�re pQte�• ¢iH;tng #h�s'vpsit; • ;Y;o� vvi�� •><ee�iye �o fu�-t�t�r : _ corresporiciei�ce: a foul~ this visit........ ... ..... . . ❑ Yes ago �' ❑ Yes o ❑ Yes f ❑ Yes aVo ❑ Yes No ❑ Yes QdVo ❑ Yes ;��O_ 1i❑ Yes ❑ Yes IrJ'No ❑ YesZN' ❑ Yes ❑ Yes ❑ Yes ONo ❑ Yes ❑'No ❑ Yes Id�O ❑ Yes 6No ❑ Yes mNo ❑ Yes ❑ Yes ;2�� ❑ Yes � o ❑ Yes N� ]Facility Number: ZE=7 Date of Inspection �` Cl(fur Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below es ❑ No liquid level of lagoon or storage pond with no agitation? C 27. Are there any dead animals not disposed of properly within 24 hours? ❑Yes 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ;No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes ONo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes o 31. Do the animals feed storage bins fail to have appropriate cover? rYes 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ No I13 Divisio Soil and Water'Conser�ation Operation Review ©D stun of Soil and Water Conservagon ,Compliance1InLsL�pectront` �s �4 i f I p ` < < I fiv t h`'' khk kit ° , ivision of Water Quality-ComplianceiInspection GG i !Other Agency.- Operation- �. 0 Routine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review 0 Other ■rn I i i w n� F ility Number Z Date of Inspection Z Time or Inspection b 24 hr. (hh:mm) Permitted 0 Certified [] Conditionally Certified Q Registered JE3 Not Operation -al Date Last Operated: r Farm Name: .in.14.L:.r.k<I � r'?' 60.3 County:....... r`�..�..................... ............ I.......... Owner Name: A.0., +}.o....... Z Z S %' Z I 0 5 .......... Phone No:....... .............�............................................ // ril Facility Contact: .4.I.. v ` !"r....C'ra�t....�= ......................Title:................................................................ Phon Nn:`....z.S..Z..`...5��.-.�..��� Mailing Address:.. ......4 ...D... ............Z..L%..U...... 14W7�. ✓ '�......... .���..........I.......Z3.�S.. ................... _........................ r 1 Onsite Representative: ~`� C! �G,G„ Integrator: ✓l r ................ ......... '�t✓'.!4.......Y............................................................. Certified Operator:........i.� 1 j........ ............ Operator Certification Number:.......................................... Location of Farm: 7 , I / 2—,5 . Latitude Longitude �° �" At Number of,Lagoons' - i �.t : ❑ Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area Holding Ponds / Solid Traps €'l ❑ No Liquid Waste Management System r -!I'Ad . � ' Discharges & Stream Impacts __ 1. Is any discharge observed from any part of the operation? ❑ Yes ;2-NO Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made•? ❑ Yes jao h. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) ❑ Yes �o c. If discharge is observed, what is the estimated flow in gallmin? d. Does discharge bypass a lagoon system? (If ycs, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): ........�.�.1`.......... .................................. ..... .�......................................................................................................................... .... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 3/23199 ❑ Yes N ❑ Yes Ng," ❑ Yes WNo Structure 6 ............................... ❑ Yes No 7/ Continued on back Facility Number:, L Date (If' Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered, yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes ;2- �0� ❑ Yes Imo ❑ Yes ❑ Yes No ❑ Yes,Vo<� ❑ Yes 12. 13. Do the receiving o differ with designated the Animal Waste Management Plan( ),_,..,..,..___ fNo P yP .aG. g p g g CAWMP ? ❑ Yes 14, a) Does the facility lack adequate acreage for land application? ❑ Yes b) Does the facility need a wettable acre determination? (es ❑ No c) This facility is pended for a wettable acre determination? iKs ❑ No 15. Does the receiving crop need improvement? El Yes No 16. Is there a lack of adequate waste application equipment? ❑ Yes ldN0 Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes 2<04 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) , ❑ Yes ZrNo 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes o 22. Fail to notify regional DWQ of emergency situations as required by General Permit? .(ie/ discharge, freeboard problems, over application) El ;No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? El Yes 24. Does facility require a follow-up visit by same agency? ❑ Yes o 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Ye ❑ No 0, Nd •VIOlatiORs *ot. deficientcipS •were hotf'd. daring (biS.vlslt.. Yoit will •reegiye 0a furthgr: • . - . :•corresnonc�ence:about:thisvisit.:•.:::::::..::::-:::-:-: :.:..............::. Comments{re€er to question #)i liplarn,any,YE811. a''nd/or any recommendations'or"any other comments.s r `.+ j a i Use draw►ngs of €qc�i�l. rcttd o.betterexplainsttattons (eadd.t:ht ' ¢o v nal page§,as neeesary�.T x � c �A .d u w� /�iys II A" d �y c ,� w Fl,` sue- c Tt-� t r�pr,`..' A. 12`� C A +► -C' tf-d •GEC p.- 1 p w I„�r • f r� rX v,. �'p.-� .� I SG�,nw�^�i- �Ap/J /�/� r4au t� 6 ) 61XW-�kASt r-trtf1 S-d`'` „arS'es fir/dr9 ,d,j s �tro r,� S o a,. ti/a, S / • �r/f ' �5► c R-� ¢I C r .i G111.e�rt �l h �/ f yf � di^ S i �} e-, r 4, . f r S c rf .J'� /-'6r- w,t✓1�4/jt • J � *,, Aa4, ram- 4-0 a,-r,• e � 4-4-dr s •� �-r 1 d d mot. ¢•tom. � r Reviewer/Inspector Name •- r.z mar r - j rt 7vIT", k. F :: h � 4 Reviewer/Inspector Signature: Date: L Y/ 9f�� 3/23/99 D' ' ion of Soil and Water Conservation ❑Other Agency MIN ��� BDivision of Water Quality F #� { ...�„ �i< Q,��;. .. � ;: >^�"�•� ;,,. ,,�:: k� <. Satz �x �*�,� „^^ :.rya �f �9 !� "G�a& :<��� �-. �,,,� a+r,sc:,. � �?' � � : ,� �a l � #§:; Routine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-u of DSWC review 0 Other Date of Inspection 0 Facility Number Time of Inspection 24 hr. (hh:mm) Registered Certified [3 Applied for Permit © Permitted JE3 Not Operational Date Last Operated;,,,,,,,,,,,,,,,, Farm Name: .... 0J! _rK.0.jj_g ...... �"� �%'!�..,.. �... County:...,t.- 6' 6?.z.............................................. .............. ............................ Owner Name....... SM..' I� rl a.J , vf� ��!Q i ....... Phone No: ....................................................................................... Facility Contact: 1 !� . �. �'� v .... Title: .......................... Phone No:...,............................................... .......................................... Mailing Address:... �,....�.. 4...X...{..L.� �..... ..�.`�.........'�!�- ..Z�?..�.g..�....../............................................... .......................... Onsite Representative:..!:1..�.✓. LW-n .... .�.✓..!.."1...f . t�. ..... Integrator:...`.?.!7�.8.'S.............................................. Certified Operator._. ............ ......................................................... Operator Certification Number ......................................... Location of Farm: S 0- / f........................................._........................................^ .................... y.................,.......... -............................... Latitude Latitude Longitude 0• �' 0" �� z �' Destgti : .current Design Current '' t. Design Current Swine � Capaelty� Poputattop Poultr Ca" uci Po ulation, Cattle . Ca act Po ulaho _.y P t3' ,.. P P. . Y . p.._. n PF Wean to Feeder ❑Layer ❑Dairy eeder to Finish ❑ Non -Layer ❑ Non-DairyFarrow to Wean V;f; ❑ Farrow to Feeder ❑Other fA:- Tr to Finish Total Design Capacity. ❑GillsAll ❑Boars " ; �,, Total SSLW_ u Subsurface Drains Present 110 Lagoon Area I© Spray Field Area No Liauid Waste General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance ratan -made? b. If discharge is observed, did it reach Surface Water'? (If yes, notify DWQ) c. If discharge is observed, what is the estimatecl flow in gallmin? d. Does discharge bypass a lagoon systern? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes N ❑ Yes No ❑ Yes ZN_�� ❑ Yes rNo ❑ Yes ❑ Yes ❑ Yes ❑ Yes NV , ❑ Yes VIA 7. Did the facility fail to have a certified operator in responsible charge'? 7/25/97 ❑ Yes /0No Continued an bac3 r� Facility Number: Z — Z 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes LSO Structures (Lagoons,ttold ine Ponds, Flush Pits, etc.} �. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes ❑ No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: P Y Freeboard(ft): .................1................................ I............... ........... ........................ .............. ........... ........... .................................... ........................ ............. I 10, Is seepage observed from any of the structures. ❑ Yes -2�''oo 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes No 12, Do any of the structures need maintenance/improvement? ❑ Yes (if any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type f .�re�! nJl f...��` .C... L................................................. ............................................................. 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24, Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? 0 No.violations:or. deficiencies were;noted;during this;visit: You,will receive.no.furiher •:�correspQndeitcetib:outthis'visit:•:•�.�:�.:�:���:• •:�..�:�..�:�..•:-:-;........ ❑ Yes Yes .Jd'lVo ................................ .. ❑ Yes No ❑ Yes to ❑ Yes ;�O ❑ Yes No ❑ Yes No ❑ Yes No Yes ❑ No ❑ Yes L�l'No ❑ Yes ❑ Yes ��N� o OC,V", CL 4- -; & -�F -4,,p,, -4 1cle, - 7- jco t-t� 4D C,,Oq t3.,s-A & b,7 o 7 c- r,4_C,V"_ .1 5 o-,, r�?q 01 I 7/25197 Reviewer/inspector Name 3 �/ # .`.rs- iJ.Y/..rv"::.`..:(X ..+;r�, Reviewer/Inspector Signature: Date: ❑ DSWC Animal Feedlot Operation Review ❑ DWQ Animal Feedlot Operation Site Inspection e —Routine-0 Complaint 0 Follow-up of t)"7 ) inspection 0 Follow-uE of DSIVC; revicxv .0 Other �] [.Da1jt,(,,IInspection Facility Number rintt'Iuspection 0 24 hr. (hh:mm) Farm Status: a Registered ❑ Applied for Permit ❑ Certified ❑ Permitted Total Time firs fraction ot'hours (ex:1.2; for 1 hr 15 min)) Spent on RevieH,hC- or Inspection (includes travel and procv Mng) l] \ot ) )erational I Date Last Operated.................................................................................................. .... l' Fo /. Farm Name: (,l 1 lX .5 Counts. �� � r �G1.........................I............... Owner Name: �G.Y .S?..� ......Foe? d.�....... ....... Phonc .No: '� .�' /b 9......................................... rM............ �................................. Facility Contact: ....,.. J. M....4 .�.Ql`rM..E..!(................ Title: ..J...:.!,.�ntn. �.f� .......,.,.....,... Phone No. ...... �....`�..: .L. ......... Mailing:Address........ �r.�.,....t3��.....1��0................... I ....................................... ........................... .................. .......................... Onsite Representative:...ZO. ............................................... Integrator........................ I............. Certified Operator ........K��,,►t... ...... ....................................................... Operator Curt itication Number ......... I S S.I`i Location of farm: ..............................s.f..s.,..................................................................................................................................... Latitude • ©',ii Longitude i , f I+ ®Z r :9 Type of Operation Swine L Design Current Design Current Capacity Population Poultry Capacity Population ❑ Layer ❑ Non -Layer ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish t)Q ❑ Other Design Current Cattle Capacity Population ❑ Dairy . ❑ Non -Dairy Total Design Capacity 1 60 Total SSLW : 8 50 Number of Lagoons / Holding Ponds E= ID Subsurface Drains Present 110 Lagoon Area ❑ Spray Field Area General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Di.scharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. 11 discharge is observed, was the conveyance man-ntade? b. If discharge is observed. did it reach Surface Water? f f ' yes, notify DWQ) c. if discha r-e is observed, what is the estiurated flow in callmin? d. Does discharge bypass a lagoon system'' (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge'? 5. Does any part of the waste management system (other than lagoons/holding ponds) require nwi ntenancc/improverttcnt? 4/30/97 ❑ Yes No ❑ Yes IJ No ,+ ❑ Yes ❑ No 1"a ❑ Yes ❑ No jjtk, ❑ Yes ❑ No ❑ Yes EKO ❑ Yes 1 do ❑ Yes Mo Continued on hack Facility Number: — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? S. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoow and/or Holding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure I Structure 2 Sin►cture 3 Structure 4 Structure 5 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? MMle Application 14. Is there physical evidence of over application'? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type................................................................................................................................................................................................ 16. Do the receiving crops differ wiih those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewerfinspector fail to discuss review/inspection with on -site representative? For Certified Faciditigs Onl4' 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes No. ❑ Yes 0 No ❑ Yes 0 No Cl Yes • No Structure 6 ❑ Yes Q'No ❑ Yes ❑ No ❑ Yes ❑ NV ❑ Yes E No ❑ Yes d No ❑ Yes ❑ do ❑ Yes [}No ❑ Yes ❑ No ❑ Yes O No ❑ Yes [No ❑ Yes E3 No ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No Reviewer/Inspector Name T Re. viewer/Inspector Signature: Date: cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Mr. Rudy Grammer Smithfield Carroll's P.O. Box 1240 Waverely, Virginia DFHHNFZ DIVISION OF WATER QUALITY May 19, 1997 23890 Subject: Compliance Evaluation Inspection Facility # 42-23 Carroll's Farm # 63 Halifax County Dear Mr. Grammer: On May 6, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the Swine operation was not discharging wastewater into waters of the State and that the waste lagoon had the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal_was.te.__management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, North Carolina 27609 C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper Mr. Rudy Grammer Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an "Operator in Charge". it shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, ._. Judy Garrett Water Quality Section Supervisor cc: Mr. Jeff Dillard, Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District (Halifax County) Ms. Margaret O'Keefe, DSWC --- RRO DWQ Compliance Group RRO Files 42-23 ❑ DSWC Animal Feedlot Operation„ Review ---- �Q.Animal Feedlot Operation Site inspection 0 Routine GrCOMpl2int 13 State employee tail 0 Follow-up of DWQ inspection Cj Follow-up of DSWC review Date of Inspection Facility Number ZL Time of Inspection Use 24 hr. time Farm Stators: � Total Time (in hours) Spent onRe, -iew ; �D or Inspection (includes travel and processing) Farm Name: rA)-,-v 11S /��;q0-- A' 6 Z _ County: r 0 t Owner Name: f �� �"/`r s Phone No: Z Mailing Address:- r /Onsite representative:�!'� Integrator: 1 i Y Certified Operator Name: Location of Farm: Latitude ®••�" N Longitude ®a 3©4 U` Q Not Operational Date Last Operated: ype of Operation and Design Capacity Pouitrw Cattle Number Number Number. ❑ Wean to Feeder ` ❑ Layer ❑ Dairy n-Laver 10 Beef 7, v [I Other Type of Livestock Q Feeder to Finish FMMw to Wean Farl6w to Feeder a ow to Finish ti! P :.;, Number o Lagoon Holding. p Subsurface Drains Present 13 Lagoon Area S0rav Field area Gener�i 1. Are the.e any bufers that need maintettancelimprovement'? 2. Is any discharge observed from any part of the operation? a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it roach Surface Water? Of yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gaVmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Was there any adverse impacts to the waters of the State other than from a discharge? :. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 1 ❑ Yes 2<o ❑ Yes ZINO ❑Yes, ❑ Yes L�fNo ❑ Yes �'Na i ❑ Yes N ❑ Yes No ❑ Yes No Continued on back 7. L iL4 ch.- facility fail to have a certified operator in responsible charge (if inspection after 1/1/97)? 8, A:e there lagoons or storage ponds on site which need to be properly closed? Structures (La dons and/or Holding Ponds 9. Is structural freeboard less than adequate? Freeboard (ft): Lagoon 1� Laaoon 2 N ^ NLaoun 3 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance!improvement? (If any of questions 9-I2 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adquate markers to identify start and stop pumping levels? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15 Crop type. ��_ S,n !� r,. 5 .....__..... ..... _ _. �. . _ ..___. 16. Do'the active crops differ with those designated in the Animal Waste Management Plan? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the cover crop need improvement? 19. Is there a lack of available irrigation equipment? For Certified Facilities Only 20. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 21. Does the facility fail to comply with the Animal Waste Management Plan in anyway? 22. Does record keeping need improvement? 23. Does facility require a follow-up visit by same agency? 24. Did Reviewer/Inspector fail to discuss review/inspection with owner or operator in charge? ❑ Yes 2No ❑ Yes No ❑ Yes 2reNo f Lagoon 4 .-...._.....�......_. � Yes El Yes NO ❑ Yes t 'a ❑ Yes 0 ❑ Yes 1 0 ❑ Yes , o ❑ Yes I�No ❑ Yes o ❑ Yes 1 o ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Gip/qLN -} � �✓os-�.s r�-�, ,,►-. �-N�.t,/ �-, cn, s' - S-�7. � � w� � 3•�:1 e y C /�-1- G� � �l�iN�f Rerieiver.!1n5pecror Nome _ �il �S��I� _ �D ��✓:�!`/ h r Rcvi}Fer:InspectarSignature:,� _ Date: cc: Division of Wafer nualin% Water Quulin, Section, Fac•rlin-.-lssessment Unit 1 Ii l-4 95 r State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr„ Governor Jonathan B. Howes, Secretary A4� DEHNR DIVISION OF WATER QUALITY August 26, 1996 Mr.. Rudy Grammer Smithfield--Carrolls P.O. Box 1240 Waverely, Virginia 23890 Subject: Compliance Evaluation Carrolls Farm # 63 Facility # 42-23 SR Halifax County Dear Mr. Grammer: Inspection 1117 On August 7, 1996, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that this swine facility was not discharging wastewater into waters of the State and that the waste lagoon had more than the required amount of freeboard. There was a Waste Utilization Plan onsite and it was determined that records were being kept to show waste application events: As a result of this inspection the facility was found to be in compliance with the State's animal nondischarge rules. Effective wastewater treatment and facility stewardship are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh. North Carolina 27609N%`f C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 500% recycled/ 10% post -consumer paper ME Carrolls # 63 Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an " Operator in Responsible Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (9.19) 571-4700. Sincerely, ICj(,6 �. 460� Judy E. Garrett Water Quality Supervisor cc: Halifax County Health Department Fishing Creek Soil and Water Conservation Steve Bennett -Regional Coordinator, DSWC RRO File Copy District (Halifax) Facility Number: L�_ Z.3 Division of Environmental Management Animal Feedlot Operations Site Visitation Record Date: _74� Time: r 3 Z,,r General Information: Farm Name:_ C�k✓d/a A;T/4, Owner Name: 42L`d/<1 r u �-S Phone No: Z703 3S/ z(o On Site Representative: Y-- Integrator: Cq l/S Mailing Address: 0 ! Z Ct -4- t:z_ Physical Address/Location: 1123 Vic. s Latitude:_/L( / 3"3 Longitude: _ % 7 1-3 0 1 2_ Operation Description: (based on design characteristics) Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle U-Sow St? o ❑ Layer ❑ Dairy ❑ Nursery ❑ Non -Layer ❑ Beef 427eeder 5� "v OtherType of Livestock: Number of Animals: No. of Animals -7 Number of Lagoons:y" (include in the Drawings and Observations the freeboard of each" lagoon) � I r-ra"I v-,vr I La o ++" Facility Inspect_ lorL Lagoon Is lagoon(s) freeboard less than 1 foot + 25 year 24 hour storm storage?: Yes ❑ No Er Is seepage observed from the Iagoon?: Yes ❑ NoJ2-'- Is erosion observed?: Yes ❑ No Is any discharge observed? Yes ❑ No ❑ Man-made ❑ Not Man-made Cover Crop Does the facility need more acreage for spraying?: Yes ❑ No ❑ Does the cover crop need improvement?: Yes ❑ No ❑ ( list the crops which need improvement) Crop type:_ UbyA5 Acreage: L Setback Criteria Is a dwelling located within 200 feet of waste application? Yes ❑ No Cy, Is a well located within 100 feet of waste application? Yes ❑ No Is animal waste stockpiled within 100 feet of USGS Blue Line Stream? Yes ❑ No Is animal waste land applied ors spray irrigated within 25 feet of Blue Line Stream? Yes ❑ ' Nov P Y g A01 -- January 17,1996 Maintenance Does the facility maintenance need 'improvement? Yes ❑ No Is there evidence -of past discharge from any part of the operation? Yes 2No ❑ Does record keeping need improvement? Yes ❑ No Did the facility fail to have a copy of the Animal Waste Management Plan on site? Yes 21/'�'No ❑ Explain any Yes answers: O' -/ , i14- A c1, re,4, r IV Q D -sc,4-Sir---7 7fi`5 ! �A- G� b�, /�l� r b r o,s�� rr9 ��-� h � ff l��•-� 4� � �r�6i� cc: Facility Assessment Unit 12rawings or _Observations_ AOI -- January 17,1996 Date: Use Attachments if Needed .~_ JUL-14-1995 15:2E FROM OEM WATER QUALITY SECTION TO RRO F'. 0?i22 Site Requires Immediate Attendor _ Facility No. q7 - z DWISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VTSITATION RECORD DATM: -7 - 23~ , 1995 r Time: Farm Name/Owner_ v Mailing Address: _ #0' 0 ti 0 x- 12 Z-/ Q 63 ' County: 'FFl Integrator. Phone: On Site Representative: Ou w✓ Phone:L(o Phvsical Add=s/Locadon: L- '1 Oyn f 5 iz //?_� U F F Type of Operation. Swine Poultry - Cattle Design Capacity: — „ 4 o d Sa-,l Number of Animals on Sire: Number: DENI Certification ACE_ DEM Certification Number: ACNEW Latitude: b-' _63 Longitude: 77 6 Elevation: Feet Circle Yes or No .Does the Auinai Waste Lagoon have svfflcienr freeboard of i Foot + 25 year 24 hour storm event (approximately 1 Foot t 7ialches) Y or No Actual Fzeeboard: fit. Inches Was any seepage observed from the-lagooti(s)? Yes r No Was arty erosion observed? e rNo Is adequate land available for spray? Yes or No Is the cover crop adequate? Yes or No 7 ¢, 7 Crap(s) being utilized- 0 z, nfJ Y,- C-r i 1V _ _ ^ _ t.v L [: c� s Does the facility rneet SCS miairrium setback criteria.) 200 Feet from Dwellings? Ye or No 100 Feet from Wells? a or No x _ e animal waste stockpiled within 100 Feet of US'GS Blue Line Strcam? e No ardmal waste land applied or slrray irrigated within 25 Feet of a USGS Map Blue Line'? Yes or N animal waste discharged into waters of the state by roan -made ditch, flusbing system, or other ;irn:;a_r man-made devices? Yes or No If Yes, Please Explain. 7-)4 ms the facility maintain adequate waste maztagemcnt .Tecords (volumes of manure, land applied. spray irrigated on specific acreage with cover crop)'? Yes or No Additional Comments: C2iyl4-0Ly�?'� LVmj one _W,cF,I F',0j ' d,74edm j(Lo•1IJ11 S• OC'rS�!+ .-.I�+ra S.� e_ � ^- - ���"' F _fLcJw�. +�Mrb �-t �.0 /^� ,5'.[.fi- 5'�(i F r �► ,l/%�/ cc: Facility Assessment Unit Use Attachments if Needed. TOTAL P.d2 ....w. TO JUL-14-1995 15 : 2e FROM DEM WATER QUALITY SECTION RRO P.02/02 Site Requires Immediate A nentior Facility No. e/Z_-Z� DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE'VISITATION RECORD DATE: i - ?sr — , 1995 Time: Farm Name/Owner: Mailing. Address: •_�' d County: Integrator. Phone: On Site Representative: ' ►11 ► 6 Phone: 3" a _f ? Physical Addressa ocation: L"'o F �J�iL /� Z� i7 F F S/z /// ? Type of Operation: Swine LX2- Poultry Cattle. Design Capacity: _ d S70p%/ Number of Animals on Site:. 4/Z_� o DEM Certification. Number: ACE DEM Certification Number: ACNEW Latitude:.' j ' " Longitude:_'" Elevation: _ Feet Circle Yes or No Does the Animal Waste.Lagoon have sufficientfreeboard of l Foot + 25 year 24 hour storm event (approximately I Foot + 7 inches) Desor No Actual Freeboard: _: R. Inches Was- any seepage observed from. the-lagoon(s)? Yes r No Was any erosion observed? e�r No Is -adequate land available for spray? Yes or No 7 Is the cover -crop adequate? Yes or No 7 Crop(s) being utilized. J Does the facility meet SCS minimum setback criteria? 200 Feet from Dwellings? e or No 100 Feet from Wells? or No -.nc arirnal waste stockpiled within 100 Feet of USGS Blue Line Stream? a No animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes or N animal waste discharged into waters of the state by inan-made ditch, flushing system, or usher � iimilar man-made devices'? Yes or No If Y -s, Please Explain. L {. 5 the fie:ility maintain adequate waste martagcmcrir records (volumes of m2Aure; land applied, spray irrigated on specific acreage with Lover crop)? Yes or No Additional Comments: [aYl4P.y p a+ wqj _ wog r / _/ ��h_ G� e F� �/ 0� r r r•lam_( F Signature cc: Facility Assessment Unit Use Attachments if Needed. TOTAL P.02