Loading...
HomeMy WebLinkAbout420010_PERMIT FILE_2017123104 Type of Visit: 0 Com 'Once Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: rrival Time: Departure Time: Z® County: Farm Name: Owner Email: e Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: E3' L( t 1 r3g 1' / / Back-up Operator: Location of Farm: Title: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Region: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry` Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Non -La er Dairy Cow Dai Calf Wean to Feeder Feeder to Finish Dairy Heifer FaVow to Wean Des€gn C•urrent Dry Cow arrow to Feeder 6717e Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Qther —Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [:]Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ZNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) [] Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesFNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facility Number: -i Date of Inspection: / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [] Yes gN0"' ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): t t 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2rNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not property addressed and/or managed through a ❑ Yes No ❑ NA [] NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental rest, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYPe(s): r� 14, 5/4- 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA go ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 25 No ` ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfer ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspection ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued jam' Z_ Facili Number: Z - Z,0 1 jDate of Inspection: ( Irl2-- 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ENo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes KNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes:No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes D NA ❑ NE and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 0 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No [] NA ❑ NE Comments (refer to question ##): Explain any YES answers and/or any additional recommendations or any other,comments, Use drawings of facility to better explain situations -,(use additional pages as necessary).,:-'T 231 r z_ Reviewer/Inspector Name: Reviewer/Inspector Signature: (l 6f f ` �L ,,!r 41"4 C Page 3 of 3 Phone: Date:12- 2/4/2011 (Type of Visit: Q Cance Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Cy` 2-) Arrival Time: Departure Time: County: Farm Name: C�}12h� 7� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Coat &i9-Q t' h Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator, Certification Number: Certification Number: Longitude: Region: Sw Design C parity MR1, Current Pop: Wet Poulfr a Design Current Cap ca ity Pop. Cattle Design C Trent Capacity Pop. Wean to Finish d-4(33 Layer Dairy Cow Wean to Feeder Non -La er Da i Calf Feeder to Finish IDairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D , Roul III Ca acillPa . Non -Dairy Farrow to finish JLayers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets L Beef Brood Cow Turkeys Other' TurkeyPoults Other Other a I-: �Noo Dischar es and Stream Impacts I. Is any discharge observed from any part of the operation? ❑ Yes 21 NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [] Yes ❑ No NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued / Facility Nbmber: U/ Z - f 0 1 ; - I Date of Inspection: /0 - 2 —% I Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? e'N; NA No ❑ NA Structure 6 ❑ Yes VNo. ❑ NA ❑ Yes No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environFNoZ reat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes CZ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 ibs. ❑ Total Phosphorus [] Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window [] Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): r At J61- 13. Soil Type(s): 14. Do the receiving; crops differ from those designated in the CAWMP? ❑ Yes NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes VT.146❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA jNo ❑ NE IS. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists [:]Design [:]maps ❑ Lease Agreements ❑other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes UVo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued r'�_ Facili Number: Z - S Date of Inspection: 0 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes N [] NA ❑ NE 25. is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26, Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes -No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑Yes No ❑NA ❑NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes [:]No ❑NA []NE ❑ NA ❑ NE ❑ NA ❑ NE a ..... . . .. ......... ... . ......... C©mments'(referrto. uestion #1..€ExRla n' an ';YE .answers andlor,.nn{/'adilitranallrecommendations•or'any ot#i'er comments ,�., ➢ - / i � dl � :I � .% !.I � . uim€€t� !,i,a�rpl,,€catPlPr€tf<dl (II Gd n !! III 11 1, fifitar€pi'ii!?l1i4>�fllrlfli� !i€ , t, i u f I P( s1i 11� !iP Ill i @ dl! .f. a es �m,-,neecessi� lilfi (I l d lrlit �r ltP i i l ? � rlllfr(l idi,`�' +li? hl {'rl ltll lid'#1 i6JFl�3 lliir j It { i i , Use drawjngs,offacili,,tobetfer,,explamasetuatiotisl,(use;addiionahp .g Reviewer/Inspector Name: Phone: 6?19 ?9% V U p Reviewer/inspector Signature: f 5e, .540k C r w -e- Page 3 of 3 Date: l d" 2— I S 21412015 M. 1Type of Visit: ,EO Co nce Inspection O Operation Review O Structure Evaluation O Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: _ -417M_ �J _ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: On site Representative: Fv r, Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Rai€ "$ =dc)! € n is DesignCurent DesignseurrentDyy►esE Gur:rent Capacityop. '-�� Wet Po dtry ���.k'��Swi Capacity Pop. Cattle Gapacity Pop. can to Finish Layer Dair Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish Dai Heifer Farrow to Wean Design 'Current D Cow Farrow to Feeder Dc ,ll?oult . ; Ca aci Plop. Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys :Other ; : Turkey Poults Other Other SfVtInlVM.emlaw.aif itulalu W€pylhnl/L€ii}gt6p}yN'.HfYIlhN9.f4wnYftrtzl[Enal Widdilaula1111iiiPat6 MMaEx Ea€elY:nw€aEF![EtlanNaEH.IBai4exbttX}�Mk814lffllxllaes%PE[E[Illatlef@EetiatanalY;A €3iYla[NYaif � Discharges and Stream Impacts I. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes o ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Faefility Number: 2- Date of Inspection- 10, 2- / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? El Yes o ❑ NA [] NE a. If yes, is waste level into the structural freeboard? I ❑ Yes i�lo ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): - 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Zj No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment hreat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes!No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yeso ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? I I. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 2rNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN 0 PAN > 10% or l0 lbs, ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area rWindow 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ YesVNog ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes VN❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall InspectioVO�NA dge Survey 22. Did the facility fail to install and maintain a rain gauge? El Yes ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: Z - ( Date of Inspection: yoo �- 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Z No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Ycs ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [] No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 0 Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE IV 0- 3,7? CA t , 6".v Reviewer/Inspector Name: �C?'- 5--(2 Phone: 7 ! I - y 20 0 Reviewer/inspector Signature: tat,-sP2- _ (pi,{Q— Page 3 of 3 Date: 16 - Z ` 1 1 21412015 -A. Type of Visit: fiD Co nce inspection Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up Q Referral Q Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: y5 Departure Time: 4 t7 County: Region: Farm Name: re -1-n A, 5' Z Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: L tN- 21 N iA �_ q Integrator: Certified Operator: Back-up Operator: Phone: Certification Number: Certification Number: Location of Farm: Latitude: Longitude: Design Current ine Capacity Pap. Wet Poultry Wean to Finish La er Design Current Capacity Dai Cow Qesign Rllpeit Capacity P Wean to Feeder LFNon-Layer DairyCalf Feeder to Finish DairyHeifer Farrow to Wean /S Design C*urrent D Cow Non -Dairy Farrow to Feeder Dr, P.uultr, Ca aci P,o Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow 111. Other Other Turke s Turke PouIts Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes eNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes [] NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes INo [] NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? [] Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [] No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Farili N�imber: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [3NA [3 NE a. If yes, is waste level into the structural freeboard? ❑ Yes❑ VNo NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 1257No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a []Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental hreat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [] NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 2 /No/ ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): l '' r M kc—J4—, 5'^ 9 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA gNo ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA g ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ YesN ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP []Checklists []Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZNo ❑,NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfer Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facility Number: Z- f2 Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes NNA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes rNo NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes;�No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [] No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the ReviewerlInspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE se sl#el L-40' 4 un� Po q r 2 cA . k .-( R Z & --- pi um-i 4) 3 ti j J, f - aw4- C— ,34n A S I ti4x- re-"W4— L Clt, l r 6 rq-iL, jj• ( C , ; —/ 7 Reviewer/Inspector Name: Reviewer/Inspector Signature: ] . S TM,4 e— t/ Page 3 of 3 Phone: Date: �t) — ` {7 21412015 Z_r Type of Visit: fQ Once Inspection U Operation Review U Structure Evaluation U Technical Assistance Reason for Visit: Routine O Complaint O Follow-un O Referral O Emergenev O Other O Denied Access Date of Visit: '-I _ 6. 1 Arrival Time: t-- Departure Time: O b County: Farm Name: M_Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: & da f Q14 -e a e'iJ Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Region: Swine Design C*apacity Current Pop. $ Design: Our ent Vet Poultry .g C city{{ Pop. k tta�tt'r'Y La er Non -La er Cattle Dai Cow Dai Calf Design Current Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean # Den i]r� Poultry :; Ca aci pol :Current Po . Dai Heifer D Cow Non -Dairy Beef Stocker Beef Feeder Farrow to Feeder Farrow to Finish Lilts La ers Non -Layers Boars Pullets Beef Brood Cow Qther, Other Turkeys Turkey POUItS Other f'iNiY1f�Y.Y.� �! mYiFi 1.'�i1:#!CY Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State`? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation'? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Ntt ber: - Date of Inspection: ' f'i ' G - a Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? El No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) /No 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment hreat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ YesVNo❑NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes C2 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 4N ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): i3e r o, k.d 13. Soil Type(s) 14. Do the receiving crops differ from those designated in the CAWMP? a ro riate ❑Yes 0 I�Io ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ©% ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application'? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? D Yes VD NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes[Zy ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available'? If yes, check ❑ Yes No ❑ NA ❑ NE the box PP P ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ElYes To ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued r Facili NUZ er: - Date of Inspection: y G 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ONco)�DNA ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes VNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document D Yes❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ON E ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Cornmetits `(refer to question. #): Explain any YES answers and/or any additional; recommendations or any other. comments. Use°drawinas of'facility to better explain situations (use additional pages as necessary) .. . De rt' L i e_ n Cy Po ► - k� o*- - d v 1' 6 to-�, o4c5 �h�Q. 5jgdjp,-sur✓e( 1(-(51 /6 t,j = �, j9 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: ­7 11 — t1 2-#o Date: � ' (d7—IL 21412015 _f6_. Type of Visit: ® Co ance Inspection O Operation Review 0 Structure Evaluation Q Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 19 7'( Arrival Time:I tZ_J-[L I Departure Time: County: Region: Farm Name: Po' x)-' SZ_� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: C Age— 1(9 h e- e'w-' Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design wine C Sapacity Wean to Finish C►►arrant Design Current Fop. W�t!wn_acity Pop. Layer Design C►arrant Cattle Capacity Fop. Dairy Cow Wean to Feeder 11 jNon-Layer I E] Dairy Calf Feeder to Finish 1111111N1111111111 Dairy Heifer Farrow to Wean Farrow to Feeder Design Current D . F,ouI . acit P,o . Dry Cow Non -Dairy Farrow to Finish JLavers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other keys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? / d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No [0]N ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yeso ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412014 Continued Facility Number: Z d I jDateof inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes -NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes��NoM NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �! 5. Are there any immediate threats to the integrity of any of the structures observed? [I YeseV2Z ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ONE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t at, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes — Noo 0 NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes CVO ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) TTT 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): / 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15, Does the receiving crop and/or land application site need improvement? ❑Yes WN ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E"No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes eN ❑ NA [] NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall InspectieNo Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA ❑ NE Page 2 of 21412014 Continued FAility Number: - Date of Inspection: -- - j 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes�No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No [:]Yes [:]No [3 NA ❑NE ❑NA ❑NE ❑ NA ❑ NE Comments (refer to question #): Explain any.yES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional°pages a}snecessary) (,q d5l, "aQ � I. 2 6 / v x/ � 3- 3 D 0 r, lf. S o Reviewer/Inspector Name: Reviewer/Inspector Signature: l�l t 5 7 0-7t- �Z Zf J Page 3 of 3 Phone: �� /" Y Zeds Date: —1 y— (-s _- 2/4/2014 Type of Visit: X Compli Inspection Q Operation Review Q Structure Evaluation Q Technical Assistance I Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: © Departure Time: 0 County: Farm Name: I- 'L— Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: u:� i2 l &L't ZL'n _- I Integrator: Certified Operator: Back-up Operator: Phone: Certification Number: Certification Number: Location of Farm: Latitude: Longitude: Region: Design ulen III Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish Dai Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D , P,onitr Ca aci P,o , Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other I==Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) fh 11 ❑ Yes No ❑ NA ❑ NE ❑ Yes rNo"' ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters o t e State (ga ons) . d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes /0[] NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Faeili Number: jDateof Inspection: 2•- �� Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 2 Structure 3 Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Structure 5 ❑ Yes ❑ Yes 5�Z— No ❑ NA ❑ NE No ❑ NA ❑ NE Structure 6 No ❑ NA No ❑ NA ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes VNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes <No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift [] Application Outside of Approved Area 12. Crop Type(s): 1 rr'' k J-14 •z rq rsk- in 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑Yes ,�] ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [] YesVIN, ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes Z� o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste TriNo fers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield El120 Minute Inspections ❑ Monthly and 1" Rainfall InspectiSludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o [3 NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: V Z_ - ! 2 1 1 Date of Inspection: l2 •-f / 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [:]Yes �O ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document 0 Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ONE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.. Use'drawings of facility to better=explain situations (use additional pages as necessary). l h ` f-C sit vv `� 2__ 24 Reviewer/Inspector Name: Reviewer/Inspector Signature: Phone: 79 ( ^ V ZC%C_> Date: l Z �/ 5��� 21412011 Page 3 of 3 V f -27 -( Type of Visit: C Coin nee Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: -IL J Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: t� A a- 1 0-6-1 G,0— yk'� Integrator: Certified Operator: Back-up Operator: Location of Farm: Phone: Certification Number: Certification Number: Latitude: Longitude: Region: Design Current Swine Capacity Pop. Wean to Finish Wet Poultry Layer Design Capacity I I Current Pop. Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Wean to Feeder I INon-Layer Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Q—rxylP,outt . Layers Design Ca aci4YP,o Current . Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Gilts Non -Layers Boars Pullets Turkeys Other Turkey Poults Other Other Discharses and Stream Impacts I. Is any discharge observed from any part of the operation? ❑ Yes No 0 NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes o ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ YesFNoM K' ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑YesA ❑ NE of the State other than from a discharge? L\� Page 1 of 3 21412011 Continued lFacKity Number: - jDate of Inspection: 3 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): S— rl 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Structure 5 N ❑ NA ❑ NE No ❑ NA ❑ NE Structure 6 ❑ Yes 0<0 NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental th at, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes o ❑ NA ❑ NE maintenance or improvement? Waste A1312lication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): % / k J iq i :5741 9 —A -' n s v 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �"N NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA TNo ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists [—]Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [] Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections []Monthly and V Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued lFacitity Number: Z - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ZrNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Ef ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments refer to question # • Explain an 'YES answers and/or any additional recommendations or. an .other,cominents ,,, J t'` Use drawings of facility to better explain situations (use additional pages as necessary). JCGc �Ln �` �� c�! Gam, L ; �� �� -f-, `,� . Reviewer/Inspector Name: Phone: 71 ! ` C) Reviewer/Inspector Signature: (3 Lt S 4f2 (_0Q 4? E 1 Page 3 of 3 Date: &1%2 ziaaall L(t k t ype of visit: o nce inspection v operation tcevtew u Nrrucrure Evaivatron V i eennecat Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up Q Referral 0 Emergency 0 Other 0 Denied Access i u. nn u� Il. unntlw YiTi IIIi YI���W� Date of Visit: �l 1 !� Arrival Time: Departure Time: 1 Z (] County: Region: Farm Name: r 4 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: [ Pt `� &kecr `t Certified Operator: [� 3 r — 1 (_3 A a et Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry ` Capacity Pop. Cattle Capacity Pop. Wean to Finish La er iry Cow Wean to Feeder Layer iTy Calf Feeder to Finish iry Heifer Farr -to Wean "Design Current Dry Cow arrow to Feeder Dr, P.oultr. Ca aei Po Non -Dairy Farrow to Finish Layers Beef Stocker Beef Feeder Beef Brood Cow Gilts Non -Layers Boars Pullets Turke s Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 24011�o NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes XNoEJ ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) []Yes NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes rNo NA [3 NE ❑ Yes NA ❑ NE ElYes NA ❑ NE Page I of 3 21412011 Continued li acili Number: Z - (7 jDate of Inspection: / 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate'? ❑ Yes No NA a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA Structure I Structure 2 Structure 3 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �3 Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No ❑ NA ❑ Yes No ❑ NA -5-2- NE ❑ NE ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 2<0 ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ N1 (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ N ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes Z(No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): I� Q r A"',1 Fy 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [3-No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E]�No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 2<o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [/:6o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes FA/No ❑ NA ❑ NE the appropriate box. ❑ W UP [:]Checklists ❑ Design [] Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections/No ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge'? ❑Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Ycs ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued lFacili Number: V 2-- Date of Inspection: r( 2 I I Z 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No [] NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/lnspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency'? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other commcnts Use drawings of facility to Wetter. explain SOW' ations. (im additional pages. as necessary) =,;, . - �` �� �_� �� �, .. �, � 1 Reviewer/Inspector Name: Phone: Reviewer/lnspector Signature: f��srz Date: to 2-/ �T Page 3 of 3 21412011 Type of Visit Com - nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: 2 (,3 Arrival Tlme: © Departure Time: County: Region: Farm Name: 'iZ , Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Phone: Title: Phone No: Onsite Representative: C�3iv� tQ "tFB h Certified Operator: �t +►^ Goff [ (�_ Back-up Operator: Integrator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: 0 0 = = I[ Longitude: ❑ e = 6 = Li low Design ji� C•uerent Design Current Design Current Population Wet Foultry Capacity Population Cattle Capacity Population P!wneCap�city Wean to Finish ❑ La er ❑ Dai Cow Weto Feeder Non -Layer El Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer Dry Poultry ❑ Dry Cow ElNon-Dairy ❑ Layers ❑ Beef Stacker Non -La ers ❑ Beef Feeder ❑ Pullets El Turkeys ❑Beef Brood Cow ❑Turkey Points El Other Number of Structures: ❑ Farrow to Wean M�Fa7ow to Feeder El Farrow to Finish Giits PEJ13oars Other ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? El Yes IQ N NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes 2TNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) []Yes N�o ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El N ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ;No❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued Facility Number: L�-- Date of Inspection 2 i Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): l/ 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No NA ❑ NE ElYes o ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No ❑ NA ❑ NE ❑ Yes 2 �No❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre t, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes CTNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 4. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ONo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) !_'r`7`�`f , &f'!n" C4A - 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes P [I NA ❑ NA VNo [INA ❑ NA ❑No El NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Reviewer/Inspector Name'' Phone: ZO [7 Reviewer/Inspector Signature: L727/ve.Date: 7 Z11 d Page 2 of 3 12128104 Continued Facility Number: 4 L — (t, Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes g< ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ZNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes N ❑ NA El NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? [I Yes � ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesrNo NA ❑ NE 26. Did the facilityfail to have an active) certified operator in charge? ❑ Yes NA ❑ NE Y P g 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document []Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE ._ AdditionalCmepointsand/orDrawtngs w w Page 3 of 3 12128104 Type of Visit Cam I nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Z Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: [4/2 q0 Arrival Time: Departure Time: County: Farm Name: ^ t� 7� Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: 1 y Certified Operator: jz&t f Back-up Operator: Title: Phone: Phone No: r Integrator: f2 J_ Operator Certification Number - Back -up Certification Number: Region: Location of Farm: Latitude: = o = i = « Longitude: = ° = 6 0 f4 Design Current Design Current Design Current Swine Cap�y Population i�.Po: Capacity Population Cattle Cap�ci�ty Population ❑ an to Finish ❑ Layer ❑Dai Cow ❑ an to Feeder ❑ Non -La er ❑Dai Calf ElFeeder to Finish �. ElDai Heifer ElFa w to Wean ;Dry Poult11;Y'A' ElD Cow Farrow to FeederEl ❑ Layers Non-Dairy ❑ Farrow to Finish El Beef Stocker ❑Gilles Non -Layers ❑ Beef Feeder ❑ Boars ❑ Pullets 10 Beef Brood Cow, x.. ❑ Turkeys Other ❑ Turkey Poults ❑ Other IDOther Number of Structures: c Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) [:]Yes No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Ye No ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued Facility Number: Z — Date of Inspection (b Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a NA ❑ NE a. If yes, is waste level into the structural freeboard? El Yes ;No❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): d 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes o NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No 2 NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Cropj Window ElEvidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 131e. +r m 1,, 4 4 , S"-' a f`iA- 6,, S , C'D 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes e(No ❑ NA No ❑ NA lYo ElNA No ❑ NA No ❑ NA 77 T ReviewerlInspector Name Phone: _ `)�%�/ 20 ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Reviewer/Inspector Signature: Page 2 of 3 Date: C -- O T 12128104 Continued .. 5 Z"- I Facility Number: — j Date of Inspection Z Z Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ZNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �()E] NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections Elaher Code 22. Did the facility fail to install and maintain a rain gauge? El Yesj-No No El NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 2NA NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑YesNo ❑ NA El NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No - NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or DriMngs, Page 3 of 3 12128104 Page 3 of 3 12128104 l2 ((I Lot ZH / D Type of Visit odo lance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: %Z � Arrival Time: Departure Time: County: Region: Farm Name: F4121, '5_ 2_' Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: & In L �—e Certified Operator: c_ Back-up Operator: Title: Phone: Phone No: Integrator• Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: 0 6 [� A = Longitude: = ° =1 = 4{ Design Current Design Current Design Current Swtne Capacity .Population Wet .Poultry C►opacity Population Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ DairyCow ❑ Wean to Feeder ❑ Non -Layer ❑ DairyCalf ❑ Feeder to Finish ❑ DairyHeifer ❑ Farrow to Wean Dry Poultry ❑ D Cow Erfarrow to Feeder p ❑ Layers ❑ Non -Dairy ❑ Farrow to Finish ❑ Beef Stocker Gilts ElNon-La ers ElBeef Feeder EEJ Boars ❑ Pullets ❑Beef Brood Cow ❑ Turkeys Other ❑ Other ❑ Turkey Poults ❑Other Number of Structures: Discharzes & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes oNo ❑ NA ❑ NE ❑ Yes �"` NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes VNo[0:1'�NA A ❑ NE ❑ YesA ❑ NE ❑ Yes ❑ NE 12128104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): L.2 el Structure 2 Structure 3 Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (iel large trees, severe erosion, seepage, etc.) 6, Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes E rNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental th at, notify DWQ 7, Do any of the structures need maintenance or improvement? ❑Yes j VNo El NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ElYes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) -� ri`� . ��� / < <-,5, C -� � , tjo_A_j_X — — f 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ElNA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA El NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? El Yes NA ❑ NE 17. Does the facility lack adequate acreage for land application? El NA El 18. Is there a lack of properly operating waste application equipment? El Yes NA ❑ NE ,,;°; �:�a''I.. Y. ..a.c:.f1t Gomments•(refer torquest�ont#) E pl n anyft ES answeA' nd),,or any r#ecommendat�ons or,;anyother comments. r t [J a dra*Inistiaf fa61ityta bettereexplaln s�tuatlnns. (use'.additianal pagesias necessary);. k . Name Reviewer/Ins ector r p Phone: ��� Z 6y Reviewer/Inspector Signature: :� Z Date: Z ( r JVZY/04 Continuea �,� a7 �:i �l �A '�7-'r J y '� �:.t. ra .� -giS''�c i�� -.H-�'.,�,,. y t �� i. �-R ".. r�r ...+y"-": I{acility Number:412--al Date of Inspection Repaired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ZfNoEl NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP El Checklists ❑Design El Maps ❑ ether 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspection�No ❑ cather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes -NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the pen -nit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes 1` NA ❑ NE ❑ Yes NA ❑ NE ElYes rN ❑ NA ElNE ❑ Yes C3 A ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes VTNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewcr/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional'Co'minents aEtdLoi•aDraivin' s J T 12128104 Facility Number (, Z 0 Division of Water Quality 0 Division of Soil and Water Conservation ` 0 Other Agency Ya�" Type of Visit 0 Co lance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visi Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: // Arrival Time: //p ,:EDeparture Time: County: Farm Name:Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 144, wQ r - _ Certified Operator: or 14 Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Other ❑ Other �o Latitude: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Dischames & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made'? Region: Longitude: = ° = 1 Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? I ElYes No ❑ NA ❑ NE ❑ Yes Nd NA ❑ NE ❑ Yes [2rNo ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes r(No [I NA ❑ NE El Yes o ❑ NA ❑ NE 1212"4 Continued . Facility Number:q Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): le 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ro(Ell A El NE El Yes A ❑ NE Structure 5 Structure 6 ❑ Yes No NA ❑ NE ElYes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta�N�o otify DWQ 7. Do any of the structures need maintenance or improvement`? ❑ Yes A ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ YesA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need []Yes ;No o NA El NE maintenance/improvement? 11. is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 12g - ►nh,.-A, s>+-. �''j 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. is there a lack of properly operating waste application equipment? ❑ Yes [�No ElNA No ❑ NA 6 X�o❑ NA No NA No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: �� 12/28/04 Continued Facility Number: Date of Inspection l Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes "NoNA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check El Yes No ❑ NA ❑ NE the appropiiate box. ❑ WUp ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes oNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute inspections ❑ Monthly and I" Rain Inspections ❑ tither Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 'NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �oEl NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesF<NoNA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesNA ❑ NE 2b. Did the facility fail to have an actively certified operator in charge? ❑ Yes NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes A ❑ NE Other Issues 7j] 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP'? ❑ Yes A ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency'? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: I2/28/04 5 0 Facility Number ( p 40 Division of Water Quality 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit Z Com ' nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: 3 ( a Arrival Time: Departure 'rime: County: Region: Farm Name: ___. _._ . _...._ Owner Email: __... Owner Name: Gly?� 5 z Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: tl Certified Operator: Back-up Operator: Location of Farm: Title: Phone No: ]Integrator: Operator Certification Number: Back-up Certification Number: Latitude: ❑ 0 ❑ 4 ❑ Longitude: ❑ o = ` ❑ Design Current Design Current Swine Capacity Population Wet Poultry Capacity °Population Cattle ❑ La er ❑ Non -La et ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Fapowto Wean ErFarrow to Feeder o v ❑ Farrow to Finish ❑ Gilts ❑ B oars Other ❑ Other Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys urkey Poults ❑ Other Discharges & Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co Number of Structures: b. Did the discharge reach waters of the State`? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation'? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ZN NA El NE El Yes NA ElNE 6 ❑ Yes ❑ NA ❑ NE ❑ Yes 7 N ❑,NA ❑ NE ❑ Yes eNo NA El NE ❑ Yes NA ❑ NE 12128104 Continued Facility Number: Z Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure l Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No 0 NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No NA ❑ NE ❑ Yes:No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta;N7E] , notify DWQ 7. Do any of the structures need maintenance or improvement`? El NA [I NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. El Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes No NA El 17, Does the facility lack adequate acreage for land application? ❑ Yes rrNo NA ❑ NE 18. Is there a lack of properly operating waste application equipment? El Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone- Reviewer/Inspector Signature: Date: (Z I G 1212814 Continued v Facility Number: — Z,6 Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No NA ElNE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUp ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �oO A ❑ NE El -Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes NI NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [IYesZN NA El NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? El YesNA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit`? ❑ YesNA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No NA ❑ NE Other Issues ' ' 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes o ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ic/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: 12128104 III". Facility. Number I C1 2 r� bivision.of Water Quality OPIVIsion,of Soil and Wale Other;Agency 5 llkj { � f ti on ' Type of Visit •t� Co nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: l L(i 0& Arrival Time: Departure Time: County: Farm Name: I°' E ed— �t _� Z Owner Email: Owner Name: ,.-_- Mailing Address: Physical Address: Facility Contact: Title: Phone: Phone No: Onsite Representative: / Integrator: Certified Operator: ZeK, en�d� ' Operator Certification Number: Back-up Operator: Location of Farm: Di ine Ca Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars ier Region: Back-up Certification Number: Latitude: ❑ c = = Longitude: = ° = 4 = 6f Current Design Current t Design y"s Population Wet Poultry Capacity Population's ,rCattle Capacity ,] ❑ Layer ❑ Non -La er Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Da Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures 77 b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes No ❑ NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No �❑ NA ❑ NE ❑ Yes 4 o , ❑ NA [INE ❑ Yes o [INA ❑ NE ElYes fNo ❑ NA ❑ NE 12128104 Continued Facility Number• L — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Y fi 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ZNoaNA ❑ NE ❑ Yes o ❑ NA ❑ NE Structure Structure 6 ❑ Yes o ❑ NA ❑ NE ❑ Yes WO ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thrIE3 otify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes N NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes No [I NA El NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNwl� NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) t; N-A." ( A- 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes []Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes NA ❑ NE ,ONO El NA ❑ NE F NA ❑ NE NA ElNE NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or`any!'.other comments Use drawings of facility to better explain situations. (use additional pages as necessary):, t AL Reviewerllnspector Name I _ - - _ — �_— - -- T Phone: Reviewer/inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number: Date of Inspection i it - Reguired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ZNlqo NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ElYes :No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections eather Code 22. Did the facility fail to install and maintain a rain gauge? El YesP/DNA NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? El YesNA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? El YesNA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? El Yes ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3 12128104 Type of Visit .QS Corn ce Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: � Arrival Time: 6 Departure Time: County: Farm Name: �r:4C"_ &.�Z Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: r A e— L 62t"�2-G✓__ . Certified Operator: Back-up Operator: Phone: Phone No: Integrator Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: = e = = Longitude: = ° = I = 11 Design'; Current ;Y;a A Deg^ R �Curent Design Current Swine Capacity Population Wetl'oultry apaci.typopulation Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ Dairy Cow ❑ Wean to Feeder I ❑ Nan -La et ❑ Dairy Calf El Feeder to Finish i El Dairy Heifer ❑ Farrow to Wean Dry Poultryx El Dry Cow ❑ Farrow to Feeder ElNon-Dairy ❑ Farrow to Finish ❑ Layers El Beef Stocker ❑ Gilts ❑Non -Ira ers ❑ Beef Feeder ❑Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys Other ❑ Turkey Poults ❑ Other 10 Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? El Yes;No o ❑ NA [I NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes N 0 NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El El o ❑ NA [I NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ElYes No ❑ NA El NE other than from a discharge? 12128104 Continued Date of Inspection of Facility Number: ilz — Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �❑ NA ❑ NE a. If yes, is waste level into the structural Freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ZfNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental notify DWQ tZoa 7. Do any of the structures need maintenance or improvement? ❑ Yes;No -NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 4. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ffNo ❑ NA ❑ NE maintenance/improvement? ` l l . Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Croptype(s) 4-pv r pYr✓'►� 13. Soil type(s) E j -- yo%y,' 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes iCi No NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ElNA ElNE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes NYE] NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes D 10 []NA ❑ NE Reviewer/inspector Name ' � ' `;•' '3 - 9 ^ li e`� , �-� Phone: Reviewer/Inspector Signature: [ Date: 3 12128104 Continued Facility Dumber: Z — b Date of Inspection t Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ONo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ONo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ElNE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? es r❑ No ELNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes o ❑ NA ❑ NI? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional-Commentsand/or.Drawirigsn��'� ,�yf,,; s P 1 V �-CG- 4, i l2 - (z) v y 7 /as"U - C- hs 12128104 I . . w Facilin Number Date of Visit: Time: u / Not O erational Below' Threshold L,I�Permitted ©Certified [3 Conditionally Certified ©Registered Date Last Operated or Above Threshold: !Farm Name: County: Owner Name: Phone No: Mailing Address: Facility Contact: Onsite Representative: �T Certified Operator: I 1 � Location of Farm: Title: Phone No: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0• 06 " Longitude ' • 44 Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Ca acit-v Population ❑ Wean to Feeder ❑ Laver I I❑ Dairy ❑ Feeder to Finish ❑ Non -Laver ❑ Non -Dairy ❑ Farrow ro Wean ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons h {LJ_Subsurface Drains Present JjLJ Lagoon Area JLJ Spray Field Area I Holding Ponds / Solid Traps 0 [] No Liquid Waste Management System Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ 1-aeoon ❑ Svrav Fie€d ❑ Other a. If discharge is observed, was the conveyance man-made? b. if discharge is observed, did it reach Water of the State? (if yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4, is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard(inches): 05103101 ❑ Yes eo ❑ Yes [I Yes;N;0o ❑ Yes ❑ Yes ;0�: El Yes 4a1Vo ❑ Yes o Structure 6 Continued Facility Number: 42--- Date of Inspection ell 7 e, 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) b. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenancelimprovement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? M*aste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type ge-r -,I k C109J �•� r',i' 1 f✓r� — - 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAV6'MP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Reguired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20, is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the faciliry fail to have a actively certified operator in charge? 22. Fail to notify- regional DN Q of emergency situations as required by General Permit? (ie.r discharge, freeboard problems, over application) 23. Did Reviewer; Inspector fail to discuss reviewiinspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No ❑ Yes La'l�io ❑ Yes P40 El Yes ❑ Yes fo ❑ Yes rl��o ElYes ❑ Yes Nio ❑ Yes 0 ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No- E3Yes ""1_J No ❑ Yes No ❑ Yes ICI No ❑ Yes ❑ Yes No No ❑ Yes h o ❑ Yes �No- rqo j" El Yes ❑ Yes No ❑ Yes No �© No violations or deficiencies were noted during this visit. You will receive no further correspondence aboui this visit. .,'.!-N 4 .� , ,� �, N•-_ .tis:t.:;iaen�ih_,•"'�.+aie"z.G".±li .hum �.y�, a 5, s� Gmtnents(refei- to 'Eitp any YES answers:andlor,any,reeommeodattons or$ny,other cotaments..s gneszavn: `�- W .M.-.—.._....h.. . Use drawings of facility to better explain sttuattons.,(use additional -pages as necessary) ❑ Field Copv ❑ Final Notes �{ �} Er !� .4d':{e;,;i;.43.s€?Y.�3.i{�xa'1h:i.:k,.*'€A`ww`........;.... iiHl 4hae"vi�SSR s�a�le..:C?ri..tla"laiaE�&k%iis"��5.':Mi96re{i4P€is3i..rs:3Ei€A:ErlB?#i;.i9b>'.-w.�rs+�, :�nr...�.•.�-.� a..»w+^.•.r-'--.n�nn•....w:."� 'r.ia.?'Svi�Y.�$ Reviewer/inspector Name a«� •';tom rr R i` a Reviewer/Inspector Signature: Date: 05103101 Continued 41 ti / Fa ' ttv Number Date of Visit: ® Time: 9 D D Nat operational 0 Below Threshold ermined [] Certified ©Conditionally Certified © Registered Date Last Operated or Above Threshold: Farm Name: - _— _ County: Owner Name: Phone No: Mailing Address: Facility Contact: _ m 4J1 N�� S'S�� Title: Onsite Representative: / Certified Operator: Location of Farm: Phone No: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Morse Latitude ' 0 0" Longitude 0' Current-',,,., Design Curren �' D'estgn "a` Current' 1: Swine //:Design ` '..l.a aC�ty. a�..�.. -;��'. I ,.�. E I tad Po ulation 'Poult " tCa aci Po' ulatiari Cattle $ ; achy `-°Pa' ulattan .F ._ ❑ Wean to Feeder ., , .Ca`f ❑� a er - Dairy, - 5[03Non-La Feeder to.Finish er { Non -Doi ' [� Farxz<to Wean, 8 ❑Other r , 9 t 3 � Ek.�� ?��� E,� 3, E , d arrow to Feeder �„ Farrow to Finish x ; a R� 4 r�i i Fi—'- f T' M E n iDt�� 1/i.+grC[ip i�i�F; ❑ Gilts '� , 1 p� Boars ,'- �+r �y� �Iirl f 1 T� 1E Jt t ( f, �#1 ott l SSL P1. �� ,E �' t � =�E IE " tE f �a93 Nutnber of Ligii; ns !1 J], E =' E �E �tj= ❑ Subsurface Drains Present Lagoon Area S rav Field Area E P dingPands'lrSohd,Traps " rki Yie'u ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 ❑ Yes No ❑ Yes ` ❑ Yes No ❑ Yes ❑ Yes ❑ Yes No ❑ Yes 2'No Structure 6 Identifier: r Freeboard (inches): [� 05103101 Continued Facility Number: �.— Date of Inspection Q 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (if any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type ❑ Yes , re ❑ Yes 2<0 ❑ Yes o ❑ Yes !.a "'0 ❑ Yes No ❑ Yes ❑ No ❑ Yes ❑ No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15, Does the receiving crop need improvement? ❑ Yes ❑ No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes ❑ No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) ❑ Yes ❑ No' 19. Does record keeping need improvement? (iel irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ❑ No 20, Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ❑ No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ❑ No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes ❑ No (iel discharge, freeboard problems, over application) 23. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? ❑ Yes ❑ No 24. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Comments (refe*l to uestion ) .-Expialn,any YES nswers and/orany recommendations or an yoth r comments. . ,. � �� gUse rdrawinga of faciiitbetter explain s�ituatians. {use addttidnal pagesa" s n ces r��y) � �:. ❑Field Couv ❑Final Notes . .. � ; „ . ;� ,� Reviewer/inspector Name { &:o Reviewerlinspector Signature: Date: 05103101 Continued I" Type of Visit 0 Compliance Inspection Operation Review 0 Lagoon Evaluation Reason for Visit O Routine O Complaint O Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number Date of Visit: Time: � 10 Not Operational 0 Below Threshold ©Permitted 0 Certified [3Conditionally Certified [3 Registered Date Last Operated or Above Threshold: Farm Name: . j;11 e4t-- `7 Z County: Owner Name: Mailing Address: Facility Contact: Title: Phone No: Phone No: Onsite Representative: integrator: Certified Operator: Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' ` iG Longitude ' ` 0 Gf Design Current Design Current Design Current Swine Ca aci ' Population Poultry Ca aci Pa`ulation°F Cattle Ca ki ' Po ulatidn ❑ Wean to Feeder ❑ Layer I I ❑ Dairy ` ❑ Feeder to Finish ❑ Non -Layer ❑ Non -Dairy ........ ❑ Farrow to Wean i ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars f' Total SSL' W Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area ti .ter , Holding=Ponds ISolid Traps ❑ No Liquid Waste Management System Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the Stale? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freboard (inches): 05103101 ❑ Yes ❑ Yes P <1 ❑ Yes ❑ Yes �Il o El Yes Vo - ❑ Yes ElYes No Structure 6 Continued 3 Facility Number: tl Z p Date of Inspection Z a 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste A,Pplication 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type I ^'� �� 7 �}' �r ✓ 4 / �_ 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes LdNo ❑ Yes No ❑ Yes 17 No ❑ Yes ❑ Yes 2 ❑ Yes No El Yes � ❑ Yes [2 o ❑ Yes � o ❑ Yes ❑ No _ ❑ Yes e�? <0 ❑ Yes ❑ Yeso ❑ Yes 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available. WUP, design, ❑ Yes V:t (ic/ checklists, maps, etc.) o 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes pxo 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes o 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes o 22. Fail to notify regional DWQ of emergency situations as required by General Permit? El Yes (ic/ discharge, freeboard problems, over application) Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ElYes24. ;0'No23. Does facility require a follow-up visit by same agency? ElYes25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Co nmi:ntsYrefer'to auesti6n #}.',';Explain anv YE5.answers andl." a. '. i ' ` r "� or�anv recommendations or an�'a"ther,,:ccimments.;.... Reviewer/Inspector Name ReviewertInspector Signature: ❑ Field Copy ❑ Final Notes Date: % 2 2 / 05103101 Continued Type of Vlslt ,/C� Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit outine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other Z ❑ Denied Access Facility Number Date of Visit: L Time:10 J � Not Operational 0 Below T reshold Permitted 1cer+tified O Conditionally Certified 0 Registered Date Last Operate or Above Threshold: Farm Name: u "�J 7� County: Owner Name: Phone No: Mailing Address: �r- (!,+ TL1Ly [ v`�^�Sd 1'u-- ZZ 378 Facility Contact:Title: Phone No: Onsite Representative: I Integrator: 4 Certified Operator: Operator Certification Number: Location of Farm: �S$ oslwIne ❑ Poultry ❑ Cattle ❑ Horse Latitude Longitude 0• �� ��� Design Current Swine ! enonir. Pnnnlelinn ❑ Wean to Feeder ❑ Feeder to Finish ❑ F ow to Wean Farrow to Feeder OD O XTD ❑ Farrow to Finish ❑ Gilts Boars Design Current Design Current Poultr capacity Population Cattle Ca acl Po rile#ion ❑ Layer I 1 1110 Dairy ❑ Non -Layer I 1 11 10 Non -Dairy ❑ Other I - - I Total Design Capacity Total SSLW ❑ Subsurface Drains Present ❑ La oon Area ❑ No Liauid Waste Manaeement Svstem Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste roftcli2a &I[eatment 4, is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure S Identifier: h r Freeboard (inches): 05103101 ❑ Yes No ❑ Yes / No ❑ Yes Y o ❑ Yes ZNo ❑ Yes ❑ Yes rNo ❑ Yes E�/No Structure 6 Continued Facility Number: Z - f Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waite Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over appplica ion? f ❑ Excessive Ponding ❑ PAN [IHydraulic Overload 12. Crop type r. J'l .D .f►AIX_ ) I SIN 13. Do the receiving crops differ with those d6signated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management,Plan readily available? (ie/ WUP, checklists, design, maps, etc.) V/ �y e 19. Does record keeping need improvement? (ie/ iff4on, freeboard, vShhe ralysis & soti sample reports) 20. Is facility not in compliance with any applicable setback criteria in time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25• Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No r ❑ Yes _ONo Cl Yes ,0<, ❑ Yes ONo ❑ Yes [2No ❑ Yes j No ❑ Yes 0 ❑ Yes ONo ❑ Yes ❑ No ❑ Yes [:]No ❑ Yes ❑ No ❑ Yes,'eNo ❑ Yes P190 ❑ Yes ZrNo ❑ Yes 0No ❑ Yes ON, ❑ Yesfo ❑ Yes No ❑ Yes t No i ❑ Yes ;2rNo ❑ Yes ZNo ❑ Yes eNo © No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Comiments"('refer to''question #j rEzpiain any YESkanswers andlar:any recommend tions,or anyo't r comments ` aLfsedrawings of'facility'to better explain situations: (use additional pages as `necessary) ; field Copy El Final Notes f x°� � ; i BLtR �S �� .G�.lil�ati Reviewer/Inspector Name , " _ �. Reviewer/Inspector Signature: Date: o's- 05103101 V Continued Facility plumber: L6-1 — Date of Inspection I /2t71��j Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes No ❑ Yes ❑ Yes jPNo ❑ Yes No ❑ Yes 7No ❑ Yes El Yes Addition al°Comments and/or Urimings: O5103101 Type of Visit I>Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit G4 outine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit:b / 'Time: Facility Number / O � Not Operational O Below Threshold GI(ermitted [3 Certified ❑ Conditionally Certified © Registered Date Last Operated or Above Threshold: Farm Name: ......... f rr .....A...f 3................................................................................... County: lir°!r ......................................................... OwnerName: ................................................... ..3�.... .....� .............. Phone No:... 9Lc7.l..�r9% � �v...................................... Facility Contact: ............... Title: ................................................................ � `Phone No:.................................................... MailingAddress: .................................................`..................................................................... .......... ,�L,4 �...(".C......................................... � G1...... Onsite Rcpresentative:.. ; {� lN�.�4.�P Integrator: rator• 5.. °...............................:v................. Certified Operator:.....``....... ..... �..................... Operator Certification Number:..,Z,d3,t(/, ;,,,,,,,,,,,,,, ....... .......... Location of Farm: ["wine ❑ Poultry ❑ Cattle ❑ Horse Latitude • ©4 �6L Longitude �• �4 /0 gn Cana Ponulatiian r?' Caaacity Po''nulation' x Des 5iwlne Poulfi Cattle Cabi ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder Lopd ❑ Farrow to Finish ❑ Gilts ❑ Boars ❑ Layer ❑ Dairy. - - ❑ Non -Layer 10 Non -Dairy ❑ Other Total Design Capacity Toltal SSLW C . - Nuiinber;'ofELagoons f [ ] Subsurface Drains Present ❑Lagoon Area Spray Field Area HoldingPonds`I Solid+Traps` ❑ No Liquid Waste Management System r. Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? h. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) c. II'discharge. is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Identifier:I.- ..................... .................................... ................................... .................................... Freeboard (inches): 5100 ❑ Yes CINo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes E;VNo ❑ Yes Q No ❑ Yes No Structure 5 Structure 6 ................................................................. Continued on back Facility Number: t z-,— (,a Date of Inspection L o Printed on: 1/9/2001 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10, Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14, a) Does thefacility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 1 ,l 19. Does record keeping need improvement? (ie/ irrigation, free oard, wa Jddd/la`tjalyosis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25, Were any additional problems noted which cause noncompliance of the Certified AWMP? O:.�R•YiQia�itjgs off• d�ft;�encies �r. pgter�-d�tcitig �hisa; �:Y:o� ;w�i�->�eei<iye �ti �lu��er • . :. ctirresDoricience: a�aut this visit: ..:::::.:....::....:..::...::.... Use drawingsttn f,h,? t /' ` '�; rl�y►+�w_. „ors 7 ►r �'� � I � ❑ Yes Ey�o ❑ Yes 9/No ❑ Yes [] No ❑ Yes Gllo ❑ Yes ILdtvo ❑ Yes (Ilo ❑ Yes EEO ❑ Yes Ml� o ❑ Yes Ko ❑ Yes Ulry0 ❑ Yes GYNo 04eYefs ❑ No ❑ Yes L No ❑ Yes 10 ❑ YesCNo ❑ Yes Lytvo ❑ Yes �LYNo ❑ Yes [�'No ❑ Yes 2No ❑ YesIo ❑ Yes [I Y es Yes `i Reviewer/Inspector Name p , v•K!iJ�-) r V .. r %.11� - � _<<.< �: e^.€V i'Pt e.{� •,,, .n !id €z ...ti ,.i.�v `. s�V• r#�'i. ,a, a Reviewer/Inspector Signature: Date: Z i s/]pp Facility Number: 2-- In I Date of Inspection Printed on: 1/9/2001 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours?� 28. Is there any evidence of wind drift during land application? (i.e. residue on neighbonng vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes EkKo ❑ Yes Vo ❑ Yes 1140 ❑ Yes UINo ❑ Yes �zo' ❑ Yes:/0 ❑ Yes -- ,S�I�-e.. � v,,rr� r�� `f� ..� ate..... � �•�,,�,r . 5100 IvisiOn of Water Quality Q Division of Soil and Water Conservation l� s i.•'! • � � I � Q Ather Agency �' I ! 3 ' (Type of Visit _Q'Compj ante Inspection O Operation Review O Lagoon Evaluation Reason for Visit oRoutine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access t)ate of 'Visit: /i eU Time: a t Printed on: 7/21/2000 FIli Number ar Q Not Operational Q Below Threshold ermitted [3 Certified 0 Conditionally Certified ❑ Registered Date Last Operated or Above Threshold: ............... .. ... �l p �''irs �If 1? K" � � 1.... FarmName: ..................................................................................................................'................................................... County: �y�T��!Fy� OwnerName: Phone No:.q..Q....I......Z.........,..":.....%................................. ..........I ..................................................................................... �d" FacilityContact: ........................... ... ....................... Title:....................................... ................ Phone No:................................................... ,Mailing Address: #Vs.....1�..Q.%�......�.,i�.�..........��rr&O.... �.�---........... ..................................................................................... .......................... Onsite Representative: .................................................................................................... Integrator:...3 ..... Certified Operator:,,,,, S � ' Operator Certification Number: ................ Location of Farm: .......... ❑ Swine [I Poultry [I Cattle ❑Horse Latitude �...... Longitude �• ®� Design Current Design Current Design Current Swin Capacity Population Poultry Capacity Population Cattle Capacity Population Z,WgTzrn to Feeder ❑ Layer ❑ Dairy it Feeder to Finish JE1 Non -Layer EEEI JE1 Non -Dairy ❑ Farr o Wean P,rairrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSL W , Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray Field Area Holding Ponds 1 Solid Traps ❑ No Liquid Waste Management System Discharees & Stream Impack5 I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is ohscrved, was the conveyance man-made? h. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. li'discharge is observed. what is the estimated flow in gal/min'? d. Does discharge bypass a lagoon system? (If ycs, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Struct e `, Structure 2 Structure 3 Identifier: ..............Z........ ❑ Yes _1Vo ❑ am' Yes l"� ❑ Yes No ❑ Yes o ❑ Yes � �0�' ❑ Yes ;Zo� ❑ Spillway ❑ Yes o Structure 4 Structure 5 Structure Frechoard (inches): i 5100 6, tq, l 1 Continued on back Facility Number: — Date of inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type 15CI A-+u. A . 5�.. yr ,rf r R✓f 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16, Is there'a lack of adequate waste application equipment? Required Records & Documents IT. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time,of design? . 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? �'Vc� yipli ><tQnjs'o tl fc�encies vv�re �Qte�1 iltit itr�g h#s:v�s�t} Yoh wi....y.... hi 6r; • • • ctirresporicierrce: a�otiti this visit. • • 4 -aJ 0w {'r L%0 ) 9�q '( ❑ Yes No ❑ Yeso ❑ Yes r - - ❑ Yes P_N�O- ❑ Yes ❑ Yes Eh(O ❑ Yes <fTN—o ❑ Yes P-Ko ❑ Yes ..��No, Ko El Yes ❑ Yes LdN0 ❑ Yes No ❑ Yes 0440 ❑ Yes Id�o es ❑ No ❑ Yes UKO ❑ Yes Ib ❑ Yes No ❑ Yes NN ❑ Yes No ❑ Yes o eVA.9/ySiS , Ia,,-4..>-f Facility lumber: — Date of Inspection //�j%/1M Printed on: 7/21/2000 Odor ISSUES 26, Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge gt/or below es ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes No ❑ Yes No ❑ Yes ❑ Yes eNo ❑ Yes o es ❑ No Additional.Comments and/orDrawings: • 5100 IV ,.., Div►s►o Sort and Water Conservation - Compliance Inspection` Conscrvat►on O eration Review ,0'D to of.Soil and Water p Division of Water" -Quality '- Compliance Inspection [];Other Agency Qperation,Review.Lai i Routine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-u ► of DSNVC review 0 Other. �I Number Mae of Inspeclion Tillie of lw:pection 24 hr. (hh:mm) �rclmittcd J ] Certified [3 Conditionally Certified © Registered JE3 Not O per:►tional Date Last Operated: Farm Name: f rO......01.,-s.....*.......!...0................................................................ Count .4, .. .....'... .%................................................... Owner Name:. G�%f-!%� ivxi Phone No: . . �....'~.,. �'.. ..,� t!i. ?............................ 1 t Facility Contact: D�.�a.. ..�9/ / ! %. .... ..., ............. Title :..................................n..1........................... Phone No.................................................... 7-2 MailingAddress: 1..:..����... W..7 ....... ��1.�✓..��G...�...0-;..1r..d........................................................................ .......................... Onsite Representative:. �................................. Integrator: ... O..A,,rGrtf..................................................... Certified Operator:...... -fin (/t%� � �` d Operator CertifWation Number :.......................................... .........................I...................... Location of Farm: p b ....................................................................................................................................................................................I.................... .........................................................................................................................................................................I.................. ... Latitude �' �� �•� Lougitude Design ' Current Swine Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean arrow. to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer ❑ Dairy ❑ Non -Layer ❑Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑Subsurface [)rains Present ❑ Lagoon Area ❑Spray Field Area Holding Ponds / Solid Traps JE1 No Liquid Waste fiManagement System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation (I I' yes, notify DWQ)? ❑ Yes 2 No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? 1). If discharge is observed. did it reach: ❑ Surface Waters ❑ Waters of the State c. If discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system`? 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & "Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes 7No El Yes ❑ Yes Pr IN41, ❑ Yes ❑ Yes No ❑ Yes No Structurc I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: (� Freeboard(inches): ...., 1 `+r...!................................................................................................................................................................................................. ... 1/6/99 Continued on back Facility l9bmber: 7 L l Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence ofover application? ❑ Ponding ❑ Nitrogen 12. Crop type � 77q�/.......... .7................................................................................................................................................ 13. Do the receiving; crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. Does the facility lack wettable acreage for land application? (footprint) ,r G' Lj t�7►�., 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklis(s, design, maps, etc.) 19. Does record keeping need improvement'? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21, Did the facility fail to have a certified operator in responsible charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did RevipWer/Inspector fail to discuss reviewhnspection with on -site representative? 24. D facility require a follow-up visit by same agency? No.vililations'or: de ciencit�s'were' noted: during:tliis'visit. * Y•ou wviIfret eive niY Mrtiie'r :•eorresptiridence;about;tk�isvisit.:•;•;•;•;�;•;•;•.•;•;•;•;•.•,•.•; ; ; ; ; ..•.•;•.•.•.-.•........... 2� ❑ Yes a< ❑ Yes o ❑ Yes o ❑ Yes o ❑ Yes eNo ❑ Yes Calr o ❑ Yes .......................... ❑ Yes o ❑ Yes ❑ No ❑ Yes ;1No� ❑ Yes 211O ❑ Yes 1=J rO ❑ Yes No ElYes No ❑ Yes No ElYes � o ❑ Yes FNo ❑ Yes ❑ Yes Comments`(refer to question #): Explain any YES answers and/or any recommend6tions or any, other,comen mts ace sty. to ,ett.er explain situations. use additional pages as necessary); i se rawrn s'a , Reviewer/Inspector Name Reviewer/Inspector Signature: 't,4 Date: 1 /6/99 f JUSTIFICATION & DOCUMENTATION Facility Number t/L a Farm Name: roti n On -Site Representative: Inspector/Reviewer's Name: 2r7.✓ e- Date of site visit:._ Date of most recent WUP::�25ZT�_ Revised January 22, 1999 FOR MANDATORY WA DETERMINATION Operation is flagged for a wettable acre determination due to failure Part 11 eligibility itemof F9 F2 F4 Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Annua! farm PAN deficit: pounds Irrigation System(s) - circle #: 1. hard -nose traveler; 2. center -pivot system; 3. linear -move system; stationary sprinkler system wlpermanent pipe; 5. stationary sprinkler system wlportable pipe; 6. stationary gun system wlpermanent pipe; 7. stationary gun system wlportable pipe PART I. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D21D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part Ill. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part 11 - F1 F2 F3, before completing computational table in Part 111). PART II. 75% Rule Eligibility Checklist and Documentation of WA Determination' Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to deduct required bufferlsetback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part Ill. \\ Revised January 22, 1999 Facility Number 4/Z- -IeD Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER' z TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS' t 3 7,3 z• �r 17 b .Z FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption if possible; otherwise operation will be subject to WA determination. FIELD NUMBER' - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. ❑ DSWC Animal Feedlot Operation Review x DWQ Animal Feedlot Operation Site Inspection r Routine O C'onwlaint O 1 ollnNv-up of t)1N'O inspection O Other Facility Number Farm Status: M Registered ❑ Applied for Permit ❑ Certified ❑ Permitted Date of nspection Time ttf inspection � 24 hr. (hh:mm) Total Time fin fraction Ot' luturs (ex.1.2; for I hr 15 min)) Spent on Review or itaspection i,inclutles tnivel and processing} [3 \ttt O aerrttional Date Last Operated: ................................................................................................................................................ t 4 1 �} �Ililnt\" �� �'��..x............... Farm larnc:.........�r..A..ttil.!�'.........f*'�.....C.f.�..t,S,?.i..ta.�?...T...L..�............ ' Owner Name :..... 4..co. ,4........V..f.x.:rl........................•.........•.......................•......•... Phone \rt; I,14.� . `�. ?... 1. .4,1....,................................ Facility Contact: � Title I1G C........I............................ . r' ............................ ........... iltrtiling :Iddress:.....,..,.. x.....!„••...(...........i/�,1.�di'�.lAi...!•(. `!.t......•.a..•.A.:..�r•..•.......••............................................... ................ Onsite Representalive:,,..,.QsM................................................................................ Integrator:.................... I S a r...... !� h `� e C,t.., p 0 3 3 �.......... Certified Operator: :....... ..... . ,l.•.. ..... ................. Operator C'crtification ?�urnbcr ._.• _. ,•. Location of Farm: .��-�..�...•..��•, �i.�,..� rr,�,n•,•,•,•��....••••.,�......•....•••...•...•....,••,•••'Ir••.r••,r•••,•'•••••••,�••...••r•�....I.�i.....�.i..�.�...............��...�.•`�.•tti••r•••.rr.•...•••....•r••r,,.,r••.r•,•r•,•••.... VCR • ••• •• Latitude �� E�LJi �� cc Longitude ��• nr � �:� Type of Operation Swine - Design Current ' Design Current Capacity Population Poultry Capacity Population ❑ Layer ❑ Non -Laver ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Other Total Design Capacity Total SSLW Design Current Cattle Capacity Population ❑ Dairy ❑ Nnn-Dairy '0 0 Number of Lagoons / Holding Ponds ❑ Subsurface Drains PresentJ10 Lagoon Area 10 Spray Field Area General 1. Are there any buffers that need maintenance/improvement'? ❑ Yes 12:10 2. Is any discharge observed from any part of the operation'? ❑ Yes [ No Diecharoe originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. It'dischar•.ae is oN orved, was the conveyance titan -made'?• ❑Yes ❑ No h. If discharge is observed. did it reach Surlace Water'? (Ifyes, notify D\VQ1 ❑ Yes ❑ No c, lfdisfharoc is observed. what is the estttnated How to Ealfmin? d. Does. discharge bviiass a la-oon system'? tlf yes, notify D\VQ} �ja � ❑Yes �❑, No 3. Is there evidence of past discharge from any part of the operation'? El Yes 11 �o 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes �ZNo 5. Does any part of the waste nianagetnent system (other than lagoons/holding ponds) require ❑ Yes [; No ntai ntenance/improve ment'! 4/30/97 Continued on hack • Facility Number: — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes �'o 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes GTNo 8. Are there lagoons or storage ponds on site which need to be properly closed'? ❑ Yes p No Structures. (Lagoons and/or Holding fonds 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes r No Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 ............................................................................................................................................................................................................................. 10. Is seepage observed from any of the structures? ❑ Yes R o IL Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 13 No 12. Do any of the structures need maintenance/improvement? ❑ Yes 0 No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes EdNo Ri tc_application 14. Is there physical evidence of over application? ❑ Yes OKO (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type................................................................................................................................................................................................................................ . 16. 17. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? Does the facility have a lack of adequate acreage for land application? ❑ Yes ❑ Y s [f do IJ Na 18. Does the receiving crop need improvement? Yes ❑ No I9. Is there a lack of available waste application equipment? ❑ Y d'o 20. Does facility require a follow-up visit by same agency? Yes ❑ Zo 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes For Cgrtilied Facilities_Onlr 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No Reviewer/Inspector Name Reviewer/Inspector Signature: Date: cc: Division of water Quality, Water Quality Section, Facility Asses.srneia Unit 4/30/97 % State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B, Howes, Secretary e�� 1DEEHNFZ DIVISION OF WATER QUALITY August 26, 1996 Mr. Scott Gurkin Browns of Carolina 303 East College Street Warsaw, North Carolina 28398 Subject: Compliance Evaluation Inspection Browns of Carolina Farm # 19 Facility # 42-10 SR 1101 Halifax County Dear Mr. Gurkin: On August 7, 1996, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the swine operation was not discharging wastewater into waters of the State and that the waste lagoon had more than the required amount of freeboard. The vegetation on the adjacent spray fields was much improved from the previous years site inspection, and as a result the facility was found to be in compliance with the State's animal nondischarge rules. Effective wastewater treatment and facility stewardship are an important responsibility of all animal waste producers, The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, i FAX 919-571-4718 Raleigh, North Carolina 27609 N� C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/100% post -consumer paper Browns of Carolina # 19 Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an " Operator in Responsible Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, c h �,, Judy E. Garrett Water Quality Supervisor cc: Halifax County Health Department Fishing Creek Soil and Water Conservation District (Halifax) Steve Bennett -Regional Coordinator, DSWC RRO File Copy Facility Number: L/ Z _ / D Division of Environmental Management Animal Feedlot Operations Site Visitation Record Date: 3 " 7 ` 9Z _ Time: 013 a Farm Name: 3raX-17s 0 �� G<?rJl� �—�3/ �_ _ County: Owner Name: S� f -- �2ccr /G � _ _ Phone No: � �� — yn z On Site Representative: -----Integrator: L _1'Uw,75 Mailing Address: aZ a_0 Y Z 7 -3 Physical Address/Location: Latitude: 1 I Lon 'tude: 1 1 Operation Description: (based on design characteristics) Typ �of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals O'Sow ?2 0 ❑ Layer El Dairy ❑-Nursery 5 v o o 0 Non -Layer ❑ Beef ❑ Feeder Othe:Ly a of Livestock. v Number of Animals: Number of Lagoons: ��(include in the Drawings and Observations the freeboard of each lagoon) Fact i ,�i�pgtion: Lagoon Is lagoon(s) freeboard less than 1 foot f 25 year 24 hour storm storage?: Yes ❑ No Is seepage observed from the lagoon?: Yes ❑ No E Is erosion observed?: Yes ❑ No Is any discharge observed? Yes ❑ No ❑ Man-made C? Not Man-made Cover Crop Does the facility need more acreage for spraying?: Yes ❑ No ❑ Z ❑ Does the cover crop need improvement?: Yes No ( list the crops which need improvement) Crop type:_why O -+: G -,ems s _ Acreage: 4eo1*Cgy'•- Setback Criteria Is a dwelling located within 200 feet of waste application? Yes D No Is a well Iocated within 100 feet of waste application? Yes ❑ No ;,l Is animal waste stockpiled within 100 feet of USGS Blue Line Stream? Yes ❑ No Is animal waste land applied or spray irrigated within 25 feet of Blue Line Stream? Yes ❑ N AOI » January 17,1996 1 %� Maintenance Does the facility maintenance need improvement? Is there evidence of past discharge from any part of the operation? Does record keeping need improvement? Did the facility fail to have a copy of the Animal Waste Management Plan on site? Yes Or"' No 0 Yes ❑ No Yes ❑ No O Yes ET- No ❑ Explain any Yes answers %I� �s5 ► s S-1111 S��rs�S o?��T. �� Sc7s,,� 'P__/A`� T , L��110r, ff�4 c� Z FrccL a�a_�-d . Signature Date. i .- ?- 9 6 cc. Facility Assessment Unit Use Attachments if Needed Drawings or Observations_ AOI -- January 17,1996 IUL-14-1995 15:26 FROM DEM WATER QUALITY SECTION TO RRO P.02/02 M• Site Requires Immediate A*tcn6nn- V Facility No. DIVISION OF ENVIRONMENTAL MANAGEMENT' ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: 7 ' , 1995 "7'7 3 f -z' Time: I / J- Farm Name/Owner:, & nw ✓S a /- e'll, Z /f�� 11�/ / L _ Mailing Address: J a ,3 E ns t Go110r- S4, . P-0: o ff o x y 7 r9�s.�<✓ s.� r 2 a' S' �' County: /`76'9 / (' A yIntegrator. Phone: On Site Representative: Phone: 310 - 793 - Physical Address/Location. S !� h`4 S 2 %� ��7u^ c�' v+� .._ �Lc,.,� 4 Type of Operation- Swint Poultry Cattle Design Capacity: �c: SL��r�_ Number of Animals on Site: Tr).-� �-IL� DEM Certification Number: ACE DEM_ Certification Number: ACNEW Latitude: O`(' l Longitude: 3 D -' / Z" Elevation. __-__meet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 hour storm event (approximately I Foot + 7 inches) Yes or N& Actual Freeboard: —L-yt. Inches {41 Was any seepage observed from the lagoon(s)? Yes or t�i Was any erosion observed? YY or No Is adequate land available for spray? Yes or No P Is the cover crop adequate? Yes of Crops) being utilized: ViEtZ\,, S,''.,t c _ r- e ci, e / Ll r Does the facility meet SCS minimum setback criteria'? 200 Feet from Dwellings? Yes or No 100 Feet from Wells? ,Jcs or No .hc animal waste stockpiled within 100 Feet of USGS Blue Line Strcam? Yes oris(:)) animal waste land applied or spray irrigated within 25 poet of a liSGS Map Blue Line'? Yes 007 animal waste discharged into waters of the state by inan-made ditch, flushing system, or uther sirni;ar man-made de-rices? <&or No If Yts. Please Explain..B ! �� 'k ws tric +:tc:ility maintain adequate waste management records (volumes oi6nlanure, Land applicd. s-gray irrigaied on specific acreage with cover crop}? Yes or No p d : d 'i 4i%e Additional Comments: 0--n '1 q a/ W it b J ��, a �� cl -r A-�' )9 7 veer _..r/ey vc� 44'�o�/,y r Jr�ii*,L�, .� Lv YJ rl [ 0-- 0 n T o _ +� zvi J T /e- Cr c/ lie r + C. \_3,.: Si arLue cc: Facility Assessment Unit Use Attachments if Needed. 74 L L i'n TOTAL r] OF Ln" i i UIN") DnMj,4�ri - WU r df • 71 Z7 - 1 1-J-QU'40 Jul LV 7J 11 - )" I 1L1 1Cl Site Requires Immediate Attention SITE VISITA IION RECO D DATE:� �� 1995 / /y Owner: Farris Name: County: r'� - Agent Visiting Site: ram• C�� Prone: '-? $e8l Operator: Phone: , � - 5KZ- e ?- On Site Representative: : ;. r�� ��r� Phone: Facility Number: y2 / O Physical Address: Mailing Address: Type of Operation Design Capaciry: Swine ✓ Poultry Cattle Latitude: 2 7 0 7O /O Type of Inspection: Ground Number of Animals on Site: C) Longitude.G v_ Aerial Circle Yes or No Does the Animal Waste lagoon have suffleient f cboard of 1 Foot + 25 year 24 hour storm event (approximately i Foot+? inches) Yes o Actual Freaboard: 1 � Feet O Inches For faeilities with more than one lagoon, please address the other lagoons' frceboard under the continents section. Was any seepage observed from the lagoon(s)? Ycs 0& Was there erasion of the dam?: Yes t�0 Is adequate land avilable for land application? Yes or No is the cover crop adequate? Yes 0(i ;'J JIJ rrp..rf �^' Fax to (919) 715-3559 Signal of Agent Site Requires Immediate Attention Facility Number: _ Ll 2 - I b SITE VISITATION RECORD DATE: — 7 ," q , 1995 Owner: % ! 2Farm Name, �,1 .S.0 / 4 U County: Agent Visiting Site; - a 6%�1 % � . �'.�'� Phone: .S Operator. Phone: On Site Representative: r Phone: Physical Address: Mailing Address: Type of Operation: Swine ✓ Design Capacity: Latitude: 70 Type of Inspection: Ground Poultry Cattle Number of Animals on Site: 2 - Longitude• •?C o Aerial Circle Yes or No Does the Animal Waste Lagoon have sufficient f eeboard of 1 Foot + 25 year 24 hour starm event (approximately 1 Foot + 7 inches) Yes o Nor Actual Freeboard: Feet D Inches For facilities with more than one lagoon, please address the other lagoons' freeboard under the comments section. Was any seepage observed from the lagoon(s)? Yes o& Was there erosion of the dam?: Yes d&D Is adequate land av Hable for land application? Yes or No Is the cover crop adequate? Yes o Additional Comments: , a,,-e- r ♦ / moo.— s^a �Tr 01401 — 5 r v-40.a e f ev"4 .G.— . Fax to (919) 715-3559 ' Signab4 of Agent NUH I H GAHULINA Department of Environmental Qual � �y . - � ..7 .. i �;= � �• _- f''r, � }'?- r �ai�n_ - .. _ _ �- "ems ie,. '-.. �. DIVISION' (IF AVA'fER 0111A1.ITY - 1'hnuis[n I,ahnralmy Hryn,rt! 1x'alrr t)natkty r r w SAMPLE'l YPE ('()IIN tY HALIFAX E'KIVKIII" HI('F:Ft B,151N : AMBIEN-I- OA ❑ STREAM ❑ EFFLUENT � n 14FTOR1.10 RRO RvAirni ( ltire AN jlry 1 r C COMPLIANCE S l-IIAIN0FCUSIc717Y 5 2�0 ❑ ❑ LAKE ❑ INFLUEiNU �Jj Other 1.t} i FMFRGFNCY VISIFID FS'I'UARY (:OI,LF;('I ORES) HUNT J --- E%i mated It011 Range: ( .. - - — -- -" •— Station I.oratian: BROWNS FARIA Seed: Uhlnrinalyd; Hnnxr4s: Stallan M Daee Begin 1yy7mmlddl Dale Fnd ( slmmldd) Time Begin l imr End Depth - WN1, pR, UB\I Value Type- A. H, 1. Composite-T, S, B Sample Type SPRAY FIELD SOURCE 20021217 1050 BOD 310 200 G! m /L COO I li , 340 m L COD Low 335 mg/L Colifurm: MF Fecal 31616 330000 /100m1 Colifurm: MF'rotal 31504 /100m1 Colifurm: lubc Fecai 31615 - / 100ml Colifurm: Fecal SLrep 31673 1100m1 Residue: Total 500 m L Volatile 505 m&IL Fixed 510 m L RvsidUC; Sus ,ended 530 m /L Volatile 535 m /L Fixed 540 m /L pit 403 units Acidity to pli4.5436 m /L Acidity to pli 9.3 435 m /L Alkalinity to 2119-3 415 nn /1, Alkalinity to pi14.5410 m /L TOC 680 m /L Turbidity 76 NTU Colirsrrm Total Tube "/ 100 mis C011ftl EN I S : Chloride 940 m I. Chi a: l ri 32217 upVL Chi a: Corr 32209 u /L - Pheo h sin a 32213 u /L Color: True 80 C.U. Color: (Ell) 83 11= C.U. Color. pH 7-6 82 C.U. Cyan 720 . m /L Fluoride951 m 1L Formaldehyde 71880 rn /L Gicax and Oils 536 m •/1. llardness 'Fotal9W m /L S •cifrc Cond. 95 u,nhos/cm2 hH4AS 38260 n, g/l. 11hcnols32730 u /I - Sulfate 945 rt, /l. Sulfide 745 In/l. Boson Tannin & Li in u /L l lexavalem Chromium u /L Bieatbonate m /L Ufttiatt Rig/ 1. t NJU as N 610 X2 m /L I KN an N 625 X2 m /L NO2 plus NO3 as N 630 mg/ L X P: Total as P 665 X2 m L 1104 as P 70507 nt L P: Dissolved as P 666 m L K-Potassium m /L Cd-Cadmium 1027 tt /L Cr-ChmrniumcTotal 1034 u /L Cu- Copper 1042 u /L Ni-Nickcl1067 u /L Pb- Lead 1051 u /L Zn- Zinc 1092 u /L IV -Vanadium u /L A-Silvci 1077 u L Ai -Aluminum 1105 u L Be - Br Ilium1012 u /L Ca- Calcium 916 m /L Co -Cobalt 1037 u /L Fe- Iron 1045 u /L Li -Lithium 1132 u /L Mg- maesium927 m /L Mn-Man nese 1055 u /L Na- Sodium 929 m /L Arsenic:Total 1002 u L Se -Selenium 1147 uSIL Hg- Mercury 71900 u L Ba Barium u L Organochlurinc Pesticides Organuphosphorus Pesticides Acid I1crbicides Basc/Neutral&Acid Extractable Os inics IPiI Range Purguable Or nits (VOA bo01c rc 'd) 'FPH Gasoline Range TPH/BTEX Gasoline Range Ph to lanklon C�p.; e+c--u yoy DIVISION OF WATER QUALITY WATER QUALITY HELD -LAB FORM (DMI) COUNTY PRIORITY SAMPI.F TYPE � 4i1�� �-� R1VF•,R BASIN ❑ Ah1111LNT ❑ STREAM ❑ I:FFLU T REPORT TO: ARO FRO MRtl� WaRO WiRO WSRO TS AT QM COAIP!_IANCE ❑ LAKE I ,UE Other Shipped by: Bus. Courier to Other v - ❑ EPAERGENCY ❑ FSTUARY COLLECTOR S1: Estimated 130D Range: 0-5l5-25 5- e40-130 or 100 plus STAl1ON UWAi IS_ I- AaPA Z Seed: Yes ❑ No P4_ Chlorinated: Yes ❑ No REMARKS: F_ 1 .1, flew ()NI V Lab Number: Date Rece'vcd: Time Rec'd b From: Bus -courier- and De DATA ENTRY BY: CK: DATE REPORTED: Station H Dalc Ile gin (yylmn+dd) Tinte Begin hate litd rime End Depth DM DE3 DBM Value Type 7011sposite Sample Type tZ ! (�' $ A 11 L S B C GNXX 1 XIBOD53110 nrg/L 2 COD High 340 mg/L 3 COD Low 335 mg/L 4 Colil"orm: MF Fecal31616 flound 5 Cout'orm: hiFTotal 31504 110Und 6 Colifonn: Tube Fecal31615 !1(10ml 7 Coliform: Fecal Strtp 31673 1100ml 8 Residue: Total 500 rng/L 9 Volatile 505 mg/L 10 Fixed 510 mglL 11 Residue: Suspended 53U rng/I. 12 Volatile 535 mg/L 13 Fixed 540 mg/L 14 pit 403 units 15 Acidity to pil 4.5 436 mglL 16 Acidity to p1l 8.3 435 mg/L 17 Alkalinity to pit 8.3 415 tng/l. Is Alkalinity totill 4.541U Ing/l. 19 TOC 680 twit. 20 Turbidity 76 NTU Chloride 940 mgeL Chi a 70953 pgll. Color: True RQ Pt -Co Color:tpll ) 83 ADhl1 Color:pl17.6 92 ADMI Cyanide 720 mgll. Fluoride 951 mg/L Fornuldehydc 71880 mgll- (ifeace and oils 556 lowt. I iardlless Iola190) mg/l. Specific Cond. 95 NIBAS 38260 ntglL Phenols 32730 µrr/L Sulfate 945 mgel. Sutlide 745 mg/L Nlll as N 610 mglL rKN as N 625 mg/L NO2 plus NO3 as N 63Q mg/L P: Total as 1' 665 mg/L V4 as P 665 mg/L ': Dissolved as P 666 mg/L d-Cadmium 1021 pg/L Cr-Clromittrn:Tntnl 1034 pglL 'WCopper 1042 µgeL i-Nickel io(17 pg/L Pb-Lead 1051 pglL Zn-Z.irte 1092 µg/L AS-Siltvt 1077 µgeL Al -Aluminum 1105 pglL ie-Beryllium 1012 pgeL Ca -Calcium 916 mg/L Co-C-uball 1037 pgll, Fc-Iron IIFl5 µgel i-Lithium 1132 µg1L 1g-Magnesium 927 mg/L Mn-Manganese 1055 µg/L a -Sodium 929 mg/L rscnictTolal1002 - Itg/L Sclenium 1147 Ig-Mercury 71900 µ C/L lrgao0cld0rinc Pesticides ' 1rgalWpllnsphortl5 Pesticides ' cid Ilerbieides SasclNetaral Extractable Organics Acid Extractable Organics urgcabie Organics (VOA bonle req'd) 'hytoplanklon Lnh Use (h11v I'ctn teraturc on arrival: samplingsamplifig Point % C'urduciamv at 25-C WBter 1'en raltrc "C ).U. mJL 11 Alkalinity Acidity Air Te ratiae'C Ill 8.3 1114.5 Ill 4.5 pit 8.3 2 J4 U 3oa 400 2244 431 2243 L7242 20 Salinity '.4o Precipitation (inldayl Cloud Cuter % Wind Direction (Dcg) Srreant HOW Severity Irtobidily Severiry Mind Velocity lean Strea m Depth I1, 164 Stream Width It. 80 45 12 36 351 350 35 4 NC DENRIDWQ Chemistry Laboratory Report to: RD Sample Anomaly Report (SAR) Lab Number. - 1 v 6 7 '1y Sample ID: Station Location: IcrttN 's _l= A-9-,Y) County: I-l-PL t >;�_,c Region: r Sample Type: t_.00t7 ' Priority: t; 1= o (__ Collector: Date collected: is, / 1'7 / 0 Date received: I -z- / i ) I r~ -2- Date analyzed: I 1 Affected Parameter(s): Analytical Area (check one): ❑ WCH ❑ METALS NUT ❑ MICRO The following anomalies occurred (check all that apply): ❑ Samples ❑ Improper container used ❑ VOA vials with headspace ❑ Sulfide samples with headspace ❑ Samples not received, but listed on fieldshcet ❑ Samples received, but not listed on fieldshcet Cl Mislabeled as to tests, preservatives, etc. ❑ Holding time expired ❑ Prior to receipt in lab ❑ After receipt in lab ❑ Insufficient quantity for analysis ❑ Sample exhibits gross non -homogeneity �k Sample not chemically preserved properly pH out of range (record pH): ❑ Improper chemical ❑ Residual chlorine present in sample ❑ Color interference ❑ Heavy emulsion formed during extraction ❑ Sample bottle broken in lab - no reportable results M Other (specify): ❑ VOA ❑ PEST ❑ SVOA ❑ Quality Control ❑ Instrument failure - no reportable results Cl Analyst error - no reportable results ❑ Surrogates ❑ None added ❑ Recovery outside acceptance limits ❑ Spike recovery ❑ None added ❑ Recovery outside acceptance limits ❑ Failed to meet criteria for precision ❑ Internal standards ❑ Blank contamination ❑ QC data reported outside of controls (i.e. QCS, LCS) ❑ Incorrect procedure used ❑ SOP intentionally modified with QA and Branch Head approval ❑ Invalid instrument calibration Cl Elevated detection limits due to: ❑ Insufficient sample volume Comments: Sc� is w� c�.-� c� .. �_ Ci'- T Corrective Action: Samples were rejected by DWQ Lab. Authorized by: L4�JLII 0 Date: JQ Accepted and analyzed after notifying the collector or contact-pers-&h and determining that another sample could not be secured. ❑ Sample(s) on hold until: ❑ Sample reported with qualification. Data qualification code used: ❑ Other (explain): Notification Required (circle one)> Yes No Person Contacted: T z t1 Date: a 113� 1_12 Form completed by: IilcTt5L L eV- rA-,TA,t t Date: 1 2 /17 / L;- ad Chemist Re vi w t ual): B10CREM ❑ PEST Q SVOA ,I METALS ❑ VOA Branch }lead Review (initial): QA/QC Review (initi Logged into database by (initial): QASFo,m�SLaban,ary�SAR 1012310i dbs ti Amami January 22, 2003 Mr. Kenneth Schuster `ti Regional Water Quality Supervisor North Carolina Department of Environment and Natural Resources Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 RE: Notice of Violation, Intent to Enforce, COC AWS420010 Brown's of Carolina Farm 52, Halifax County Dear Mr. Schuster: We are in receipt of a Notice of Violation (NOV) for Smithfield-Carroll's Farm 52, operated by Brown's of Carolina, Virginia Division. The NOV details events occurring on December 16, 2002. The NOV indicates that a site inspection by Mr. Buster Towell, of the Raleigh Regional Office, "led to the discovery of an illegal discharge of animal waste from the subject facility which flowed into surface waters of the State." While we do not dispute that lagoon effluent did in fact leave the application field at this location, we do not believe that this constitutes a discharge to waters of the state. The wastewater flowed into a drainage ditch and infiltrated into a low area in the woods before reaching the pond. The pond is indeed hydraulically connected to the USGS "blue line" stream known as Cow Haul Swamp; however, no effluent reached either the pond or this swamp. As flow of the effluent stopped before reaching these features, it can be reasonably assumed that no adverse downstream water quality impact occurred as a result of this incident. Remediation efforts were also conducted at this location to remove lagoon effluent that had reached the woods. These efforts ensured that flow would not continue into the pond if accelerated by rainfall. For these reasons, we feel that no enforcement action is appropriate in this case. The NOV also states violation of General Permit Condition 11.2., which states that a vegetative cover shall be maintained on all application fields. A small grain crop was indeed interseeded into these pastures in the fall of 2001, and while extremely cold conditions this winter have made it challenging to attain a strong stand, nitrogen uptake will still occur. It appears that the runoff conditions were exacerbated more by the moisture levels in the soil than by the grain stand. The employees responsible for land application activities on this site have been disciplined for the lack of proper oversight exhibited in this situation. This includes the termination of employment of Ronald Vincent. Brown's of Carolina considers the responsibility of avoiding permit violations a condition of employment with the company, and takes necessary action to see that incidents such as this do not occur in the future. BROWN'S OF CAROLINA, INC. 434 EAST MAIN STREET - P.O. BOX 1240 - WAVERLY, VA 23890 - PHONE (804) 834-2109 VIRGINIA DIVISION We appreciate the opportunity to work with the DWQ in effectively resolving this issue, and once again state that no enforcement action is warranted in this situation due to the fact that all effluent runoff was retained on Smithfield-Carroll's property and did not reach USGS "blue line" surface waters. Please contact me at (804) 834-2109 if you require any further information. Sincerely, Neil Zahradka Manager of Farming and Environmental Affairs cc: Mr. Jack Keane, Brown's of Carolina, Virginia Division Mr. Kraig Westerbeek, Murphy -Brown, LLC Mr. Don Butler, Murphy -Brawn, LLC Ms. Kelley Kline, Esq., Smithfield Foods, Inc. DIVISION OF WA•F'ER QUALITY ,�'t •'. Chrndstr.� I.ahuworl liryorrr ! tVatrr Qnallt. El 511ia BE Y\ t-t C[)IINT'Y' 11AI.IFAX RIVERIIASIN: 1'Ii10KlI_Y � AMBIENT� QA ❑ STREAM `� EFFLUEI S - Rf;l.01tTT[1 : RRO RcginnalOfLcc a COMPLIANCE CIIAINOFCUSTODY G LAKE Q']NFLUZNI' Other EMERGENCY VISH 11) ES'E-UARY [Y IL1.1:Cf[IRISI : JlIUNT Lab Number 2W8719 Bate Received : 12/ 1712002 Time Received : 2:25 PM Received By 11MW L 1�1316 Data Released Alt Date Reported: 1 /10/2003 h:s[lmsrcd Will 7sn>:r•, Station i!Kstinn; BROWNS FARM Srrd: 1'h for In atrd: Itrnu rks: Slat too 11 Datr Iirgln la.Immlddi Usle End gpLllnuddl 7 imr Begin -I Imr Find Ilrpth - DNI, IIEf, 111151 ".WI 'slnr T j pr- A, 11, 1- l'ompositti I', S. B Namptr'1'ppe W I,ILANUS 20021217 RYES r 13011310 280 G1 m /L CUD Ili h 340 m /L COD Low 335 m /L x Coliform: Nil -'Fecal 31616 620000 83 11(nnl Coliform: MF Total 31304 / I Win] Coliform: tube Fecal 31615 / IOU" Coliform; Fecal Sj�ep 31673 /l0oml Residue: Total 500 m /L Volatile 305 m L Fixcd 510 m /L Residue: Suspt nded 530 m /l. Volatile 535 m /L Fixcd 540 m /L 11 403 units Addit In 11 4.5 436 m /l, Aridity to PH8.3435 rn /L Alkalinity to ptl 9.3 415 m L Alkalinity to p1l 4.5 410 m L TOC 680 rtt /L I utbijity 76 NTU Coliform'TotaI Tube '/l00 mis ['ll\fA1FNl"S ; Chloride940 m /L Chi a:"] ri 32217 v /L Chi a: Cart 322U9 u /L Pheo h ytin a 32213 u /L Color: True 80 C.U. Color: ( l l) 83 pll= C.U. Color: Of 7.6 82 c,a Cyanide 720 m /L Fluoride 951 m /L Formaldehyde 71990 m /L Grease and Oils 556 m /L Ilardnos Tatal900 nr /L Specific Cunt]. 95 umhtn/cm1 MBAS38260 mg/ L Phenols 32730 u /1. Sulfate 945 m /L Sulfide 745 rtr /L Boron Tannin & Li in u /L Hexavaleni Chromium u /L Bicarbonate m /L Carbonate m /L 0 X 010asN610 280 m /L X '1 KN an N 625 290 m L NO2 plus NO3 as N 630 L X P: Total as P 665 39 m&IL PO4 as P 70507 m / L P: Dissolved as P666 to 'i K-Polassium m /L Cd- Cadmium 1027 u /L Cr-Chtomium:Total1034 u L Co- S102peT 1042 u /L Ni-Nickel 1067 ug/L Ph- Lcad 1051 u /L Zn- Zinc 1092 u /L V-Vanadium u /L A -Silver 1077 u /L Al- Aluminum 1105 u /L Be- Belyllium 1012 u L Ca- Calcium 916 L Co -Cobalt 1037 u /L Fc- Iron 1045 u /L Li -Lithium H31 ug/L Mg- Maetsium 927 mg/L Mn-Manganese 1055 ug/L Na- Sodium 929 /L Arsenic:Tota11002 u /L Se -Selenium 1147 u /L H . Mercury 71900 u L Ba Barium u L Organochlorine Pesticides Organophosphatus Pesticides Acid Ilerbicides Basc/Neutral&Acid Extractable Organics TPH Diesel Range Pu able Organics(VOA botde re 'd) TPH Gasoline PanVe TPH/BTEX Gawline RanjE Phytoplankton DIVISION OF WATER QUALITY WATER QUALITY FIELD -LAB FORM (DM 1) For Lab Use ONLY I+ A)/ COUNTY � A L, 1 �^ r R 'Rl 1 SAMt'LR TYPE RIVER BASIN ❑ AhltilfNT ❑ STREAM ❑ EFFLUENT REPORT TO: ARO FROM RRO aRO WiRO WSRO TS I AT BM �i✓ COA4PLIANCE ❑ LAK£ ❑ IN Olhcr Shipped by: Bus. Courier, raft Cher ❑ EMERGENCY ❑ reTUARY Lab Number: Date Rece-v d• Time: 5knd,� Rec'd b From: Bus -Courier DATA ENTRY BY: CK: ` DATE REPORTED: COLLECFOR(S): r rJ t , Estimated DOD Range: 0-515-23125-665140-130 or 100 plus 5'rA I70_ N LUCA I ION: F] (r� ] S F019—/--'s Sced: Yes ❑ No19L Chiorinaied: Yes ❑ No Rli61ARKS: Station p _ Date Itcgin (yy/mnUdd) Time Ilcgin Time Find l)eplh DAI Dl1 U11M Value Type Composite Sample Tyre I)i'"T L A .S C) _S UL 1 L 1 n: `t S A.jDalcluki �- Z-1. [-1— - q {� A 1 I L T S B C GNXX 1 13005 310 utglL 2 CUD High 340 mg1L 3 C013 Low 335 mgll. 4 Coliform: MF 1'ecal 31616 1100ail 5 Colifosrrc MFTotal 31504 /IIXhn1 6 Coliform: Tube Fecal 31615 AW1111 7 Coliform: Fecal Sucp 31673 /100mi 8 Residue: Total 300 mg/L 9 Volatile 505 meL 10 Fixed 510 mg/L I I Residue: Suspcmlcd 530 rnglL 12 Volatile 535 ntg/L 13 Fixed 540 mgrL 14 pit 403 units 15 Acidity to pit 4.5 436 mg/L 16 Acidity to pll 8.3 435 mg/L 17 Alkalinity to p118.3 415 mg/L 18 Alkalinity to pit 4.5 410 ntg/I. 19 I0C 680 mgrL 20 'I tvhidity 76 N-111 Chloride 940 111g/L Cld a 70953 µ fill. Color. True 80 Pt -Co olor:(Pll ) 83 ADMI Color:pI17.6 82 ADM I Cyanide 720 nrg/L Fluoride 951 mg1L Formaldehyde 71880 mg/L Grease aril0its 55f. mg/L llardnesslotal900 mg/L Specific Conti 93 MBAS 38260 nrg/L Phenols 32730 µg/L Salflre 945 mglt. Sulfide 745 ntg1L NI13 as N 610 mg/L rKN as N 625 mg/L NO2 plus NO3 as N 630 mg/L P: Tidal as 1' 665 mg1L 104 as 1' 665 mg)L Dissolved as P 666 mg/L d-Cadmium t027 pCIL Cs -Chromium jotal 1034 µg/L u-Copper 1042 µ fill. i-Nickcl 1067 It C/L E"b-Lead WS1 pg/L Zn-Zinc 1092 µgfL \g-Silver 1077 ftg/L M-Aluminum 1105 pg/L se-llcrylliunr 1012 pgli- Ca-Calcium 916 mg/L Co-Cohalt I037 pg/L Fc-Iran 1045 µCA. -i-Lithium 1132 µg1L 1g-Magnesium 927 mg)L Mn-Manganese 1055 µg/L a -Sodium 929 mg/L rsenic:Tutal 1002 pg1L c-Selenium 1147 µg/L IS -Mercury 71900 µg/L lrgarwchlorine Pesticides rganophosphonts Pessicides cid Ilerbicidcs J lasemcutral Extractable Organics Acid Extractable Organics urgcable Organics (VOA bottle req'd) 'hytuplanktun Lab Ilse Oulu Trio craturc on anival: Sam lin Poim % Conductance at 25"C: water Trnr )crature'C ).O. niWL 11 Alkalinity Acidity Air Tent erature'C 1113.3 pl1 4.5 tlt 4.5 pit 8.3 2 M 0 311(j 00 42244 431 2243 92242 0 Salinity %. Precipitation FirVday) Cloud Co,cr % Wind Direction (Deg) SlRarn Flow Severity Severity Vind Velocity lean Sires m Depth ft, Stream Width li- 80 45 32 6 1351 Ifurbidily 35U 35 164 4 Reportto: Q WATER QUALITY SECTION Page —L- of —L k P V NC DENR/DWQ LABORATORY (check one): CHAIN OF CUSTODY (COC) RECORD I I CENTRAL I I ARO I I WaRO � For Investigation of: S T--PF."h Sample collector (print name) and DM-1 forms completed by: Sample collector's signature: .. Field storage conditions and location (when applicable): Lab Use Only. . 4 I ti SLAB NO �,, -�, STATION NO. STATION LOCATION DATE SAMPLED TIME SAMPLED `UMBER OF CONTAINIERS t d 73 r,. _ i I � Relinquished by (signgture): ate Time "Cled g tur t i Datc Time Relinquis a by (signature): Date Time Receivedbysignature): Date Time Relinquished by (signature): Date Time Received by (signature): Date Time Method of Shipment (circle one): State Courier -delivere Federal Express UPS Other: Security Type and Conditions: Sealed by: Broken by: INTRALABORATORY CHAIN OF CUSTODY - Lab Use Only ° �NLJMBER, ANALYSES-,.- RELINQUISHED RECEIVED DATE TIME :. FROM i : THROUGH a ^BOTTLES REQUESTED BY .. .. ' :. BY: > lit 7 Z 2:50 �/ �1! .� t/ rI '.:i "1 U �� y ;! 14� S` �A �1 12-17-a2 3• �.t y� II l _ - :iF .nrait`i- Ya i - .-1.AC ,r r., h ., IF I �.1 -� Ilt _. L I ' I J-P I, ��� fi 5.� i I.s!.n7,k§ __�. a' �waa _��.. , �,.L.rniL..ur ,r i�'_ �.i.kl•'. �.� J��.. ?li.. :d,a� �: �:: �. - { QA\FormslSample ReceivinglCOC form WQ 4/I0/0ldbs NCDSNR/MVQ Chemistry Laboratory Report to: Sample Anomaly Report (SAR) Lab Number. 2W1 7 i 9 � Sample ID: Station Location:,grr W—Ar G M S2-- County. c Region: O Sample Type: r'OG _ Priority: i' CE? Collector: '&069L Date collected: _- 12 / 17 UZ Date received: IZ• 1 l7 I 0 Z— Date analyzed: IZ 1 1 IF / o z Aff ctcd Parametcr(s): -Qp Analytical Area, (check one): ❑ 1VCH ❑ tETALS ❑ VOA ❑ SVOA ❑ NUT i h(iCRO ❑ PEST The follov.ing anomalies occurred (check all that npply): ----^- y ❑ Samples ❑ Quality Control ❑ Improper container used ❑ Iiwur.%rt failure — ro r.-porcabl: reaJlci yCr-r ❑ VOA vials %Vith hCadsp:cc ❑ Analyst e,ior ^ no r.- 3 ,able r:4ults ', ❑ Sutcidc samptcs wi:h h:adspace ❑ S"roga:es I ❑ Sarpl:s not rcceiv:d, but hsted on ficldshc:c ❑ None added 4m_` ❑ Sampt:s rcceived, but no: Hs:cd on fields; e.., ❑ Rccovcry ou:s,':: a:eep;anec lirnsi s ❑ Mishb:I.d as to t:sfs, Dr: s:,;atiVa, ctc. ❑ SDI�-C f:CO'. Cry' ❑ Folding lime expiecd 0 Nole added ❑ Prior to receipt ie: lab ❑ Recovery oe:sid: acc:pcanee Timisi�- ❑ Arcec receipt in lab ❑' Failed to meet ericarii for pr:eisior, ❑ Inserilcient quantity Car an=lysis :,, •+• ❑ Incerzal sandardi ' ❑ Samal: czhibics gross non-homogcneicy ❑ Blank contamination ❑ Sample no, chemically preserved properly Cd� QC dam reported oe:sidc o; eonnols (i.e. QCS, LCS) ❑ pH out orrangc (rccord'pH): ❑ Incorrect proccdL:: Used ❑ Im?roper chemical ❑ SOP lmdmional ly r..cditled with QA aad Branch F.-ad ❑ Residual chlorine pres:nc in s2m?1: approval ❑ Color intcrrerciwc ❑ Irvalid ins",rnen: ccli5rtion' ❑ Hea,,y emulsion fonred during exxcraccion ❑ Et_vat:d dc:cction timks d_: to: ❑ Sample bocde broken in tab - ro reportable r:salts ❑ InsuM-Icat s_r,.?lc volume ❑ OtIter (specify): Co: nnicnts: Ccrrcctive Action: ❑ Samples were rejected by DWQ Lab. Authorized by: Date: ❑ Accepted and analyzed after notifying the collector or contact person and dct:rrnining that ancthcr sampl: could not be s:curcd. ❑ Sample(s) on hold until . tB' Sample reported with qualification. Data qualification code used: ❑ Other (explain): Xotirication Required (circle one)? Yes No Person Cont_eted: y Form completed by: Data: 12 / 30 / 4 ' cad Chemisc R- iew (initial): BIOCHYN Cl PEST ❑ SVOA 7 METALS ❑ VOA :a1ch Head II.:YIeW (ini;ial): tA/QC R:vic%v (intttal) Lo;;:d i:.fo database by (initial): a;r: nv i a• {,Iimu�l+b.irttuq SA i Report to: P., -I-. jv-,�-, WATER QUALITY SECTION k9CHAIN OF CUSTODY (COC) RECORD --, () NC DENR/DWO LABORATORY (check one): CENTRAL ARO WaRO Page .—L--.f—j For Investigation of: Sample collector (print name) 0-jxr— and DM-1 forrns completed by: Sample collector's signature:_ Field storage conditions and location (when applicable): :Lab UseOnly-v!,.,i NUMBER DATE TIME OF k,LAB; NO.'.!. STATION NO. STATION LOCATION SAMPLED SAMPLED CONTAINERS 0 Relinquished by (sign tire): _ _ Date Time e 0 e cified. by jig r VyDate Time n Relinquisfici by (signature): Date Time Received by Tsignature): Date Time Relinquished by (signature): Date Time Received by (signature): Date Time Method of Shipment (circle one): State Courier Federal Express UPS Other: Sealedby: —Broken by _:'I .... Security Type and Conditions: onditions: J RECEIVED 412w. 10 Em M, M,/ UP MR ymm� 'Awromm, IRA , k, ? r LL P "I I 1i J1 jj ;�, '�"; A 1. !I 'I u Z i 14- 'I -1; U P a I- 's z L A-4Z A A 1 17-AC:....-1 D -1 1ni- V-.... ill/1 V All n in 1 Al... Waste Management Plan Changes Facility q Z - / 6 Farm so, This farms Waste Management Plan has made the following changes: ❑ Crop changes ❑ Wetted Acres ❑ Increased Acreage ❑ Decreased Acreage ❑ Changed Irrigation Design ❑ Change in Farm type ❑ Plan based on 3 Years On Farm Records Other Comments: 3 - 2, Date Murphy -Brown, LLC 3/26/2008 P.O. Box 856 Warsaw, NC 28398 Grower(s): Farm Name: NUTRIENT UTILIZATION PLAN Murphy -Brown, LLC Farm 52 County: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder 2000 Farrow to Finish Wean to Feeder Feeder to Finish Storage Structure: Anaerobic I Storage Period: Application Method: >180 days Irrigation _agoon The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different Infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH In the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): `Based on Site Specific Records Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr 2000 Farrow to Feeder 4015 gallyr 5,185,934 gallyr Farrow to Finish 10585 gaVyr gal/yr Wean to Feeder 223 gal/yr gallyr Feeder to Finish 986 gall gal/yr Total 5,185,934 gal/IZ AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibslyr Ibslyr 2000 Farrow to Feeder 6.5 Ibslyr 9,288 lbslyr Farrow to Finish 26 Ibslyr Ibslyr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 lbs/yr lbsiyr Total 9,288 Ibsl Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste In a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize In the normal growing season. Total Irrigated Acreage: 55.91 Total N Required 1st Year: 15289.7763 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 15,289.78 Totals Nitrogen Produced by Farm: 9,288.00 Nitrogen Balance for Crops: (6,001.78) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 8 a��t©®o��©����©�©ter■©®�® �®mom©try : �®�■®��*��©��©��® �®■��■m■©����©■�©������©�■©©mom ��r■���■�©� .,, , ■ram©®����oi�©���mm■� Reception Area Specifications 200512011 Amendment for Pumping Agreement. Aerway Application- Fames 51 d 52 -Whitehead Tract Field Irrigated Soft 1st Crop Time to 1st Crop 1st Crop Lbs NIAc Lbs N Tam! 02s N Acres s TVD& Coda Apply Yield ibs NlUnit Residual fAc Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs NlAc Lbs N Total Ors N Code Apply Yield Ibs NAIrlt Residual 1Ac Utilized Total Lbs NlAc Total tbs N Utilized 5973 1 11.7 Emporia F Mar-A 825.0 0.12 35 64 745.8 Cover CrDpj Se 1 35 35 409.5 99 1158.3 2 4.5 Gritre F Mar -A 675.0 0.12 35 46 207 Cover C(opi Se -A r 1 35 35 157.5 81 364.5 3 3.7 Goldsboro F Mar 925.0 0.12 35 76 281.2 Cover r 1 35 35 129.5 111 410.7 4 5 Marlboro F Mar 925.0 0.12 35 76 380 Cover Cmd SePtApr 1 35 35 175 111 555 5 7.3 Norfolk F Mar -Aug 875.0 0.12 35 70 511 Cover 1 35 1 1 35 255.5 105 766.5 6 6.5 Goldsboro F Mar-A 925.0 0.12 35 76 494 Cover Cm Sept -Apr 1 35 35 227.5 1 111 721.5 7 7.2 Emporia I F Mar-A 825.0 0.12 1 35 64 460.8 Cover Cro 1 1 35 135 252 99 712.8 8 3.1 Empoda I F Mar -Aug 825.0 0.12 35 64 198.4 Cover Cropi Se 1 35 35 1084 99 308.9 9 2.9 Emporia F Mar-A 825.0 0.12 35 64 185.6 Cover 1 35 35 101.5 99 287.1 10 9.2 Norfolk F Mar-A 875.0 0.12 35 70 6" Cover Croul SePtAor 1 35 35 322 105 966 11 3.1 Bethera F Mar-A 600.0 0.12 35 37 114.7 Cover 1 35 35 108.5 72 2232 5968 4 2.8 Emporia F Mar-A 825.0 0.12 35 64 179.2 Cover r 1 35 35 96 99 277.2 23 10.2 Goldsboro F MaLA4 925.0 0.12 35 76 1 775.2 Corer Se 1 35 35 357 111 1132.2 5973 1 11.7 EmDcwia D Mar -Jul 110.0 1.25 138 1608.75 N 55 2.4 132 1544A 269.5 3153.15 2 4.5 Gftiev D Mar -Jul 100.0 1.25 125 562.5 N 45 2.4 108 486 233 1048.5 3 3.7 1 Goldsboro D Mar -Jul 130.0 1.25 163 601.25 N Sept-AprB5 2.4 156 577.2 318.5 1178,45 4 5 1 Marlboro D Marjul 1%0 1.25 138 607.5 1 N Sept-Apr60 2A 144 720 281.5 1407.5 5 7.3 Norfolk D Mar -Jul 115.0 1.25 144 1049.375 N Se 60 2A 144 1051.2 287.75 2100.575 6 6.5 Goldsboro D Mar -Jul 130.0 1.25 163 105625 N 65 2.4 156 1014 3i8.5 2070.25 7 7.2 Em D Mar -Jul 110.0 1.25 138 990 N 55 2.4 132 950.4 269.5 1940.4 8 3.1 EmRRM D Mar -Jul 110.0 1.25 138 42625 N 55 2.4 132 409.2 269.5 835.45 9 2.9 Em da D MarJul 110.0 1.25 138 398.75 N 55 2.4 132 382.8 269.5 781.55 10 9.2 Norfolk D MarJul 115.0 1.25 144 1322.5 N 80 2.4 144 1324.6 287.75 2647.3 11 3.1 Bedrera D MarJul 105.0 1.25 131 406,875 N Se 40 2.4 96 297.6 227.25 704.475 5968 4 2.8 1 Emporia D MarJul 110.0 1.25 13B 385 1 N Se 55 2A 132 369.6 269.5 754.E 1 23 10.2 Gold D MarJul 130.0 1.25 163 1657.5 N SOMAW 65 2.4 156 1591.2 31&5 3248.7 5973 1 11.7 Emporia O ADr-AuQ 35.0 4 1 140 1638 0 0 140 1638 2 4.5 GLbM D -A 35.0 4 140 630 0 0 140 630 3 3.7 Goldsboro O 45.0 4 180 666 0 0 180 666 4 5 Marlboro O 45.0 4 180 900 0 0 180 900 5 7.3 Norfolk O 42.0 4 168 1226.4 0 0 16B 1225.4 6 6.5 1 Goldsboro 0 A 45.0 4 180 1170 0 0 180 1170 7 7.2 Emporia 0 AprAtn 3&0 4 140 1008 1 0 0 140 1008 8 3.1 Emporia 1 O Aor-Auo 1 35.0 4 140 434 - 0 0 140 434 9 2.9 Em a O Apr-Auq 35.0 4 140 406 0 0 140 406 10 9.2 Norfolk O ADr-Aw 42.0 4 168 1545.6 0 0 168 1545.6 11 3.1 Bemera 0 -A 35.0 4 140 434 0 0 140 434 5968 4 2.8 Emporia 0 Apr -Aug 35.0 4 1 140 392 0 0 140 392 23 10.2 Goldsboro O Apr-Aua 45.0 4 180 1836 0 0 180 1836 Totals., 231.6 286111A 13420A 42038.8 This plan does not Include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers In some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine Inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late In the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage Just before heading as Is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to Interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yield A Barley 1.6 lbs N 1 bushel B Hybrid Bermudagrass - Grazed 50 lbs N I ton C Hybrid Bermudagrass - Hay 50 lbs N 1 ton D Corn - Grain 1.25 lbs N / bushel E Corn - Silage 12 lbs N 1 ton F Cotton 0.12 lbs N / lbs lint G Fescue - Grazed 50 lbs N 1 ton H Fescue - Hay 50 lbs N 1 ton I Oats 1.3 lbs N 1 bushel J Rye 2.4 lbs N / bushel K Small Grain - Grazed 50 lbs N / acre L Small Grain - Hay 50 lbs N / acre M Grain Sorghum 2.5 lbs N 1 cwt N Wheat 2.4 lbs N 1 bushel O Soybean 4.0 lbs N / bushel P Pine Trees 40 lbs N / acre I yr Q Matua 50 lbs N 1 ton Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal In the lagoon sludge Farm Specifications PANT rlanimal Farm Total Farrow to Wean 0.84 2000 Farrow to Feeder 1 2000 Farrow to Finish 4.1 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2000 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10000 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 33 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 80 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by Initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, It is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of Freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop Inlhr inches Zone 1 Emporia BIC 0.4 1 Zone 2 Emporia BIC 0.4 1 Zone 3 Emporia BIC 0.4 1 Zone 4 Gritney BIC 0.5 1 Zone 5 Emporia BIC 0.4 1 A Emporia BIC 0.4 1 B Emporia BIC 0.4 1 C Emporia BIC 0.4 1 D Emporia Wildlife 0.4 1 E Emporia Wildlife 0.4 1 F Emporia Wildlife 0.4 1 6of8 Additional Comments: This plan is written on site specific documentation of Waste/PAN production from June 2001-Sept 2003. Fields A-C are optional for this plan. Application on these areas will be made with an aerway machine. Wildlife plantings are optional for this plan. Crops may include Sunflowers, Chufa, Millet, or Peas. PAN rates listed are equal to or slightly lower than standard nutrient recommendations from NRCS and NCWLRC for wildlife plots. For all fields, the grower will take the followin_g residuals: 15 lbs from any crop following Soybeans All PAN applied (allowed 35 Ibs) from any crop following Cover Crop The Bermuda is written for a hay/graze combination. At least half of the yield will be removed for hay. _ 7 of 8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Farm 52 Owner: Murphy -Brown, LLC Manager: OwnerlManager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner; M Signature: Name of Manager (if different from owner) Signature: +0r Z► 3--25-08 Date 3-2S- 08 Date Name of Technical Specialist: Amy E. Roberson Affiliation: Murphy -Brown, LLC Address: 2822 Hwy 24 West, Drewer 856 _ Warsaw. NC 28398 Telephone: Signature: C� 293-3434 Date 8of8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fail or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist'. Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 J Murphy -Brown, LLC 4/9/2009 P.O. Sox 856 Warsaw, NC 28398 Grower(s): Farm Name: NUTRIENT UTILIZATION PLAN qa-10 Murphy -Brown, LLC Farm 52 County: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder 2000 Farrow to Finish Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: RECEIVED � DE�Nn Se�ctio� A4u ... APR 0 9 Ms Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. r 1 of 8 r This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, W, tons, etc.): *Based on Site Specific Records Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gal/yr gal/yr 2000 Farrow to Feeder 4015 gallyr 5,185,934 gallyr Farrow to Finish 10585 gallyr gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gall r gallyr Total 5,185,934 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibs/yr Ibslyr 2000 Farrow to Feeder 6.5 Ibslyr 9,288 Ibslyr Farrow to Finish 26 Ibslyr Ibslyr Wean to Feeder 0.48 Ibslyr lbs/yr Feeder to Finish 2.3 Ibs/ r Ibslyr Total 9,288 Ibslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner, LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season, Total Irrigated Acreage: 55.91 Total N Required 1st Year: 15289.7763 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 15,289.78 Total Nitrogen Produced by Farm: 9,288.00 Nitrogen Balance for Crops: (6,001.78) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility, 2of8 :Reception Area Specifications Tract FifMid FmRjlated - Soil I st Crop Time to 1stCrop istCrop LbsNlAc US N Total Fbs-N Acreage Type Code Apply Yield lbs NfUnit Residual lAc PPrIf .71 FI 111T a =1 EFF1.1 OMIT 3(a) of 8 Reception Area Specifications I Tract Field Irrigated Soil Ist Crop Time to 1st Crop 1st Crop Lbs N/Ac Lbs N Total Ibs NJ 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs NI Total I Total Ibs NI Acreaae Tvoe Code Aoolv Yield Ibs NfUnit Residual !Ac Utilized Code Aooly Yield Ibs N/Unit Residual IAc Utilized Lbs N/Ac Utilized 3(b) of 8 ■�■®���©����©�����o©�■®mom -®�- ":i' ©t�'1i'ial:!!• •111 �' L�©®® 'W'i�.Llt�•wJ rG�'..�:JOr©-®©®® Reception Area Specifications 2006/2011 Amendment for Pumping Agreement - Aerway Application- Farms 51 & 52 - Whitehead Tract Field Irrigated Soil 1st Crop Time to 1st Crop 1st Crop Lbs NlAc Lbs N Total Ibs N Acrea e Type Code Apply Yield Ibs NlUnit Residual /Ac Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs NlAc Lbs N Total Ibs N Code - Apply Yield Ibs NlUnit Residual lAc Utilized Total Lbs NlAc Total Ibs N Utilized 5973 1 11.7 Emporia F Mar -A 825.0 0.12 35 64 748.8 Cover C 1 35 35 409.5 99 1158.3 2 4.5 Gdtr*y F Mar -Aug 675.0 0.12 35 46 207 Cover Crod Se - r 1 35 35 157.5 81 364.5 3 3.7 Goldsboro F Mar -A 925.0 0.12 35 76 281.2 Cover 5e 1 35 35 129.5 111 410.7 4 5 Marlboro F Mar-A 925.0 0.12 35 76 380 Cover 1 35 35 175 111 555 5 7.3 Norfolk F Mar -A 875.0 0.12 35 70 511 Cover Cmd Se 1 35 35 255.5 105 766.5 6 6.5 Goldsboro F Mar -Aug 925.0 0.12 35 76 494 Cover 1 35 35 227.5 111 721.5 7 1 7.2 Emporia F I Mar-A 625.0 1 0.12 35 1 64 460.8 Cover C SeUt-Apr 1 f 35 1 35 252 99 712.8 8 3.1 Emporia F Mar -ALA 825.0 0.12 35 64 198.4 Cover CnAA Sept-&K 1 35 35 108.5 99 306.9 9 2.9 Emporia F Mar-A 825.0 0.12 35 64 185.6 Cover 1 35 35 101.5 1 99 287.1 10 9.2 Norfolk F Mar-Auq 875.0 0.12 35 70 644 Cover 1 35 35 322 105 966 11 3.1 Bethera F Mar- 600.0 0.12 35 37 114.7 Cover Croj SftA4W 1 35 35 108.5 72 223.2 5968 4 2.8 Emppris F Mar -Aug 8250 0.12 35 64 179.2 Cover 1 35 35 98 99 277.2 23 10.2 Goldsboro F Mar -A 925.0 0.12 35 76 775.2 Cover Sept-AprSept-Apr 1 35 35 357 111 1132.2 5973 1 1 11.7 Emporia D Mar-JW 110.0 1 1.25 1 138 1608.75 N 55 2.4 132 1544.4 269.5 3153.15 2 4.5 Gritne D MarJul 100.0 1.25 125 562.5 N 45 2.4 1 108 486 233 1048.5 3 3.7 Goldsboro D Mar -Jul 130.0 1.25 163 601.25 1 N Se 65 2.4 156 577.2 1 318.5 1178.45 4 5 Marlboro D Mar -Jul 110.0 1.25 138 687.5 N Sept-Alix 60 2.4 144 720 281.5 1407.5 5 7.3 Norfolk D Mar -Jul 115.0 1.25 144 1049.375 N S80:6E 60 2.4 144 1051.2 287.75 2100.575 6 6.5 Goldsboro D Mar -Jul 130.0 1.25 163 1056.25 N 65 2.4 156 1014 318.5 2070.25 7 7.2 Emporia D MarJrd 110.0 1.25 138 990 N 55 2.4 132 950.4 269.5 1940A 8 3.1 Emporia D Mar -jut 110.0 1.25 138 426.25 N Sept-Aly 55 2.4 132 409.2 269.5 835A5 9 2.9 EmRpria D Mar-jul 110.0 1 1.25 138 398.75 N I Sept -Apr 55 2.4 132 382.8 269.5 781.55 10 9.2 Norfolk D Mar-lul 115.0 1.25 144 1322.5 N 60 2.4 1 1" 1324.8 287.75 2647.3 11 3.1 Bethera D Mar -Jul 105.0 1.25 131 406.875 N 40 2.4 96 297.6 227.25 704.475 5968 4 2.8 Emporia D Mar -Jul 110.0 1.25 138 385 N 55 2.4 132 369.6 269.5 754.6 23 10.2 Goldsboro D Maraud 130.0 1.25 163 1657.5 N 65 2.4 156 1591.2 318.5 3248.7 5973 1 11.7 Emporia O 35.0 4 140 1638 • 0 0 140 1638 2 1 4.5 Gritne O 35.0 4 140 630 1 0 0 140 630 3 1 3.7 Goldsboro O ADr-AuQ 45.0 4 1 180 666 " 0 0 180 666 4 5 Marlboro O -A 45.0 4 180 900 0 0 180 900 5 7.3 Norfolk O 42.0 4 168 1226.4 0 0 168 1226.4 6 6.5 Goldsboro O _Agr-Aug Apr -Aug 45.0 4 180 1170 0 0 180 1170 7 7.2 Emporia O ADr-Aua 35.0 4 140 1008 0 0 140 1008 8 3.1 Emporia O 35.0 4 140 434 0 0 140 434 9 2.9 Emporia O Apr-A09 35.0 4 140 406 0 0 140 406 10 9.2 Norfolk O Apr-AApr-Aua 42.0 4 168 1545.6 0 0 168 1545.6 11 1 3.1 Bethera O Aor-Auq 35.0 4 140 434 0 0 140 434 5968 4 1 2.8 Emporia O A A 35.0 4 140 392 0 0 140 392 23 10.2 Goldsboro O A A 45.0 4 180 1836 0 0 180 1836 Totals. 231.6 28618.4 13420.4 42038.8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue - Grazed H Fescue - Hay I Oats J Rye K Small Grain - Grazed L Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Q Matua Lbs N utilized 1 unit yield 1.6 lbs N 1 bushel 50 lbs N 1 ton 50 lbs N 1 ton 1.25 lbs N 1 bushel 12 lbs N / ton 0.12 lbs N 1 lbs lint 50 lbs N 1 ton 50 lbs N 1 ton 1.3 lbs N 1 bushel 2.4 lbs N 1 bushel 50 Ibs N / acre 50 lbs N / acre 2.5 lbs N 1 cwt 2.4 lbs N 1 bushel 4.0 lbs N / bushel 40 lbs N 1 acre / yr 50 lbs N / ton Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT rlanimal Farm Totall r Farrow to Wean 0.84 2000 Farrow to Feeder 1 2000 Farrow to Finish 4.1 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2000 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10000 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 33 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 80 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. /s1�;1�L+lirfi. [�1► N]�'a'I����1i�L�L�L•�L�lit3 The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop _ inlhr * inches Zone 1 Emporia BIC 0.4 1 Zone 2 Emporia BIC 0.4 1 Zone 3 Emporia BIC 0.4 1 Zone 4 Gritney BIC 0.5 1 Zone 5 Emporia BIC 0.4 1 A Emporia BIC 0.4 1 B Emporia BIC 0.4 1 C Emporia BIC 0.4 1 D Emporia Wildlife 0.4 1 E Emporia Wildlife 0.4 1 F Emporia Wildlife 0.4 1 6of8 Additional Comments: This plan is written on site specific documentation of Waste/PAN production from June 2001-Sept 2003. Fields A-C are optional for this plan. Application on these areas will be made with an aerway machine. Wildlife plantings are optional for this plan. Crops may include Sunflowers, Chufa, Millet, or Peas. PAN rates listed are equal to or slightly lower than standard nutrient recommendations from NRCS and NCWLRC for wildlife plots. For all fields, the grower will take the following residuals. 15 Ibs from any crop following Soybeans All PAN applied (allowed 35 Ibs) from any crop following Cover Crop The Bermuda is written for a hay/graze combination. At least half of the yield will be removed for hay. 7 of 8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Farm 52 Owner: Murphy -Brown, LI_C Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Murphy -Brown, LI_C Signature: Date Name of Manager (if different from owner): Signature: Date Name of Technical Specialist: Amy E. Roberson Affiliation: Murphy -Brown, LLC Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: Date 8 of 8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS {continued} 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 if animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 O�O� W A r Brown's of Carolina, Inc., VA Division Farm #52 PO Box 1240 Waverly VA 23890 Dear Jeff Turner: MichaelF. Easley,Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality Z' October 15, 2004 f O \ c Subject: Certificate of Coverage No. NCA24 01.0 Farm #52 Swine Waste Collection, Treatment, Storage and Application System Halifax County In accordance with your application received on September 16, 2004, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Brown's of Carolina, Inc., VA Division, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with NPDES General Permit NCA200000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Faun #52, located in Halifax County, with an animal capacity of no greater than an annual average of 2000 Farrow to Feeder swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until July 1, 2007, and shall hereby void Certificate of Coverage Number AWS420010 dated May 1, 2003, and shall be subject to the conditions and limitations as specified therein. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed General Permit. Since this is a new joint State and Federal general permit it contains many new requirements in addition to most of the conditions contained in the current State general permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this permit. The Devices to Automatically Stop Irrigation Events Form must be returned to the Division of Water Ouality no later than 120 days following receipt of the Certificate of Coverage. The Animal Facility Annual Certification Form must be completed and returned to the Division of Water Quality by no later than March 1st of each Year. Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Internet: http://h2o.enr.state.nc.us 2728 Capital Boulevard Raleigh, NC 27604 Phone (919) 733-3221 Customer Service Fax (919)715-0588 1-877-623-6748 Fax (919) 715-6048 N e Caroli luralll An Equal OpportunitylAffirmative Action Employer-50%Recycled110%Post Consumer Paper If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C, the Clean Water Act and 40 CFR 122.41 including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual NPDES Permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Aquifer Protection Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact J. R. Joshi at (919) 715-6698. Sincerely, v .. for Alan W. Klimek, P.E. Enclosures (General Permit NCA200000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Halifax County Health Department Raleigh Regional Office, Aquifer Protection Section Halifax County Soil and Water Conservation District Permit Pile NCA242010 APS Files Murphy -Brown, LLC 11/7/2005 P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Murphy -Brown, LLC Farm Name: Farm 52 County: Halifax f' Farm Capacity: Farrow to Wean Farrow to Feeder 2000 J Farrow to Finish Wean to Feeder a' Ott Feeder to Finish ge Structure: Anaerobic Lagoon �d,� Storage Period: >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the'crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft', tons, etc.): 'Based on Site Specific Records Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr 2000 Farrow to Feeder 4015 gallyr 5,185,934 gallyr Farrow to Finish 10585 gallyr gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gallyr gallyr Total 5,185,934 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibslyr Ibslyr 2000 Farrow to Feeder 6.5 Ibslyr 9,288 Ibslyr Farrow to Finish 26 Ibslyr Ibslyr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibslyr Ibslyr Total 9,288 Ibslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total irrigated Acreage: 55.91 Total N Required 1st Year: 15289.7763 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 15,289.78 Total Nitrogen Produced by Farm: 9,288.00 Nitrogen Balance for Crops: (6,001.78) The following table describes the specifications of the hydrants and Gelds that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 Reception Area Specifications Tract Field Irrigated soil 1st Crop Time to 1stCrop 1stCrop LbSNIAC Lbs N Tow 1b Acrea2e Utilized q 3(a) of 8 Reception Area Specifications — Tract Field IMqated Soil Ist Crop Time to Ist Crop Ist Crop LbsN/ c LbS N Total lbs 2nd Crop Time to 2nd Crop 2nd Crop Lbs NIAC Lbs N Total Ibs �WmmmAcreage Type Code Apply Yield Ibs NJUnit Residual /Ac Utilized Code AppIX Yield Ibs N/Unit Residual /Ac Utilized 3(b) of 8 Reception Area Specifications 2004R005Amendm nt for PumpIngAgr rnem-AcxayAppllcafion-Farms51 52 Tract Field Irrigated Soil 1 st Crop Time to 1st Crop 1st Crop Lbs NIAc Lbs N Total Ibs N Acreage Type Code Apply Yield Ibs N/Unit Residual IAc Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs N Code Apply Yield Ibs N/Unit Residual /Ac Utilized Total Lbs N/Ac Total Ibs N Utilized lose 1 0.8 Altavista F A r-A 850.0 0.12 35 67 53.5 CoverCro Sept-Apr 1 35 35 28 102 81.6 2A 34.8 State F Apr -Aug 875.0 0.12 35 70 2436 CoverCro Se t-A r 1 35 35 1218 105 3654 213 14 13 Altavista F Apr -Aug 850.0 0.12 35 67 871 CoverCro Se - 1 35 35 455 102 1326 2.5 Bibb F Apr -Aug 675.0 0.12 35 46 115 CoverCro Sept-Apr 1 35 35 87.5 81 202.5 5 21.5 State F A ug 875.0 0.12 35 70 1505 CoverCro Sept-Apr 1 35 35 752.5 105 2257.5 8 6 Altavista F Apr -Aug 850.0 0.12 35 67 402 CoverCro Se -A r 1 35 35 210 102 612 9 6.5 1 Altavista F I ADr-AuQ 850.0 0.12 35 1 67 435.5 CoverCro Se t A r 1 1 35 1 35 1 227.5 102 663 10 27.5 Boiac F Apr -Aug 750.0 1 0.12 35 55 1512.5 CoverCro Se t-A r 1 1 35 35 962.5 90 2475 11 W 11 Altavista F Apr -Aug 850.0 0.12 35 67 737 CioverCro Sept -Apr 1 35 35 385 102 1122 11 E 15.8 State F Apr-AApr-AuQ 875.0 0.12 35 70 1106 CoverCro Sept -Apr 1 35 35 553 105 1659 12 2 Altavista F A r-Auq 850.0 0.12 35 67 134 CoverCroQ Sept r 1 35 35 70 102 204 13 18 State F A r-A22 875.0. 0.12 35 70 1260 CDverCro Sept-Apr 1 35 35 630 105 1890 14 25 State F Apr-AApr-Auq 875.0 0.12 35 70 1750 1 CoverCro Sept-Apr 1 35 35 875 105 2625 16 7.6 State F Apr-AApr-Auct 875.0 0.12 35 70 532 1 CoverCro Se t-A r 1 35 35 266 105 798 17 3 Altavista F A r-A 850.o 0.12 1 35 67 201 CoverCro Sept-Apr 1 35 35 105 102 306 18 22.2 Tarboro F A r-Aug 600.0 0.12 35 37 821.4 CoverCro Sept- r 1 35 35 777 72 1598.4 19 39 1 Tarboro F A r-Aug 600.0 0.12 35 37 1443 CoverCrn Sept -Apr 1 35 35 1365 72 2808 22 9 Altavista F A r-Aug 850.0 0.12 35 67 603 CoverCro Sept-Apr 1 35 35 315 102 918 24 3.8 Tarboro F AR r-Aug 600.0 0.12 35 37 140.E CoverCro Sept-Apr 1 35 35 133 72 273.6 25 1 Tarboro FApr-Aug 600.0 0.12 35 37 37 CoverCro Se t-A r 1 35 35 35 72 72 26 13.6 Bo'ac F A r-A 750.0 0.12 35 55 1 748 CoverCro Se t-A r 7 1 35 35 476 90 1224 27 15.3 Tarboro F Apr -Aug 600.0 0.12 35 37 566.1 CoverCro Se t-A r 1 1 35 35 535.5 72 1101.6 30 6.8 State I F Az)r-Auq 1 875.0 0.12 1 35 70 476 CoverCro Sept-Apr 1 35 35 238 105 714 31 11.3 State F A r-Auq 875.0 0.12 35 70 791 CoverCro $e t-A r 1 35 35 395.5 105 1186.5 rotats. 317 18676.7 11095 29771.7 Reception Area Specifications 2004WOAmendment for Pumping Agreemenr-AennyAppk*tfo„-Ftms5fs52 Tract Field Irrigated Soil 1st Crop Time to 1st Crop 1st Crop Lbs NlAc Lbs N Total Ibs N Acreage Type Code Apply Yield Ibs NlUnit Residual /Ac Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs N1Ac Lbs N Total Ibs N Code Apply Yield lbs N1Unit Residual /Ac Utilized Total 11-bsNIACI jTotallbsN Utillzed Josev 1 0.8 Altavista F Apr -Aug 850.0 0.12 35 67 53.6 CoverCro Sept-Apr 1 35 35 28 102 81.6 2A 34.8 State F Apr -Aug 875.0 0.12 35 70 2436 CoverCro Sept-Apr 1 35 35 1218 105 3654 2B 13 Altavista F A r Aup 850.0 0.12 35 67 871 CoverCro Sept-Apr 1 35 35 455 102 1326 4 2.5 Bibb F Apr-AApr-AW 675.0 0.12 35 46 115 CoverCro Sept-Apr 1 35 35 87.5 81 202.5 5 21.5 State F Apr-AugApr.Aug 875.0 0.12 35 70 1505 CoverCro Se -A r 1 35 35 752.5 105 2257.5 8 6 Altavista F Apr -Aug 850.0 0.12 35 1 67 402 CoverCro Sept-Apr 1 35 35 210 102 612 9 6.5 1 Altavista F I Apr -Aug 850.0 1 0.12 35 67 435.5 CoverCro Se -A r 1 1 35 1 35 227.5 1 102 663 /\ 10 27.5 Bo' c F A uq 750.4 1 0.12 35 55 1512.5 CoverCrx)p Se -A r 1 35 35 962.5 90 2475 11 W 11 Altavista F Apr-ALrR 850.0 0.12 35 67 737 CoverCro Sept-Apr 1 35 35 385 102 1122 11 E 15.8 State F A r Au 875.0 0.12 35 70 1106 CoverCro Sept-Apr 1 35 35 553 105 1659 12 2 Altavista F Apr -Aug W.0 0.12 35 67 134 CoverCro Sept-Apr 1 35 35 70 102 204 13 18 State F Apr -Aug 875.0 0.12 35 70 1260 CoverCro Sept-Apr 1 35 35 630 105 1890 14 25 State F Apr -Aug 875.0 0.12 35 70 1750 CoverCro Se -A r 1 35 35 875 105 2625 16 7.6 State F ARr-Auq 875.0 0.12 35 1 70 532 CoverCro Sept-Apr, 1 35 35 266 105 798 17 3 1 Altavista F I Apr -Aug 850.0 0.12 35 67 201 CoverCro Sept -Apr 1 35 1 35 105 102 306 18 22.2 1 Tarboro F Apr-AuApr-Auq 600.0 1 0.12 35 37 821.4 CoverCro Sept-Apr 1 35 35 777 72 1598.4 19 39 1 Tarboro F A r-Au 600.0 0.12 35 37 1443 CoverCroe Se -A r 1 35 35 1365 72 2808 22 9 1 Altavista F Apr -Aug 850.0 0.12 35 67 603 CoverCro Sept-Apr 1 35 35 315 102 918 24 3.8 Tarboro F ADr-Aug 600.0 0.12 35 37 140.6 CoverCro Sept -Apr i 35 35 133 72 1 273.6 25 1 Tarboro F A ug 600.0 0.12 35 37 37 CoverCro Sept -Apr 1 35 35 35 72 72 26 13.6 Bojac F Apr -Aug 750.0 0.12 35 55 748 CoverCro Sept-Apr 1 35 35 476 90 1224 27 15.3 Tarboro F Apr -Aug 600.0 0.12 35 37 566.1 CoverCrop Se -A r 1 1 35 1 35 535.5 72 1101.6 30 6.8 State F Apr -Aug 875.0 0.12 35 70 476 CoverCro Sept -Apr 1 35 35 238 105 714 31 11.3 State F Apr-AuApr-Auq 875.0 0.12 35 70 791 CoverCro Se i-A r 1 35 35 395.5 105 1186.5 Totals: 317 18B76.7 11095 29771.7 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yield A Barley 1.6 Ibs N 1 bushel B Hybrid Bermudagrass - Grazed 50 Ibs N 1 ton C Hybrid Bermudagrass - Hay 50 Ibs N 1 ton D Corn - Grain 1.25 Ibs N 1 bushel E Corn - Silage 12 Ibs N / ton F Cotton 0.12 Ibs N / Ibs lint G Fescue - Grazed 50 Ibs N / ton H Fescue- Hay 50 Ibs N / ton I Oats 1.3 Ibs N / bushel J Rye 2.4 Ibs N / bushel K Small Grain - Grazed 50 Ibs N / acre L Small Grain - Hay 50 Ibs N 1 acre M Grain Sorghum 2.5 Ibs N I cwt N Wheat 2.4 Ibs N 1 bushel O Soybean 4.0 Ibs N 1 bushel P Pine Trees 40 Ibs N / acre / yr 0 Matua 50 Ibs N / ton Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT rlanimal Farm Totall r Farrow to Wean 0.84 2000 Farrow to Feeder 1 2000 Farrow to Finish 4.1 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements.. Your production facility will produce approximately 2000 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10000 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 33 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 80 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant_ Type Crop inlhr * inches Zone 1 Emporia B 0.4 1 Zone 2 Emporia B 0.4 1 Zone 3 Emporia B 0.4 1 Zone 4 Gritney B 0.5 1 Zone 5 Emporia B 0.4 1 A Emporia B 0.4 1 B Emporia B 0.4 1 #REF! C Emporia B 0.4 1 D Emporia Wildlife 0.4 1 E Emporia Wildlife 0.4 1 F Emporia Wildlife 0.4 1 6 of 8 Additional Comments: This plan is written on site specific documentation of Waste/PAN production from June 2001-Sept 2003. The bermuda rate in this plan is a combination of hay & graze rates. At least half the yield will be removed as hay. Fields A-C are optional for this plan. Application on these areas will be made with an aerway machine. Wildlife plantings are optional for this plan, Crops may include Sunflowers, Chufa, Millet, or Peas. PAN rates listed are equal to or slightly lower than standad nutrient recommendations from NRCS and NCWLRC for wildlife plots. 7of8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Farm 52 Owner: Murphy -Brown, LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the now animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Murphy -Brawn, LLC Signature: Date Name of Manager (if different from owrWrh Signature: 00 Name of Technical Specialist: Dawn Williamson Affiliation: Murphy -Brown, LLC _ Address: T 2822 Hwy 24 West, PO Drawer 856 ^ Warsaw, NC 28398 Telephone: (910)_293-3434 Signature: Date 8of8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Wastelnutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients: Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 -Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2of3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 Farm 52 Scale: 1 "=400' Total Field = 1.34 Ac. r Total Field = 3.61 Ac. r 7i Total Field = 1.28 Ac. Total Field = 28.15 Ac. A V I`Ca t Total Field = 7.39 Ac. Total Field = 3.35 Ac. I ]ti J yr d, L II a ■ a ■ ■ R ! R R ! ■ ■ ! a s a a ! ld R a „� ■ ! ! a ■ q ■ a ■ o. a a a ■ R ! II R ! R a a ■ P a a ��'` q a ■ a ! a ■ ! R g a a s g a ! p ! R a R ■ R a a R ! a R R a a ! a i ! a ! a x ! p a a R R s ■ x ■ ! R a x ! R x a R a a a a ! it a a s a R s ■ ■ R II a R a ! a R ■ R a R a a ! R R ■ a ■ ! ■ q R ! a ■ ■ R ! g R a R p x a a q R ! a a a ■ R a x a R a ! a a ■ R R ■ q a a R R IN a p a a ■ ■ a q a R a ■ x ! s ■ ■ ■ ! a ! x ! R ■ a a ! R ! x p .■ a R p ■ R ■ isII R R II v a II R R is R ■ R ! ■ R R a ■ ■ INx ! ■ x a a a x ■ R ■ Total Field — 31.24 Ac. a R a ■ a p R ! ! ! a ■ a R g ! g R Wells w/ p ■ ■ 100' ■ offsets Hog Houses and Logoon �L d- Total Field = 2.23 Ac. 1 0.12 0.25 �t1i®�I�Kiiz�rur�N�f miles K�s r;Works ww- Additional Comments: Leased land listed in this amendment may be used for aerway aeplication from lagoons at Farm 51 or 52. All leased land is optional for both plans. 7of8 1flP13/2025 13:57 34 PAGE 04 Pr S- 1 !�-a Animal Waste Utilization Agreement Murphy Brown LLC. Waverly Division 1, 0 S2 �, f y►� hereby give M � ()km (if to apply animal. waste from the WaSTe utilization system Oil res of my land for the duration of time specified below. I understand that this waste contains nitrogen, phosphorous, and other trace elements and when properly applied should not Harm my land or crops. I also understand that the use of waste will reduce my overall needs for commercial fertilizer, and that: Nitrogen limitations exist based on individual faro] Waste Utilization I lans. After the completion of animal waste application, Murphy Brown LLC shall provide said Landowner / Farmer with a Nitrogen total of animal waste derived nutrients vs. the remaining nutrients allowed in the Waste Utilization Plan. Adjacent Landowr Waste Producer Technical Representative Date: a4 r-2 ,7 �2 0 o S` -'tdw '�Oas Terri of Agreement , 20 U 5- to + c. 7, 20 10i13/2025 13:57 34 PAGE 05 Provided Nutrient Totals Murphy Brown .LLC. Waverly Division Nitrogen Recommended for crop Animal Waste Nitrogen applied to crop Remaining Nitrogen for Crop Adjacent Landowner/ Farmer Waste Producer / Representative YJ kIlh. Date: ��-6� o�0� W a 7 �9p� co r • ' y 0 Y Brown's of Carolina, Inc. Farm #52 PO Box 1240 Waverly VA 23890 Dear Brown's of Carolina, Inc.: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality May 1, 2003 Subject: Certificate of Coverage No. AWS420010 Farm #52 Swine Waste Collection, Treatment, Storage and Application System Halifax County On April 28, 2003, the North Carolina General Assembly ratified Senate Bill 733 which directs the Division of -Water -Quality -(Division) -to extend the expiration date of the Swine Waste Operation General Permit AWG100000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In accordance with your application received on February 14, 2003 and in accordance with the directive . of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Brown's of Carolina, Inc., authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS420010 which expired on April 30, 2003. This_ approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm #52, located in Halifax County, with an animal capacity of no greater than an annual average of 2000 Farrow to Feeder swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, 2004: Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary.. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. • The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to np date under this pernut conve�any property rights in either real or personal property. ]1 Non -Discharge Permitting Unit Internet httpJ/h2o.enr.state.nc.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 Fax (919)715-6048 Customer Service Center Telephone 1-877-623-6748 An Equal Opportunity Action Employer 50% recycled/10% post -consumer paper Upon abandonment or depopulation for a period of four years or more, the Permittee must submit . documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per MRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water - - Quality•Staff,may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Michelle Barnett at (919) 733-5083 ext. 544. Sincerely, for Alan W. KIimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Water Quality Section Halifax County Health Department Halifax County Soil and Water Conservation District Permit File AWS420010 NDPU Files APR-10-2001 TUE 03:24 Phi BROWN'SOFCAROLINA ` 9102966166 P. 19 • NUTRIENT MANAGEMENT PLAN CERTIFICATION Name of Farm: BOC #'t9 —7 Noc.+ ;Z*S2. Owner: Brown's of Carolina Manager: Glenn Davis Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described In this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Brown's of Carolina Signature: Date Name of Manager (if different from owner): Glenn Davis Signature: 4- L Date Name of Technical Specialist: M. Kevin Weston Affiliation: Brown's of Carolina Address: _ 785 Hwy 24 East, PO Box 487 Warsaw, NC 28398 - - Telephone: {910) 296-1,800 Signature: • Date . —F .. '�.^`-s�.�e., �..°i�-reK'Y �e�x �.. �;i?'r..F•�i r.:�P:n .. ��-�ya, �^...i _... .. 8of8 B00101080195 4� ` APR-10--2001 `SUE 03 ; 22 Phi BROWN' SOFCAROL I NA ' 9102966156 P. 12 Brown's of Carolina 8/28/00 Hwy 24 East Warsaw, NC 211388 Certified Animal Waste Management Plan Grower(s): Brown's of Carolina Farm Name: BBC #1 a County: Halifax Farm Cataacity: Farrow to wean Farrow to Feeder 2000 Farrow to Finish Wean to Feeder Feeder to Finish Storage Structure; — - Anaerobic Storage Period; >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste Is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed • before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. 0 Several factors are Important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it Is applied In an environmentally safe manner. 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding tapacitles. i 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year, Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it Is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which Is not allowed under DWO regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. B. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 {St7-0 ].0108018 _ APR-1.0-2001 TUE 03;22 PM BROWN' SOFCAROLINA' 9102966166 P. 13 It • This plan is based on the waste applilcatlon method shown above, If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste Is based on typical nutrient content for this type of facility. in some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. I_Ime must be applied to maintain pH in the optimum range for specific crop production, This waste utilization planr If carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission, AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, fe, tons, etc,): Capacity— LIE& Waste Produced per Animal otal Farrow to Wean 3212 gaVyr gaVyr 2000 Farrow to Feeder 4015 gallyr 8,030,000 gaVyr Farrow to Finish 10585 gallyr gaVyr Wean to Feeder 223 gallyr galyr Feeder to Finish 086 gallyr gallyr Total 8,030,0 0 ga lyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Capaeltv iYR2 Nitrogen Produced pgrAnimal Total Farrow to Wean 5.4 Ibsyr lbslyr 2000 Farrow to Feeder 6.5 Ibsyr 13,000 lbstyr Farrow to Finish 26 lbsNr ibsyr Wean to Feeder 0.48 IbeV lbsyr Feeder to Finish 2.3 Ibsyr lbom Total 13,000 Ibslyr Applying the above amount of waste is a big job_ You should plan time and have appropriate equipment to applythe waste In a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops Indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the trope under irrigation may uptake and utiC¢e In the normal growing season. Total Irrigated Acreage: 45.9 Total N Required 1st Year. 13701.5 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 13,791.50 Total Nitrogen Produced by Farm: 13,000.00 Nitrogen Balance for Crops: (791.50) The following table describes the specifications of the hydrants and Gelds that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the slte, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 8 APR-1-0--2001 TUE 03.23 PH BROWN' SOFCAROLINA , 9102966166 P. 15 4D • • This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine Inches. Cattle should be removed when plants are gazed to a height of four Inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late In the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage Just before heading as is the normal situation, you are encouraged to cut the small grain earlier, You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recamtnended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yield A Barley 1.6 Its N / bushel B Hybrid Bermudagrass - Grazed 50 lbs N 1 ton C Hybrid Sermudagrass - Hay 50 lbs N I ton D Corn - Grain 1.25 lbs N / bushel E Corn - Silage 12 lbs N / ton F Cotton 0,12 Ibs N / lbs lint G. Fescue - Grazed 50 Ibs N / ton H Fescue - Hay 50 lbs N / ton I Oats 1-.3 lbs N 1 bushel J Rye 2.4 lbs N / bushel K Small Grain - Grazed 50 ibs N ! acre L Small Grain - Hay 50 lbs N ! acre M Grain Sorghum 2.5 lbs N I cwt N Wheat 2.4 lbs N / bushel O Soybean 4.0 ibs N / bushel P Pine Trees 40 lbs N 1 acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4018 H0010IOB0191 APR-10-2001 TUE 03:23 PM BROWN'SOFCAROLINA' 9102966166 P. 16 Y 0 SLUDGE APPLICATION; The following table describes the annual nitrogen accumulation rate per animal In the lagoon sludge Farm Specifications PAN! r/animal Farm Total! ► Farrow to Wean 0.64 2000 Farrow to Feeder 1 2000 Farrow to Finish 4.1 Wean to Feeder 0,072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates, The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2000 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10000 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 33 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 80 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate Is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids, The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface Irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an Irrigation system is Installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan Invalid. 'This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop Is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation, The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 8 months. In no Instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It Is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown In the tables. Failure to apply the recommended rates and amounts'of nitrogen shown in the tables may make this plan invalid. Cell your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. Sofa 800101.0801.92 APR-10-2001 TUE 03!23 PM BROWN'SOFCAROLINA 9102966166 P. 17 . Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type_ Crop INN *inches 3546 A Emporia a 0.4 1 3546 B Gritney 81 0.5 1 354a C Gritney B 0.5 1 3546 D Emporia B 0.4 1 354a E Emporia B 0.4 1 3546 F Marlboro B 0.66 1 3546 G Emporia B 0.4 1 3548 H Emporia 13 0.4 1 3546 1 Emporia a 0.4 1 • • 6 of a B00101080193 APR-1.0-2001 TUE 03:24 FM BROWN`SOF'CAROLINA 9102966166 P. 18 C 0 Additional Comments: This elan revised to reflect wetted acres by hydrant. The rates shown In this .plan are for controlled grazing, just as_it was originally. 7 of 8 BDOIOI080194 or awn s Qt Uarolina Farm #I n Netted Acreage Map �........ 5.43 Ac. LEGEND ZONE A • ZONE 8 - • ZONE C • ZONE D • ZONE E • ZONE F B00101080019 -0 z. a N co rn rn rn rn State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Brown's of Carolina, Inc. Farm #19 PO Box 487 Warsaw NC 28398 Dear Brown's of Carolina, Inc.: NCDENR NOM)-I CARouNA DEPARTMEW OF ENVIRONMENT AND NATURAL RESOURCES June 5, 1998 ' JUN 1 510 ,..1 IEHNR RALEiGh REMNAL OFFICE - Subject: Certificate of Coverage No. AWS420010 Farm # 19 Swine Waste Collection, Treatment, Storage and Application System Halifax County In accordance with your application received on April 24, 1998, we are forwarding this Certificate of Coverage (COC) issued to Brown's of Carolina, Inc. , authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm #19, located in Halifax County, with an animal capacity of no greater than 2000 Farrow to Feeder and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this CM you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. ' Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by.the Division. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733.7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 500k recycled/ 10% post -consumer paper W X Certificate of Coverage AWS420010 Farm #19 Page 2 This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Katharine Keaton at (919) 733-5083 ext. 533. Sincerely, �[ A. Preston Howard, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Halifax County Health Department Raleigh Regional Office, Water Quality Section. Halifax County Soil and Water Conservation District Permit File 1 State of North Carolina �W1+D Department of Environment and Natural Resources' i //?,* , Division of Water Quality'1N Non -Discharge Permit Application Form 4, AFC 4 1995 (THIS FORM BE PHOTOCOPIED FOR USE AS AN ORIGINAL) Non�p M MA-$c General Permit - Existing Liquid Animal Waste Opera> ONS Poniiting The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. GENERAL INFORMATION: 1.1 FacilityName: Farm #19 1.2 Print Land Owner's name: Brown's toftCaro I ina, Inc. 1.3 Mailing address: PO Box 487 City, State: Warsaw NC Telephone Number (include area code): 910-296-1800 1.4 County where facility is located: Halifax Zip: 28398 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): Douglas Hill Farm Rd. approx. 2 miles N. of Intersection wl US 258 1.6 Print Farm Manager's name (if different from Land Owner): Jimmy Vinson - - 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): Srown0s of Carolina, Inc. 1.8 Date Facility Originally Began Operation: 12/01/93 1.9 Date(s) of Facility Expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility No.: �42 (county number); 10 (facility number). 2.2 Operation Descriptton Swine operation Ta—rrow to Feeder 2000- Certified Design Capacity Is the above information correct? Myes; F7no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum number -for which the waste management structures were designed. Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm: No. of Animals: FORM: AWO-G-E 1126/98 Page l of 4 '! 3. 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 58.6 ; Required Acreage (as listed in the AWMP): 58.6 2.4 Are subsurface drains present within 100' of any of the application fields? _ or NO (please circle one) 2.5 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or NO (please circle one) 2.6 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NR tandards, etc.) (Swine Only) YES or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? j- 7e%. What was the date that this facility's land application areas were sited? _ - a -7 - / 1 REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicants Initials 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: 3.3.I The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.1 l Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.) If your CAWMP includes components not shown on this list, such as an irrigation design, or site evaluation, please include the additional components with your submittal. FORM: AWO-G-E 1/28/98 Page 2 of 4 Facility Number: 42 - 10 Facility Name: Farm #19 4. APPLICANT'S CERTIFICATION: I, 152e. " c e t _� L1.i,G ,e (Land Owner's name listed in question 1.2), attest'that this application for Z. © •C- -"' /�' _ (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Signature Date 5 AGER'S CE TIFICATION: (complete only if different from the Land Owner) I, - �-!/•-(Manager's name listed in question 1.6); attest that this appli t' n for �2au>ti C,¢,IcL��R �l {Facility name listed in question 1.1} has reviewe y me and is accurate and complete tote best ot my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application packag be returned as incompie e. Signature Date THE CAMpLETED-APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, j / SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-F 1/2S/9S Pagc. :t c+f tl a ri / q, -f)t7N p-, OF CAR4LINA~. BROWN'S OF CAROLINA, INC. - FARM 18 AND 19 STATE ROAD # 1100 & "TATE ROAD # 1101- HALIFAX COUNTY (2) 2000 SOW FARM FARROW TO FEEDER ULF,hu'llUNS: TAKE HIGHWAY # 903 TO SNOW HILL, THEN TAKE HIGHWAY # 258 TO HALIFAX COUNTY. AFTER CROSSING IN TO HALIFAX COUNTY TAKE THE FIRST ROAD TO THE LEFT SR # 1100 (DOUGLAS HILL FARM ROAD). TAKE FARM ROAD TO THE LEFT APPROX: I.2 MILES DIRECTLY ACROSS FROM SR # 1101, TO GET TO FARM 19. TAKE SR # 1101 AND FARM 18 WILL BE ON THE RIGHT. MAILING ADDRESS: MR. SCOTT GURKIN ROUTE 2, BOX 228 SCOTLAND NECK ,NC 27874 HOME TELEPHONE: (919) 826-3389 SHIPPING ADDRESS: MR. SCOTT GURKIN STATE ROAD # 1100 SCOTLAND NECK, NC 27872 imoWN'S UP CARU:.INA, INC. 303 17AST ('01.1-Fol: 51'111;rl' • f .U. Tli),X 497 • WARSAW, NX. 2Rl')XA1AA7 • OFFICE: 191c)1 293-21R1 0 FAX: 1919120.4726 ' k nIla ...:..._..�. Lo Im � 1571 O FiA r♦ LI JAlt - 1 111Z b� fa �� 1171 LLM 5p�0 Na jin o Dv..m r Cmrae6 ` 1491 1,1J1 1l.O1 41 D. sln. i 1>� J!Q! CQTI1/o NEC% w LPl L 1 r , i 1T . lul li4C � 1!]111 �Ory 11$ lE4p N.rM.I� im 1l11 dr ' .1 For. 27 TP �� ♦ .p a � 4 ID lawn 113A. IL ILU / I •4 / Im im f ♦ A. !!9 Is n NOKY000% A% 1.,. Im . J JtNL-ua LM- T ? im � F Animal N-Vaste Management PIan Certification (Please type or print all information that does not require a signature) ! QExisti a or NeNv or Expanded (please circle one) j S eneral Information: _ Dame of Farm:_ �,f✓rn� 9 0,wner(s) Name, e Facility No: /D _ PhoneNo, Mailing Address: t� 7 ZI—) 7e �. _,K4C ' ?2 ?- :6 Farrn Locariott: Qi Count• Farm is located in: Latitude and Longitude:.34/, 6 D .34 - Please anach a copy of a county road map with loc_tion identified and names, directions, milepost, etc.): Oyeration De5crintion: Type of Swine No.ofAnimals J Wcan to Feeder Z Feeder to Finish Z F 014, to Wears ?YFarsow• to Frder ZOO t::> :1 Farrow to Finish u below;,Oe specific: road ' //oo S,e T1pe of Poultry No. of.inirnais Trpe of Cattle No. ofAninutls Layer -M Daisy M Pullets D Beef Other Type of Livestock;: ,\`timber of Animals: Expanding Operation Only Previous Design Capacity. Addirichal Design Capacity: Total Design Caaacin : Acreage Available for Application: 'f:>0' & Required Acreage:l',arS �_��+ so- G Number of Lagoons / Storage Ponds :_L Total Cap §�i 2S Cubic Feet (ft3) Are subsurface drains present on the farm: YES or lease circle one) If YES: are subsurface drains present in the area of the LAGOON or SPR41' FIELD (please circle one) Owner/ (Manager Agreement I (we) Verify that all the above information is correct and will be updated upon changing. I Ove) understand the operation and maintenance procedures establisbcd in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage st srem or construction of new facilities will re»wire a new certification to be submitted to the Divisiatz of Environmental.Management before the ne-x animals are stocked. I (we) understand that there must be no discharge of a iiraal waste from the storage or application s}'stem to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the ?!-vc=. '_'t-hour storm and there must not be run-ozf from the application of animal Waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conser•atien Service. The aper' ved plan will be fled at the farm and at the office of the local Soil and Nate: Canso:•: ation District. I k xv know that any mod; 5 cation must be approved.by a technical specialist and submitted to the Soil and Water Conservation District prior to imeiemeztation. A change in land ownership requires written notification to DELI or a nc% crnifi:aticn iif the aecroved plant is chanced't within 60 d3t•s of a title transfer. \gate of Land Owner : S v"j G Siunature: Larne of MLinsgenif Differ,-ni from owners: Signature: Date: Dote: 9% �D), Anplication and H3,,dlin_a_Equipment Check Me nppropr'((((r bo.v I - i;tinQ or x .andin� foci its• with existing waste apolic3tion eaui meat (Vti't.-P or Y) Animal (waste application equipment specified in the plan bas been either field calibrated or evaluated in ac:ordance with existing design charts and tables and is able to apply waste as ncc=ssary to accommodate the waste manage-ment plan. (existing application equipment can cover the area required by the plan at rates oot to c.,zceed either the specified hydraulic or nutrient loading rates, a schedule for timing of applications has b=a ca established: required buffers n be maintained and calibration and adjustment gui=ce are contain as part or' the plan). G _Ne«•. ex anded, or e. ' t'ng facilitv with ur existing waste ae iioatinn eat:! erit rav -ttQati n. (l) Animal waste application equipment specified in the plan bps been designed to apply waste as necessary to accommodate the waste management plan: (proposed application equipraeat can cave: the area recuired by the plan at rates not to exceed either the specified hydraulic or auLnent loading :aces: a schedule for timing of applications has bern established; required buffers can be maintained; calibration and'adill'stment guidance are Contained as part of the plan). 1 dew. ex2aa ded. or existing facility without existinz waste application equipment tnr 13TId spreading n t using s2rav i i'gat' (NVZ P or I) Animal waste application equipment specified in the plan has been, selected to apply waste as necessary to accommodate the waste management plan; (prcposed application equipment can toyer the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has beta established: required buffers can be maintained; calibration and adjustment *guidance are contained as pan of the plan). Tame of Technical Specialist (Please Print): Affiliation:_ZI/11� I{ zvl.PC'S Address(Agency - �,� Phone No.: 9t S ignarure: Daze. _4z2 � -% ltanaae t an meraencv act' Pla ( E} Odor trnl.In tD ;. «U.-P C or ) The waste management plan for this facHiry includes a Waste Management Odor Control Checklist, an insect Control' Checklist. a Mo�rmlity Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated, with respect to this site and Best Management Practices to Minimize Odors and Best Managemcnt Practices to Control insects have been selected and included in the waste management plan. Both the Mortality Nianagemcnt Plan and the Emcrgcacy Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Affiliation: %T C ���G BL�G r� v OX l3 Address(Aaency : r.�,� , F,aYA Phone No.:-19,,9��c�� Signature: Dare: Z Z F) 11,ritten � mice of Ne • or Ex ondina Sivine Farm The foilo%iinb signature block is only to be used for new or expanding s,%ine farms that be constru a ter June 6. If the facilit}' was built before ,Tune 21. 1996. tiyhen «•as it constructed or last eCpan I t.�=} certi y t aye attempted to contact by cc:ii:tcd ntail all adjoining pr�pe:ty era and all grope ty owners who own property located acro , is road. street. or highway from this ne,.v andir.p s irc farm. The notice was in compliance with the %auiremrnts of NC A :epy of the notic- rda list of the ^rccercy owners notified is act:shed. -Name of Land 0«•ner : Signature: Fame of Nlana1,;!r, ... �� _ it sit, tr�tn ,� rtCri: Si, -,nature ��'_ D3te: AWC .- J��ar� t. 1047 t C) Runoff Controls fro. Exterior oft (RC) Facility «ith emerior lots Methods to rtinirttize the run off of pollutants from lounging and heavy use areas have testalle: as specified in the plan. For facilities without exterior lots, no certificat' is necessary. Name of Technical Specialist (Please Affiliation:. Address{Agency): Phone tio.: Sisnature: te: D) An ' ntion and Handling Eguipment In tallation (WUP or I) Chec.� the appraprrerr block +n Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and�djustment materials ba •e n -. prove d to the o ners and are cg�tai = as par, of the plan, r �S /0 �Q• ��/// �C? fro.- ��✓ Jd.,r6.• t��.�!/d� Cp✓.,� lj rr�a✓dd �orrirrread ar! Y ?animal waste application and handling ewpment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and adjustment guidance have been provided to the owners and are contained as par. of the plan. Z] Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/day/ycar); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping s}•stem contained in the plan; and calibration and adjustment guidance have bean provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): Affiliation: l%l J 1C C� Address(AQencv): c Phone No.: Sicnature: Daze: 7 The foliorFinn signature block is only io be used hen the box for conditional apprati•al in bove hasn checkeertihat I (we; have committed to purchase the animal waste application andling equipment as specified to waste management plan and will submit to DE:vt a verif n of delivery and installation from a Technical Specie ' 15 calendar days following the date ied in the conditional c_ 01cation. I (we) realize that failure to submit this tionis a violation waste management plant and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: - Name of -\I —kif different from owner): Sisnat tyre: Date: _ E) Odor ontrnl. Tnsect nntrnl and Mortality liana}ement t'SD. ST- INTP._RC or I) Methods to control odors and insects as specified in the P!an have been installed. and are operational. The monalitt• man_�-_ment system as spec:fied iri the P'.an has also beeri in -::ailed and s operational. Nance of Technical Speci: fist (Please Print'): A1'ftliation: Addrr;sS,a •L s� n;sturc:� N .- WC -- .lanuny. 1. u 41- 19 WASTE UTILIZATION PLAID September 13, 1995 PAGE 1 PRODUCER: BROWN'S LOCATION: PO BOX 487 WARSAW NC TELEPHONE: 293-2181 28398 TYPE OPERATION: Farrow to Feeder Swine NUMBER OF ANIMALS: 2000 sows design capacity The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or. groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial -fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infilitration rates, leaching potentials, cation exchange capacities, and available water holding capacities. Normally waste shall not be applied to land eroding at greater than 5.tons per acre per year. with special pre- cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential -for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage require- ments should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. l WASTE UTILIZATION PLAL PAGE 2 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2000 sows x 7.3 tons waste/sows/year = 14500 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2100 sows x 6.5 lbs PAN/sows/year = 1.3000 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. WASTE UTILIZATION PLAN PAGE 3 TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW PER AC AC USED APPLIC. TIME 1�5 3546 10 EMPOR 0-2% BC 5.1 255 0 7.5 MAY-AUG 3546 IS JEMPORIA 0-21 BC 5.1 1255 0 14.9 11249.5 MAY-AUG 3546 13 EMPORIA 0-21 BC 5.1 1255 0 11-2.4 13162 MAY-AUG 3546 7 MARLBORO 0-296 BC 5.1 1255 0 14.7 11198.5 MAY-AUG 3546 6 IGOLDSBORO 0-25 BC 5.5 1275 0 12.9 1797.5 MAY-AUG 3546 3 IGRITNEY 0-2°; BC 4.7 1235 0 16.6 11551 MAY-AUG 3546 1 EMPORIA 0-2o BC 5.1 1 255 1 0 110.4 12652 MAY-AUG 3546 11 EMPORIA 0-2915 BC 5.1 1255 0 1.9.2 12346 MAY-AUG OCT-FEB 3546 SG 1 150 0 14.9 1245 OCT-FEB OCT-FEB 3546 1-7 1 SG 1 150 0 14.7 �235 OCT-FEB 3546 (1 �SG 1 10 110.4 1520 OCT-FEB 3546 -11 SG 1 Q 150 19.2 1460 OCT-FEB 3546 SG 1 Q 1-6 1 150 12-.9 1145 OCT-FEB 3546 SG 1 0 1-3 1 150 16-.6 1330 OCT-FEB TOTAL 17199 WASTE UTILIZATION PLA3x PAGE 4 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. TABLE 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW PER AC AC USED APPLIC. TIME END TOTAL 10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, lay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with the stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. * Acreage figures may exceed total acreage in fields due to overseeding. ** lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. WASTE UTILIZATION PLAT, PAGE 5 The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE BC SG LBS N CROP UNITS PER UNIT HYBRID BERMUDAGRASS-CONTROLLED GRAZED TONS 50 SMALL GRAIN OVERSEEDED 2-io3 AC 50 Aj ixri �a: TOTALS FROM TABLES 1 AND 2 TABLE 1 1 58.5 1 17799 TABLE 2 TOTAL [ 58.5 *** BALANCE 17799 13000 -4799 This number must be Jess than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2200 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. WASTE UTILIZATION PLAN PAGE 6 Scc attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of waste being stored in your structure be within 1.6 feet of the top of the dike. I£ surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION: WASTE UTILIZATION PLA1.. PAGE 7 Plans and Specifications 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10„000 per day by the Division of Environmental Management for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either has owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff.leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Standard 393 - Filter Strips and Standard 390 interim Riparian Forest Buffers). S. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when the wind is blowing. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste -may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance. 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that no more than 20 to 25 percent of the leaf area is covered. WASTE UTILIZATION PLAN 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Animal waste shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. waste shall be applied in a manner not to reach other property and public right -of ways. 15. Animal waste shall not be discharged into surface wasters, drainageways, or wetlands•by discharge or by over -spraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. 15. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. Lagoons and other uncovered waste containment structures must maintain a maximum operating level to provide adequate storage for a 25-year, 24-hour storm event in addition to one (1) foot mandatory freeboard. 18. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. 19. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and imple- menting a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 20. waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. PAGE 8 WASTE UTILIZATION PLAN PAGE 9 NAME OF FARM: #19 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the ap- proved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the I (we) understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also cer- tify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: BROWN'S SIGNATURE:- � �� DATE: NAME OF MANAGER (if different from owner): p ease print S IGNATURE : S'4 "'L'7-- q, 5 Ck 40 ��("'_ DATE: NAME OF TECHNICAL SPECIALIST: chuck AFFILIATION: ADDRESS SIGNAT ( AGENCY) : URE : �� _ ATE: WASTE UTILIZATION PLAN ---------------------- Owners name --:Brown's of Carolina #19 County:Halifax Mail Address -:Warsaw, NC Type of production unit----:Far-Feed Number of animal units-----: 2000 Type of waste facility ----- :Anaerobic Lagoon Temporary storage period---: 180 days Method of application ------ :Irrigation Amount of animal waste produced-----------------: 14693 tons/year Amount of plant available N produced by animals-: 13000 lbs./year Commercial N to apply on planned acreage--------: ' 0 lbs./year Your animal waste utilization plan has been specifically developed for your swine operation. The plan is based on the soil types, crops to be grown, and method of application for your particular operation. The waste must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle and annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or not more than 30 days prior to planting. soil incorporation of waste will conserve nutrients and reduce odor problems. Page 2 The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Annual acreage requirements may be more or less based on the waste analysis report for your waste management facility. YOUR WASTE UTILIZATION PLAN IS BASED ON THE FOLLOWING: Tract Field Soil Crop Yield Lbs. N Acres Lbs. N Month to No. No. Type Code /Acre /Unit Used Apply 3546 10 EmporiaB 5.1 50.00 7.5 1912.5 MAR-OCT 3546 8 EmporiaB 5.1 50.00 4.9 1249.5 MAR-OCT 3546 13 EmporiaB 5.1 50.00 12.4 3162 MAR-OCT 3546 7 MarlborB 5.1 50.00 4.7 1198.5 MAR-OCT 35046 6 Go B 5.5 50.00 2.9 797.5 MAR-OCT 3546 3 Gt B 4.7 50.00 6.6 1551 MAR-OCT 3 5 4 6 - 2 Go E, 6 9-F-JUNS -S-N 3546 1 EmporiaB 5.1 50.00 10.4 2652 MAR-OCT Total 56. 8 L3$9-2:' . -7,. i Available Nitrogen (includes commercial) 134800., Surplus Or Deficit Crop codes: Crop -unit A=Barley-bu. B=Bermudagrass(graze)-tons C=Bermudagrass(hay)-tons D=Corn(grain)-bu. E=Corn(silage)-tans F=Cotton-lbs. lint G=Fescue(graze)-tons H=Fescue(hay)-tons I=Oats-bu. J=Rye-bu. K=Small grain(graze)-acre L=Small grain(hay)-acre M=Sorghum(grain)-cwt. W=Wheat-bu. Y=Fescue(pasture)-tons Z=Bermudagrass(pasture)-tons Page 3 If more commercial fertilizer is used than shown in this plan, then additional acres of land may be needed. A three to fifteen feet wide permanent grass filter strip should be seeded along all ditches in fields that receive animal waste. Additional comments: -------------------- 1.0 Prepared by: r,! ;r.i' ...�� Title:`/ �•.�r f./;-Date:^''• :'';`. i Concurred in by: oducer Date: �r �- l I understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. Date: ~S-� Producer Technical Specialist: �� Date. J 1 •4b y �, 41, - .� �i1'. _� a ... -.,1 y-- •:.��� rye; F i. f1 � �• # .ia�:'-��• n." '•/t {r s � •�`i;"v�'-r�;i�yF,'r � ��: ;ice .� _ � - _ .� ji• 1 _`ti� .•:' _ :\'i 7:7- ' r�'� •I' y� (/Er�� ' .y l � :.-.� �7 �i� �. ��• t y' • Jr •� jam_ r .Ca ^F- r-' _ :�.: ,r: 7. i. �V_ � � r� yi�/r. � • 44 'f-•,���^.;C �14s1.'� - f tea.- - CC�� •• +� 1 b'c'`_ -..•r j: _r `+ � »Ifff � � - -� r •tom _:,J�: � it •.�i. +•-1•r �\ � � -�4 L:i:` r air-.r'• q � t } t- � � c wr � •1 •-s �.__ r Oft"' m NRCS WASTE UTILIZATION PLAIN SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift. manivade conveyances, direct application, or direct cLs `arge during operation or land application. Any disci ar•,c t1r%Vaire %Vhieh reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer zither owiis or has a notarized agreement for use of adequate land oa which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, be/she sha11 provide a copy of a notarized agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure as update of the Waste Utilization Plan when there is a change its the operaiton, increase in the nuraber of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of inaiiagement, unless there are regulations that restrict the rate of application for other nutrients. Actual yields may be 1l,Cd rn lidU of realistic-vIeld tables at the discretion of the planner. 4. Aairzal waste shall be applied on land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at more than 5 tons but less than 10 tons per acrea per }•e;u• providing truss filter strips are installed where runoff leaves the field. (See FOTG Standard 393-Filter Sail?�) 5. Odors can be reduced by injecting the waste or disking a.ier wiste should not be applied when there is danger of dr;l1 from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be Soil inccn l)orated on conventionally tilled cropland. Whz:i applied to cots:: ation tilled crops or grassland, the waste may be broadcast provided use application does not occure curing a sewn prone to flooding. (See "Wlnealhc, and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rare such that runof:'does not occurs off --site or to surface waters and in a method wrier does not cause drift ti-otn rliu sire durnnc: nl.plicntion. No por:ding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall evetlts. or whell (lle surface is frozen. 9. Animal waste should be applied on actively growing crops in such a nratu:cr [liar the crop is not covered with waste to depth that would prohibit growth. The potential for salt datnn.<< 1111111 ;rltitnrll tti'crste should also be considered. 10. Waste nutrients shall not be applied in fall or winter for spring platacd crups fire soils with a high potential for leaching. Waste nuts sent loading rates on these soils should be held ro a mirimunn and a suitabie wirier cover crop planted to take up released nutrients. Waste shall not be applied aw c [i:,ur 0 days pritrr to planting of a crop or forages breaking dormancy. 11. Any new swine facility sited on or aPer October 1, 1995 shall compiy «'it!r the tttllowins: The outer perimeter of the lard area onto which waste is applied from a lagoon drat is a cunipunet of a ziwinc farm shall be at least 50 feet from any residential prope ^: boundary and from any percanial strearu m- wher- than an irrigation ditch or canal. Animal waste other than sulne-waste frorn facilities sited on or after Qctohcr 1, 1995, shall not be applied close. than 25 feet to surface water. This distance may be re:lLLCCJ that are 110t perennial provided adequate vegetative filter strips are present (See Standard 19.1 - f ilrer Strips), MRCS WASTE UTILIZATION PLAIN SPECIFICATIONS (COivTINIMD) 12. Azimal waste shall not be applied closer than 100 feet from wells. 13. Animal waste shall not be applied closer than 200 feet of dweliir.__s orhei• than those mvne� by landowner 14. Waste shall be applied in a manner not to reach other props:}' and public riuht-o -ways. 1 S. Animal waste shall not be discharged into surface waters, drainsgcways or wetlands by a discharge or by over - spraying. Aairaal waste may be applied to prior converted cropland provided it has been approved as a land applications site by a "technical specialist". Animal waste applied on grassed watcu-ways shall be at agronomic rates and in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from.washdown facilities, toilets, sinks, etc., shall rot be discharged into the animal waste management system. 17. A protective cover of appropriate vdgetation will be establishe:i on all disturbed area, (iaecon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, tc prorecr the vtgctatium Vz._tation such as trees, shrubs, and other woody species, etc. are limited to areas where ccmisidered appropriate. L_goon areas should be kept mowed and accessible. Lagoon berms and structures should he in:�pectod regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is terminated, the o%;-ner is re;;pomsible for obtaining any! implementing a "closure plan' which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdo% s, leaks, and spills. A regular maintenance checklist should be kepr oii siE�:. 20. Animal waste can be used in a rotation that includes vegetalbles and other crops for direct human consumption. However,'d animal waste is used on crops for direct humat,. cmi:,uuupEit)n it slnitild only he applied preptant with no hlr4her applications of animal waste during the crop season. 21. Eg:Jy visible permanenet markers shall be installed to mark d,e top and boc'mal elevations of the temporary storage (p zmping volume) of all waste treatment lagoons. Pumping sliall be n;anaeed cc) Iliahitau, !tie liquid level between the markers. A marker will be required to mark the maxilnuE,1 :ioro:"c Volume 4"or waste ;tcrage ponds. 22. SoiI tests shall be made every year, and a liquid waste analysis .Ball be rAtn within 0 days of application eorsis,ent wi_i: waste utilization plan. Poultry firer shall, be tcstc4 pric,r n} jpplica-6on. S�iil and waste analysis records shall 'be kept for five years. Dead animals will be disposed of in a maiu,er thaE inucts NC' rc_ulations tMortality A-latiagenmil. \•tethods (Check- which method(s) arc bk:1112 implcrncntcd) D Burial three feet beneath the surface of flit Yground within 2-1 hours after knowlcd«e of the death. The. burial must be at least 300 feet trorn any nowin! stream or public body of ►ti•atcr. penile; in�� at a readering plant licensed untie: G.S. 1 Ob-163.7 Complete incineration In flit case of dead poultry only. piacinR in a disposal pit of a size and'dcsign approved by the Department of AiTriculture Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) Insect Control Checklist for Animal Operations Slcurcc ('uuse llllll's tit C11111111 Insects Silc Slcccific' Pracliccs Liquid Syslctos 1:111A Collol • Accumulatmtt of solids I.a1;ouns and fits Cucsled Solids vcuclalivc l}ccuyinl; vecclalion t itowth ❑ 1:I11sh syslcnl is designed and ohcralcd suflicicntly to rCOMM; .Icclonkshitul solids rrotu I;nllcrs as desiglied. ❑ Itemove bridling of accimmialul solids ill ditir.har�c maitltain h1goous, sclllictl; WS11IN anti Mils ► helc: pest breeding is apparutl lu mirtitrticc the ci-1151illl; ofsollds to it dcpllt ofno more Man G - 8 inches over more Ihan 70% of sm face. tvtaittlain vCudativc collllol along hacks ol, lagoons aml other iu1lsou11ENICnts 141 I1fCVt:111 accumnimioo of decaying vcl;cltllivc mallcr aloot; walci's edge ou imhotimintcol's petintcicr. jwine Farm Waste Management Odor Con(rol ChoddIst Cause BrAl's (1) Millilkli"r.c. 011111- Nilu Spri-ifir Fill !Iwilic 11141thiclioll vecclalln OF I(cc om loclidul I)CS1 mallap'llicill placlicc.,;; Gocidjudgincill ;Hill C11111111011 Sclirle Aitim-al body mufaccs 4 filly mallill C-comcd allillials 1)( Dry lloon; 0 wul- 11taillitc-covelcil Illmls Slolld IIqloI.-;; Walcicr-, lipualtil over slollud Ilomr; 0 Feeders al high call orsulill Hums; Cl ScIalle Illimille buildup hool flools; 1.1 Undcl-floor miliblioli for drying himillic clillcoilill llits t 11 inc; F] Ficilticill 111411UN lCilloval by 111101, pil leclial-cc. • 11.11lial miclullial deconspalsilion or Scialic; it 11111 C'XilatiA fiIlls Volatile Laws; Fall Illaitilullance., Dusl lifficicall air lliovclllclll Dusl -W, wilsildown Ildweell giolills ol'allillmlso Fctdcr uivers-, Cl -y dumiqwIll exicitilus In kcilcr I cell deliver')! Agilaliml. W'iccycled lagooit Cl Fimal lank- clivels; liquid while lailks aw lillilil; El ExInIll fill line:; to lical loullillo 4II'laill's wills .1111i -.sillholl 1- 111511 alkyl. Aj;flalion duriul; wasimatcr 1-1. Wildcl floor 1111sh wilh 111111cl I Illur veillilal ilill colliveyallix Iwilds (dic-cycleal lalmm i.1 I :A Icild I uchal I"t; finc..; III nl:ar 1JI11143111 III' IIIIS lifillid while pi(S are fillillf., Will -.1111 i -Si 11111111 VC111% I.ill NI'diow. • Agiialion diiiiiii; somy umL 1-. 1 ,)*ltllll3 will, cliver; fillilig ;pill Illawilown 111;1ill LUIlUlitill Aditalimk dmiiig wastmalcr El Ilux covets Ahlr IC - Mimmilici 11. 1996, P-.igu 3 5unrcl: Clulsc ti 1111.11's lu 1lllniulitr. I)Ilur � _�----�—� �.ile';llrrilir l'1 ari.it�r:-_ I'lid Ordwinpiltcs .11 Al;ilalimri luting waslt:IP;11Cr C.I Exicild discharge pninl I1f Ilipt;s 1111ticinualit lal;ntlrl cnnvcyallix 1:11;0nn lilplid level L;lt;tl4ill 51111i1CC5 • Vu1i111it: oils CInIS51[mSi 1'111fICl- laglllnl Ililllill Ci111aL•Ily; �----.---�--..v. �-------�---.------ • Biological mixing; Coll-ecl lagoon ;li illlll Illoccilnrc:; • Al;iialliln Ivlilillln1111 titlrf;tCG;11L';1-UI-VuI11I111; lillln; Miilinlum agilalioll MIC11.11nmltillg; I_) Mechanical a aliull; f I I'lovrn hiu1111;ical addilivcs 1111g:1111111 %ills 1.kr • I11g14 flll'1SIIIl: agllalllllh 11ricalC till l!l-y days with IiulC Ur litl xvilul; nou..1cs . Wind Ill ill fvlinilnunl Icconunclulcll operaEing plcsmut:; c 1'11111p inIA.C. licar l;1g111111 hipl111 Sill Face; n 11111111) rloill sCcond-clage lagllml - illlal;C 1;1111: Ill basin • 1:1111id 1n1C101161 41CCI1MIMSllnlll- l.I 111111RI1i Ill. millICVC1 lumIilig; - Sill last: . Mixing whilt: filling; r) Ti111I: CI1VL'I5; • Agilalilln when c:inplying n 11asill Surface mils Il['s1lllils; C) I'111VC11 Ililll4l;iCAI a11111INCS fir IlxithillS �C11II111; II:1S111 S111li1t • i';nlial 1111crullial ticcompllsilif.m., Irl — I:x1Clltl diaillpipc uuIIC1S llnllcincalll liquid • it'lixillg whilC 1111ing; ICVLI; • Agilmian when -emptying t 1 .ltclnnvc sculc{l 5ulid5 Icl;ul;Ally Itlaimic, Slnlfy 11!shldgc • Ahlialin11 1v11C11 slllcading; n Soil injulilln III Still i"yl'ililt Igcs; )pie:;ide r millcis • `Jlll;lllll: g;ls L'lllissiun5 n Wash ICsilhl;ll malillit: II'om .-,plCaller alter use; n I'lowlt biolol.,ical;Itlllilivcs or nx111 ol1 1111covc1cil ill;ll1l11C� • VldalllC g:15 clllissiolls whilC n 511i1 ill;cCliull t11'511111)'�S111t1gC5 shirr)- or sl idge Iltl lichl (isyilll; r] Suil hicurpcirali n 1vidi111 -111 his.; a Sl11 �cl.S n SIMCild ill 11141 I111i1ill'Ill I;Iyt l.'; for 1a1,ill dl)'ilig. El I'lllvcn hiologic;ll addilivcs nl- tlxill;lills Ih;ill ;nliucll, (';uc;lSs dcLulllposilinn �Ih:;Iel auilliill t1is111t..a1 - Cm dcr.gmpusiliun pile `I1n:iu1:1:11nI; • )lu:tln+p1c11:1:onlilusli1111 r� I'1{l11Cr 411spn5111Ui1 ii1 hill l:;l:;a::; El C:omplcll: covl:liilt; of calua: a:: ill llnlial fill:; C) I'l-oper local innlcullAttit: Ililt) tl1*l1kpn:;a1 pits f'I .;t:cnnllary slack 11uln�ts A4�iCti(: - 1.1uVC11111t:r 11. 1996. 1 arc -1 5nnr'rc Cutut 11N.11's In 141initnFr.c 01111e — Silt_Spevilic 1'raclit�cs Standing miler atonnd lull}rotter drainage: !t Gratle and landscape such Ural water tlraiirs lacililic� IYlicrtdtial decurlllrOsition Of away from 16161ities organic matter Alamrrc lrn:kt:d Onlo Poudy mainlaincd access roads Farru access marl mainlenancc public roads Iinlu f nin .access Atllfilional Infommlion : Swine Nia mrc Management ; 0200 Ride/llM11 racket Swiuc Prutiucliun Farrtr Potential Oder Sources and I(CmediCS ; MIAG Fact Sheet Stvinc i'rtultrction Facilily Manum Maitagcmcnt: Pit Recharge - Lopou Trcallnatt ; FIIA1- 128-811 Swnit: Nuth3cliutl Facilily Malone: Matingonuil: Underfloor Flush - Lal;oon Ti-calm of ; EIIAF 129-88 Lagoon Design and Managcnicul fur Livestock Mlamirc Trealutcol and Storage ; EIIAF 1113-83 Calibraltnn (if Maelnrc and Wastewalcr Applleatlnn Equilnlma ; ERAli Fact Shcei Controlling Odors from Swine Iltrildings ; 11111-33 Unviranmental Assurance Program ; NPI'C Manual Oplions fir Managing Odor ; a rennet Irons lltc Swine Odor Task Force Hidsanct: Ctrticems in Animat Manure Management: Odors and Flies ; PROIU7, 1995 Coufert ucu l'roccedill'Us -Available From : NCSI I. Culutly ExIensiuu Ct:lllt:r 14CS0 - BAI? NCSII - IIAI: NCSI I - IIAE NC'SII - IIAI: NCSIJ - 11AE NCSII - Swine Lzteusiml NC Pmk F'rutlnct:rs Assoc NCS11 Agri Colmmulicatinns Fltuid:l COOlrcruivt: EXICrt5inn Altl()(; - l'lrtveteelUX 11. 1976, Page 5 LAGOON MARKER �--- FREEBOARD + 25YR%24HR STORk IAXIMUM 'LIQUID LEVEL �-- 6 MONTH TEMPORARY STORAGE IINIMUM LIQUID LEVEL 'ERMAN ENT STORAGE -�- ENMRGENCY ACTION PLAN PL4Na NI -n, SERS D�VQ EtiLRGE�CY;VL��+:�GEy�i`(T SYSTEvi 9I I StiVCD 114,0,,CS cDS O--5; S 3 -3 VI j—iSh:n j Cru-/c-04,` x_ hzis plan w;Jll be i,:,ciecen_ed in the event tl at wastes Liam your operation are leakin& cve:-2ow..z, or running of site. You should not wait until wales reach su. act waters or leave your propery to consider th --t you have a problem. You should make every, effort to easure that this does not lzppen. Mis elgn sh=ld be in aC Acc-:2sibbe lacaticZ for all emalovees at the faciir�. The fallowinj are some action items you should take. 1. Stop the release ofwa-zes. Dependirz on the sitaticn. this may or may not be possible. Succested responses to some possible problems are listed below. A Lap=a ove:t2aw—possible solutions are: a. Add soil to be.^Z to increase elevation of da.,n. b. Purn.p waste to nelds at a&--i acceptable rate. C. Sop all flows to the Iagoon ia-nrnediately. d. Call a purnpirg contractor. e. MZke sure no s-ufzce water is entering lagoon. B. Runcff con waste application field-acticns include: a. L:.:��e: Lately stop wassY appiicauan. b. Create a ternporzry diversion to contai:t waste. C. Lncorporate waste to reduce rsno". d. Evaluate and eluTEnate &,e reascn(s) that caused the runoff e. Evaluate the appUca_ion rates ,`or the fields where rtnor occurred. C. Lea`:s e E-om the waste pipes a:nd sprinklers -actions include: Z. Stop rec fcle pu::.p. b. Stop lr iizaticn purr;p. c. Clcs- to eam—mate %:l Lie~ dischc p. d. Repair a!I le=.ks prior to rzsta gins punps. D. Leakage f em flush systems, houses, solid separators -action include: a. Scop recycle purnp. b. Stcp ir-igation pump. C. Make sure no siphon occurs. d. Scop alr1 flows In the house, flus:~t systems, or solid separators. e. Repair all leaks prior to restarting pumps. E. Lez.L-_ge corn base or sidewal of €agoon. Often this is seepage as opposed to flowing lefts -Possible ac ion: a, Dig a small well or ditch to catch 0 seepage, put in a sz:bmersible pump, and pump back to lagoon. . b. L holes are caused by burrowing animals, trap or remove animals and fill holes and cornpact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the =,ent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any dar^zge noted, such as employee injury, fish kills, or property damage? d. Did t:.e spill leave the property? e. Does the spill have the potential to reach surace waters? f. Couic a fixture rain event cause the spill to reach sur<ace waters? g. Are rouble wa.er wets in danger (either on or oi<oFthe property)? h. How much, reacted surace waters? J. Cont=.c=prcpr':ate agencies. a_ Du inz norr,7al business hours, call your DWQ (Division oFWater Quality) regional ofifice; Phone-M-211-'1201) After hours, emergency number: 2�0`009"99Your phone tail should include: your ra=e, facli:y, telephone number, the details of the incident fi'om item 2 above, the exact location o►` the 'facility, the location or direction of movement of the spt`iL wezr`,er and wind conditions. The car, ective measures tliat have been under take;z: and the s ncusness of the situation. b. L spit leaves property or enters sumo: waters, call local EMS Phone number 911. c. EMS to contact local Health Depart.-nent. d. Cor.=" CES, phone number `5g3-516 1 , local SWCD ot5ce phone number -5�13 3t1461 , and local +'RCS orrice For advicVtechnical assistance phone number. 4. li none oL'the above works, call 911 or the She: if's Department and explain your problem to th"z ar,:. 2sk t 'zt person to contact toe proper a,pncieS For you. F 5. Contact the contract ofycur c erica to begin repair of probiem to mini a off -site damage. ROWW i I it a. Contractors Name: . b. Cor.tracors Address: C. Cont-ac:ars Phone: 6. Conti Lie technical spe^zis` who cc wed the lagoon (:MRCS, Consulting Eng;nesr, a z.) a_ Nance: b. Phone: 7. InpIa meat procedures as advised by D WQ and technical assistance agencies to rec::fy the damage, repair the systern, and reassess the waste management play: to keep problems with release of wastes from happening again. ; ' SIT EVALUATIOM REPORT I N I!! f rodu cr Count I �; { '` ''" Da tc TyPc 3 n,d Si zc tit or, 1' Z000 oc..J i �A,Q,�ocJ' L-EcpE,el Cry .ir "'. 4toErPATica-r S/ ram^ f _ Nw o %f�Ony }'PcAGE , SI i E a� Z ,Nc. A EycacE ,51 03 Sc... J ob_ CL ass. Lh sr•?nce to the Nca'rst Resi dencc Other TbaeiI 04uncr or Pub! i c f3ci ( i t : rc' cf Z ncc ro rac1 ( S_!r onccr ma to SaarcCs: II f -'I • s Y3 Trd C edss-ili C.?-ti Ci7 I . .>,i Tc- c ist 3 Q.. .4 Z4,e p dZAJr/F1C..,7t{ is 4� : Nousr r' r facr i [ Ji. � L. 60o. �l.nCJ aAIL �u/Lt%/.tJ�f I I Tv L. 6 ;.tiJ tt E,u T ��lC C 4 v q r/n Aj 11 y 5 SIT£ EVALUATION A All Lans! ?!!-:a tr n0 ofnacres aver (a6Lc `7 50 .V G R E s 7o 7-4 L. i Cho P LA ti U AYM I L 3EvG44 N�dp2Ci1 li+ rL �1' W/LL gtF QLACFIj ;j i dGuE, ' ANY a Usste Irrrg3fiOn £autiment. !QEEr... 1100e, der m, uC Summg of Soil Inve'�r.�'*3fion .5 17 F �t �cr`idN s�ilsn��r� w gTE,e I 1 ! Pe To 3 s.' ' ��'F�.�s Q 3L i1ya: PST -,-t•rl Z- AfPe=ayes J/ndj.i AWS Cr.+ :s c: j cc M4TL- -C,AL "r�r+tPoRA !'I o.e4Lr ; e3E AQsv� i I y Ew*(3A..LCA+�NT ,.l n c: 4 4 .rar ri%A T+r.e r/,1 L i �. �.�.���' •.� is ±,1 j ! j C. Cem JEr�Ir.efr�y s:oi'Ac� To E AE3Jvt St 4ro,udL �!� i�1�.T�!e Tg6W E . iv i ; i '�' I. IF F E,eM CA SW `. Ali MAW L is ♦al To E C�ixPA'aTG)P�AG>` So ! t_a_b l � r o f � c � < � f_o r s +a r n e o .v_e'r a - - tir o n 5I7'E A/c. 1 /t it.arS .Q2 ►(_on<n+.6;'NAED �0+2 lao�,�J c3"/TE E3EC,dujE i r7 F' .SP .'•;4 72eLrrt L C j : n DEPTN, k1li f1 [,S A'iErC �AaLE I G'A t" a AoloL , q iti3 F4.o, D PLA;.0 , I i .S1 TES No Z 7 j 4 4r' 2 7e CaE Ged9 r'':Z �i': 'a A-1 .::,7I-r- k �� Jill Xrz ` a .`' �^ 66 / bL,/ /, /.1 � ,yw�.5G'��I:t r �Y'1t.. :i ��t�" h i ,�;j sh��' r�„`I✓� .;tY,`�.� f ' �JCrr +_'�0: \11.1", r �1a 9& '�1U�� �,� f/ � II �; �� Gro a 'Sr �l. /�J:;s�`I��'•-.•i. _3���1 ,�:}. '/�'`100•, �.Y:. 'L��'=G:\rr ��\" >��r li !r, ;,'', � �_r. .�,''I .�'' � ZZL •{�,, �' e- +ti r � r r t , � `Ltd .�, `�� t• � u ; 3 �i� " ;j y: ,r 03�,, ;�� , J✓N�� ����� f��` 1• '.� , f �� �T� If %• altr-1 4• v�t�J / y �0 � � 4 ry'�.° r0 :I ,k � t.` � \J t r � !! 1 ty,,. J d•`1,'' 'f, 1�\, � _ i �' r! " a' r,Ia Wr .r�:L'r �. Jl J /' r 9 ke '"1� f I 'i /* 1. iy'� `I 't ''4 ' n 7r i� I !J : i r�.L-j'''-1}n -neas 4 pb i1\ G I v�r • � ��'�'� r'�;' �• �� s�l�ly `\1 ti ( 0.��� � `� 1 _l'h.'. .. _. .. „ `. �" / / / 1� r1 l���,� �. �i` �•�_ ;. '�1 wry �/ 4 s Q': ;r •r�-•. .. � � r •.�,,R�'�J�1!:„�, � ��` •; loo C.' �} � ..� � •� -� r P� � r/ r r 1 -SI ��\` �� �a• 'Qi - T��s �. r r � ■ .�'.'� � r/ 41 ' -- ' '- �/ r �i. I .{ '� '•r �y.•. 1'� "+, ". / ' �`.,::�.. •�rEr it `'�IC i�'L1. r t . 00 1� �s0 y i�>? ¢ r - sl- � � ° 'r,.' 'r•t� ' 97 a .ti s v-� '-'�, a�• ' ��� � .s• \�- f ",q �a, �� 't ,,�. 'a ! /4' �. �As}lLew. � u . r:� � �d ,1, f '-/ � /' j .\ too., .. r �_ 60 I ` t rl„r I I SJTE'I EV A LI�A?'JON +XPOJPT rr I. I I•7,to l � Producer: I ;tC'o el•'y, JYt, A I - i tt.ii li=I 4f fl.' r1,t i I I I T c aad Si:e:4 allioR. r 4' Sire Jl l - n/w CF and �',[aeE of SCS ,lob C 1 a s s I I rt1 �i Di std.RCCt0 the cal stl Residence 0th`Cl''T�{t .`."Ord PUbfl r S/�E -.� -7 �.��. Y I I ' •'I �! .�11 I r` 77 t IIII it l!. I'' ,5' ' i }i - .>;- 4 �E,•+ '°'a'i;. S17 ri I I I } _ r ft .c.711 7 Iz ''iI,� I'-il' �' ,.•{� ' -a� `3i�l.v;r; Distanec; to well., ca other !wattr sau!rc'cs'!'�=, I;Y I'i�rk�l'''�y1'�� 1—.111 kl 2 S1TE5 ��i ,3 T s I ; D,o ; � 11 1 1 I ',+;�I. Yazard C1 assi i c a t i I it 11 I +' �; I t+ ' 4•} L��I+ii�p`p �Fj-•�ji ` �( Z r L4o. Nousr asy Fa crl i ty: Li..ri`ii+ I} II I Y'�I}oE La'yoot� S cci fi cs, I i 1 s l iII 1 ';�w 33 �;� _' ,' ,]{jj{Ir�Tt�' 7 j '� I �y JC/— J / 0 PA e 7 i.a 4 E�tB.q.N 11►i E+� T /SIG CA PA: 1. 1 , -� •I I !�� - I � 1' q �f 1"•I.Iti,r, . :J R'. :DA y 5 i i I ,;, to , I 11 n ii cry ,ti I ,I i.{.,< , at I , J �• it I•� „� { � 1 r. Ippr r ` E Facil'i 1 ;' r [ i i J•1 �9� I I •I : z r, ; 1• , S I F , I I , II II . (:S1TE-.EVAL4VAr1OiV RE .1 Land A i ca ti on of I E:-c 7"o 7 50 ae !� I iQcE� . `t�'PE is c- rm is Re a u i red: I-JALI,CAA ' r_Ou 0 'So i I /V CII sc. Item,,. TO- .i':Sui tab i I i ty of si e. bj— jrp A44T�,eiAc- JF4mob PLAIAJ o -51 TES 2 04 � CeoA-jD A.-0VR' Ii '��j� (-4 W A IYA .74 C 4. Ai ot,r 9 iA L — 4 rex; - 14 A &A Oiw- 14vz: A I -AA TeX tA. L To du �. .4 CA PA; for s O.D c e a!t P O'n 'Of dF T17 I . �k!llq: w g m j. 15 I il S W I N E L A G O O N D E S I G N Operator: S&CrT UURK1k / County:_ ��-,FAx_ -- _Date: s -�z— 9z '5,Mt T [+5%eL_P SIYE -3 PRCV45r­o 4'�__ Distance to nearest residence (other than owner): ,�Ea� � feet 2sw FE�f 1. STEADY STATE LIVE WEIGHT saws (farrow to finish) x 1417 lbs. = o lbs z000 saws (farrow to feeder) x 522 lbs. - 044aati I b s head (finishing only) x 135 lbs. = o lbs o sows (farrow to wean) x 433 lbs, = o lbs a head (wean to feeder) x 30.lbs, = o lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = ' u4A-000 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = loh A000 lbs. SSLW x Treatment Volume(CF)Ilb. SSLW Treatment Volume(CF)Ilb. SSLW= �'o CFllb, SSLW Volume = to 44000 Cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = o cubit feet ovdNFP—. J'�4 s�ur�c,�� STo�AczE. Sc�u�ca� w�L� 6� i-F-MOvEo AS. µrector j>. 4, ` TOTAL DESIGN VOLUME Inside top length 43V feet ; Inside top width 412 feet Top of dike at elevation q 4to feet Freeboard i -_ feet ; Side slopes 3 : 1 (Inside lagoon) Total design lagoon liquid level at elevation feet Bottom of lagoon elevation -7z•3 feet _ Seasonal high water table elevation -7!�'•ce feet Total design volume,using prismoidal formula SS/ENDI SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH AREA OF TOP LENGTH * WIDTH = (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH w ?, a 3"t 1,� ; I z s t ( AREA OF BOTTOM) AREA OF MIDSECTION LENGTH WIDTH 4 39 g. 9 -7 3, 9 = t 4 ( AREA OF MIDSECTION 4 ) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] DEPTH/6 1 r° -7/cg 'i539L S98o`)Z r 2s�r �- VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 1b03 s -7o CU. FT. 5, TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) . :.Length * Width g3e �u= = tea 45L square feet Buildings (roof and lot water) : Length * Width = square feet TOTAL DA = I b o4r5( - Square feet Design temporary storage period to be ►e o days, 5A. Volume of waste produced Approximate daily production of manure in CFILB SSLW 0.00136 Volume - Jo.44.0oo Lb5, SSLW * CF of Waste/Lb./Day $o days Volume = cubic feet 19 P��.PC�S, l- �.nT Wtt.�► 1yoT' DR4iy ro L�4C�oa�. a iolume of wash water �L...,_ , r - This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = gallons/day o days storagel7.4$ gallons per CF Volume = a cubic feet ;5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. I to days excess rainfall - r3 inches Volume = 12 in * DA 112 inches per foot Volume = s + cubic feet 5D. Volume of 25 year - 24 hour Storm Volume = (0,t inches 1 12 inches per foot * DA Volume = -to z.zsb cubic feet TOTAL. REQUIRED TEMPORARY STORAGE 5A. 2-55s-71 cubic feet 59. �. o - - cubic feet 5C. _ r.��4�4--Cubic feet 5D. �02.2s _ cubic feet TOTAL_5eF- 3Z3 cubic feet rAuz ) 6. SUMMARY Total rewired volume IS 9 7323 cubic feet Total design volume avail. iT,Tz o cubic feet _ Min, req. treatment volume plus sludge accumulation o O0 o cubic feet At elev. -79. (.s feet ; Volume is 04k`toao cubic feet (end pumping) Total design volume less 25yr-24hr storm is I4 9 so s cubic feet At elev. $ z.37 feet ; Volume is t 4950(a5 cubic feet (start pumping) Seasonal high water table elevation 7 4.�o feet 7. DESIGNED BY: �L�I��C-' 7 �i��-W� P.�. APPROVED BY DATE: $^ +2- 9-�-- DATE: n. o -y to o In rl -p (IF fu :A 11, -Q -y O -. a� C. (n f = to s (A [n O {p =,, fn I C�0 o- x. n, �•O C ti ui R, [n n As r-y nlnr,nn[n-o �� (p 411 Al 0 - { ) (u n - 1 "0 r1 n- r( UI n O (TO �� in• n� c � a � n 1 n As (n n rj nr C) Q I- f) n 1 Al ill n 'y IA -y f_ (1). IU r-1 As (n (n Ci' 00 n; As (n _s (� u, --- Cis n ,I r•0 C o As 0 Al ] N � (D -1 -1 S "0 ul(fn 1 n! {11 rp _ (D y it (ll rl (ll mom(Afu(n -< Al n! {p D. I: (is Li fnC -, nI -uy (n - As r1 (D;• -'- '("I fly (n "C.) C (1) m 1 n. nl c.y r1U _In_Ly0 C) _ RI n n1 Q 1n'';rl•i'i -1(�-�;nlrn=n_ C) ,., O (A s 1 .-1 n. -1 r�0(r _, -) -1 (� (I) (rr {111 .1its A! -1" f i C - — _... (D O = =1 (U -1 [n (n q, t� .nor-rnr,nl�n,R1 n-n' anl,1 ten! r) (r} C,. < n O rl C A' _ 71 -3- n! 0 (n m (p (;,fell,-y�n1� in , C n. Q (p n. —, fit n _ (y n) (P DUlcy in A fit _ O C -, (, - ( , ID n. Q ti iAsn'[n r- As -1 rl — (.1 VI U 0 0 "Cy Q Al �" n _1 pr (G AI nl (rl - - n n; Its C - (n —. n -(, Al (II ryr o- m(n- o _yc,n1 =. Ay n r n. AsS ry 1� At QnoC) 7 , �c, At a[ n C( n (n - rl -n I (n l l (p In rn Q At -. n AI .n its { =1 fit O 0- - R1 n c nl [n ns' ni C7 o n 1 C) R} r1 (- -" r, 0• Al C)-' (li -rin o _y n as (l) O (n (1) fit As At n' Q -• _� v -(a � ns -1 — O ( IT ni n Q -I n As -((- ns u' 1 q� (!! n (p n- 0 It in O I- R, r! _, to al Cl - (� Ll s IT A(1, (p (A O (CI IL Q o < ln.t1 �1_[n0 - IA (p to rf (Il_ 1] n r( U (i► N (-!• � (^ U n+ t = 0- (n � Al n. fit — •rn rn 3 n. (Is n 0 (, m ni ns rn Cy n1 (n _�..rj- (o 1•, f_- n} 0 0 i As rU O In is (h r, In -� -U =1 Al pl 0 if) Q n - 1 nt O in O 3 m o (11 0n fit D x fu _l ,., Q 1•4 - As v .-, D [(11s) � Q (11 ru r( (n 0iU O c7. ^y• At 3 'o fit [Is A [n m , As AI (l) � n. (A -1, fn u1 . fu crOQcn [p tI r( 0 A n1 I n- (n O n = (: (� [Uu a to -� nl n' n' In fit rn I + (is =7 r n_ iu ((-I r1 rF Its n'v C) m n} (n -, m a- n- _s -71 (n tli . v, As R f.: fuss At (Ss Al (1) n o Ell nIa—tom(=u_ ns (l, C ('+ fit (n in- 0 Ai (n f� v � 1 D1 !_!. m (. - -C r1 cc) -s („ -s" m rn(�ru cu n. -1 -o n n 0 1, =1- O 'i flr n' A) -. nr frs C in O Al -. + r1 41} Eh (n r1 r 1. v _r lu Its (1) _ • 0 "C) =i 71 As } (o - 3 R, A] [n C) Q [U 5 to Its fl, . , IT)u, . n I .r 1 (s f:1. rJ (A n1 -'- n; 14 r ::! C) As n (A 3 O AI n "1' A, [p D O Al 'o -1 (u it,(I, fs, U (CI As (f [1 A! In i us (A O ci• '= � n1 � ns C .I7 nl n n �v (11 0 A, (a A, �1 •n --I , As in r (I) A! (n OPEILkTIOti & NLA, TE-N --� ItiCE PLAAWN Proper lagow. liqu,.d SnoLIC_ be a �'-i0L'G� L-7ii0'[` I: is espe---,llty innpo:a:t to r;nnaw levels -so C=_ You do L,oc nive Pro''Olems eL'71-ig ex:elded r- rLy and wet OeroC's. _Nkf=-dr.;UrL 5:0"_"'_ capm y should be a` aillar,, b:e .n the lagcofor pe^ods winen C-le r�Ce:Ving C 0.:� C�_...:�"_(5:._'.c5 'w"::L:e' "?e foc wine.': i e:e a:,- ex nday .� A speUs suchas :he c'....nde mar... SwSCR 1: Ine.S4,TLL;,e:'11'e. Th-S Me: --IS tna: a: the 5: Era _'S 0'. � _._ . 0' : n In the lamr W'ii::eN?eazi V s?nn.g 1:='__QC? according to a fa_ . waste ,:._. `e n?e' plan Sl ot-,!d be done whenever the And is d:~" enough to rCKVI! lagoon, Liquid. This will ,ra],:z s:crage space avallable :n the lagoon -or iL'mre; wet pe:_odL In the la:e i`I me. lagocri should be pumped do` -n to the low (see F_ _ :) c0 al.CW' for ywiliCt7 5tC?'-- Ever,' ...:Orr. SnaL!C be CiiGde to the lagoon close to t`e ._::L m l.c:iC level as lor_ as the em-':er v.d waste e uaizat on plan:. w':-- glow' it. ti'val_:g Lndl t"e lagoon: `as reac;:ed 1tS rnaXIMLM Storage Capaci:v before Si=�i1g to Ilsgate LaeS not le:ve roan for StOr -c excess w_`r GL�ng ov•>arCe.cr per'_oCS. O.""erEow f 'om die lagoon for any rerson except a 75-year, 240our Storm. 1S a 1dol"adon o state law and SLbjec: to pena ty acaon. 7% rour ne r3`..cenance C . a Lagoon involves the following: 30ra_ncenamce of a vw_'Ca:-ve cover for the Cam. Fescue OC t'C?mr-nan bee—M_C_ , S are the I:105t Co1rn - 0:, �'e?e':i�'e covers. •ezet . o ..` yr. ezz seder to CL ...-. L:le V T.. �. �:o�i �L:IJLIc be : -11� �: eGC:� �/�._, 1_ il�.....�r:, r ainy'n a vigorous manC. The c-:QLnc of Ie7auze: applied. should. be Base.-.. or a soils Lees; bL: in the event cha - l: is Ito,- ?acziC ' to ob: ain a SOON tes: each yew, the lagoon and. SL"ounding a=yr5 s'nou'e be rer._.__ec w::` 800 pounds pe- acre of 10-10-10, o: ar'd gees or the em'.b.a L :nen. CT'it_5t be Con::olieC. This r.ay be Cone by ro`. ng'spraying,g=—.gig, Cl:c77i:,g, or a combina::Gn of t lespyr.;c ups. This sha&( be to,--e a: leas: once a yta an C• in 4'ea 5 ::'a: w'ea: Le CC'nd-- _ions are .a`iora'Ole fo NOTE: I vegemAn is CCr•woUed by spraying, the hd iC ldt Rol be a.'LC'•.eC Co' enm- the lagoon WOW SUCK CA;':!.:a!S COLIC: LIa ,�L :'e bacte:�a in t-e lagoCr, that c.=e t=e :_ a the. waste. ML:itenance mspe-.iams o` CA en..re lagoon SnOLld be rn:de d-yring t~« .r,i::_ -Tinge o= the lagoon ant a: 'le::S[ i:C .' nC of:e" M-';Ci-Lai7..'.!1 1:7-d SCUM eVENS. 1 MS [o be checked a i...i:i,i:�Tn, [he Wasm Inlet Oes, Re' vc:.ry P'_es, a .d O"re7OCR Pipes —lock for: 1. S'.c"L:_. an Oi C;,n_5 b eah5 Sa:t5 0r r' n e 7 a I S ove-_`.1, cc'rci_ or, o� pipes Lagoon surKace---lOOk- for: L. i:ndeSAble Vege-,.a-dve g-ow:h 2. I':Oa:-ng Or lodged debns Emnban',u •enr --look f= I. Se&e7.^.e:,t, C7a::'.&.,7, Or "jug" EiojeS �. S:Ca S10,Je SL•-^._l_:V SiuT-?1 0: Cui-'S �. I'E Or Lip veil On the back sWce e7osicn due to lac'.{ Of v'_':__ot Cr as a res::l:Oi wave aL:iOn r Cden t C--- :i:a9' La:-'e. lagoons may be SubJec: CC line_ da-a=e Cue tO wave action caused by St_Cr•.g . w':.C5. These Wa'yes can erode Ene l=zoon Sidewa-111s, t ,e:ebv wea'<e ;_ ~ the lc_GOn dw—L. ?k coed sand of Vege_.:Ors will reduce the poker:=al damage cau5ad by wave action. If wave ac_on causes serous damage to _ lagoon sidew•L1 b'e.::i'ie5 in the la_oon ^"' y be us,-C to rem, ce L,e wa`ie is —oaczs. Any 0f these could lead t0 erosion and weakening Or the Ca:s. If your lagoon has a.ny 0f &.esa fezoures, you should cLl as appropriate expert ie,':"ELZ u%i::11 CeSi1gc.r•d coast_ uCtOn Y o' waste lagoons, 'You ii:ay need' CO pcovide a tenpor-an' fix if tlhe7e is a th-ea: of a w'_sta disc :ar e. How'eve" a l:.erma.%w soluntoni should be reV,e,.ved. by the Cec nicL e:toer : Any Gig=ing ii CG a lagoon dam heavy equipment is a senio s underaking w:t i pOte.".:_O;i S.-Hous ccnse uenceS and should not be ccnductet unies5 :ecor:.Me::ce� by an propr'ate tech= ica! eXpZ77 WWI: p's^os---c'r.ec'.: for proper Ope __On ef. 1. r_cycu - Pumps =. i-- ,ion pumps Check "or le`:s, loose F.c-ir:gS, and over2,l puT:p Ope ct:or. An u us',la ly loud Or e-ndrin note, Or a lu_e o i-ibraucn, may ir:GiCate Dial tr:e pump is in nee:: Or i-_ , or rep!acemen... tQ 7 _. P,,: -, nping 5y"S Vnould be inSpe..tz.. a:'.0 Gpz a�_...: .. L'e;:tly e::Cl:z:: 5e th"e.: VOu c:4 --.CC CORp*.t:thl 'iwphsad" by e0 ipmenc ra:l'�re. YOU S':Gu1d p)e70 " VG�_r p�_.:ipi%g 5! Ster'; maRe"tc.^:ce a: a twe when vc��7 lagoon is at its to level.' 1 nis ti'i+i''..__ow Sonne time si:eL'k+' C"ia;or C pairs C)z MQ,",7et. .=vitig a nea..y t l IwgGOI, is nCt the O:i:.. to :-_nk abou_ swixh�greoaih or berro%ing pumps. ASK,:-. is ycL;,- l_;oor is Full, You: i�dthbOr ' s l•_gocnis iL l Lso. 'You should cor s"ddr an inven:,o j OF Spare pars or pumps. SuM= ewer civerslan fe =es are e.escr;e,� to ca., all s=ace e-a:ra;t xarers Qc.^ as is n all rinoFt, ro0F dAmage Cuaer C1__ieCS, ind paAnj lot runic':) a`vav f`Ori your lagccr. and C•t�e- t asze cmawidw or Szora~ S=r .�t'Sr�5. The only w'a:!" G:a. Si-C'ule bt- corm g Porn yourla won i5 Ct1p._ which Comes Cron, you—, f '_S`:i. (washing) system pi__s and the raln.all Cna: hies thz! lagcor: ciret •y. You shoWd l:'SPM YOU7 dNe:mon system for the iolickwi-` I. acecua:e vegt!l=.ion �. dive75icn capacit,; Ider.d7ed probiem.s should be co-ecced pro rilptiy. I: is advisable to inspect your system during or 1Lni7L.;'; !a:_:;! following a heavy rain'.. I-,-technicZ assistance is'needpd to dete=dne psopd sotu- ?ons, con 'u'.c wi_i appi— pHace eCuZ~i. You sc:0uld rt00rt the lz',el of the lagoon jest prior Co wh..en min is predicted ar.ci the.,, record t2 a level ago_.. =:c 6 hours a_'er the ic_' (ass--mes there is ::0 give you z:, idea a: how much your lc_=oor; levy will roe w'ich a. G'.'rr'1:- r' =z_i1 l u' i.'r (you L50 _e record::1g y'0117 r_._.�a!1 for C :is to work). K-:awing C :35 Should help in pia=_. hng i:-- ___or appi-c=_.or:5 oral 5.0rsge. I' v0u: la_Oor, ,—_5es e.:Ce55iVely you May have an. inf'ow probleal Wrl a surface water di eMon or che:e rniay be seepage into Lhe lazoon. for, tie S=.ounc.n_ l_e :. Lagoon Operation Startup: 1. Immedia:ely after conwocion establish a complete sod cover.or, bate soil su_=aces to avoid erosion. + Z. Fi I anew la_oor, design t=e:.tnenc volur;':e a: least ham: full of waor before waste loading begins, =-Idng c`e not to erode lining or bar:_, slopes. j. D:L pipes inco he lagoon should have a Flexible pipe exzendt7 or, the end. Of t'e 00Z t0 0scha==e ne` the bocrom of une l=;oor, du-n i:'?ual Wne ar ak" er Meads Of slowing the Lincorning wayCO avoid erosional of the: Gins. 4. When eossibr:e, begin. loading new lagoons in the sp-+" to bacceK esmbi shr:er (due to warme. wear —her). 5. I: is recom.mendef_' that a new lagoon be seeded wi.h sludge from a ire: Luny w'or,kin swine lagoon in the arnounc of 0.25 percent OF the RAI !_goon lice= d volume. This Seeding should occour lk>z L•ryo wee`s pnor to the ackitioni of w=scewate:. b. NEMnaGn a pe odic check on the lagoon liquid pit. I_ the pi Wis below 7.0, add l::i;e a. C[ie fete 0 1 pound per 1000 cubic It: of lacoor, EgUid Lr:t l the p . rises above 7.0. Oo_ t mum lagoon liquid PH is bec`.vetn 7,5 and 8.0. 7. Adak color, lark OF bubbling a ,,d excessive Odor Sig n`5 biolo_ical activicy. Consul_ on vich a tec*nriicz-1 is re-zo-'mmended if C=e_e cord=: -.ors oczur Mr prolonged periodsr espeziailly d--.��nw t-e warm Sez,on. Loadiag: Tne -L"Ore .-_ccenr'.Y Wd QgWa y that was.ewam is added to a la_oor., tn: be::.. tee lagcon Will u.^.c::v ;. Fi'us, syscers t.`,a,- wa_<< wasce info tie la_cor!. se'fe.ri t:- es C`iy axe opt:-u:�i ;0" tie`: e.".i. P:. Ce:f1r::�� sys:e is, in W; ic1 ore Or noiz OU:IC:'_s t7zina Management: Practice watercauservaEon---minimize building waver usage and soilage ".Orr, leaking wa:erers, broken pipes and washdowri tniough P Q:ee- 1T:c_rfenazce and water conserva-zon. �:�_....�. :eed w'rC:ai' and scpMage 'by keeping fee—.e s aCILSZtd. lids w._l ret_Ce t"e amou ._ of soUds enzarIg the lagoor, T__..Nn lagoon Uquk level bztween the penrianenr storage level and the i :l» te."r,pOrZ Y 5t07ag e level. D!'-e visible rriai'Cers or Was On the lagoon bars t0 Show the rni`inIU : liC'Ad We. and u e maxi.T:L«, liquid lever (Figure 2-1). Scar; i gaci _= an fie earliest possible date in the spi.r,g ba.:w or: nu:-encreQu:_e.�:ent5 L-id soil rrioistLre 50 Lttat teTOors:--v smr-age w':Il be rinaxim- i e rcr the Sumrier, tilunderstoL'it sea -son. 5imila=lV, i-g-:e in the lave su:; mer/early fall to provide ra:irnur-, lagoa_ n storage for the winces. 'I he lagoon HQ4 level mould never be closer [rian, 1 foot to the lowest t;oi:,c c the dam, 'or en:ba:r,Icn,enc. Do noc pump tie lagoon liquid ie`�el IOwe- that the �er.:�`ye^.t scocage level unless You a=e~_e-moving Slud e. T Oca:' float pump Lpp7 3XiMna:elv 18 inc,,es the Liquid and as farGriG'i iron the di,_:rt7ipe inlets as possible. Prever: aCCiGM 0 TF bedding M2.t=225, long -Stemmed forage Or vegMdOrl, feed, Classic syrages, or ocher fo-eigri n; ace: as s inn the lagcon. Pac'_endv remove soiids moil, ca•_ch basins at and of con Mement homes or L":�1 z�%�: L:l��/ a:e instLieo. 1.1a1n ca n sty:ct vewe:zkon, rodent, and vanmin. concrol nea- lagoon etges. DEC noc a110, trees or larp bushes to ?row on lagoon Car: Or ember' krrienz. Remove sludge hom the lagoon eic!!er were^ t: e Sludge storage C:Dr.:�� is } l'_.l of beVe it Us 51 pe-CenC 0 title i e7-MGrld.nt S:ol:Lge 4Oilill.e. J if prcC,_c:-.cn is to be ter ?i"S r=.,, t_`'.e 0,,V7,e: is rzpons::�:e for cc_L7-'.rC and imi- ie'encing a Vosa7z plan :o eli-,una:e PCss;'OUir' OF a Sledge Removal: Race of l-:_o+:n s:--,d bL:lk�,op ``r, be rea'i:cec b.•. prapv lagoon Win? C"'.a'c-aniczl Solids c•i flushed w'asz�, :-�' - - �-' i. �'_ ." 5�c _ _ Oi r: S�:e 'w'a5:a 501id5 � an. die5icn,!.j. b"c..5i:'l, Or ::...._...._.'°' ietd w'as:Sge and spinage. lagoon sl_dge that is .remo 'ems ha 'Ors odor, and lno .a. land M Lrope '1 use the nu enu. Removal Lech icues: Hi-e a cus[om a---�lica:vr Mix the fudge and lagoon liquid w-h a chopper-agi_:vr Ongel_er pump [`_ougla_e-bore 5prin'_ter z-i;__vr. sys:tr1 onto ne—arby C.opla :C`; and soil incogms-2. Dewwr the upper aa_z of lagoon by i=.ga.ion or::o rea:bY C70pla~:d 07. r-, x remz:n!n_ 5iudje; p1: 7 into l:e '.d sludge aODI_4a:Or; haul and sprea : or:o'Cropla::d OF rora`_la:d; and SCiI incoivQ wca. Dewacer t:e upper pa _ of iagoon by i- !-io . Cn[C i:ez.-rby c:v_C•!zziCj or ioC=?'-iai?d: sludge Ham lagoon or sludge ba=_a; berm. an a-aa reside lagoon to .-.....ve the 5IL!CCt so :Aa: LC' Cs can Vain back into la=ocn; Llo,. Sludge Co de'Na q haul and. spread Spreader On,o c-=,'.and Cr For_wa.=nd; and 5v^'_i Regiadiess of the r-..'.:.;od, you ttl s, have the sludge r1_:an211 C�:wl V zed for waste. MnSd=. e= ii_'S: as VOU `.•vOuld YOUR lagoon w:. V 1 e fudge ME contain dL:eren: nu _en," a-..� mne:al from ,che l:Quid. The appl can:on Q::Ine. sludge to i e`ts Will be United by these- a5 we", as 2:ny O-ZeVlcus waged =.ppica::ors [0 una: aid and crop Cequi.-a,min.. Waste aOviica.ion r :.—s w:_. be discussed in de:_1 in Chacce; 3. When removing $,uc_ You r;-;�.s: �:50 oa'% a[. ..iiCn ro t::.. I...... v prevent ca- Close ,. the s. fine �w �il ensure th : the lagoon kner remains a::aa:ion 0+ :i�.. pumper OC �.'. 'L .:... 0✓�''�:LC W, !: :� Own If vet: see so:l r:.amr al or the K-'",[:'a:iC li::ar MZ—.-27ill b2ing C S ur:z�, �'OU S�:O•ui stop the ac:ivir .. imetia-ti ' and not UnC.1 YCu Z:e Su': {'_. Me- 514 due can be a •` "ti iu* i^a_ t e Her � 3r-^aged r : � repaired, as s on a removed W�: C � 1 .,.., i:".)l..": li [`t.. I•.,.., is C'....::�`..�: i[ Rli..S' Z t.. S possible. Siuc' e re:noveo : ,e la_ccn has a much h4her cnosor',ow and :zap-; me_l concen: _ chin liquid. Ewa. --,se Oi i 1s is snLO'_ C Lrobab;, `b3 apt'!..eC :o land PhoSpnC -S and mnizLll a: by a SOI: [.'_J:, lnC MCOP':.'aNd CO reducethe Oawce OF erosion. Nace chat is the sidge is a:O:!e'.. [C A& vti::','.e... �:: 5Ol!WS: PhOSP'r,areS, it should be cpcilet: 0': _ a_ Caws GO :ne crop removal Oi nosp'nor_S. As W",- i CChe wastes, alwayS haVe yCo QaCn ]i° g! Zna!1'L.'..d iO Ins The apvl;,czOn O` OS','-1dg=v..11 increase the amount 0` odor cc L:,.' ,va::�' c�.l!C4: 0r, size. L Ex a reca`. MOO 5�icdt be, LStd Cs. [J fl�.�SMe the wi dimcdon ant lear�^''` ichner could increase [ e cor,.:ern or Possible Causes of Lagoon Failure Lagoon f..ilures result in the discha,ge of wastewater fom the s=cture. Types of r4u.es include lesk ,e t_hrouch the bosom or sides, overopping, and breach of the Assuming proper design and construction, the owner has d-le responstai1lity for e'Su-:Ii S ;Ct'='4 SZetV. Irems. which may lead to lagoon fzilures include: Modi=ca=on of the lagoon exa-m-ple is the placement of a pipe in the da n1 w,t:^.out proper design c:d con5m: +cuor�. (Consult `n exper 3.ti lagoon des:=n be.,ore placing a=iy pipes in da-ms.) Lanon licuid levels --high levels z:e a szfety z4sk. Falure to inspect and main= -in the dam. Excess surface water flowing into the lagoon. Liner integrity ---protect from inlet pipe scouring, damage during -sludge removal, or rupture from lowe::ng lagoon liquid level below groundwater L=bie. NOTE: If lagoon water is allowed to overtop the dam, the mavL-i,-- water, will soon cause ?'L!ies to form, Ln the dZM.. Once Lhis dz-image st:---z, It care quickly cause a l`ge discinazZe of wastewate: and possible dam fai?ure. SPECIFICATIONS FOR....CONSTRUCTION OF WASTE TREATMENT LAGOON Producer - SMlT Ff� s� oT'T Clearing: All trees and brush shall be removed from the impoundment area before construction is started. The foundation of the lagoon shall be cleared of all trees, stumps, roots, brush, sod, organic soil, and debris. All stumps and all roots exceeding I inch in diameter shall be removed to a minimum depth of 1 foot. Satisfactory disposition will be made of all debris. After clearing is completed the foundation area shall be loosened thoroughly and roughly leveled, with suitable equipment, before placement of any embankment material. Cutoff Trench: A cutoff trench shall be excavated to a minimum depth of 1 Z inches under the embankment. The exact depth shall be determined on site by SCS. The trench side slopes shall be 1:1 or flatter and the width will be a minimum of 6 feet, but will depend on the equipment being used. The cutoff trench shall be backfilled with GIf material. The trench shall be backfilled in 9 inch layers and compacted with a sheepsfoot roller with a minimum of 4 passes per unit width of fill lift. If sheepsfoot roller is not used, the trench shall be backfilled in G inch layers and compaction shall be equivalent to or better than the routing of the hauling and spreading equipment over the fill in such a manner that every point on the surface of each layer of fill will be traversed by not less than one tread track of the loaded equipment traveling in a direction parallel to the main axis of the fill. All standing water shall be removed from the trench before backfilling is started. Existing Tile Drains_ When tile drains are encountered, the tile will be dug up and removed. The tile trench shall be backfilled with a compacted layer of CL or CH material. Excavation: Topsoil shall be stocked piled separately for later use. The bottom of the lagoon shall be excavated as shown on the plans. Where pervious material (SP, quartz veins, etc.) is exposed during excavation, it shall be undercut and backfilled with a compacted layer of highly plastic (CL, CH) material approximately one foot in thickness. Scarify and compact the bottom and, where practicable, the side slopes of the lagoon to decrease the permeability of the soil in the lagoon. Embankment Construction: The material placed in the embankment shall be free of sod, roots, stones over six (6) inches in 'diameter, and other objectionable materials. GL G✓W1a9-5C- materials shall be used in the embankment. Pervious material shall not be used in the embankment. Construction of the embankment shall be made in layers not to exceed 4 inches in thickness. Compaction shall be equivalent to or better than the routing of the hauling and, spreading equipment over the fill in such a manner that every point on the surface of each layer of fill will be traversed by not.less than one tread track of the 1 .. ;r s OF WASTE TREATMENT LAGOON SPECIFICATIONS FOR CONSTRUCTION loaded equipment traveling in a direction parallel to the main axis of the fill. If pans are not used, construction of the embankment shall be made in layers not to exceed 9 inches in thickness and compacted with a sheepsfoot roller with a minimum of 4 passes per unit width of fill lift. At -any time the embankment surface becomes "slackened" such that the succeeding layer will not bond to the previous layer, scarify the previous layer sufficiently to assure bonding of the surfaces before continuing with the fill operation. Construction of the fill shall be undertaken only at such times that the moisture content of the fill material will permit a reasonable degree of compaction. Construction of the embankment shall allow an additional kS % for settlement. Stock piled topsoil shall be spread over top of embankment and outside side slopes for the establishment of vegetation. Pollution Control During Construction: Stripping of embankment and borrow areas shall be done as they are needed in a normal sequence of construction. Use temporary mulch protection on all ,V- disturbed areas that are subject to erosion and will not have substantial additional work performed for 30 days. Vegetation: vegetation shall be established on the slopes, embankment top and all other disturbed areas, except the area that will be inundated, as specified in the plans as soon as possible after construction. Necessary steps shall be taken to ensure that a good stand ofvegetation is established in a reasonable amount of time. Permanent Stake: A permanent stake (CCA salt treated 4"x4" post or 1 inch diameter PVC pipe with tee,) -marked to indicate pumping level elevations, shall be placed in the inside,slope at one end of the lagoon. 2 I PA �i THE STELLAR GROUP Job No. Date-o�izt 9 - SUBJECT 5 -r - F1 ;E�. c-a7T CA vP-Klx/ Z000 6gxx,%,, 7o flo s Sheet No. of SE � D I1.l.Ca �.�Uo M M�a DaTI ptii 5 SSF�T_DIti.1 DPrrES 56Ep4+.lCR MlxYJ�L� ljrprF-C-;A is -Co ` 175).154 r--� apt al tP. CoL k S.S. C. 3'oNr 30 e.o 96,, - W iTkt G0Mc'10Q L`��R FM'tvDAr TO >sv�.�-Eta 6ERMvv� C,Fza�55 p+os�- 4 is 4 OD l T l o rs) }kr P P t1y ro L-t-c L-, c u cj {moo rZot s 4' GE o Q6g�y�SG. 10�10- la V-(L L moo -ibs S Msr�+r GtPRA-iy-f S7 P-Aw ( lao Si-rr �3 U.S. DEPARTMENT OF AGRICULTURE Soil Conservation Service MC-ENG 34 September 1980 HAZARD CLASSIFICATION DATA SHEET FOR DAMS Landowner: S M {�,� ,�/ s 4,rr c,'ja-� ' ►a County: k a L-+ �: Ax Community or Group No.: N1 z. Conservation Plan No.: Estimated Depth of Water to Top of Dam(ft): to FT, Length of Flood Pool (ft): ,00c Fr• Date of Field Hazard Investigation: 7 _ 2 n - 9 z Evaluation by reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. R e a c h •Length Width Slope Land Use Kinds of Improvements Est. Elev. Improvements Above Flood Plain Est. Elevation of Breach Floodwater Above Flood Plain tDeo SOOb� 0,Z0/o 5+1AwlP GOW i�AVI. SwofMV G I•a �[-. uescrioe potenuai for loss or lire ana aamage to existing or proname future downstream improvements from a sudden breach: Ro ?* rC:ur4A4` r-o►z Lass cFe L I r= Z . (-*VJ "A-JL Swl}MP iS L *C-AerF-0 a [Ooo+ DouuSris.C^164. No SrA-oc-rulzics oR Ro4DS A LS L"ATi'o P G;;TWV-r-.J LACGaop4 Os%%0 SWPrM1P Hazard Classification of Dam (a, b, c) (see NEM-Part 520.21) Dam Classification (l, ll, III, IV, V) Z:. By: F� k% +P T.1F�-Lf ,Y� PIR-Ec..Ta{Z or— Date rot (.- Y'Z- (Name) - (Title) r-q Concurred by: Date (Name) (Title) Note: 1. Instructions on reverse side. 2. Attach additional sheets as needed, A �°� THE STELLAR GROUP Job No. '1 (-a t- z 33 Date SI CztgZ SUBJECT Sc. orr 4%vT` V- t rrV- irx5L.0 L, 04 FarRW;,-SITS.++r.3 Sheet No. __�_ of 3 L!k 004 S T s Ta /ZA,Q ir- , AAA F AACA MC7k,,0 E;LXl4TIoN p,-4Cg-a44£ AREA VdLVMC- LL.)mr)VVA'rj Vdwr1E �z 3 1zSZ►4 -- -- r 7 1Z_`bIM 1Z.7'L GgOA 90°r`i 7Ir 13 3057 1 3ob W 1 3101S0-f 2.191 q_; -75 i 3 7 A-12- l3SZfo5 1'3S17.4a57 35519 9 ?CQ � i 9 (ac 1 39-714a 119171to -+94915 -77 tkiQ,51LG if24c 1'F4tI'Z4o Lp39t55 -700 SIBS&I lag1 !S'7(0 "79-79,71 79 1r.�r, 05Ca [ ar35a't 15305404 91+1495 4�o tLa oCo3Z 15Ib2k4 65S,2.44 1099739 b! 142 0 �ca3o5Ca 1ca3�o5Ca 12i4?'!95 4,L 1"?04oa [laig4o j191,94c 1oc3o��5 -ron of D1+LE= -b4.o TOT A►- D Es►6,vL VoLvMF_ t,69-1.3z-5 F L► 1 1_L c R aF L 2. 5 C- OP- c. i-4 1" Wrr, F.I AL 1, FRsf_,a.A zo 25 `tR-• STpRN1 VOL.uN1F 1 �Z25� Ge� 82.•3"7 33 a ESL Ea rJ V o L: u ► vL — y5 Y Ft. gToc.PA z 1 °r9150625 c,F RE aV►P-5-0-rt-CArMIE"-r -t' S, L-U D 61 1E_ _ to 4 A4- o ao C.F 5HLiT = 7 z{-, c Job No. 71-o t - z- 3 � j� Date THE STELLAR GROUP SUBJECT u rz- w r FrEc-, r- s Sheet No. t of f-i sor L- 7-Es7" Plrs CA ILa um 0 5 vox E: A-e-,r — Z 5 F ,:5 o.v a t— +d-t j a +u.41-C ,Q. 7- 3 L �C -z - _. UaP-+Ny / PEP-r To GRoutiID 15vRPAGjc- SF{wT rp-sr Pert.- *Q �uu�s�t[�+1T�o►l t + -7- -Z.-+-92- 4-o" ycA o 2- -r --7-2--)-9,L 21��kw.a¢n 9l 4 �` `i5�5"PsaUAr.o 3 7- 2`7-9Z 3ot`-PEacsO q9•o 9[�•9-rtc.+� 9- 5 84.gob — p t�,S•4t$ A 17—s^-k Jo -A,S SydwT -J �. A,r10P,4 1N L.A.C.)0a9 v�s�4U SATE �'�' botzs"7/ r�Ls + •dn,7-r_ pF EµVSSr+4R71ok DLtiPr1+ ro sr:L.+r cj-;L. 4'YlC/S 64T• CL4.VkrtO^R D%-F "4- -L"1-9Z 30% �-1,4 T4•La F3u z 'i�Z`1- 9 �- 4 z" -� S• l 7 4- -1-7 - 91— to 7 44 • La. A,"15 s s E" V-5E O As- sa a W T I�4 L A-y o o M D ES t 6% N -'- S0P-q p G.4MP i-.aS!�-oG., itit�� o,.! E!)� 3 ( 9Z +�e y e Nt -11 I fi trRor� �c1S `�o�G-S 1�1VE<ST14A-ri--f Rr.Poa_T �>a.�.o -I--z-I-9 -ti- P~�o►�t p TAD 9-1(Q- 9'Z- L-o t o.1 S LAGOON SUMMARY SHEET & TYPICAL CROSS-SECTION Settled top of dam: a4-.o ate Tap Width f Sf $4�"S Construtct t0P Of darn Fill Yardage: q� 415Z -Natural ^gi_oUnd elev. V t rS ---- .--_-------- --__ -- `_x--------------_ cut off seal D - -*--\DPpth deterrnind 13y Depernd s on egt.ti pment "_!_:t� SCS on site Start land application'} Stop land application elev. $2�3-] / elev. $o,'L _111Temporary Volume ------------------------- _-__- ------------- ------------ Seiat SUPport-- Treatment Volume � 41a 3 Top of slLidge elev. '73-o u�A .3 5l Udge aCCUriwl ati on Laoytl�tc�r+� elev. -].3,0 - . I} .` Lac)nt7n size: Length 4i l2- GJi dt:h Ct-t. Yd a. excavated RENCW MARK 1)ESCR I F'T I ON : To P o c,,L P-o AS �a 0" PL, 4w C, AHj- 600tp As50-4Arr-'T=s E I e v a t i a n 7o 35- GENL' RAL. I Ni= f3PMAT I ON JOB CLASS: 11 HAZARD CLASS: A ANIMAL TYPE & NUMBER: 2oO0 ao5ow KIND OF OPERATION: R4-ou, 1,110TEC: If Const,r•t_tct::i t-sn i a nOL started within one year, this plan is nat valid L.tnLi.l re- c?vali.tat_ion cif fIoc)d p.la.in -For s,af ety hates and i s:s rfo:%de . LAGOON FOR ANIMAL. WASTE (SINGL..E STAGE) 5411TI4FrE,�SL_o_�tla� L W-3 FARM COUNTY 110rz1`H CikR-o.uOS STATE U. S. DEPAf;TMENT OF AGRICULTURE SOIL_ CONSERVATION SERVICE jl OCSIGNCD BY: AF PROVED BY: TITLE: SCS-(NG-S38 AR ME 4 F:AC ICUL URE I C Ti SOIL INVESTIqATIIINITO DETtkMIN.E'SUTA I I 70t FARMER'S NAMEzL/L/_)L_r� U151 11 H 0 -7 DATE S. C. S. P.110TO S11E.ET �0. WATERSHED ARE' ME�wRtmi.-as:14 CW ilRO- N-0 Owl J' A S"-rcH OF PROPOSEDIPO PRIM, NNE 11 ME MEN NO NNE 111�,'Ilw 3191 B"INIRSE20a"its- ON NIEMEN I I mmummummmomi ONEEME BEEN ffifflumm ENO WARCHIGN 11FACHMN i3oRING-NUNtBER A.N;D POFT iff"Pip"iffmilElm. ■iiii I • IMMIUMMEN921M I f®i■iL�Li■i�lll IIEM .0 1=21=1 Im iI�IIL�;�I■I■ I�I���i�l i�l�!` .'■i■I�I®�®+®��■I11�'�ffl�l�!��I'�I� . &11MJ 7- .Serra / ,si IUHiFIED CLA IFI GW-Well"igraded'graveis; g ave :'GP -Poorly graded gravels GM-Silty'gravels; gravel-s d- GC- Clayey gravels; grave -sa SW -Well 9*raded sands; sad-gr SP - Poorly graded. sands SM -Silty; sand SC .Clayey sands; sandal y m ML-Silts';"silty, v. fine sand ;'s CL-Clays' of low to medium pl CH -Inorganic clays of higi pia MH -Elastic 'silts , OL - Organic silts and silty cla OH -Organic ,clays, medium to 1 1. Suitable material for ern REMARKS irl , I i, r 2. lrrpla.in'hazacds reyuirting Istse C L-f C` 13 a,rt GJ r TM �4 T f GENERAL' ItE: MARKS; 7_e1keCAA4G7 rr A vdTex- 7A' 0 24 2S 1126 27 28 1 2y I 30 31 131 OF MATERIAL ENCOUNTERED ' (Use one of systetils be�uw)' AlON 'a.,'k`ll1 liyl 4 li I•� an4 aaiY I { =1 Ir S kgra a� f. ssnd�,I,i` Ik Muir 11'? I of ={vety �iti lay(mix t I sl a'aaid'yloi 01 msx . ,' I, fsl4fin' l;san, I, darosl si rclayey sif t '. .'siI ssi ticit? daa y . ,' ; I i -'ci cla'CC E i I ityl I sicl ,sj tq�;ci scl as dycl s, {low plasticity.,. sib si �y IIIa 1 i plpStlClty C-Clay�il11�,. at is available +Yea ..++ ! teM f Ij E' �I sI nL '" t 1 I c ltf t- gtw'ptioa'in deal %stspgg4l ap, 11d 7'6,4,A,atG , I f r r1,llt• r� ! E �I 14Ii: j. 3d 35 3611 37.1138 1 33 40 :41! 11 ■ice ini�i� MJMIRU minino m11 MINIMS MINN. DMIN1 0001% MIKIMEN r'lfhld 1 rI,'.1i rl i ! , .r Lrl f I K"Il t t i9 E 1t r 11 � i r g. .r r i- i 4tit:' Ui r i { kN ; `h ry% Job No. 7&o 1- Date ta (,Z= 1 THE STELLAR GROUP SUBJECT 5c0T^'r- Lr,uP- V- I sr•rr;,H Fr an 4••foc,, Via. r_ms _ Sheet No. I of I SO!— TEST PITS Cl P—o I0 5 5f.asa�✓�},� �ltSN kUAr,EF� T4•3�1� [�aP-,Nh / DFkrE ��r'rL TO G2outi4D 15ufLr-c*G.C- SPwY •rr=sr PLr t. o F 5►l OJT eL-EJATr01,4 C\jA r%ctij 1uuEsnCagTSo�l L 40" 9Co. 'a _k'Zs IED q i , 4 �` �j5•15' PE kO 3 i" 7- 27-92 --so ftgvw, q9,0 91a•�S-P rc► p 9 Z • 1 -Z- za +-a= -- - q-[�- 92- 2G"- pf~ s�,s� 57.15 ""K 84•`7� — P 9-[(a-9z-�34" _ �. g�.3I 85 48 12�'5-4t 5 �)Of25 uU67 T•r-S rr+� l►+V ST��aT'.on{ P eT TO 5::.wr G- 12-0v1-1D Trar.l wr1 O+y 1-1-7 - 9 1- 74.Ls- A1P%5 SSE" US -SO As t��JT- EL.cv�--rtor4 IN ��-cxooN DESt4N -;f Sv4=V'ayE r.r s v'•tea- h .��k3,�- orJ �43Iy7 r'r' �'4,oM �h7F-L7 9-I(a- 4"L fio'F-ts.Jc� .( ,T~ moo: r_.� :�' A._� _ o .. *��a:.�°� State of North Carolina Department of Environment and Natural'Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Brown's of Carolina, Inc. Farm #19 PO Box 487 Warsaw NC 28398 Dear Brown's of Carolina, Inc.: 4 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 30, 1999 Subject: l Z_001/1�­/"Z"`,`�­ Fertilizerr Application Recordkeeping Animal Waste ManagementanSystem Facility Number 42=T0 Halifak--County This Ietter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRRI, IRR2, DRY1, DRY2, DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincere , Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Halifax County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper "We THE STELLAR GROUP Job No. Date - I 1 i 9 -x- SUBJECT. SG oT r _4ur�K-w �-000 VAR+zow o v�Ep-F--PL. - -0-- 3 _ Sheet No. MI ! } i .. :1 0 oco IL n r { It ftl I f � - ! I I 1. i,. I. q .4'-•--�:� - ! : r rr r r ! r r � r 'I T[t U• r.' f I I f i I l I • i � I - I�, f ,i ' •,-.•_.-,. _I..; ...; L.. � .i__.1 k...�..,� ! 1 Y I ;- , ! -I I � i � ._I I I ; I �. L i I ! i r I I ; ! I I ; I i , , { V I i I I # � I { r i I I l 1I , 1 N ..:''{��I I E i • -� ' I i L.-! ; I { � I � ,• i -I--! .� � Ord Ci..�. i ii; f ? ! i I i , r I : ! � i t I >I i . ,- .. � I r I i i �- I { I _�_ i.. I. •1d f I I � I , t._ I' ( i �,._ I .I }. r I i _ , ._+. `.._,._. -� — r -!--.i-- -�-;-- --i ...-�-•r� --� -t- ! 4r { i. l .!_-,. IIl! I- � Ifk I I i � I.,.i,. •. -� ` I. 'I I� -�._' -_.I. ,- � 1 I i i � 77 - I - 1 !' I -- - �- I 111 t I I I I- i� • [ � I • f � I II € I , r _ • I i i- -I. I I I ! -E 71 r_L _ h c p'J IB HUNTJR,J;� k. NOR IOLMAN NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Division of Water Quality September 18, 2000 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Todd Rowe Brown's of Carolina, Inc. P. O. Box 487 Warsaw, North Carolina 28398 Subject: Notice of Deficiency Brown's Farm # 19 COC AWS420010 Halifax County Dear Mr. Rowe: RALEIGH REGIONAL OFFICE On September 11, 2000, Mr. Buster Towell of the Raleigh Regional Office conducted a compliance inspection at the subject swine operation. The inspection revealed that the facility was compliant with its Certificate of Coverage with the exception of the following deficiency: A records review indicated that the last waste analysis for this facility was collected in May of this year and that land application had occurred beyond the 60 day window allowed for the collection of a waste analysis. Your Waste Utilization PIan for this farm lists coastal bermuda and small grains as the receiving crops. If you haven't already done so, now would be a good time to collect a sample of your lagoon for early fall application to small grains. The Raleigh Regional Office appreciates your cooperation in correcting this matter. If you have any questions regarding this Notice please call Buster Towell at (919) 571-4700. incerely, Kenneth Schuster, P.E. Regional Water Quality Supervisor cc: Halifax County Health Dept. Mr. Wayne Short, Fishing Creek Soil & Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files MAILING ADDRESS: 162a MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1626 LOCATION: 3600 BARRETT DRIVE. SUITE 101, RALEIGH, Nc 276o9 PHONE 919-571.4700 FAX 919-571-4716 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLED/10% POST -CONSUMER PAPER State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director April 3, 1997 Browns of Carolina I Farm #19 d PO Box 487 d Warsaw NC 28398 Dear Mr. Browns of Carolina Inc: e�� IDEEHNF;Z Notice of Violation Designation of Operator in Charge Farm # 19 Facility Number 42--10 Halifax County You were notified by letter dated November 12, 1996, that you were required to designate a certified animal waste management system operator as Operator in Charge for the subject facility by January 1, 1997. Enclosed with that letter was an Operator in Charge Designation Form for your facility. Our records indicate that this completed Form has not yet been returned to our office. For your convenience we are sending you another Operator in Charge Designation Form for your facility. Please return this completed Form to this office as soon as possible but in no case later than April 25, 1997. This office maintains a list of certified operators in your area if you need assistance in locating a certified operator. Please note that failure to designate an Operator in Charge of your animal waste management system, is a violation of N.C.G.S. 90A-47.2 and you will be assessed a civil penalty unless an appropriately certified operator is designated. Please be advised that nothing in this letter should be taken as absolving you of the responsibility and liability for any past or future violations for your failure to designate an appropriate Operator in Charge by January 1, 1997. If you have questions concerning this matter, please contact our Technical Assistance and Certification Group at (919)733-0026. . Sincerely, hh�� for Steve W. Tedder, Chief Water Quality Section bb/awdesletl cc: Raleigh Regional Office Facility File Enclosure P.O. Box 29535, PC FAX 919-733-2496 Raleigh, North Carolina 27626-0535 An Equal Opportunity/Affirmative Action Employer Telephone 919-733-7015 17T50% recycles/109% post -consumer paper rip o 0 r+� September 6, 1995 Kenneth Schuster, P.E. Regional Supervisor Department of Environment, Health, and Natural Resources Raleigh Regional Office 3800 Barrett Drive, Suite 101 Raleigh, NC 27609 Dear Mr. Schuster: Your letter dated August 24 concerning management deficiencies observed on July 19 at Brown's of Carolina Farm #19 was received on September 5. Glenn Davis and Sonya Johnson visited this farm on August 22 and reported the newly sprigged coastal bermuda crop to be establishing well for an irrigation spray field. All soils appeared to be stable, minor washes will be repaired during the spring which is the appropriate time for pasture renovations. Major washes will be corrected as necessary. It should also be noted that the irrigation system will be managed so that overspraying does not occur. The lack of sufficient freeboard in the lagoon has been corrected and the broken septic tank line was repaired immediately. If any questions arise concerning this farm, please contact me at (910) 293-3600. Sincerely, Jim R. Vinson Environmental Resources Manager cc: Greg Brown Scott Gurkin BROWN'S OF CAROLINA, INC. 303 EAST COLLEGE STREET • P.O. BOX 487 • WARSAW, N.C. 28398-0487 • OFFICE: (910) 293-2181 • FAX: (910) 2934726 May 11, 1998 Mr, Kenneth Schuster, P.E. Regional Supervisor NCDENR 3800 Barrett Drive Suite 101 Raleigh, NC 27609 Dear Mr. Schuster, Brown's of Carolina Scott Gurkin PO Box 487 Warsaw, NC 2839$ ---1 Igo This letter is in response to the Notice of Deficiency I received on facilities #42-10 and #42-11, which are Brown's #19 and Brown's 418 respectively. Since receiving your letter, I have had the pumping records transferred to the forms the other Brown's farms have been using. I am enclosing a copy of these to see if they will meet with your approval. A copy of these records has been signed by the Operator In Charge and placed with the other pumping records. All of 1998s records have been transferred to the new forms. I hope these will meet with your approval. If you have any questions, please let me know. Sincerely, Scott Gurkin Nitrogen Application Summary"(Ibslacj Qgm-gley YJr EACM Hvdrpnt Q= N Required N A oR lied N to-A66iv_ %N Anulied 1998 18 D Ber Gr 275 56.70 218.30 20.62 AM 18 E Ber Gr 275 28.35 246.65 10.31 1998 18 G Bar Gr 275 28.35 246.65 10.31 1998 18 H Ber Gr 275 42.53 232.47 15.48 1998 18 l Ber Gr 275 42.53 232.47 15.46 Friday, May 01. 1998 Pap 1 Irrigation Report Form Farm 18 Hydrant D'' Fn Complex # Sprinklers =' Date - �.rF. Year 1998 Crop Ber Gr A 2..1 Field Lbs N Required 275 s Lbs N Residual Field Acres Lbs N to Apply 275 C Start Stop N11000 Lbs N In to Date Time Time PSI GPM Gallons Lagoon gal In/Ac Lbs N to Apply Apply 04/08/88 2:00:00 PM 4:00:00 PM 70 18 ! 2_10 0.50 28.35 246.85 4.35 04I07188 4:00:00 PM 6:00.00 PM 7p � � - 1 g 71 2.10 _, _0.50`� 28.35 218.3D 3.88 E= 0 —_.+�� F -' I.-�-' ', �� O.DO 218.30 �----•-L,-.218.3D �0� 771 O. QO 218.30 Crop Report Form Planting Date Seed Rate Variety Harvest Lbs Total N/Ac Date YieWlAc Harvested N Harvested lUni# Yield r----•-----.-- L 0 �T State of North Carolina Department of Environment7, Al and Natural Resources 4 Division of Water Quality 0 James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director _ r March 20, 1998 CERTIFIED MAIL RETURN RE IPT W"U STED Brown'sEo ECarol'ina, Inc. Farm # 19 PO Box 487 Warsaw NC 28398 Farm Number: 42 - 10 Dear Brown'sEofECarolina, Inc. : You are hereby notified that Farm #19, in accordance with G.S. 143-215.10C, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has six 60 days to submit the attached application and all supporting documentation. In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. ; The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location �.. , t\ map, and two copies of the Certified Animal Waste Management Plan must be returned to complete,the, application package. The completed package should be sent to the following address: North Carolina Division of Water Quality" Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 �;�� ..� If you have any questions concerning this letter, please call J R Joshi at (91•,9)7"13-5083 extension 363 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700. Sincerely, 4u- A. Preston Howard, Jr., P.E. cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper JUN-22-01 FR I 05 : 52 PM EAS I CARE FAX N0, 8048342909 P. 01 /03 Carroll's Foods of Vif�inla, fnc. PU Pox t2� 434 E. Main Sf, Waverly. VA 23800 (804) 834,2109 (804) 83 1-37..07 Fax To, J.D. Hester Fgxs (919) 571-4718 Phom. F►on Neil Za111'adka Pm34 , 2 (including cover) Date- June 22, 2001 6te; P.0,A, Farm 52 CC; Ronald Vincent 11 Urgent OFor Review 11 Please Comment 0 Please Repty As Requested a Cm nent%— 'this Puri of Aclion Is providc d in response to the freeboard level less than 19" recorded at Brown's of Carolina • Virginia Division Farm 52 (Facility 10 42-10) on Wednesday, June 20, 2001. The freeboard level was reduced from 19" as a result of heavy rain. Land application from this lagoon to increase the freeboard level will continue as soil conditions allow. The followhig effluent application summary is provided to indicate that adequate allowable RAN application area remains at this site. Pleasc coniact me at (5o4) 834-2109 if you require further information. Thank you. r �R L,. S FCv�-S 0< L'4 iN L';LL Fp?:I i.Tic-i (f=:es 5;;inp � 3 =.i ?z'th31_ 2.O pY Cnrn 7731.-3 ;7r, m 52 �.^i��- iT - JJij 31. 2110: ^2C '/Ear`❑I-eeIr6gi.-c -sumrra^: .9aj1-3ES 0..-o7-31,2X- -EF. LUET;" AP IJICr:TIC A AT 5�tT!;FI`LlCAgP- L-S iL: BY -.ELD Fa:: Grain :etc-mL•_r 3C. 2DO` P:.i:rj-. ALLGr'AE�Lr AVAIL: BLE Rezyxnrra.^_ed PA! PAN A".LC':JD9LE I'Jr 2„G J PA _D_3ing A?PL,''EO :i 4--�PLZAi12« A?PL': A'rv7,z K fir. Cu 'FARr1 F:=LC CAP EFFL'JE1r A P Pul Ev AnPIlED [':vacra; OF7 COAL F= !AINfVG pc A::1 ; AFC E D P?! IF-D a�;L=Eb AFPuILs� =_mil ri�'�^-e� p:.s���+e7 n'ti�cce: Y.ct� a'�,r�s1 rlbsacrei rIC�*acr=} rlt�a.-sej ?�s:�e� 52 A SPF<,res,asgrain =.43 33,5 R ...t� 0-4 2? 50 65% 0 6 v c^._i1 +)r:7 t rrr��a razs 5 1-31 ;3,� 2 0-8 52 255 20% 703 393.22.9 11 iC� d-21 0 G7 .. FIc sr -grain 5.L3 ...... ......-._ ...._�................., G'.0 _-.. 0 -.�-.�_._._..-_._.._......-_._, 50 050 50 96,9G4 0 C 0.00 --_ G ED J� 5 R:FtGsTra•L9Pa- I S.`0 53,1^3 GA - 25 51 WA ..._-._.._.._._ O - E - 51 - 0.12 GCs t2rr _grams 5 K) 5•.,�?a R-7 5 2a5 19% 190 345,908 9 -04 0.18 D_CO =. LL sr.a'a�ran g-13 G_0 Cr 0'6 50 91,071 C 0-0Q C CD 52 1r �?i�_raG scx a?I grr n 5.3J 3-Cc- D-4 .2E 50 0% 0 - E 55 O. i 1 D CU L,Ur^I;.�479;ev, 5.30 126,14z 00 60 235 2 % 176 332,196 12 12" 0.24 GEE F ALL -'.. H - 03 O 6 50 94.643 0 U 003 CLO --.......� ._..._._. 5.1-. ....__..._..._. 0 59. EE-6 OA _.__.. 29 �... 57 .._ 68°5 _ 0 ............,4 - _ ._. _ __... 6 =J 0.`.2_ ..m..,. G_M �Zrrn c grams 514 E1,320 0 A 3G 255 12 ie 225 413,366 5 62 0'2 G C-0 ,.. FALL s;nai am s 14 - 0 0 0 4^6 SO 0.00._.._._-.._�: ..__. 52 _ .__ _._._.. E CO i� sma.t g7:1 -- 5 CO ._......�._. i 4,4F0 _.. - Q 5 __.._ ..,...�_...... 3f _._T__..._._......._�-.__.__......._..._- J 74 ......._.._r._..._...91,7B&�__�....__.......Y9,.,._.-...- 7es 1-i5 G.CC _ -r •n� 5-1!0 E9,252 G 7 45 25-) 79",; 210 375,571 5 03 .0.:6 D Gc: �_.,.... FAaeL�Lnsumcza{ttgran....� 0 ._.......,..�.D ._�.._....... � _"._........._-. DC ] Y a2 SPRING smallge:n 4.70 04 - s .S 0.:0 C_CU ass 470 641)56 0.-/ -5 255 le-'. 210 352,9 9 92 CL 15 0 CO FALL nallczn 470 fl.0_.......r� 50?83,925 Q 0 0.07 C-CO 52 C; ,. �__...._...._,._.__ S?'RI `F"o smau �Fair 4 32 ......,.. ._.......... � ,�7 • ...-._ D. .o ..__._..._.... _. 3] _,_........_...0°% �7 _.__._....__. 757, 0 - $ 75 0.15 0. Go uc.4ass 4 92 101.178 0 3 52 255 21% ?m 346 G24 :1 1C= 021 0 OG ALLs-maflT=,'.... 482 00 D 50 .._...86;071.�-0._....._..---�........_._ 0.00 -- 52 r__...... ;-I SPRI'Ksma:lgcir. 517 _.._...... _T_..-.._-...._� 7445C 05 _....... - S3 ........... 7 ........O -- 7?°% .�...._..--- 0 - a r5 - ._..._OCG 014 O,GO S:.Tnucag-ass 5 17 122,646 013 59 255 23 % 196 361,346 :2 124 0-24 QCG F�lLsm811cir-,ry 5-17 0+J D 0% SG 92,321 0 0 00.] GCD 52 ] 5P ?F1 sm�'l. E firt 5.24 51,32C 0.1; 29 31) 65% 0 - G 61 0.112 C OD 1uCaaerrs �.74 i83.56C 12 b9 2-16 34% 167 312,954 `8 183 0 35 0.90 FALL smaH gan 5 21 0.0 0 77 0;( SD 93.671 0 Q O Gll Q GO TO'. AL :,54U-44E 4,CSS,735 P. 03/03 AUTOMATIC COVER SHEET DATE: JUN-22-01 FR[ 05 53 PM TO: FAX #: 19195714718 FROM: EASICARE 1961164 1 ' 1 illi MA pl, Ir 03 PAGES WERE SENT (INCLUDING THIS COVER PAGE) ,UN-22-01 FRI 05:50 PM EASICARE FAX N0, 8048342909 P. 0I/03 +'' C�rrail's Foods oCl�irffinla, Inc, i'o Box 1240 45 t_ Main sl. Wd Yv -rly, VA 2.3890 (804)634.2109 MI) Fax �aX 30: J.D. Hester Fax: (919) 571-4118 ]Phone: Re. P,Q.A. Farm 52 From Neil Zahradka Pages- 2 (including cover) Datew June 22, 2001 Cc: Ronald Vincent L� Urgent DFor Ravlow ❑ Please Comment 1:1 please Reply � Ax Requested s cortunents: This Pian of Action is provided in response to the freeboard level less than 19" recorded at Brown's of Carolina - Vjiginia Division Faun 52 (Paclity ID 42.10) on Wednesday, ,dune 20, 2001, The freeboard level was reduced from 19' as a result of heavy raid. Land application from this lagoon to increase the freeboard level will continue as soil conditions allow. The following effluent application summary is provided to indicate that adequate alowable PAN application area remains at this site. Please contact me at (804) 834-2109 if you require further information. Thank yoo. E772i "-31 PNNNv.LrFPSpar,C-:7 'fer013'-?C_!i yCa 510 Gr,- -3'.ZD1 2:101 Yoz. lc F,'e Img-mnn ober M, 7E-31 EF'I. -EN'1 :.PPLJCA7�CN AT S'VlT`J-FIELDCARRCUS zA�R :S BY =LLB Fa= G-2rr 14memD2, 23, 2C-71 p L.r,W AU-OV-'.AS'-E APrnO7C3 s't.T� A VAl--A-' E PAN PAN - NITROGEN PAN -_o I ID 15 APPL;CA. ,O'1 APPUC'ATIG 3 K Zn G, A,nr-+. FiEL{? Gq�_,p Acres F~LUW' r?FL -ED APF+ IFD ;i 'acrc; OFG0. ; fi=I.1nNING PAPPL:--rl APP IS AF1 LI=� AF��I 7 e} fb6facl.0 ;:G:d` g911Dns', fl[r.:;a=rNj , �)>acr2; [ISb�ac-e,= (,L Jzc;,e; n SPA-NG -5.43 59,5-,3 D.4 27 50 65„ 0 � S 57 , ).: 1 QC-9 ba'r,.`d-Wr3as 5 43 343,4A2 C.8 `2 2"5 201Yr 2[33 393,223 11 109 0 2, 0.7J ..,..... --„-_-. --------- _-FALL,s 3 gr'�..,.�_..5.43 __...,.....-_.._ _.......E:a..- - ............. fl 5750.._..,.,,.......__�__.._.,,_9&.96C_......... ---.._..,....9.....r_., :C':_..___ 0,G7........- 52 13 Sr=ZI14G2E,-nall z:; 5 ':9 J9,S:'O C-A 29 S7 IWA 0 5-iio 91,-9 C_7 45 19rl� Y90 345,908 9 94 0,18 0,C] FALL :�: 6 0 raj D°b - ............... ..........._ _ 0 G 52 G SF i�LG sma9 n 5.33 So;3 4 lz 4 ..-_ �. iC 53 63°/i .....,-._.._....._.-_......_....31,071.......w 0 - 3 5 �� _ LIA ; .. 0,ci h�-TnL{'i.2ss 5.51D 125,1.14 0.9 GO 23S 25y 17E 332,1W 12 i24 074 0,L.] FALLS'Hall-r3�,_W....�.5.37.._. - c�11 0 r� 0'0 _ -- 50 99,�43 0 .............. 0 _.,, .. OC:7 Of<� �.._.. 52 �....__.- D SPRING =_mall taro 5,`---4 _.�_-�..-_..._.—._._. 5L3,5CIS __�..-...-.,...,-.-.-.._........_-_. 9 50 . sell, __....._.._�_._...... 0 --...,.__. - 6 6) 0 12 O C-J t,-^mr.Csj'ass 5114 1,32G D 4 30 255 12% 725 413,3&G 5 52 01.2 G CO s� 5'4 0fl !) 57 09a 50 yf,736 ^ 3 0C3 0C!] V - —FALLfnal SPRI13sma1E-airk 5 ifs r`Z,450 0.5 3-174 y 0 a 75 0.1= O CO tv,mL.,U -ass 5LJ a3,352 0.7 45 25 1 B Y, tie 375,F71 4 93 O.+F 0C3 J 0 0 ��. SD.- 8? 286....- r� 0 O.iIJ F SPRIN-, sm34: gain 470 eg 056 - 3 4 ..... _ .-- -... _ .,c . __5: ..,_....- 51 - - -52 'A ._..... ......--..... 0 54 G {C- O.CJ t*rmLCac-ass 470 E4,08(i 0.7 .35 255 SB'i 210 352,553 93 IL15 ❑.C-) F7,LL 5'na11C.-d r, z 70 - 0 0 0 50 0% 50 93,3Z9 L` 0 0 CJ 0 C.7 FPPIK ; raja' grain z 62 72.27C 3 6 ;37 _. -53 75% _ 0 B 74 0 15 0 C-] bermj;C2�,ass 4.82 101, :78 08 52 25s 21-A 203 348,624 11 1 )9 021 0.0 FALL sma3l rr: ?'2 3.0 0 57 0% 60 B6,071 0 0 O.r D ON 52 N .:'-..___.4 SPRII� sm "prejn..._ _. .. 3c .., _..._r- S] W.. _......__ 72'z (3 - s 75 0 tt O G9 bermuCar as,, 5.17 122,C'r1D (19 59 255 23% 196 361,34E 12 524 0.2e O.Ca -ALL �rnaq c-a n 517 00 0 �3 ---.......__�. 0°r6 .__ s0 92.321 0 _ ....... i) 0 G] _ 0 C-] 52 t ....___.... 'FtIL�G smac6rajn .-...-..-.__._.- 5 2a 61,31G __.._ 0.4 --...-._--, 29 ._ __,_._ F.0 69% 0 ."__.-._ ..... - 6 6� 012 O C� 7emx.-d 5.7.6 18,3,950 1.3 Ba 25t 34% 167 312,95'? 18 183 0.35 OC3 `-A`_L sma6 5.74 019 0 1-0 0-Y 60 93,571 0 B D.awl 000 .OTAL 1,540,746 4,065,395 MAY- 2-06 TUE 5:00 PM BROWN S FAX N0, 9102961675 85 Hwy 24 Cast PO Box 487 Warsaw, NC 2&1 -WT volew (010) 2W-1 WO Fax: (910) 29"188 Fcow To. �From. BROWN'S OF GAROLINA Pkonfe Date: Re: CC. C] Urgent e Commeritsa 13 For Review ❑ Please Comment 17 Please Reply ❑ Please Recycle 1 MAY- 2-00 TUR 5',00 PM BROWN S FAX NO. 2102961675 P. 2 10 *.. ;i OF CAROLINA May 2, 2000 To: OEHNR — Raleigh Region From,. BF6w- n:s=of_Carolirie;_Inc Subject: Lagoon Levels Update The following lagoon were less than 19" as of April 29, 2000. Farm CiU 1 am Please call if you wish to discuss these lagoons or the actions underway to alleviate these high levels. Gus Simmons 910-296-1800 (Office) Glenn Davis 910-296-1800 (Office) 910-290-0366 (Mobile) BROWNS OF CAROLINq, INC, w MAR-12-2001 MON 02:27 Phi BROWN'SOFCAROLiNA 9102966166 1', 01 Jam- BROWN' OF CA.ROLINA FaX To# �TIloo-29& T-Hwy 2a East Box 407 n a nn�rww, NC 2839E-0497 a 1 2 B01Iem 871-&M 11 a-M-al W -- Fax FNNR RALEIGH REGIONAL OFFICE From Fain Pagem Phan"Dom Rm CC: © Urgent 0 For Review C] Plamm Cos meM a Plwme Reply C7 Plaasr Rsayols 0 Commsew RECEIVED PEAR 14 2001 WATER QUALITY SECTION Non -Discharge Compliance Enf. MAR-12-2001 MON 02:27 PM BROWN'SOFCAROLINA 9102966166 P. 02 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Faclitty Number. :--,l„dCounty: Facil Name 1C 00 RECE I V IE Certified Operator Name: Jc1144-IA M WI -Ls-ON Operator AIAR. -1 4 2001 # . . �' V WATER QUALITY SECTION 1. Current liquid level(s) in inches as measured f om the current liquid level in rth9Ff4pa9-ct-aol a Ent lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lag sons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Namelidentifier (0): Spillway (Yes or No): ._..&.r.,. - Level (inches): _a - 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. _kj:::::�_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action Is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content r.11 waste to pumped and hauled is reflected in section III tables. Included within this plan iu a list of the proposed sites with related facility number(s), number acres and receiving crap ire Formation. Contact and secure approval from the Division of Water Quality prior 10. trangWl- of waste to a site not covered in the facility's cei�ffl- ed animal waste management plan. Operation will be partially or fully depopuiAted. - attach a complete schedule with corresponding animal units and dates for depopulation w if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begirt land application of waste: T/ F�Q7 I hereby certify that I have reviewed the Information listed above and Included within the allnched Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. J ex G.re "4--0440 /Ve • .... ... Phone: ledd Faciilty Owner/Manager (print) Date: a Factiity OwneNManager (signature) PoA Cover Pogo 2121100 MAR-12-2001 MOH 02:27 PM BROWN`SOFCAROLINA 9102966166 P. 03 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentlffer (ID): SOC # 19 2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 Inches b. designed 25 yr.124 hr. storm & structural freeboard 18.8 inches c. line b - line a (inches in red zone) = 0.8 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 175392 ft2 e. line c 12 x line d x 7.48 gallonse 87462 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 255571 f13 . h. current herd # 200p certified herd #1 2000 actual waste produced ; QMnt herd # x line g = 255571 ft' certified herd # 1. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 171046.3 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 531850 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated F 1/17/01 1.20 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 743.2 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 MAR-12-2001 MON 02,27 PM BROWN'SOFCAROI.INA 9102966166 P. 04 Ill. TOTAL. POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 26 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: BOG # 19 line m = 743.2 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line.m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m lb PAN n.lines 1+2+3+4+5+6= 7432lb, PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOb. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPLIF-n nuRINO THIS 30 DAY PFRInD_ 0, tract # p. field # q. crop r. acres 9. remalnhg IRR- 2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIEIO (lbs.) column r x 6 G. application WjnQny 1425 1 Small Grain 4.09 55.02 225.0 Se t-Qct Feb -Mar 1425 2 Small Grain 4.62 53.27 246.1 Se t-Oct;Feb-Mar 1425 3 Small Grain 5.15 20.27 104.4 Se t-Oct•Feb-Mar 1425 4 Small Grain 6.51 68.48 445.8 Se t-Oct;Feb-Mar 1425 5 Small Grain 5.20 65.35 339.8 Sept -Oct -,Feb -Mar 1425 6 Small Grain 3.34 55.35 184.9 Se t-Oct•Feb-Mar 1425 6 Small Grain Z06 63.75 131.3 Se-Oct;Feb-Mar 1425 9 Small Grain 2.99 46.46 138.9 Se t-Octfeb-Mgr 1426 10 Small Grain 2.81 46.01 129.3 Se t-OcfiFeb-Mar 1425 11 Small Grain 3.00 29.74 a9.2 Se t-Oct;Feb-Mar 1425 15 Small Grain 2.07 46,83 96.9 Se t-Oct:Feb-Mar 1425 16 Small Grain 60,60 27.26 1662.0 Se t-Oct;Feb-Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3783.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section ll) = 743.2 lb. PAN POA (30 Day) 2/21 /00 MAR-12-2001 MON 02:28 PM BROWN'SOFOAROLINA 910296616E P. 05 x. Crop's remaining PAN balance (line v from section lit) = 3783.7 lb. PAN Y. Overall PAN balance (w - x) _ -3040 Ib. PAN iUne y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and' haul, depopulation, herd reduction, etc. For pump & haul and hard reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to lanother permitted facility, provide Information regarding the herd population and lagoon freeboard levels at the receiving facility- Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH __- _ FREEn,30ARD AT ANIMAL FACILITIES Facility Number: -fZ _ - Facility Name:C C0 /Yids -I or, &,4 Certified Operator Name: L41.1141m_ - �,,tor� Operator # Z4 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Nam/Identifier (ID): / Q Spillway (Yes or No): /1( Level (inches): _ /z 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered In the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility , 3. Earliest possible date to begin land application of waste: _3�_ld i hereby certify that I have reviewed the Information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: ?14 - PZP - Aedd Facility Owner/Manager (print) Date: _ /�e --- Facility Owner/Manager (signature) PoA Cover Page 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): BOC # 19 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 18.8 inches c. line b - line a (inches in red zone) = 0.8 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 175392 ft2 e. line c/12 x line d x 7.48 gallons/ft3 87462 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 255571 ft3 h. current herd # 2000 certified herd #1 2000 actual waste produced = current herd # x line g = 255571 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (fines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/17/01 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) © ft3 171046.3 ft3 531850 gallons 1.20 Ibs/1000 gal. 743.2 lbs. PAN PoA (30 Day) 2121 /00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: BOC # 19 line m = 743.2 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 743.2 lb PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1425 1 Small Grain 4.09 55.02 225.0 Se t-Oct;Feb-Mar 1425 2 Small Grain 4.62 53.27 246.1 Se t-Oct;Feb-Mar 1425 3 Small Grain 5.15 20.27 104.4 Se t-Oct;Feb-Mar 1425 4 Small Grain 6.51 68.48 445.8 Se t-Oct;Feb-Mar 1425 5 Small Grain 5.20 65.35 339.8 Se t-Oct;Feb-Mar 1425 6 Small Grain 3.34 55.35 184.9 Se t-Oct;Feb-Mar 1425 8 Small Grain 2.06 63.75 131.3 Se t-Oct;Feb-Mar 1425 9 Small Grain 2.99 46.46 138.9 Se t-Oct;Feb-Mar 1425 10 Small Grain 2.81 46.01 129.3 Se t-Oct;Feb-Mar 1425 11 Small Grain 3.00 29.74 89.2 Se t-Oct;Feb-Mar 1425 15 Small Grain 2.07 46.83 96.9 Se t-Oct;Feb-Mar 1425 16 Small Grain 60.60 27.26 1652.0 Se t-Oct;Feb-Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3783.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 743.2 Ib. PAN PoA (30 Day) 2/21 /00 x. Crop's remaining PAN balance (line v from section III) = 3783.7 lb. PAN y. Overall PAN balance (w - x) = -3040 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Teceivinq facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office .lames B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Xf� 1Dr-=HNFZ Division of Water Quality July 17, 1997 Mr. Scott Gurkin P.O. Box 487 Warsaw, North Carolina 28398 Subject: Notice of Deficiency Browns of Carolina Farm 19 Facility # 42-10 Halifax County Dear Mr. Gurkin: On July 9, 1997, Mr. Buster Towell from the Raleigh Regional office conducted a compliance inspection of the subject animal operation. This inspection is a part of the Division's effort to determine compliance with the State's Animal Waste Management Regulations. Mr. Towell's site visit determined that wastewater from your facility was not actively discharging to the surface waters of the State, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiency was observed: The pasture located directly across from the office building utilizes a solid set waste application system. Some of the nozzles located in this pasture are situated in close proximity to these well established cattle trails. During waste application events it is apparent that these trails act as channels to carry waste down gradient and into a small pond. The necessary corrections should be made so that waste does not reach the pond which is considered waters of the State. The above matter should be addressed to prevent the possibility of an illegal discharge. Please respond to this Notice within 30 days of. receipt. You should include in your response the actions that you will take to address these deficiencies. 38W Barrett Drive, Suite 101, �`�' FAX 919-571-4718 Raleigh, North Carolina 27609 NIEff An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/ 10% post -consumer paper Mr. Scott Gurkin Page 2 This office would like to remind you that you are required to submit an approved animal waste management plan by December 31, 1997, or you may choose to submit a closure plan for this facility. These plans must be Certified by a Designated Technical Specialist or a licensed Professional Engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your -local Soil and Water Conservation District Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Buster Towell at (919) 571-4700. Sincerely, "'eUneth Schuster, P.E. Regional Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District (Halifax) Ms. Margaret O'Keefe, DSWC--RRO, DWQ Compliance Group RRO Files NOD\42-10 10 Routine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review 0 Other Date of Inspection - 7-5 Facility Number Z_ ?� Time of Inspection 137 24 hr. (hh:mm) Total Time (in fraction of hours Farm Status: Registered ❑ Applied for Permit (ex:1.25 for I hr 15 min)) Spent on Review ❑ Certified ❑ Permitted or Inspection includes travel andprocessing) ❑ Not Operational Date Last Operated-.,........................................................_....`....L..._............................._............................................ Farm Name: p..�%?.�....�%..�........vr!rP�G...�.�..�..................... County:.f.�T��:.��.�`............... ....... ......... ............ Land Owner Name:... jr..Q w!"�......G� .... {� i.c�r/ ................ Phone Nw .....!./ U........ 7n3... .. G v............................ Facility Conctact:.. �'�L% ... lrG:,r�J ................. Title:................................................ Phone No: ....53!9 !:'. ........................... MailingAddress:... .... 0..�`....... ..1�.. .......... rS A4,(.............!" C...........Z...0.......I...........................I .......................... OnsiiteRepresentative: ...57`�p�C� ........ %./�.�tr��S...-..................................... Integrator: ... L?.:&G'.:.Zx ................................................... Certified Operator: .-5.j� �.{11...f...6.,(�...................................................... Operator Certification Number:......................................... Location of Farm: Latitude 6 « Longitude 0 4 « eneral 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? . Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/97 maintenance/improvement? ❑ Yes .;No No ❑ Yes ❑ Yes d No ❑ Yes 42 1V V ❑ Yes No No ❑ Yes ❑ Yes�ON0 Yes Continued on back FacUity Number: , f (,�.,, 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed? titructures_(Lagoons and1gr Holding -Pond 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure) Structure 2 Structure 3 ...... Q U.......... ............................ Structure 4 ❑ Yes 0No ❑ Yes No ❑ Yes Ld'No ❑ Yes IGNo Structure 5 Structure 6 10. Is seepage observed from any of the structures? ❑ Yes 0 0 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 1d'No 12. Do any of the structures need maintenance/improvement? ❑ Yes Sa o (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes 0-90 Aaste A]lplicati0 14. Is there physical evidence of over application? es ❑ No (If in excess of WMP, or//runoff entering waters of the State, notify DWQ) 15, Crop type ?'4S.t................................................................................................................................................... ............ 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes 015o 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes Q o 18. Does the receiving crop need improvement? es ❑ No 19. Is there a lack of available waste application equipment? ❑ Yes No/ E 20. Does facility require a follow-up visit by same agency? El Yes 2<0 21, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No For_Certifted 22. Facilities Only Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No Co6hents (refer to question #} Explain any YES answers and/or any recommendations orany other comments .> se drawings of facility to better, explain situations (use additional pages as necessary} LiAI s�� s�a ualt. �ra�+ p �,5 w . 7 e A, el. C.v cs� fa� � �/y ���- of F,c s sol. �l s' Sysfa,-.. 5, ►•e.,-�-I -*70�I J �t r ac 42 e / +� I,! c� S'1� rR1-/ v'�-�-1 � .� 6 y C l/c Z`/rrt. f 4L14 � ►7 S I �^% iA'l ri 'f �� L-?'►gam d e"1. �'0 ii l^r J . �% in'L' t�iyYLlF �' f 7 // �ii/`-�C'h i. t11^ p vY a n "^n', �4, , 3 +�"'q3 �ly°v`�-� 5 W' ,,,F, °�epe�v. +n'� w rca,,r f • 3„ r•. � .�. Reviewer/Inspector Name .� ReviewerlInspector Signature: K5 � _ _ Date: -7` ' F 7 cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 State of North Carolina Department of Environment, Health and Natural Resources ' Raleigh Regional Office James B, Hunt, Jr„ Governor Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager XPIWA DEHNR Division of Environmental Management August 24, 1995 Mr. Scott Gurkin Browns of Carolina 303 East College Street Warsaw, North Carolina 28398 Subject: Management Deficiency Notification Browns of Carolina Farm 19 Halifax County SR 1101 Dear Mr. Gurkin: On July 19, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's effort to determine potential problems associated with animal waste disposal systems. Mr. Towell's site visit determined that wastewater from your facility was not discharging to the surface waters of the state, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: A broken pipe with black liquid waste water bubbling up from the ground was observed on the back side of your waste lagoon. This liquid flowed overland an in the direction of a nearby pond. This liquid was later determined to be human waste from a broken septic tank line. The available land application fields were sparsely vegetated and had been eroded by recent heavy rains. It was also noted that some of the spray nozzles were located in, or very close to diversions and/or waterways. This could present a problem during land application if overspraying occurs. Your waste. lagoon had one foot or less of available freeboard. There should always be at least nineteen inches of freeboard in your area to account for 25yr./24hr. rainfall events. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper 11b Browns #19 Page 2 In addition to continued facility waste management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. You should specifically address how you plan to correct this problem and submit a schedule (with dates) stating when these management deficiencies will be corrected. Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges to surface waters of the State are subject to civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take the opportunity to remind you that you are required to have an approved animal waste management plan by December 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Buster Towell at (919) 571-4700. Sincerely, Kenneth chuster, P.E. Regional Supervisor cc: Halifax County Health Department Fishing Creek Soil and Water Conservation District ( Halifax County) Steve Sennett-DSWC VO -6- > NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REGIONAL OFFICE Division of Water Quality April 6, 1998 Mr. Scott Gurkin Brown's of Carolina P.O. Box 487 Warsaw, North Carolina 28398 Subject: Notice of Deficiency Farm #19 Facility # 42-10 Halifax County Dear Mr. Gurkin: On April 3, 1998, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal operation. This inspection is a part of the Division's effort to determine compliance with the State's Animal Waste Management Regulations. Mr, Towell's site visit determined that wastewater from your facility was not actively discharging to the surface waters of the State, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiency was observed: Record keeping at this facility needs improvement. There should be copies of the waste application records kept on site on the approved forms labeled IRR-1 and IRR-2. These forms should be separated by field number, crop type, and crop cycle so that an accurate determination of nitrogen balance can be assessed. These records are to be signed by the Operator In Charge designated for each facility. On the date of the inspection, no records were available to indicate amounts of wastewater and nutrients applied. Without these records there is no way to determine compliance with the State's regulations. 3800 BARRETT DRIVE, SUITE 101, RALEIGH, NORTH CAROLINA 27608 PHONE a 1 0-571 -4700 FAX D 1 8-571 -471 8 AN EQUAL OPPORTUNITY /ARFIRMATIVE ACTION EMPLOYER - 50% RECYCLKWI O 6 POST -CONSUMER PAPER Mr. Scott Gurkin Page 2 The deficiencies regarding record keeping should be corrected to reflect an accurate record of land application activity at the subject farms. The Raleigh Regional Office suggests that you check you records and adjust them accordingly back to the first of calendar year 1998. By doing so, the facility can again be considered to be in compliance with the approved animal waste management plan and regulations governing the requirements for Certified Operator in Charge. Please respond to this Notice within 30 days of your receipt, outlining what measures that you will take to correct the above deficiencies. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this matter please call Mr. Buster Towell at (919) 571-4700. Sincer , Kenne c r, P.E. Regional Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC--RRO DWQ Compliance Group RRO Files H:42-10.wpd State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office Michael F. Easley, Governor William G. (Bill) Ross, Secretary Alan W. Klimek, P.E., Director Division of Water Quality January 9, 2003 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Jack Keane, General Manager Brown's of Carolina, Virginia Division PO Box 1240 Waverely, Virginia 23890 .Subject: Notice of Violation Intent To Enforce Brown's of Carolina Farm 52 Permit No. AWS420010 'Halifax County Dear. -Mr. Keane: 17'_� 400 �f NCDENR NORTH GAROLINA DEPARTMENT pg ENVIRONMENT AND NAWRAL RES0URa;E5 On December 16, 2002, Division of Water Quality staff from the Raleigh Regional Office and the Central Office conducted an aerial inspection of confined animal operations in Halifax and Northampton counties. This inspection led to the discovery of an illegal discharge of animal waste from the subject facility which flowed into surface waters of the State. Mr. Buster Towell of the Raleigh Regional Office met with Mr. Ronald Vincent, Farming Manager, on site at approximately 3:30 PM. The inspection revealed that wastewater was actively flowing from the spray field in front of the farm office into several large ponded areas in the lower portion of the field. The run off continued to flow from the field through a culvert and into well channelized ditch which flattened out into a small wetland area. This wetland area then flows to a larger pond located on Brown's of Carolina property. This pond is hydraulically connected via a breech in the pond dike to the adjacent Cow Haul Swamp (Beech Swamp). The inspection also revealed that wastewater was also actively running off the spray field up gradient of the farm office, near the cattle enclosure. Though this waste stream did not reach waters of the State, it was observed leaving the spray field and entering the adjacent wooded area. 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919) 571.470D FAX (919)5714700 An Equal Opportunity Affirmative Action Employer 5D% recycled110% post -consumer paper Mr. Jack Keane Page 2 The inspection revealed that land application activity had been conducted on fields that had dormant coastal bermuda and little if any sign of any growing crop such as small grains which are specified in the farm's Certified Animal Waste Management Plan (CAWMP). Please note that the above referenced discharge is a violation of North Carolina General Statute (N.C.G.S.) 143-215.1(a) which states: No person shall do any of the following things or carry out any of the following activities until or unless such person shall have applied for -and received from the Commission a permit Therefor and shall have complied with such conditions, if any as are prescribed by such permit -------- -----Make any outlets into waters of the State. You should also be aware that this facility is considered to be in violation of its General Permit Condition II.,2., which state that a vegetative cover shall be maintained on all application fields in accordance with the CAWMP. The Raleigh Regional Office is prepared to proceed with the enforcement action for the aforementioned violations. This Office is already in receipt of a response letter from Mr. Neil Zahradka concerning this matter. If you have any.other response or justification for us to consider you.may submit it ink within ten days of your receipt of this Notice. In the absence of any such justification, the Regional Office will forward an enforcement action to the ' . . Director for his review and signature. If you have any questions regarding this matter you may contact Buster ToweIl at (919) 571- 4700. Sincerely. Kenneth Schuster, P.E. D Regional Water Quality Supervisor cc: Halifax County Health Department Fishing Creek Soil & Water Conservation District (Halifax) Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files Q— )o t August 1, 1997 E�1: DEHNR ALEIGH C/O Kenneth SchusterOffU 3800 Barrett Drive, Sui Raleigh , N.C. 27609 Dear Mr. Schuster: In regards to your Notice of Deficiency for Brown's of Carolina Farm 19 dated July 17, 1997, the following actions have/will be taken: 1. The cattle in that pasture have been moved to allow the grass in the cattle trails to reestablish itself. 2. If, within 30 days, this has not occurred,we will overseed the necessary areas to regain proper cover. I trust this response will be sufficient. Please let me know if I can be of further assistance. Sincerely, L.SCott Gurkin Brown's of Carolina State of North Carolina Department of Environment, Health and Natural Resources. Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director August 7, 1995 MEMOIRANDUM: ; I To: Regional Water Quality Supervisors From:' Dianne Williams Wilbutnw Subject: Information from Regions Animal Operations Aug 7 ' 95 10 :17 P. 01/02 [ Z _ 1 U AlFKVIC 41 C) oEHNF=1 Post -it" Fax Note 7671 Dale 7 pa► 2 To U 0 cx UJ � From Go.l[)epL co. Phone # Phone n 914 71,SDd 2. [oxas 491IC'-7l5-LOGY$ Please find attached a note from Steve Tedder. He has a meeting with the Governor's Office at 5.00 today. Please provide the following information and fax to me by 2,00 today. Please feel free to hand write the information. Farm Na.me:6 ro h-n S _ p t: 6,n r d < < w of Owner Name: S,� Responsible Parry (if different from Owner): J Location[: a / n d /�t? V County: rl r�r! rfi �' Fish Kill: Yes ooNoircle One) Type and Amount of Waste Spilled:✓ Summary of Spill: v i J AV-1 a � Sri r P*4 ( e IQ c . ypr y y 7g �S L17Ci�'f Lit �'� ' 1 !'T�'I�,5 V I / ✓ I �,,,t,, c _ Pam+' O s , 1-4 pis �9'�rlc ol P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-715-fiO4e An Equal Opportunity Affirmative Action Employer 5o% recyctedl 10% post -cons urner papeo Michael F. Easley, Governor,`! Q�� William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources C.., Alan W. Klimek, P. E.,+Director !Z3 Division of Quality August 4, 2004 CERTIFIED MAIL RETURN RECEIPT REQUESTED Brown's of Carolina, Inc. Farm #52 PO Box 1240 Waverly VA 23890 Subject: Facility Number:42- 10-National Pollution Discharge Elimination System (NPDES) General Permit Dear Brown's of Carolina, Inc.: The Division of Water Quality (Division) has been required by the U.S. Environmental Protection Agency (EPA) to develop a NPDES permit program for animal waste management systems. The Division has developed a general NPDES permit similar to the state Non -Discharge General Permit that this facility is currently permitted under. Pursuant to the requirements of North Carolina General Statues §143-215.1, 40 Code of Federal Regulations §122.23, and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated May 9, 1994, coverage under the General NPDES permit is required of all facilities that have had a discharge of wastewater reaching Waters of the State. According to our records your facility meets the requirement for an NPDES permit based on the discharge criterion. Please sign and submit the enclosed NPDES Short Form B — Existing Facility. Please carefully follow the instructions on the form. Please submit completed enclosed application within 60 days from receipt of this letter. Failure to submit the application as required may subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. If you have any questions -about the new NDPES permit, the enclosed applications, or any - related matter please feel free to contact J R Joshi at 919-733-5083 ext. 363. Sincerely, M. Paul Sherman, P.E. Cc: Halifax_County-Soil.and Water Conservation District RR� Regional -Off ice, Division of Water Quality Permit File AWS420010 Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Customer Service Center An Equal Opportunity Action Employer Internet http://h2o.enr.state.nc.us/ndpu Telephone (919)733.5083 Fax (919)715-6048 Telephone 1-877-623-6748 50% recycled/10% post -consumer paper { C -? ia' 0 -Z 3,� 531�`3ci Z Q �-2 68g' 3yV, 53!! r"vo0 --:>I -dorn fi-L-dV3 _7 -o/Y- No n'rnoh'S S�airz� C>35 cd o vd ory EJ ri1 s ix� H1 i ' �dM1z:d0 S 'v"74 r GQ tj'-:P01r+ f7 G7 N/S!? 5 bH CI N b _Lo 7 TD- n- 14 T6- IV-I1- G1 07 rt Gz t] rl Cq.¢9v-7a•Ta-cv-•1.L9- r4 n ry 1Y " L'. rr 7[ rt 1Z Cr Cl ra ra rV SC 7 Yl CS n [] Iz 42 Is 1E i'C rr m-ae-rLi-r7 67 Lt 91 IV ru r2 0'7 621Z- L�W.LE u�-M-tl-a]-ty- CS 6C .I LL-j �. K t1 rq ra Tl A Lii'r IR-K-OS-K-K-6T.-fr;^rv-OS-V;-6L-rS'.'' 27 ii7 rC v cm Zv r1 L.GK T.-fK-K-PG-ai-K-a;-OC-K-R-as-[lt-at-DE-a'CiY-�Lv r4l L- .0 LV [q r9- rs rt.,` rL-K-rL-PS-aG-R-PL-aS-rL-6L-rL-aS-PSit•LY-h-�T- CL1 a7 Cl rI rV Cv- 1S 1'ra2-rL-rS-PL-aL-PG-et-VC-rL-PC-K-PG-at-LYi'1i'.tr-1K' 1LI /Z Ya .11r .a- G VIr7Z- IgL-VC-K-K-PG-rS-a'S-LS-PS-a:-PGiY-rY�•-LY-LY-YI-iLE LZ VV .D Ca -IT gi7E-r-cL-n-rC-n-K- as- n-rc-ru-LY-rr.1Y-9Y-"-Y.iY-& YCC. �q'9 6.1 rq CS n K 7Pr-iF-rT.-DG-aL-PL-fL-PL-aL-OC-K-4r-1'. �I-C.-C.-.'.-•'•-•T- 'G7 41 Cv ra Tv rs]6rr�T.-2s-PS-a;-PC-VS-aS-65-9G-LY-rr-9t-rY-..-0 V-c -C.-tp- r7I n art ry ra La 6. I lxv,at L4 IT ro tr`�-[si6s-Ls-e;-rs-K-rs-PG�Yr�s•-rr-rr-zr-[.-1-+-Ir-f[v o!1 ss ro SF R P.ILn-S'9�7FLs{S-rYrl/'G-rS-ViiY-1Y-Y.-.Y-C•-n-e•-P'•-r,-s.-rn rt r= .v ro CF 11 7f{'4 -G'7-1 rK-TS•E'G-K{i-KEY-L'IK.'r-.Y-2Y-Pr-al-Pr-a1-II 6] �! 7/ PaI 70 a'[['I�rcxfsr+-24a9-ss-ct-K-tc-cE-eE;.-cY-rr-cr-r.-cs-rr-n- tz L c, ( La ca n rir•-Tf-rL-PL 77-rTii-ly e{ }S{siY-['r-YI •Y-rY-C+-r•-7Ci rt J1 rT TV 91 .q .] Plit n-L'L�L-rL-rc-Lv-cv-LsxG-[s-Lr-r.-Y.-r.-t.�•-tc• 9t �'c it Iv Ce Eo Cr- rt ITp-s'! 6�y-4¢Pe-['[.L-rL-67-Z1LS-Cs-ri-rc-n-sr-ilK.-r-r-a� rt t'L rt ?9 ro7 L'[ i9i'r-f4R-LL{L-E4.6S-7T.•fS-rYKY-LY-CY{+-L'i• ►r'['L r• r9 rv-CV-ro- n'•-PL•-rS-7S�S=r7•S4L}LTiY'[9-iS.1S J3-TS{.-Y.-.-•-•1- .�tO r, zr n-n-n-i} ro�PT•aF LS 17�.}C_o-G9 C}•}L'}L}6¢ n-.l-rr-r2��rOl rq at to C¢aY r'I-61-61-6a- rV T9.}Z¢ Cv n S] zZ T2 Vt 6rE C'0�-j�,T. ill E+ n [}L]-Yi-Y2-.'2i."2-SI- ra rorz-f2-n-II-L7-r} VV Ca 61 In rr LT C. ZE VT Z7 r9 P• 11 [v rq n-. Ps- i r: Cl 71 n P2 12 TZ 1-2M VT r2 r2 n I2 CT 91 K it r1 tr- z1- rum 11 1'r n n rr L-z 'T LE Z, L. n 79 IT " V1 Ls 11;17 n rt-21 L} M- h 1v •1 4-2 91 C2 tZ rVom — r%W 6; r9 Ig YL C'C RR r9 TV L1 L1 LL •1 Lt- TV- IT V1 11 Tr Vr 92 rT 6E L• rL L; a999 r1 art V1 UAV 61 r6 l[ C6 C1 rE Eq 7•-L n- V- CO 1 In 61 s C 6t r9 619 VV M CG r9 61 IM +C .1 IS .2 LI-rD- Y6 rT rr E TZ 6S 1( rL T 11 61 L1 Cl C 2 2 r4n -Y1-L} ' � n 21 � =E WE . 6s L [[ rc =LZ '. 1Q � n ro L ■a a S a a Z CHI- -n•i¢ r1- g 69 6 � CE Pr 1S P< 1'[ pRo G1 is [1 +v L't-r.- -ra-• v- a -CV- r1 dE CC Y ss am re 79 is R ; Cv K i2-91 v-r1- 11 I rr 91 C7 rS 1 C'G Y L Qt Ev K ra r1 Y it ry 9 5-"T- si9-"-rl-rv- L2. WC 61c t LS D2 '2 'L r[ •'L r, it CTiE-PC-7'i-I'I-6¢IY-C1- Cv r9 Vt 61 LZ rc r. 7+ r r1 rt iZ it fE-T. .E-K-T1-rV- rl 91 27 72 2 r2 9T C. rr CS K r9 C'9 G9 rL 1 T[ 9 r2 CM• .T-LZ-61-a1V• n-[}Cv n Ca •1 R r6 L1 TT ET 7T y 99 L9 r7 I'L R •'�('• Li�-.7-6}C 69-942¢ rD 9v r1a'3.�R LE s'. Pr L2 L1 nLb y.Y •9 LA YL • LEE-VE-61-r1 CVVV 9'1 T2.E 6T C. rr .; ►; sE "r7 .969 CL T¢ o a r9<-c«.c.-rTK7-n-64L}ra.Ev z1 n 91 c1 a cz o 6 to n c9 6-9 rc T. cv 0 n ar s4 e'c 12 r• T. rs �P,s�ct T Ta a'L • ro K r-rrt[--61-61-L1-•1-a]- 7-.C9- EV ZD 9.r7 n r[-6'f.I1-.I#t- C7fi7-E7-rF-t2-ri '�l�ar.� ra TI n " 17 Or�'C 0,• •S CS s'L rc-T.-r.-7E-11- - - -6rnS-arrP CV Cl r2 PE L ri rE . iUr 1, r. 6. n 0 CL- •Li-.-K-•T-IT-Zs-t'2-r7-n-91-a- n- +¢ tv-TP [ n 1`3 T al rt h . s Cq Z'[- rFS- aYiE-C.- - - We- C1-i-1-R-sa- n-.V- Vt r] DZ '2 rE r[ It SS c.1 ct L-rs-• r.-aG-rr-9+-i'.-6EKE-VE-LY-[L-C1-12-•'2-L]- - 6' - 6'7 WE '1 tL L-.Tl -rr----[S-L+••Y-IY-IY�(,iBsF'i - 9 r1 r�Jlla(f/ -94 [4 .1 2i7-47-['2•YI-La-Zp- 9a Y LT L'l7 ro n-r[-aL-rTS1-lY-=S-CY-rY-iT-[Y�F{iZ-h-6p-[2-r'r�i- - 0�'D 17r 911¢ 6-9[-C'L-.9-9'C-LSyY-KKL-aC-ss-6Y-[E-•TES-oF-Ci-r?-Ct-V1-2tFrv- CD 91-r1-L¢ a9-CL-oY-60•9 4-[9-99-[ --rsir-T.-G.-6T iYKz-Cr-L'1-6}L¢ 11- -•'t-61-n-rs-[4 r1-L1-P2-.'2{Z-q2�_rYiY�Z-V¢49-r9-47;9H9iS-L'f- 2-Cf-CE-LZKZ-R- IS IaC'0-rl-ni'i-r[HE-rf-E'.1'.-6'G-I;i' 6'1-rE{i•L1-6q-1¢ r}6'1-LE -rf- 2- '1-a4[q-9}Zp- TV-TIyE-rE Z- 1- w. )NO �J- b n 7 �?'v 7 --� -) 1� o x,4 v jv O 11'd n v g X a C�: --ff :V11 s