Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
420001_PERMIT FILE_20171231
F / 31 zz t (Type of Visit: ,D Com . ce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency O Other 0 Denied Access Date of Visit:7ZY413 I Arrival Time: Departure Time: County: Farm Name: C ,$.".8 n 4- Pr 1 SO n 0 4 ! 17L Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Phone: Integrator: Phone: Certified Operator: Scd �� Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Region: Design Current Design Current Design Current Swine C►apaeity Pop. Wet Poultry Capacity op. C«attle Capacity Pop. We to Finish La er DairyCow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design C«urrent Dry Cow Farrow to Feeder Dr Poultr Ca acit Po Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) []Yes No ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons) . d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes FNo NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facili Number: - C2 jDate of Inspection: / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Z No NA ❑ NE a. If yes, is waste level into the structural freeboard? [—]Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) �oo 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes A ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr t, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 2 No A ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes;_N_o❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): L2SG0e— �4 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 8 No NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes o NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? [:]Yes [:]No ❑ NA NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ETNA ElNE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ YesE_15�013 NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑ Other: �21.D record keeping need improvement? If yes, check the appropriate box below. 'Yes ❑ No ❑ NA ❑ NE Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ZI No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ��No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: jDate of Ins ection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? es ❑ No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes VNo [3 NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #) Explain any'YES answers and/or any 'additional recommendations or any other,commentse, Use drawings of facility to better explain situations (use additional pages as necessary): ; 1 5& 2 (_0 l�15 � Q 4 pp � . c,�-�. a � l2ecvw Js �v� Y J Z,'�,, 4, IVjz C- 4-o Re rzo woe L SS r teas ► h -� �j,�� Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: C) (I _791— L122 or Date: 3ZI 14 1 (3 21412011 (Type of Visit: U7outine ce Inspection U Operation Review Q Structure Evaluation Q Technical Assistance I Reason for Visit: 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: P4j3_( 12--1 Arrival Time: © Departure Time: E�= County: Farm Name: �(? Ag+ ; Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: G Certified Operator: siv '� if j Back-up Operator: Location of Farm: Title: Latitude: Phone: Phone: Region: Integrator:--=1 l Certification Number: Certification Number: Longitude: Swine Wean to Finish Design Capacity Current Pop. Wet Aoultry a er Design Capacity 0 Current Pop. y 0o C«attle DairyCow Design Capacity Current Pop. Wean to Feeder Non -La er DairyCalf Feeder to Finish r Will, I La ers Design Ca aci , i Current P_o DairyHeifer D Cow Non -Dairy Beef Stocker Farrow to Wean Farrow to Feeder Farrow to Finish Gilts on -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other Turke s Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes XyNo ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes n No ❑ NA ❑ NE ❑ Yes ❑ NA [3NE ❑ Yes o [DNA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 21412011 Continued Facili Number: Z - U Date of inspection: 424 13 t (2__ . Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 6NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ YesI�No❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard in () ;-t/ 2-`/ ,, S-' 5. Are there any immediate threats to the integrity of any of the structures observed? ❑Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes Z No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t eat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): rC—SriL, 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ffNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes N ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes gNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Trans rs Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspection Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued [Facility Number: Z- - fi Date of Inspection: /31 /L 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes <No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or, any other comments Use drawings'of facility to better explain situations (use additional pages as necessary). p y)•. I'?/��� �`� ,-� S �a c� /� C� •Jai- (,✓� cz_ n Reviewer/Inspector Name: s 4� e--- Phone: `7 g /— y Z e 0 Reviewer/Inspector Signature: Date: gl / 3 // Z' Page 3 of 3 21412011 Feb 1010 08:17a NRCS & Fishing Creek SWCD (252) 583-1814 p.1 Fishing Creek Soil and Water 'Conservation District Halifax County Agricultural Center 359 Ferrell Lane Room 151 Post Office Box 8 Halifax JVC 27839-0008 Phone: 252-583-3481 Ext 3 Fax: 252-583-1814 William N (ill) Mann, Jr. Resource Conservationist Specialist Email: will.mann@nc.nacdnet.net Fax Transmittal Date: Il O f Fax Number: Ql�-Jr%�' L/7) ,2(0-3 9 V� Lr-aLJ.,iWV) �4v-;,:)-, number of pages including cover sheet Feb 10 10 08:17a NRCS & Fishing Creek SWCD (252) 583-1814 p.2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Late DVI' a L,ca,oah 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker /,2 inches b. designed 25 yr./24 hr. storm & structural freeboard inches c. line b - line a (inches in red zone) = 7 inches d. top of dike surface area according to design D 6 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = ?/6 q2 1.3 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design P 9U days g. volume of waste produced according to structural design q1 203, 2- ft3 ;40 ono d Q f • y ft3 h, actual waste produced = current herd # x line g = !� 000a certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 01 m. (lines e + k) x line I = 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE PoA (30 Day) V21100 1 3 g6c'S.5 ft3 ,a060 —gallons 1, 3 lb/1000 gal. 3)3,'� lb PAN Feb 10 10 08:17a NRCS & Fishing Creek SWCD (252) 583-1814 p.3 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: line m = 313• g lb PAN 2. structure ID: line rn = Ib PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line rn = lb, PAN n. lines 1+2+3+4+5+6 = 3i?, lb PAN III. TOTAL, PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s, remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' F&S 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN avallable for all fields (sum of column 1) _ Y a lb. PAN PoA (30 Day) 2J21= 2 Feb 10 10 08:18a NRCS & Fishing Creek SWCD (252) 583-1814 p.4 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = � / 3, ?' lb. PAN x. Crop's remaining PAN balance (fine v from section 111) = -11Y$'5 lb. PAN y. Overall PAN balance (w - x) = — L/ / 7/, 2 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. 9 animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: J-- 33, 6 `r 7— PoA (30 Day) 2121/00 3 Feb 1510 08:25a NRCS & Fishing Creek SWCD (252) 583-1814 p.1 —2�o t Goo �< Fishing Creek Soil and Water Conservation District Halifax County Agricultural Center 359 Ferrell Lane Doom 151 Post Office Box 8 Halifax JVC 27839-0008 Phone: 252-583-3481 Ext.3 Fax: 252-583-1814 Fax Transmittal 97Iliam N (Will) Mann, Jr. Resource Conservationist Specialist Email: will. mann anc.nacdnetnet Date: Fax Number: 9 i 9 - S % ! - 1-171 'K (a - &!::"o 1 '0 Jo Vt i 0— N e-T 1 ©1^ cL / 1rL1/.ti t d N! number of pages including cover sheet Feb 1510 08:26a NRCS & Fishing Creek SWCD (252) 583-1814 p.2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I, TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID). La � a �oT ,OA 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker Z< • 6 inches b. designed 25 yr.124 hr. storm & structural freeboard 33- 61 inches c. line b - line a (inches in red zone) = 7 inches d. top of dike surface area according to design ' g6J6 ft, (area at below structural freeboard elevation) e. line c x line d x 7.48 clalion�s = MI6 q2 I.3 gallons 12 ft 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design / TfU days g. volume of waste produced according to structural design ql 203. 2- ft3 h. actual waste produced = current herd # x line g = 2 00;z 1- y ft3 �,obo certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design Z q b SAS. 5 ft3 k. (lines h + i +i) x 7.48 x 30 days = a'f a�0 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 0� D q i, 3 Ib11000 gal. m. (lines e + k) x line 1 = 3 ) 3, `t lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE PoA (30 Day) 2/21/00 1 Feb 1510 08:26a NRCS & Fishing Creek SWCD (252) 583-1814 p,3 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: line m = lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure. ID: line rn = lb PAN 6. structure ID: line m = lb PAN n. lines9+2+3+4+5+6 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN 13ALANCE FOR FIELD (lbs.) column r x s u. application window' 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) lb. PAN PoA (30 Day) 2/21/00 2 Feb 1510 08:26a NRCS & Fishing Creek SWCD (252) 583-1814 p.4 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) _ 31 / 3. ?-' lb. PAN x. Crop's remaining PAN balance (line v from section III) _ -lV875 lb. PAN y. Overall PAN balance (w - x) = '-/ / 7 /, 2 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be Included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2121100 3 (Type of Visit iO Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of visit: t7 Time: 0 Not O erational 0 Below Threshold 'p"Permitted Certified [3 Conditionally Certified [3 Registered Date Last Operate or ove Threshold: ............. FarmName: 11M................................................................. County:.. /........................................... OwnerName: ................................................... ........................................................................ Phone No:....................................................................................... MailingAddress: ..................................................................................................................... ........................................................................ ........ .......................... FacilityContact: ..............................................................................Title:................................................................ Phone No:................................................... OnsiteRepresentative: .................................................................................................. Integrator:...................................................................................... Certified Operator: ... 144J........`W5-coc.......................................................... Operator Certification Number:,.220,3. ............. Location of Farm: ❑ Swine Poultry ❑ Cattle ❑ Horse Latitude Longitude �• �' ��� Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes .CJINO Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes �No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ;'�No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes] No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes j No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes ❑.PQo Struc,tur {{ Structure 2 Str cture 3 A.0 re 4 Structure 5 Structure 6 Identifier: ...q� �...... )...... ..... . �... L�' ........ � .. ...................... ...................................................................... I ........ Freeboard (inches): I 12112103 Continued Facility Number: Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes P'NO seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes closure plan? (If any of questions 4-6 was answered yes, and the situation poses an /5�No immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ; o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes o elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes j2l �qo ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen, Ground ❑ Copper and/or Zinc 12. Crop type ESQ Cp iV 1,0,E U 4 S G►e 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑Yes o 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ['o 16. Is there a lack of adequate waste application equipment? ❑ Yes o Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes Ko liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yesf/No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes No Air Quality representative immediately. Field Copy ❑ Final Notes r OV o JW Gyw�/ oKC(07Z) T' AyKej �h �{�i L o (,U;�I Div,Q; S r•J �J_JA S W4T - Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 1L/1L/U.1 Lonanuea Facility''%Number: — Date of Inspection Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes P<O 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes T alysis Soil Samplin ❑ Waste Application ❑ Freeboard ❑ W1� 24. Is facility not in compliance with any applica e s ba critl rFd in effect at the time of design? � Elc ❑ Yes" _ .- 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes 26. Fail to notify regional DWQ of emergency situations as required by General Permit? 27. (ie/ discharge, freeboard problems, over application) Did Reviewer/Inspector fail discuss ❑ Yes ❑Yes No to review/inspection with on -site representative? 28. Does facility require a follow-up visit by same agency? ❑ Yes 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes;/No NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) Yes ❑ No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ;'No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes 'N �fc O33. Did the facility fail to conduct an annual sludge survey? ❑ Yes 34. Did the facility fail to calibrate waste application equipment? ❑ Yes No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ Stocking Form ❑ Crop Yield Form [:]Rainfall ❑ Inspection After V Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 Type of Visit Z Compli a Inspection Operation Review Structure Evaluation Technical Assistance Reason for Visit outine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: f 0 �;j Arrival Time: 1 Departure Time: County: Farm Name: f'/ 6 4, 1 q a g, Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: /' ' r (' ' ►F' Sy Ke f Title: Onsite Representative: Certified Operator: 7iiU CL 'sL,0-e Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: = o = = Longitude: = o = g = 14 Design Current Design Current Capacity Population Wet Poultry Capacity Population a er �i ❑ Non-Layet j Other ❑ Other i Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ONo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes 'No ❑ NA ❑ NE 12128104 Continued Facility Number: tjZ Date of Inspection I I'D 0'7 dJ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): _ _ 0 ct 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No ❑ NA ❑ NE ❑ Yes ��o❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes LI No ❑ NA ❑ NE ❑ Yes LiJ'No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr t, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes LJ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑yes No El NA [I NE maintenance or improvement? Waste -Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect a lotion? If yes, check the appropriate box below. Ell Yes No El NA El NE El Excessive Pon ding Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) F o J- l� 2...r. ��, ��^ 9 ✓� f ..1' 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes I No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes RrNoo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination: ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes CoEl NA ❑ NE 18. Is there a lack of properly operating waste application equipment? El Yes �Io ❑ NA ❑ NE . toquestion#� E�xplamanyYE5 answers and/or; any recommendations or any other comments. Commen15!niaculu 3* to better expl;, fix krurQ�dixh� t .w. a aGvsi.P:sfi k a�s s te C, Reviewer/Inspector Name F , Phone: Reviewer/Inspector Signature: / .+_ « Date: 12128104 Continued r Facility Number: — P Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ZNo,❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ste Analysis ❑ Soil Analysis El Waste Transfers ❑ Waste Application ❑ Weekly FreeboarL2�OMinute [I Annual Certification El Rainfall El Stocking El Crop Yield Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA *, ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes U/ ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? El Yes E N ElNA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? El Yes N %"❑ NA [I NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes � ❑ NA El NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional*Commen,`ts and/or:D,rawtn'gs f t �} 12128104 U Type of Visit IXCompli Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: OF 1 Arrival Time: Departure Time: County: Farm Name: La Owner Email: Owner Name: i'U C Phone: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: P'q y Back-up Operator: Title: Phone No: Integrator: lrY" Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: = o Longitude: = o = 6 = 11 Design Current Swine Cn.FjVRPoD7jajjun ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Design Current W ,P,oultry Capacity Population La er ❑ Non -Layer sit Dry Poultry �� El Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other DesignMroDuRation Cattle Capacity ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non-Dai ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: DischarEes & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes [INE 2. Is there evidence of a past discharge from any part of the operation? El VVNo�NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ElYes El ❑ NE other than from a discharge? Page I of 3 12128104 Continued f Facility Number: Date of Inspection Y a Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No NA ❑ NE El Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes Ej No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr t, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No - ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes No El NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ;/No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No .❑ NA [INE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ElYes No El NA El NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window El Evidence jof Wind Drift El Application Outside of Area / 12. Crop type(s) f Q 6 e/ '-1Gi-- 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ Yes ❑ NA O7NV�'E] ❑ NE i NA ❑ NE ❑ NA ❑ NE No NA ❑ NE o ❑NA ❑NE Comments (refer to question #): Explain any YES answers. and/or any recommendations br any, other comments x "; Use drawings of facility to better explain situations. (use additional pages as necessary)::' ,: Reviewer/Inspector Name I__--�-�___ -j Phone: Reviewer/Inspector Signature: S Date: O Page 2 of 3 12128104 Continued � 1 Facility Number: Z- Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No 'NA El 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check El Yes;No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists [I Design ❑Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspection�No eather Code 22. Did the facility fail to install and maintain a rain gauge? El NA ElNE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ElYes , ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes LQ N NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yesro NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ YesNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑YesNA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3 12128104 Facility Number 1-- �I Type of Visit Reason for V 0-Wision of Water Quality 0 Division of Soil and Water Conservation 0 Other Agency F. �pliarfce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: 0! r% J Departure Time: County: Region: Farm Name: G 9— �i �''t Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: 17Ay Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Title: �o Latitude: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: = « Longitude: = o = d a 66 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er I❑ Non -Layer Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Cattle Design Current 'r Capacity "Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ D Cow ❑ Non -Dairy ❑ Beef Stocket ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes eNo ❑ NA ❑ NE ❑ Yes No NA ElNE [IYes No ❑ NA ❑ NE ❑ Yes 0'NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued Facility Number: p Date of Inspection 07 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: ❑ Yes No NA ElNE ❑Yes o ❑NA El NE Structure 5 Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 0<o ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre t; notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes I No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ��o❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ A ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) (- S�� . �� e r .^ 1.�--- 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No NA El NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] Yes N ' EJNA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: S Date: 12128104 Continued Facility Number: Date of Inspection I7/ Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes . A ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropirate box. ❑ WUp ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ YesVN ❑ NA El NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA [INE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes N ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? [IYes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes i o ' NA [INE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? El o ❑ NA [INE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than nonnal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments and/or Drawings: 12128104 for Visit: Q'Routine 0 Complaint 0 Follow-up 0 Referral 0 0 Other 0 Denied Access Date of Visit: 2// 1 a I Arrival Time: Departure Time: -v County: Region: Farm Name: � �6 j 4 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: !/e 11 _ S 60' L Certified Operator: T L✓ Back-up Operator: Location of Farm: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Swine Finish Design Capacity C«urrent Pop. Design Current We, . oultry Capacity Pop. La er 0 S n Cattle DairyCow Design Capacity Current Pop. Feeder Non -Layer DairyCalf o Finish DairyHeifer to Wean Design Current D"r, Poultr Ca aci + Po Layers D Cow o Feeder to Finish L Non -Dairy Beef Stocker Non -Layers Beef Feeder Pullets Beef Brood Cow Turkeys urke Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE ❑ Yes�yo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes Now ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation?;, 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes fUl ❑ NA ❑ NE ❑ Yes o [DNA ❑ NE ❑ Yes No [DNA ❑ NE Page 1 of 3 21412015 Continued ilacili }Number: Z - 0 jDate of inspection: / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes "" NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �Q << 0 t� 30 l/ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t eat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? .If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area l 12. Crop Type(s): i'.7G�� h.� % 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [—]Yes PNo NA ❑ NE l6. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑Yes NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: y- Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permi ? ❑ Yes " No ❑ NA ❑ NE 25. Is the facil' ut of compliance with permit conditions related to sludge? If yes, check Yes ❑ No ❑ NA ❑ NE the ropriate box(es) below. - Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? 0 Yes 2 No 0 NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ NA Coo' ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [:]Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA 0 NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refet:-to question #) Explafn�anyFY�S answers and/or any�additional recommendations or any -other coinmentsl." �'� �s •'� Use drawings of facilii to betteir4xp`lain situations (u'se additional pages as necessary):' On (,I �s e SI.Cr ✓ V tAS -� i c av 13 ivo 514dSe 5-a_�-✓.el I�vr 2-00. C7� Ct)v&fa C.4,C'/j.eh (_ i j -e KP;le!Ls Reviewer/Inspector Name: Reviewer/Inspector Signature: l� Cc S lqtj _,z Page 3 of 3 Phone: 9 / j 7q/ Vzo o Date: 1131 14/2015 2- Division of Water Qualit y 0111ty iumber_t D Division of Soil and Water Conservation O'.."Other Agene y Tjpe of Visit I:O =Khce Inspection O Operation ReOri ieW O Stcture aluation O Technical Assistance Reason for Visite O Complaint O FolloW up O Referral O I:mergeml O Other ❑ Denied Access Date of Visit: 4�= Arrival Time: /D.�n Departure Time: County: Farm Name: ('11'4 V 14 Ar' S ow- JC74 ea-- Owner Email: Owner Name: I✓ C 0 G Phone: _ Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: �) i� 1rS Grp- Certified Operator: Back-up Operator: Location of Farm: Swine Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: a o = = Longitude: = ° 0 Design Current --- Design Current Capacity Population Capacity Population Layer O 610, VT331jO D ❑ Non -Layer ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder. ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Strictures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes ZN NA ❑ NE ❑ Yes No [;'NA ❑ NE ❑ Yes NA ❑ NE ElYesrNo NA [INE ❑ Yes NA ❑ NE 12128104 Continued 1 Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 ❑ Yes No NA El NE ❑ Yes No ❑ NA ❑ NE Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): ZG 2 l! 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA El NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre otify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ;No NA ElNE (Not applicable to roofed pits, dry stacks and/or wet stacks)9. Does any part of the waste management system other than the waste structures require ElYes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes IKI No "❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable CropWindow [IEvidence of Wind Drift ElApplication Outside of Area 12. Crop type(s) (3e ✓ #1 h.Qj q re S kA_eL__ �� � �✓15 ��" ✓� 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 No . ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No NA ElNE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination, El Yes No NA ❑ NE 17. Does the facility lack adequate acreage for land application? El Yes o NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ElYes o ❑ NA ❑ NE �nts,(relain any Eeand/orkanyt wings of�facility totbetter exp�laingsituations (use additional pages«as�necessaryyc)s ' IffiiRomm 1 1 �i +. a� �,� _ �� _ r. 1 .v ,-_:)e. U;k rt Reviewer/Inspector Name 1 6 L& `Z�� � ( I Phone % L� -t7 t Reviewer/Inspector Signature: Date: I b 12128104 Continued Facility Number: YZI p Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes N ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUp ❑ Checklists ❑ Design ❑Maps [I Other 21. Does record keeping need improvement. If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No A ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes NA ❑ NE 25. Did the facili fail to conduct a slud a surve as re uired b the ermit? facility g Y q Y P ❑ Yes ;�_No NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: II II V)-& 01 _0 a,,) �S 4 c C41i %r941 v'/ iin C1 P ,-+ T cS'I),'� � � 12128104 X Type of Visit ;zutinence Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance ReasonforVisit 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: 7 ?j Arrival Time: q Tiir—c] Departure Time: County: Region: Farm Name: C 4"LQ JIM 110— Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Phone No: Onsite Representative: ID n1 (l 1 C1 --srs 419.E Integrator: L Certified Operator: Back-up Operator: Location of Farm: Operator Certification Number: Back-up Certification Number: Latitude: = o = i = « Longitude: = o = i = 46 Design Current Design Current Design Current ity Population Wet Poultry Capacity Population Cattle C«apacity Population n to Finish ❑ La er y0 % ti� ❑ Dai Cow n to Feeder ❑ Non -Layer ❑ Dai Calf er to Finish ❑ Dai Heifer ow to Wean '❑ D Cow ow to Feeder La ers Non-Dairyow to Finish LEFe ❑ Beef Stocker ❑ Non -La ers Beef Feeder rs ❑ Pullets❑ Turke s Beef Brood Cow ❑Turke Poultsr ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes �NoE:] NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes El El Yes VoEl ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Page 1 of 3 12128104 Continued Facility Number:(Z — Date of inspection 7 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes LEI N NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes ONo A ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre , notify DWQ 7. Do any of the structures need maintenance or improvement? El YesFNo o NA El NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yeso A ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [:]PAN ❑ PAN > 10% or 10 lbs [:]Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil [:]Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) f- e S64AjtP ��e r M1 e 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No El NA El NE 15. Does the receiving crop and/or land application site need improvement? El Yes ;❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes 7 ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? El Yes o ❑ NA ElNE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): I.et � �/�' I'—cy—,,..sue C p.e Ce�"�X2 �) 0 + C v F= F L-`Z Sr +' Reviewer/Inspector Name Phone: 7 g — V ZJ t7 Reviewer/Inspector Signature: C-" Date: 7 12128104 Continued Facility Number: 7 Z — G ( Date of Inspection 7 Zc► v Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ElNE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �NoO NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes N ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ON NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ NA ❑ NE ❑ Yes NA ❑ NE ❑ Yes N 9 NA ElNE ❑ Yes No ElNA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE El Yes El No El NA El NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes, ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Addltio iit6Jnjrh nts)and/or Draxwin s ^$ ` , ' ° ; r,ag �: t `#, � ..`� o1 f Lys (Ypp - �--s 1 r^ -� H d 01" -r�s-�- k �,.�.�-/7 s ; ,r �v� ►- c� t„"g s ( 2. r Z- 0-0 Page 3 of 3 12128104 Zl4f r 0 Type of Visit Q Co nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for W Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: /2�%�lQl V Arrival Time: (!) 0 C Departure Time: County: Farm Name: ✓1. Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 04 y; G—✓'-ems Certified Operator: d 1 cal Back-up Operator: Location of Farm: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: a o = 6 = Longitude: = ° = 1 DesignW@u&Hrt Design @urren Design Current Swine C«apacity opuration Wet ry Capacity Population C«attle Capacity Population ❑ Wean to Finish a er 160, &r.'a I Dairy Cow ❑ Wean to Feeder 10 Non -Layer I Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poulbry ❑ Dry Cow ❑ Farrow to Feeder ElNon-Dairy ❑ Farrow to Finish ❑ Layers El Stocker ❑ Gilts El Non-Layers El Beef Feeder ❑ Boars ❑ Pullets El Beef Brood Cow ❑ Turkeys Other ❑ Other ❑ Turkey Poults 10 Other I INumber of Structures. Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes 0<q/IJ NA ❑ NE ❑ Yes No ❑ NA ❑ NE i ❑ Yes N ❑ NE ❑ Yes N NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued Facility Number: t12— p Date of Inspection I Z Zo Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes;:o�[[31 ❑ El NE the appropriate box. ❑ WUP ❑ Checklists El Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. El Yes NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections�N�o- Gather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑Yes NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesPNo/ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes A ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ YesNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE AddMoat Caommenfsand%orDr�awngsc R k 12128104 12128104 Facility Number: - Date of Inspection Li La) Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: ❑ Yes �n.No A NE ElYes No ❑ NA ❑ NE Structure 5 Structure 6 Designed Freeboard (in): Observed Freeboard (in): Z 30 c 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ZfNo ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment;No rea otify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes A El NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yeso ❑ A El (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [I Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box'below. ElYes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 153-7/artkJ4 _5" 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �allo El NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes ❑- NA [I NE 17. Does the facility lack adequate acreage for land application? ElFNo ❑ NA El 18. Is there a lack of properly operating waste application equipment? ❑ Yes❑ NA ❑ NE Reviewer/Ins ector Name r �x` `� n� � �;�tt nt.,F .. .,eat zr Phone: P Reviewer/Inspector Signature /�j/,c $ �11 1=4� _ Date: // Z7 t 2 171 U 12128104 Continued '-7 , Type of Visit O'Com nce Inspection Operation Review Structure Evaluation Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: �L1 Arrival Time: EE=Departure Time: County: Farm Name: A - la— Jos.7 d r4 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: -J�✓c' S Certified Operator: Back-up Operator: Location of Farm: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: = 0 = i Longitude: = o a 1 = l{ Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population C«attle Capacity Population Wean to Finish ❑ Layer 0 ❑ DairyCow Weanto Feeder ro ❑Non -La erDai Calf Feeder to Finish El Dairy Heifer ❑ Farrow to Wean apnoultry ❑ D Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Non -Layers ❑ Beef Stocker El Beef Feeder ❑ Gilts ❑ Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys OO ther ❑ Turkey Poults Number of Structures: 111E] Other ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes No ❑ NA ❑ NE ❑ Yes �1❑ NA ❑ NE ❑ Yes I �O_ ❑ NA ❑ NE ❑ Yes VoEl A ❑ NE El Yes A ❑ NE El YesA ❑ NE 12128104 Continued t.. . Facility Number: ,. Z — J- Date of Inspection 2 -1 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �i 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ YesPU<o NA ❑ NE ❑ Yes ❑ NA ❑ NE StructureStructure 6 ❑ Yes No NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa otify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes Rio NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ElYes o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes o❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [:]PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) r P -C ,,p , t ry► 13. Soil type(s) � 14. Do the receiving crops differ from those designated in the CAWMP? ElYes O No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �No❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] Yes IQ No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 9No ❑ NA ❑ NE Reviewer/Inspector Name 1 � ,—1 Phone: , (� �� �'qz-" Reviewer/Inspector Signature: Date: 2 ti [ [ Page 2 of 3 12128104 Continued f Facility Number: Z — Date of Inspection a+01 It Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ W-Up ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. es ❑ No - NA ❑ NE El Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ElYesVN�O NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? Yes NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? El Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE =Addfional Comments and/or'Drawm's x =E `' :` r * ` , ry`'°k` „;;,' r / Page 3 of 3 12128104 1-1-7 _iei v lType sit: Routiof Visit: -,0 Com ance Inspection Q Operation Review O Structure Evaluation 0 Technical Assistance I Reason for Vine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: /,{- le ( Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 1 Integrator: 4� Phone: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Swine Wean to Finish Design Current Capacity Pop. small Wet P.. ultry a er Design Current Capacity Pop. pp Cattle Design Capacity Current Pop. Dairy Cow Wean to Feeder Non -Layer Dairy Calf Dairy Heifer Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Dr Ploultrs' Layers Design C*urrent Ca asi ; Po Dry Cow Non-Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow OO ther Other ILIOther TurKeys Turkey Poults Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ONo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes NNA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ YesgNo�[3 NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes roE] A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesA [3NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesA ❑ NE ofthe State other than from a discharge? Page I of 3 21412011 Continued Facili Numder: a2 jDate of Inspection: / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):` 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑ NA PNo ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment 'te at, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): [fie 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage &Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall InspectioVNo le ge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes NA ❑ NE Page 2 of 3 21412011 Continued Faeffl Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o NA. ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yesg�No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels' in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ YesgN�0 ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Il% -�o czj,4-'^t e �,6R/G "g W °-( (4 P73 1h ors -�f C5 tv-q.54 -4-0 /J r { 1,4 546V\_, Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 15A 549-� o� e- ) ( Phone: 7� /� y Zy c-) Date: 21412011 Type of Visit: Z) Com nce Inspection Q Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit: 0 Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: / Departure Time: County: Farm Name: o , Li-- Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: o'411i C/ :74 Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Region: Swine Wean to Finish Design Capacity Current Pop. Wet Poultry La er Design Current Capacity Pop. Cattle Dai Cow Design Capacity Current Pop. Wean to Feeder -Layer Dai Calf Feeder to Finish Poultr Layers Design Current Ca aci , Po i. DairyHeifer Farrow to Wean Farrow to Feeder Farrow to Finish D Cow Non -Dairy Beef Stocker Gilts on -Layers Beef Feeder Boars Pullets Turke s Turkey Poults Other Beef Brood Cow NJ Other I Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes . No ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes N ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes ❑ NA gNo ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page l of 3 21412011 Continued Facili Number: - p jDate of inspection: — — Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in). 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Structure 5 N ❑NA ❑NE No ❑ NA ❑ NE Structure 6 ❑ Yes No NA ❑ Yes No ❑ NA ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta r at, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ZN ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Bel ,,, ti j 4L-- 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes � ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑YesgN�o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes❑ VNo NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA gNo ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑WUP []Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes []No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes N ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes i No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes 5o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? []Yes [:]No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer tdquestion #): Explain any YES answers, and/or any additional,recommendations oreany othercomiiients „t Use drawings of facility to better explain situations (use additional pages as necessary).- ,, t', C-` ) "44; "..' � may_ 40 C� -5,14t C5( e 5" *,-6, e_/ n'k SPA i�,i its �y S'C V'-/D :1-- >-, 6e7 4 tA A-( C e,✓1- cam-- w-4" I 0 Reviewer/Inspector Name: Phone: *791—yz 0 Reviewer/Inspector Signature: �� �j �. _777Z� Page 3 of 3 Date: / — 2-t-0, (j- 2/4/2011 17 —i 0 (Type of Visit: /E) Compl' a Inspection U Operation Review U Structure Evaluation 0 Technical Assistance I Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 1!%�g-fijjj Arrival Time: Departure Time: County: Farm Name: �lad ol � Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: t/,q,/ f C� •p J'6- —e Title: J Phone: Onsite Representative: �tlI e_C3r4 h c j& /1 �/e Integrator: r Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Region: Wean to Finish La er jDairy Cow Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder. Farrow to Finish Non -La er Dairy Calf Design Current D_r, P4oultrs Ca aeih ; P,o La ers Dairy Heifer Dry Cow Non -Dairy Beef Stocker Gilts Layers Beef Feeder Boars F I 113eef Brood Cow Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) El Yes Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE 2. is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Kbmber: - O Date of Inspection: — L -=< Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):I t 3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes;No No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application Z;,�NodENA 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes VN❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA yNo ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA g ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes XNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: Z. Date of Ins ection:41—Z_y—tk 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o A ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (rd6it6question,#) Explain any;YES ar swers;and/or any additional v6commendations or any; other comments ; t iioBterez utons e addtionaaesasneesaUse drawin s,'ofm„ G t k4j.. �� V -( f� r 1"o 7 P �. Reviewer/Inspector Name: Phone: '% / ( V Zdb Reviewer/Inspector Signature: (34- S' )-hc 7mi .e , L Date: Page 3 of 3 21412015 (Type of Visit: fD Com nce Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: j D Departure Time: %/ , h County: Region: Farm Name: 4Y1 a ra Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Wean to Finish I I Layer I I Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Dr Po_u_Itr ; La ers Design. Ca aci Current Po Dairy Heifer Dry Cow Non -Dairy Beef Stocker Gilts on -Layers I Beef Feeder Boars Pullets 113eef Brood Cow Other Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 2<0 ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA �No ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DW R) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA 0A ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued F9cili Number: -I Date of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): (, I 36 1 t 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Structure 5 ., N NA ❑ NE No ❑ NA ❑ NE Structure 6 ❑ Yes ZIrf7o ❑ NA ❑ Yes ZfNo ❑ NA ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta reat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ YesVNo NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 21 X ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes;No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): �P �G��Q, (jGJr .✓� ti r9-- 13. Soil Type(s): / 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ZN ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑Yes o ❑ NA gNo ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the a ro riate box PP P ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections []Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? El Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Fdcilit Number: - V Date of inspection: A 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0'�_Nolo NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ZNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? []Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ YesrZNoO[— o NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑Yes NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No [DNA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #):,Explain any YES answers and/or any additional recommendations or any other -comments Use drawings of.facility to better, explain situations (use additional pages as necessary). ►� -�R- 4T l IGr/�'�� ivr dJn /3-r� cA� e(Qrc_i�M 2r�-f Reviewer/Inspector Name: 22 'n I Reviewer/Inspector Signature: �Je, S ,(Zrbya Page 3 of 3 Phone: 2_012 Date: 17 21412015 w' Type of Visit /0 Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit oRoutine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number I Date of Visit: ermitted Certified [3 Conditionally Certified [3 Registered Farm Name: Ca.l2c�tlru Owner Name: NC_ C Mailing Address: Time: I rO Not O erational 0 Below Threshold Date Last Operated or Above Threshold: _ County: 4-Lk Phone No: Ar Facility Contact: Title: Phone No: Onsite Representative: I Integrator: Certified Operator: ��� G`( QIrac2 Operator Certification Number: Location of Farm: ❑ Swine Poultry ❑ Cattle ❑ Horse Latitude 0' 01 0« Longitude 0• 6 0« Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts N Other No Liauid Waste Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? N b. if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 h icture 3 Structure 4 Identifier: lf� C.. Freeboard (inches): % Z c( Y g.. q sill 05103101 Structure 5 ❑ Yes o ❑ Yes No ❑ Yes O ❑ Yes No ❑ Yes No El Yes �Ko ❑ Yes (ZNo Structure 6 Continued v Facility Number:.. ; Z.- Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type y 13. Do the receiving crops di er with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal,yyasyp�Iar ement Plan readily available? (ie/ WUP, checklists, design, maps, etc.) j�l Yov 19. Does record keeping need improvement? (ie/ irrigation, freeboard, w ire�r6Wsis &soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes , No o ❑ Yes �No fyes El No es ❑ No ❑ Yes �No ❑ Yes No ❑ Yes [/No ❑ Yes A No ❑ Yes [--]No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes /5No El Yes � o ❑ Yes )zNo ❑ YesN ❑ Yes No El Yes No ❑ Yes' X O ❑ Yes No ❑ Yeo ❑ Yes No ❑ Yes No 10 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. i ..'. :t g,.n 4'.�'` �... - Comments (refer to question #) * Explain any YES,answers,,and/or-any recommendations o_r any otI r,comments., A.w . , Use�draw�in°gs of faeiIiW4o better explain situations: (use additional page as" -necessary) Field Copy ❑Final Notes v k"- 10/004 �����a�� Reviewer/Inspector Name %l.Q (; Reviewer/Inspector Signature: Date: 05103101 / Continued Facility Number: Z — 1 1 Date of Inspection 1 Q Odor Issues ,�(� 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes [[ No liquid level of lagoon or storage pond with no agitation? /VP' 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes o 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? Cl Yes No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes N 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes XNo Additional-Coiriments>and/or nrawings: ,' O5103101 :; Type of Visit Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit PrIhoutine O Complaint. O Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit: 2 D Time: `• 3Q Facility Number Z ' Q Not Operational Q Below Threshold 13 Permitted 13 Certified [3 Conditionally Certified Q Registered Date Last Operated or Above Threshold: FarmName: ...... ............................................... County:. 1:`.............................................................. OwnerName:...I. '.0 ...: k' :......6-correr&4 ............................................... Phone No:.............................................................................:. FacilityContact:.......j.�............:.................�./.................................... Title: ....I............................................................ Phone No:................................................... MailingAddress:...... r..q .. ..1.......................... I .. ....{.J.`.......... ..................................................................................... .......................... Onsite Representative: ..................................................................................................... Integrator: ...... rr I, /1 Certified Operator:................1 .. 9lA...............C.r.?ik?! r t�......................................... Operator Certification Number:.....:.................................... Location of Farm: 666 ❑ Swine (poultry ❑ Cattle ❑ Horse Latitude " Longitude �• �� Design .'` Current Design Current'. Design Correct „Swine Ciilnacifv Pooulahon. P.oWhy Caoaclty. Population Cattle Capacity , Potoulatioa ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Number of Lagoons Subsurface Drains Present ❑ I[] Lagoon Area JE3Spray Feld Area 1i I , Holding,Ponds / SolidtTraps ❑ No Liquid Waste Management System € ,..s Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Identifier: ... ;�-jtu .................. SOco�?da !�..... ...... l ao d.a?) ............... Freeboard (inches): �%36 5100 Structure 5 ❑ Yes ❑ Yes No ❑ Yes 0 0 ❑ Yes No ❑ Yes 10 ❑ Yes �*o ❑ Yes O No Structure 6 Continued on back Facility Number: — Date of Inspection Printed on: 10/26/2000 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes �No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? es ❑ No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? �'j�"Y❑ Yes 0<0 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes o Waste Application /� 10. Are there any buffers that need maintenance/improvement? ❑ Yes ❑'1� 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes / No 12. Crop type Re 1 (301D r %440 , C. , s A4. d a a;wz _ 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment'? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal W ste, Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ����Jd� y(a f 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waSyeS la�alysis &soil sarf�ple reports) I co 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? 000ciencies •w•gre ;mote.• during �his:visit; Yop wiil receive o fu>�•thgt . . correspondence. about. this visit. • • • • • • • • • • • • • • • ❑ Yes ;3 No ❑ Yes gNo ❑ Yes 1 ❑ Yes ❑ Yes P"N"o ❑ Yes )2190 ❑ Yes No ❑ Yes O-N"'o Xyes ❑— NNo ❑ Yes 2<0 ❑ Yes ❑ Yes JQ No ❑ Yes /,e No ❑ Yes � No ❑ Yes )!j'No uvaaau,�cuw �a:caca av yucawvi n� un�Saaaai;,nuJ auk uaa�nca�:wuaaiva nuJ:►cavia�aucaautauva>, va au] ouaca wauaucuwa= 3Ili, '!! 11 ,3, Use drawings of facility to better ezplamaituahons (use'additional pages as;necessary) evo.�.. a, j �r� (�5 ^(may ° 0'1 05 A1.Jcj OrC 5�iow.(c� •► Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 5100 Facility Number: y— ( Date of Inspection 2 p Printed on: 10/26/2000 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge actor below ❑ Yes r No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ;Ir'N"o 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes PNo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near 'the liquid surface of the lagoon? ❑ Yes ;3/No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes �No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes 140 5100 ly IQYRoutine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review 0 Other Fumber Late of Inspection p Time of Inspection / Z O 24 hr. (hh:mm) 6�ermitted ® Certified Q Conditionally Certified [] Registered 0 Not O erational Date Last Operated: Farm Name: 1. .A:.(..d'...dSh1.4....�?!.�..''�`....( .f?.'�......................... County: ..... jr:.��>L'4..1.:....................... ....................... Owner Name :................. ...........�.�.... G i1..:Yl..!....t-.............. Phone f f / J.Z S.....-L........A.�` ......... Facility Contact: ..............................................................................Title:................................................................ Phone No: MailingAddress: .... I...:..... .. f..Q...(....... C..7................ ..(..:.....�L�ir.`,/............ ........................................................................... I.... ................. I........ OnsiteRepresentative: ... V. .l .!.. ......!l................................................... Integrator:...................................................................................... Certified Operator:......,, /�f/�,. ,......, Mj,Gr7 ........ Operator Certification Number:•,• Location of Farm: i ............................................................... .......................... ... Latitude [-' j Longitude �� •" Design Current Design Current Design Current Swine Ca ac�ty Po ulation Poti Capacity ,Population Cattle p pacrty,;'Po ulation ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars AtO Layer 1 0 1 1 ILJ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other t rs 1 Total Design. Capacity. F Total SSLW c. If discharge is observed, what is the estimated flow in gal/ruin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: I t ( tt Freeboard(inches): ............... .............0114 'LLB.............................................. ........................... .�........................................ 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 3/23/99 ❑ Yes 0 No ❑ Yes �Io ❑ Yes ❑ Yes o Structure 6 ..................................... ❑ Yes No Continued on back 4 ` Facility Number: IVZ- Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? [:]Yes o (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement'? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type n h n. Yes ❑ No ❑ Yes Oo ❑ Yes No ❑ Yes No ❑ Yes o 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes 0150 14. a) Does the facility lack adequate acreage for land application? ❑ Yes XI -No b) Does the facility need a wettable acre determination? es ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? o yiolaticjris:or deficiencies -were noted• during (his'visit; • Y;oir will-teeeiye fio further ; correspondence. about. this visiit. ..... -. -. -. -. -. .. .. •. •. .. •. •. .. •. •. • . •. •. •. •. •. •. •. -. •. • , r� )6o-7 1' lo n S le Reviewer/Inspector Name Reviewer/Inspector Signature: ❑ Yes l�o ❑ YesO �esoNo ❑ Yes o es ❑ No ❑ Yes I o ❑ Yes ❑ Yes L��O_ El Yes ❑ Yes; ❑ Yes � o 660173 /Zobo717. ;AL lip i",y l•�n �9,0� �� t„�, s. �Q ��►.s c� e,. �, / 4.,ro S ) _zz Date: ii 7 'L41r4 3/23/99 J�\tE� rFS UNITED STATES ENVIRONMENTAL PROTECTION AGENCY YW REGION 4 o ATLANTA FEDERAL CENTER Z3F NO 61 FORSYTH STREET O 4 PAOle ATLANTA, GEORGIA 30303-8960 PAP R 3 0 2009 :j � �i , CERTIFIED MAIL 7008 2810 0000 4316 5050 ;� MAY -4 2009 RETURN RECEIPT REQUESTED - Mr. Phillip C. Sykes, Farm Manager North Carolina Correction Enterprises Caledonia Prison Farm North Carolina Department of Corrections P.O. Box 67 Tillery, North Carolina 27887 RE: Letter of Concern Caledonia Prison Farm NPDES Permit No. NCA200000, Certificate of Coverage NCA442001 Dear Mr. Sykes: This is to advise you that the U.S. Environmental Protection Agency, Region 4 (EPA), the North Carolina Department of Environment and Natural Resources (NC DNER) conducted a Compliance Evaluation Inspection (CEI) on the above referenced facility on March 5, 2009. A copy of the CEI report is enclosed. Based on the information obtained during the CEI, EPA has concerns regarding the management of silage that was not addressed in the National Pollutant Discharge Elimination System Permit or the Nutrient Management Plan. Specifically the concerns related to the containment of seepage coming from the storage of this silage as documented in the CEI. Please provide a written plan to address these concerns within thirty (30) days upon receipt of this letter to Ms. Lisa McKinley at the address on the letterhead and copy Keith Larick, North Carolina Division of Water Quality, Animal Feeding Operations Unit, 2728 Capital Boulevard, Raleigh, North Carolina 27604. Failure to comply with the requirements of the Permit and the CWA may subject the facility to enforcement action pursuant to Section 309 of the CWA. This Section provides for the issuance of administrative penalty and compliance orders and/or the initiation of civil and/or criminal actions. Enclosed is a document entitled U.S. EPA Small Business Resources -Information Sheet to assist you in understanding the compliance assistance resources and tools available to you. Any decision to seek compliance assistance at this time, however, does not relieve you of your obligation to EPA nor does it create any new rights or defenses, and will not affect EPA's decision to pursue enforcement action. In addition, the Securities and Exchange Commission Intemet Address (URL) • http://www.epa.gov Recycled/Recyclable • Printed with Vegetable Oil Based Inks on Recycled Paper (Mlnimum 30 % Postconsumer) (SEC) requires its registrants to periodically disclose environmental legal proceedings in statements filed with the Commission. To assist you, EPA has also enclosed a document entitled Notice of Securities and Exchange Commission Registrants' Duty to Disclose Environmental Legal Proceedings. Please direct any specific concerns you may have regarding these requirements to Ms. Lisa McKinley at (404) 562-9403. Sincerely, Christopher Plymale, Chief East NPDES Enforcement Section Clean Water Enforcement Branch Water Protection Division Enclosures: (1) Water Compliance Inspection Report (Form 3560) (2) EPA Region 4 CAFO Inspection Checklist (3) U.S. EPA Small Business Resources -Information Sheet (4) Notice of Securities and Exchange Commission Registrants' Duty to Disclose Environmental Legal Proceedings cc: Keith Larick, DNER, North Carolina Division of Water Quality Buster Towell, NCDNER, Raleigh Regional Office �/ United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Section A: National Data System Coding i.e., PCS Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type N NCA442001 8/ 1 /07 { 2 Remarks Inspection Work Days Facility Self -Monitoring Evaluation Rating BI QA-----------------Reserved-- --------------- Section B: Facility Data Name and Location of Facility Inspected Entry Time/Date . Permit Effective Date D&B Swine Farm Inc. 1033 Bartholomew Rd. Enfield, NC 27823 1:10 m 3/5/09 August 1 2007 Exit Time/Date Permit Expiration Date 2:50 m, 3/5/09 June 30, 2012 Name(s) of On -Site Representative(s)/TiUe(s)/Phone and Fax Number(s) Dwight Blowe, Assistant Farm Manager David Inscoe, Operator in Charge Other Facility Data (on)e.g., SIC NA/CS, and other descriptive informs i 112310 Chicken Egg Production Name, Address of Responsible Official/Titie/Phone and Fax Number Mr. Phillip C. Sykes, Farm Manager, NCCE Caledonia Prison Farm, NC Department of Corrections P.O. Box 67, Tillery, NC 27887 252-826-3821 Section C: Areas Evaluated During Inspection Check only those areas evaluated x Permit Self -Monitoring Program Pretreatment MS4 x Records/Reports Compliance Schedules Pollution Prevention x Facility Site Review Laboratory Storm Water Effluent/Receiving Waters Operations & Maintenance Combined Sewer Overflow Flow Measurement Sludge Handling/Disposal Sanitary Sewer Overflow Section D: Summary of Findings/Comments Attach additional sheets of narrative and checklists, including Single Event Violation codes, as necessary) SEV Codes SEV Description ❑❑❑❑❑ ❑❑❑❑❑ ❑ ❑ ❑ 110 igna r Inspector(s) Agency/Office/Phone and Fax Numbers Date tNam,$)nd t�f I o-41 le , it nmental cientist YW East NPDES Enforcement Section/CWEB/WPD/EPA '� ►"404-562-9403,404-562-9729(fax)� ( � East NPDES Enforcement Section/CWEB/WPD/EPA Maurice Horsey, Environmental Engineer 404-562-9764, 404-562-9729(fax) Si t e of Ma�gem nt Q�ie er Agency/Office/Phone and Fax Numbers Date East NPDES Enforcement Section/CWEBIWPD/EPA 404- 7 Plat Christopher P , Chief 562-9794, 404-562-9729(fax) / v EPA Forth 3560-3 (Rev 1-06) Previous editions are obsolete. NPDES CAFO Water Compliance Inspection Report Date March 5, 2009 Weather Conditions Sunny Entry Time 1:10 pm State Inspector(s) Buster Towell, Environmental Senior Specialist II, NC DNER, Raleigh Regional Office, 919-571-4718 1. FACILITY Facility Name Caledonia Prison Farm Latitude/Longitude 36016"20.40 N, 77029"07.51" W Type of Operation Poultry, Layer Number of Animals 14,000 per house, 3 house Number of Animals in Confinement 42,000 layers 2145 days or more Animals have direct contact with Waters 0 no ❑ yes, explain Nearest Waters Conocohnara Swamp, Halifax River ❑ 303(d) listed, for 25-year, 24 hour rainfall amount for this location 7 — 8.5 inches 25-Year Return Period, 24 hour Duration Precipitation, inches (SCS, 1986): include source htt://www.Imnoen .com/Rainfa//Ma sIRainfa//Ma s.htm Description of Facility 3 house layer operation, flush system, 3 tier lagoon Facility Map Map 1, Source, Web Soil Survey 7Perlmitber NCA400000 ❑individual 0 general f Covera e NCA442001 ❑ co available on site August 1, 2007 Expiration Date June 30, 2012 Number of Animals the Facility is permitted for 60,000 layers, Compliance Schedule Z no ❑ yes, provide -a brief description acility has NMP 0 yes ❑ no ❑ copy available on site 0 copy maintained at farm office at another location ❑ the Facility has a nutrient budget ❑ the Facility has an environmental management plan Prepared by a Certified Planner 0 yes ❑ no Includes Maps of Production and Land Application Areas 0 yes ❑ no RECORD4. KEEPING Inspections of Waste Storage System 0 yes ❑ no ❑ some, explain Liquid Systems, Freeboard Records Z ❑ yes ❑ no ❑ some, explain not a liquid system Inspection of Storm Water Controls 0 yes ❑ no ❑ some, explain Rainfall 0 yes ❑ no ❑ some, explain Records of Manure Transferred Off Site ❑ 0 yes ❑ no ❑ some, explain does not transfer manure off site Records of Land Application of Manure 0 yes ❑ no ❑ some, explain Maintenance Reports i.e. equipment calibrations 0 yes ❑ no ❑ some, explain Annual Reports 0 yes ❑ no ❑ some, explain Required Training for Employees 0 yes ❑ no ❑ some, explain Emergency Response Plan 2 yes 0 no Soil Sample(s) 0 yes ❑ no ❑ some, explain Manure Storage Structure(s) ❑ holding pond ❑ clay lined ❑ synthetic lining Z lagoon (3 tier) ❑ aerobic digestion ❑ anaerobic digestion ❑ clay lined - ❑ synthetic lining ❑ concrete structure ❑ under house structure ❑ manure pack house ❑ manure lot ❑ composting ❑ other ❑ concrete slab ❑ tarp/cover ulescription or -Dtorage 5iructure(s) Flush from barn to 3 tier lagoon system, see diagram 1 Designed to NRCS or State Required Standards 0 yes ❑ no ❑ do not know Sketch or Photo of Manure Management Structure(s) qE.r' i�G d Y ,.• �s Prump to fields{` , v s+l r1, Layer Houses Flush to first tier i Map 1, Source, Web Soil Survey Photo 1, Source, EPA, pipe between tiers 1 &2, connecting to tier 3, lagoon in photo show lagoon that effluent is pumped from Visual .Inspection of Structure(s) Structure(s) appears to be maintained to state standards 0 yes ❑ no ❑ concerns, explain Structure(s) appears to be sound 0 yes ❑ no ❑ concerns, explain Rain gauge installed and maintained 0 yes ❑ no ❑ monitor rainfall by Structure(s) maintain liquid waste 0 yes ❑ no ' Banks are maintained 0 yes ❑ no ❑ concerns, explain Marker is present to gauge freeboard 0 yes ❑ no Freeboard 0 yes ❑ no MANURE7. - Manure Transferred Off Site ❑ yes 0 no ❑ some, explain The Facility is following state approved ❑ yes ❑ no *0 some, explain protocols for transfer of manure 0 does not transfer manure off site NMP Calculated Application Rates and 0 yes Areas for Application ❑ no Manure is Land Applied on Farm 0 yes ❑ no ❑ some, explain Description of Land Application System Traveling Gun The Facility has Adequate Land 0 yes ❑ no ❑ some, explain Facility has a schedule for Land Application and is following the schedule 0 yes ❑ no ❑ some, explain Facility has appropriate setbacks and buffers 0 yes ❑ no ❑ some, explain Visual Inspection of Land Application Areas Visited all land application fields. Sketch or Photo of Application Areas Facility has 4 fields identified in the permit as application areas for a total of 78.60 acres. The facility uses field #81, 34.7 acres and field #81, 14.2 acres, to apply all effluent. Map 2, Source Farm NMP Mortality Management According to the NMP ❑ burial 21 incineration ❑ rendering ❑ composting NMP gives specifies location for mortality management 0 yes. ❑ no NMP specifies management required Visual Inspection of Mortality Site Mortality Management On Site ❑ burial 0 incineration ❑ rendering ❑ composting yes ❑ no Facility is Manac MortalityAccordingto the NMP _yes 0 no NMP addresses the storage, handling and management of all chemicals ❑ yes ❑ no Chemicals stored on site ❑ fertilizer ❑ herbicides ❑ pesticides ❑ cleaning supplies ❑ fuel ❑ veterinary ❑ other 0 no chemicals are stored on site Method of Disposal of Chemicals no chemicals are stored on site Visual Inspection of Chemical Storage Facility is managing chemicals according to the NMP ❑ yes ❑ no no chemicals are stored on site OTHER10. Waste Generated Storage Disposal seepage from silage Concerns Seepage from silage stored on site poses was not properly contained and managed. Seepage appeared to have entered to a nearby channel. Facility management confirmed that the channel leads to a pond where all pollutants would be contained on sight (see map 2 and photos 1-4). NO http://webs Map 2, Source, Web Soil Survey, identifies the location of the silage \qb 44V` \ 1 w5v , `..+� c h� r�i.'���t �}icy, 7 • , x y N`I `''�k� 4' f 7�y✓'_4i t � ,:,n'.F"'jy � a�5"$�1a��,ts ,y�hls } r✓ �y '•,d � } -, ,•' I . �w,,rrwr�i ,'�Ir�•1� .. IO J i ir. •. 4 . jy •eP .�t •1 A 1 . vil � '�1:��3711.�:jyM ,.}y"-"-t7i7ra'jr..pu., yt�t .2 '•O.,o:, ;'• e. c :� ? f 4 i I l ".rf„l wl 4 �'" h i.ru 1 N r I l:n y tot t., r F t4r'" T.�9' f ; t, . ''�.t, r as 4Y'e',re. ,La,:'"'°vNn i� t 'h t. F' ' t�ytt , �1 r • 1 l MM r�rf .; 7�CI � r Tr t `t �i:' j 1 t .• �� 1 t .fin ,,,� � -7n w -, y.. e � � i;� r '�'t.-ryt •d e}.r.. �r » � y. y� ��� r t� F 1 R.e �' +'1'^t � t,���. �� t C. 1 3 .y .� w I�, , ,�.N+ `' i i'°'�•!`'}S( n �.•9! + `P�,�„S}„ia'r}t fl ,u 1?'"W 1 '`�•.1 TLC"' r h v{-�±a' '�'`!, '7' ?`K 7 +, t r't'#•i i', +) f �il },v:'1 ,i '�.b- ,� .,Sr .(K".f.'Ai'mtit 'r.• +� +} , o .• �t�T7+ r i i��`�ui �R s it'd 1 rx4t t�'H t� y� re4"y�yr r era ti` 'T 't j. :el'tc.�'� •, r �+^,�f��t k ,�� p,,.i�� •fit, 5t/ rS� t'4.' ±�Y 4�.�. _., :, �f ��.,�� ` 'V" � d gi t ' _fit y I {+ tr-11e, {+# yt" ^, 'O� r. � r �' 'S iY r � +., r' �a. � �. "!,�` ' ^P •4` A • YS r §: ry9>."'4J t Li* - y> .n ' 'i p'-r7,:.�y •ce ' 7 Y , :hs: a�..�.•Y'C �.h}M�» r 1:k� ' r w i !1 'litj 1`�`'A�Y fit, 1 Y'k y ..t 1 'Sf'C t'','. ' �''`i :trIIj t ft 1r .„ ,,Svolts a 4r M 4` t S• 6�r Y r 7' y1� ti4+' lly tY' t r t C� ��,,�t�-riq.r••� sS.� �', � {. ``7i� r. p^^- +. .. �i ,(o^ tit.;' .7t1 � ' t'. '.t« +rr ':, '.l,,tp !� '7r ' 1•, !P^rjl�,t`�r I� t i! � p.' t �•. y+,}• J:, �.� a ..0 �~ � �'_ 1 GOP t :ti, DISCHARGES EXIT INTERVIEW b 0�wand:; r August 1, 2007 NC Department Of Corrections Caledonia Prison Farm 4216 Mail Service Ctr Raleigh, NC 27699-4216 Michael F. Easley, Govemor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Subject: Certificate of Coverage No. NCA442001 Caledonia Prison Farm Animal Waste Management System Halifax County Dear NC Department Of Corrections: In accordance with your application received on 12/27/2006, we are hereby forwarding to you this Certificate of Coverage (COC) issued to NC Department Of Corrections, authorizing the operation of the subject animal waste management system in accordance with NPDES General Permit NCA400000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the Caledonia Prison Farm, located in Halifax County, with an animal capacity of no greater than the following wet system poultry annual averages: Non -Laying Pullets: 0 Layers: 60000 The COC shall be effective from the date of issuance until June 30, 2012 and replaces the NPDES COC issued to this facility with an expiration date of July 1, 2007. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP_ and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please. carefully read this COC and the enclosed General Permit. This General Permit contains many new requirements than the previous NPDES General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this permit. The Animal Facility Annual Certification Form must be completed and returned to the Division of Water Ouality by no later than March 1st of each year. If your Waste Utilization Plan has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property., N'or�thtCarolina ,vatura!!y Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Internet: www,ncwaterauitlity.org Location: 2728 Capital Boulevard Raleigh, NC 27604 Fax 1: (919) 715-0588 , Fax 2: (919)715-6048 An Equal Opportunity/Affirmative Action Employer- 50°% Recycled/10°% Post Consumer Paper Customer Service: (877) 623-6748 t Upon. abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all .current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 02T .0111(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100-foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Per 15A NCAC O2T .1306, any containment basin, such as . a lagoon or waste storage structure, shall continue to be subject to the conditions and requirements of the facility's permit until closed to NRCS standards and the permit is rescinded by the Division. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General. Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior'to a name change or change in ownership. If any parts, requirements, or .limitations contained in this COC -are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for, information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Aquifer Protection staff may be reached at (919) 791-4200. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Unit staff at (919) 733-3221. Sincerely, for Coleen H. Sullins Enclosures (General Permit NCA400000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Halifax County Health Department Halifax County Soil and Water Conservation District Raleigh Regional Office, Aquifer Protection Section AFO Unit Central Files Permit File NCA442001 NCDENR North Carolina Department of Environment and Natural. Resources - Division of Water Beverly Eaves Perdue - -- = = Charles Wakill Governor — Director June 5, 201 +. NC Department Of Corrections Caledonia Prison Farm P.O. Box 67 _ Tillery, NC 27887 Subject: Certificate of Coverage No. NCA442001 Caledonia Prison Farm - Animal Waste Management System - .- Halifax County ---- -_ Dear NC Department -Of Corrections: - - In accordance with your renewal application received on May 2, 2012, we are hereby forwarding to you this Certificate of Coverage (COC) issued to NC Department Of Corrections, authorizing the operation of the subject animal waste management system in accordance with NPDES General Permit NCA400000. This COC.shall be effective from July 1, 2012 until June 30, 2017 and replaces the NPDES COC issued to this facility with an expiration date of June 30, 2012. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the Caledonia Prison Farm, located in Halifax County, with an animal capacity of no greater than the following wet system poultry annual averages: Non -Laying Pullets: 0 Layers: 60000 Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please pay careful attention to the record keeping and monitoring conditions in this permit. The Animal Facility Annual Certification Form must be completed and returned to the Division of Water Ouality by no later than March 1st of each year. If your Waste Utilization Plan has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. 1636 Mail Service Center, Raleigh, North Carolina 27699.1636 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-64641 FAX: 919.807-6492 NorthCarolliina Internet: www.ncwaterguality.oro Agtum[i ff Upon abandonment or depopulation for a period of four years or more, the Permittee . must submit ._ documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 02T_011 l(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the'%6oiripliance boundary. Per NRCS standards a 100-foot separation shall be, maintained between water. supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may ,result iri the�reyocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. In accordance with Condition IH.27 of the General Permit, waste application_ shall cease within four (4) hours of the time that the National Weather Service issues a Hurricane Warning, Tropical Storm Warning, or a -Flood Watch associated with -a tropical system for the county in which the - facility is located. You may find detailed watch/warning information for your county by calling the Raleigh, NC National Weather Service office at (919) 515-8209, or by visiting their website at: www.erh.noaa.gov/er/rah/ This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Aquifer Protection staff may be reached at (919) 791-4200. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Unit staff at (919) 807-6464. Sincerely, for Charles Wakild, P.E. Enclosures (General Permit NCA400000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Halifax County Health Department _ Halifax County Soil and Water Conservation District Raleigh Regional Office, Aquifer Protection Section AFO Unit Central Files Permit File NCA442001 IF ° , State of North Carolinaisl�l 4qVJ Department of Environmental Quali ty auk , 12016 Division of Water Resources Animal Feeding Operations Permit Application FENR Raleigh k (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) 9h Regional Mce State General Permit - Existing Animal Waste Operations 1. GENERAL INFORMATION: 1.1 Facility name: Caledonia Farm 1.2 Print Land Owner's name: N.C. Dept of Corrections 1.3 Mailing address: P.O. Box I:af 6 7 City, State: Tillery, N.C. Zip: 27887 Telephone number (include area code): ( 252 ) 826 - 5621 1.4 Physical address: 2576 Caledonia Dr City, State: Tillery, N.C. Zip: 27887 Telephone number (include area code): ( 252 ) 826 - 5621 1.5 County where facility is located: Halifax RECEIVEDINCDEWWR AUG 0 9 2016 Water Quality Regional Operations Section 1.6 Facility location (directions from nearest major highway, using SR numbers for state roads): located on dead end of Caledonia Dr (SR 1 141) North of the town of Tillery and East of the town of Halifax 1.7 Farm Manager's name (if different from Land Owner): Day d Inscoe 1.8 Lessee's / Integrator's name (if applicable; circle which type' ; li., 1.9 Facility's original start-up date: Date(s) c, 'facility expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility number: 42-1 2.2 Operation Description: Please enter the Design Capacity of the system. The "No. of Animals" should be the maximum number for which the waste management structures were designed. Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals ❑ Wean to Feeder ;5 Layer 60000 ❑ Beef Brood Cow ❑ Feeder to Finish ❑ Non -Layer ❑ Beef Feeder ❑ Farrow to Wean (# sow) ❑ Farrow to Feeder (# sow) ❑ Farrow to Finish (# sow) ❑ Wean to Finish (# sow) ❑ Gilts ❑ Boar/Stud ❑ Turkey ❑ Turkey Poults ❑ Beef Stocker Calf ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Milk Cow FORM: AWO-STATE-G-E 1/10/06 Page 1 of 5 ❑ Other Type of Livestock on the farm: No. of Animals: FORM: AWO-STATE-G-E 1/10/06 Page 2 of 5 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 223.4 Required Acreage (as listed in the CAWMP): less than 223.4 2.4 Number of lagoons: 3 Total Capacity (cubic feet): 896,665 Required Capacity (cubic feet): Number of Storage Ponds: Total Capacity (cubic feet): Required Capacity (cubic feet): 2.5 Are subsurface drains present within 100' of any of the application fields? YES or O (circle one) 2.6 Are subsurface drains present in the vicinity or under the waste management system? YES or (circle one) 2.7 Does this facility meet all applicable siting requirements? YES or NO (circle one) 3. REQUIRED ITEMS CHECKLIST: Please indicate that you have included the following required items by signing your initials in the space provided next to each item. 3.1 One completed and signed original and two copies of the application for State General Permit - Animal Waste Operations; 3.2 Three copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied and a county road map with the location of the facility indicated; 3.3 Three copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a permit application for animal waste operations. ArmlicaInitials Vdd-- Dcli- D/C The CAWMP must include the following components. Some of these components may not have been required at the time the facility was certified but should be added to the CAWMP for permitting purposes: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application 3.3.4 The soil series present on every land application field 3.3.5 The crops grown on every land application field 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP 3.3.7 The PAN applied to every land application field 3.3.8 The waste application windows for every crop utilized in the WUP 3.3.9 The required NRCS Standard specifications 3.3.10 A site schematic 3.3.1 1 Emergency Action Plan 3.3.12 Insect Control Checklist with chosen best management practices noted 3.3.13 Odor Control Checklist with chosen best management practices noted 3.3.14 Mortality Control Checklist with the selected method noted 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.); please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility 3.3.16 Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (Composting, waste transfers, etc.) FORM: AWO-STATE-G-E 1/10/06 Page 3 of 5 4. APPLICANT'S CERTIFICATION: Dwd%d see e- (Land Owner's name listed in question 1.2), attest that this application for /L (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to —me as mcopleett%. SignatureDate 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) (Manager's name listed in question 1.6), attest that this application for Prx4c f FtP—r✓1 (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. r Signature �G�C-� ` Date �4 _ li THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER RESOURCES WATER QUALITY REGIONAL OPERATIONS SECTION ANIMAL FEEDING OPERATIONS PROGRAM 1636 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1636 TELEPHONE NUMBER: (919) 807-6464 FAX NUMBER: (919) 807-6496 FORM: AWO-STATE-G-E 1/10/06 Page 4 of 5 DIVISION OF WATER RESOURCES REGIONAL OFFICES (9/05) Asheville Regional WQROS Supervisor Washington Regional WQROS Supervisor Raleigh Regional WQROS Supervisor 2090 U.S. Highway 70 943 Washington Square Mall 1628 Mail Service Center Swannanoa, NC 28778 Washington, NC 27889 Raleigh, NC 27699-1628 (828) 296-4500 (252) 946-6481 (919) 791-4200 Fax (828) 299-7043 Fax (252) 975-3716 Fax (919) 571-4718 Avery Macon Beaufort Jones Chatham Nash Buncombe Madison Bertie Lenoir Durham Northampton Burke McDowell Camden Martin Edgecombe Orange Caldwell Mitchell Chowan Pamlico Franklin Person Cherokee Polk Craven Pasquotank Granville Vance Clay Rutherford Currituck Perquimans Halifax Wake Graham Swain Dare Pitt Johnston Warren Haywood Transylvania Gates Tyrell Lee Wilson Henderson Yancey Greene Washington Jackson Hertford Wayne Hyde Fayetteville Regional WQROS Supervisor Mooresville Regional WQROS Supervisor Wilmington Region WQROS Supervisor 225 Green Street, Suite 714 610 East Center Avenue 127 Cardinal Drive Extension Fayetteville, NC 28301-5094 Mooresville, NC 28115 Wilmington, NC 28405-3845 (910)486-1541 (704)663-1699 (910)796-7215 Fax (910) 486-0707 Fax (704) 663-6040 Fax (910) 350-2004 Anson Moore Alexander Lincoln Brunswick New Hanover Bladen Richmond Cabarrus Mecklenburg Carteret Onslow Cumberland Robeson Catawba Rowan Columbus Pender Harnett Sampson Cleveland Stanly Duplin Hoke Scotland Gaston Union Montgomery Iredel I Winston-Salem Regional WQROS Supervisor 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Phone (336) 776-9800 Fax (336) 776-9797 Alamance Rockingham Alleghany Randolph Ashe Stokes Caswell Surry Davidson Watauga Davie Wilkes Forsyth Yadkin Guilford FORM: AWO-STATE-G-E 1/10/06 Page 6 of 5 Nutrient Management Plan For Animal Waste Utilization This plan has been prepared for: Caledonia Prison Farm Caledonia Prison Farm PO Box 67 Tillery, NC 27887 252-826-5621 04-12-2012 This plan has been developed by: Will Mann. Fishing Creek SWCD P.O. Box 8 Halifax, NC 27839 252-583-3481 ext.43 i' Developer Signature Type of Plan: Nutrient Management with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. �✓� L�G7`Ori 1�?tp �l/S D , to Signature (owner) Signature (manage0or producer) Date Date This plan meets.the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved .By: Technica peciali Signature Date ------------------------------------------------------------------------------------------------------------------------------------------------------------- Preview Database Version 3.1 Date Printed: 04-12-2012 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S17 Layer Liquid Manure Slurry waste generated 972,120 gals/year by a 60,000 animal Layer Liquid Manure Slurry operation. This production facility, has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 23944 Incorporated 40107 Injected .48487 Irrigated 19754 Max. Avail. PAN (lbs) * Actual PAN Applied (lbs) PAN Surplus/ Deficit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 23,944 36715 -12,771 1,490,581 -518,461 Year 2 23,944 22213 1,731 901,837 70,283 No ---te: ------In -------s-o-u---rce--- IDb ------e---an-s-----stand-a---rd------,--U ---m------u--se--r--de--------ned----sourc-------.--------------------------------------------------------- , S m-----source--eans--fie * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source. Preview Database Version 3.1 Date Printed: 04-12-2012 Source Page Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each field, where available. If a field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Tract Field Total Acres Useable Acres Plat Rating LI Soil Series Crop Sequence RYE P205 Removal (lbs/acre) Applied (lbs/acre) 3302-A 36. 16.10 12.00 Low 5.0 State-CP Fescue Hay 3.9 Tons 61 N/A 3302-A 1 40 15.901 11.90 Low 5.0 1 State-CP Soybeans, Manured, Full Season 45 bu. 36 N/A Soybeans, Manured, Full Season 45 ba. 36 N/A 3302-A 41 18.60 13.90 Low 5.0 State-CP Soybeans, Manured, Full Season 45 bu. 36 N/A Soybeans, Manured, Full Season 45 bu. 36 N/A 3302-A 46 58.50 .43.90 Low 5.0 State-CP Fescue Hay 3.9 Tons 61 N/A 3302-A 47 34.20 25.70 Low 5.0 State-CP Fescue Hay 3.9 Tons 61 N/A 3302-A 48. 12.70 9.50 Low 5.0 State-CP Fescue Hay 3.9 Tons 61 N/A 3304-B 147 24.80 18.60 Low 5.0 State-CP Soybeans, Manured, Full Season 44 bu. 35 N/A Soybeans, Manured, Full Season 44 bu. 35 N/A 3304-B 164 36.20 27.20 . Low 5.0 State-CP. Fescue Hay 3.9 Tons 61 N/A 3304-B 172 13.50 10.10 Low 5.0 State-CP Fescue Hay . 3.9 Tons 61 N/A 3304-B 189 31.50 23.60 Low 5.0 State-CP Soybeans, Manured, Full Season 44 bu. 35 N/A Soybeans, Manured, Full Season 44 bu. 35 N/A 3304-B 190 17.70 13.30 Low 5.0 State-CP Soybeans, Manured, Full Season 45 bu. 36 N/A Soybeans, Manured, Full Season 45 bu. 36 N/A 3304-B 1 192 18.30 13.70 Low 5.0 1 State-CP Soybeans, Manured, Full Season 44 bu. 35 N/A Soybeans, Manured, Full Season 44 bu. 35 N/A PLAN TOTALS: 298.00 223.40 825337 Database Version 3.1 Date Printed 4/12/2012 PCs Page Page 1 of 2 NOTE: Symbol * means user entered data. LI Potential Leachin g_:.: Technical Guidance 2 Low potential to contribute to soluble None nutrient leaching below the root zone. >— 2 & Moderate potential to contribute to soluble Nutrient Management (590) should be planned. . nutrient leaching below the root zone. <_ 10 High potential to contribute to soluble Nutrient Management (590) should be planned. Other conservation practices that improve the soils nutrient leaching below the root zone. available water holding capacity and improve nutrient use efficiency should be considered. Exampl > 10 are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391.). PLAT Index Rating P Management Recommendation 0 - 25 Low No adjustment needed; N based application 25 - 50 Medium. No adjustment needed; N based application 51 - 100 High Application limited to crop P removal > 100 Very High Starter P application only 825337 Database Version 3.1 Date Printed 4/12/2012 • PCS Page Page 2 of 2 NOTE: Symbol * means user entered data. 6. SURFACE WATER CLASSIFICATION: This form must be completed by the appropriate DWR regional office and included as a part of the project submittal information. INSTRUCTIONS TO NC PROFESSIONALS: The classification of the downslope surface waters (the surface waters that any overflow from the facility would flow toward) in which this animal waste management system will be operated must be determined by the appropriate DWR regional office. Therefore, you are required, prior to submittal of the application package, to submit this form, with items 1 through 6 completed, to the appropriate Division of Water Resources Regional Aquifer Protection Supervisor (see page 6 of 10). At a minimum, you must include an 8.5" by 1 1" copy of the portion of a 7.5 minute USGS Topographic Map which shows the location of this animal waste application system and the downslope surface waters in which they will be located. Identify the closest downslope surface waters on the attached map copy. Once the regional office has completed the classification, reincorporate this completed page and the topographic map into the complete application form and submit the application package. 6.1 Farm Name: 6.2 Name & complete address of engineering firm: Telephone number: ( 6.3 Name of closest downslope surface waters: 6.4 County(ies) where the animal waste management system and surface waters are located 6.5 Map name and date: 6.6 NC Professional's Seal (If appropriate), Signature, and Date: TO: REGIONAL WQROS SUPERVISOR Please provide me with the classification of the watershed where this animal waste management facility will be or has been constructed or field located, as identified on the attached map segment(s): Name of surface waters: Classification (as established by the Environmental Management Commission): Proposed classification, if applicable: Signature of regional office personnel: (All attachments must be signed) Date: FORM: AWO-STATE-G-E 1/10/06 Page 5 of 5 ,. I North Carolina State University is a land- Department of Crop Science grant university and a constituent institution of The University of North Carolina College of Agriculture and Life Sciences Campus Box 7620 Raleigh, NC 27695-7620 919.515.2647 919.515.7959 (fax) Eastern Gamagrass Limited data are available on the response of gamagrass to various levels of N and soil types in North Carolina. However, until further data is collected, the following guidelines may be used. 1. On sandy textured soils that are well drain or excessively well drained, gamagrass may yield similar to hybrid bermudagrass at similar PAN rates. 2. On heavy textured soils that are poorly to somewhat poorly drained, gamagrass may yield 1.5-3 times more than hybrid bermuda Gamagrass establishes slowly and will not usually produce much harvestable forage during the establishment year. It is best to allow the growth during the seedling year to accumulate for most or all season; if it is to be harvested, it should be done after full seedhead formation on a majority of the plants. Therefore, PAN for the seedling year should be modified accordingly. Overseeding gamagrass with winter annuals is not currently advised because the harvesting or grazing management of the winter annual crops during February -April would be detrimental to the survival of gamagrass. Gamagrass should not normally be harvested or grazed below 6-8 inches stubble. Application rates are to be based on the realistic N rates that address the N needs per ton of hay, a realistic yield and an appropriate application window. When harvested as hay in the 24-36 inch stage of growth, the N rate ranges from 40-50 lbs/ton of dry matter. The PAN rate for grazed systems must be reduced in accordance with NRCS Technical Standard #590. The application window for gamagrass is slightly earlier than for bermuda; gamagrass starts growing about 3-4 weeks earlier than Coastal bermudagrass and about 2-3 weeks earlier than Tifton 44. Gamagrass is dormant from frost to March. The last application of PAN in the summer should be prior to August 31. Rescuegrass (i.e. Matua) Rescuegrass is a cool season grass and makes most of its growth from March -June and September -November. It should receive most of its N during the September -October and late February through May months. Limited data are available for realistic yields of rescuegrass on various soils and at various N levels in North Carolina. However, until further data is collected the following suggestions may be useful 1. On sandy, well drained to excessively drained soils, rescuegrass may yield 1.5- 3 times fescue, assuming a uniform and dense stand of grass is present. North Carolina State University is a land- Department of Crop Science grant university and a constituent institution of The University of North Carolina College of Agriculture and Life Sciences Campus Box 7620 Raleigh, NC 27695-7620 919.515.2647 919.515.7959 (fax) 2. On wet or poorly drained soils, rescuegrass may yield .75 -1.0 times as much as fescue. 3. On soils where both are well adapted the yields of rescuegrass may be 1-1.5 times more than fescue, The above RYE estimates assume that stand density is maintained through natural reseeding every year. Although rescuegrass is a "perennial" it does not maintain dense, satisfactory stands unless it is allowed to reseed every year. Even under this management it is likely that disease will affect one or more growths in some years. Application rates are to be based on the realistic N rates that address the N needs per ton of hay, a realistic yield and an appropriate application window. When harvested as hay, the. N rate is similar to other cool season grasses such as fescue, ranging from 40-50 lbs/ton. Rescuegrass may also continue some growth in June -August if moisture is available. During these off-seasons, rescuegrass should not receive more than about 25 lbs N/acre/month. Only apply 25 lbs N/acre in June -August if the equivalent of 1-inch of water can be applied at the same time. If the crop does not respond with at least a 1000 lbs of growth within a 3-5 week period do not make another application until the plants have had the opportunity to use the previous application. APPENDIX 1.1A Animal Waste Application Windows' For Common Crops Which Receive Animal Waste These application windows include 30 days prior to planting and greenup of Bermudagrass. End 30 days before harvest. Bermudagrass Small Grain Overseeded in Bermudagrass Corn Cotton Begin March 1st Begin October 1st Begin February 15th Begin March 15th End September 30th End March 31 st End June 30th End August 1st Cucumbers - Direct consumption Begin March 1st (100 % at planting) - For Processing Begin April 1st End May 31 st (2 seasons) Begin July 1st End August 31 st Rye Begin September 1st End March 31 st Barley, Oats, Triticale Begin September 1st End April 15th Wheat Begin September 1st End April 30th Peanuts Begin April 1st End September 30th Sorghum/ Begin March 15th' End August 31st Sudan Grass Hay Soybeans Begin April 1st End September 151h Tobacco - Flue Cured Begin March 15"' End June 30th - Burley Begin May 15t" End August 15th Fescue Begin August 1st End July 31 st Dates shown represent statewide limits. Planting and harvesting dates vary across the state and from year to year. Actual values shall reflect site specific conditions and in no case allow application more than either 30 days prior to planting/breaking dormancy or less than 30 days before harvest. See General Permit for food crops Mountains — limit N application during June and July / no nitrogen in December and January Piedmont & Coastal Plain — limit N application during June and July / no nitrogen in Dec and Jan during severe winters. September 19, 2006 Waste Application Fields Customer(s): NC CORRECTION ENTERPRISE FARMS District: FISHING CREEK SWCD Legal Description: Tract 3304-B Fields 80,147,164,172,1.89,190,192 Legend Field Boundary _ Streams Waste Application Fields ® Wettable Acre Buffer Date: 4/17/2012 Field Office: HALIFAX SERVICE CENTER Agency: USDA-NRCS Assisted By: State and County: NC, HALIFAX 660 0 660 1,320 1,980 2,640 Feet A • - ` /,�. .; �o� g..-+ .; � a. � 1, � � >ell S.ails Inventory Report Page 1 of 2 Soils Inventory report NC CORRECTION ENTERPRISE FARMS Tract Land Unit Map Unit Symbol Acres Percent 3304 CbA 6.3 1 % 3304 AaA 38.1 8% 3304 StA 76.8 15% 3304 CwA 85.5 17% 3304 StB 296.7 59% Total: 503.4 100% 3304 80 CwA 3.7 14% 3304 80 StA 4.9 19% 3304 80 StB 17.2 67% Total: 25.8 100% 3304 147 AaA 3.9 16% 3304 147 CwA 8.6 35% 3304 147 StB 12.3 50% Total: 24.8 100% 3304 164 CwA 1.4 4% 3304 164 AaA 3.9 11 % 3304 164 StB 14.3 40% 3304 164 StA 16.6 46% Total: 36.2 100% 3304 172 AaA 0.9 7% 3304 172 StB 12.5 93% Total: 13.4 100% 3304 189 StA 0.4 1 % 3304 189 CwA 6.4 20% 3304 189 StB 24.7 78% Total: 31.5 100% 3304 190 AaA 11.6 9% f;1P //�` \1lnr.,,mPntc and CPttinoc\will mann\Mv Customer Files Toolkit\Caledonia Farm 4/19/2012 Sails Inventory Report Page 2 of 2 3304 190 CbA 2 11% 3304 190 CwA 3.3 19% 3304 190 StA 3.7 21 % 3304 190 StB 7.1 40% Total: 17.7 100% 3304 192 CbA 0.1 1 % 3304 192 AaA 2.4 13% 3304 192 CwA 5.1 28% 3304 192 StB 10.8 59% Total: 18.4 100% Total: 671.2 100% rr,.,.11-+\O 1,,.1... - 17.,,-..,, A/10/')111') APPENDIX 11.1A ANIMAL WASTE MANAGEMENT SYSTEM OPERATOR IN CHARGE DESIGNATION FORM ANIMAL WASTE MANAGEMENT SYSTEM: Facility ID Number: y.2 ' County: za'.1 9cieiex*xxxxxxxxicie�Fe'e�cn'e�c9c�Ficxdexxxxicxx��cicxicxx�exx�x�'c��ex���c�'e:E�c�Fdc9c��9c�k OPERATOR IN CHARGE Home Mailing Address N D. E a X (o % City State NL Zip a -7 $" Certificate # 03 Social Security # Work Phon - Home Phone Signature Date a acx�'cxirx�xxxaeiex3c�'cdc*xic�ir������xxicx*x��xicicxicxa���k�nkicxxir*�c*�:�c�ede�e*�kk OWNER Mailing Address State Signature Zip City, Telephone# Date ae�eicxxicxiexxxxicxxxx�nt�dr�ex�c���aexic�xx�xxxxrc*x�Y3cxx*��FicaF�'ck9c:6�c�c�ckdedc* Please Mail to: WPCSOCC Division of Water Quality 1618 Mail Service Center Raleigh, N.C. 27699-1618 EMERGENCY ACTION PLAN DWQ PHONE NUMBERS 1 _vp0 — f(5g' d 3(1K EMERGENCY MANAGEMENT SYSTEM 4111 SWCD 2 -3 L#3 NRCS - 3 $ EK�'3 This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. December 18, 1996 D: Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - - . After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - - c. Instruct EMS to contact local Health D artment. d. Contact CES, phone number2Q50-51ocal SWCD office phone number25�FS_ ant/ ct3 local NRCS office for advice/technical assistance phone number - - 25x 58"33�8!t3 2 December 18, 1996 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: 1`l.� �f!.�/�'1/O�i�- b. Contractors Address: d2S"% ,�• e Ai r-i e c. Contractors Phone: Vo? - 3 ;Z 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: -errs es b. Phone: a,5a v 8' 3 - 3 y8-/ 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 3 December 18, 1996 Poultry Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Farmstead • Poultry production 0 Vegetative or wooded buffers (Recommended best management practices CYGood judgment and common sense Floor surfaces • Wet dirty surfaces 0 Scrape manure, dust, feathers into collection (walk aisles) alleys O Splash boards along upper ends of collection alleys O Proper ventilation Cage manure • Manure -covered surfaces 0 Scrape manure into collection alleys dropping boards Manure collection • Partial microbial O Frequent manure removal by flush or scrape alleys decomposition 0 Frequent checks and maintenance on waterers and water pipes Ventilation exhaust • Volatile gases Q" Fan maintenance fans • Dust D�Efficient air movement Indoor surfaces • Dust 0 Vacuum or washdown between flocks Manure conveyors • Partial microbial decomposition 0 0 Keep mechanical equipment in good repair Remove manure accumulations promptly Storage tank or • Partial microbial O Bottom or midlevel loading basin surface decomposition O Tank covers • Mining while filling 0 Basin surface mats of solids 0 Proven biological additives or oxidants • Agitation when emptying Manure slurry or • Agitation when spreading O Soil injection of slurry/sludges sludge spreader . Volatile gas emissions FrWash residual manure from spreader after use outlets 0 Proven biological additives or oxidants AAAO - NnvP.mhPr 11 149E nave 1 Poultry Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Uncovered manure • Volatile gas emissions while O Soil injection of slurry/sludges slurry or sludge on drying O Soil incorporation within 48 hours field surfaces Outside drain • Agitation during wastewater O Box covers collection or junction conveyance boxes Lift stations • Agitation during sump tank 0 Sump tank covers filling and drawdown End of drainpipes at . Agitation during wastewater 0 Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emissions Proper lagoon liquid capacity • Biological mixing 0 Correct lagoon startup procedures • Agitation 0 Minimum surface area -to -volume ratio 0 Minimum agitation while pumping 0 Mechanical aeration O Proven biological additives Irrigation sprinkler • High pressure agitation MIrrigate on dry days with little or no wind nozzles , Wind drift O Minimum recommended operating procedure O Pump intake near lagoon liquid surface R"'Pump from second -stage lagoon A TxAnC - T\Tn uPrnhPr 1 1 1 006 nncv- 7 Poultry Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Dead birds • Carcass decomposition O Proper disposition of carcasses Dead bird disposal • Carcass decomposition O Complete covering of carcasses in burial pits pits O Proper location/construction of disposal pits O Disposal pit covers tight fitting Standing water • Improper drainage 0 Grade and landscape such that water drains away around facilities . Microbial decomposition of from facilities organic matter Mud tracked onto Poorly maintained access Q' Farm access road maintenance public roads from roads farm access Additional Information: Poultry Manure Management; .0200 Rule/BMP Packet Poultry Layer Production Facility Manure Management: High Rise, Deep Pit; EBAE 131-88 Poultry Layer Production Facility Manure Management: Undercage Flush —Lagoon Treatment; EBAE 130-88 Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet Proper Disposal of Dead Poultry; PS&T Guide No. 19 Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings Available From: NCSU, County Extension Center NCSU—BAE NCSU—BAE NCSU—BAE NCSU—BAE NCSU—Poultry Science Florida Cooperative Extension AMOC - NnvPmhPr 1 1 1 QQ6 nncrP Z Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Liquid Systems Flush gutters • Accumulation of solids Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed Remove bridging of accumulated solids at discharge Lagoons and pits • Crusted solids 0 Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 to 8 inches over more than 30 percent of surface Excessive vegetative • Decaying vegetation O Maintain vegetative control along banks of growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Dry Systems Feeders Feed spillage O Design, operate, and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage 0 Clean up spillage on a routine basis (e.g., 7- to 10- day interval during summer; 15- to 30-day interval during winter) A A4TP AT..<.o.Y.l— 1 1 1 nnK ---- 1 6 '. North Carolina State University is a land- Department of Crop Science grant university and a constituent institution of The University of North Carolina College of Agriculture and Life Sciences Campus Box 7620 Raleigh, NC 27695-7620 919.515.2647 919.515.7959 (fax) Memorandum TO: North Carolina Certified Technical Specialists FROM: NC State University Forage Production Workgroup DATE: July 13, 1998 SUBJECT: Crop Management Practices for Select Forages Used in Waste Management The following is a four -page summary of suggestions for management practices for some forage crops that can be used in waste management plans. These suggestions are a result of discussions within the NC State University Forage Production Workgroup, a group comprised of NC State faculty and NRCS agency personnel with expertise with the crops. There are limited documented research responses of some of these practices on the many soils and environments where these crops are currently being grown. The Forage Production Workgroup has taken the available data and used the combined experiences and realistic estimates of key people to come up with suggestions that will allow farmers to incorporate these crops and practices into waste management plans. As data become available to substantiate or refute these suggestions, the Forage Production Workgroup will make appropriate changes. Bermuda Overseeded With Cereal Rye and Annual Ryegrass Currently two types of "ryegrass" are being used for winter overseeding in fields used for animal waste management. Cereal rye is a winter annual smallgrain that looks similar to wheat, barley and oat. Annual Eyegrass is a winter annual grass that looks much like tall fescue. Both of these grasses, when growing during the winter on bermuda sod, can have significant impact on subsequent bermuda yields. In effect, the total yields from an acre growing the combination of bermuda with these winter annuals will usually yield between 1-2 tons more per acre than bermuda growing alone for the year. Therefore, the total amount of PAN/acre for the year is about 100 lbs more than bermuda alone. Although cereal rye and annual ryegrass are suitable crops for overseeding, the management of the crops are different and thus practices implemented are dependent on the crop selection. 14 1 ' • North Carolina State University is a land- Department of Crop Science grant university and a constituent institution of The University of North Carolina College of Agriculture and Life Sciences Campus Box 7620 Raleigh, NC 27695-7620 919.515.2647 919.515.7959 (fax) Cereal Rye The cereal rye should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling rye into short (less than 3 inches tall) bermudagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda prior to August 31. An application of 50 lbs/acre of Plant Available N (PAN) may be applied between September 15 and October 30. An additional 50 Ibs/acre of PAN may be applied in February -March. If rye growth is harvested on time and does not significantly shade the bermuda, PAN rates for the subsequent bermuda crop are based on realistic yields of bermuda. A harvest is required prior to heading or April 7, which ever comes first. This is necessary to minimize the potential for shading bermuda and reducing its yields. The PAN rate for grazed systems with bermuda overseeded with cereal rye must be reduced in accordance with NRCS Technical Standard #590. Annual Ryegrass Annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling ryegrass into short (less than 3 inches tall) bermudagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda prior to August 31. An application of 50 lbs/acre of (PAN) may be applied between September 15 and October 30. An additional 50 lbs/acre of PAN may be applied in February -March. If additional PAN is applied to the ryegrass in April -May, the PAN rate for the bermuda must be reduced by a corresponding amount. This is necessary because ryegrass - growth during April -May will reduce bermuda yields and shorten the time bermuda can fully utilize the N. A harvest is required by heading or April 7, which ever comes first to prevent shading of emerging bermuda during April -May period. To favor the production of the bermuda, additional harvests of ryegrass will be required when the ryegrass canopy reaches 12 to 15 inches height. The PAN rate for grazed systems with bermuda overseeded with annual ryegrass must be reduced in accordance with NRCS Technical Standard 9590. STEADY.STATE LIVE WEIGHT 160000 LAYERS X 4 POUNDS = 240000 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 240000 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.825 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in layers. Years of sludge accumulation in design? 0.0 Sludge Volume = D cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 2.5 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = ERROR cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 48.9 feet Construct lagoon bottom elevation 41.2 feet Lagoon size for -normal lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 3.0 3.0 3.0 3.0 7.7 AREA OF TOP LENGTH * WIDTH = 320.0 155.0 AREA OF BOTTOM Lb * Wb = 273.8 108.8 AREA OF MIDSECTION 49600.0 (AREA OF TOP) 29789.4 (AREA OF BOTTOM) (Lm * Wm) _ 296.9 131.9 39161.1 (AREA OF MIDSECTION.) CU. YD. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 49600.0 156644.4 29789.4 1.283 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL = 302910.1 CU. FT. VOLUME NEEDED = ERROR CU. FT. THE SURFACE DIMENSIONS•OF THE LAGOON AT NORMAL LIQUID LEVEL ARE. 320.0 FEET LONG BY 155.0 FEET WIDE DIKE Place spoil as a continuous dike to elevation 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 350.6 185.6 65071 square feet Additional Drainage Area 54.0 feet. 53477 square feet TOTAL DA 118548 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 240000 SSLW * 0.008 gallon/lb. SSLW/day * 180 days in the pumping cycle / 7.48 gallons per cu. ft. Volume = 46203.2 cubic feet 6B. Volume of excess water. This is the amount of excess water usage (see tech. guide 633-83) Volume = 780 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 18770.1 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) 7.6 inches Volume = 7.6 inches * DA / 12 inches per foot Volume = 74685.5 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.6 inches * DA / 12 inches per foot Volume = 65201.6 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 46203.2 cubic feet 6B. 18770.1 cubic feet 6C. 74685.5 cubic feet 6D. 65201.6 cubic feet TOTAL TEMPORARY STORAGE 204860.3 cubic feet (ABO REUIREDVE NORMAL STORAGE Q LIQUID ELEVATION OF LAGOON) DEPTH OF = Volume of temporary storage divided by surface r Depth required area of lagoon. 860 204860 cu. ft. / 49600 sq. ft. Depth required = feet 4.1 Depth required = . Normal lagoon liquid elevation = 48.9 feet 4.1 feet Depth required = 1.0 feet Freeboard = 54.0 feet Top of Dam THE DIMENSIONS OF THE INSIDE EDGE OF THE D8 ATFEETVATION 54.0 ARE 350.6 FEET BY 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 46203.2 6A. cubic feet 6B. 18770.1 cubic feet 6C. 74685.5 cubic feet TOTAL PUMPED VOLUME = 139658.7 cubic feet Depth required = Volume of pumped storage divided by surface water level. area of lagoon at normal Depth required = 139658.7 cu. ft. / 49600 sq. ft.. Depth required = 2.8 feet n od 0 AM APPROVED BY: 1'9 y a 'd DESIGNED BY: DATE: /D// 71�/ DATE: i Farm Name: CALEDONIA LAGOON #1 -HdL/Fr4X Date: SEPTEMBER 23, 1996 County: 'a)I v J-pox/z/) PRISMODIAL FORMULA Length = 96 Width = 117 Depth = 8.1 Side Slope(ft/ft)= 1 Volume in Cubic Yards = 2878. 25 = -7 -7, 7/ 3 eu'4f' 11232 sq. ft. Mid = 9572.31 sq. ft. 87.9 lin. ft. X 108.9 lin. ft. l� �V Bottom = 8043.84 sq. ft. 79.8 lin. ft. X 100.8 lin. ft. Prepared By: J P SHERROD Farm Name: CALEDONIA LAGOON #2 County: PITTFAX Date: SEPTEMBER 23, 1996 4-1 x i3gRISMODIAL FORMULA Length = 314 Width = 127 Depth = 8.6 Side Slope(ft/ft)= 1 Volume in Cubic Yards = j,'7'1Top = 39878 sq. ft. Mid = 36159.36 sq. ft. 305.4 lin. ft. ;r Bottom = 32588.64 sq. ft. 296.8 lin. ft. 11525.28 = 31 1, ► �/a c LIA4 Prepared By: J P SHERROD X 118.4 lin. ft. x 109.8 lin. ft. Waste Application Fields Customer(s): NC CORRECTION ENTERPRISE FARMS District: FISHING CREEK SWCD Legal Description: T-3302-A Flds 36,38,40,41,46,47 & 48 Legend Field Boundary _ streams arc Fid Boundary oWettable Acre Buffer Date: 4/17/2012 Field Office: HALIFAX SERVICE CENTER Agency: USDA-NRCS Assisted By: William Mann -JP State and County: NC, HALIFAX 660 0 660 1,320 1,980 2,640 Feet N 11 Waste Application Soils Map Customer(s): NC CORRECTION ENTERPRISE FARMS District: FISHING CREEK SWCD Legal Description: Tract 3302-A Fields 36,38,40,41,46,47,48 Date: 4/17/2012 Field Office: HALIFAX SERVICE CENTER Agency: USDA-NRCS Assisted By: William Mann -Jr State and County: NC, HALIFAX Legend ® AaA ❑ CbA N CwA ® StA ❑ StB Field Boundary _ Streams Waste Application Field Wettable Acre Buffer 660 0 660 1,320 1,980 2,640 ® Feet N O v Soils Inventory Report Page 1 of 2 Soils Inventory Report NC CORRECTION ENTERPRISE FARMS Tract land Unit Map Unit Symbol Acres Percent 3302 36 AaA 0.5 3% 3302 36 CwA 2.7 17% 33021 36 StB 6.2 39% 3302 361 StA 1 6.71 42% Total. 16.1 100% 3302 38 CwA 1.1 9% 3302 38 StB 11.5 91 % Total: 12.6 100% 3302 40 CbA 1.3 8% 3302 40 StB 6.3 39% 3302 40 AaA 8.4 52% Total: 16 100% 3302 41 CbA 2.5 13% 3302 41 AaA 6 32% 3302 41 StB 10.1 54% Total: 18.6 100% 3302 46 StA 3.3 6% 3302 46 CwA 13.5 23% 3302 46 StB 41.6 71 % Total: 58.4 100% 3302 47 StA 2.6 8% 3302 47 CwA 9.9 29% 3302 47 StB 21.6 63% Total: 34.1 100% 3302 48 StA 0.2 2% 3302 48 CwA 1.1 9% 3302 48 StB 11.4 90% file://C:\Documents and Settings\will.mann\My Customer Files Toolkit\Caledonia Farm_... 4/19/2012 $oils Inventory Report Page 2 of 2 Total: 12.7 100% Total: 168.5 100% file://C:\Documents and Settings\will.mann\My Customer Files Toolkit\Caledonia Farm_... 4/19/2012 Jyj y !. /jr. \ W W g'� 1S �: n, j 7yE•J[r , Ar t 10g 1. "�liF'tJ arr \ ,•�'..) A \'.J./S1,( S'''� A,6 '.lt�r4: 11 . vy,- ,.� ✓,� i } Z�^'} >1'•r1:' ��.� Fcti Y� c� ,r 1 j \'�` . ny� � ., •: �(f vi�!'� • �,I� `r' � t •I � i�•,t� - �• i-' T I rtil'4t! ,`+.,tG.,•� .. ` Z '-,r''"� :' S ;. � ,\.V• �' 6 �.i.,l. XZN ��\ - t�`i ►� � � IY r � 1 W �+ � •' t� {�' kir °1?iN"T'F"' �.r>" f tr .- '+t'i�'/Jie "4.�1 'ti• •�) }+u W rt i, n K � ,; .� :.�_! • \��.' .::.. �, . � :: ,� + r � •mac ��. •� t �� t•?' f ti..•..�.Ytry b}YYr••' .ram •.. F1 .,c tT::l y5jj;s• L}I ` i- �C tJ:! r y1 r✓/� f•'.•a-re'&tb.t +(1':k• s'} !.t�, 1 R�r�1� .+• \ 'y•�/?�,••yY;,,'Y;..�. J'a 'r{kt ��.✓� �i1 Y.:• 'a�i;iii a I •;= � 1 '•'i � �, s�.k" � f'v s ����;�,� +r� �:ve f c''A �: / ! ,oe a �n �' ��q5 �(�( '•. c t i' I s "f' it/*a r • 4 s �[�� r� t ,:� �... t�+t4/, ,/,l iLJ i.Q�•T",Zri Art �.� . �'Y x.t r r�•fAy�1'Sf'tL'th,' '4i4 t�.�Q • . •i' 'lJ 1� co1.1 \ ,(, ,n 1 r r t' 2 �. xi I t✓ i s , ff I�+J,r`..:,u `•:•,� �• 1 F�,p^���\{r 4 x d y A �` \ - \. Ji '1'y' i��/.. ` �itl t}k. ljC,l. t�,• ` }WF¢� '/ {� 'Ib '�1 -t \ ,�Ji1- J •�4 ,• ` %,� \ ° ' 4 \� 'L�� / ):Y 1^d✓ ft1 V�1 \ `'.S ''•t r� i' j �• `•�-r+''�'1 1inKS. �L„ J'�.'7 t l 1'� 1'T 'v� . Ai iz-•:. fit{ Q co ~ f ' �•11 � (�� `''.`° �''}G..� �/ �+ .I��� � __ r `YLt �� �4. `+C�f•';!� y � � { �C'i Pe /-� 1r / f .: ::t -e• , \' I ✓/1�•, i. / �.7�� F•�:�'r i� ir(�l .S, !�c1 ��Ty Jt, a'�i,�'.Y; ✓ f i, �',-:\• � r / ��, • n; F` III c' 1 �, ' .�{y.( •cy. \,\� t �„F-f •a �'1.'> 5 :'." RS � t 3 wi�G'i.;l! ° �,�,,.,,[ i•3i ✓• ,/ :... � •�r.Ry ✓ �•.�. _ �- .'s:.'.•4'I' �• t icl� is +.�s•. La J t i `.,frt:,tra_, ^rd �aayF' �t�-7r4- �n;:'•� / _ ' � � .� !. ' �' O r'[t, �: . "t..t,ljlir Cry'. R'i.,+ji1'.:•% j `I'i :.:�ytl: t I. jT� ( '�, r:✓, ; •AAT.1 a'." `„`� ...: � - .�.: �J �F4 'l, p.:h': F, ti• ^1:1�F':. 1 \. 'r•E: t 1t •%, '•" :�t'�� ��\� ,� �fi`•e-L,t�7.'6s{+'�. c �` , :r Nt. w ,t. � L!'•1 1'•. 5• � F��1£'rt'i�:: C �J� �f! °k• ;� Y 4 �* ! i �i f 1 . iat ( ei v ' • / •, �7 !`•.� 'w' Yd '�l -� t,•1!'M �i.�� ��;sy��t� � � k �, e'I���fi,.:t+`9''�•- r� �'�% i I a ' �''�� • ' r : • z-��,r,' � cry •w �,.t f �. `, ' � �• 41 �'.� �,' ,'�Im �.��{ �' ,/ ti `:��Iik ,�'�� �, k't}N�� �''.- s`, rr �1.1'yt�✓iJ.7� taj�\ { � aye, Y• � 'r � i F . `= 'tt� �. ri: r t' i+f ti f Y'S �l, •x r y L � � '�¢R�, !i , ♦ G, / �t�F� �, K.. •�''�•Tdap Y '✓, �t ,YS _ ,L ,4 1j.i j✓,,'�•' yJ�yt„'iw tr /''.., �,. "l� .�,'�• •" - }',>;... F /I 1!. 1 I jl } I .i5• i' �!' �' i wig IV IV ' /�..'. 4, , `a1c ;"yf• Z ;lily t .� � � `4.*, � r • rt "' � A% tt i ,i � t �'r� j' �ylr'��, �t';i, � ,� a �•ir � ��` •~- ttn;• d�••. / '�-, �` .r�* �• i\,: " s�,..,,.il` ! ) . .f 1•"� 5•ia y r 5 r c „�j r / 4S� 4i i �r+1-\'..♦ '� i}. •`FraYryl'f•�yri.(,3 ;A .sty 6y1llr �{•�r.t ? Y�5 'i)•t„,jF I . �:' � � t tY `�k,:r� .`�t `Br� � ''� �� I' > c� Ps•\f ��� f��� 4 lc ttil� ii7.� �,� ,,; - ,. .. .... .. .5 '..-.`i. �' ., tir p ,�y�y� `' �, '� rFr•� 1,�• �r �' � S+' G Y• y'i+,"+� f{� \ ti t�� ,• "•�;.: ,.� 'F,B �� t .r�, •K'� �(t��_j �, dlifa I ,i�'I'}�,'�tr �'1� . �1 i r,��. t r -Etil �'� •'.J ,� ',. Hf. •• � �� > c � ? I a 5tt , h. li ,v 1-�r 5� , "" p ;!y..... - tsY (Ti i p�'y'Vjlri�. !' F,.r'f, L.• : . - r t 5 f 7 ` � t o i'1.'.'ti%. 1 }, _ 4 F �(1 P ••+Y �jt} '' 1' � j '� •`i.. �W4 +�.•.`'F� •`,�•��cSai :`� _'<� ; 't R+N'•} } 4�4t1 I' I '�� "' I _ trJ. "r,>•�;k��l..,t� �Ay,.• •y \ 1� f.:- �d�^4 j' .1•tk. ,3 y ;4:'L.,b. 1 ({ c'ci 41r?:;, \ '��,,lt . C.�H'. fJ�J \ � �� it l,t 'tArJ '.t t}• [ �x (_.. .mot :1,��A,.f" `7� i Y t:;wl. rX ,, `s!t'•i� � f.'. � 1 � ,kc.; N•' �Y?.u':�•",� . t T t jF� Ji; � -� •. `5 ti S' t _ .:;:EN.f ,dm �i -,+��',tkFN,r :.t'=? I;'' Iii►' 11 ..� i" (. +r_.:. t` � .jk' I �a���tir�,1. 1,� ^,1 ,i! . i'•�� .'�s'��• `. J?: Sr�� X• ��A. r" t r /.�., 9. Ir.(�j 'v,:.I �`.1, ' . � / �',•• / � .r'.'. �+�-' �.' �•, ,..� "F;1' ' w.l'° rs(o�• �E.., t,f;.�,' ii�Yt��`�> ti:.�� ,,t,`;�jy -'// 1� � q• ,Y''� {I i•� � .:.. ,� l( •t rK'Y i" � C 5y 4- �! j �/^ 'r if 'Z:' �. •�"`..'� n •'�'hff',1 •% '�t"�., .lk,� Y. •t_ 1° II �, F_. i t~'� r r\ • • ::\ 1 " '° . a [..Y y� 1{;+�, i i •,1..•• ' .. � 1( _ '1 S t �l ,���r ♦ �� t` 1 .'�"��,�� F "" }.'J ./7..., e�T' ` �i{ .,1 '. •+•'4�-���. L y •,, .C�d Y {4 �. •�y. 1' �' lY' t t ��J w i:.!.` .� ��� ��1' `�` {` .i'�slt �'� .�i• 3.' s�r\ f"ift "+t;: 0 �•t-�'�.y •! %jY. •.I ':• _'{; , �'�•r.• .... i►t(F r, r ,i y4• r :r. �} � M � IM Ex skkre- wt y� THIS DESIGN IS FOR A SINGLE STAGE LAGOON (LAYER) LIENTS NAME COUNTY TODAYS DATE DISTANCE TO NEAREST NONFARM RESIDENCE _> NUMBER OF LAYERS TREATMENT VOLUME (minimum 2.5 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > CALEDONIA FARMS HALIFAX COUNTY, NORTH CAROLINA SEPTEMBER 23, 1996 7ISaO FEET 60000 2.5 0.0 YEARS TOP LENGTH AT NORMAL WATER LEVEL =_____> 320.0 FEET TOP WIDTH AT NORMAL WATER LEVEL =______> 155.0 FEET NORMAL WATER LEVEL ELEVATION =_________> 48.9 FEET SEASONAL HIGH WATER TABLE ELEVATION =__> 41.2 FEET LAGOON BOTTOM ELEVATION _______________> 41.2 FEET Depth of Permanent Water 7.7 feet (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES ___________________________> 3.0:1 Permanent Volume Required 675000.0 cubic feet Permanent Volume Provided 302910.1 cubic feet ADDITIONAL DRAINAGE AREA IN SQUARE FEET> (.i.e. pumpout pond & other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY EXCESS RAINFALL ABOVE EVAPORATION 25YR/24HR STORM RAINFALL FREEBOARD Temporary Storage Volume 204860.3 53471 SQUARE FEET 180 DAYS 780 GALLONS (EJ(C C 5 L✓f}7� 7.6 INCHES 6.6 INCHES 1.0 FEET cubic feet Top of Dam Elevation = 54.0 feet Inside Dimensions of Lagoon at Top of Dam Length = 350.6 feet Width = 185.6 feet Begin Pumping Elevation = 51.7 feet Stop Pumping Elevation = 48.9 feet 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to- protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied, pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of thetemporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the. maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste. application records for all other waste shall be maintained for five (5) years. 23. ' Dead animals will be disposed of in a manner that meets North Carolina regulations. ----------------------------------------------------•---------------------------------------------------------------------------------- --- 825337 Database Version 3.1 Date Printed: 4/12/2012 Specification Page 3 Crop Notes The following'crop note applies to field(s): 164, 172, 36, 46, 47, 48 Fescue: Coastal Plain, Mineral Soil, Well Drained to Excessively Drained Adaptation: Not adapted. The following crop note applies to field(s): 147, 189, 190, 192, 40, 41 Soybeans -Full Season, Coastal Plain: Mineral Soil, highly leachable The suggested planting dates for soybeans in the Coastal Plains are from April 20-May 20. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 2-4 seed/row foot for 7-8" drills; 4-6 seed/row foot for 15" rows; 6-8 seed/row foot for 30" rows and 8-10 seed/row foot for 36" rows. Increase the seeding rate by at least 10% for no -till planting. Seeding depth should be 1-1 -1/2";and adequate depth control is essential. Phosphorus and potash recommended by a soil test report can be broadcast or banded at planting. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 lbs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable soybean production. --------------------------------------------------------------------------- ------------------------------ s25337 . Database Version 3.1 Date Printed: 04-12-2012 Crop Note Page Page 1 of 1 The Available Waste Storage.Capacity table provides an estimate of the'number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in. the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage CaDacity Source Name Design Storage Capacity (Days) Start Date Plan Year Month Available Storage Capacity (Days) * Available Storage Capacity is calculated as of the end of each month. ---------------------------------------------------------------------------------------------- Date Printed: 04-12-2012 Capacity Page Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste. shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns. or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a. landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste. application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall'be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there'is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. ------------------------------------------ --------------------------------------------------------------------------------------------------------------- 825337 Database Version 3.1 Date Printed: 4/12/2012 Specification Page 1 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or.after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal. waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways. that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. ------------------------------------- ------------------------------------------------------------------------------------- --------------------------------------- 825337 ' Database Version 3.1 ' Date Printed: 4/12/2012 Specification Page 2 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P2O5 (lbs/A) K2O (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3302-A 40 Req'd Nutrients 175 0 0 0 0. 0 0 0 Acres App. Period 1.1.90 4/1-9/15 Supplied By: CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE I Sample Date 45 bu. 12-03-10 Manure 01 0 0 0 0 .0 01 0 P Removal IRating 36 lbs/ac. Low BALANCE -155 0 0 0 0 0 0 0 Tract Field 3302-A 41 Req'd Nutrients 175 0 0 0 0 0 0 0 Acres App. Period 13.90 4/1-9/15 Supplied By: - - s_- CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 01 0 Soil Series State-CP Residual 20 0 0 0 0 0 01 0 RYEJ Sample Date 45 bu. 12-03-10 Manure 0 0 0 0 0 0. 01 0 P Removal IRating 36 lbs/ac. Low BALANCE -155 .. 01 0 01 0 0 01 0 Tract Field 3304-B 147 Req'd Nutrients 171 0 0 0 0 0 0 0 Acres App. Period 18.60 4/1-9/15 Supplied By: J0 = R CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 Commercial Fert 01 0 0 0 0 0 0 0 Soil Series State-CP Residual 201 0 0 01 0 0 01 0 RYE Sample Date 44 bu. 12-03-10 Manure 0 0 0 0 0 0 01 0 P Removal IRating 35 lbs/ac. Low BALANCE -151 0 0 0 0 0 0 0 Tract Field 3304-B 189 Req'd Nutrients 171 10 0 0 0 0 0 0 Acres App. Period 23.60 4/1-9/15 Supplied By: PP _ -" CROP Soybeans, Manured, Full Season Starter 0 0 0 01 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE I Sample Date 44 bu. 12-03-10 Manure 0 01 0 0 0 0 01 0 P Removal Rating 35 lbs/ac. Low BALANCE -151 -10 0 0 0 0 01 0 Tract Field 3304-B 190 Req'd Nutrients 175 0 0 0 0 0 0 0 Acres App. Period 13.30 4/1-9/I5 Supplied By: P CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE Sample Date 45 bu. 12-03-10 Manure 0 0 01 0 0 0 0 0 P Removal IRating 36 lbs/ac.. ILow BALANCE -155 0 01 01 01 0 0 0 825337 Database Version 3.1 Date Printed: 4/12/2012 NMR Page Page 4 of 5 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P2O5 (lbs/A) K2O (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3304-B 192 Req'd Nutrients 171 0 0 0 0 0 0 0 Acres App. Period 13.70 1 4/1-9/15. Supplied By: T CROP Soybeans, Manured, Full Season Starter 0 0 O 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE I Sample Date 44 bu. 12-03-10 Manure 0 0 [777 0 0 0 0 0 P Removal Rating 35 Ibs/ac. ow BALANCE -151 0 0 0 0 0 0 0 NOTE: Symbol * means user entered data. 825337 Database. Version 3.1 Date Printed: 4/12/2012 NMR Page Page 5 of 5 The Required Soil Test Values shown in the following table provide a summary of recommended actions that should be taken if soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis for these elements. High levels of zinc and copper can adversely affect plant growth. - Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated by dividing the amount of copper and zinc to be applied in lbs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. By adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal. In addition to copper and zinc indices, this table also provides a summary of lime recommendations for each crop based on the most recent soil sample. Application of lime at recommended rates is necessary to maintain soil pH in the optimum range for crop production . Required Soil Test Values Tract Field Crop pH Lime Recom. (tons/acre) Cu-I Copper Recommendation Zn-I Zinc Recommendation 3302-A 36 Fescue Hay 6.5 0.0 196 None 223 None 3302-A 40 Soybeans, Manured, Full Season 5.5 0.8 52 None 69 None 3302-A 40 Soybeans, Manured, Full Season 5.5 0.0 52 None 69. None 3302-A 41 Soybeans, Manured, Full Season 5.9 0.0 80 None 99 None 3302-A 41 Soybeans, Manured, Full Season 5.9 0.0 80 None 99 None 3302-A 46 Fescue Hay 6.5 0.0 196 None 223 None 3302-A 47 Fescue Hay 6.5 0.0 196 None 223 None 3302-A 48 Fescue Hay 6.5 0.0 196 None 223 None 3304-B 147 Soybeans, Manured, Full Season 5.5 0.7 46 None 86 None 3304-B 147 Soybeans, Manured, Full Season 5.5 0.0 46 None 86 None 3304-B 164 Fescue Hay 6.5 0.0 196 None . 223 None 3304-B 189 Soybeans, Manured, Full Season -5.9 0.0 48 None 57 None 3304-B 189 Soybeans, Manured, Full Season 5.9 0.0 48 None 57 None 3304-B 190 Soybeans, Manured, Full Season 6.1 0.0 53 None 54 None 3304-B 190 Soybeans, Manured, Full Season 6.1 0.0 53 None 54 None 3304-B 192 Soybeans, Manured, Full Season 6.3 0.01 54 1 None 65 1 None 3304-B 192 Soybeans, Manured, Full Season 6.3 0.01 54 1 None 65 1 None - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 825337 Database Version 3.1 Date Printed: 04-12-2012 STV Page Page 1 of 1 The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to _ maximize nutrient uptake. : This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be. applied on each field in order to supply the indicated quantity of nitrogen from. each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd (lbs/A) Comm. Fert. Nutrient Applied (lbs/A) Res. (lbs/A) Apptic. Method Manure PA NutrientA pplied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals tons 3302-A 36 S17 State-CP 16.10 12.00 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 84.28 0.00 3302-A 40 S17 State-CP 15.90 11.90 Soybeans, Manured, Full Season 45 bu. 4/1-9/15 175 0 20 Broad. 155 6.29 0.00 74.89 0.00 3302-A 41 S17 State-CP 18.60 13.90 Soybeans, Manured, Full Season 45 bu. 4/1-9/15 175 0 20 Broad. 155 6.29 0.00 87.47 0.00 3302-A 46 S17 State-CP 58.50 43.90 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 308.34 0.00 3302-A 47 S17 State-CP 34.20 25.70 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 180.51 0.00 3302-A 48 S17 State-CP 12.70 9.50 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 66.73 0.00 3304-B 147 S17 State-CP 24.80 18.60 Soybeans, Manured, Full Season 44 bu. 4/1-9/15 171 0 20 Broad. 151 6.13 0.00 114.03 0.00 3304-B 164 S17 State-CP 36.20 27.20 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 191.04 0.00 3304-B 172 S17 State-CP 13.50 10.10 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 70.94 0.00 3304-B 189 S17 State-CP 31.50 23.60 Soybeans, Manured, Full Season 44 bu. 4/1-9/15 171 0 20 Broad. 151 6.13 0.00 144.68 0.00 3304-B 190 S17 State-CP 17.70 13.30 Soybeans, Manured, Full Season 45 bu. 4/1-9/15 175 0 20 Broad. 155 6.29 0.00 83.701 0.00 3304-B 192 S17 State-CP 18.30 13.70 Soybeans, Manured, Full Season 44 bu. 4/1-9/15 171 0 20 Broad. 151 6.13 0.00 83.99 0.00 825337 Database Version 3.1 Date Printed: 4/12/2012 WUT Page Page 1 of 3 Waste Utilization Table Year l Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd (lbs/A) Comm. Fert. . Nutrient Applied (lbs/A) Res. (lbs/A) Applic. Method Manure PA NutrientA pplied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals -tons Total.Applied, 1000 gallons 1,490.581 r Y Total Produced, 1000 gallons 972.1 : = Balance, 1000 gallons -518.4 ; _ 'Total Applied, tons _ j 0.00 Total Produced, tons ' ' 0.00 Balance, tons ' ` 0.001 Notes: 1. In the tract column, — symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 825337 Database Version 3.1 Date Printed: 4/12/2012 WUT Page Page 2 of 3 Waste Utilization Table Year 2 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd (lbs/A) Comm. Fert Nutrient Applied (lbs/A) Res. (lbs/A) Applic. Method Manure PA NutrientA pplied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals - tons 3302-A 36 S17 State-CP 16.10 12.00 Fescue Hay 3.9 Tons 8/1-.7/31 173 0 0 Broad. 173 7.02 6.00 84.28 0.00 3302-A 40 N/A State-CP 15.90 11.90 Soybeans, Manured, Full Season 45 bu. 4/1-9/15 175 0 20 N/A 0 0.00 0.00 0.00 0.00 3302-A 41 N/A State-CP 18.60 13.90 Soybeans, Manured, Full Season 45 bu. 4/1-9/15 175 0 20 N/A 0 0.00 0.00 0.00 0:00 3302-A 46 S17 State-CP 58.50 43.90 Fescue Hay 3.9 Tons 8/1-7/31 173 0 .0 Broad. 173 7.02 0.00 308.34 0.00 3302-A 47 S17 State-CP 34.20 25.70 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 180.51 0.00 3302-A 48 S17 State-CP 12.70 9.50 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 66.73 0.00 3304-B 147 N/A State-CP 24.80 18.60 Soybeans, Manured, Full Season 44 bu. 4/1-9/15 171 0 20 N/A 0 0.00 0.00 0.00 0.00 3304-B 164 S17 State-CP 36.20 27.20 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 191.04 0.00 3304-B 172 S17 State-CP 13.50 10.10 Fescue Hay 3.9 Tons 8/1-7/31 173 0 0 Broad. 173 7.02 0.00 70.94 0.00 3304-B 189 N/A State-CP 31.50 23.60 Soybeans, Manured, Full Season 44 bu. 4/1-9/15 171 0 20 N/A 0 0.00 0.00 0.00 0.00 3304-B 190 N/A State-CP 17.70 13.30 Soybeans, Manured; Full Season 45 bu. 4/1.-9/15 175 0 20 N/A 0 0.00 0.00 0.00 0.00 3304-B 192 N/A State-CP 18.30 13.70 Soybeans, Manured, Full Season 44 bu. 4/1-9/15 171 0 20 1 N/A 1 0 0.00 0.00 0.00 0.00 Total Applied, 1000 gallons 901.84 +' Total Produced, 1000 gallons 972.12 -` Balance, 1000 gallons 70.28 '. . Total Applied, tons O.OG Total Produced, tons - - --- 0.00 Balance, tons y ' 0.00 Notes: 1. In the tract column, - symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 825337 Database Version 3.1 Date Printed: 4/12/2012 WUT Page Page 3 of 3 The Nutrient Management. Recommendations table shown below provides an annual summary of the nutrient management plan developed for this operation. This table provides a nutrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the crops to be grown, their nutrient requirements and soil test results. The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount. However, the quantity of other nutrients applied may exceed their required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. In such situations, additional nitrogen applications from nonorganic sources may be.required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR 1< N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract . Field 3302-A 36 Req'd Nutrients 173 0 20 0 0 0 0 0 Acres App. Period 12.00 8/1-7/31 Supplied By: CROP Fescue Hay Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 0 0 0 0 0 0 0 0 RYE Sample Date 3.9 Tons 01-20-12 Manure 173 288 183 48 3 3 1 0 P Removal IRating 61 lbs/ac. Low BALANCE 0 288 163 48 3 3 1 0 Tract Field 3302-A 40 Req'd Nutrients 175 0 0 0 0 0 0 1 Acres App. Period 11.90 4/1-9/15 Supplied By: } - CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 01 0 0 01 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE Sample Date 45 bu. 12-03-10 Manure 155 258 164 43 3 3 1 0 P Removal IRating 36 Ibs/ac. Low. BALANCE 0 258 164 43 3 3 1 -1 Tract Field 3302-A 41 Req'd Nutrients 175 0 0 0 0 0 0 0 Acres App. Period 13.90 4/1-9/15 Supplied By: y I CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE I Sample Date 45 bu. 12-03-10 Manure 155 258 164 43 3 3 1 0 P Removal IRating 36 Ibs/ac. Low BALANCE 0 258 164 43 3 3 1 0 Tract Field 3302-A 46 Req'd Nutrients 173 0 20 0 0 0 0 0 Acres App. Period 43.90 8/1-7/31 Supplied By; Ti ' - u CROP Fescue Hay Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 3.9 Tons 01-20-12 Manure 173 2881 183 48 3 3 1 0 P Removal Rating 61 Ibs/ac. ow . BALANCE 0 288 163 48 3 3 1 0 825337 Database Version 3.1 Date Printed: 4/12/2012 NMR Page Page 1 of 5 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (Ibs/A) K20 (Ibs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract FFild 3302-A 47 Req'd Nutrients 173 0 20 0 0 0 0 0 Acres App. Period 25.70 8/1-7/31 Supplied B PP Y t r 1_ + CROP Fescue Hay Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 0 0 0 .0 0 0 0 0 RYE Sample Date 3.9 Tons 01-20-12 Manure 173 288 183 48 3 3 1 0 P Removal IRating 61 Ibs/ac. Low . BALANCE 0 288 163 48 3 3 1 0 Tract IField 3302-A 48 Req'd Nutrients 173 0 20 0 0 0 0 0 Acres App. Period 9.50 8/1-7/31 Supplied By: 1 ';" CROP Fescue Hay Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 0 0 0 0 0 0 0 0 RYE Sample Date 3.9 Tons 01-20-12 Manure 173 288 183 48 3 3 1 0 P Removal IRating 61 Ibs/ac. Low BALANCE 0 288 163 48 3 3 1 0 Tract I Field 3304-B 147 Req'd Nutrients 171 0 0 0 0 0 0 1 Acres IAPP• Period 18.60 4/1-9/15 Supplied BY: s ._--- --�- CROP Soybeans, Manured, Full Season Starter 0 0 0 . 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 01 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE Sample Date 44 bu. 12-03-10 Manure 151 251 159 42 3 3 0 0 P Removal Rating 35 Ibs/ac. Low BALANCE 0 251 159 42 3 3 0 -1 Tract Field 3304-B 164 Req'd Nutrients 173 1- 0 20 0 0 0 0 0 Acres App. Period 27.20 8/1-7/31 Supplied By: F . ' CROP Fescue Hay Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 0 0 0 0 0 0 0 0 RYE Sample Date 3.9 Tons 01-20-12 Manure 173 288 183 48 3 3 1 0 P Removal IRating 61 Ibs/ac. Low BALANCE 0 288 163 48 3 3 1 0 Tract IField 3304-B 189 Req'd Nutrients 171 10 0 0 0 0 0 0 Acres App. Period 23.60 4/1-9/15 Supplied By: CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 01 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE Sample Date 44 bu. 12-03-10 Manurel 151 251 159 42 3 3 0 0 P Removal Rating 35 Ibs/ac. ILow I BALANCE I 0 241 159 421 31 3 01 0 825337 Database Version 3.1 Date Printed: 4/12/2012 NMR Page Page 2 of 5 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P2O5 (lbs/A) K2O (lbs/A) , Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3304-B 190 Req'd Nutrients 175 0 0 0 0 0 0 0 Acres App. Period 13.30 1 4/1-9/15 Supplied By: u0 CROP Soybeans, Manuted, Full Season Starter 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE I Sample Date 45 bu. 12-03-10 Manure 155 258 164 43 3 3 1 0 P Removal I Rating 36 Ibs/ac. Low BALANCE 0 258 164 43 3 3 1 0 Tract Field 3304-B 192 Req'd Nutrients 171 0 0 0 0 0 0 0 Acres App. Period 13.70 4/1-9/15 Supplied By: mIT 3 CROP Soybeans, Manured, Full Season Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series State-CP Residual 20 0 0 0 0 0 0 0 RYE Sample Date 44 bu. 12-03-10 Manure 151 251 159 42 3 3 0 0 P Removal Rating 35 lbs/ac. ow BALANCE 0 251 159 42 3 3 0 0 NOTE: Symbol * means user entered data. 825337 Database Version 3.1 Date Printed: 4/12/2012 NMR Page Page 3 of 5 Water Resources ENVIRONMENTAL QUALITY NC Department of Public Safety Caledonia Prison Farm PO Box 67 Tillery, NC 27887 Dear NC Department of Public Safety, PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary Ste. JAY ZIMMERMAN RECEMED/ ' C[_''2-0 nWR Director July 15, 2016 JUL 2 0 2016' Water Quality Regional Operations Section Subject: Requirement for Phosphorous Loss Assessment Caledonia Prison Farm Permit No. NCA442001 Halifax County This letter is being sent to remind you that your current Animal Waste Management System NPDES General Permit issued by the Division of Water Resources (Division) requires periodic evaluation of potential phosphorous loss. Condition IV.8. in the above referenced permit states: "The Permittee shall perform a phosphorus -loss evaluation prior to application for renewal of this Permit in accordance with state and federal requirements. This evaluation must be documented on forms supplied by or approved by the Division and must be submitted to the Division. Upon completion of the phosphorous -loss evaluation, the CAWMP shall be updated to include the current risk assessment rating, and submitted to the Division upon application for renewal of this Permit." In North Carolina, the Phosphorus Loss Assessment Tool (PLAT) is utilized to assess phosphorus loss risk on a field specific basis. PLAT was developed by NC State University and the Natural Resources Conservation Service (MRCS) and addresses four potential loss pathways: leaching, erosion, runoff, anddirect movement of waste over the surface. Each field must be individually evaluated and rated as either low, medium, high, or very high according to its phosphorus loss potential. In no case shall land application rates for any field exceed the established crop removal rate for phosphorus for fields with a "high" phosphorus -loss assessment rating. There shall be no waste application on fields with a "very high" phosphorus -loss assessment rating. The ratings for each application field for your facility must be reported to the Division using the attached certification form along with the updated Certified Animal Waste Management Plan as a part of your permit renewal application. The PLAT field specific forms must be included with the certification form and copies shall be maintained with other farm records as required by your permit. State of North Carolina I Environmental Quality I Water Resources ry 1636 Mail Service Center Ralei t, Nurth Carolina 27699-i636 Kc F 17 c,-�"✓; "•^ 919 807 6464 NC Department of Public Safety Letter Page 2 7/15/2016 You are encouraged to contact a certified technical specialist as soon as possible to being the process of having PLAT performed for your facility's fields. Contact the Division of Soil & Water Conservation for a list of certified technical specialists at 919-733-2302 or visit hqp://www.ncagr.gov/SWC/tech/animalwaste.html If you have any questions regarding this letter, please contact me at 919-807-6354 or the Raleigh Regional Office at 919-791-4100. Sincerely, Christine B. Lawson, Program Manager Animal Feeding Operations Enclosure cc: Raleigh Regional Office, Water Quality Regional Operations Section Halifax County Soil & Water Conservation District WQROS Central Files (Permit No. NCA442001) Fax:252-826-3691 Jul 28 '04 10:26 P.01/07 I T Fax ENTERPRISE FARM NC CORRECTION ENTERPRISE POST OFFICE BOX 67 TILLERY, NC 27887 Phone: (252)826-3821 Fax: (252)826-3691 To; Fromi Pax: Dates Phone: Pages: Re: CCs ❑ Urgent C7 For Review O Please Comment 0 please Reply •Commenta: � W� NOR AWoni Division 4300 Reedy Creek Road RaleiA NC 276(7-6465 (9: 133-2655 Report No: 385 W Grower: Caledonia Faram Copies To: t nscoe, David r- PO Boa 67 Tillery, NC 27887 E)w ' Inscoe,Davidste nal yszs eport Farm: PO Boa 67 idlery, NC 27887 7122404 Halifax County Iggle Info. Results per, million vless odmwwise - :l swupk zo.N P A: Ca mg S Fe AM Zn Cu B No Cl C 1 TOW 659 72.2 9w W 27.6 31.1 4.64 0.49 1.55 0.16 1.26 R -N wade Code: 4m ALP -NO3 Nrt Ali Cd Pb Al Se Y Aff SS ON DM CGB% ALEARaO� a DesaVHM. OR-N 197 7.63 x Um a cNn Mm - . -ter' - • Y'Mi. _ -- j?a ,- - V 'y-ipsl rl se -i tl .,:. E _ ;:5.. - - �•. lKlijiw Sav*k JR- N P K ca mg S Fe AM Zn Ca g ai C 7ata! 542 70.4 966 87.0 22.5 31.7 1.75 0.32 L36 0.09 1.17 IN-N waste Cede.• -AN4 ALP Na 1, Cd Pb Al Se if pA SS c.7v DM% ccz% dLE(Rgal) �, vewrfpt". OR-N 109 '7.85 P*WtFy Lapon L avd Urea Ap N A05 Aid , Ado iib - 4% W A At S8 M .�th 1rr�+i6oa 2.2 0.94 7.7 0.51_: 013 ; 0.19_ a01 r -0.a1 r ao1 L7 '4 o ti rn 0 ►J O *DA - Division 4300 Reegy Creek LAemtwy R&SUfts MonA Weigh, MC 27607-6W VeO wOon Was otherwise noted) (9A 133-2655 Grower: Caledonia Farms Report NO: t 385 Ply 2 - . Sam le k& Sample La. Wage COAL. ALP Dmripft". Potdiry UWn Liquid IV p K Ca MR s to Mn zn ca B Ato Cl c row 541 N -#V -Aff4 -NO3 ORW I Ova i 55.4 920 76.7 19.3 25.8 1.14 0.23 0.60 0.11 1.06 AW m Cd A At Se Li PH ss C-AV D64% Ca% AIE(W) 199 8.08 Rent tda�oas: Nod" Avs 1e for ftmt IbWtoNggm - Other Memema ibslfw#&#&= mWalftsmosad krig" N -P205 X20 . 2.2 0.74 74 Ca io- , Afg.- S Ma' . 0.45 0.11: .0.15 O.Ot 7 Ze Ca 8 No 7 - T - 0.01 -a AAdsArtCd 1.7 :Fit A! k a I v i .1 N) NCO I K.) 00 O O N> li FORM IRR-1 Lagoon Liquid Irrioa:ion Fields Reco;d For RecordiN Irrigation E-Vants on Different I-;Oids "Ate"few fs 4 j = _ - (, .,--- • `• -= I (sews) a=_' i. �ze lI =cj iir�;: I i o:at : ' = I Oae z''•co ina�'-!s !� (:cde I F r • � f � I � 1 I , I I l I i I f I I I I I I I f I i :.'eather Codes: C-Clear, PC -Partly Goudy, CI -Cloudy, R-Rain, S-SnovdS—I et, W-Wmfy 3!1 �rtL3 Persons ccmplatirg bhe irrigation inspections must initiai to signify that inspections viere competed at least every 120 minuses. �i C4 00 A 0 00 .. Form IRR-2 Tract Q Field Size (acres) = (A) Farm Owner Owner's, Address Owners Phone" _�30Y I Field t Lagoon Liquid Irrigation_ Field Record One Form for Each Field Per Crop Cycle Facky Number q.2 laigation Operator 411, � lfication Operators I Address - ,G CD--ratcrs Phone A x From Anima! Waste blanagement Plan N Recommended PAN f o0 Crop Type va r /i2 4 C(R S Loac5ng (lblace} _ (8I ��.5 CD i (T) (2) (3) (4) (3) (o) (7 (e) (9) (10) 0 1) I - Irrigation - I I I Dale (mWddlyr) SarS Time (hrmiiti) EndTm:e (hr:nin) ictal Minutes (3)-(2) ;, of Sprinklers Operatis5 Flow Rate (gal/min) Total Volume (gallons} (a} x (5) x (s} Volume Per Acts+(A)c) - {� - {A) i Waste Analysis PAN Ib/1000call ( PAN A owed p• arc) fie) (-)I � t,000 Nitro Ealance' � (mac) I 1 i I I I I i 1 -I _- I I I I I I I 1 1 I I I I Crop Cycle Total's Owner's Signature / Operator's Signature Certified Operator (Print) G4 C /t ��'�� l�-% Operator Certification T 00 0 A 0 00 0 Ln 0 FORi.1 iRR-1 Lagocn Liquid Irrigation Fields Record For Recording Irrigation Fverns on 0-Iferent Fields =a rChv^er L/tl .L.���rR �i,f - r ct / •t t. _�:� N 3 9;f - C�-;razor �i`k i .0 �RP4J�•�� . irast8 Dale i C:c? Fi-au Size I :;es! ur^a,60a Time .". S}prktje:s I 0oera:ra CYrratar I ka!s "Weaker Code 'Inspe—Orrs Sia.-. lima .. Total'•':r, =s lWO I I I I I I 1 1 I I I - � f I i I I I I I I I I I I •I I I Weather Codes: C-Clear, PC -Partly Cicudy, CI•Cfcudy, R ,Rain, S-Sno► !Sleet, W-Windy 3.1114 .3 " Persons complatinq the irrigation inspections must initial to signify that inspections vrere completed at least every 12J minutas. A00 -W Form IRR-2 Tract Field Size (acres) = (A) Farm Omer 11% 0-wners Address owner's Phone R Lagoon Liquid Irrigation Field Record One Form for Each Field Per Crop Cycle Facility Number I 1�41 A 2 irrigation Operator l� G�1-�y44J/,,0-; lmoation Operator's Address Q zo.G— Ooerator s Phorie _ w ' x From Animal Waste Management Plan 7—] Crop Type / Reccnirnended PAN � ' >= C( R. �. LozcTng(bJaGe) = 19j' i (21 (3) (4) (5) (6) (7) (10) (l 3 0 Field X n P � • � X ��l L ,c° I Irrigation- I I I t7ate mrn/ ( yr1 Start Time r min (h ) End Tir> a hr_n"dn ( ) i ctGl Mnutes (3) - (2) : of Sphrlder5 Operating Flow Rale (�/mom ) Total Volume . (gallons) (4) X (5) x (6) Volume Per Acre (g flac) �)'+(A) r Waste Analysis PAN-(lb/1000cal) PAN Applied oblac) [(a) x (�J _ t.000 Nitrogen Ealance (Iblac; (S) _(;0j i J - I I I ! J I J I I I I I I I I I I I I I II I J ! I I I ! I I I ! ! ! f l= J ! crop cycle totals I I Ownef's Signature Certiffed Operator (Print} Operator's Signature Operatcr Ceftfication 00 M 0 0 0 Beverly Eaves Perdue Governor AMA NCDENR North Carolina Department of Environment and Division of Water Quality Charles Wakild, P.E. Director CERTIFIED MAIL7002 2410 0003 0273 3013 RETURN RECEIPT REQUESTED NC Department of Correction Caledonia Prison Farm PO Box 67, Tillery, NC 27887 Dear NC Department of Correction: March 13, 2012 !IfIc ON Dee Se��e� ZIOZ l �dW cre t Subject: Additional information request Permit No. NCA442001 Caledonia Prison Farm Halifax County The Division of Water Quality has received an NPDES permit renewal application for this facility. Additional information is required for further review and public notice before the issuance of the NPDES General Permit certificate of coverage to this facility: 1. Phosphorous Evaluation: For coverage under the NPDES General Permit, a phosphorus evaluation through phosphorus loss assessment tool (PLAT) is required for all fields utilized in the nutrient management. plan. Please submit such assessment of phosphorus, including the datasheets, for each of the fields used in your plan. Be sure to update your Certified Animal Waste Management Plan, if required, to include the current risk assessment rating upon completion of the phosphorous -loss evaluation. 2. Setback Map: Please submit a map showing either a 100-foot setback with no vegetated buffer or a 35-foot setback with a vegetated buffer fir-orn surface water or wetlands or any conduit to surface water or wetlands in and around your facility. Such map is required of all NPDES general permits. 3. PAN Balance: Your waste utilization plan lacks the plant available nitrogen (PAN) balance at your facility. 4. Lagoon Volumes: Please submit a lagoon design or as -built calculations to show the lagoon storage volumes at your facility. 5. Operation and Maintenance (O&M) PI An O &M plan for your facility is missing in the package. Please send the above requested information to the following address within 30 days of receipt of this notice. Feel free to contact me at (919) 807-6341 if you have any questions. cc: Halifax County Soil and Water Conservation District RaleighRegional Office, Aquifer Protection Section APS Central Files (NCA442001) 1636 Mail Service Center, Raleigh, North Carolina 27699-1636 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919.807-64641 FAX: 919-807.6492 Internet: www.nmatergualitv.om Sincerel J. R. Joshi DWQ Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 One. No hCarol.i.:na atura!!U An Equal opportunity 1 Affirmative Action Employer Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality . August 1 i 2007 NC Department Of Corrections Caledonia Prison Farm 4216 Mail Service Ctr Raleigh, NC 27699-4216 Subject: Certificate of Coverage No. NCA442001 Caledonia Prison Farm Animal Waste Management System Halifax County Dear NC Department Of Corrections: In accordance with your application received on 12/27/2006, we are hereby forwarding to you this Certificate of Coverage (COC) issued to NC Department Of Corrections, authorizing the operation of the subject animal waste management system in accordance with NPDES General Permit NCA400000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the Caledonia Prison Farm, located in Halifax County, with an animal capacity of no greater than the following wet system poultry annual averages: Non -Laying Pullets: 0 Layers: 60000 The COC shall be effective from the date of issuance until June 30, 2012 and replaces the NPDES COC issued to this facility with an ,expiration date. of July 1, 2007. Pursuant to this COC, you are authorized and required to `operate the :system in conformity. with the conditions and. limitations as specified in the General Permit, the . facility's CAWMP, and this. COC. An adequate system for• collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste ' production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and -this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read. this COC and the enclosed General Permit. This General Permit contains many new requirements than the previous NPDES General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting.. Please hav careful attention to the record keening and monitoring conditions in this hermit. The Animal Facility Annual Certification Form must be completed and returned to the Division of Water uality by no later than March 1st of each year. If your Waste Utilization Plan has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Aquifer Protection Section 1636 Mail Service Center Internet: www.ncwatmualily.org Location: 2728 Capital Boulevard An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper NamNa` Carolina turally Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Raleigh, NC 27604 Fax 1: (919) 715-0588 Fax 2: (919) 715-6048 Customer Service: (877) 623-6748 Upon abandon ment-:or depopulation -for a period of , four, years. or :more, the Permittee' must submit �. documentation to the Division demonstrating that all current NRCS standards are.met prior to restocking of the facility. Per 15A NCAC 02T .0111(c) a compliance boundary is provided for the facility and no new water supply wells shall:be constructed within the compliance boundary. Per NRCSstandards a 100-foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Per 15A NCAC 02T .1306, any containment basin, such as a lagoon or waste storage structure, shall continue to be subject to the conditions and requirements of the facility's permit until closed to NRCS standards and the permit is rescinded by the Division. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with. NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC ' are unacceptable, you have the right: to apply for an individual permit by contacting the staff member listed below for information -on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is .located in a. county covered by our Raleigh. Regional Office: The, Regional Office Aquifer Protection staff may, be reached, at (91-9). 7.91-4200. If you need: additional, information concerning this: ni COC or the General Perinit please contact_the Animal Feeding Operations Unit'staff at (919) 733 3221.: . Sincerely, for 'Coleen H. Sullins Enclosures (General Permit,NCA400000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Halifax7County Health Department Halifax County Soil and Water Conservation District Raleigh Regional Office, Aquifer Protection Section AFO Unit Central Files Permit File NCA442001 State of North Carolina ` Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director June 25, 1999 Phillip Sykes Caledonia Prison Farm PO Box 67 Tillery NC 27887 AN ffl?W,A NCDENR NORTH CAROL-INA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWP420001 Caledonia Prison Farm Poultry Waste Collection, Treatment, Storage and Application System Halifax County Dear Phillip Sykes: In accordance with your application received on February 2, 1999, we are forwarding this Certificate of Coverage (COC) issued to NC Dept. of Corrections, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with State General Permit AWG300000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Caledonia Prison Farm, located in Halifax County, with an animal capacity of no greater than 60,000 Layers and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting; and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWP420001 Caledonia Prison Farm Page 2 If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Dianne Thomas at (919) 733-5083 ext. 364. Sincerely, '� cc: (Certificate of Coverage only for all cc's) Halifax County Health Department Raleigh_RegrQn:41- f ie-e Water Quality -Section Halifax County Soil and Water Conservation District Permit File T.Stevens W. Q RECEIVED State of North Carolina WATER QUALITY SECTION Department of Environment and Natural Resources Division of Water Quality FEB 0 21999 Non -Discharge Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) Non -Discharge Permitting General Permit - Existing Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: 1.1 Facility Name: Caledonia Prison Farm 1.2 Print Land Owner's name: NC Dept.'of Corrections 1.3 Mailing address: PO Box 67 City, State: Tillery NC Zip: 27887 Telephone Number (include area code): APAZ-AY/ 252-826-5784- 252-826-3821 1.4 County where facility is located: Halifax 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): I-Iwy. 561 West approx. 10 miles West off Hwy. 258 and approx. 10 miles East off Hwy. 301 from Halifax. 1.6 Print Farm Manager's name (if different from Land Owner): Jy iJfZL 1jt Phillip C. Sykes 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): N/A 1.8, Date Facility Originally Began Operation: 0 1/0 1/60 1.9 Date(s) of Facility Expansion(s) (if applicable): N/A 2. OPERATION INFORMATION: 2.1 Facility No.: _ipti42_ (county number); 1 (facility number). 2.2 Operation Descron: Poultry operation Layer 60000- Certified Design Capacity Is the above information correct? yes; no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum nurn er for which the waste management structures were designed. Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) O'rurkcy 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm:. No. of Animals: FORM: AWO-G-E 5/28/98 Page l of 4 42 - 1 0 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 104 ; Required Acreage (as listed in the AWMP): 104 2.4 Number of(lagoons/storage ponds (circle which is applicable): 3 2.5 Are subsurface drains present within 100' of any of the application fields? YES or (NO )(please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or (NO )(please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) N/A YES or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? What was the date that this facility's land application areas were sited? 01 /01 /60 REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.11 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may applicable to your facility. 3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. FORM: AWO-G-E 5/28/98 Page 2 of 4 42 -1 Applicants Initials PC PCs " u Facility Number: 42 - 1 Facility Name: Caledonia Prison Farm 4. APPLICANT'S CERTIFICATION: I, N C Dent- of CnrrPcti nns (Land Owner's name listed in question 1.2), attest that this application for Caledonia Prison Fartns (Facility name listed in'question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge.. I understand that if all required parts of this - application are not completed and that if a required supporting information and attachments are not included, this application ' package will be returned to asi m ete. Signature qDate 2�1�AA 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) I, Phi 11 iD r. O.Vkpq (Manager's name listed in question 1.6), attest that this application for Izon. (Facility name listed in question 1.1) has been reviewed by me an id s accura a an comp e e o e best of my knowledge. I understand that if all required parts of this application are not completed -and at if all required supporting information and attachments are not included, this'application package will a ret d as o lete. Signature Date _ 211/99 THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS:' NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 RECEIVED WATER OUN-IN SECTION FE6 0 21999 Nott UrAiar9e Permitting FORM: AWO-G-E 5/28/98 Page 3 of 4 42 -1 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Non -Discharge Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Existing Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: I.1 Facility Name: Caledonia Prison Farm 1.2 Print Land Owner's name: NC Dept. of Corrections 1.3 Mailing address: PO Box 67 City, State: Tillery NC Zip: 27887 _ Telephone Number (include area code):18RAZ P/ 252-826-5784- 252-826-3821 1.4 County where facility is located: Halifax 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): Hwy. 561 West approx. 10 miles West off Hwy. 258 and approx. 10 miles East off Hwy. 301 from Flalifax. 1.6 Print Farm Manager's name (if different from Land Owner): /2 r,6ja.. )W jy Phillip C. Sykes 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): NIA 1.8 Date Facility Originally Began Operation: 0 1/0 1/60 1.9 Date(s) of Facility Expansion(s) (if applicable): N/A 2. OPERATION INFORMATION: 2.1 Facility No.: _42_ (county number); _1 (facility number). 2.2 Operation Description: Poultr operation Layer 60000- Certified Design Capacity Is the above information correct? yes; no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum num er or which the waste management structures were designed. Type of Swine 0 Wean to Feeder 0 Feeder to Finish 0 Farrow to Wean (# sow) 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Un of Aniinnle Other Type of Livestock on the farm: FORM: AWO-G-E 5/28/98 Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Layer 0 Dairy 0 Non -Layer 0 Beef 0 "turkey No. of Animals: RECE,VED WATER QUWTY SECTION FEB 0 21999 Page 1 of 4 42 - t e Permitting Non-Discharg 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 104 ; Required Acreage (as listed in the AWMP): 104 2.4 Number of(lagoons/)storage ponds (circle which is applicable): 3 2.5 Are subsurface drains present within 100' of any of the application fields? YES or (NO )(please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or (NO )(please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) N/A What was the date that this facility's swine houses and lagoon were sited? NSA YES or NO (please circle one) What was the date that this facility's land application areas were sited? 01101160 3. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicants Initials 3.1 One completed and signed original and one copy of the application for General Permit - Animal �/ Waste Operations; PCs ��d 3.2 Two copies of a general location map indicating the location of the animal waste facilities and 1 . Q/ field locations where animal waste is land applied; pcs V.l 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. PCs The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.1 1 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. FORM: AWO-G-E 5/28/98 Page 2 of 4 42 - 1 Q Facility Number: 42 - 1 Facility Name: Caledonia Prison Farm 4. APPLICANT'S CERTIFICATION: I, N C. 1)Pn1-. of CoriPr-ti nn.-, (Land Owner's name listed in question 1.2), attest that this application for Caledonia Pi-ison Farms (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and! if a required supporting information and attachments are not included, this application package will be returned to a as i m ete. Signature Date 9/1/99 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) 1, Phi 11 iD_r- S_ykes (Manager's name listed in question 1.6), attest that this application for CAI ` (Facility name listed in question 1.1) Ti has been reviewed by me ans`accura eaaad `comp e e o e best of my knowledge. I understand that if all required parts of this application are not complete nd at if all required supporting information and attachments are not included, this'application package will a ret d as o / lete. Signature Date 2/1/99 THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL. SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF .WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 REQ � S C, WATER FEO 0 21999 Nan-Dischat9e Perm►��g FORM: AWO-G-E 5/28/98 Page 3 of 4 42 -1 i Animal tiVaste Management PIRECEIVED ��1� 1'1irED (Please tvoe or orint all informadon dyat'does not reuuire a si,ana(ur':) E.Yisting New or Ex anded '( l6se circle.one) JAN 61997 enerai Information: WATER QUALITY SECTION Name of Farm: �q �CGI On ; CA_ �5 r Non-Qischarge Co Owner(s) dame: ill G. D pf 1,2'r Phone \o:_ZL6 - SGZ/ Mailin o .address: O , I6 XC 6 % 7? 8 7 Farm Location: 114 5(' io ^ -/'_S Councv Farm is located in: w.sf ofF Ll,,/y z5V „ d Latitude and Lonszitude:,16 27 DS Integrator: Please attach a copy of a county roads� map /With Vocation identified and describe below (Be speific: road names. directions, milepost. etc.) GIC- 74 r"al��� Operation Descriodon: Type of S► -ine ho. of animals :1 Wean to Feeder _1 Feeder to Finish • Farrow to Wean • Farrow to Feeder • Farrow to Finish .0 Gilts _1 Boars Type o paltry No. of animals Layer 60,, o 0 0 :1 Pulleu Other Type of Livestock: Type of Cattle No. of animals _1 Dairy J Beef Number of animals: ...........,:::..,:..:,:..:.::::.:.......................................... .:}Siv}}?:':::::::.vx:,:::::.::,�:}::{}.:.}'>:::'r'i•.y::v'.'v::}::i.:.{{r;i•}w:::•::;:•'K:: n.v::: .:: �.n... r:,v:::::;.+........� •.v:..v::.::{{.S'{j.}:{.: .......... :....vv::r_.;:;;+' :::.,: ,,.yTvn}�_t:.y {. .:.:::...:...:.. ...... ......:.:. r:: v:::{,: ;,aa.. v::::::: ;•.::..v:;,v.v.::: r w:.. v.v ...y..}v.:::'nWx::: v, .. •:.}+:': } }?:O:i?.;: •:::::::::..v. � �l ?� v.:v::::::.:v......ay.v:: nav:.n:.... : +;... p .:......... }' •.v: r,:v:.::v;. �:}:: ii }...v::.; Y.�:+...::: \ t?y...,y, . •... ... .... ......v-....:...............tt.r....n...•t:•:..v:n.:::'w::::.n:?S:'?'.i{.::!::.v.: w:.:....:.: n}:: ;: :... ..O erattotc.OnI :......r..t.:::.a.............�::::..t................ ...:.:...,::..tr:::.;> {::}•.;::;:}: ....:...........,,...,.:, .,..:.:.:..........................\:::.:::::{{{•}n:v::::::...:::::: ..v:.v::::;\.;.}!i$;:;}ii%2�>?:i?'"^•t.::?}:v:vi::ii}::::'3.{: ...a .{... t............n. \J.h+ a\..i.: S:•}: .::::::.. .n.r.:t+:v:: ....v..... ...t .,.. :.: ....: :.:.w:::::: ... ...:::::: ..: ... ,..T: ...: .. a ..: ..v::::vv::.v;. ...:: n•.v •:: r.v v.,n :v:: •..^::: 25..2............ ..: :.::. t. i....tu Y.va,:.. :: �: .:-...n......... .. +.:..: •::.mot,.:. !. nt: non...........:: .: ti'tY......aaf }v},.u. ..??.v.N wry.: Yt. ... :...,.....Y v......:.. .t ..:a ..........{•. .............. :... n.., •i.:v .::: � ..5 ..?;.}}:::{.}}�::}::' ... y.'R\\:v ark'ildrtranal:•DesrenCauacttt•�>•>:::�.':::.?,:>..:...:.:Toral.DestQ>r Crroacrty:•:a�:<;:<:,.:: ... .... Acreage Available for Application: /D 5r /c • Required Acreage: Lli rf 4,17 /D¢ Number of Lagoons / Storage Ponds : 3 Total Capacity: 894e6 Cubic Feet (P Are subsurface drains present on the farm: YES or VO (please circle one) if YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one) i� +k ,k ai ,i is M a� aN sa r ,it �!t �N si * ,k,k iM is � ,k ,k � s� * � * at s[ i� � � y. yt M i� �!t 1Y � ,!t � �!t,!t,k �k ai � ,k si }ia ai, is a� it M # s,. +K is M aj� i,. as a,. i,� is >,a �a sa * +i• +k ,;�,1t it rt,!t air is is ai is ,!t Owner / 1lanager Agreement I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of dye waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Manaeement before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly dtrough a man-made conveyance or from a storm event less severe than the 3S-year, 24-hour storm and there must not be run-off from dye application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areasmust be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be tiled at the farm and at the office of the local Soil and Water Conservation District. I (we) know drat any modification MUSE be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DELI or a new certification (if the approved plan is changed) within 60 days of a title transfer. ,Name of LandC A/ f- I\ -,f .,I r _ - __-1. _ _ Signarure': GPI :Name of NIanaf! Si;nature:&-Jle AINC __ .au-'wt t. /�—a 9-9 7 Technica•1 Specialist Certification I. As a technical specialist designated by the `North Carolina Soil and Water Conservation Commission pursuz, o NCAC 6F .0005. 1 certify that the animal waste management system for the farm named above has an animal �«1$;� management plan that meets or exceeds standards and specifications of the Division of Environmental `lanuemen, (DENT) as specified in 15A NCAC 2H.0217 and the USDA -Natural Resources Conservation Service (MRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.031.7 and 13A NCAC 6F .0001- .0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC. 1), the technical specialist should only certify parts for which they are technically competent. II. Certification of Design A) Collection. Stora;e. Treatment System Check the appropriate box -ZExistine facility Without retrofit (SD or WUP) Storage volume is adequate for operation capacity: requirements. storage capability consistent with waste utilization J New. expanded or retrofitted facility (SD)' --- .animal waste storage and treatment structures. such as but not limited to collection systems. lagoons and ponds. have been designed to meet or ecceed the minimum standards and specifications. Name of Technical Specialist (Please Print): (�G`fne. S �,A' Affiliation-9 kCS Date Work Completed: Address (Asenc ): , O o /;-�'oa/ AI- C 279'37 Phone No.:_ Signature: Date: / Z - t_7 B) Land licatior(Site (WUP) Th . plan provides for minimum separations (buffers): adequate amount of land for waste utilization; chosen crop is suitable for waste management: hydraulic and nutrient loading rates. Name of Technical Specialist (Please Print)::. Wayrl e, Affiliation Date Work Completed: Address (Agenc7 ?3 9 Phone \'o.: ,.5-F3- 3y9/ Sinature: Date: C) Runoff�Controls from Exterior Lots Check the appropriate box —ZFacility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. =-I. Facility with exterior lots (RC) Methods to minimize the run off of pollutants from loungin_ and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print):_ --1. �at/►1e— 5 k o✓� Affiliation /V PC _S Date Work Completed: Address (Agencv): _box-gl,,�a.k- Al. C. Z783 Phone No.: (4/9) 5"�3 -3�/81 Signature: DaEC- Lz — 7� .a%%'C -- .au,uNt /. 1vv7 hox s,. o o a wnSie 1�Dllcat'on etluinme W c�stin or rrt+nndin f tujlity with ext. (WUP or I) Animal waste application equipment specified in the plan has been either field calibrated or 6� uated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates. a schedule for timing or applications has been established: required buffers can be maintained and calibration and adjustment guidance are c.,,ntained as part of the plan). _.1 New. exonnded or existing facility without existing waste avelicntion eauipment for soriv irrigation. (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates: a schedule for timing or - applications has been established: required buffers can be maintained: calibration and adjustment guidance are cuntained as part of the plan). -D New exonnded, nr existing facility without existing waste noolication euuipmem for land sareading not usinv srr v irrigation. (WUP or 1) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommbdate the waste management plan:_ (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates: a schedule for timing of applications has been established. required buffers can be maintained: calibration and adjustment guidance are -conmined as put of the plan). Name,of Technical Specialist (Please Print): L6-Yh e- S k o ✓ 4— Affiliation /��RCS Date Work Completed: Address (Agenc ): D g � 1-6-� a -'3 Phone No.: ry/f Signature: Date: /.2 E) Odor !;(ontrol. Insect Control. Nfortality ilytanaeement_and E_mer2encv_Action Plan (SD. St. WUP. RC or 1) The waste management plan 'for this facility includes a Waste Management Odor Control Checklist. an Insect Control Checklist, a Mortality ;management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Nlanagemem Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Wayne -S ho✓-� Affiliation C S Date Work- Completed: Address (Agenc), : P, D , t30 V A8'14 qC, 27'3 Phone No.: 5-IF3 Signature: Dace: 1 z— 0 F) Written ?flotice of New or En2ndin? S%Ane Farm The follomwing signature b ck is only to be used for new or expanding seine farms that begin constructfo er June 21, 1996. If the facility was uilt before June 21. 1996, when was it constructed or last expanded I (we) certify that I (we) have atte red to contact by certified mail all adjoining p owners and all property owners w•bo own property located across a pu ' • road. street. or highway from th' or expanding swine farm. The notice was in compliance with the requirements of N l06-3G5. A copv notice and a list of the property owners notified is attached. - _ _ _ Name of Land Owner: Sinattice•_ Name of Sian Si;natufe:__ r (if differeric from owner): �._... _... _ Date: -.. _... _... . Date: '1Vc •- Aut"ust 1. 1997 .I. III. Certification of Installation A) Collection. Storatle. Treatment Installation New. eeoanded or retrofitted facility (SI) Animal waste storage and treatment structures. such as but not limited to lagoons and ponds. have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technic: -I Specialist (Please Print): J. �WUJrle•- hU✓�' Affiliation Al R C S Date Work Completed: Address (Agencv) o al: •ra)e W C..27 Phone N+o.:- 583- W Signature: Date: f Z 3 D- Q 7 B) Land Aooication Site (WGP) Check- the appropriate box --.._.- - - - 7a/The cropping system is in place on all land as specified in the animal waste management plan. J Conditional Approval: all required land as specified in the plan is cleared for planting; the cropping system as specified in the -waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/dav/year); the proposed cover crop is appropriate for compliance with the wasteutilizadon plan. Q Also check this box if appropriate if the cropping system as specified in the plan can not be established on newly cleared land within 30 dad of this certification. the owner has committed to establish an interim crop for erosion control; Name of Technical Specialist (Please Print): ne, s h o r -4- Affiliation /ll R C Dace Work Completed: Address (A,o,n U. o o ��� �l �� -z 7�3 9 Phone No.:t191,7J S?3 - 3VS- S ignacure: I Date: ! z This foilowiKg signature block is only to be used when the box for conditional approval in III. B above has been checked. I (we) certify that I (we) ha committed to establish the cropping system as specified in my (our) waste utilization plan. and if appropriate to establish a interim crop for erosion control. and will submit 7--d adon of completion from a Technical Specialist with• 15 calendar days following the date spec' to the ertification: I (we) realize that failure to submit this v ficadon is a violation of the was anagement plubject me (us) to an enforcement action from DE`I. Name of Land Owner: Signature: Name of Nlanager (ffA Signature: WC •- .august I. 1997 erenc from owner): 1 Date: Date: 1 (RQ MVtluvli Itl 1101RIilt ale ruff orr pr puiiulunls Irtim ItlynViAj Ind hC.1►'V U11i Yd• .1 l;lt►'r. bcln MAL114 4 U ipet;iti4u HP 0C plan. I Fur facilities without cxieilor lots, no trtfffcotiprt. ft nt Islam. df Te dame ochnic 1$peclal st (Please Pint);., Aifilia:ion,,,,� Uf�. ���'°1- Dole WorR.CQmpleltj:' -- — _.._ AdQre!s (Agetjcy)'f" EPge b6 �o .s'o .9Lif%9 ph0A0 �'0.: 91sp Fal r<#'V D) A, Clerk J (Wt:Y or •1) An(=l Ovule apvllcalion and hsndi"11% equipn►ent spteirt4d in iNe plan is On s(te Ud rnnvy for Vit: tali tun slid eJ)uetmant males;old have been provided to the ot►.'ttetti 3AQ art rtintalneq rn part of did plan. t �ntn�o weste opplieodoa and t,vditng truulpnwnt ept:ciflatl 4n tiw:pihn list pin buds InsshlltJ but use tit% fist pr to),ets icasinq Of thins ptuty eppllaellun end iuu QrovWs>1 / 110-W Writn9.1; CyuipmeAl s;+el;itled to unc'eo tract igril i With. Old tegvirlements of the pltA: rnr11111t140 b4f(IM e';sn be ntelnlalnvd: Olibr4liVA cup el,lue lent Suldtulet he+e bairn provided it) 09 OWMI't 94d Art Ctl>~ 41kd U AM of the pine. bean %ome of Techn r�ftilitiUon.j,� Address S ig n a turf .,,,.,, The foliowin'? St above h" beam that sotelne'd In my from a ocnnlc iwe, re 7t to It tf; (us) tv trifor, NoRu dt Lanid t Sivoturt:—, Same of Nunae ItLonl:1 approval; Midttti ws6tt epplicstion ono hVdling lquipDtt?at Spbcltltd in U14 plu 041 Isa'eafued and will bt orl cite end intl wild by tbtdtlt8/ltaYMU); were IS adegvolc to ,tWi$ the waste vndl Use equiptnent Is lntW14d and -Undl the watt tarn ba Ions $Afltad In Lm4 with the cropping systetn cotltllned In ft plan: and eaeibmdott u+d edjvstnneht iutt>anee bcve rovided to the owners and tut eontWned as part of the plaA. al SpeciallSt (please Print):, Piz agan;BF.�- Gifirm4s, SAN, Date -Work COMpit;Wd:� t_ �l SI 1 :� �aX�—S�R� i�i4 Mi,���6� �. �'0��, P�D00 �t?.� 4i�•71b��OC� naturt block is only to be used when the licked. (%►O have committed to purchu s tht rrilAt11 *A04u rtaneipment plan tn4 Will luomit t Will wig to lubmit this ver(lit: action fmtn DEN! caner: different ffom o vw): F.) 4 Ial, Ingart Cnnlroo,a, nd �tortalite Manoe�rncnj,�,�j�.-,�L �ilt►P RC qr t} `iat'hoas % oon ol.000rs Lnd ►meets is specified In Ote Plan have WA inimNett and are operudof53l. the mortality ntariag mans systern as tpeclAW in the Ptah has also been Ir�jjtilled ark 10 opvtaU 1141, Name of Tech tical Speclaiist (Ple4le prif►t):G�a� � ��; 7, � pa Atfiliatio9 tC•1VOtk Complt►tad +,t dMS (A; nC Stdn;,ture: / <<'y'i'� .......,,._.....,....._Dart:_ l,, :`,•a._ Date: — -U- -- box for condlNona! apArev% n fli 1) t wfut ,eulori and hdntlitn� equlpmert as 8CMa:vcnR�'tlton of dtlivot'y ants tnt►wllctinn data 4.evided id die eolulitiouoi certltieodun. i Ine waste Manaltment ptpn and %Vill sutijtl : me E ••..(;tl.i. K.a tir1 � tad 11�;G . • PROUD SPONSOR 1.888.767.1999 Wq RECEIVED DUA111,, C1]ON AM 2 2 1999 Non -Discharge pemlit6ng, North Carolina Department of Correction Correction Enterprises P. O. Box 29540 2020 Yonkers Road • Raleigh, North Carolina 27626-0540 Apri4 16 999 James B. HuntJr., Uovernor NCDEN'R Division of Water Quality P. O. Box 29535 Raleigh, N. C. 27626-0535 Dear Ms. Thomas: James Godwin Enterprise Director Subject: Application No. AWP420001 Additional Information Request Caledonia Prison Farm Animal Waster Operation Halifax County Mack Jarvis, Secretary Enclosed is the additional information you requested in your letter dated April 8, 1999. Question # 1. Please note on Page 3, Animal Waste Utilization Plan, animal waste of nitrogen per acre for soybeans is at 15 pounds per acre rather than the usual 40 pounds per acre. The residual Nitrogen for soybeans is at 25 pounds per acre. Question # 2. Please note that the irrigation system and pump design were reviewed by NRCS Engineer,Joy Sherrod and met the NRCS specifications when installed. See the attached copy of letter dated 3/4/99. Question # 3. The waste water from the three layer houses will enter Lagoon # 2. The water is then gravity fed througli a pipe, into Lagoon # 1. From Lagoon # 1 it is transferred with a lift pump into Lagoon # 3. Please advise if you have any further questions or if we can be of any assistance. Sincerely, CALED/ONIA PRISON FARM Phillip C. Sykes Farm manager Sv� b Cc: John Clark Phone: (919) 716-3600 Courier # 53-71-00 Fax: (919) 716-3974 j0A • NRCS 201 St. Andrews Street Room 138 P.O. Box 10 Tarboro, NC 27886 Telephone (919) 641-7900 TO: John Clark SUBJECT: ENG - Caledonia Prison Poultry Operation Irrigation System Halifax County, NC DATE: March 4, 1999 n FROM: Joy Sherrod ` ' CC: Andrew Snead, NC Dept. of Correction I have reviewed the information submitted to me on the proposed waste water land application system for Caledonia Prison as furnished by Triangle Environmental Inc. Item # 3 under General Notes, Sheet 1 of 5 of the drawings, specifies 4 inch class 200 PVC. This should be 6 inch class 200 PVC to comply with the drawings and calculations. A review of the design showed the designer based his calculations on a Nelson 150.7 inch taper bore nozzle. I understand the poultry operation has a range of Nelson 100 ring nozzles. A 150 .7 inch taper bore nozzle will need to be purchased to meet the design requirements or the design revised to use one of the existing nozzles. Due to time constraints, purchasing the taper bore nozzle would be more efficient. On March 2, 1999, we laid out the location of the proposed hydrants and the beginning of each pull. Based on the measurements taken that day, length adjustments were made to pulls # 4A, 5A, 5B, 6, and 7. Pull #7 was changed to a 300 degree spray. These adjustments are shown on the attached map. I have made some revisions to the effective area calculations on the irrigated area worksheet, as was agreed to by Andrew Snead. The design will meet MRCS standards and specifications once the waste utilization plan is revised to show 29.9 acres of effective irrigated acreage under the traveler system. Approximately seventeen acres of coastal bermuda grass are required to utilize the PAN being produced. I understand that the cost share contract will pay on the required acres. The operator should be encouraged to maintain a permanent marker for the location of the gun cart at the start of each pull. Once the system is installed, a letter of certification is needed from the irrigation installer confirrning the system has been pressure tested and has been installed according to NRCS standards and specifications. You are encouraged to visit the site during installation and testing of the system. l (41 ANIMAL WASTE UTILIZATION PLAN 9 fig' V Producer: CALEDONIA PRISON Non-Discharge Parrni2ting Location: P.O. BOX 137�� TILLERY NC 27887 r` / �, ��U:;.� Telephone: 252-826-5621 Type Operation: Existing P51JL"nv LAYING. Number of Animals: 60000 head (Design Capacity) ` t STORAGE STRUCTURE: Anaerobic APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. 'This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 i ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methodsin the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may -want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific ..;crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 60000 head x tons waste/head/year = tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 60U00 head x .084 lbs - PAN/head/year = 5039.4 lbs . PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Paae: 2 ANIMAL WASTE UTILIZATION PLAN I TABLE 1: ACRES OWNED BY PRODUCER TRACT IFIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS ! DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH ITT TIME 4485 3304 86 StB FP 3.0 150 0 29.9 I SEPT-MAY 3304 3304 3304 3304 mr6r., 3304 3304 3304 3304 StB 81 IStH t6 t t t 28 StB -- 26 StB 28 StB BH 16.3 1315 10 129.9 19418.5 SBPT SG 29 49.3 0 29.9 I 11474.07 NOV-APR 210 SB 40 15 25 14.0 I 1 1 1 1 1 JUN -AUG . CO 800 96 0 I 114.0 11344 APR-AUG 210.0 C 120 0 I 1150 114.0 MAP, Ml SG 29 49.3 0 I 1 1 114.0 1690.2 NOV-APR SB I 40 15 25 4.8 172 JUN-AUG CO 800 0 I I 196 14.8 1460.8 APR-AUG C 120 0 I 1 1150 14.8 1720 MAR - JUN SG 29 49.3 0 I 1 1 14.8 1236.64 NOV-APR SEND I= I I 1 I TOTAL Page : 3 J/r�-4C- ANIMAL WASTE UTILIZATION PLAN - I Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. "DOTE: j The applicator is cautioned that P and K may be over applied while - meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a I nutrient management plan that addresses all nutrients. This plan only addresses.nitrogen. '1OTE: SOME FIELDS ARE SHOWN WITH A AND THESE FIELDS ARE PART OF THE NORMAL CROPPING ROTATION. THESE FIELDS MAY BE PLANTED WITH ANY ONE OF THESE CROPS, AND THE NUTIENT UPTAKE WILL HAVE TO BE ACCOUNTED FOR THAT PARTICULAR CROP. /c _12 0 71 zr r 0 c , 15 //C/ev���� 17144f je -12e At - ,✓�l/�oJF� X ale j rc WA F o JUN 0 , 1999 Non-Dischar ge Permiffig /1 ANIMAL WASTE UTILIZATION PLAN - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a %,' nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. i NOTE: SOME FIELDS ARE SHOWN WITH A ti THE NORMAL CROPPING ROTATION. THESEAFDJDTHES�E�'FIELDS ARE PART OF ANY ONE OF THESE CROPS, AND,THE NUTIEN,TPMAY BPLANTED TAKEWILLHAVE TOBEACCOUNTED FOR THAT PARTICULAR CROP. / i ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTALI0 -- Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, i hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the. season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Page: 5 ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables-1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY TONS 50 C CORN BUSHELS 1.25 CO COTTON POUNDS 0.12 FP TALL FESCUE -GRAZED TONS 50 SB SOYBEANS BUSHELS 1.0 SG SMALL GRAIN OVERSEEDED 1.7 TABLE 1 TABLE 2 TOTAL ** TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 78.6 0 0 78.6 * BALANCE *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Pane: 6 ANIMAL WASTE UTILIZATION PLAN t � *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not' exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This .rate is limited by initial soil moisture content, soil structure, soil ,texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the ' time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 3304 28 StB SB 0.5 *1.0 3304 60 StB SB 0.5 *1.0 3304 81 StB BH 0.5 *1.0 3304 86 StB FP 0.5 *1.0 3304 StB C 0.5 *1.0 3304 StB CO 0.5 *1.0 Page: 7 ANIMAL WASTE UTILIZATION PLAN I - 3304 �28 StB 3304 StB 3304 StB 3304 "60 StB 3304 StB SG SG 0.50 0.5 0.5 0.50 0.5 *1.0 *1.0 *1.0 *1.0 *1.0 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over. applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. .;Your facility is designed for 180.00 days of temporary storage and the ';"temporary storage must be removed on the average of once every 6.00 i months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application.rate prior to applying the waste. NARRATIVE OF OPERATION Page: 8 WASTE UTILIZATION PLAN V 4 a REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is.eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be.broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the.soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from .the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 9 rr WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. .(See Standard 393 - Filter Strips). 12.'Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall'be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 11 ANIMAL WASTE UTILIZATION PLAN i WASTE UTILIZATION PLAN AGREEMENT Name of Farm:CALEDONIA PRISON Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: CALEDONIA PRISON (Please print) Signature: Date: Name of M4 ag (I differe om owner): Signature: Date: Name of Person Preparing Plan: (Please print)John Y Clark Affiliation:NRCS Phone No. 919-583-3481 Address (Agency): Post Office Box 8 Halifax NC 27839-0008 Signature. __CQADate: Q�_� Page: 12 ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) I, hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent.Landowner: Waste Producer: Technical Representative: SWCD Representative: Date: Date: Date: Date: Term of Agreement: ,19 to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 13 ANIMAL WASTE UTILIZATION PLAN w STATE OF NORTH CAROLINA COUNTY OF I, , a Notary Public of said County, do hereby certify that personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this 19 ' My commission expires day of Notary Public. (SEAL) Page: 14 ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Partv Receiver Agreement I, hereby agree to apply waste generated by in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that , a Notary personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My•commission expires (SEAL) Notary Public. Page: 15 Q� It''� � N° i" t '�".�4fir,tFr, '� q, ''$�, •t1� ... � 14.X` ! .i v v �7 r + •.:A: 1r; � ,t� i 1 d tti v ��� � • n7'• 1 ���� t .3�'tr�� �(��� • 9r OTC �76 ➢ � r r. ;�K � P 1, ,� � ( y fly \,:. , r. ;a tr Fr'r J� � ja,•r .Y" o '. .\ "-r'IfiLir ., g, to r y 'iu =-IY•!'j.7i" { n• a� V' �' � � , r .i,;.�j,�r. fib+LU 'r i ,� j Cr t raj rPFw y,�� �, \ t � /' -r✓':/,7��v"D. �. f_� . i„1 • -� \ . r li �,}I��.c tic�'.N�,. `t �� '' �7/�rl� t ' � �• tY (� I�/.� �\,� �,! V4t'f%y��t Ff .. t }: r'.,.t '� 'zf� ;, t•�'•i �'„ h��,Fi4 1' � ��r�'• ..\ � ` , tul r !i , • ` y F j-OP.•t a . r ® ry r % +��J 4� 1��/ `'�,v1� if � � '� � �. %��-'►�ii'� � S�?�"t /��� �s�r�' �' � `' { �' (. f ` .�.•': � ,,' ,! �-- ? .:. ` S_] �yl` S ytf�,? ;•f. ,• ',, � `YV 1 1, I \• / �t / ` r • 4 . ? t •P"',f'� �(l!?rhPA' , .) vts� . ,, U� ti El� r r. ,,• TV �\�\Y / :=i"�'.`'�`�� / � •i �if�, ::�I� ` ys ...Rr"' tirt"� i .��'1" vi.t �• •. ,`� 1 t .r let,'� 7 /� .�\�,`tv .t._ r r \ v `'. � � � .. v r` � �e'� r y ��y3`r:..+ w•,�r}yi���;•: � ,'s i � a �1t�n+ t•.��,:1�{ NIX,, ' �' °, t_ +. ;,,, Si .i >• rZ L , ram. � T` r.. , < � •s �'t�if'rv. •, `r ',�� • /,�, { -.i'. r?' ,1 %. 'ds p rf r 1. r.r,.1 ,�N rtM ,y. �^j+,, t• -r',� 1 � , . , f • R , y.M, r. �F_ � 1 . �_ L. � • b+v'� 1 ( f ' 't� ' ,' � y � �. r1v, ,1'' tx ii tl rv"a } i .t'Y w��+•T .:G ";�� ' .. � �. �' 'P` �1 .�' J' � \` f � :•1'1. �T: r'' 1)./S � 1 r ,�A •;• t t:� ir.• .. ;1 '� � ,,�•. � _ .�` •-� ''•s �h . N /' .:�,j; k.#}. , t + 1 I; {fir d ' f � +'�, � � � ! � •� , r P!'?{ ,� 9� .{i�':•� �y,�t� 7i7�ntge 7� 7[r 7'vv� f. 7;l '�i, %,. �!. 7 1+r •"� t!ti !'rl4 74�1y �HSi 1•'rrii� �� f r: �` `• •,r � � eta" ?��', i � ,�" $, . �` 44, . f'+• ` w:�'•• .+ ,� `� 4•``� .ny tl� r_,• �•� rl �.r �rf ,.?qw, •_ r 4t,� r. •�r.� k �4r ��4� ���'%' �xr'''Cilr �+i S .t`r`�'�8 al'. ,� t<l;. 'i ;�,•.�:�{ 'aN �C,Q � � �: '�`,4.? •1= ,,r, 1, f� r� � .'R' ' (•� ' ?4 . ''; .r ', �� � 'fit �� i! ..�..7. � �°•'!f`•"� P:�x :A. �i t�!" (�' yyl�*��:-�',' �1 a 1F � ,.,'1'..,• �`� � �B'1": ^�tlit�.f,,yyy�� i .. '. r f Tf:� .'t ' f�al ,i�` }.4 �'"' h ..,�' -f ' f as •'. yCki•p,K. .✓' ti�'•' t J ,n- ,�''. � It, + )�'� l � '� rs 1 r � ern. -7� /- � • t� \ .� � P `j� fir. ,•• •� •4 { t �: �. •jti�: r' �r,It c 1. r. • 'f `._.t. :.+• s � :���'.}. •' ., rt r ; ;`_ 1�.�:'e'M�•f:� •r. F.Y=rl Ty rf !� ( J - v , s t• .. � V.• • � �f�l 111 �.» "'..; t J+' r^ V,. •f P�i� �- ` � .. � . ..� � 1 tl�:r�'. it i ..';�:?'ir l►�:��'.:•:, � %.a - . �. �`,w,4t �i F'o% 'I WT, PON, - lu do -is EApostue 'Ab 44m J L ZT., T775tZ F: =77-12, co. 71, vSri toAp FiLorms .t AV,.��-, \airs od x fs � ,qcNI �+. tip, ,� �• � - �~� ,(� � ,,. @. ...\�.. ��` �`.a� i � ti'ii p;,�,4 ��i�'.F 1�� ,� �; :fC� r• Ll.yr .�,-:' .p � %'. � ''{•" +�.�\� 1 .��/ � �. ti` r �'. 1 y. ��^�•�� ' n�� A � 'J'••'' � ~ a( Yi 4'" •� /� \ � \ \ J a fii J K, ,' , J•-`. \� •' f jr\��f�f r, l�7`3�•{ar YF.ly tL�rA, ,� r� ? Y ` .'��,�`. �\. "V ;. �'V \i L� ri4 ri A7 .a •i.,'A Fy'� �L'k r dIF r � � J i "�:.. / 'gyp. � J , Y',} i'�".e J '�:: j�°�.ty�''•-��'�d-C� .,: � � ` - i y' ; .. ::y , a L"YJ1r.(�' F � r • ��r' e /..y.:.4" T � � ` 4 r?nAy S-•L i. :,! l .. 1. f , j ¢, o-� y - / r C.•', r Lf iz n�Z`(j/,�Q` Zw 1.9 IAP P. ''k•'r�'la� � t• ! �1 11 '� ;, ra.. �i�t► i,� . l•" L. �,, 1) '�� � Z � \ rA Z L VuIR' b y (ice OD f it ZI 00 "'^� L .. � r•���'•r 4p �./} ."L'•' •t tI1F,� it'd ~.h',� .. �. 71--rW wr r n � �°'''�. ��}y�� _ a;. • fir• '.. ,r. I,.. � :' �.I :• ¢. _ � '� :'awl ,,:.�' `' v •ti Cry-•, �:"r." `x � ;, ��� ,..� _ .tip -r - ;�`_^•• �'`,. �, �� ,� z -�t YI>•. •�..:f,t. ,'�- i1, a, ^.;.•_ Sf 1` •rf*�;,� p 'I 1 a r �. � ,•tti`t;�y }', i � t\.! . .;A.; •, 1. cf 'r• -3r. �'� -•.�fh •' .•�•' �_��e� -i!t.i ,�'n � 1 f_S ',� ,. (.••.c�4.�•. :: i.is d.� A ��. •motif `� + ! 1ti r `r t Z1 �• �'e, e. ,1 .,,yt. � Jl �• ♦ 1 1� S ♦', ;,af*��y lat. b (- { 4(p i ro �' S�S" R� tint 1 .Y r J , ), • rr r- h ( ri t �� � � Tt!ir�F-Y��t r t ,II •%.••�~�: '\l, •-r r,' �- -• .r �' ��:U(rt;ll. �', �tl�I `�,,•"r �r?tl'( L , 1 -r' a 1i •r •y: r ''f. r.�. •t .,,'.'� .f , 'ti �,� i3•�I p,�',��V. ! TT f. j� t S i•�t-b,; ,, >� •, .. t r J`� ..1i hili'•� +� j� .f,� , � 1'•�. f, 1 THIS DESIGN IS FOR A SINGLE STAGE LAGOON (LAYER) U LIENTS NAME COUNTY TODAYS DATE DISTANCE TO NEAREST NONFARM RESIDENCE _> NUMBER OF LAYERS TREATMENT VOLUME (minimum 2.5 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > CALEDONIA FARMS HALIFAX COUNTY, NORTH CAROLINA SEPTEMBER 23, 1996 � 1 S 00 FEET 60000 TOP LENGTH AT NORMAL WATER LEVEL TOP WIDTH AT NORMAL WATER LEVEL NORMAL WATER LEVEL ELEVATION =_________> SEASONAL HIGH WATER TABLE ELEVATION =__> LAGOON BOTTOM ELEVATION Depth of Permanent Water 7.7 feet (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES ___________________________> Permanent Volume Required 675000.0 cubic Permanent Volume Provided 302910.1 cubic ADDITIONAL DRAINAGE AREA IN SQUARE FEET> (i.e. pumpout pond & other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY =___> EXCESS RAINFALL ABOVE EVAPORATION =____> 25YR/24HR STORM RAINFALL FREEBOARD Temporary Storage Volume 204860.3 2.5 0.0 YEARS 320.0 FEET 155.0 FEET 48.9 FEET 41.2 FEET 41.2 FEET 3.0:1 feet feet -73-DQ,a a.5 ek- 53477 SQUARE FEET 180 DAYS 780 GALLONS (EX 6 c .ss WI)7L 7.6 INCHES 6.6 INCHES 1.0 FEET cubic feet Top of Dam Elevation = 54.0 feet Inside Dimensions of Lagoon at Top of Dam Length = 350.6 feet Width = 185.6 feet Begin Pumping Elevation = 51.7 feet Stop Pumping Elevation = 48.9 feet STEADY STATE LIVE WEIGHT 4 60000 LAYERS X 4 POUNDS = 240000 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 240000 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.825 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in layers. Years of sludge accumulation in design? 0.0 Sludge Volume = D cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 2.5 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = ERROR cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 48.9 feet Construct lagoon bottom elevation 41.2 feet Lagoon size for -normal lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 3.0 3.0 3.0 3.0 7.7 AREA OF TOP LENGTH * WIDTH = '320.0 155.0 AREA OF BOTTOM Lb * Wb = 273.8 108.8 AREA OF MIDSECTION 49600.0 (AREA OF TOP) 29789.4 (AREA OF BOTTOM) (Lm * Wm) 296.9 131.9 39161.1 (AREA OF MIDSECTION) CU. YD. _ (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 49600.0 156644.4 29789.4 1.283 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL S= 302910.1 RROR CU. FT. VOLUME NEEDED = THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 320.0 FEET LONG BY 155.0 FEET WIDE DIKE Place spoil as a continuous dike to elevation �. TEMPORARY STORAGE REQUIRED 54.0 feet. DRAINAGE AREA: Lagoon (top of dike) Length * Width = 350.6 185.6 65071 square feet Additional Drainage Area 53477 square feet TOTAL DA 118548 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 240000 SSLW * 0.008 gallon/lb. SSLW/day * 180 days in the pumping cycle / 7.48 gallons per cu. ft. Volume = 46203.2 cubic feet 6B. Volume of excess water. This is the amount of excess water usage (see tech. guide 633-83) Volume = 780 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 18770.1 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.6 inches Volume = 7.6 inches * DA / 12 inches per foot Volume = 74685.5 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.6 inches * DA / 12 inches per foot Volume = 65201.6 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 46203.2 cubic feet 6B. 18770.1 cubic feet 6C. 74685.5 cubic feet 6D. 65201.6 cubic feet ,TOTAL TEMPORARY STORAGE 204860.3 cubic feet DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface ' area of lagoon. 204860 Cu. ft. / 49600 sq. Depth required = 860 feet Depth required = 4.1 Normal lagoon liquid elevation = 48.9 feet Depth required = 4.1 feet Freeboard = 1.0 feet Top of Dam = 54.0 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION ARE 350.6 FEET BY 185.6 FEET ft. 54.0 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 46203.2 cubic feet 6B. 18770.1 cubic feet 6C. 74685.5 cubic feet TOTAL PUMPED VOLUME = 139658.7 cubic feet Depth required Volume of pumped rmalstorage water lev divided by surface area oflagoon l. 139658.7 cu. ft. / 49600 sq. ft. Depth required = 2.g feet Depth required = / ' �, APPROVED BY: DESIGNED BY: ,;�-� DATE: DATE: /D/ '7 f �� / Farm Name: CALEDONIA LAGOON #1 4gdL/F,4X County: Date: SEPTEMBER 23, 1996 D PRISMODIAL FORMULA Length = 96 Width = 117 Depth = 8.1 Side Slope(ft/ft)= 1 Volume in Cubic Yards = 2878. 25 = -7 -7, 7/ 3 eu •4-4-. Top = Mid = OV Bottom = 11232 sq. ft. 9572.31 sq. ft. 87.9 lin. ft. X 108.9 lin. ft. 8043.84 sq. ft. 79.8 lin. ft. X 100.8 lin. ft. Prepared By: J P SHERROD ra••a 4-9.� Farm Name: CALEDONIA LAGOON #2 County: PITTFAX Date: SEPTEMBER 23, 1996 Q- 1, a• ) D i 3 RRI SMODIAL FORMULA Length = 314 Width = 127 Depth = 8.6 Side Slope(ft/ft)= Volume in Cubic Yards = Top = 39878 sq. ft. Mid = 36159.36 sq. ft. 1 11525.28 = 31 1, I 305.4 lin. ft. X 118.4 lin. ft. Y Bottom = 32588.64 sq. ft. 296.8 lin. ft. X 109.8 lin. ft. Prepared By: J P SHERROD North Carolina Division of Environmental Management AGREEMENT FOR THE LAND APPLICATION OF WASTEWATER RESIDUALS j TO PRIVATE LANDS Permittee: SEE APPENDIX VIII.4 Contact Person: GREGG CAMP Address of Permittee: - ROANOKE RAPIDS SANITARY DISTRICT P. 0. BOX 308 ROANOKE RAPIDS, NC 27870 List of wastewater residuals to be applied to these lands: RRSD ROANOKE RAPIDS WWTP Site ID Number: D:� o r o 6 o 7 Field Number. 7= , l Location of Land to be used for residual application (include map for each site): Owner of Property used for residual application: _ RC ot= 6�a2f-cziws Lessee of Property (if appropriate): W . S. LNESV EUT Fcx NCO o C. Land use or cropping patterns: A Utz( c,vczveto"- c etop-v Intended use or disposition of crops: kt�Ll - t4U1^4w c4Su syAP'r1W The undersigned land owner or his representative hereby permits ROANOKE RAPIDS SANITARY DISTRICT hereinafter referred to as the Permittee, to apply the above listed residuals onto the land at the location shown as described herein in accordance with the restrictions and stipulations as given below. The landowner or his representative receives, in consideration, full use of the nutrient value of the applied residuals while the Perr ittee receives, in consideration, the use of the land described above for the disposal of wastewater residuals. This agreement shall remain in effect for the length of the Division of Environmental Management land. application permit and shall be renewed each time the land application permit is renewed. The undersigned land owner or his representative and the Permittee agree to abide with the following restrictions and stipulations until such time as written notification, given thirty (30) days in advance, modifies or cancels this Land owner's Agreement.. Notification of cancellation of this agreement shall be immediately forwarded to: Division of Environmental Management Permits and Engineering Unit Post Office Box 29535 Raleigh, North Carolina 27626-0535 FORM: LARS 06/94 Page 15 of 18 STIPULATIONS: 1. The landowner or his representative hereby authorizes the Permittee, County and State Officials or their representatives to inspect each parcel of properly prior to, during, and after residual application and to established monitoring facilities on or near the application site as required by the residual land application permit 2. The landowner or his representative authorizes the Permittee, County and State Officials or their representatives to take necessary soil, surface and ground water samples during the term of, and twelve (12) months after termination of, this Agreement 3. The Permittee will provide each landowner or his representative with a copy of the land application permit as issued by the N.C. Department of Environment, Health and Natural Resources (NCDEHNR) Division of Environmental Management (DEM) for the land described above prior to commencement of residual application. The NCDEHNR-DEM permit will specify maximum application rates, limitations and other restrictions prescribed by the laws and regulations. 4. The Permittee has provided the landowner or his representative with information and data concerning the program for land application of residuals to privately owned lands which includes an analysis of constituents of the residual, residual application methods and schedules for typical cropping patterns and a description of the equipment used by the Permittee for residual application. 5. The Permittee will furnish each landowner or his representative with a copy of the results of each soil analysis. 6. The site shall be adequately limed to a soil pH of at least 6.0 prior to residual application. Residuals may be applied to sites with a pH of less than 6.0 provided a sufficient amount of lime is also applied to achieve a final pH of the lime, residual and soil mixture. of at least 6.0. 7. The landowner of his representative will inform the Permittee of any revisions or modifications to the intended use and cropping, patterns shown.above prior to each planting season to enable the Permittee to amend this Agreement and schedule applications at appropriate periods. Within the limits of the NCDEHNR-DEM permit, the owner or his representative and the Permittee will determine residual application rates and schedules based on crop patterns and the results of soil samples. 8. Crops for direct human consumption shall be harvested in accordance with the conditions of the permit 9. The landowner or his representatives or successors shall adhere to the provisions of this Agreement for a period of eighteen (18) months from the date of the most recent residual application. 10. Appropriate measures must be taken by the Permittee or Land Owner (Lessee) to control public access to `the land application sites during active site use and for the twelve (12) month period following residual application. Such controls may include the posting of signs indicating the activities being conducted at each site. 11. Specific residual application area boundaries shall be clearly marked on each site by the Permittee or Land Owner (Lessee) prior to and during application. 12. Should the landowner or his representative lease or otherwise permit the use of the land by a third party, the landowner shall be responsible to insure the third party agrees and complies with the terms and conditions of this Agreement 13. The existing lessee, if any, of the site agrees, by execution of this Agreement, to comply with all provisions of this Agreement FORM: LARS 06194 Page 16 of 13 a .114. This Agreement shall be binding on the grantees, the successors and assigns of the parties hereto with reference to the subject matter of this Agreement. 15. Animals should not be grazed on residual applied lands within a thirty (30) day period following the residual application. Application sites that are to be used for grazing shall have fencing that will be used to prevent access during these periods after each application. 16. Prior to a transfer of this land to a new owner, a permit modification must be requested and obtained from the Division of Environmental Management. The request shall contain appropriate fees and agreements. In addition, a notice shall be given by the current landowner to the new landowner that gives full details of the materials applied or incorporated at each site. 17. Any duly authorized officer, employee, or representative of the Division of Environmental Management may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the application site and facility at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be kept under the terms and conditions of this permit; or may obtain samples of groundwater, surface water, or leachate. 18. The landowner shall not enter into any additional waste disposal contracts or agreements with another municipality, contractor, or other permitted entity for the land specified by this Agreement. The land application of any additional wastewater residual sources, other than the residuals specified by this permit, is prohibited. RESTRICTIONS: FORM: LARS 06/94 Page 17 of 18 -, 1 have read this land owner's agreement and do hereby grant permission to the Permittee to apply sludge/residual to my lands as specified herein. Land Owner F;Isy Tti Dare NORTH CAROLINA, k It I COUNTY, L the undersigned Notary Public, do hereby certify that W • S• l.✓ fS i personally appeared before me this day and acknowledged the due execution of the forgoing inst=ent. WITNESS my hand and official se this day of 1Z , 19 NOT Y UBLIC My commission Expires >> z Y 9 7 SEAL: OFFICIAL SEAL s Notary PUbliC. North Carolina COUNTY OF FORSYTH ROY L. WHITAKER My Commission Expires Nov.23.1997 t # * * * * * * * * t * * t # * * t * * * * # * * * t * * * # * t * # * * * # * * t # t # * * t # # # t t * t # L have read this land owner's agreement and do hereby agree to abide by the stipulations and restrictions as specified herein. Lessee Date * * * * * * * * * + * * * * * * * * * t Jr Jr Jr * # +r * * * * * * * * # * * t * * * * * * * * * *• L (!:�" . Of 5`2"J (C.. —Ay is f JR • have read this land owner's agreement and do hereby agree to abide by the stipulations and restrictions as specified herein. , Petmittee Date FORM: LARS 06/94 Page 18 of 18 f ANNUAL LAND APPLICATION FIELD SUMMARY FORM FACILITY NAME: ROANOKE RAPIDS PERMIT # WQ001989 OWNER: CALEDONIA LIVESTOCK DIVISION SITE # : 005 FIELD # : 02 CATION EXCHANGE CAPACITY: 0.0 OPERATOR: Division TOTAL ACRES: 126.00 BUFFERED ACRES: 89.20 TOTAL DRY TONS APPLIED (ANNUAL): 178.35 CROP: Bermuda Lime Application (tons/acre) Date Applied Per Acre Dry tons/acre Residual Source %Solids Min. Rate Temperature Rain past 24 Site conditons Method 09/09/98 156000 gal. 1748.88 0.29 Roanoke Rapids 3.94 0.20 70-9'0 No rain Moist Surface 09/10/98 201500 gal. 2258.97 0.37 Roanoke Rapids 3.94 0.20 70-90 No rain Moist Surface 09/11/98 162500 gal. 1821.75 0.30 Roanoke Rapids 3.94 0.20 70-90 No rain Moist Surface 09/12/98 188500 gal. 2113.23 0.35 Roanoke Rapids 3.94 0.20 70-90 No rain Dry Surface 09/13/98 208000 gal. 2331.84 0.38 Roanoke Rapids 3.94 0.20 70-90 No rain Dry Surface 09/14/98 169000 gal. 1894.62 0.31 Roanoke Rapids 3.94 0.20 70-90 No rain Dry Surface LBS/ACRE TOTALS PAN P As Cd Cr Cu Pb Hg Mo Ni Se Zn Annual 1085500 12169.28 2.00 78.02 83.23 0.012 0.000 0.184 1.288 0.432 0.010 0.160 0.104 0.009 6.358 Cumulative 16.52 0.136 0.030 1.386 12.772 2.992 0.046 0.862 0.698 0.060 40.117 Permit limit (lbs./acre/year) 220 Cumulative Pollutant Loading kimit (lbs./acre) 34.79 2676.00 1338.00 267.60 15.16 16.06 374.64 89.20 2497.60 /336.57 Amsco, Inc e `" (SIGNATURE OF LAND APPLIER) U DATE ."I certify, under penalty of law, that this document was prepared under my direction or supervision to accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ANNUAL LAND APPLICATION FIELD SUMMARY`FORM FACILITY NAME: ROANOKE RAPIDS PERMIT # WQ001989 OWNER: CALEDONIA LIVESTOCK DIVISION SITE # : 005 FIELD # : 03 CATION EXCHANGE CAPACITY: 0.0 OPERATOR: Division TOTAL ACRES: 84.00 BUFFERED ACRES: 76.00 TOTAL DRY TONS APPLIED (ANNUAL): 168.45 CROP: Bermuda Lime Application (tons/acre) Date 07/06/98 07/07/98 07/08/98 07/09/98 07/10/98 07/11/98 07/12/98 Applied Per Acre Dry 97500 gal. 1282.89 175500 gal. 2309.21 143000 gal. 1881.58 117000 gal. 1539.47 175500 gal. 2309.21 208000 gal. 2736.84 130000 gal. 1710.53 tons/acre 0.21 0.37 0.30 0.25 0.37 0.44 0.28 Residual Source Roanoke Rapids Roanoke Rapids Roanoke Rapids Roanoke Rapids Roanoke Rapids Roanoke Rapids Roanoke Rapids %Solids 3.86 3.86 3.86 3.86 3.86 3.86 3.86 Min. Rate Temperature 0.20 70-90 0.20 70-90 0.20 70-90 0.20 >90 0.20 70-90 0.20 70-90 0.20 70-90 Rain past No rain No rain No rain No rain No rain No rain No rain 24 Site conditons Moist Dry Dry Moist Moist Moist Dry Method Surface Surface Surface Surface Surface Surface Surface LBS/ACRE TOTALS Annual Cumulative 1046500 13769.74 2.22 84.37 6.84 PAN 85.13 P As 0.012 0.034 Cd 0.004 0.011 Cr Cu 0.257 1.476 0.634 4.351 0.333 1.178 Pb Hg Mo 0.016 0.106 0.035 0.371 Ni 0.098 0.287 Se Zn 0.007 5.364 0.022 17.880 Permit limit (lbs./acre/year) 220 Cumulative Pollutant Loading Limit (lbs./acre) 36.57 34.79 2676.00 1338.00 267.60 15.16 16.06 374.64 89.20 2497.60 t Amsco, Inc v" %_-I✓ _% (/ v L (SIGNATURE OF LAND APPLIER) ATE "I certify, under penalty of la that this document was prepared under my direction or supervision to accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." :PORT NUMBER A&L EASTERN AGRICULTURAL LABORATORIES, INC. R014-.031 7621 Whitepine Road - Richmond, Virginia 23237 - (804) 743-9401 Fax No. (804) 271-6446 SEND AMSCO TO: 6490 STADIUM DRIVE P 0 BOX 1770 CLEMMONS NC 27012 TE OF REPORT 01 / 15 / 9 9 PAGE I CALADONIA LIVESTOCK GROWER: SOIL ANALYSIS REPORT SAMPLES SUBMITTED BY: ACCT # 45250 MIKE ROGERS DATE RECEIVED 01/13/99 DATE OF ANALYSIS 01/14/99 ORGANIC MATTER PHOSPHORUS-_ _ POTASSIUM :::r. ' MAGNESIUM. .' CALCIUM SODIUM pH ACIDITY I C.E.C. SAMPLE NUMBER LAB NUMBER % ENR BRAY PI BRQYP2 Ks':`'.:, MG.. :. CA NA SOIL BUFFER, 'H IbslA ppm RATE ppm RATE ppm • RATE ppm RATE ppm RATE ppm RATE pH INDEX meq/100g meq/100g )502 15652 5.0 137H 154 VH 206 VH 347-VH 323 VH 1090 M 7.1 0.0 9.0 PERCENT BASE SATURATION NITRATE - SULFUR ZINC IMANGANESE IRON COPPER BORON SOLUBLE CHLORIDE MOLYB- SAMPLE SALTS..,. DENUM MO NUMBER K Mg Ca Na ' H NOS N SO, S ZN MN FE CU B CL . °k °A °k q° %. ppm RATE ppm`. RATE ppm . RATE ppm RATE ppm RATE ppm RATE ppm RATE ms/cm RATE ppm RATE ppm RATE 3502 9.9 29.8 60.3 0.0 Slues on this report represent the plant available nutrients in the soil. T is r rtapplies to the sample(s) tested. Samples are retained a (planation of,symbolg: Values are expressed as % (percent), ppm (parts per million), or Ibs/A (pounds per acre). m Um of thlr: days after testing. Soil Analysis prepared by: ating after each value:'VL (Very Low), L (Low), M (Medium), H (High), VH (Very High). A a L A E/R/N�AGRICAULLTURAL L/AAB(J� '' "'p�IES, INC. . _ -.. .. hi:.... --- rl-I-..-.. P• r- /� n�a:.. ,. C.... L.........:��n�nih. // / / /1/) f .,./ 1/1 � n 1_' .:: -.%3lr,,.f.,. .,,-,:.5:2._;.terao. ° nc► :.»-,.., .c. x,; l)t.v...i.�sio-.n>. t..x,.z,, x4300,a R.e...e'rid y_M,. C>r._ ee... oaa:...:.. _. .... .>•� ,y5Y ~ r . �E 1:s� ,t '� e�o65kRisRlig..� tewa.,... wz m _ rower.- Caladonia Livestock Copies to: County E.xlei. Director • .. s , Attn: Greg Walker Amsco Inc. Rt 1 Box 137 Tillery, NC 27887 Report Anisco Inc. oZ vPst Farm: 05 Attn:Michael Rogers PO Box 1770 7/22/98 SERVING N.C. CITIZENS FOR OVER 50 YEARS Halifax County Ciemmons, NC 27012 Agronomist. Comments: FieldInformation�-u Lied<Lime -. Recommendations Sample No. Last Crop Ko Yr T/A Crop or Year Lime N 1105 KO Mg Cu Zn B Mn 'See Note 0503 Berm Hay/Pas,M 1st Crop: Berm Hay/Pas,M LIT 180-220 0 100-120 0 0 0 0 12 2nd Crop: Test Results Soil Class HM% W/V CEC BS% Ac pH P-1 K-I Ca% Mg% Mn-1 Mn-AI (1)Mn-AI (2) Zn-I Zn-AI Cu-I S-1 SS-1 Na-N NI1'-N Na MIN 0.56 1.14 7.9 85.0 1.2 5.6 117 49 67.0 15.0 475 294 295 295 86 72 0.1 f Name: Caledonia Livestock Division Rt. 1, Box 137 Tillery, NC 27887 919-826-5784 Landowner #: 05 Operator: Jeff Collier, Superintendent Greg Walker, Farm Manager Edward Outland, Cattle Manager Directions: From Halifax take HWY 561 East approximately 9 miles to SR 1141 and turn left. There is a sign in the direction of Caledonia. Go 2.5 miles on SR 1141 and Operations Office will be on left. Field # Total Acres Net Acres Cron 05-01c (sand bed) 78.0 50.0 bermuda 05-02 (fish pond) 126.0 89.8 " 05-03 (silage pit) 84.0 76.0 Total 224.3 174.0 L` ,tty HAL iFAX Owner 4VC.570cl< �-�C✓z:Sxonl ^•\ \ •� n N5 �\ n G p f/ • , O e a� �p- �\ -��� n \� �� / p \ ��\ ♦ as \ � • �, +\\ ` ...—� � ++ _ �\\� 'tea \\• +� '. \ �,•' ` \ �/ y\\ p $C / rya \ �„ \ ` `-� I / ♦ \,\ j , NA It PTO CO cr �'. a\i 11 r a'� i c� .'a ` `♦ a \�\\� +++C �WiIZG .\OOSaI + Pl VPortg� \ \\ . // � 1', �� / � //-�1 //.1/+ � ..ram � + \\ � Jo •, �+++ �` \ �\ \ \�6oa Ca C r—. e\ Form ! �� a• o`er \ ,�/ � I \ flat f � 56 L NV 0,00 0010 Ol � tl •i' \ � \ \ O H\ \ \ •`. •♦tin ,•., 2 � ' i Owner ark av;s,o Scale: V= ZDoo' Field SIAd81-1 i+z ems{ i ?10) 100 Sty . Cm k`S A -� S �`� ��c►.y 0 CALEDONIA LIVESTOCK DIVISION -er .Scale: V= 660' Feld rANDBED 1 & 2) 14 Total Acres .7y O Net Acres =g�-•d� r'` • • • -Stream �°`-'ate - Application Area - Forested Area - Steep Slopes S -House w -Pond - Unsuitable Soils fi�r - Well R - Rock Outcrop -4, . Wet Area - So-il BoniN9 . . . s Map �1/07 T SC.4C e CALEDONIA LIVESTOCK of VlatON Owner _ .Scale: 1". 400' Total Acres /2 6 Legend: Stream ^ . Application Area ������ • Steep Slopes - House - Unsuitable Soils . Well R - Rock Outcrop .I. Wet Area .0u 1 jLrAcww c.IG Mt*rs Field IFISH POND_ Net Acres 8 9 -8 - Wrested Area lapPond O - Soil Boring _ t FISH POND IV SILAGE PIT . i. CAL6DON 111 LIVFATOCK Ot V181011 Owner Av J SC31@: iw� 400r Field ILACE PIT) 3 Total Acres RN Net Acres 76 Legend: -Stream ev--Q^ .ApplleattonArca ������ • Steep Slopes House • Unsuitable Soils Well R Rock Outcrop Wet Area • Forested Area W:1 Pond E) - Soil Borir+q , To6ograph id Map +' •. Sw n .1 1' \I'\ / — • 14 2a. 0p14PTON CO50 GO N. •�.�\ �.' .1 1 � � � ,per � � % o .�; j�..��-• /�\I � � _` � • .�- � '.' jay/, a �posol _ • emu- cam` ♦�\ \ ♦�` > �o ♦ IS - �J • Form `\1`\ �.. ♦c IN IN -N,\ 14 it Ln \ 1 I - i- ^ n n a 1 al IV IN (OAtl ` ��\ %/� • -:�- �•:} ��' . nth �\'• %/- - - • • - - - - '- - _ _ - _ . Owner Scale: 1"= 2-oQn Reld L 5:/agt� F'si 'P",� 7llcry Co/rlc�;onol �pc•�%�y �ocNES CtZoSS/d�R,7S QvR� CALEDONIA LIVESTOCK DIVISION Owner -Scale: 1."= 4001 — - Total Acres /2 6 Legend: Stream _ Application Area Steep Slopes0 -House - Unsuitable Soils fif - Well R - Rock Outcrop y - Wet Area Field (FISH POND Net Acres _ 8 9. 8 • Forested Area -Pond O -Sail Borin9 4 9 V 7 I SILAGE PIT CALEDONIA LIVESTOCK DIVISION Owner 900 Field (SILAGE PIT) 3 Scale: I Total Acres R 4 Net Acres 76 Legend: Stream '°`�� • Application Area Steep Slopes -House - Unsuitable Soils Fl - Well R - Rock Outcrop .V - Wet Area - Forested Area w - Pond O S-o3 O - So;1 Boring Lva I 0 Z O N 1 .00, CQ 1 - ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 02/01/98 To: 02/28/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(55300.00000 mg/kg - 23600.00000 mg/kg) + 1.00(23600.00000) mg/kg + 75.00000 mg/kg .20(31700.00000 mg/kg) + 23600.00000 + 75.00000 mg/kg 6340.000.00 mg/kg + 23675.00000 mg/kg 30015.00000 mg/kg x .002 a 60.03000 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) .20(55300.00000 mg/kg - 23600.00000 mg/kg) .20(31700.00000 mg/kg) 6340.00000 mg/kg 18215.00000 mg/kg x .002 Plant Available Phosphorus + 0.50(NH3) + NO3 + NO2 + 0.50(23600.00000) mg/kg + 75.00000 mg/kg + 11800.00000 + 75.00000 mg/kg + 11875.00000 mg/kg 36.43000 lbs/dry ton 19900.00000 mg/kg x .002 - 39.80000 lbs, total P/dry ton 39.80000 x 2.3 - 91.54000 lbs P205/dry ton 91.54000 x .5 - 45.77000 lbs/dry ton Plant Available Potassium 3800.00000 mg/kg x .002 ® 7.60000 lbs total K/dry ton 7.60000 x 1.2 - 9.12000 lbs K20/dry ton 9.12000 x .5 - 4.56000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 03/01/98 To: 03/31/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 -20(55300.00000 mg/kg - 23600.00000 mg/kg) + 1.00(23600.00000) mg/kg + 75.00000 mg/kg .20(31700.00000 mg/kg) + 23600.00000 + 75.00000 mg/kg 6340.00000 mg/kg + 23675.00000 mg/kg 30015.00000 mg/kg x .002 ® 60.03000 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(55300.00000 mg/kg - 23600.00000 mg/kg) + 0.50(23600.00000) mg/kg + 75.00000 mg/kg .20(31700.00000 mg/kg) + 11800.00000 + 75.00000 mg/kg 6340.00000 mg/kg + 11875.00000 mg/kg 18215.00000 mg/kg x .002 - 36.43000 lbs/dry ton Plant Available Phosphorus i 19900.00000 mg/kg x .002 - 39.80000 lbs, total P/dry ton 39.80000 x 2.3 - 91.54000 lbs P205/dry ton 91.54000 x .5 - 45.77000 lbs/dry ton Plant Available Potassium 3800.00000 mg/kg x .002 - 7.60000 lbs total K/dry ton 7.60000 x 1.2 - 9.12000 lbs K20/dry ton 9.12000 x .5 0 4.56000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 04/01/98 To: 04/30/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + .20(56900.00000 mg/kg - 23700.00000 mg/kg) + .20(33200.00000 mg/kg) + 6640.00000 mg/kg + 30419.00000 mg/kg x .002 Plant Available Nitrogen (Surface) 1.00(NH3) + NO3 + NO2 1.00(23700.00000) mg/kg + 79.00000 mg/kg 23700.00000 + 79.00000 mg/kg 23779.00000 mg/kg 60.83800 lbs/dry ton .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(56900.00000 mg/kg - 23700.00000 mg/kg) + 0.50(23700.00000) mg/kg + 79.00000 mg/kg .20(33200.00000 mg/kg) + 11850.00000 + 79.00000 mg/kg 6640.00000 mg/kg + 11929.00000 mg/kg 18569.00000 mg/kg x .002 - 37.13800 lbs/dry ton Plant Available Phosphorus 20100.00000 mg/kg x .002 = 40.20000 lbs. total P/dry ton 40.20000 x 2.3 - 92.46000 lbs P205/dry ton 92.46000 x .5 - 46.23000 lbs/dry ton Plant Available Potassium 4800.00000 mg/kg x .002 - 9.60000 lbs total K/dry ton 9.60000 x 1.2 - 11.52000 lbs K20/dry ton 11.52000 x .5 - 5.76000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 05/01/98 To: 05/31/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(56900.00000 mg/kg - 23700.00000 mg/kg) + 1.00(23700.00000) mg/kg + 79.00000 mg/kg .20(33200.00000 mg/kg) + 23700.00000 + 79.00000 mg/kg 6640.00000 mg/kg + 23779.00000 mg/kg 30419.00000 mg/kg x .002 m 60.83800 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(56900.00000 mg/kg - 23700.00000 mg/kg) + 0.50(23700.00000) mg/kg + 79.00000 mg/kg .20(33200.00000 mg/kg) + 11850.00000 + 79.00000 mg/kg 6640.00000 mg/kg + 11929.00000 mg/kg 18569.00000 mg/kg x .002 - 37.13800 lbs/dry ton Plant Available Phosphorus 1 20100.00000 mg/kg x .002 - 40.20000 lbs. total P/dry ton 40.20000 x 2.3 - 92.46000 lbs P205/dry ton 92.46000 x .5 - 46.23000 lbs/dry ton Plant Available Potassium 4800.00000 mg/kg x .002 - 9.60000 lbs total K/dry ton 9.60000 x 1.2 - 11.52000 lbs K20/dry ton 11.52000 x .5 = 5.76000 lbs'/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 06/01/98 To: 06/30/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + .20(54900.00000 mg/kg - 26200.00000 mg/kg) + .20(28700.00000 mg/kg) + 5740.00000 mg/kg + 32134.00000 mg/kg x .002 Plant Available Nitrogen (Surface) .20(TKN - NH3) .20(54900.00000 mg/kg - 26200.00000 mg/kg) .20(28700.00000 mg/kg) 5740.00000 mg/kg 19034.00000 mg/kg x '.002 Plant Available Phosphorus 1.00(NH3) + NO3 + NO2 1.00(26200.00000) mg/kg + 194.00000 mg/kg 26200.00000 + 194.00000 mg/kg 26394.00000 mg/kg 64.26800 lbs/dry ton + 0.50(NH3) + NO3 + NO2 + 0.50(26200.00000) mg/kg + 194.00000 mg/kg + 13100.00000 + 194.00000 mg/kg + 13294.00000 mg/kg 38.06800 lbs/dry ton 16700.00000 mg/kg x .002 = 33.40000 lbs. total P/dry ton 33.40000 x 2.3 - 76.82000 lbs P205/dry ton 76.82000 x .5 - 38.41000 lbs/dry ton , Plant Available Potassium 3500.00000 mg/kg x .002 - 7.00000 lbs total K/dry ton 7.00000 x 1.2 - 8.40000 lbs K20/dry ton 8.40000 x .5 - 4.20000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant .PERMIT WQ001989 From: 07/01/98 To: 07/31/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(54900.00000 mg/kg - 26200.00000 mg/kg) + 1.00(26200.00000) mg/kg + 194.00000 mg/kg .20(28700.00000 mg/kg) + 26200.00000 + 194.00000 mg/kg 5740.00000 mg/kg + 26394.00000 mg/kg 32134.00000 mg/kg x .002 - 64.26800 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(54900.00000 mg/kg - 26200.00000 mg/kg) + 0.50(26200.00000) mg/kg + 194.00000 mg/kg .20(28700.00000 mg/kg) + 13100.00000 + 194.00000 mg/kg 5740.00000 mg/kg + 13294.00000 mg/kg 19034.00000 mg/kg x .002 - 38.06800 lbs/dry .ton Plant Available Phosphorus 16700.00000 mg/kg x .002 - 33.40000 lbs. total P/dry ton '• 33.40000 x 2.3 - 76.82000 lbs P205/dry ton 76.82000 x .5 - 38.41000 lbs/dry ton Plant Available Potassium 3500.00000 mg/kg x .002 - 7.00000 lbs total K/dry ton 7.00000 x 1.2 - 8.40000 lbs K20/dry ton 8.40000 x .5 - 4.20000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 08/01/98 To: 08/31/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(0.00000 mg/kg - 0.00000 mg/kg) + 1.00(0.00000) mg/kg + 0.00000 mg/kg .20(0.00000 mg/kg) + 0.00000 + 0.00000 mg/kg 0.00000 mg/kg + 0.00000 mg/kg 0.00000 mg/kg x .002 ® 0.00000 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(0.00000 mg/kg - 0.00000 mg/kg) + 0.50(0.00000) mg/kg + 0.00000 mg/kg .20(0.00000 mg/kg) + 0.00000 + 0.00000 mg/kg 0.00000 mg/kg + 0.00000 mg/kg 0.00000 mg/kg x .002 = 0.00000 lbs/dry ton Plant Available Phosphorus 0.00000 mg/kg x .002 - 0.00000 lbs. total P/dry ton 0.00000 x 2.3 - 0.00000 lbs P205/dry ton 0.00000 x .5 - 0.00000 lbs/dry ton Plant Available Potassium 0.00000 mg/kg x .002 - 0.00000 lbs total K/dry ton 0.00000 x 1.2 - 0.00000 lbs K20/dry ton 0.00000 x .5 - 0.00000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 09/01/98 . To: 09/30/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + .20(60200.00000 mg/kg - 24900.00000 mg/kg) + .20(35300.00000 mg/kg) + 7060.00000 mg/kg + 31960.00000 mg/kg x .002 Plant Available Nitrogen (Surface) .20(TKN - NH3) + .20(60200.00000 mg/kg - 24900.00000 mg/kg) + .20(35300.00000 mg/kg) + 7060.00000 mg/kg + 19510.00000 mg/kg x .002 - 1.00(NH3) + NO3 + NO2 1.00(24900.00000) mg/kg + 0.00000 mg/kg 24900.00000 + 0.00000 mg/kg 24900.00000 mg/kg 63.92000 lbs/dry ton 0.50(NH3) + NO3 + NO2 0.50(24900.00000) mg/kg + 0.00000 mg/kg 12450.00000 + 0.00000 mg/kg 12450.00000 mg/kg 39.02000 lbs/dry ton Plant Available Phosphorus 18100.00000 mg/kg x .002 - 36.20000 lbs, total P/dry ton 36.20000 x 2.3 - 83.26000 lbs P205/dry ton 83.26000 x .5 - 41.63000 lbs/dry ton Plant Available Potassium 3200.00000 mg/kg x .002 - 6.40000 lbs total K/dry ton 6.40000 x 1.2 - 7.68000 lbs K20/dry ton 7.68000 x .5 - 3.84000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 10/01/98 To: 10/31/98 * NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(60200.00000 mg/kg - 24900.00000 mg/kg) + 1.00(24900.00000) mg/kg + 0.00000 mg/kg .20(35300.00000 mg/kg) + 24900.00000 + 0.00000 mg/kg 7060.00000 mg/kg + 24900.00000 mg/kg 31960.00000 mg/kg x .002 - 63.92000 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(60200.00000 mg/kg - 24900.00000 mg/kg) + 0.50(24900.00000) mg/kg + 0.00000 mg/kg .20(35300.00000 mg/kg) + 12450.00000 + 0.00000 mg/kg 7060.00000 mg/kg + 12450.00000 mg/kg 19510.00000 mg/kg x .002 - 39.02000 lbs/dry ton Plant Available Phosphorus 18100.00000 mg/kg x .002 - 36.20000 lbs. total P/dry ton 36.20000 x 2.3 - 83.26000 lbs P205/dry ton 83.26000 x .5 m 41.63000 lbs/dry ton Plant Available Potassium 3200.00000 mg/kg x .002 - 6.40000 lbs total K/dry ton 6.40000 x 1.2 - 7.68000 lbs K20/dry ton 7.68000 x .5 = 3.84000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 11/01/98 To: 11/30/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(54200.00000 mg/kg - 22300.00000 mg/kg) + 1.00(22300.00000) mg/kg + 0.00000 mg/kg .20(31900.00000 mg/kg) + 22300.00000 + 0.00000 mg/kg 6380.00000 mg/kg + 22300.00000 mg/kg 28680.00000 mg/kg x .002 - 57.36000 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(54200.00000 mg/kg - 22300.00000 mg/kg) + 0.50(22300.00000) mg/kg + 0.00000 mg/kg .20(31900.00000 mg/kg) + 11150.00000 + 0.00000 mg/kg 6380.00000 mg/kg + 11150.00000 mg/kg 17530.00000 mg/kg x .002 - 35.06000 lbs/dry ton Plant Available Phosphorus 16500.00000 mg/kg x .002 - 33.00000 lbs. total P/dry ton 33.00000 x 2.3 - 75.90000 lbs P205/dry ton 75.90000 x .5 - 37.95000 lbs/dry ton Plant Available Potassium 3200.00000 mg/kg x .002 0 6.40000 lbs total K/dry ton 6.40000 x 1.2 - 7.68000 lbs K20/dry ton 7.68000 x .5 - 3.84000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Digester Waste Treatment Plant PERMIT WQ001989 From: 11/01/98 To: 11/30/98 * NUTRIENTS* Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(39400.00000 mg/kg - 11000.00000 mg/kg) + 1.00(11000.00000) mg/kg + 29.00000 mg/kg .20(28400.00000 mg/kg) + 11000.00000 + 29.00000 mg/kg 5680.00000 mg/kg + 11029.00000 mg/kg 16709.00000 mg/kg x .002 - 33.41800 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(39400.00000 mg/kg - 11000.00000 mg/kg) + 0.50(11000.00000) mg/kg + 29.00000 mg/kg .20(28400.00000 mg/kg) + 5500.00000 + 29.00000 mg/kg 5680.00000 mg/kg + 5529.00000 mg/kg 11209.00000 mg/kg x .002 - 22.41800 lbs/dry ton Plant Available Phosphorus 7900.00000 mg/kg x .002 - 15.80000 lbs. total P/dry ton '. 15.80000 x 2.3 - 36.34000 lbs P205/dry ton 36.34000 x .5 - 18.17000 lbs/dry ton Plant Available Potassium 700.00000 mg/kg x .002 - 1.40000 lbs total K/dry ton 1.40000 x 1.2 = 1.68000 lbs K20/dry ton 1.68000 x .5 - 0.84000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Digester Waste Treatment Plant PERMIT WQ001989 From: 12/01/98 To: 12/31/98 * NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(39400.00000 mg/kg - 11000.00000 mg/kg) + 1.00(11000.00000) mg/kg + 29.00000 mg/kg .20(28400.00000 mg/kg) + 11000.00000 + 29.00000 mg/kg 5680.00000 mg/kg + 11029.00000 mg/kg 16709.00000 mg/kg x .002 - 33.41800 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(39400.00000 mg/kg - 11000.00000 mg/kg) + 0.50(11000.00000) mg/kg + 29.00000 mg/kg .20(28400.00000 mg/kg) + 5500.00000 + 29.00000 mg/kg 5680.00000 mg/kg + 5529.00000 mg/kg 11209.00000 mg/kg x .002 - 22.41800 lbs/dry ton Plant Available Phosphorus 7900.00000 mg/kg x .002 - 15.80000 lbs. total P/dry ton 15.80000 x 2.3 = 36.34000 lbs P205/dry ton 36.34000 x .5 - 18.17000 lbs/dry ton Plant Available Potassium 700.00000 mg/kg x .002 - 1.40000 lbs total K/dry ton 1.40000 x 1.2 - 1.68000 lbs K20/dry ton 1.68000 x .5 - 0.84000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Roanoke Rapids Waste Treatment Plant PERMIT WQ001989 From: 12/01/99 To: 12/31/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(54200.00000 mg/kg - 22300.00000 mg/kg) + 1.00(22300.00000) mg/kg + 0.00000 mg/kg .20(31900.00000 mg/kg) + 22300.00000 + 0.00000 mg/kg - 6380.00000 mg/kg + 22300.00000 mg/kg 28680.00000 mg/kg x .002 = 57.36000 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(54200.00000 mg/kg - 22300.00000 mg/kg) + 0.50(22300.00000) mg/kg + 0.00000 mg/kg .20(31900.00000 mg/kg) + 11150.00000 + 0.00000 mg/kg 6380.00000 mg/kg + 11150.00000 mg/kg 17530.00000 mg/kg x .002 - 35.06000 lbs/dry ton Plant Available Phosphorus 16500.00000 mg/kg x .002 - 33.00000 lbs. total P/dry ton 33.00000 x 2.3 - 75.90000 lbs P205/dry ton 75.90000 x .5 = 37.95000 lbs/dry ton Plant Available Potassium 3200.00000 mg/kg x .002 - 6.40000 lbs total K/dry ton 6.40000 x 1.2 - 7.68000 lbs K20/dry ton 7.68000 x .5 - 3.84000 lbs/dry ton Print Date: 03/17/99 ROANOKE RAPIDS Dewatered Waste Treatment Plant PERMIT WQ001989 From: 12/01/98 To: 12/31/98 ** NUTRIENTS ** Plant Available Nitrogen (Injection) .20(TKN - NH3) + 1.00(NH3) + NO3 + NO2 .20(21500.00000 mg/kg - 1000.00000 mg/kg) + 1.00(1000.00000) mg/kg + 25.00000 mg/kg .20(20500.00000 mg/kg) + 1000.00000 + 25.00000 mg/kg 4100.00000 mg/kg + 1025.00000 mg/kg 5125.00000 mg/kg x .002 - 10.25000 lbs/dry ton Plant Available Nitrogen (Surface) .20(TKN - NH3) + 0.50(NH3) + NO3 + NO2 .20(21500.00000 mg/kg - 1000.00000 mg/kg) + 0.50(1000.00000) mg/kg + 25.00000 mg/kg .20(20500.00000 mg/kg) + 500.00000 + 25.00000 mg/kg 4100.00000 mg/kg + 525.00000 mg/kg 4625.00000 mg/kg x .002 - 9.25000 lbs/dry ton Plant Available Phosphorus 7600.00000 mg/kg x .002 - 15.20000 lbs. total P/dry ton ! 15.20000 x 2.3 - 34.96000 lbs P205/dry ton 34.96000 x .5 - 17.48000 lbs/dry ton Plant Available Potassium 700.00000 mg/kg x .002 = 1.40000 lbs total K/dry ton 1.40000 x 1.2 = 1.68000 lbs K20/dry ton 1,68000 x .5 - 0.84000 lbs/dry ton Print Date: 03/17/99 ANIMAL WASTE UTILIZATION PLAN Producer: r Location: Telephone: Type Operation: Number of Animals: (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: CALEDONIA PRISON P.O. BOX 137 TILLERY NC 27887 252-826-5621 Existing poultry La 60000 head Anaerobic Irrigation 9 The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the was is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in,implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil ypes are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4.1 Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 � s•, ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum -range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 60000 head x tons waste/head/year = tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 60000 head x *084lbs PAN/head/year = 5039.4 lbs. PAN/year Applying the above amount of.waste is a big job. You should plan time. and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 r ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME 4485 3304 86 StB FP 3.0 150 0 29.9 I SEPT-MAY 3304 3304 3304 3304 3304 3304 3304 3304 3304 3304 81 IStB -81 StB 60 StB -60 StB -60 StB -60 StB 28 StB tB -28 IStB -28 StB END BH I6.3 1315 10 SG 29 49.3 0 I SB 40 40 0 I CO 900 0 I 1108 C 120 0 I 1150 SG 29 49.3 0 I SB 40 40 0 I CO 0 I 1900 1108 C 120 0 I 1150 SG 129 149.3 1 0 I I 36.4 111466 APR-SEPT 36.4 11794.52 NOV-APR 14.0 1560 JUN-AUG 14.0 1512 APR-AUG 14.0 12100 MAR-JUN 14.0 1690.2 NOV-APR 4.8 1192 JUN-AUG 4.8 1518.4 APR-AUG 4.8 1720 MAR-JUN 4.8 1236.64 NOV-APR TOTAL Page: 3 L, ANIMAL WASTE UTILIZATION PLAN - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. . NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. NOTE: SOME FIELDS ARE SHOWN WITH A (ti) AND THESE FIELDS ARE PART OF THE NORMAL CROPPING ROTATION. THESE FIELDS MAY BE PLANTED WITH ANY ONE OF THESE CROPS, AND THE NUTIENT UPTAKE WILL HAVE TO BE ACCOUNTED FOR THAT PARTICULAR CROP. Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTALI0 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height'of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain.for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. the following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY TONS 50 C CORN BUSHELS 1.25 CO COTTON POUNDS 0.12 FP TALL FESCUE -GRAZED TONS 50 SB SOYBEANS BUSHELS 1.0 SG SMALL GRAIN OVERSEEDED 1.7 TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES 1 AND 2 ACRES 85.1 0 85.1 *** BALANCE LBS AW N USED 0 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. 0 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface, irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 3304 28 StB SB 0.5 *1.0 3304 60 StB. SB 0.5 *1.0 3304 81 StB BH 0.5 *1.0 3304 86 StB FP 0.5 *1.0 3304 728 StB C 0.5 *1.0 3304 '28 StB CO 0.5 *1.0 T 17 ANIMAL WASTE UTILIZATION PLAN 3304 `28 StB SG 0.50 *1.0 3304 760 StB C 0.5 *1.0 3304 �60 StB CO 0.5 *1.0 3304 "60 StB SG 0.50 *1.0 3304 "81 StB SG 0.5 *1.0 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00- months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Tom, ....- . r% WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that.is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10..Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25'feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by.a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways,.waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if . animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season.• 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 11 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:CALEDONIA PRISON Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review'by NCDWQ upon request. Name of Facility Owner: CALEDON A PRISON (Please print) Signature: Date: Name of Manager(If different rom owner):_ Signature: Date: Name of Person Preparing Plan: (Please print)John Y Clark Affiliation:NRCS Phone No. 919-583-3481 Address (Agency): Post Office Box 8 Halifax NC 27839-0008 Signature: J Date: 1ZgZ29 Paae: 12 ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) I, hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Waste Producer: Technical Representative: SWCD Representative: Date: Date: Date: Date: Term of Agreement: ,19_ to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) t ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this My commission expires (SEAL) 19 day of Notary Public. Panes 1.4 ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement I, hereby agree to apply waste generated by in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division�of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF 19 Public of said County, do hereby certify that , a Notary personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires (SEAL) Notary Public. Page: 15 All, 7axns In 'v- A f 19L �t" 1A kk- I .��� - ,•� `� .� r��c� ` \ � � !lam \ `�,\ r`^_' \ •. :. •� 't,Qv. �.w iU.`'I;" / •^mil 3 rJ -''1 y� �. �,� / \ J. 467 � i Nw ,x ggp,Le Yf a'� n tj` r ,tia r � %•��1.. "r ..� � s� '' / R ��,• L... it 11 - - , ' �'� vile A l p kr. :� -. ! �'�. - _ i , ;. /! Y�•. - 1 �\ �� t_t�. ems: .... � $' ;.';4- -:� PI 67 CG .� • �d�1 I l . F � Is 11' i�� ° '�^��+ . `. f � �i •�?pal'` A� ��� 11 r "ji}'f ,. +�r•�'(��'�i� � ��`ti� '�-.„�'T � � �• � : � a =' ar�a .�.. a_�. 1��.,,•�.. �..��.,�y-','��•'� II, 'It r \yo # ark n V 1- v -7 77- 4 10 ro Expost&re 31� fj . . . . . . . . . . . . . : tlA �77. Insect Control Checklist for Animal Operations Cause 11MI's to Cou(rol Insects Site Specific Practices _ 1.14111111 Systems Hudl (i1111C1 S • Accumulation of Solids Flush system is designed and operated stlfticiemly to remove accumulated solids front gutters as designed. 0 Remove bridging of accumulated solids -it - - - - — �s4barge - - - - k1gwuls and I'ils Crusted Solids Maintain lagoons, scaling basins and pits where pest breeding is apparent to minimize [lie crusting of solids to a depth of no more than 6 - 8 inches over more than 30% of surface. Exces�'We VCgoilive Decuying vegcialion Maintain vegetative control along banks of I iru�� lh lagoons and other impoundments to prevent accumulation of decaying vegetative matter along waters edge on impoundment's perimeter. Dry Systems 0 Deed Spillage Design, operate and maintain feed syslems bunkers and troughs) to minimize the "ecumulaliun of decaying wastage. W-Cican up spillage on a routine basis (e.g., 7 - 10 day interval during sunuucr; 15-30 day interval during winter). I.cc', SiMil .e 0 Accumulations of feed residues RMIUCC moisture accumulation wilhin and amend im medialc perimeter of tixti slor.%c areas by insuring drainage away from site anlVor providing adc(Itmic containment covered bin for brewer's grain and similar high j�Inisture grain producls). M Inspect ror and remove or break up-uccumulated solids in filter strips around feed storage as needed. AN1I • - V14-C-11cl 11. 1'►'H6, I'31;C I Jllllrl'L• CUUSe Animal I Wiling Areas Accumulations ofanintal wastes _ [j and feed wastage n f)ry hL'ulluc I L11111ling • Accumulations of animal wastes 1`3 Systcnu n Cl BMPs to Conlral Insects- Sitc Specific Practices Eliminate low areas that trap moisture along fences and other locations where waste accumulates and disturbance by animals is minimal. Maintain fence rows and filler strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as ncc(led). Remove spillage on a routine busis (e.g., 7 - 10 ' clay interval during summer; 15-30 day interval during winter) where manure is loaded for land application or disposal. Provide for adequate drainage around manure stockpiles. Inspect for and remove or break up accuntulaled wastes in filter strips around stockpiles and manure handling areas as needed. 1'or more inllrnwaion contact the Cooperative Extension Service, Npartntcnt of Entomology, [lox 7613, North Carolina State l luivershy, Raleigh. N(", 2769i-7613. . ANIIC :nlllcr 11, 1996, Page 2 --&a hTL-Farm Waste Management Odor Control Checklist tiuurce — cause 11119I's to Mluilnize 011111r Site Specific Practices I ;unute;ul-- Swine production n Vegetative or wooded buffers; --- n Recommended best management practices; n Gond judgment and common sense Aoiolal body surfaces 0 Dirty manure-comed animals Cl Dry floors . I loor�ml:�cc�0 wet manure -covered floors Cl Slotted floors; n Walcrcrs located over slotted floors; n Feeders at high end of solid floors; n Scrape manure buildup from floors; n Underfloor ventilation for drying ALuulre cuncCllult bits & Ifrinc; n Frequent manure removal by flush, pit recharge. • Partial microbial decomposition or scrape; Cl Underfloor ventilation vc,llil.1ii4111 cxhil l falls volatile bases; n ran maintenance; nest n Efficient air movement 1111loor sot faccs a Dust Cl Washdown between groups of animals; n feed aridiiives; n Feeder covers; n Feed delivery downspout cxlenders to feeder covers I'lun.h t.uil.s Agitation of recycled lagoon [l blush lank covers; hilitid while tanks are fining n I'smcnd fill lines to near bollom oriai&s with anti -siphon vents I:luNII alleys 0 Agitation during waslewater n Underfloor flush with underfloor ventilation conveyance I'll IcrII.ul;c Iloiuts 0 Agitation of recycled lagoon n Extend recharge lines to near bouonl of pits liquid while pill are filling wilh anti -siphon vents I:il-1 Nlalions aAgitation during sump Tank CI Sump lank covers filling and drawdown olltsitic Jr;Iin collection Agitation during waslewater n Ilox covers or jllnclion boxes conveyance ANV IC - I-111-1lbcr 11. 1996, Page Source Cruse nMPs to Allaiutize Odor Sile Specific Practices find of drainpipes at Agitation during wastewater n extend discharge point of pipes undl:rneath lagoon conveyance lagoon liquid level Lagoon surfaces Volatile gas emissions; Proper lagoon liquid capacity; • Biological mixing; t Correct lagoon startup procedures; ' Agltauolt R" inimum surface area -to* -volume ratio; C1 Minimum agitation when.pumping; CI Mechanical aeration; n Proven biological additives Irrigalion sprinkler t ligh pressure agitation; Irrigate on dry days with little or no wind; na�ulcs Wind drift Minimum recommended operating pressure; Pump intake near lagoon liquid surface; Cei' Pump frnm second -stage lagoon SimaLc lack ur basin Parllal llrlcrobiul decomposilion; n Ilotioni or midlevel loading; sill lace • Mixing While filling; n Tank covers; • Agllallon wheal Clnplying n Basin surface mats of solids; L"1 Proven biological adifilim or oxidants Sclllnlg haslal sm mike • Paiiial microbial decomposidon; C7 Extend drainpipe otnlets undcrnealh liquid • Mixing while filling; level; • Agitation when emptying C7 Remove seeded solids regularly t`I:uuare flurry ur sludge • Agitation when spreading: L1 Soil injection of shiny/sludges; spreader outicls 0 Volalile gas emissions O Wash residual manure from spreader after use: M Proven biological additives or oxidants l Ina,vered m:ulilre, Volatile gas emissions while O Soil injection of slurry/sludges slurry or sludge on field drying Cl Soil incorporation wilhin 48 firs.; surfaces 1.1 Spread in thin unirornt layers for rapid drying; Cl Proven biological additives or oxillanls Dead animals Carcass decomposition Proper disposition orcarcasses Dead :uaivaal di.pus:ll Caress deconlposilion n Complete covering or carcasses in burial pin; bits O I ,roper location/constntctinn ordisposal pits Incincl:llill s Incomplete colnlwstion Secondary stack burners ANV ivemlicr 11. 1996, Page it Sn11rce ra�wo Cause f, ;I•.;..g . UILI aJuuuu • Improper drainage; IIMPc in Mi..;... .,e n.�.... Grade and landscape such that, water drains ail Itl" . Microbial decomposilion of away from facilities organic matter Almillrc hacked only a I'oarly maintained access roads Nunn access road muinlenance Illlblic roads linnl farm access Site Sl►ecific 11radices Addilional Information : Available From : Swine Al;ulur.: blanal;culent ; 0200 Rule/I1MP Packcl Swim Production Fanu Potential Odor Sources and Remedies ; FBAE Fact Sheet NCSI I. Counly Extension Center NCSIJ - IIAE Swine Prnduclion Facility Manurc Management: Pit 11ccllarge - Lagoon Treatment ; EBAC 128-88 NCSIJ - 11A1: Swine Production Facility Manurc Management: Underfloor flush - Lagoon Trealmeni ; C11AE 129-88 NCSIJ - BAE Lagoon Design and Management for Livestock Manure Treatment and Storage ; r11AR 103-83 NCSIJ - I IA E Calibration of Manurc and Wastewater Application L(hnpinclll ; CDAG fact Shed NCSIJ - IIAE Cuutrulling Odors from Swine Iluildings ; PH I-33 NCSIJ - Swine [extension Euvimnmcnull Assurance Program ; Nl,PC Manual NC fork Producers Assoc Olrtimis I'or Managing Odor ; a repon Isom the Swine Odor Task Force NCSII Agri Unnnuulir.,tinns Nuisance Concerns in Animal Manure Management: Odors and flies ; PROW. 1995 Conference Proceedings Florida Cooperative Extension AtM 1(: - Ilovcm1scl 11, 1996, 11.ige 5 E1\1ER GEN CY ACTION PLAN PH \ `Z1"vIBERS DWQ (Gle, - 5-7/ — y7 0 0 i,:.; E.'IERGEVCY NI.-\:NAGEME.N-T SYSTEM 15;10- Sf S"- Z 03 / SWCD � r ,� , ,. •ii. r^�' 1V-RCS.;:�9i9):SR3-3`�g/ This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave vour property to consider that you have a problem. You should make every effort to ensure that this does not happen.- This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed befow. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. - e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. In'corporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close %,aJ'ves to eliminate further dis:harge. d. Repair all leeks prior to restarting pumps. D: Leakage from Flush systems. houses.:olld separators -action ine!ude: a. Stop recycle pump. b. Stop irri__atian pump. c. Make sure no :Iphon occurs. d. Stop ,:II tlo%% ; in the house. tlusi <� items. Or s.`li.l :epura(ors, 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting • Engineer. etc.) a. Name: D A I�/ge S b. Phone: r7/1) - 5,f3 — 3 y 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage. repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. N-lortality Management i\'Iethods (check which methods) are being implemented) .I Burial three feet beneath the surface of the eround within 24 hours after knowledge of the death. The burial must be at least 300 feet from anv flowinL, stream or public body of water. " =� Rendering at a rendering plant licensed under G.S. 106-168.7 Complete incineration In the_ case of dead poultry only, placing in a disposal pit of a size and desien approved by the Department of Agnculture =� Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) J4 System Calibration Information presented in manufacturer's charts are based on average «� operating conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of _ coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reasons, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves o %cting an measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect per a icular to the direction of pull. Set out collection container 25 feet a art long the transect on both sides of the gun cart. You s ould compute the average application rate for all collection containers. You should also look for evidence of nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. %•f./i„ ,..-„ ..., ., .; ; .: •rti.' iuti �t OQ. �� hi..i% •'_({W� "/t9.t?N' � it 'a r1 y S�W r�[r 1 A i t �S. Department of Agriculture111 ~ �A14k~ATM ` NC-ENG-34 , .'Soil Conservation Service September,.1980 HAZARD CLASSIFICATION DATA SHEET FOR.DAMS.t"r` Landowner ('alAn�ania �rSon t=ar.» county.—. yi1 /, , y' . Community or Group No. Conservation Plan No. — - 5"¢0-. 4sS /o&-estpt a/an9 Estimated Depth of Water to'Top of Dam '.5 Ft. Length of Flood Pool., 3 5/' Ft r Date of Field Hazard Investigation '7/dy/94, Evaluation by reach of flood plain downstream to"the point of estimated minor effect,,..._-,-,, from sudden dam, failure. Est. Elev. s evation • Kind.of . .:Improvements ' of .Breach ;},r• Reach: Length: Width: Slope: • Land Use ' 'Improvements, 'Above.'.4 •Floodwater Above .; v :"Flood `Plain• `Flood'Pl:ain Ft. . Ft. . ; Ft • '1 t.n 3 Describe, potential for loss of life and damage `to< existing or, probable , future downstream „ improvements -from a sudden breach d'` �`.`;, fi'�,/` -fir l0 /57SN Hazard Classification of Dam (a, b., �c) (see NEM-Part 520.'21) Q Dam Classification (I, II, III, IV, V) 7-r c �,�,. CSC Y B Date me ti t e .." •; • Concurred By. C .. �:f Date na title NOTE: 1. Instructions on reverse side. 2. Attach• additional sheets as needed. • 1 at+;r • • •-• The. purpose of,,this. plan •is,,,to:rprovide. guidelines for carrying out the routine'.operation and maintenance work needed to keep this swine waste "management . r.jsystem;:.function'ing•.,as planned. Routine maintenance is considered..`to be'normal good"'care'of the system. Good maintenance='adds:;,to, beauty,,!usefulness, and permanence. A. Maintenance:::; The routinec.,maintenance;:,of the lagoon involves the following: 1. Maintenance",of a.vegetative cover on the embankment top and side slopes: FESCUE is being established on;;;these jareas.,,,.IBeginning.:in)Il9.96,:;;and each', year 6thereafter y ` ;the?!;embankment.,,-. shou ld :,ber;ferti1ized '?', with+:,800:_poundst.ofr410-10=10. �per,',acret:to; maintain a.',vigorous stand. 2: Control4'of;;brush;,,;and;�trees ion:•:the;�embankment-. , I.This<t,mayj be done. by mowing,.... owing,... spraying;! or :chopping,', or a 'combination -of all three. LThisJ,will`„need' :.to,,be:'.done,j•atr least ;once ;each year•:and possibly",=twice-�.in'.-years favorabler+to;•.heavy;:growth,..., of -;vegetation. t.:,`, 4, V��:: !...4t Y• ai'i� %�'.�.t '•')'. �1 � .i.i:?•;. ¢: +: (: '�R Cal: t:: V C: 17. i'•i; .. ?..7i., •a:i !.. :.'i s �`. . Maintenances;inspections'.: ofvthe�lagoon;, shouldcbe•,-,made.;;during-the.. initial„..filling;:.ofc; the lagoon ''.andratsleast, monthly. ;iItems -..,to'.,be checked should L,include, 1'as:�•a" minimum, Mahe ,following: ;;:- '' i' {, �".i�?t"Ptits';T;��'S,i•:. �71i�•.'.�{��;:r�. ',�.i.�,C,tSU�; a ^q%'1a. vr� i;::� :-�:. :� i;. - 1 1. Waste;: InletlPipes, �Recycling,' Pipes, ;-and Overflow ;Pipes}....: , .. iY: i'-. ,' �,:.t.. i26'. ;)',�.: vl %'^t";<r` �G.A�liz fP :'!' .,1 t;J � is _. .. "1-.. 1 !'• a;:::.;separation oft:joints,1'...:,::. b. , '.cracksr.or;P�breaks;:Y, .:. ;y•9;: is ,. c:.�%:Iaccumulationrof salts or minerals d. overall condition of pipes 2,. Lagoon -:surface:: a,: ; f;;undesirable,nvegetative: growth; • b:..-:floating!:,or,�lodged debris; 3. Embankment ;! a. settlement, cracking or "jug" holes b.,; side.•., slope t'stabilityi:-_(slumps: or; bulges c. t:4::wet';or "damp; -;areas;. on,-,the"-,,back,•slope,: d-. •, }.. erosion •i due, to'•' lack of - vegetation or as a..result of .wave,,action.. e:.I . rodent..: damage 1 y:.i r t an, �. t.. ,... j: .ad•:: 3lti 1�. Err F7',}"t •' N�Ia C r,t .`,.;ti tfi,el, ',y'^1. Kai i c�•, 4v.•;..a -, •,: 4 . Transfer:�Pump � s recycling d U Elanr,,igation : pumps �, w,• 1+•� : ; �, a.:,_i overall: pumpzoperation-,'{j. : ...;; • b.; �t.i,,leaks �r2"<i�i.d�C ���: is {,�i Y�7,j,p di nr .x f ;i'. '. .. ' .'7'• F . c.yydz lloose;c:,fittings'...,~ .c,�4 ;.;: c� +gat •,7'..x ; �:;.:� �., tii / rii'.: !.- .. ,.. ii. `S '4,�:��i1 �:.�: i.r; l��'� t"'i3i, ti'F.?'i 1:};" Y i?•. �` i:. .1 1 .. .. ,.. ,.. ' 5. Surface , water, diversion,:,,, a.. z� % adequate..;.vegetation b. divers ion'',capacity: c. t.,,:ridge;:berm height r,3 t;:',,, ' ?.b�l,n' .:,:'�.. �J,.�-•gip � c�i f'�t �,v � '�i iFaiYr}'{.- tt fts q{y,F 1. � �� } i i! ..1'•j -' 1.":,. .. � `... B. Oberatiorrtgrr+ew C, t'l : 31 is A. ..: Your,tanimal�cwaste;;management.:facil`ityc:was designed(,.*-for�'a- total ::.oVt,:60, :000 ?;layers: -.,NV The,,,lagoon contains ; both ; permanent and:.,temporaryi:storage. ,Therjpermanent :•storage, is `,not to be' pumped.�iin•torder'-to ensure thatranaerobicractiontwill -.occur. The; design storage �include's apermanent':: storage... of, two,, and one half cubic- foots ert' oundiof stead ,state Wive wei ht ivaj! ff�►r�.}'d"'fia��i 3i�iw��`�p' ?w�e�x,!" "� q 'r°(: ti'';iC1(�r'iC:','2: C";!1�1 The;t^temporary storage portion .of;.the ;i,lagoon . includes <capacity: for,:the;rvolume' of, produced''over180*.'days,, the amount of: rainfalTC in,a��25 year�'24,-hour,;: storm ,,event,' excess. water, ,'and rainfall ingexcess,of.�:'evaporation: Your. facility is 'designed :'for,,' 180's days of 'temporary*;storage, : ;' therefore; it will: need t t,obe:i;pumpedk`everyft`six:H;months`.. ,.'Begin'. pump -out' . of `.theaelevation'•.-.51.:7,;-as;marked by r<; `r , e,, permanent;r.markers.' Stop��pump-$out whenr,the.',fluid;.:level r� e'I-started''',hesFelevatipbr'stopped.reac at ;any time,between,rttiie,�se'�PtwoFes.l: eevations for:operating . convenience: as,: -`site �Iconditions:,permit,' such as weather, . soils, crop, and:'"equipment>°<<in'order to apply waste without i runoff or leaching.. The attached.1waste management,plan must be followed. This plan.'*recommends sampling'c�,and .;testing' of waste (see Attachment:B) before•land.::applicatfon. The waste material should be analyzed before";,.each;application cycle to determine its•nutrient:content. A soil test of the area of application.should''be:made:'annually to insure the waste is a liedas reasonably -and and pp .y' practically possible to recommended:rates. Waste treatment lagoons must be,precharged with a volume of water equal''to one-half:,of.:`.the; treatment volume before -', wastes are introduced. •:Precharging reduces the concentration of the•initial':waste entering the lagoon thereby reducing odors. Solids.should be covered with effluent"at all times. 2 .,..--Pipes that,"are ;,used'°for recycling;;effluent-, to use ;as flush water ,..and'4irrigation. 'intakes',must-tbe.'_placed 18..inches below the surface and as far from the inlet pipes as possible in order to provide a cleaner effluent for flushing and to reduce odors when irrigating,,on;land. When these pipes are placed through the embankment, they should be installed no more than two:.feet below top of dike;and not in the highest section of fill. The:pipe trench should be compacted with clay material. After five years the waste treatment lagoon must be checked for sludge..accumulation annually. If sludge has encroached into the.;treatment;volume,. the,vsludge must be removed and applied at';agronomic rates!based on -analysis of the sludge. Treatment volume must•havela,minimum of 4 feet of depth free of sludge at, all times. In December 1992, the Environmental Management Commission (EMC) in North Carolina revised water quality regulations that address animal operations. These rules became effective on..February•,1, .•.1993,'! (15A NCAC •2H .0200) . This ,, .animal-operationrshall;•be operated within the requirements , ., of these rules, . and regulations. 3 M rn -n -s 0 4 v, , t Ar vy '4 p I a -T, 7 1 '• . r.0 y• P 4►`y0fk b �':: •F''. ,�,� � .:?Y. -c— Ss!,r•t. \� 11 h Vim• "A�'�,b�~MoonIt - � r.,.... .:," c�y"'�"',•� .1 •'ate• •+ '� •F+�•4 Y V 1�, r a,, w at, , ..� a'j �:NS•I � � . ' ip r,. �, •hi .y�k n•�i•Rir _,._ , - f � �y: � tili ' A`,��' I I ti1',�j�,�J, •L��•m•; !r ' rr.,;�,••.`�.�3�F��i,•�,. ... �'1 �y�4h�' y,_ ,•t 1 I I,,..- - _ _• _-_ - - n_w � _ ._......._�.. ._ .. _..------...._----•- - caw � 1 i .� 1• , II � I I .. '.•fy��Jir�tll i:�'•�2.�. I � I nb��` ILI" - S Jill' LY 44- Pmi . VJ4 lt QL 77-7- rf IN, 44 at Fo.irft\.S }.. { •rat• �.�t� ''1���• �', � � IL 1X. j '.� 7�a,.,{.,}c�''�:�� %•� i,,� �. .t. ...y�'T �t", St'kr':f. �.,,. � ��• !� � Iti'•i �i;�'. •M`•y. /_.'.'f--_ s;.i• '•l I�i�%��k.>.� i+. `�•/Yr"''.•+..'I_� :v A 1:1w/:w!•f:.."�.�. Y 1�: .:� V a,w STATE 4tio 41 F North Carolina Department of Correction `v�°fV� oFF�oF Michael F. Easley Governor March 19, 2003 Mr. J. D. Hester Enterprise Farms PO Box 67 • Caledonia Drive • Tillery, NC 27887 NC Dept. of Environmental and Natural Resources Div. of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Mr. Hester: On March 6, 2003, Mr. Mann with the Halifax Natural Resource Conservation Service made a site visit to our lagoons to ensure adequate amount of freeboard. Mr. Mann determined after a visual inspection that we were in no danger of exceeding the flag. After recent rains in the area and forecasts to receive more, we were very concerned about our lagoons. Mr. Mann suggested that we slightly increase the holding capacity in the two smaller lagoons. Thus, giving us a greater holding capacity in the larger lagoon in case of an emergency or if additional rain occurred as forecasted. Theodis Beck Secretary Mr. Mann suggested that we notify or inform Mr. Towell, which we did. Our conversation was to inform only, not a plan of action. I informed Mr. Towell about our amount of freeboard and that we were in no immediate danger of exceeding. Therefore, a plan of action is not needed. Sincerely, Phillip C. Sykes Enterprise Farm Manager Telephone: (252) 826-3821 An Equal Opportunity / Affirmative Action Employer Fax: (252) 826-3691 Jul-08-2002 02:15pm From -NC Correction Enterprises Administration 9197163974 T-848 P.001/012 F-070 0000Fo%I11 -11(04I Facsiri�ile Cover � sheet E .North Carolina Correction Enterprises P 2020 Yonkers Road • P. 0. Box 29540 �QFCroN E���a�a\ Raleigh, NC 27626-0540 1-800-241-0124 TO: From:_ 0� ar� Company: �/�'�/� Phone: (91 ) 71 .3600 Phone: 5'7 `f 70a Admin. Fax: (919) 716-3974 Fax: 521- `(2-1 Date: ' % $rt4-,� Pages (including cover page) _ ❑. Prepare reply for my signature ❑ Per our conversation ❑ Per your request 13 For your approvol Q For your comments For your information ❑ Signature ❑ For distribution Comments: Jul-08-2002 02:15pm From -NC Correction Enterprises Administration 9197163974 T-848 P.0021012 F-070 Michael F. Easley Governor Mr. J. D. Hester NCDENR Forth Carolina Department of Correction Correction Enterprises 2020 Yonkers Rnad • 4240 MSC • RalFigh, North Carolina 27699.4240 Karen A. Brown EnterpTiec Dirct:to r July 8, 2002 Thcodi� Bcck Secretary Raleigh, North Carolina SU13JECT: Hydraulic Oil Release at the North Carolina Correction Enterprise Caledonia Farm, Tillery, NC, Dear: Mr, Nester: I = writing you regarding the hydraulic oil release at the N.C.C.E.. Caledonia )~arm located in Tillery, N.C., on July 8, 2002. I have attached with this letter a copy of the e-mail forwarded to me by MT, Phil Sykes, N_C.C,E. Farm Manager. It describes what was done in regards to contai=-imt and clean-up of the released hydraulic oil. Also attached is a copy of the Material Safety Data Sheet for the chemical released, Texaco 01893 TDH Oil. I hope this information finds itself beneficial in regards to the hydraulic oil release and the action taken. If you have any questions concerning this incident, please do not hesitate to call me at (919) 716-3625. Si Correction Enterprises d j g/lrtters2002/#'ann01. dpc CC: Plant File CORRECTION EN1Uf'RI5E5 wwvr.doC,8Mte,nc,us/uprije (919) 716.3600 Fax: (919) 716.3974 Courier ff 53.71-00 Jul-08-2002 02:16pm From -NC Correction Enterprises Administration 9197163974 T-848 P.0031012 F-070 From: Phillip Sykes To: Douglas Gaylord Date: 7/8/02 12:05PM Subject: Hydraulic Spill on 7-8-02 A hydraulic line on a dump body trailer broke an released or spilled approximately 25 to 30 gallons of oil onto the ground. The spill was contain with send being place around the area, Once contained, sand was added to absorb the oil. The area approxiamtely 6 feet x 8 feet was removed to a depth of 6 to 8 inches and loaded onto a dump truck. The area was checked to ensure all soil in question was removed before adding fill dirt and topping with stone, The contaminated soil was removed to an area (free from runoff) an placed on plastic and covered. Once the soil is determined to be free of contaminates it will be land applied, From time of spill to actual clean-up and removal was approximately two hours. Therp was never any danger of the oil entering a waterway or ditch. I will be faxing you a copy of the MSDS for your records. Any questions, please call. PHIL Jul-08-2002 02:16pm From -NC Correction Enterprises Administration 9107163974 T-848 P.0041012 F-070 - „ • zsyad: 12-08-95 • TEXACO SWersear s : 07 -31-95 MATERIAL SAFETY DATA SH91T NOTE, Read and understana Material safety Data Shi4et gefore'handling or disposing of product. I. CHEMICAL PRODUCT AND P E FI T21A MATERIAL IDENTITY Prpouci Coo@ and Neale: 01693 TPH OIL Chemical Name and/or Famlly.or Doncrlption: Torgve Fluid MAnufacturerrs Name! and Aaoress: TEXACO LUBRICANTS COMPANY A DIVISION OF TEXACO REFINING AND MARKETING INC. P,O. pox 4421 Mcus2pn. Tx.7721q-.4427 TRleohone Numoers: Transportation Emergency -Company (914) 83.1-3400 CHEMTREC (SDO) 424-8300 Health Emergency -Company (914) 831-3400 General MSDS Asel4tance (914) 838-7304 TaYnnical Information -Fuels (914) 438-7336 -Chemical (513) 450-6.543 -Lubricant/: (800) 762-7862 Alit i freezes 1AdditiV4@ (713) 236-6278 -Solvents (000) e76-3738 '2 COMPOSITIQN/INFORMA ON o Na S Tr- -InITE911- FOF,•LISTING CONPONEN S•IN TAR COMPOST ON SECTION 15 AS FOLLOWS: C4RZINZGENS ARE LISTED WHEN PRESENT AT 0.1 % OR 042ATER: COMPONENTS WHICH ARE CTr1L9:ISE MLZAR0005 ACCORDING TO OSHA ARE LISTED WHEN PRESENT AT 1.0 is OR GFSATIR; NON-HAI,tRDOU$ COMPONENTS ARE LISTED AT 3.0 % OR GREATER. THIS IS NOT IN'ENDED TC Be A CQMPLETC COMPOSITIONAL DISCLO$URE, REFER TO SECTION 14 FOR APPLICABLE STATES* RIGHT TO KNOW AND OTHEP REGULATORY INFORMATION. proaact anC'Or Compon6nt(sl Carcinogenic AcFprping to: pshr. I4RC NTP OTHER NONE X composition: (Sequence Number and Chemical Name) 5®c Chemiga' Name CA$ Number _Range in_'� a Severe',, solvent refined, svtvent`deua>c®d 64742-65-0 35.00-49.99 neev, poraFflnic petroleum olstillaws a $plvk'rt pRuaxeO lignt paraffinic petroleum 64742.5E-8 35,0C•48,80 F;t''letes 5 F ,.a-c,,r@ateq heavy paraffinic petroleum 64742-54-7 3.00-$,99 o�s-lllat®s - 71rC ajKyl 0i1n10pn0sph81® 65549-42-3 1,00.2,68 1,00.2.99 CS - r,)d-0treato0 Ii9nt ndpntnenie petroleum 64742.53-6 1.00-2.98 01Gt111ater. C" Meinac�)•lic ap,C, copolymer of "putyl•, 50667-5$-5 1.00-2.99 "louryl" and "Glearyl"eatere Witn 3-dlmethyl•afnlnbprOpylmethOCrylemld® P,;Z':;CT I5 NCN•HAZARDOUS ACCORDING TO OSHA (1910,1200). _aMPONENT IS hAZAROOUS ACCORDING TO OSHA, • _3.%;PONENT. C' DEFINITION. IS CONSIDERED H42AR000$ ACCORDING TO OSHA S5Ct1JSE IT CARRIES THE PERMISSIBLE,exPOSVAE LIMIT (PEL) FOR MINERAL OIL :MCm5ure L,m,t� referenced cy Sequence Number in the Composition Section Sep L,mi� m� rr3 TWA -OSHA (MINERAL OIL MIST) E' maim; TWA-ACGIH (MINERAL OIL MIST) 1 rr0%m3 $TEL ACGIH (MINERAL OIL MIST) Mq'M3 TWA -OSHA (MINERAL OIL MIST) C, mg,'rr3 TMIA-ACGIH (MINERAL •014 MIST) PAGE: 1 N - N;," DETERMINED N.A. - NOT AP LICAOLE NIT, NOT STED s LSSS THAN > - GREATER THAN'' Jul-08-2002 02.16pm from -NC Correotioil Enterprises Administration 9197163974 T-848 P 005/012 F-070 NAME: TDH GlL w ►� •�swa; llz-pe-Yp. supersedes: 07.31-95 a. COMPOSITION/INFgRMATIP ON NOREPIENTS (CANT) P� 10 Will-? STE( ACGIH (MINERAL OIL MIST Oa 5 MQ/m3 TWA -OSHA (MINERAL OIL MIST) C3 5 me/m3 TWA-ACGIH (MINERAL OIL MIST) 03 10 mo/T3 SYEL ACCIH (MINERAL OIL MIST) 03 B Mg!M3 TWA-OSH4 (MINERAL OIL MIST) 06 5 m9%m3 TWA-ACGIH (MINERAL OIL MIST) 00 10 Rip/m3 STEL ACGIH (MINERAL OIL MIST) 3', HAZAR0 PENT CA7 0 EMERGENCY OVERVIEW Appearance: Osrk red liquid Ogor: Po;rOlaum Oil odor STATEMCWT NOW CONSIDERED NECESSARY HMIS Health 1 RaaCtivity: o F 1 amrr,ao i l l t> : 1 Spec i 81 ,- PQTENTIAL HEALTH EFFECTS NPPA Health: t Reactivity: 0 Flammability: 1 Special • - EYE SKIN INHALATION INGESTION PriMpry Route of Exposure: 6 a I EFFECTS OF OVEREXPOSURE Acute: Eyes: &:ay c41u66 minimal irritation, experiencoo as tamPorary discomfort, Skin: arse' Gpntdct mad cause slignt irritation. Prolonged contact, as with clotr,ing we "Pa wltn material. may 'cause More severe irritation and dis- comfort, seen as local redness and swelling. GTne- tnar the po:antial Skin irritation pffeCte noted above, eCute (short terms adverse effects orb not expected from brief Skin contact; 569 Other V4fe_T5. below. ono SOCTiOM i1 for infOrmatlph regarding potentlal long Lein effects. Inhalation: la.ors or mist, 11% exCeDs of permi W 010 Concentrations, or in unusuaity r,)n- _oncer.trations gene^atea from sprayinP, heating the material or, as 41rcn exoo5w,e in poorly ventilated areas or confined Spar_e5, may cause c` the nose and throat• headacha, nausea, and drowsiness. Ingestion: m,AE ;non several mow1rifuls are $*allowed, abdominal Discomfort, nausea, an-- c+a-rhea ma, occur, Sensitization Properties: . r%O . M Chronic: N: adverse effects have been dpcumented in human$ as a reault of cnronic erpcsure, SQcTIOr, 11 MAY Contain applicable Animal Coto. Medical Conditions Aggravated C1y Exposure: Ee�&.S@ of iTs irritating properties, repeat00 akin contact may Aggravpte a e■ist,ng aormatitig (skin condition). PAQ9; 7 N,C - NC' OE7ERM)NEG N.A. - NQT APPLICABLE N.T. - NCI TESTED • i.E55 THAN > - GREATER THAN Jul-08-2002 02:16pm From -NC Correction Enterprises Administration 9197163974 T-848 P 006/012 PRODUCT cooE: 01F93 Date Issued: 12-o8-95 NAM@: TDH CIL SuWrseides: 07-31-95 F-070 �i 3. R4= IDENT ATIOH (Ca other Remarks: Material from high pressure equipment. pinhole leaks, or high praesyre line failure can pgneTrate The 4kin and, if not properly Treated, can Cause severe injury, including disfigurement, lobs of function, or even require amputation of the affected area. To prevent such serlo4s injury. immaaiatp meoio6l attention should be sought even if the injection Injury appears to be minor. linen overheated, proawct may ,release hydrogen sulfida IH2S) gas. H25 conpantratlons above permissible CoMeenTratfons Can cause irritation of the eyes and respiratory tract, headache, dizziness, nausea, vomiting, ctiairrhoa and pulmonary edema, 4t concentrations above 400 pprn, respiratory paralysis. causing unConsciousne2s and death, can Occur. 4. FIRST AID MUSURES Eyes; Plush eyes with plenTy of water for se'verai minutes. GOT medical ationxion if eye irritation persists. Skin; w'asn skin �'ilh plenty of soap and water for several minutes. Gat meoical e;centlpn if sh,n irritation oevoloos or par6ista. Ingestion: if mere anon several moutrlfuls of -this material are asvallowed, give two olasse5 of water (16 oz.). Get medical attention - Inhalation: :f irritation, neadac`ie. nausea. or arowolneas occurs, remove to fresri air. Get meoical a:raniiOn if breatnIng becomes dif'fieult or reap iraTory irritation persist®. Other Instructions; high pressure injection of material can cause severe injury. Failure to oeoride the wowno of all residual material can result in disfigurement, less of function. or, may require amputation of the affected area. Pamove Ano or$—c'ieen or launder elathimQ Soaked or Boiled with this malarial before reuse. Dry Cleaning of ConiaminaTeC Clothing may oe more effective than normal laun0Vrin9, Inform Individuals reVpOnaiol" for claaning of colenripl ha2aros 04VOCiated with hanating Contaminated c�c-n�np, S. FIRS-FICHTING MEASURES I gn i t i on a-Ve>rature - A (degrees ): Nc: deTe,minea. Flash Point i0OgrRe5 F); 3E= i cc- i Flammable Limits i%!: „c-ier; NOT oeTerminaa. uaDer NOT derorminea. Reeommenosa Fire £Ytingwishtng Agents Aitd Special Proeaquresl use waster spray. cry chemical, foam. or cilroon dioxide to extinguish flames. use Later spray to cool fire-egaosed Containers• Water or foam ma cause frotning. Unusual or Expiosjve Hazards: m1orogen swlfioe (H2S) may be released if overheated. Extinguishing Media Which Must Not Be Used: NO% oetermined, special Protective Equipment for Firefighters: Nz spe:lasl equipment or procedures requirad, PAGE: 3 N.0 - NO' DETE2MINEp N.A. - NOT ♦PPLICASL N.T. � NOT TES E < �FSS THAN > - GREATER THAN Jul-08-2002 02:i6pm From -NC Correction Enterprises Administration 91071639 74 ii>o��, >f7 8448e`85 0071012 F-070 yoxfNAME: TDH OTL Super efts: 07-31-PS � 6.. ACCIOE TA RELEAS ME UR ( rsnspar" ation Spll se: baWltc 30 424-tlioo) Proce ures in Cass of AccTi4ent.11 Release, raskage or Leakage: Ventilate area. Avoid prea,triing vapor, wear appropriate personal protective Rquipment, including appropriate respiratory protection, Contain spill if pgssiDIR. Wipe up or absorb on suitaclo material and shovel up. . Prevent entry into sowers and waterways. Avoid Contact with skin, eyes or s'lotn,ing 7. HANOL NG AND S ORAGE mrocputions to be Taken in Hanaling: Minimum feasiole handling temperatures should by maintained. Storage: Perioqs of exposure to high temperatures ShOulO be minimized, Water contamination shoulo ow avoided, 6, EXPOSURE CONTROLS/P SpNAL T CT ON ProteCtive Equipment(Type) Eye/Face Protection: Safety slasses, chemical type goggles. or face shield reaamMandoo To prevprt eye contact, Skin Protection: wDrpe-6 sroulo brash exposes skin several times doily with soap and water. So,iao work Clothing snoula Ve laundered or gry-cleaned. Respiratory protection: ciroorni3 coneentra:tons srtoutO pe kept to lowest levels possible. if vapo•, mi5- or dust is generated ano trio occupational exposure limit of thm A^oou.t, cr any component of Ina product. i$ exeeedetl, use Appropriate NIpSti cr Ai5H4 approved aIr'purify'ing or air tsuppIigo respirator after oete-r•.in+nj� tna airborne concentration of She contaminant_ Air supplies resolrator8 snoula aluay9 op worn when airborne concentration of the con;BR.inBnt or oxygen Pohlent is unknown, ventilation: Ageo.4ple Ta moat Component occupational exposure limits (see Section 2). Expo2urQ Limit for Total Product: None astraoliSheo for prgduct: refer to Section 2 for component exposure 11m+t5. S. PHVS(CAL ANO CHEMICAL PROPERTIES appearance Da,, rap 1i0� C Odor: nour Roiling point Ibegree5 F1: Nct ae,erminea Melting'iree:ing point raegrees F): NLI 4P011CAC1b. Specific Gravity ivaterall: ,a0:7 pH of undiluteo product: NO; apalicaPle Vapor Pra5awre: N�•, oeterminau Viscosity! 9 1 CS: at 13G.0 C VOC Content: ryc: gRT�rff�n@a. _ PAGe: 4 + G - N37 GE7EFMiNEP N.A. - NOT APPLICABLE N.T. - NOT TESTEO LJ S5 TtiAN > - GREATER THAN Jul-08-2002 02:16pm From -NC Correction Enterprises Administration 8187163874 T-848 P.008/012 F-070 ndbu CO E: 01693 Pole Usued: 13-GB-85 �I NAME; TRH 0I1- SwperSe0s: 07-31-OB 9, M 51GAC AND F ENIGAL PROPERTIES CONT) Vapor Density (air=l): Not oetermined. 5olwoiliTy in Water (96): Not oetermineo, Other: None 10. STADILI ANDIM—AFFMTY Thtn Material Gaeta violently MR: (If others IS checked bel0W, see comments for Details) Air Water Haat Strong Oxidizers Othora None of These X Co4iients ; - under extreme temparbtures or extended atprapa periods, nydroQun sulfide IH2S1 Ras MAf' accumu1810 ih the hOad•apaoe Of container. Products evolved When SuojeCted to Neat or, Cofmstion: 7c4ic levels of Carbon mpnoniaa, car0on OiQxicta, irritating aldehydes And ketones. ana eomowstion products or cpltlpounds of ;,inc, phosphorus. sulfur Imay include nydropen sulf(de). Hazardous Polymerizations; 00 NOT OCWR 11, TQXICOLOG CAL INFORMATION TOXICOLOGICAL ORMATIONt L TQX CI Y DATA) Median Lethal Dose Oral: -D5D Eel ieveo T; oe > 5.00'51A 9 (rat) practically non -toxic Inhalation: Not oatermined, Oermal: 6Z50 beliOVOP IQ De > 2,00 9/kg iraatiitl practically non -toxic Irritatign Index, Estimation of 2rritition tspaaies) Skin: IDraizei 6vliiavad to oe > .50 - 3.00 /8.0 (rabbit) slightly irritating eyes: 10^ai=el fiviievea to be < 15.Q0 /110 (rabbit) na appreClablo affect 3ensitixation; No- opterminec, Other: Sams lo, vi$goS;T naontne-llc oils have caused 61kin irritation and skin _mv^5 it lacgra6ory animals when repeatedly applied and left in place Ce:reen apoligz:lons, The significance of this effect to humans ngs not oee^ es'aelilsneq iZ DISPOSAL CONSIRERATIONS ►taste Disposal Mothods Tn,e proawci has been evaluates for RCRA Characteristics And does not meet the wri-eria of b hazaraaus waste if disearged in its purch4aeo form, 6;-qe, R�n4, it 15 trip respong10111ty Of tnp user of the product~ to deter- mine at the time of disposal, uhother the proowc% roaetm RCRA criteria for n4-aroow5 Waste. Tnis is oecause product uses, transformations, mixtures, p-ccesses. etc, may renger the rEfrulting malerloto hazardous. Remarks hang 13. TRANSPORT INFOR AN Transportation DOT: Proper Snipping Name: NCI PACE; 5 h - ha- Ri--ERMINED N.A, - NUT APPLICABLr N.T. - NOT TESTED - LESS THAN > - GREATER 7MAN Jul-08-2002 02:16pm From -NC Correction Enterprises Administration 9197163974 T-848 P.008/012 F-070 r1LublNb ) 6'1j1JV 010vi • r-'- --- pate 18iiied: 19-08-86 .�• NAME: TDH OIL supersoft$: 01-31-65 in. TRMSPORf N ORMATIQN CANT) i I MOG : Proper Shipping Name: Not evaluated ICAO: proper Snippimg Name: Not oveluet®C TUC: Proper Shipping Name; Not evaluated 14, REELATORV INFORMATION Federal Reyu10t1ones: SARA T W e I I I: Section 3OR/304 Extremely Hazardous Substances Sees. C►�emtCal Name CAS NumbFIF Range in None Section 302/304 Extremely Hazardous liubstancrs (CONT) LToo Ro Nona Section 311 Hazardous catesorization: Acute Chronic Fire Pressure Raamtive N/A X Section 413 Toxic Chemical Cnem+cel Name CAS Nur�trer ComeentraTion Zinc a1h>1 a�tniopn�spnate tiatiAa^s2�3 i.OQ-Z.88 CERC�.A 1021al/00T Hazardous SWONt4noes: (t IngiCates DOT Hazardous Substance) S�eG. CheMiCbl Narne _ CAS NuMber go-neiA- in f, hone CERCLA/RRT Hazardous Sumulaneos (Sequence Ntimders and RQ'$): LC Ro None TSCA inventory Status; Tnl,K proowcl, or its camponent5, are listed an or are exempt from the Taws c Suostance Control AcT (T5CA) Chemical Suoslance Inventory. Other: N�nB. Slate Regulations, California Proposltion 65; ;hE `„'lowino aeteG;avl a comporent$ of this product are 5ub6tanCos, or peionp to classet of substances, knownto the State of California tP ca"oe 4anc,er anolor reprvavctive loxieity• Cnem i ca 1 Narne CAS NurtIQQr None States Right -to -know Regulations: Cnpnical Namb State Ric lit-_tQ-knpw--- YrnC alkyl 011ni0pnoePMOTO CT,I� L� ,LA.N►1.M1 Solvent Oeuaxed light oaraffinie petroleum MA dlstille>;e5 -. - - '' (Connecticut) FL(Florida),IL �taie listCT(Illinois), MI (Michigan) LA Il-oulsiana). MA (Ma$5pc►lusetta). NJ (New Jelraey), PA (Pennoylvopnie), R1 (RhodO IS1anO) International Regulations: MHMIS C1a5s1fication: NoT regulateo ' Canada Inventory Status: Not determined. PAGE: 6 N.D. NOT RETF4101NE; N.A. - NOT APPf`ICASLF N.T. NOT TESTED < - LESS THAN > - GREATER THAN Jul-06-2002 02:16pm From -NC Correction Enterprises Administration 9197163974 T-848 P 0101012 F-070 PIKUW 61 LQUL: Uts" OAce -To- stied: 12-00-015 UT NAME: TDN OIL S�rsedas: 07-31-105 la. —INGLAYORY INFO A ION CO EINECS Inventory Status: NOT dewrminea, Australia Inventory Status: NCe 0e1,erm1n0Q[- .japan Inventory Status: Nat oeiernineq_ 15. ENYIRONMENTAL INFORMATION Aquatic Toxic ty: Not asTorminea. Mobility: No- determined.. P,trsiAtence and Biodegradability; NOt aetermined. Potential to picaccumulate. N,jl evaluates. Remarks: Ira: evalNaTpa, 16. OTHER IN ORMAYION tier® 7H5 :NFQRMA-ION CONTAINED HEREIN IS BELIEVED TO BE ACCURATE. IT IS PROVIDED INDO;ENOEN%) OF ANl SALE OF THE PRODUCT FOR PURPOSE DR HAZARD COMMUNICATION AS PaRT OF TEXACO'S PRODUCT SAFETY PROGRAM. IT 15 NOT INTENOEP YO CONS71TUTF PSRFQRMANCE INFORMATION CONCERNING THE PRODUCT. NO EXPRESS WARRANTY, OR IM°LIED WARRANTY OF MERCHANTA5ILITY OR FITNESS FOR A PARTICULAR PURPOSE IS µAD;, r'ITH RESPECT TO THE PRODUCT OR THE INFORMATION CONTAINED HEREIN, DATA SHEETS ARE AVAILAEiLE FOR ALL TEXACO PRODUCTS. YOU ARE URGED TO OBTAIN DATA SHE:E-S FOC ALL TEXACO PRODUCTS YOU BUY, PROCESS, USE OR PISYRIBUTE AND YOU ACE ENCOURAGZD AND REQUESTED TO AOVISt THOSE WHO MAY COME IN CONTACT WITH PRODUCT$ OF THE INFORMATION CONTAINED HEREIN, 7C GE-ERMIN; APP41CAF-ILITY QR EFFECT OF ANY LAM OR REGULATION YITM RESPECT TO HE %ROOJ.', 4,15ER SriDULD CDNSUI-T HIS LEGAL, ADVISOR OR THE APPROPRIATE 3:vE;NMEN A::EN-t, TExACD DOES NOT UNDERTAKE TO FURNISH ADVICE ON SUCH Since the lest mailing for this CUStomer co0e, the fallowing SCCtions have been revised ;8:8 1:-06-2 Now X Revised. SuperVQdQV: 07-3 -95 0a;e a■+nteo. 12.20.95 .naijr1es regaroing MSD5 should 00 direciod TO; -a%aCC Int. mao1ager, Praawci Saf®ty : Fc. 50$ �ea:an, N1), 12508 PLEA5E SEE NEXT PASS FOR PRODUCT L.ABE4 PAQE: 7 _ K.G NC- P1'"iRM:NED N.A. NOT APPLICAIILE N.T. - NOT TESTED LESS TnAN > - GREATER THAN Jul-08-2002 02,17pm From —NC Correction Enterprises Administration 9197163974 7448 P 011/012 F-070 FMWWuv l %PYMC : w +oaa .. .. ...... bite 166" : 13-04-66 NAME: TOH OIL Supwrioaes: 07-31-95 `!" T . PRODUCT LABEL Label Qatb: 13708-65 READ AND UNDERSTAND MATERIAL SAFETY DATA SHEET BEFORE HANDLING OR DISPOSING OF PRODUCT, THIS LABEL COMPLIES WITH THE REQUIREMENTS OF THE OSHA HAZARD COMMUNICATION STANDARD (20 CFR 1910-1200) FOR USE IN THE WORKPLACE, THIS LARE: 15 NQ7 INTENDED TO HE USED WITH PACKAGING INTENDED FOR SALE TO CONSUMERS AND MAY NOT CONFORM WITH THE REQUIREMENTS OF THE CON5UMER PRODUCT SAFETY ACT OR OTHER RELATED REGULATORY REQUIREMENTS. 01893 TDH OIL M NONE CONSIDERED NECESSARY eRfeALIT;gNAlyEAS RE -AVOi6 prolongao preathing of vapor• mist, or 04z. -Wprkera should Mash exposed skin Several tillmes daily With soap and water, F.IA6T Ax0 Eye Cpntact: F1uSh eyB5 with plenty of water for moveral minutc;. Get medical attention if eye irritation persists. Skin Contoot: Mash skin with plenty of soap ana water for several minutes. Get medical attention if Skin irritation develops or per9irtf. Ingestion: If more than several mouthfuls of this material are swallowed, give -two 91d®5v5 of water (16 02,1. Gat mealcal attention. Ihhal�t{on: If Irritation, headache. nau5ov or drow5,ne2z Occurs, remove to fresh air. Get mvo+cal attention if trearh+np OeeomeS Oiffiewlt or respiratory irritation perAist5. Note to Physician: h1Q� pressure In)ectien of material can eawue severe injury, Failure to optripe :he wound of all rasiaual material can result in disfigurement,, )css of fvnct+on, or may require smputattpn of the affected area. In case oo fira, use water Spray, cry chemical, foam or c4r0gn dioxide, water may cause frothing, uom water spray to cool fire -exposed Containers. G hem i ca 1 Name - CAB NNraber )tange In Y. • Severely solvent refineo, 5elvent-dewaxeo e4749-65-C 35.00-49.89 neavy paraffinic petroleum ojstillata5 • Sclvent oRwaxerl lignt par4ffinic petroleum 64742-56-8 35,00-43.99 d+5:+lla:n>t • nyoro;reateo hebvy- paraffinic petroleum 64742-54-.7 3.00-8.09 oI_;+11ate8 Aao,:lves 1,00-2.99 Z'mc alk11 plth+opho5phate 68649.42-3 1.OQ-2.99 . �pa:en :ignt napntnenie p®troleum 64742-53-6 1,00-2,99 a;s;Ilia;q;. Metnacryl,C acid, copolymer of "bytyl^, 50867.55-5 1,00-2 99 "lauryl^ and 15Teary I"ester$ M1th 3-dimeIMy) -am inppropyImethacryldmldo PRODUCT I5 NON-HAZARODUS ACCORDING TO OSMA (1910.1200). COMPONENT IS HAZARDOUS ACCORDING TO OSHA. ;OMPONENT, Bi DEFINITION, IS CONSIDERED HAZARDOUS ACCORDING TO OSHA FECA05F I; CARRIES THE PERMISSIBLE EXPOSURE LIMIT (PEL) FOR MINERAL 01U MIST. Aa^nnelIv n,nip Special Hazardous&ubstancd(f,l CA5 Number Rands in X NpnO HMIS NFPA meal:': I Reactivity! 0 Mealth; 1 Reactivity: o F I ammao i I I I).: i special - Fiammatzility: 1 5pecial - Transportation OCT: Proper Shipping Name: Not re0V1dt90 PAGE: a r,D, - NCT DETERMINED N.A. - NOT APPLIFAHLE N,T. - NOT TESTED . LESS ?WAN > - GREAYCR TH4N Jul-08-2002 02:17pm From —NC Correction Enterprises Administration 9197163974 T-848 P.0121012 F-070 nI%uuu61 vuuG; W1904 Pai• 15lu e! 19-OB--65 �. NAME: TOM OIL SNpfl`iQdo$1 Oy-9185 17. PRPDUCT LABEL (CONT) M61 Date: 12.08.95 CAUTION: MiBUSe of empty ConTainers Can be ha4prdou5, Empty COnSalnpru can be hazardous 1f U560 %0 Store toxic, f1OR1114101e, or rear -live ma%Crialg, Cu111nq or Melding of empty Container$ miOhT Cayse fire. 6X010810n„0r tpxiC.fum®s from residues. Do not,pras6yrizR or expose To Open Flame or lieac. Keep container C1056d And drum pungs in plate. ManwfacTurvr,S Name and Address: TFXACD LUBRICANTS COMPANY A DIVISION OF TEXACp REFINING AND MARKETING INC. P.O, Box 4427 Houston. TX 77210.4427 TRANSPORTATION EMERGENCY Company: (914) 811-3400 CHEMYPFC: (800) 124-93CK1 HFp T EMERGENCY Company; (S14) 831-34M 1 State of North Carolina Department of. Environment and Natural Resources Division of Water Quality Animal Waste Management. Systems Request for Certificate of Coverage Facility Currently Covered by an Expiring NPDES General Permit ! On July 1, 2012, the.Noitli Carolina NPDES General Permits for Animal Waste Management Systems will expire, Facilities that have been issued Certificates of Coverage to operate under these NPDES General Permits must apply for renewal within 30 days of receipt of this application. Please do not leave any question unans",ered Please make any necessary corrections to the data below• 1: Facility Number: / and Certificate of Coverage Number:�� 2. Facility Name: 1L1 • f.� %Z�SOr / pig ) 1 f 3. Landowner's name (same as on the Waste Management Plan):. 0"V 4. Landowner's mailing address'. !} City/State: +/ /C e-1&!j /'L..CQQ _ Telephone Number (include area code):olJ 5. Facility's physical address:O City/State:, / .' Ile /, , 6. County where facility is locatbd: .711 /• l"/fx 7. Farm Manager's name (If different than the Landowner): E-mail: Zip: 8. Farm Manager's telephone number (include area code): �. -' '0& "F J �7 9: Integrator's name (if there -is not an integrator write "None"): 'yd 10. Lessee's name (if there is not a lessee write "None"): _%'✓D/� 11. Indicate animal operation type and number: zip: 7�1�% Swine Cattle Dry Poultry Wean to Finish Dairy Calf Non Laying Chickens Wean to Feeder Dairy Heifer. Laying Chickens Farrow to Finish Milk Cow Turkeys _ - Feeder to Finish Dry Cow Other Farrow'to Wean Beef Stocker Calf Pullets Farrow to Feeder Beef Feeder Turkey Poults Boar/Stud Beef Brood Cow Gilts Other Other - Wet Poultry f-Turss:.c - I-Torses Sheep Sheep - - ---_.__ Non J:aying Pullets FORM RENEWAL-NPDES-1.2/2011 • �� �E�nR 1 p�C��e (� I Submit two (2) copies of the most recent Certified Animal Waste Manat emeut Plan (CAWMP). The CAWMP must include the following components: Some of these components may not have been required'at.thetime the facility was certified: but should be added to.the CAWMP for permitting purposes: • The Waste Utilization Plan .(WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) • A map of every field .used .for land application • The soil series present on every land application field • The crops grown on every land application field • The Realistic Yield Expectation (RYE) for every crop shown in the WUP • The PAN to be applied to every land application field � F S 1 4 2012 • Phosphorous to be applied on every land application field with a "HIGH" PLAT rating, • The waste application windows for every crop utilized in the WUP e The required NRCS Standard specifications hC D�NR • A site schematic Bale{^h�F'°{r'nal Mice s Emergency Action Plan • Insect Control Checklist with chosen best management practices noted • Odor Control Checklist with.chosen best management practices noted • Mortality Control Checklist with the selected method noted. Amass mortality plan must also be included. • Site -Specific Conservation Practices. necessary to prevent runoff of.pollutants to waters of the State. • PLAT results including datasheets for each field. • Lagoon/storage pond capacity documentation (design, calculations, etc.); please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your. facility + Operation and Maintenance Plan I attest that this application has been reviewed by me and is accurate and complete to the best of. my.knowledge: I'understand that, if all required parts of this application are not completed and that if all required supporting: information and attachments are not included, this .application package will be returned to me as incomplete. • Note: In accordance with NCGeneral Statutes 14372.15,6A. and 143- 215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation...(18 U.S.C. Section 1001 provides a punishment bya fine of not more than :$10,000 or imprisonment of not more than 5 years, or both fora similar. offense.) Printed Name of Signing. Official (Landowner, or if multiple Landowners all landowners should sign. If'Landowner is a corporation, signature should be by a principal executive Officer of the corporation): Name:.. Si;gnature:. ` r �� Name: i 1(a�uTitle: Yowl Tate: Title:' Signature: Date: THE COMPLETED, APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDENR — DWQ Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, North Carolina 27690463.6 r Telephone Number: (919) 807-6300 F -w, Nu„ lwr: (019) 807-6.354 FORM RENEWAL-NPDES-1212011 Producer: Location: Telephone: Type Operation: Number of Animals: (Design Capacity) ANIMAL WASTE, UTILIZATION PLAN CALEDONIA PRISON P.O. BOX 137 TILLERY NC 27887 252-826-5621 Existing poultry Laying 60000 head 0 E c EB 1 A. 2012 STORAGE STRUCTURE: Anaerobic P!CD`rNR >;I'l nine . APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The.plant nutrients in the animal waste should be.`used-, to reduce the amount of commercial fertilizer required for the .crops_; in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can balanced for realistic yields of the crop to be grown. Several factors are important in implementing your -waste -utilization plan in order to maximize the fertilizer value of the waste:, and,:to ensure that it is applied in an environmentally`,safe.manner: 1. Always apply waste based on the needs of the crop to be,:�. grown and the nutrient content of the waste. Do not apply.:'-. more nitrogen than the crop can utilize 2. Soil types are important as they have different rates, leaching potentials, cation exchange capacities,"and . available water holding capacities. 3. Normally waste shall be applied;to land eroding at less -than 5 tons per acre per. year. Waste may be applied to land'.....,:' ..<.. eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE XTILIZATION.PLAN 5. Wind conditions should also be considered to avoid drift and, downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing.,crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on : typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to'be flexible... ` so as to accommodate changing waste analysis content and crop type:,: Lime must be applied to maintain pH in the optimum -:range for specific - ":'.��.:..` .. crop production. This waste utilization plan, if carried out, meets the requirements, for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.), 60000 head x tons waste/head/year = tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 60000 head x 'Og41bs PAN/head/year = 5039.4 lbs. PAN/year Applying the above amount of.waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner.. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** *,LBS DETERMINING PHASE CODE AW N PER ACRES AW-.N-_;,.,. PER AC AC USED ----- or --=----. APPLY RESID. APPLIC- METH N TIME: 4485':- 3304 86 StB FP 3.0 150 0 29.9 I SEPT.-MAY 3304 181 lStB 3304 F 81 jStB 3304 160 jStB 3304 -60 jStB 3304 -60 jStll 3304 �60 jStB 3304 28 jStB 3304 -28 jStB 3304 -28 jStB 3304 -28 lStB END BH 0 114664 � '�,.': IAPR-.SEPT 16.3 1315 136.4�, SG 0 36.4- 1794'....52::. I 129.. 149.3 NOV-APR" SB 4 0 0 14.. 0.. 560.:;'. `... 140 1 CO 900 - 0 0 , I 1108 114. 1,1512_:.::: APR-AUG- C 120 0 14:.0:., 2100.; I 1150 MAR'JUN SG. 49.3 0 690.`2'_; II 129 11.4.0: NOV -APR: SB 40 40 0 4.8 192- '.:.=: I JUN-AUG CO 900 0 518: 4 1108 14.8.,,�,, APR-AUG C 0 8 I 1120 1150 14. 1720., MAR-JUN. SG 0 236.64 I 129 14-9.3 14.8. NOV-APR I TOTAL Page: 3 ' ANIMAL WASTE UTILIZATION PLAN - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied. while meeting the N requirements. In the future, regulations.may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. NOTE: SOME FIELDS ARE SHOWN WITH A (ti) AND. THESE FIELDS ARE PART OF THE NORMAL CROPPING ROTATION. THESE FIELDS'MAY BEPLANTEDWITH -:. ANY ONE OF THESE CROPS, AND THE NUTIENT UPTAKE WILL HAVE TO,.BE ACCOUNTED FOR THAT PARTICULAR 'MOP. Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables.l and 2 above:. CROP CODE CROP UNITS PER UNIT 50 BH HYBRID BERMUDAGRASS-HAY TONS C CORN BUSHELS 1.25 CO COTTON POUNDS 0.12 FP TALL FESCUE -GRAZED TONS .50. SB SOYBEANS BUSHELS 1.0: SG SMALL GRAIN OVERSEEDED TABLE 1 TOTALS FROM TABLES 1 AND 2 ACRES 85.1 ' LBS AW N ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total. acres in the fields listed may, and most likely will'be, more than the . acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate soil at the time of irrigation such that runoff or ponding,.occurs. Thi`sY;.`.' rate is limited by.initial soil moisture content, soil structure, --soh,`;;'``_ texture, water droplet size, and organic solids. The application°amount-_.` should not exceed the available water holding capacity of:the�.soil atthe time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land.application for:this.plan,lF�� it is the responsibility of the producer and irrigation designer::to'ensure.;:_ that an irrigation system is installed to properly irrigate- the .acres: shown in Tables 1 and 2. Failure to apply the: recommended rates ':and amounts of nitrogen shown in the.tabl:es may make this plan invalid.'...-... - The Y� following table is provided as a guide :for establishing application,:.,-, rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount:.: (inches) 3304 28 StB SB 0.5 *1.0 3304 60 StB. SB 0.5 *1.0 3304 81 StB BH 0.5 *1.0 3304 86 StB FP 0.5 *1.0 3304 "28 StB C 0.5 *1.0 3304 728 StB CO 0.5 *1.0 3304 -28 3304 -60 3304 "60 3304 60 3304 '81 StB StB StB StB StB ANIMAL WASTE UTILIZATION PLAN SG 0.50 C 0.5 CO 0.5 SG 0.50 SG 0.5 *1.0 *1.0 *1.0 *1.0 *1.0 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00' months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste.Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that.is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to. planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season.- 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for.waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry. waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five ( 5 ) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Dn--. 11 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:CALEDONIA PRISON Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: CALEDON A PRISON (Please print)` Signature: r Date: Name of Manager(If different Prom owner): Signature: Date: Name of Person Preparing Plan: (Please print)John Y Clark Affiliation:NRCS Phone No. 919-583-3481 Address (Agency): Post Office Box 8 Halifax NC 27839-0008 Signature: Date: I B D-,--. 1 7 ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) I, , hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Waste Producer: Technical Representative: SWCD Representative: Term of Agreement: Date: Date: Date: Date: , 19_ to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this 19 My commission expires (SEAL) day of Notary Public. ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement I, hereby agree to apply waste generated by in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division,of Water Quality. Third Party Receiver: Date Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that a Notary personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires (SEAL) Notary Public. tv NO` -411 L.0 fi ivsj 4 AWJL f4 Air tar gw. ..... . tA • •: - `°ram '.H�/'► I . V. \ Vi ...� `. (� .F r Ipoo v 1 4- i . 1 ''ti to N j Y.. 51 ."• y .k 1�a7" = .�1 �.. �k�'ly� I ( r' +1` ,.� •� Ir _IF' c5T .M_ JN' .C•� I"d�'�.':i r (� f i ui.{/' iIt t ,�•.i : it .Q ° �"�yii •.� to �� �. ti rrC`•,,. I r--j • ':1 v \ . . ' ` • � • �i�•er,"`` . %b' � � V d'' � � � ti e"r^ �'�`r� "%cam'.; Lag 7: I S� d : i'3•+0`4!iW z+� '� ..�nl• i`•�f7i1"t'G 2 a a„ ,% r }• ,•fit' { _ r,�x�'.t k'`ex ^]rq ��`\ n�•5:' `^7 �'7 +. •^,�,'irt'}:i...a., r a .. '! : I �` "� � � \ � ,.� \ 1 � �.: It7 ",�''r� � y`la•�a f rt.. `�e'`��• L ryw . -.+ i..' • \ � ir'+ .\\ I`''. ir+� �bS I�'•,!t� n.'.�C r.(�•�i �?7':. y:_ ', . +►: is w "1C�q � f L y i �. t L.t cYa.• � J , ` '1 i.�I�CT i� _ •yd .Ir � M '+ty7/�w�{. . ,M 4.�:� � t.. i 1� ` �, ,`i1., �; �'.;�', : •,:ten, 7f. .. 'y, �;t!r.R.a Zip x'''_'� -� 1. � \`'��., . Cy _ �•: � ��. ,;�+. . ` 04 Ex ?a sLLre Fkrii n.s VwXV3 it Il � Fl. tle. JT tz . . . . . . . . . . ij iA :u : '�� :'.r�..Y '. w'..N. �iK •••f ..'•{,,i� r„��'ir: ^ I r-��-' ' :I� ,��„• r: .p., iI' .R -1 I •L. ! f ,:. � .' • 1 Xy tt 11"'..may '":'�,• �� 7, Www " `�'S'tk Y r h �. .._.... ..•T. - rJiE. �'" _"tir��,c, �qr. - �!I_}+'. tw ' - - t r.. '� d.": ''I ,�c:'I�i� 7E��. • J .%�� yFu 4i !1 '' ,��'•�'.i1 +t".:L vrr'`}�.f Y .'; •. � k ,• ! .r i y1•>j�r��� ��1r Y, •,1 A. \'`•QV � � .` I� r , ba ,`` to r: � ` �:1.�t`i•p� . 3 .•��„a'n.{7 w.i.. / ��q•r Fit. .i , ':"' � � f A •s,:} , it < � a . �� h �k z, r 't. 11' Y � ' .P'4 U •'rrti 1fiJ� ..: • _-. - 1,� � 'r,17`L�� n"'l7 r � •"'•r.•.-.,. •� :...r,� � � "w Ae {51 t, `Y_ •v+.1,+.. ..•__:..:.-.tea.-.�+� ,'•'i 1Y.n ; . ,, ru '' �•�'r'f• .. r !�,: Nn �' � r 1 a.�,�T1.: to 'e*'TcYi i� c'�'p� r r;+,(•'0JJr w�,f/� , 7`f � � '} -�c �5 ��rp � . :?2�'�`i."•Cr earn• c r. r� Jam..,• % � lY ' a A \• :AL J.•• • w:�.�:,:r. .. ,•�;:, •:f.},Tj^T.;v: f7�,j !::'{r;;.. -+a••i•a� ,y+',T t,.a•; a .►•; ,ij':S. ���: :)" ,;4+:y :4:'4. •'f; :�a`y; �: i.�6 S' •'t`+'.::fi? "i;/, 'e. 1 , i 2♦ ,.,.; ;:. ..., `'r ✓jr+5• 'ire ;:•.. t `: .�+"••: ��yy 1� � .�[ . ,yF: rvj; ' �.. I �i•' ,;: . C-��:� > � rJ�r•' -. f' � 'i. ,y,. r. i1,t•. �" ! ,. 1. • r I , t i. '.. J ,' .. w. ... . ►. ry + Insect Control Checklist for Animal Operations -- luurrc- Cause RMI's to Control Insects Site Sliccific Pracliccs Systems FIus1J (11111crs Accunntlation of solids Pr Flush system is designed and operated sufficiently to remove accumulated solids from glitters as designed. Q Remove bridging of accumulatcd solids at I.al;nwJs and NIS • Cruslcd Solids - Maintain lagoons, scllling basins and pits where - - - - pest breeding is apparent to minimize the cnlsting of solids to a depth of no more than 6 - 8 inches over more than 30% of surface. I:accs:'iVe Vcl;ctrlivc Decuying vegelalinn Maintain vegetative control along banks of t in��t Jh lagoons and other impoundments to prevent accuuntlatinll ofdecaying vegetative mailer along water's edge on impoundment's perimeter. _ Dry Systems Fcu) Spill.,gc Pr Design, operate and uaintain feed systems bunkers and Ironbhs) to minimize the j"cllulllalioll of decaying wastage. W Clean tip spillage on u routine basis (e.g., 7 - 10 day interval during summer; 1 S-30 day interval _ during winter). I ccd S,orage Accumulations of feed residues Reduce moisture accumulation within and around inunedi:nc perimeter of 1ecd slorage urcus by insuring drainage nway from she an(Vnr providing adequrlc containment covered bin for brewers groin and similar high loisture grain products). O Inspect for and rentove or break up -accumulated solids in filter strips around feed storage. ncedcd. Wit $uurrc CaUSe Ani►nal I lolling Areas Accumulations of animal wastes CI and feed wastage n NY h1allme handling Accumulations ofanimal wastes n Systems n a IIMPs to Conlrol lusects. Site Specific Practices Eliminate low areas that trap moisture along fences and other locations where waste accumulates and disturbance by anin►als is minimal. Maintain fence rows and fiIlcr strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed). Remove spillage on a routine basis (e.g., 7 - 10 ' clay interval during summer. I5-30 day interval during winter) where manure is loaded for land application or disposal. Provide for adequate drainage around manure stockpiles. Inspect for and remove or break up accumulated wastes in litter strips around stnckpiles and manure handling areas as needed. For 111ore intone:lion contact the Cooperative Extension Service, Department of Entomoingy, pox 7613, North Carolina State University. Raleigh. NC. 37695-7613. AAllt: :nilrcr 11. 1996. Page 2 --S irrhFarm Waste Management Odor Control Checklist tiourcc Cause IIMPs to il9iuiulize Odor Site specific Practices I ;u uute;..l Swine production 0 Vegetative or wooded buffers; n Recommended best management practices; n Gond judgment and common sense Animal body surface Dirty manure -covered animals n pry floors I Iur ;ui frees Wct manure-covcrctl flours n Slotted floors; n Waterers located over slotted floors; Cl Feeders at high end of solid floors; n Scrape manure buildup from floors; n Underfloor ventilation for drying hl.nuuc collection I)ils • (trine; n frequent manure removal by flush, pil recharge, • Partial microbial decomposilion or scrape; n Underfloor ventilation VCn111.161111 c\liatlsl Ears Volatile gases; n- Pan maintenance; . nest n Efftciew air movement Induur surfaccs Dust n Waslldown between groups of animals; fl Feed :iddilives; n heeder covers; n Peed delivery downspout extenders to feeder covers I:lusli t.wl.s 0 Agitation of recycled lagoon Cl .Plush lank covers-, liquid while links arc lining n 13xtend fill lines to near bouoo, or was %vitb anti -siphon vents I lush alleys 0 Agitation during wastewater n Underfloor flush with underfloor ventilation conveyance I'll iecb.nl;e points 0 Agitation of recycled lagoon n Extend recharge lines to near bollmo ufpils liquid while Ails are filling with anti -siphon vents I:III sl;1liolls Agitation during sump lank n Sump lank covers filling and drawdown outside drain collection Agitation during wastewater n iiox covers ur junction boxes conveyance AAII II' - 1•11 1ve11tber 11. 1996, 11agt: Source _ Cause — BMPs to Minimize Odor — -- - - - Sile Specific Practices 1:1111 of drainpipes .11 0 Agitation during wastewater 0 Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces 0 Volatile gas emissions; Proper lagoon liquid capacity; • Biological mixing; Cv"Correct lagoon startup procedures; Agitation rt" inimum surface area-to-vohtme ratio; Cl Minimum agitation when.pumping; Q Mechanical aeration; fl Proven biological additives Ilrigalion sprinkler 0 I llgh pressure agitation; f-Irrigate on dry days with little or no wind; naulcs • Wind drift _"Minimum recommended operating pressure; f_e/Pump intake near lagoon liquid surface; ( Pump from second -stage lagoon 51111:1t!C lalll. of basin • Partial microbial decomposition; n Bottom or midlevel loading; Mixing while filling; n 'Tank covers; • Agitation when emptying Q Basin surface mats of solids; CI Proven biological additives or oxidants ScIlling bas111 sltft;lce • Partial microbial decomposition; CI Extend drainpipe outlets underneath llllllid • Mixing while fining; level; • Agitmion when emptying Cl Remove settled solids regularly Manure, slurry or sludge e Agitation when spreading; Ll Soil injection of slurry/sludges; spreader Outlets . Volatile gas emissions Q Wash residual nianure from spreader after use; CI Proven biological additives or oxidatus Uncovered m;uulic. a Volatile: gas emissions while L7 Soil injection ofshirry/slndbes slurry or shldge on field drying 0 Soil incorporation within 48 brs.; sur laces C_7 Spread in thin uniform layers for rapid drying; CI Proven biological additives or oxidants Dead animals • Carcass decomposition _ Proper disposition of carcasses Ih:ul;ulinl:el disposal 0 Carcass decomposition CI Complete covering of -carcasses in lluri;il pits; I111i 0 T 00location/cmislructinn ofllispo�al pits luiinel:ewu • Incomplete colldlus6oll ' Secondary stack,hurners Antr wemher 11, 1996. Page 4 Source cause / 11MI's to Minimize Odor- Site Specific Practices Standing %vater arollltd • Improper drainage; Grade and landscape such that water drains laclltttes . Microbial decomposition of away from facilities organic matter Al.mnre hack-ed unto • Poorly maintained access roads I-arnt access road maintenance pulllic roads Lion► faro► access L Additional Information : Swine Manure Management ; 0200 ItulelRMP Packet Swine Production Dann Potential Odor Sources and Remedies ; G13AG Fact Sheet Swine Production facility Manure Management: Pit Recilarge - Lagoon Treatment ; GQAG 129-88 Swinc Production Facility Manurc Management: Underfloor flush - Lagoon Treatment ; CRAG 129-88 Lagoon Design and Management for livestock Manure Treatment and Storage ; G13AG 103-83 Calibration of Manure and Wastewater Application Equipment ; GDAG fact Sheet Controlling Odors from Swine Imildings; Pill-33 Foviroomenlal Assurance Program ; NI'1'C Manual Options Illr Managing Odor; a report from the Swine Odor Task force Noisance C'oncents in Animal Manure Management: Odors and flies PROW. 1995 Conference Proceedings Available From : NCS11. Camnty Extension Center NCSI1 - IIAE NCS11 - IIAI' NCSI1 - IIAE NCSI I - IIAI: NCSI1- IIAI: NMI - Swine Extension NC fork Producers Assoc NCSU Agri Cummunicatinns Florida Cooperative Extension AAI( W 11. 1996- P-ll;e 5 EA.-IER GEN CY ACTION PLAN PH Q NT, NUN LBERS DWQ Giaj�j—zo3/ EMERGENCY M.-:VAGEvLE.N7 SYSTELM (2if) SWCD MRCS (9v).583'3F81 This plan will be implemented in the event that wastes from your operation are leaking. overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen: This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. zz A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. - e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close %-aIves to eliminate further discharge. d. Repair all leaks poor to resmain; pumps. D: LeakaQe from Flush systems. houses. $olid separator_ -action include: a. Stop recycle pump. b. Stop irri_•ation pump. c. Mzj.ke sure no siphon occurs. J. Stop .:11 in the house. tiu:h >� ate ;. Or _cliJ �r±parators. 6: Contact the technical specialist who cerified the lagoon (MRCS, Consulting Engineer. etc.) .a. ,Name: (/J D," IJR( S b. Phone: r9i9 ) - S-r3 — 3 V 7: Implement procedures as advised by DWQ and technical assistance agencies to rectif%-' the damage. repair the s%,stem, and reassess the waste management plan to keep problems with release of wastes from happening again. . • Y• Mortality Management Methods (check which methods) are being implemented) :.l Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300 feet from anv flowing stream or public bodv of water. =� Rendering at a rendering plant licensed under G.S. 106-163.7 Complete incineration In [he case of dead poultry only, piacing in a disposal pit of a size and design approved by the Department of A--rtculture J Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the .State Veterinarian must be attached) System Calibration Information presented in manufacturer's charts are based on average «, operating conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reasons, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every thr s recommended. Calibration involves fo e%ting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpeadicular to the direction of pull. Set out collection container 25 feet 7a art long the transect on both sides of the gun cart. You s ould compute the average application rate for all collection containers. You should also look for evidence of nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. k4or ANIMAL WASTE UTILIZATION PLAN - Indicates that this field is being overseeded (i.e. interplanted) or winter.annuals follow summer annuals. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may-. require farmers in some parts of'North Carolina to have a nutrient management plan that addresses all nutrients. 'This plan-`' only addresses nitrogen. SOME FIELDS ARE SHOWN WITH A (ti) AND THESE FIELDS ARE PART..OF THE NORMAL CROPPING ROTATION. THESE FIELDS MAY BE PLANTED WITH ANY ONE OF THESE CROPS, AND THE NUTIENT UPTAKE WILL HAVE TO BE ACCOUNTED FOR THAT PARTICULAR CROP. .•.�(l C'� r"n1 �!i✓i n t�o�U U��f' !�/ / �� . �Q.� dc'�C� :. /5 : 2� vti �J -' �i State of North ,Carolina Department of Environment and Natural Resources Raleigh Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director dw NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY October 1, 2001 CERTIFIED MAIL RETURN RECEIPT REQUESTED NC Department of Corrections Caledonia Prison Farm P.O. Box 67. Tillery, NC 27887 Attn:Mr. David Inscoe Subject: Notice of Violation Caledonia Prison Farm COC No. AWP420001 Halifax County Dear Mr. Inscoe: On September 28, 2001, Mr. J.D. Hester from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. There was no active discharge of wastewater into waters of the State from your lagoon. The lagoon had the required amount of freeboard at the time of the inspection. However, the inspection revealed several deficiencies that should.be immediately addressed: At the time of the inspection several muskrat holes were observed in the secondary lagoon. It is highly recommended that this facility fills these areas and inspects this structure for any'additional holes. You are encouraged to contact the Halifax County Soil and Water Conservation District for any technical assistance you may require in this matter. As a permitted animal facility, you are required to have a copy of your freeboard monitoring records, readily available for inspection to determine compliance with 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX (919)571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Caledonia Prison Farms NOV Page-2- conditions in your general permit. During the inspection no freeboard records were available. The above mentioned conditions are violations of your current Animal Waste General Permit AWP420001, Section III. Line 2 "Monitoring and Reporting Requirements", Your permit also requires that the lagoon levels be recorded weekly on forms supplied or approved by Division of Water Quality (DWQ). Please respond to the Notice in writine within 30 days after the receipt of this Notice. You should specifically discuss what steps have been taken to correct these deficiencies. This office appreciates your cooperation in this matter. If you have any further questions regarding this inspection, please call JD Hester at (919) 571-4700 Ext. 335. La Siincerely, uster, P.E. Regional Supervisor cc: Halifax County Health Department Halifax County Soil and Water Conservation District Ms. Margaret O'Keefe/ DSWC-RRO RRO Files STATE a ry W North Carolina Department of Correction Enterprise Farms Michael F. Easley PO Box 67 • Caledonia Drive • Tillery, NC 27887 Governor October 12, 2001 NCDENR Raleigh Regional Office 1628 Mail Service Center Raleigh, North Carolina 27699-1628 Dear Mr. Schuster: . 4 .,._ i.,..� T S O —' a LLJJ Upon receiving the Notice of Violation on October 11, 2001, the following corrective action has been implemented. An inspection of the lagoon and the area surrounding it will be completed on a daily schedule. Any areas that are found that are in need of filling will be addressed at the time of inspection. The supervisor will take corrective action as to trapping the rodents around the lagoon. We will maintain accurate records in the future as to freeboard and levels of the lagoon. These records of monitoring will be in accordance with our permit. The forms will be made readily available and kept in the office for review during your inspection. I have spoken with the supervisor of this operation concerning these violations and the corrective measures to be implemented. It is our goal to manage and monitor the lagoons in accordance with the Division of Water Quality. Thank you for your assistance in making us aware of these violations. If I may be of any further assistance, please call. Sinc ely, 41 ex /zw Phillip C. Sykes, Manager Enterprise Farm Operations CC: Halifax County Soil and Water Conservation District Halifax County Health Department Mr. Hugh Crawley, Poultry Supervisor File Beck tary Telephone: (252) 826-3821 An Equal Opportunity / Affirmative Action Employer Fax: (252) 826.3691 v. d ;,w STATf a •<� Wnm Nf�-V• North Carolina Department of Correction Correction Enterprises P. O. Box 29540 ` W Chapanoke Road • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor Les Martin Franklin Freeman, Secretary Enterprise Director Date: August 25, 1995 To: Guriiie Lee, PE Central Engineering From: William J. Hassell Farm Operations Manager Re: Corrective Action/Lagoon Caledonia Farm In accordance with Mr. Buster Towell and your recommendations for the appropriate corrective action for the Enterprise layer operations lagoon. 1. The freeboard on our lagoon was less than 12 inches and to avoid any breaching during periods of heavy rains, the following corrective action has been implemented. Corrective Action Taken- The pump that pulls the water from our lagoon was moved and placed to allow direct diversion of lagoon water. As an additional precaution we moved it so in the event of a pump or hose disconnect, any water loss would drain directly back into the lagoon. The lagoon level has been pulled down to a 20"-24" freeboard. 2. The lagoon spraying system was noted to have a damaged hose and was spraying too close to a drainage ditch. Corrective Action Taken- The flexible 4" line has been replaced with rigid irrigation pipe. The spray nozzles in our intensive grazing pastures have been relocated to insure that no water will enter a drainage ditch. Phone: (919) 662-4400 Courier # 53-71-00 Fav (914) AAI_.+.tn() Central Engineering August 25, 1995 Page 2 3. An animal waste water management plan ( required by December 1997 ) Action Taken - See attached ( Letter to initiate plan ) cc:Les Martin K.L. Kautzky W. Stoval Kenneth Schuster North Carolina Department of Correction Correction Enterprises P. O. Box 29540 Chapanoke Road • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor Les Martin Franklin Freeman, Secretary Enterprise Director Date: August 24, 1995 To: Steve Bennett Regional Coordinator, Division of Soil and Water Conservation From: William J. Hassell Caledonia Farms Farm Operations Manager Enterprise Division Re: Animal waste management plan In order that I may comply with all required water quality regulations and guide lines for implementing an animal waste management plan, please give me a call or written instruction as to the procedures that I must follow to ensure that we at Enterprise are in complete compliance. I realize that the deadline is many months away, but due to the nature and scope of this required plan, you and your staff will certainly have many other private and corporate plans to cover. Thank you for any assistance concerning this matter. William J. Hassell P. 0. Box 67 Tillery, N. C. 27887 Phone: 919-826-5784 cc:Les Martin K.L. Kautzky Phone: (919) 662-4400 Courier # 53-71-00 F;,Y• (919) AA')-eA.04 \L% y pp SPECIAL OLYM6A ryJOfl„D GAPS MS is WPC i*`w� c 4��4�i y- N , Gaul �� OF' North Carolina Department of Correction PROUD SPONSOR 214 West Jones Street - P.O. Box 29540 - Raleigh, North Carolina 27626-0540 1 - 8 8 8 - 7 6 7 - 1 9 9 9 James B. Hunt Jr., Governor March 30, 1999 Kenneth Schuster, P.E. NCDENR, Regional Water Quality Supervisor P.O. Box 29535 Raleigh, NC 27626-0535 Dear Mr. Schuster: q? I Ii�Co. 'f V. Mack In response to your letter dated March 10, 1999, Notice of Violation at Caledonia Farms, we are in the process of addressing these concerns. The violation at the fresh produce warehouse has been turned over to Bill Stovall, Chief of Engineering with NCDOC. The construction of this facility was under their supervision. I am very confident that Mr. Stovall has made contact with the engineer who designed this building and will be in contact with you addressing this concern. This processing facility has not been put in operation. Once this facility is operational the volume of water utilized will be for washing the product only. The types of vegetables that will be processed will include cabbage, peppers, cucumbers, tomatoes and lettuce. There will be no chemicals used on these products as these will be processed for the fresh market. The amount of process water used at this facility will be approximately one to two hundred gallons per day. The processing of fresh vegetables ai the produce warehouse will be limited to two or threc hays per week. I do not anticipate this operation running five days a week. In reference to the concern of washing the potatoes and the water entering an open ditch, this process has been discontinued. Eventually, this process will be moved to the produce warehouse. This process included the use ofBrotran 75W Fungicide as an agent to prevent postharvest rot. The amount of product used is .75 lb. of active ingredient per 100 gallons of water. The volume of water used at this site would be approximately two to three hundred gallons per week. This facility is normally used once a week and this provides enough product to supply the vegetable warehouse. An Equal Opportunity / Affirmative Action Employer The cleaning of this equipment does not require any type of chemicals or disinfectants. We are "currently using water as a wash down method. The total consumption of processed water at this facility will be approximately 800-1200 gallons per day of operation. If we choose to use a cleaning agent or any type of disinfectants, we will certainly get clearance from your department before we implement it in our process. Phillip Sykes, Manager Caledonia Farms cc: Jim Godwin Rodney Gusler -, State of North Carolina Department of Environment, LT!WA Health and Natural Resources 'IWA Raleigh Regional Office JAM James B. Hunt, ,SecretaE H N F1 Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager DIVISION OF ENVIRONMENTAL MANAGEMENT August 2, 1995 Mr. William N. Stoval Chief of Engineering North Carolina Department of Correction 1001 Navaho Drive Raleigh, North Carolina 27609 Subject: Management Deficiency Notification Caledonia Layer Operation North Carolina Highway 561 Halifax County Dear Mr. Stoval: On July 24, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine potential problems associated with liquid waste disposal systems. Mr. Towell's site visit determined that wastewater from your facility was not discharging to the surface waters of the state. Nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: -Your lagoon has little freeboard, less than 12 inches in some areas. This problem should receive prompt attention in order to prevent a future discharge or a lagoon breach. -It was also observed that your hydrant system has a cut hose and that your sprayer was located in close proximity to a drainage ditch. In order to pump out your lagoon to recommended levels the hose should be repaired and the sprayer should be moved to a point further away from the ditch. In addition to continued waste facility management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Caledonia Layer operation Management Deficiency Notification Page 2 You should specifically address how you plan to correct these problems and submit a schedule (with dates) stating when these management deficiencies will be corrected. Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P. E. Regional Supervisor /ds H:\animdn cc: Halifax County Health Department Halifax County Soil and Water Conservation District Steve Bennett - Regional Coordinator, Division of Soil'and Water Conservation State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director NC Dept. of Corrections Caledonia Prison Farm PO Box 67 Tillery NC 27887 Dear NC Dept. of Corrections: J&74 • • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 30, 1999 r Subject: Fertilizer Application Recordkeeping ` 0�F' Animal Waste Management System Facility Number�_42-_V Halifax_County---) This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. 1RR1, IRR2, DRY1, DRY2, DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. SincL 'f 16-e*7- Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Halifax County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper .�� JUL-14-1995 TO 15:26 FROM DEM WATER QUALITY SECTION PRO P.02/02 Site Requires Immediate Attennor, Facility No. DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: -7 ` 2- , 1995 Time: / ,-/ / D 2 �, Farm Name/Owner. '.G��' , '`' ;�` :z �2 �� i_.:•� . Mailing Address: Iy G 1)ay5l e o , s County. - Integrator Phone: On Site Representative: l Phone: Physical Address/Location:� Type of Operation: Swine Poultry _ Cattle Design Capacity: SD� r->v 'L71 Number of Animals on Site; DEM Certification Number: ACE DEM Certification Number-: ACNEW Ladrude:.p 6 % �_" Longitude:^? 7 " 2 6 Yz Elevation: Feet Circle Yes or No .Does the Animal Waste. Lagoon have suffic'r. freeboard of I Foot + 25 year 24 hour storm event t (approximate) v 1. Foot + 7 inches) Yes or Actual Freeboard: I — Ft. Inches Wasany seepage observed from the Is adequate land available for spray? Crop(s) being utilized: ee . r�J �ou(s)? Yes or No Was any erosion observed? Yes or; �or No Is the cover crop adequate? C.Yes r No ,. -S Does the facility meet SCS minimum setback criteria'? 200 Feet from Dwellings? xes,'or No 100 Feet from Wells?��s, or No _ e animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes or Zoo animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line'? Yes or No '; animal waste discharged into waters of the state by tnart-made ditch,. flushing system, or other iimilar man-made deN ices? Yes oro If Yes, Please Explain. 7)t �cs [tic facility maintain adequate waste mariagemcat records (volumes of manure, land applied. spray irrigated on specific acreage with cover crop)? Yes or No Additional Comments: L� ti h 2e c1 e rl '�� .h P____T G�w,r� _ ,4-�, �✓ w+ ry� 1� o C L"�,�/►j' F`1 i lL t�. 1 �1 G-e e- D r J- d , i,"�. Signature cc: Facility Assessment Unit Use Attachments if Needed. TOTAL P.F2 -�--• TO JUL-14-1995 15:2e FROM DEM WATER DUALITY SECTION RRO P.02ia2 Site Requires Immediate Attennor Facility No. 2' DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE' VISITATION RECORD DATE: —7 - 2 ti ' , 1995 Time: I V / -0 Farm Name/Owner. Mailing Address: _ County - Integrator. 0 Cc,ye v v dk s Phone: On Site Representative: Phone: Physical Address/Location: / O' ' - Type of Operation: Swine Poultry Cattle Design Capacity: -sal �C-2a Number of Animals on Site: 3�' � o —� Lr9 y 4,-s DEM Certification Number: ACE DEM Certification Number: ACNEW Latitude: ' % _" Longitude: -1 % " Z L V Z " Elevation: Feet Circle Yes. or No .Does the Animal Waste. Lagoon have suffic' t freeboard of 1 Foot.+ 25 year 24 hour storm event (approximately 1. Foot + 7 inches) Yes or ,�o Actual Freeboard:. I' '—Ft. Inches Was. any seepage observed from the lagoon(s)? Yes or No Was any erosion observed? Yes-orto Is adequate land available for spray?6�Oe r No Is the cover crop adequate? 9"o Crop(s) being utilized: 6r W n Does the facility meet SCS minimum setback criteria'? 200 Feet from. Dwellings? es No 100 Feet from. Wells?(S� or No _pie animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes or Co '> animal. waste land applied or spray irrigated within 25 .Feet of a USGS' Map Blue Line? Yes or Io 's animal waste discharged into waters of the state by inan-madeditch,. flushing system, or other ;'a_- man-made. devices? Yes ore) If Yes. Please Expl:urt. far 5 tnc facility maintain adequate waste mattageractit records (volumes of ruanure; land applied spray irxigated.on specific acreage -with cover crop)'? Yes or No Additional Comments: Ln Sktns^ h 4ee d (t rl J (y ,Q r4-r, �+^ w► G I rL C a,w+ C V I K1yGM , fi y s how- vim- b Z, t�)�/✓ ► ' t r S � L D .4, J"- A-) a f, cc: Facility Assessment Unit AVs- A Signature Use Attachments if Needed. TOTAL P.C2 State of North Carolina Department of Environment and Natural Resources James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director CERTIFIED MAIL RETURN RECEIPT REQUESTED NC Dept. of Corrections Caledonia Prison Farm PO Box 67 Tillery NC 27887 Dear NC Dept. of Corrections: 1 • • 00ft rA71 A 9 10 AUN 0 2 0 SON A4 �"` NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES May 15, 2000 F", "11 MAY 19 ?nno 1 Subject: Status Update Wettable Acre Determination Animal Waste Management System-- -��.-, Facility Number 42-1 Halifax County The Division of Water Quality (DWQ) is hereby requesting a status update concerning the completion of a Wettable Acre Determination for your subject facility. A letter dated August 27, 1999 was sent to advise you that your facility was required to complete a Wettable Acre Determination within six months (see attached letter). As of May 10, 2000 DWQ has not received the facilities Wettable Acre Determination Certification Form. Please submit to DWQ within 10 days a written explanation as to why a Wettable Acre Determination Certification Form has not been submitted. Please include the necessary information detailing the steps taken to certify this facility for Wettable Acres. Please be aware that not submitting this certification within the allotted six months may result in civil penalty assessments, permit revocation, and/or injunctive relief. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact me at (919) 733-5083 ext. 571. Sincerely, '7�. Sonya Avant Environmental Engineer cc: Raleigh Regional Office Halifax County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper t . " i t II)i n of Soil, AWater Conservation Compliance Inspection �,; 1 ��� d wisron,of Water Quality Comph:�nce Inspection i ; I Operation t l2ev�ew t ,: +. ' t; `..F 0"Other, , .gency:` i . ;' . �' a �', t'" a` '' ! � ., .; ' t LO'Routine O Complaint Q Follow-up of DWQ inspection Q Follow-up of DSWC review Q Other .ems. Date of Inspcclion Facility Number _-� Time of Inspection 1 d 24 hr. (hh:mm) Permitted �Krtirjed E3 Conditionally Certified ❑ Registered [3 Not Operational Date Last Operated: N /ff "� �% I / .......................... Farm Name: �!!...4. (�! F tr,ly,✓. /�0 ..!..` ..!%1S �'i��QC�rjrl 4' County: ......7"l, !.....��................................................ Owner Name: .%C.....1,.!!..V..'.. C...- ..................... Phone No:.... ....�... tP. �.... 3.:.. l..................................................... ............ Facility Contact: .. ll h(Yi6-.......... Title :....................... ..................... Phone No:............................ ....................... Mailingaddress:.......:.Q........x..6..........�.�.l..(4.....1!'�.G �..... ............................................................. .......................... Onsite Representative: ... y...av i C r`SC�g-�, Integrator: r ......................................... g........................................................................... Certified Operator: ....... .(/.!........�....................................... Operator Certification Number:.......................................... Location of Farm: FF r..........................................................................................................................................................................................................................................................................1 Latitude • �' ��� Longitude � • �' �" . i Swine Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poult • Capacity Population Cattle Capacity Population ayer p1 1[:] Dairy - ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number oftagoons ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spay Field Area Holding Ponds/Solid Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts ( 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)? ❑ Yes 2rlgo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance. man-made? ❑ Yes No b. If discharge is observed. did it reach: ❑ Surface Waters []Waters of the State ❑ Yes o c. If discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? ❑ Yes 24o 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ' Structure 1 Structure 2 ❑ Yes N ❑ Yes No / ❑ Yes Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): v'�Q ................................. ............................................................................. i Continued on I 1 /6/99 t - Facility Number: Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑yes ANo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes o 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? ❑ Yes;No No Waste Application 10. Are there any buffers that need maintenance/improvement'? ❑ YesNo 11. Is there evidence of over application? ❑ Ponding ❑ ,NiLtrogen�» ❑ Yes 12. Crop type SG�.C.....�`1ST1�4��. E P.,^ •v �i.l 1. .1.!'!.all5'� �.f..^.^.......... �....,�.. ,�................................................ 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes No 14. Does the facility lack wettable acreage for land application'? (footprint) es ❑�;O� 15. Does the receiving crop need improvement'? ;;ess es 16. Is there a lack of adequate waste application equipment? SCE'" G�.,,,�e�t,--(_5— ---i� ❑ No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes 21�0 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes o 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports), Yes ❑ No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes IQI�o !1 21. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No 22. Fail to notify regional DWQ of emergency, situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes o 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'? ❑ Yes o11 24. Does facility require a follow-up visit by same agency? ❑ Yes IQN0 0: N.O.Vlalations:Or. deficiencies .were noted. during .this; visit:. Y.oti valI rerceive no further corr. esriiHidence; about; this ;visit.; ; ; ; Comments (refer to question .#) Explain any YES answers and/or any'recommendations or any other comments Use drawings of facility: to. better explain: situations. (use additional pages.as necessary)y x 3 no JA -4,-j4,11 L,' r f )s �,q4 Ls,% 1 h Or ci e-,.- 4-O Ftk t/wf'�►��✓ � t= fvcn^1 1� L ir..� y�rt7� ��,. �-p ✓) Q.[.�f 3/ 1 0 (4 i 12 il.'f (y (,i. j ; ^ Q l rrIS9' &a- 57s f20-1 10/A N-S C)¢/� �i-hdo, rI-Jf';q,J)"f,/ Tf �-fz ;q A-( a r- yC_ f- fA,4 S. S f S n OJ o vY- p6 A/ o r ec-0y d.s 0 (= 6V "/cl C) /e . ► GJvv/Gib ,v�� ,f lU Reviewer/Inspector Name 1 I Reviewer/Inspector Signature: /,�yL, Date: JUSTIFICATION & DOCUMENTATION Facility Number W— - a 1 Farm Name:C)4 /�f%/a Prisd, Ii-. ek—, On -Site RepresentativeQtw c.1 ��sc Inspector/Reviewer's Name: -7;,j e- Date of site visit:T/� Date of most recent WUP: FOR MAN ORY WA Revised January 22, 1999 DETERMINATION Operation is flagged for a wettable acre determination due to faof Part 11 eligibility item(s) F1 & F3 F4 Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Annual farm PAN deficit: n pounds Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system w/permanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary gun system w/permanent pipe; 7. stationary gun system w/portable pipe PART I. WA Determination Exemptions (Eligibility failure, Part II, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D2/D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part III. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part Il. Complete eligibility checklist, Part II - F1 F2 F3, before completing computational table in Part lll). PART II. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. ^ zt Das ;5 h v 1= n,vp 64- -1 SyS V-%.- 4-o 6 --I-/Pe . F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. 3 J, Revised January 22, 1999 Facility Number = Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER' Z TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 FIELD NUMBER' - hvdrant_ null. nine_ or point numbers may be used in place of field numbers denendino on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption if possible; otherwise operation will be subject to WA determination. FIELD NUMBER - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. Revised April 20, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number Z - 0 Operation is flagged for a wettable Farm Name: C ,1d ,- "s acre determination due to failure KF:4�) f On -Site Representative: Pt?411 �-�r� Part 11 eligibility item(s) F1 F2 Inspector/Reviewer's Name: Date of site visit: z �- GZ e, f// Date of most recent WUP:-. / - -,� Annual farm PAN deficit: pounds Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Operation pended for wettable acre determination based on P1 P2 P3 Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system w/permanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary gun system w/permanent pipe; 7. stationary gun system w/portable pipe PART I. WA Determination Exemptions (Eligibility failure, Part II, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D203 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part III. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part II. Complete eligibility checklist, Part II - F1 F2 F3, before completing computational table in Part III). PART If. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application -of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation � records. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; .failure to.deduct:required buffer/setback acreage; or 25% of total acreage. identified in CAWMP includes small, irregularly shaped fields - fields less than 5-acres for travelers or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. Facility Number ��- K- Revised April 18, 1999 Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER' 2 TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 330 �b 2Q.� 29.9 Z9. q 00 D FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption; otherwise operation will be subject to WA determination. FIELD NUMBER' - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. P ��`' r,ti v-c Part IV. Pending WA Determinations r to"Iadequate wetted acreage but unable to complete evaluation due to the following reason(s): P1 Plan lacks following information: P2 Plan revision may satisfy 75% rule based on adequate overall PAN deficit and by adjusting all field acreage to below 75% use rate t State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director March 9, 1999 NC Dept. of Corrections Caledonia Prison Fans PO Box 67 Tillery NC 27887 Attn: Phillip Sykes IT V__T 1 � • moon NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Application No. AWP420001 Additional Information Request Caledonia Prison Farm Animal Waste Operation Halifax County Dear Phillip Sykes: The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by April 8, 1999: I . Please provide lagoon capacity documentation (design, as -built calculations, etc.) for the three lagoons at this facility. Be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable. 2. When utilizing soybeans in a crop rotation, residual nitrogen should be accounted for in the next crop. It appears that the nitrogen residual from soybeans is not accounted for in the Waste Utilization Plan (WUP) submitted. Please contact your technical specialist to review your WUP and revise the WUP to account for residual nitrogen from soybeans, if necessary. 3. Your WUP lists the yield for cotton on tract 3304, fields 28 and 60 as 900 tons per acre. This is higher than currently recommended. Please contact your technical specialist to revise the WUP or provide justification that supports the increased yield as shown in the current WUP. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. 4. In the WUP, the acreage for field 81, tract 3304, is listed as 36.4 acres, while the map provided only shows 34.7 acres for this field. Please address this discrepancy and make any revisions to the WUP or the map as necessary. 5. On the certification for this facility in section 11, part D; the date listed for work completed on the application and handling equipment is December 15, 1997. An irrigation design is required to be submitted for this facility since the work was completed after September 30, 1996. 6. Please provide some documentation or other supporting information that shows that the lift pump required to be installed in lagoon 1 and used to lift effluent to lagoon 3 (new) has been installed. 7. Please have your Waste utilization Plan completed by having the total pounds of PAN utilized calculated and listed at the bottom of page 3 and on page 6, do the nitrogen balance by filling in the table. 8. Please provide a general location map showing some roads or other recognizable features. A topographic map or a county road map can be copied for this purpose. Please also provide maps that identify (please outline or highlight) and show the acreage for each field to be used for waste application. The maps provided were difficult to read and the land application fields were hard to pick out. An explanation (match lines and north arrows) of how these maps fit together would also be helpful. On these maps please identify the three lagoons at the facility and the poultry houses associated with them. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Application No. 42-0001 Phillip Sykes Page 2 9. It has been noted that Roanoke Rapids WWTP has a permit to dispose of sludge on fields at this facility. Please provide maps of Roanoke Rapids' application fields in relation to the fields used for poultry lagoon effluent irrigation. Please also provide either a signed statement or signed plan that indicates that no fields will be used for both WWTP sludge application and lagoon effluent irrigation. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before April 8, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 364. Sincerely, Dianne Thomas Soil Scientist Non -Discharge Permitting Unit cc: Ral`e;igti Regional-Offic�, Water Quality Permit File NORTH CAROL INA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REGIONAL OFFICE Division of Water Quality July 30, 1998 Mr. James Hassell, Farm Manager N.C. Department of Corrections Caledonia Farm P.O. Box 67 Tillery, North Carolina 27887 Subject: Notice of Deficiency Facility # 42-01 Caledonia Farm Halifax County Dear Mr. Hassell: On July 16, 1998, Mr. Buster Towell of the Raleigh Regional Office conducted a Compliance inspection at the subject poultry facility. The inspection revealed the following deficiencies: Severe erosion was noted around the two older waste lagoons due to the activity of burrowing rodents. If this problem is not corrected it could be possible for wastewater to actually break through the dike wall and enter the adjacent road side ditch which flows to the nearby Roanoke River. The new lagoon that was built last fall also has received some damage from muskrats near the bottom of the interior dike wall. Your waste plan calls for the installation of a lift pump to transport waste from the # 2 lagoon to the new lagoon. To date, this lift pump has not been installed. Your plan also call for the abandonment of a portion of your old # 2 lagoon so that the flush water will be taken from the newer, cleaner hole. This construction should be completed in a timely manner and checked off by the local District as well as an Area NRCS Engineer. 3800 BARRETT DRIVE, SUITE 101, RALEIGH, NORTH CAROLINA 27600 PHONE 81 G-371-4700 FAX 61 8-871-4718 AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - 30% RECYCLED/10% POST -CONSUMER PAPER Caledonia Farm Page 2 These deficiencies should be corrected as soon as possible in order to avoid a possible illegal discharge from your waste management system. Please respond to this Notice within fourteen (l 4) days of your receipt outlining your plans to make the necessary corrections. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this Notice please call Mr. Buster Towell at (919) 571-4700. Sincerely, L14 Ken Schuster, P.E. Regional Water Quality Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Compliance Group RRO Files 3 Div'sion of Soil and Water Conservation 13 Other Agency z ivision of Water Quality , ne O Complaint O Follow-up of DWQ inspection O Follow-up of DSWC review O Other Facility Number Date of Inspection Time of Inspection 24 hr. (hh:mm) 13 Registered UrCertified 13 Applied for Permit 0 Permitted 10 Not Operational /_Date Last Operated:......, FarmName: ./�..I ..� ..'...........!.�m..2.h-................................................. County: .... l�T A,.1�.�`........................: ................. Owner Owner Name: .....1 :.. ............ 1=...C�1�.� e 1 01' s................. Phone No• .;.� .....8L.G .................. .-...3 � Z �.............._....�. Facility Contact: ...nfiv.l...............v�SG�-Q................. Title: ................................................................ Phone No: ................................................ . MailingAddress• ......�....3.... �`.ivi...... ...lio"y......... a.......... .2.. .i�7....................................................................................... ...................... .. Onsite Representative: .... �!Q,l'1✓...................................................... Integrator:...... .......... .......... ........................................................................... ........... Certified Operator:... 'C',!%.............(�t.:5.................................................................. Operator Certification Number .......................................... Location of Farm: 14A,-v i } G I — ,S /L // & ZL I..................................................................................................................................................................................................................................................................... F .. Latitude • ` 46 Longitude ' 1 46 ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Ueneral 1. 2. Are there any buffers that need maintenance/improvement? Is any discharge from ❑ Yes Z�0� observed any part of the operation? ❑ Yes Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes Peo b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes' No c. If discharge is observed, what is the estimated Flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) ❑Yes No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes N 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes N 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No 7/25/97 Facility Number: j_ -- 0 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoonsliolding Ponds. Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure 1 Structure 2 Structure 3 Identifier: A-.l. ny1Q2 ........ � � ............... l Freeboard(ft): ...... ...... ............. ..t....................... .. ..... ........................ 10. Is seepage observed from any of the structures? Structure 4 Structure 5 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) ❑ Yes No ❑ Yes o Structure 6 ............. ❑ Yes es ❑ No ❑ Yes ��No ❑ Yes Ja"0 ❑ Yes 9<0 f............F...t9..........�.....I.................................................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? [[:]]Yes 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes No 18. Does the receiving crop need improvement? ❑ Yes No 19. Is there a lack of available waste application equipment? ❑ Yes 1 0 20. Does facility require a follow-up visit by same agency? ❑ Yes 21. Did Reviewer/Inspector fail to discuss review/ins ction with on -site representative? ❑ YesFNo o Pe P 22. Does record keeping need improvement? ❑Yes For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ;No,/ 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 25. Were any additional problems noted which cause noncompliance of the Permit? ❑ Yes 0 No.violitions or deficiencies. were noted during this.visit. You:will reeeive-no further corresP0Oden0A oid this: visit: .:. . . . ... . .:.....:.:.:.: . &e_ (�-a��-s zv-e.., j at.; � e ff1.1.e .na .� us��- ti r /�.s -�4 g. (� 1,,. � J r �� � b l7 -�- � n'�-•��*, p � �4 �✓�4-6� l � �>z��� � �!! I' Orl kSS tf !J D r: lam+ �9 vT (� k•►M I S. G'r` F-V f s 1! %l9it [ Q yt/ D 0 f r%r D f /?s�S 7/25/97 MAR 09 '99 09:56AM P.1 Division of 'Water Quality Water Quality Section P.O_' Box .29535 RaTeigh, rJ.C. 27626-0535 FAX:019) 733-91M 61os7 FAX TO- &e, . " &Ime �m/� FAX NUNMFR_ 733 — 7d 7 FROM ]>ia.pl,Ke.74o✓►1,aS PHONE: (9 T 9)733-5083 Ext: 3 tg + [No. OF PAGES INCLUDING THIS SHEFT: -�I,yCS �. ot�td � v► � ✓ �v(�.�dY�d a.... �� ✓�'-e ��'v�'� vc ova -�iuw� C emu` • " . I. MAR 09 '99 09:56AM P.2 Mate of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director I March 9; 199.0 NC Dept. of Corrections Caledonia Prison Farm PO Box 67 Tillery NC 27887 Attn: Phillip Sykes fflz!,�W,A 17 0 0 �A&4qj;) 11111dw NCDENR NORTH CAROLINA DEPARTMENT Or ENVIRONMENT AND NATURAL RESPURCES Subject: Application No. AWP420001 Additional Information Request Caledonia Prison Farm Animal Waste Operation Halifax County Dear Phillip Sykes: Tile Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review.; Please address the following by April 8, 1999: l . Please provide lagoon capacity documentation (design, as -built calculations, etc.) for the three lagoons at this facility. Be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable_ 2. When utilizing, soybeans in a crop rotation, residual nitrogen should be accounted for in the next crop. It appears that the nitrogen residual from soybeans is not accounted for in the Waste Utilization Plan (WUP) submitted. Please contact your technical 'specialist to review your WUP and revise the WUP to account for residual nitrogen from soybeans, if necessary_; 3. Your WUP lists the yield for cotton on tract 3304, fields 28 and 60 as 900 tons per acre. This is higher than currently recommended. Please contact your technical specialist to revise the WUP or provide justification that supports the increased yield as shown in the current WUP. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. 4. In the WUP, the acreage for field 81, tract 3364, is listed as 36.4 acres, while the map provided only shows 34.7 acres for this field. Please address this discrepancy and make any revisions to the WUP or the map as necessary. 5. On the certification for this facility in section ji, part D; the date listed for work completed on the application and handling equipment is Decetnber 15, 1997. An irrigation design is required to be submitted for this facility since the work was completed after September 30, 1996. 10 Please provide some documentation or other supporting information that shows that the lift pump required to be installed in lagoon I and used to lift effluent to lagoon 3 (new) has been installed. i 7. Please have your Waste utilization Plan completed by having the total pounds of PAN utilized calculated and listed at the bottom of page 3 and on page 6, do the nitrogen balance by filling in the table. 8. Please provide a general location map showing some roads or other recognizable features. A topographic map or a county road map can be copiedfor this purpose. Please also provide snaps that identify (please outline or highlight) and show the acreage for each field to be used for waste application. The maps provided were difficult to read and the land application fields were hard to pick out. An explanation (match lines and north aiTows) of how these maps IN together would also be helpful. On these traps please identify the three lagoons at the facility and the poultry houses associated with them_ P.O. Box 29635, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer. 50% recycled/ 10% post -consumer paper MAR 09 '99 09:57AM P.3 Application No. 42-0001 Phillip Sykes i Page 2 C 9J It has been noted that AMSCO has a permit for the land application of biosolids to fields at this facility. Please provide maps of the application fields that AMSCO applies biosolids to ill relation to the fields used for lagoon effluent irrigation from the poultry operation. Please also provide either a statement or plan that indicates a strategy for ensuring that no Fields will be used for biosolids application and lagoon effluent irrigation in the same year. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be sighed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before April 8, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 21.1.0200 and your facility will be considered to be operating without a permit_ Please be advised that operation of the subject animal waste management system without a valid permit is a violation of Nonh Carolina General Statute 143-215.1 and will subject you to the c riforcement authority of the Environmental Management Commission. if you have any questions regarding this request, please call me at (919) 733-5083, extension 364 j Sincerely, Dianne Thomas Soil Scientist Non -Discharge Permitting Unit cc_ Raleigh Regional Office, Water Quality Permit Pile AMSCO Qom- ? RAL.EIGH REGIONAL. OFFICE • �� ••�� 3800 8orrett Drive, Suite 101 NCDENR sleigh, NC 27609 F�fOlAC <IMI�OMMOf► �..►� C,,,, NM..00,.R..s,.. or t6 Phone: 919/571-�4700 FAX 919/571-4718 AMD FACSIMILE You should be receiving 6 pages (including cover sheet). If you do not receive all pages, please contact sender at 919/5714700. TO: Ca P" M � � g S FROM: l7tCS �Pz✓ .�- �/ ORGANIZATION: W c ) q SUBJECT: cow FAX NUMBER 1 - 33 - DATE: MESSAGE: , rk-. a- fiqr.e _S oA e l e `;! C Pig' F ,a ri( .1i-'f 7L-I,-,- y� ,fie th11 lam 01.01.2080 as:00 P' z FROM USDA - NATURAL RESOURCES CONSERVATION SERVICE A.O. BOX 10, 201 Saint Andrews Street �~ rarboro, North Carolina 27886 August 13, 1997 Rodney Gusler North Carolina Department of Correction Raleigh, North Carolina Dear Mr. Gusler: I have Inspected the new waste treatment lagoon constructed at Caledonia Prison Farrn and found that it has been constructed and seeded according to MRCS standards and specifications. The staff from our Halifax Field Office checked the lagoon routinely during construction. The following Is a Ilat of work that needs to be completed in order to acquire .0200 certification. Construct a diversion between the new and existing lagoons to divert surface runoff. Set pumping markers to show the start and end pumping elevations. Inspect buildings, flush tanks, pipes: etc to make sure there are no leaks and repair accordingly. Install a transfer pump in lagoon #1 to lift effluent into the new lagoon (lagoon 43). The discharge pipe Into lagoon #3 should be placed on a bent support and the slope protected so erosion does not occur. This can be done by attaching a flexible pipe to the discharge pipe or by the placement of stone. Recycling water for the buildings would be more desirable out of lagoon #3 than out of the canal running from lagoon #2 to the pump station. The pipe from the pumping station should be reworked In order to recycle out of lagoon #3. The canal should be filled In at the point where It connects wlth lagoon #2. In order to construct an earthen plug at this point the liquid level In lagoon #2 will have to be lowered, The plug should be constructed with compacted clay and have a minimum top width of ten feet. Please contact me or the Halifax Field Office before installing any pipe through the new lagoon embankment and for further Instructions on the placement of the earthen plug. Sincerely, rt� Jo . Sherrod d 1900 Civil Engineer FENFFRING SPE�f��qq qq q L�LYMPI CS PROUD SPONSOR 1-888-767-1999 North Carolina Department of Correction 214 West Jones Street • P.O. Box 29540 • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor September 8, 1998 TO: Mr. Newell Brooks Purchasing Agent FR: Mr. Phillip Sykes Y Caledonia Farm Manager RE: Req. # 4250015304 Mack Jarvis, Secretary On August 3, 1998, I received a letter from Mr. Ken Schuster, Regional Water Quality Supervisor stating the deficiencies at our poultry facility. Upon receiving this information, I immediately implemented a trapping program to rid the lagoon of this rodent problem. This program has been very effective and is still currently in place. Another concern was the installation of a series of pumps and a source of power. In order for this project to be completed, the installation of a power line is required. The power lines will provide power to three pumps, a lift pump to regulate the level of waste water in the lagoons, an irrigation pump to irrigate the adjacent hay field and a flush pump to flush the poultry houses as required. We have met with Andy Snead from Central Engineering regarding the placement of power poles and power lines to the lagoon area. The scope of this project requires the installation of four (4) forty foot poles and five (5) guy wires and anchors. Install four (4) spans of three phase # 2 aluminum primary conductor with neutral and remove (3) spans of three phase # 6 copper primary conductor and neutral including removal of three poles, guy wires and anchors. A power supply is desperately needed at our poultry facility. As the enclosed letters state, the deadline was December 31, 1997. The urgency of this project is not life threatening but environmental impact could be life threatening. If the recent hurricanes or tropical storms had brought a large amount of water with them, without pumps at the lagoons, the lagoons could have suffered. Fortunately, this did not occur. An Equal Opportunity / Affirmative Action Employer As stated earlier, this could become environmentally dangerous if recent rains continue. These lagoons can only hold a certain amount of water. Without these pumps in place, we have no way to regulate or maintain the correct waste water level. Therefore, if a lagoon were to overfill and enter the adjacent ditch which flows to the Roanoke River, the environment would be at risk. Also, if this would occur it would be considered an illegal discharge and fines or penalties could follow. Hopefully, with your assistance on the project and by Caledonia Farms obtaining price quotes, we can speed this project ahead and in a timely manner. It is urgent that we complete this project as soon as possible. Time is not on our side. Thank you for your assistance and speed. If I may be of any future help, please contact me at 252 826 5784. Attachments: cc: Jim Godwin, Acting Enterprise Director v'Ken Schuster - Regional Water Quality Supervisor Wayne Short - District Conservationist Andy Snead - Engineering ,David Inscoe - Poultry Supervisor File r,'M sTnr� I AUG - p ll I IA. a'o North Carolina Department of Correction 214 West Jones Street • P.O. Box 29540 • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor Mack Jarvis, Secretary Mr. Ken Schuster, P.E. Regional Water Quality Supervisor N.C. Department of Environment and Natural Resources Raleigh, North Carolina 27609 SUBJECT: Notice of Deficiency Facility # 42-01 Caledonia Farm Halifax County Dear Mr. Schuster: In response to your letter dated July 30, 1998, revealing the deficiencies at our poultry operation, we have implemented the following corrective measures. The deficiencies noted at the two older waste lagoons from rodent damage will be corrected through trapping. We have ordered several approved rodents traps to place at these areas. Additionally, we have contacted an outside person to assist us in the trapping of the muskrats at the newer lagoon. In the future, we will monitor the dike area more closely for rodent damage. The construction of the lift pump in our waste plan is at Central Engineering. We have met with Andy Snead from Central Engineering regarding the placement of the power supply to the lagoon area. Everyone has agreed on the direction in which.the line should go and the placement of power poles. We have implemented to complete this part of construction by contacting several outside vendors for a price quote. Upon receiving the price quotes and the selection of the vendor, work will begin immediately. Upon completion of the power line supply, we will contact Central Engineering on installation of the lift pump. I am confident that Central Engineering will begin their process as soon as possible. We all have good intentions of completing this project as soon as possible and in a timely manner to avoid any illegal discharge from our waste management system. An Equal Opportunity / Affirmative Action Employer nank you for your time and concerns regarding our waste management system here at Caledonia Farms. If I may be of any assistance in the future, please call me at (252) 826-5784. Sincerely, Phillip Sykes Farm Manager cc: Jim Godwin Acting Enterprise Director State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director April 8, 1999 NC Dept. of Corrections Caledonia Prison Farm \.4` PO Box 67 Tillery NC 27887 l \ Attn: Phillip Sykes � \ A199 9 /S'ubject: F i Dear Phillip Sykes: 1� 1 • • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Application No. AWP420001 Additional Information Request Caledonia Prison Farm Animal Waste Operation Halifax County The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is requiredbefore we can continue our review. Please address the following by May 8, 1999: 1. The residual nitrogen from the soybeans should be credited on the crop following the soybeans. Your Waste Utilization Plan (WUP) appears to take the residual off of the soybeans giving them less nitrogen per acre but still applying the same amount of nitrogen on the crops following soybeans. As you have cropping options in your plan, you may choose to have a note put into the narrative of the WUP stating that the residual nitrogen will be accounted for on any crop that follows soybeans. Any changes to the WUP need to be signed and dated by both the technical specialist and the owner (or an agent of the owner). In your letter of response you stated that the pump station needed has not yet been installed and that a portable pbmp is being used to transfer waste. Please provide detailed information showing that this pump is suffici ntly sized to handle the amount of waste necessary, that this pump will be in place and available to ensu r6 that there is no overflow of the lagoons and provide measures that are in place to prevent any runoffpr release of waste as a result of failure of this pump or disconnecting of the pump and its piping. Also in your letter, it is stated that this pump is used to transfer waste from lagoon #1 to lagoon 43. Please clarify this. Is lagoon #2 being skipped entirely? From what I can tell from the information in the application package, waste flows into lagoon #1 (volume 77,713 cu ft.), then into lagoon #2 (volume 311,182 cu ft.) and is then transferred to Lagoon #3 (volume 507,770 cu ft.). If lagoon #2 is not being used, please show that there is enough treatment volume in the lagoon system. An overall narrative of how the waste is handled in regards to the three lagoons may help clear up these questions. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before May 8, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 364. Sincerely, �J)A��C' Dianne Thomas Soil Scientist Non -Discharge Permitting Unit cc: Raleigh Regional_Offce,—Water-Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper fPECIALUJA PROUD SPONSOR 1-888-767-1999 North Carolina Department of Correction 214 West Jones Street • P.O. Box 29540 • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor September 8, 1998 TO: Mr. Newell Brooks Purchasing Agent FR: Mr. Phillip Sykes O� Y Caledonia Farm Manager RE: Req. # 4250015304 Mack Jarvis, Secretary On August 3, 1998, I received a letter from Mr. Ken Schuster, Regional Water Quality Supervisor stating the deficiencies at our poultry facility. Upon receiving this information, I immediately implemented a trapping program to rid the lagoon of this rodent problem. This program has been very effective and is still currently in place. Another concern was the installation of a series of pumps and a source of power. In order for this project to be completed, the installation of a power line is required. The power lines will provide power to three pumps, a lift pump to regulate the level of waste water in the lagoons, an irrigation pump to irrigate the adjacent hay field and a flush pump to flush the poultry houses as required. We have met with Andy Snead from Central Engineering regarding the placement of power poles and power lines to the lagoon area. The scope of this project requires the installation of four (4) forty foot poles and five (5) guy wires and anchors. Install four (4) spans of three phase # 2 aluminum primary conductor with neutral and remove (3) spans of three phase # 6 copper primary conductor and neutral including removal of three poles, guy wires and anchors. A power supply is desperately needed at our poultry facility. As the enclosed letters state, the deadline was December 31, 1997. The urgency of this project is not life threatening but environmental impact could be life threatening. If the recent hurricanes or tropical storms had brought a large amount of water with them, without pumps at the lagoons, the lagoons could have suffered. Fortunately, this did not occur. An Equal Opportunity / Affirmative Action Employer As stated earlier, this could become environmentally dangerous if recent rains continue. These lagoons can only hold a certain amount of water. Without these pumps in place, we have no way to regulate or maintain the correct waste water level. Therefore, if a lagoon were to overfill and enter the adjacent ditch which flows to the Roanoke River, the environment would be at risk. Also, if this would occur it would be considered an illegal discharge and fines or penalties could follow. Hopefully, with your assistance on the project and by Caledonia Farms obtaining price quotes, we can speed this project ahead and in a timely manner. It is urgent that we complete this project as soon as possible. Time is not on our side. Thank you for your assistance and speed. If I may be of any future help, please contact me at 252 826 5784. Attachments: cc: Jim Godwin, Acting Enterprise Director ✓Ken Schuster - Regional Water Quality Supervisor Wayne Short - District Conservationist Andy Snead - Engineering &David Inscoe - Poultry Supervisor File NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY Division of Water Quality March 10, 1999 Mr. Phillip Sykes, Farm Manager N.C. Department of Corrections Caledonia Farm P.O. Box 67 Tillery, North Carolina 27887 Subject: Notice of Violation Caledonia Farm Illegal Discharge Halifax County Dear Mr. Sykes: On February 8, 1999, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection of your poultry facility in accordance with 15A NCAC 2H. 0217. While conducting the inspection Mr. Towell discovered that the existing equipment designed to wash sweet potatoes and other vegetables on the farm unit was designed to discharge process water into an open ditch which is an unnamed tributary to the Roanoke River. Mr. Towell also determined that new process facility had also been designed to discharge water into waters of the State without first applying for, and receiving the appropriate permit. The above referenced discharge is a violation of North Carolina General Statute 143-215.1.(a) which states: No person shall do any of the following things or carry out any of the following activities until or unless such person shall have applied for and received from the Commission a permit therefor and shall have complied with such conditions, if any as are prescribed by such permit .......... make any outlets into waters of the State. P.O. BOX 29535, RALEIGH, NORTH CAROLINA 27626-0935 PHONE 919-733.7015 FAX 91 9-733-2496 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER Mr. Phillip Sykes Page 2 In order to correct this situation you should immediately cease any discharging from both the existing facility and the newly constructed unit located adjacent to the distribution warehouse. The Division of Water Quality encourages you to seek a non -discharging alternative to your current method of disposing of vegetable processing water. You should be aware that current regulations will prohibit any new discharges into ditches or other no -flow water bodies. Please respond to this Notice in writing within fourteen days of your receipt. You should include in your response the actions that you will take to eliminate the illegal discharge from your washing operation. Also, please provide this office with the following information: 1. The types and amounts of vegetables that you process at this facility. 2. The volume of process water used at the facility. This may be by the batch or by the day, week, or month. 3. The type and amount, if any, of chemicals that may be used for cleaning or disinfection. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this Notice you may call Buster Towell at (919) 571-4700. Sincerely, ZaL Kenneth Schuster, P.E. Regional Water Quality Supervisor cc: Mr. Jeff Dillard, Halifax County Health Department Mr. J. Wayne Short, Fishing Creek Soil and Water Conservation District Mr. Charles Weaver, DWQ NPDES Unit RRO Files NOVCAL L s.. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY Division of Water Quality March 10, 1999 Mr. Phillip Sykes, Farm Manager N.C. Department of Corrections Caledonia Farm P.O. Box 67 Tillery, North Carolina 27887 Subject: Notice of Violation Caledonia Farm Illegal Discharge Halifax County Dear Mr. Sykes: On February 8, 1999, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection of your poultry facility in accordance with 15A NCAC 2H. 0217. While conducting the inspection Mr. Towell discovered that the existing equipment designed to wash sweet potatoes and other vegetables on the farm unit was designed to discharge process water into an open ditch which is an unnamed tributary to the Roanoke River. Mr. Towell also determined that new process facility had also been designed to discharge water into waters of the State without first applying for, and receiving the appropriate permit. The above referenced discharge is a violation of North Carolina General Statute 143-215.1.(a) which states: No person shall do any of the following things or carry out any of the following activities until or unless such person shall have applied for and received from the Commission a permit therefor and shall have complied with such conditions, if any as are prescribed by such permit .......... make any outlets into waters of the State. P.O. BOX 29535, RALEIGH, NORTH CAROLINA 27626-0535 PHONE 91 9-733-7015 FAX 919-733-2496 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER Mr. Phillip Sykes Page 2 In order to correct this situation you should immediately cease any discharging from both the existing facility and the newly constructed unit located adjacent to the distribution warehouse. The Division of Water Quality encourages you to seek a non -discharging alternative to your current method of disposing of vegetable processing water. You should be aware that current regulations will prohibit any new discharges into ditches or other no -flow water bodies. Please respond to this .Notice in writing within fourteen days of your receipt. You should include in your response the actions that you will take to eliminate the illegal discharge from your washing operation. Also, please provide this office with the following information: 1. The types and amounts of vegetables that you process at this facility. 2. The volume of process water used at the facility. This may be by the batch or by the day, week, or month. 3. The type and amount, if any, of chemicals that may be used for cleaning or disinfection. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this Notice you may call Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Water Quality Supervisor cc: Mr. Jeff Dillard, Halifax County Health Department Mr. J. Wayne Short, Fishing Creek Soil and Water Conservation District Mr. Charles Weaver, DWQ NPDES Unit RRO Files NOVCAL State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary IDEHNR DIVISION OF WATER QUALITY November 13,1996 Mr. James Hassell, Farm Manager N.C. Department of Corrections Caledonia Farm P.O. Box 67 Tillery, North Carolina 27887 Subject: Compliance Evaluation Inspection Facility # 42-25 Caledonia Cattle Halifax County Dear Mr. Hassell: On October 22, 1996, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. It has been determined that pastured cattle operations need not be registered under the State animal waste regulations. Therefor, please find attached, a form for the removal of your operation from the current listing of animal facilities. If you need additional information or if you have any questions or comments concerning this matter, please call either Mr. Buster Towell or myself at (919) 571-4700. Sincerel - ^ -A-fi- ,A �dy Garrett Water Quality Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District (Halifax County) Mr. Steve Bennett, DSWC-RRO Compliance Files RRO Files 3800 Barrett Drive, Suite 101, ' FAX 919-571-4718 Raleigh, North Carolina 27609 N%q C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/100% post -consumer paper FROM 21.01.2080 a0:00 P. 2 USDA - NATURAL RESDURCES CONSERVATION SERVICE P.O. BOX 10, 201 Saint Andrews Street rarboro, North Carolina 27886 August 13, 1097 Rodney Gusler North Carolina Department of Correction Raleigh, North Carolina Dear Mr. Gusler: I have Inspected the new waste treatment lagoon constructed at Caledonia Prison Farm and found that it has been constructed and seeded according to NRCS standards and specifications, The staff from our Halifax Field Office checked the lagoon routinely during construction. The following Is a Ilse of work that needs to be completed in order to acquire .0200 certification, Construct a diversion between the new and existing lagoons to divert surface runoff. Set pumping markers to show the start and end pumping elevations. Inspect buildings, flush tanks, pipes, etc. to make sure there are no leaks and repair accordingly. Install a transfer pump in lagoon #1 to lift effluent into the new lagoon (lagoon 43). The dlecharge pipe Into lagoon 03 should be placed on a bent support and the slope protected so erosion does not occur. This can be done by attaching a flexible pipe to the discharge pipe or by the placement of stone. Recycling water for the buildings would be more desirable out of lagoon #3 than out of the canal running from lagoon 92 to the pump station. The pipe from the pumping station should be reworked In order to recycle out of lagoon #3. The canal Should be filled In at the point where It connects with lagoon Q. In order to construct an earthen plug at this point the liquid level In lagoon #2 will have to be lowered. The plug should be constructed with compacted clay and have a minimum top width of ten feet. Please contact me or the Halifax Field Office before installing any pipe through the new lagoon embankment and for further instructions on the placement of the earthen plug. Sincerely, afie-.� 0 Jo . Sherrod d {9� w Civil Engineer _ r AUG 1810 ICrdkl IJFHCE North Carolina Department of Correction 214 West Jones Street • P.O. Box 29540 • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor Mr. Ken Schuster, P.E. Regional Water Quality Supervisor N.C. Department of Environment and Natural Resources Raleigh, North Carolina 27609 SUBJECT: Notice of Deficiency Facility # 42-01 Caledonia Farm Halifax County Dear Mr. Schuster: Mack Jarvis, Secretary In response to your letter dated July 30, 1998, revealing the deficiencies at our poultry operation, we have implemented the following corrective measures. The deficiencies noted at the two older waste lagoons from rodent damage will be corrected through trapping. We have ordered several approved rodents traps to place at these areas. Additionally, we have contacted an outside person to assist us in the trapping of the muskrats at the newer lagoon. In the future, we will monitor the dike area more closely for rodent damage. The construction of the lift pump in our waste plan is at Central Engineering. We have met with Andy Snead from Central Engineering regarding the placement of the power supply to the lagoon area. Everyone has agreed on the direction in which the line should go and the placement of power poles. We have implemented to complete this part of construction by contacting several outside vendors for a price quote. Upon receiving the price quotes and the selection of the vendor, work will begin immediately. Upon completion of the power line supply, we will contact Central Engineering on installation of the lift pump. I am confident that Central Engineering will begin their process as soon as possible. We all have good intentions of completing this project as soon as possible and in a timely manner to avoid any illegal discharge from our waste management system. An Equal Opportunity / Affirmative Action Employer k Thank you for your time and concerns regarding our waste management system here at Caledonia Farms. If I may be of any assistance in the future, please call me at (252) 826-5784. Sincerely, '-/-7�✓,lam �"/ Phillip Sykes Farm Manager cc: Jim Godwin Acting Enterprise Director MSTATE North Carolina Department of Correction 1 /� 214 West Jones Street • P.O. Box 29540 • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor October 16, 1997 Mr. Kenneth Schuster, Regional Supervisor North Carolina Department of Environmental Health & Natural Resources 3800 Barrett Drive, Suite 101 Raleigh , North Carolina 27609 Re: Consensual agreement Mack Jarvis, Secretary As I am responsible for the completion of the Wastewater Management Plan for the State of North Carolina, specifically the Caledonia layer operation located in Halifax County, I request the State Department of Environmental Health & Natural Resources, extend our December 31, 1997, dead line. We have worked hard to comply with all regulatory issues concerning this project. However, due to changing the design to accommodate our needs here at Caledonia, Dr. Sneed will be unable to render a second plan until the middle to later part of November. As a state agency, I will be required to bid this work out and the process will more than likely carry us well into the month of December before a contract can be reached. I will try to expedite all matters relative to this project but fear that completion may fall after the designated dead line. Please consider extending our time to properly install a system that will prove to be in the best interest of our State. Your guidance and support are greatly appreciated. cc: Wayne Short Jim Godwin Your Friend in Agriculture, William J. Hassell Director of Farm Operations North Carolina Department of Corrections An Equal Opportunity / Affirmative Action Employer • Stake of North Carolina - Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Steve W. Tedder, Chairman William West PO Box 67 Tillery NC 27887 Dear Mr. West: �40 1Y 2- —1 HOC, ria [DEH November 6, 1997 4\ Subject: Operator In Charge Designation R Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, was ratified by the North Carolina General Assembly on June 21, 1996. This bill required that a properly certified operator be designated as the Operator in Charge for each' animal waste management system that serves 250 or more swine, 100 or more confined cattle, 75 or more horses, 1,000 or more sheep, or 30,000 c',p: more confined poultry with a liquid animal waste management system. The deadline for designating an Operator in Charge for animal waste management systems involving cattle, horses, sheep, or poultry was January 1, 1997. Because a training and certification program was not yet available for these systems, you were allowed to apply for and were issued a temporary animal waste management certificate from the Water Pollution Control System Operators Certification Commission (WPCSOCC). Because you applied for and were issued a temporary certificate, you were allowed to be designated as the Operator in Charge of an animal waste management system. Your temporary certificate expires December 31, 1997, and is not renewable. Our records indicate that you have not obtained a permanent animal waste management system operator certification. If you intend to remain the Operator in Charge of the facility for which you were designated, you must obtain a permanent animal waste management system operator certification of the appropriate type before your temporary certification expires on December 31, 1997. To obtain a permanent certification, you must be 18 years of age, complete ten hours of approved training, and pass an examination. If you do not intend to remain the Operator in Charge, a properly certified animal waste management system operator must be designated as Operator in Charge of the facility prior to the expiration of your temporary certification. This year's final training program for both Type A and Type B animal waste management systems is scheduled for December 10 and 11, 1997, at the Hunt Horse Complex in Raleigh. If you would like information about this training program, please contact your local cooperative extension agent or call Dee Ann Cooper at 919/515-6968. For those enrolled in this training and registering with Ms. Cooper prior to December 1, an exam will be offered at the Hunt Horse Complex on December 11, beginning at 1:00 pm. Water Pollution Control System Operators Certification Commission P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-0026 FAX (919) 733-1338 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper /A In addition to the training and testing at the Hunt..Horse Complex, examinations for permanent certification will be offered on December 11, 1997, in Williamston, Kenansville, Raleigh (Wake Tech), Wentworth, Salisbury and Morganton. This examination date will be the last opportunity to obtain permanent certification before your temporary certification expires. If you need additional information or have questions concerning the examinations for certification, please. call Beth Buffington at 919/733-0026. For additional information about other training opportunities, please contact your local cooperative extension agent or call David Crouse at 919/515-7302. Sincerely, N� Joseph B. McMinn, Supervisor Technical Assistance and Certification Unit cc: Regional Office Water Quality Files sharedfolder/beth/animalwaste/tempcertfollowup State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Division of Water Quality August 3, 1997 Mr. Johnny Hassell, Manager Caledonia Farm Unit P.O. Box, 6 7 Tillery, North Carolina 27887 Subject: Notice of Deficiency Caledonia Poultry Facility # 42-01 Halifax County Dear Mr. Hassell: On July 29, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal operation. This inspection is a part of the Division's effort to determine compliance with the State's Animal Waste Management Regulations. Mr. Towell's site visit determined that wastewater from your facility was not actively discharging to the surface waters of the State, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiency was observed: Both of your waste lagoons had approximately 12 and 14 inches of freeboard which is less than the amount required. Animal waste lagoons are required to maintain enough freeboard so that no discharge of wastewater will occur to waters of the State during any rainfall event less severe than a 25 year\24 hour storm. The above matter should be addressed to prevent the possibility of an illegal discharge. Please respond to this Notice within 30 days of receipt. You should include in your response the actions that you will take to address these deficiencies. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, North Carolina 27609NiC An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper Mr. Johnny Hassell Page 2 This office would like to remind you that you are required to submit an approved animal waste management plan by December 31, 1997, or you may choose to submit a closure plan for this facility. These plans must be Certified by a Designated Technical Specialist or a licensed Professional Engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Buster Towell at (919) 571-4700. Sincerely, Kenneth Schus er, P.E. Regional Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District (Halifax) Ms. Margaret O'Keefe, DSWC--RRO DWQ Compliance Group RRO Files NOD\42-01 0 Routine 0 Complaint 0 Follow-up ofDWQ inspection 0 Follow-up of DSWC review 0 Other Facility Number Q Farm Status: egistered ❑ Applied for Permit ❑ Certified ❑ Permitted Date of Inspection 17 29-5 71 Time of Inspection Z, fl 24 hr. (hh:mm) Total Time (in fraction of hours (ex:1.25 for 1 hr .15 min)) Spent on Review or Inspection (includes travel and nrocessinv) ❑l Not Operational Date Last Operated: ........................................................................�...._./...................................................................... FarmName:..6rfl..f..rfl...'......................................................... County:.. `:il'A(....�..�i�............................................... Land Owner Name:.61...K:......�...... �.f .... e Ci�..�3..... Phone No: .... ..l..%. ........ ? .?.��...... s l". .. ............ Facility Conctact:... ilfi............................. Title:................................................ Phone No:.......................................................... Mailing Address:......0.........4.......t....&..7 ............ ...............t..`AIL..........` .c.................a-1....P....... ......................... I .......................... OnsiteRepresentative: ........................................................................................................... Integrator:...`..............................................................., Certified Operator:..... ( .!. ......... r......................................... Operator Certification Number: .......................................... Location of Farm: S l/ Latitude • 4 Gi of Operation and Wean to Feeder Feeder to Finish ❑ Other Longitude • 4 « General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Cl Subsurface Drains Present Lagoon Area 17FSnra Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/97 maintenance/improvement? Field Area ❑ Yes. ErNo El Yes ❑ Yes ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes N� i� ❑ Yes No Continued on back Facility Number: A f1....... 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes Ek o 7. Did the facility fail to have a certified operator in responsible charge? ❑Yes 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes No Structures (lagoons and/or Holding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes L'JNo Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 .........1. 2:. ......... ...... /.:1`............ ............................ ............................ ............................ ............................ 10. Is seepage observed from any of the structures? ❑ Yes O No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes o 12. Do any of the structures need maintenance/improvement? ❑ Yes o (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Yes ❑ No Waste Application 14. Is there physical evidence of over application? ❑ Yes o (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type ....!!''�5............................................................................................................ /..... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan I A P)? b ❑ Yes ❑ No � 17. Does the facility have a lack of adequate acreage for land application? / i /P/i ❑ Yes 18. Does the receiving crop need improvement? ❑ Yes �No 19. Is there a lack of available waste application equipment? ❑ Yes No 20. Does facility require a follow-up visit by same agency? ❑ Yes 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑Yes o For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes [:]No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No Reviewer/Inspector Name Reviewer/Inspector Signature: r��1 Date: cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 North Carolina Department of Correction 214 West Jones Street • P.O. Box 29540 • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor Department of Environmental Health and Natural Resources Kenneth Schuster, P.E., Regional Supervisor 3800 Barrett Drive, Suite 101 Raleigh, North Carolina 27609 Subject: Deficiency Notice - Caledonia Poultry Response Dear Mr. Schuster: Mack Jarvis, Secretary August 15, 1997 AUG 1 8 1997 ` 1 �DEHNR RALEIGH REGI0f-4A1 0FF-ICE In response to the compliance inspection on July 29, 1997, please accept this letter of confirmation regarding Caledonia Farms. As part of the ongoing construction of an additional lagoon at our poultry operation, we amended the contract that the State of North Carolina entered into with Sykes Grading Service. Attached for your records is the Change Order # 1 under Contract No. 2823. The increase of the top of the berm on lagoon #2 has been corrected and is sustained at an elevation of 49. Pending completion of design work, Caledonia Farms will submit an animal waste management plan. We are working with our area Soil and Water Conservation District Office in Halifax County. Also included you will find a letter from Joy Sherrod from USDA. Natural Resources Conservation Service with construction concurrence relative to NRCS standards. As always, thank you for the service that your office provides us at Caledonia Farms. Any additional information required will promptly be forwarded to your office. cc: Les Martin Wayne Short Sincerely, 0. 9. /4�L William J. Hassell Director of Farm Operations An Equal Opportunity / Affirmative Action Employer FROM 01.01.2080 00*-08 P. 3 North Carolina Department of Correction P. 0. Box 29540 a Raleigh, North Carolina 27616.0540 James B. Hunt Jr., Govemor August 6, 1997 Sykes Grading Service Route 2, Box 297 Conway, NC 27820 Re: Caledonia Pam Wastewater Lagoon Job Order No: 1156 Contract No: 2923 Change Order 01 Dear Sir: Mack Jarvis, Secretary Enclosed is your finalized copy of the above referenced changer order, This change order is an addition in the amount of $1800., bringing the total contract amount to $18,200. If you have any questions relating to this change, please feel free to call Mr. Rodney Gusler at (919)716-3400. Sincerely, G.J. Freeman, PE Design Services Manager Central Englnebring Division GJF/bmk Enclosure CC! BMK w/ original RRG, LWY, GJF, R Central Engineering - 2020 Yorkers Road 9 P.O. Box 29540 - Raleigh, NC 27626.0540 Telephone 919-716.3400 - Fax 919-716.3978 An Equal Opportunity I Alrinmativb Action Employer FROM 01.01.2090 00:00 P. 4 CHANGE ORDER NO.1 Caledonia Prison Farm Tillery, North Carolina Job Order No.: 1156 Contract No.: 2823 Contractor: Sykes Grading Servicc Route 2, Box 297 Conway, North Carolina 27820 rk Under the terms of the contract and without invalidating the original provisions thereof, the followitl$ change in work is authorized for the change in contract amount herein set forth: (Description of change order with detailed cost breakdown attached) The time of completion including previous orders is 45 calendar days and shall be increased by 2 calendar days by this change order for a revised contract date of completion of August 22, 1997 , CONTRACT COST SUMMARY: TOTALS 1. Original Contract Amount ................. . ............... $ 16.40 .00 2. Amount of Previous Orders: Add $ 0.00 Deduct $ OM _ 3. Amount of This Order: Add $ 1.800.00 Deduct $ 0.00 -- 4. Total of lines 2 & 3: S 1,900.00, Minus Total Deducts: $ IN $ 1.6 0.00 5, Revised Contract Total Amount ... , ................. $ 18.2o_0o 6. The owner certifies that the contingency Hind balance after this change is; ......... ................ , . ............. $ l9,294.70 FROM 01.01.2080 00:00 p, 3 DESCRIPTION OF CHANGE: To increase the top of berm elevation of existing lagoon #2 to a minimum eleeavation of 49.0. Top of berm width shall be 12'± and side slopes shall match existing. Material to be used shall be approved materials from site. Work shall include removal and stockpiling topsoil, excavation, hauling, compacting of embankment material in accordance with the contract documents. REASON FOR CHANGE: Requested by owner to increase freeboard of existing lagoon 42,. By; ��g 9S�i,,LL ) Q, Sykes Grading S ice By: L - NCDOC • Director of Engineering DISTRIBUTION: 1 Original to Owner I Original to Contractor Date: Date: __T��� 7 ***END*** North Carolina Department of Correction 831 West Morgan Street • P. O. Box 29540 • Raleigh, North Carolina 27626-0540 James 13. Hunt Jr., Governor Franklin Freeman, Secretary September 7, 1995 Mr. Kenneth Schuster, PE Regional Supervisor, Division of Environmental Management Raleigh Regional Office 512 North Salisbury Street Raleigh, NC 27604 Re: Response to Management Deficiency Notification Dated August 2, 1995 DOC Enterprises Caledonia Farm Layer Operation Halifax County Dear Mr. Schuster: The following responds to Notification": 1. The lagoon level has freeboard. your "Management Deficiency been pulled down to a 20"-24" 2. The lagoon spraying system's cut hose has been replaced with rigid pipe and the spray nozzles have been located to insure that no water will enter the adjacent drainage ditch. The above information was relayed to you by copy of the Farm Operations Manager's (William J. Hassell) memorandum dated August 25, 1995. According to Mr. Hassell the corrections immediately following Mr. Buster Towell's site inspection July 24, 1995. Also, initial steps have been taken to initiate completion of an animal waste management plan. Please call if more information is needed (919 850 2895). incerely, Gurnie Lee, PE Central Engineering cc: K.L. Kautzky William Stovall Les Martin William J. Hassell GOE/DRY/SAO/GRL/R File/E/File An Equal Opportunity/Affirmative Action Employer - •„a STATE yvcV1`u-rn rM� y+ 1 North Carolina Department of Correction Correction Enterprises P. O. Box 29540 Chapanoke Road • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor Les Martin Franklin Freeman, Secretary Enterprise Director Date: August 25, 1995 To: Gurnie Lee, PE<: Central Engineering 4 {. �19195 ` From: William J. Hassell Farm Operations Manager ! �` Re: Corrective Action/Lagoon Caledonia Farm In accordance with Mr. Buster Towell and your recommendations for the appropriate corrective action for the Enterprise layer operations lagoon. 1. The freeboard on our lagoon was less than 12 inches and to avoid any breaching during periods of heavy rains, the following corrective action has been implemented. Corrective Action Taken- The pump that pulls the water from our lagoon was moved and placed to allow direct diversion of lagoon water. As an additional precaution we moved it so in the event of a pump or hose disconnect, any water loss would drain directly back into the lagoon. The lagoon level has been pulled down to a 20"-24" freeboard. 2. The lagoon spraying system was noted to have a damaged hose and was spraying too close to a drainage ditch. ' Corrective Action Taken- The flexible 4" line has been replaced with rigid irrigation pipe. The spray nozzles 'in our intensive grazing pastures have been relocated to insure that no water will enter a drainage ditch. Phone: (919) 662-4400 Courier # 53-71-00 FaY (91 M 4A')-eAno a Central Engineering August 25, 1995 Page 2 3. An animal waste water. management plan ( required by December 1997 ) Action Taken - See attached ( Letter to initiate plan ) cc:Les Martin K.L. Kautzky W. Stoval Kenneth Schuster North Carolina Department of Correction Correction Enterprises P. O. Box 29540 Chapanoke Road • Raleigh, North Carolina 27626-0540 James B. Hunt Jr., Governor Date: August 24, 1995 Les Martin Franklin Freeman, Secretary Enterprise Director To: Steve Bennett Regional Coordinator, Division of Soil and Water Conservation From: William J. Hassell Caledonia Farms Farm Operations Manager Enterprise Division Re: Animal waste management plan In order that I may comply with all required water quality regulations and guide lines for implementing an animal waste management plan, please give me a call or written instruction as to the procedures that I must follow to ensure that we at Enterprise are in complete compliance. I realize that the deadline is many months away, but due to the nature and scope of this required plan, you and your staff will certainly have many other private and corporate plans to cover. Thank you for any assistance concerning this matter. William J. Hassell P. 0. Box 67 Tillery, N. C. 27887 Phone: 919-826-5784 cc:Les Martin K.L. Kautzky Phone' (919) 6624400 C niirier * iI-71-no Rev (41Q) AAA-neno State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager DIVISION OF ENVIRONMENTAL August 2, 1995 Mr. William N. Stoval Chief of Engineering North Carolina Department of Correction 1001 Navaho Drive Raleigh, North Carolina 27609 -tow .-..ram OL EDEHI.VR .-MEN C� AUG - 9 1995 E Subject: Management Deficiency Notification Caledonia Layer Operation North Carolina Highway 561 Halifax County Dear Mr. Stoval: On July 24, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine potential problems associated with liquid waste disposal systems. Mr. Towell's site visit'4etermined that wastewater from your facility was not discharging to the surface waters of the state. Nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: -Your lagoon has little freeboard, less than 12 inches in some areas. This problem should receive prompt attention in order to prevent a future discharge or a lagoon breach. -It was also observed that your hydrant system has a cut hose and that your sprayer was located in close proximity to a drainage ditch. In order to pump out your lagoon to recommended levels the hose should be repaired and the sprayer should be moved to a location further away from the ditch. In addition to continued waste facility management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional.Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 60%recycled/ 10%post-consumer paper Caledonia Layer Operation Management Deficiency Notification Page 2 You should specifically address how you plan to correrct these problems and submit a schedule (with dates) stating when these management deficiencies will be corrected. Effecti.'ve wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in. this matter. If you have any questions regarding your inspection please call Buster Towell at (919) 571-4700. Sincerely, /1( Kenn tti Schuster, P. Regional Supervisor /ds H:\animdn cc: Halifax County Health Department Halifax County Soil and Water Conservation District Steve Bennett - Regional Coordinator, UJ v-ia}d�--- j Water Conservation�' AUG !995 '3 �__-..._ ._...... State of North Carolina Department of Environment, Health and Natural Resources Air MWA • James B. Hunt, Jr., Governor IDEEHNF;Z Jonathan B. Howes, Secretary Steve W. Tedder, Chairman December 5, 1996 Caledonia Farm PO Box 67 Tillery NC 27887 Subject: Operator In Charge Designation Facility: Caledonia Farm Facility ID #: 42-1 Halifax County Dear Farm Owner: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, was enacted by the North Carolina General Assembly on June 21, 1996. This bill requires that a certified operator be designated as the Operator in Charge by January 1, 1997, for each animal waste management system that serves 250 or more swine, 100 or more confined cattle, 75 or more horses, 1,000 or more sheep, or 30,000 or more confined poultry with a liquid animal waste management system. Our records indicate that your facility is registered with the Division of Water Quality and meets the requirements for designating an OIC. A training and certification program is not yet available for animal waste management systems involving cattle, horses, sheep, or poultry. Owners and operators of these systems will be issued temporary animal waste management certificates by the Water Pollution Control System Operators Certification Commission (WPCSOCC). The temporary certificates will expire December 31, 1997, and will not be renewed. To obtain a permanent certification, you will be required to complete ten hours of training and pass an examination by December 31, 1997. A training and certification program for operators of animal waste management systems involving cattle, sheep, horses, and poultry is now being developed and should be available by the spring of 1997. The type of training and certification required for the operator of each system will be based on the nature of the wastes to be treated and the treatment process(es) primarily used to treat the animal waste. As the owner of an animal operation with an animal waste management system, you must designate an Operator in Charge and must submit the enclosed designation form to the WPCSOCC. If you do not intend to operate your animal waste management system yourself, you must designate an employee or engage a contract operator to be the Operator in Charge. The person designated as the Operator in Charge, whether yourself or another person, must complete the enclosed application form for temporary certification as an animal waste management system operator. Both the designation form and the application form must be completed and returned by December 31, 1996. If you have questions about the new requirements for animal waste management system operators, please call Beth Buffington or Bang Huneycutt at 919/733-0026. Sincerely, FOR Steve W. Tedder Enclosures cc: Raleigh Regional Office Water Quality Files Water Pollution Control System " •, .� Voice 919-733-0026 FAX 919-733-1338 Operators Certification Commission �� An Equal Opportunity/Affirmative Action Employer P.O. Box 29535 Raleigh, NC 27626-0535 50% recycled/ 10°k post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A�� EDEHNR DIVISION OF WATER QUALITY November 13,1996 Mr. James Hassell, Farm Manager N.C. Department of Corrections Caledonia Farm P.O. Box 67 Tillery, North Carolina 27887 Subject: Compliance Evaluation Inspection Facility # 42-01 Caledonia Poultry Halifax County Dear Mr. Hassell: On October 22, 1996, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the poultry operation was not discharging wastewater into waters of the State and that the waste lagoon had more than the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility stewardship are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997.. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, i FAX 919-571-4718 Raleigh, North Carolina 27609 Nf C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50°k recycled/10% post -consumer paper Caledonia Poultry Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an " Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, Judy E. Garrett Water Quality Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District (Halifax County) Mr. Steve Bennett -Regional Coordinator, DSWC--RRO DWQ Compliance Group RRO Files DS%'VC Animal Feedlot Operation Review ❑ DWQ Animal Feedlot Operation Site Inspection Routine 0 Complaint 0 Follow-up of [)1N Q inspection O Follow-up of DS«'C review 0 Other Date of Inspection FFacility Number Time of Inspection ® 24 hr. (hh:mm) Total Time (in fraction of Hours Farm Status: ffRegistered ❑ Applied for Permit (ex:1.2; for I hr 15 min)) Spent on Review ❑ Certified ❑Permitted or Inspection (includes travel and processing) 0 :Not Operational j Date Last Operated: .................................................................................... j ............................................................ Farm Name: ...C.��..�...�..�Z1..�...)...�........... �............................ County:.......,�......r6k x............................................ Owner Name: .....�A. l G'...ti?...11..q, ......r 1 `Sv.k��...T...!'y� �..�tQ Phone No:....................................................................................... .... .... ....... Facility Contact: ..J.QA�Li./�i.....,..., ,5-L.�........ Title:.. t ..�..............Q.u:.g. :r.. Phonc No:.... f I ....... Mailing., �,D r r/O 7 /..1..�� ir......, Z— 7� . Onsite Representative: ...... Z...MA.......................................................................... Integrator: ....N.i...ry.,.....-J,. �..`(..'..................................... Certified Operator:....... v..l\, ;....... -.F�, ..I1.�...�,.. �... e,......... Operator Certification Number :............. v .........5........1..1......3..........d::�:Z.::�...................................................................... .. .. Latitude • 14 Longitude ©• ®" Type of Operation Swine Design Current Design Current Capacity Population .. Poultry Capacity Population ❑ Layer Q p�� r 5 Al1li ❑ Non -Laver ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Other Design Current Cattle Capacity Population ❑ Dairy ❑ Non -Dairy Total Design Capacity Total SSLW.' �. p" Number of Lagoons / Holding Ponds 1 ❑ Subsurface Drains Present ■ Lagoon Area 10 Spray Field Area General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? ❑ Yes O<Ceo ❑ Yes No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes b. 11"discharge is observed, did it reach Surface Water? (if yes, notify DWQI / v ❑ Yes c. If dischar_e is observed, what is the estiniuted flow in sal/min? A d. Does discharge bypass a lagoon system? (If ye•, notify DWQ)r ❑Yes 3. Is there evidence of past discharge from any pant of the operation? ❑ Yes 4. Were there any adverse impacts to the waters of the State other than from a discharge.'? 5. Does any part of the waste management system (other than lagoons/holding ponds) require nlal nlenand/1n1p1'Oveme nt'� 4/30/97 ❑ No ❑ No ❑ No E�No Uf No ❑ No Continued nit back FaciJity Number: — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes t 7. Did the facility fail to have a certified operator in responsible charge? �8� Z 81 9/ Yes 8. Are there lagoons or storage ponds on site which need to be properly closed'? pl,A, 5 Yes Structures (Lagoons and/or Holding Ponds)d� 9. Is storage capacity (freeboard plus storm storage) less than adequate? 6 ❑ Yes Freeboard (ft): Structure 1 Structure 2 Stricture 3 Structure 4 Structure 5 ..................................................................................................................... 10. Is seepage observed from any of the structures? tld No ❑ No ❑ No t1Q No Structure 6 ....... ........ I ................. ❑ Yes allo 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes O'No 12. Do any of the structures need maintenance/improvement'? ��JO �❑ Yes eiNo (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DNVQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Oyes ❑ No NVaste Application 14. Is there physical evidence of over application'? ❑ Yes CdNo (If in excess of WMP. or runoff entering waters of the State, notify DWQ) 15. Crop type..................................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? ...................._..,.. .............. El Yes lye No ❑ Yes No 19. Is there a lack of available waste application equipment? la. v 'Wj iAtrT: `t Qf Yes ❑ No 20. Does facility require a follow-up visit by same agency? ��ap_ av AV � VYes ❑ No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes V"'No For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No Reviewer/Inspector Name Reviewer/Inspector Signature: 7 Date: M_ ��� cc: Division of Water Quality, Watft Quality Section, Facility Assessment Unit 4/30/97 State of North Carolina If Department of Environment, ,� Health and Natural Resources 1 ?WA • Raleigh Regional Office James B. Hunt, Jr., Governor p E H N Jonathan B. Howes, Secretary R DIVISION OF WATER QUALITY November 13,1996 Mr. James Hassell, Farm Manager N.C. Department of Corrections Caledonia Farm P.O. Box 67 Tillery, North Carolina 27887 Subject: Compliance Evaluation Inspection Facility # 42-01 Caledonia Poultry Halifax County Dear Mr. Hassell: On October 22, 1996, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the poultry operation was not discharging wastewater into waters of the State and that the waste lagoon had more than the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility stewardship are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, i FAX 919-571-4718 Raleigh, North Carolina 27609 N� C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/100/. post -consumer paper V_ Caledonia Poultry Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an it Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, Judy E. Garrett Water Quality Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District (Halifax County) Mr. Steve Bennett -Regional Coordinator, DSWC--RRO DWQ Compliance Group RRO Files Facility Number: qj_ 0 8. Are there lagoons or storage ponds on site which need to be properly closed? . Structures Magoons.Holding Ponds. Flush Pits. etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard(fr) ...». �T� ��...._»�. ...., . {.»r�..... _..... _. ».... 6,p...1....._ ..........._...........»....» ..». »......_»........» ........». » .... 10. Is an seepage any*of observed from of the structures? ❑ Yes 11. Is erosion, or any other threats to the integrity of any of the structures observed? es ❑ No 12. Do any of the structures need maintenance/improvement? ❑ Yes No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes Waste Application 14. Is there physical evidence of over application? ❑ Yes P" O (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type�t�..f�.....t...�,s.................. ....... ....... ................... ...._...................».............._.._........................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes J� �o 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes No 18. Does the receiving cropneed improvement? ❑ Yes No P 19. Is there a lack of available waste application equipment? ❑ Yes 20. Does facility require a follow-up visit by same agency? ❑ Yes 0 21. Did Reviewer/Ins ector fail to discuss review/ins ction with on -site representative? ❑ Yes No P Pe P 22. Does record keeping need improvement? ❑ Yes No For Certified or Permitted Facilities Only; 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes N 25. Were any additional problems noted which cause noncompliance of the Permit? ❑ Yes No No.violations or deficiencies. were -noted -daring this"Osit.- You401 irecei've,no further : correspbadeike Ahobt this:visit , to question ()::Explain any YF.S answers ai H �'~.r �v , �1 e ff �e rn�9n,� .y,ks/G-e-1 ti r/e j '-4,c �,�,�. � d ►�:s�' - � � y ��A'a-�-j�., p � �4 %��,"<� l � f �ql"�� � - .rAvo.'r ftGG Jr r- �. � � • �f e � � f Q••►->� i v11�+ , �kSS c.s f" 1>J � L l./�-� e c�" rt/ L G/v AL �lv►r► ( S . �'�" �/'i ��1�5 I'l 7/25/97 ok` I NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REGIONAL OFFICE Division of Water Quality July 30, 1998 Mr. James Hassell, Farm Manager N.C. Department of Corrections Caledonia Farm P.O. Box 67 Tillery, North Carolina 27887 Subject: Notice of Deficiency Facility # 42-01 Caledonia Farm Halifax County Dear Mr. Hassell: On July 16, 1998, Mr. Buster Towell of the Raleigh Regional Office conducted a Compliance inspection at the subject poultry facility. The inspection revealed the following deficiencies: Severe erosion was noted around the two older waste lagoons due to the activity of burrowing rodents. If this problem is not corrected it could be possible for wastewater to actually break through the dike wall and enter the adjacent road side ditch which flows to the nearby Roanoke River. The new lagoon that was built last fall also has received some damage from muskrats near the bottom of the interior dike wall. Your waste plan calls for the installation of a lift pump to transport waste from the # 2 lagoon to the new lagoon. To date, this lift pump has not been installed. Your plan also call for the abandonment of a portion of your old # 2 lagoon so that the flush water will be taken from the newer, cleaner hole. This construction should be completed in a timely manner and checked off by the local District as well as an Area NRCS Engineer. 8800 BARRETT DRIVE, SUITE 101, RALEIGH, NORTH CAROLINA 27608 PHONE O 10-871-4700 FAX 815-871-471 B AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - 80% RECYCLED/10% POST -CONSUMER PAPER Caledonia Farm Page 2 These deficiencies should be corrected as soon as possible in order to avoid a possible illegal discharge from your waste management system. Please respond to this Notice within fourteen (14) days of your receipt outlining your plans to make the necessary corrections. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this Notice please call Mr. Buster Towel] at (919) 571-4700. Sincerely, 41-4 Ken Schuster, P.E. Regional Water Quality Supervisor cc: Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Compliance Group RRO Files 0 Div' ion of Soil and Water Conservation (> Other Agency Idwivision of Water Quality LOrRoutine O Complaint O Follow-up of DWQ Inspection O Follow-up of DSWC review O Other _ Date of Inspection] Facility Number Time of Inspection 24 hr. (hh:tnm) 0 Registered Certified 0 Applied for Permit 0 Permitted 10 Not Operational Date Last Operated: Farm Name:/ 1..'..�1_'..!__. 1-r9 2 w-..__.... _.....__....._..... County: ... 1�1! ./-W_�`... _»..»»...._.._........._.....» Owner Name: ».../i! :.. :..._ .... �... C � i a 641 u . ........... Phone No:.;.?.' o:.;. Z. �.... Z.!i .. s~� Z .._......_..__ FacilityContact: „Q�!`fiv.,!...... ....'` rG'e.___...»..... Title: ... ..».................. _._..._.......»......__... Phone No: »...._....__......»......»......_......» MailingAddress:.A; ..._3... .... 7....T'../%a...` .........!!a ..... _...� 2..tl'..:�7................ ...................................__......................_..... ... ..._..... » ...._» Onsite Representative:... ......�!a ��lQ''..................... _.... __...... ...... ......... Integrator: ...... ��!�:...................................... ............... ......... .. 11 LL Certified Operator:._S(.� 1............W iS ..._......_....._._...._................_...... Operator Certification Number• ...__....._............._._.... Location of Farm: 14w } G / — ........ .......................... _.... ._.... _................. ........ _....... ............ ........................ .................. ............. ._....... _....... ..... _..... .._.... ..»............... .......... _.............. ..._...... _ Latitude r--�0 6 46 Longitude • 4 66 General 1. Are there any buffers that need maintenance/improvement? ❑ Yes J2 2. Is any discharge observed from any part of the operation? ❑ Yes Z�0� Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes 0 b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) Yes No c. If discharge is observed, what is the estimated Flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ yes ZTNo 3. Is there evidence of past discharge from any part of the operation? ❑ Yes 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes N 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes No maintenancelimprovement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes N 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No 7/25/97 � Div Sion of Soil and Water Conservation ❑ Other Agency vision of Water Quality W.Routine O Complaint O Follow-up of DWO inspection A Follow-up of DSWC review O Other 1 Date of Inspection l7/ & n I Facility Number Time of Inspection 24 hr. (hh:mm) ® Registered Certified ® Applied for Permit ® Permitted [3 Not Operational Date Last Operated: Farm Name. . ........................ ... ......... I ....M 2 County ... .................................................................... ...�...`.................................... Owner Name: _ .....11(..s.. �............................ f=... C 4�Y.�.Q......... �. ��' s ................. Phone No: S Z% S G L ............................................................................. Facility Contact:... 01'+.6,.'..,.... �wse� Title: Phone No: ................................................... MailingAddress: (.9. 6 . 1` (4"7 l• W . ....... ..........y..........................................17................................................................................................. . ..��4r:.......................................`....Onsite Representative: ...r4.............. Integrator: . ............................................� Certified Operator_.::�f.........(�,! e 5............................................................... Operator Certification Number ......................................... Location of Farm: .. Latitude • 1 " Longitude • 4 " General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge, is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gaUmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7/25/97 ❑ Yes ,1a<0 ❑ Yes ❑ Yes t� "" ❑ Yes No ElYes No ❑ Yes ❑ Yes ZN ❑ Yes No ❑ Yes No ❑ Yes ' No Facility Number: q L r 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons.Holding Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes eNo ❑ Yes o Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Arl.^. y.*rz`'........ ......q....[....ut ......................./...........1................................................................................................................... Freeboard(ft): ....... 7..�� fi 6 tQ .................................................................................... .................................... .................................... 10. Is seepage observed from any of the structures? ❑Yes o 11. Is erosion, or any other threats to the integrity of any of the structures observed? Yes ❑ No 12. Do any of the structures need maintenance/improvement? ❑ Yes No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes Ja "o Waste Application 14. Is there physical evidence of over application? ❑ Yes (If in excess of WMP, or runoff entering waters of the State, notify DWQ) Q 15. Crop type.......................................................................................................................................... �..... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes J2 o 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes No 18. Does the receiving crop need improvement? ❑ Yes No 19. Is there a lack of available waste application equipment? ❑ Yes o 20. Does facility require a follow-up visit by same agency? ❑ Yes o 21. Did Reviewer/Inspector fail to discuss review/ins ction with on -site representative? ❑ Yes No P Pe P 22. Does record keeping need improvement? ❑ Yes No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes N 25. Were any additional problems noted which cause noncompliance of the Permit? ❑ Yes No 0, Nvo.violatioils-o' dericiencies. were noted -during this.visit.- .You:will- recei've-no-furtlier, :. :. , correspQudekO about this'.visit., " ; , f Ar&e- tnrzra -s, zv-� n� vKe H?1- endw"j �ius�G- !-1v(ens -f-4.4- �wI d �;fS , 17 +1 y��, p , /� �,>�9G( 1e�f� r Z�rs r �s I w-r�L 1 / Cit�lv�^". fs (1ti Jfir 719H[ tvp vfie— �'1. D j s n? 7/25/97 Reviewer/Inspector Name Reviewer/Inspector Signature: //-�lt/l— Date: 7//G / IP North Carolina Department of Correction Correction Enterprises - Caledonia Farms P. O. Box 29540 20 19 1) 6 Chapanoke Road • Raleigh, North Carolina 27626-0540 Jr.,Governor L.M. (Les) Martin James B. Hunt Franklin Freeman, Secretary Enterprise Director To: Steve Tedder Division of Environmental Management From: Johnny Hassell BAR ? 5 �9g6 ' L Farm Operations Manager L(`,% J UCE,NF' RALEIGH _._.J Date: March 18, 1996 REGIONA`OFFICE Re: Application of Poultry Litter Per our conversation of March 18, 1996, I will be applying poultry litter on the Od.om_F-ar.m n_Northampt6n County. It will be applied at agronomic rates to the land that will support a cotton crop, as well as some land that we are growing daylilies on for the Department of Transportation. Care will also be taken so not to apply this litter too close to waterways and or streams. This litter will be applied and incorporated into the soil as part of regular agricultural practices which take place at this farm. Thank you for your guidance where this matter is concerned. cc: Les Martin Richard Payne Phone: (919) 826-5784 Fax: (919) 826-3691 Apr-24-2002 02:43pm �0 CARO, p C nq `yb ��ec',�ON EtalE��a From —NC Correction Enterprises Administration 0197163974 T-494 P.001/014 F-052 facsimile Cover Sheet North Carolina Correction Enterprises 2020 Yonkers Road * P. 0. Box 29540 Raleigh, NC 27626-0540 1-800-241-0124 TO: .sue. From: --- Compony: �lrC�ti'i� Phone: (919) 716-3600 Phone: ' ��� �� Admin. Fax: (919) 716-3974 Fax: S 7 (-- 47(2 L S - Date:--' Pages (including cover page) - 0 Prepare reply for my signature ❑ For your approval ❑ Signature Comments: ❑ Per our conversation Q For your comments J For distribution ❑ Per your request For your information Apr-24-2002 02:43pm From -NC Correction Enterprises Administration 9197163974 7-484 P.0021014 F-052 O� Wu . STAT{ w4iA North Carolina Department of Correction Correction ]Enterprises 202C Yonkers Road • 4240 MSC • Raleigh, North Carolina 27699.42g0 James Godwin Michael F. Easley Enterprise Director Governor April 24, 2002 Mr. ). D. );fester NCDENR Theodis Beck Secretary Raleigh, North Carolina SUBJECT: Fertilizer Release at the North Carolina Correction Enterprise Catedonia 1~ann, Tillery, NC. Dear: Mr. Hester: f am writing you regarding the fertilizer release at the N.C.C.E. Caledonia Farm located in Tillery, NC on April 20, 2002, 1 have attached with this letter a. copy of the e-mail forwarded to the by Mr. Phil Sykes, .N,C.C.E. Fann Manager, ft describes what was done in regards to containment and clean up of the released fertilizer. Also attached are copies of the Material Safety Data Sheets for the two (2) chemicals involved, Ammonium Phosphate Sol4lion and Ammonium Thiosulfate Solution. I hope this information finds itself beneficial in regards to the fertilizer release and the action taken. If you have any questions concerning this incident, please do not hesitate to call me at. (919) 716-3625. Sincer , Doug Gaylor , MS, C1 Safety Co ultant Correction Enterprises djg/Irttcrs2002/faim.doc cc: Plant File wwwdoc.sratt!.nc,us/uprise 919-716-3600 gtCORRECTION NTERPR15E5 Fax 919.716-.3974 Courier �F 53.71-00 Apr-24-2002 02:43pm From -NC Correction Enterprises Administration 919N 63974 T-464 P.003/014 F-052 From; To; Date; Subject, Phillip Sykes Douglas Gaylord 4/22/02 9:51 AM Fertilizer Leak 8-0-24-1 S On 04-20-02 (Saturday) I received a called concerning a tank leaking at the fertilizer storage area. Upon arrival at this location a tank was leaking from a small hole about two thirds from the top of the tank. I immediately contained the leak by placing a pipe over the hole with one end and placed the other end in a tank in order to capture it. Approxiamtely 500 gallons (only a guess) had leaked out of the tank. The fertilizer had leaked out onto the ground and eventually into a near by ditch. The ditch was completely dry ( no standing water) therefore we contained the runoff by filling both ends of the ditch with sand. After containment was complete, we began to cover the remaining fertilizer on the ground with sand. This was an adsorbent measure. Their was no danger of the fertilizer entering the river or a water source at any time. On Sunday, 4-21-02 we removed the sand containing the fertilizer and land applied it in near by fields. This was done rather than stockpiling it in one central location and the possibility of run off in case it rained. To prevent this tank from leaking again, we will maintain the level of fertilizer well below this hole. I believe the tank wall too thick for repair. These tanks are 17 years old. Any questions, please call. THANKS PHIL CC: Jim Godwin Apr-24-2002 02;43pm From -NC Correction Enterprises Administration 0197163974 WESTERN SERVICE P.O, x 1168 3705 W. Boa wood Avenue Fresno, 'Cakli o is 913715 (209) 4 6 450 MATERIAL SAFETY DATA SHEET SSCTTON T. PRODUCT IDFNTI-FICATION PRODUCT NAME 10-34-0 (white or green) 4-24-0 11-37-0 Chemical Name Ammonium phosphate saluca,on Gammdn Name, s'ynonyma composition CHEM1'CAT, NAME ... CAS 0 Monnammpnium phosphate 7722-76-1 Dia=oni= phosphate 7783-28-0 Ammon,;i= polyphosphate 68333-19-9% Water 7732-18-5 cERcLA RATINGS (SCALE 0-3); HF� TEi = 1 FIRE = 0 RgACTIVITY - 0 SECTION II. PHYSICAL DATA T-484 P 0041014 F-052 YC✓ RTMCO Not li5teO TB9375000 Not listed SC0110000 PERSISTENCE = Q Boiling Point Losea water at 2120F (1001,C) Mk1ti,ng point Not applicable vapor Pre5aure Not known Vapor Density Not known Percent Volatile (by Volume) Not applicable Evaporation Kato Nor )mown 10-34-0 8-24-0 11-37-0 Solubij,ity in Water Complato Complete Complete pu 6.65 6.71 5,97 Salt -out- Temperature 1QF 21QF <320F specific Gravity (H2O^1) 1.'405 1 68�'F 1.308 0 68QF 1,427 D 68PF 1Lppeazanco and odor White to green or black liquid_ Odorless Page 1 of 6 Apr-24-2002 02:43pm From -NC Correction Enterprises Administration 019T163974 T-484 P-005/014 F-052 8-29-0 PRODUCT: 11-37-0 SECTION Ill. PHY51CAL HAZARDS FIRS �.No EXPLOSION DATA FlashpoanC Not flammable Flammable Limits Not fla=able j3a=nia can be a product of combustion. Flamalyle limits of ammonia gas in air (by volume) are hoover 16%, Upper 25P Autoignition Temperature Npe applicable Extinguishing Media Water Special. Firefighting Procedures Aumtonium phosphate solutions will nor burn. Firefighting preeauti=5 are based on escaping ammonia gases. Wear full protective clothing and self-contained breathing apparatus. Apply wAtex spray to knock down and absorb ammonia vapors, Keep all, personnel upwind of fire. control runoff waters. Unusual. Fire and Explo9iaF% hazards At, high temperatures, ammonium phosphates may release gaseous ammonia, fluorides, nitrogen oxides, phosphorus oxides. NFPA RATING (SCALE 0-9); NeMe established REACTIVITY DATA stablit,y stable Hazardous Polymerization None known to occur lneompatibility None found Hazardous Decomposition Products At high temperatures may release gaseous ammonia, fluorides, nitrogen oxides, phosphorus oxides CondaCi0ns to Avoid Temperatures above 200OF (930c) SRCTTt?N TV. HRALTH HAZARPP PRIM"Y ROUTE (3 ) GP ENTRY Skin ox tye contact is the most likely exposure. Ingestion is posaibl+e. inhalation of ammonium phosphate solution is unlikely unless unusual conditions of use result in aerosol, production. Rage 2 of 6 Apr-24-2002 02:43pm From -NC Correction Enterprises Administration 9197163974 T-484 P.0061014 F-052 8-24-0 PRODUCT: 11-37-0 TARGF,T ORGANS None )Frown HEALTH EFFECTS Eyes May cause izKitazion Lo eyes Skin Normally no izritati,on to skin Inhalation May cause irritation to mucous membranes, coughing or difficulty in breathing Ingestion Large doses of ammonium phosphate may cause nausea, vomiting, and stomach pain EXPOSURE LIMITS No exposure limits have been set for auuwnium phosphate svluLions Product of decomposition or combustion are toxic ammonia, fluorides, na,trogen oxides, Arid phosphorus oxides. Ammonia Threshold limit vague (TLV) - 25 ppm CAs# 7664-41-7 (American Conference of Governmental Industrial Hygienists) LCLo - 2000 ppm/4 hours (rats) Fluoxa,des, as F TLV = 2.5 mg/gO (AGGIH) Nitxpgen UioXide TLv = 3 ppm (AGGIH) Cep 101v2-44-0 Phosphorus Oxides T'�V not listed SYMPTOMS Of OVEREXP0SURE Acute See health effects above chronic None found NOTES TO PHYSICIAN In a fire various gases can be released. Short-term exposure to smoke, fumes, and gases can lead to irreversible lung in7uzy without early eigna anti symptoms. PagR 3 of 6 Apr-24-2002 02:43pm From -NC Correction Enterprises Administration 9197163974 T-484 P.0071014 F-052 9-24-0 PRODUCT: 11-37-0 POTENTIAL CARCINOGEN DATA (IARC, DITP, OSHA) Hnne found for ammonium phosphate Solutions FOR HZAI.TH EmRcF4NCZES CALL YOUR LOCAL POT50N CENTER SECTION V. FVAST AID PROCEDURES Eyes Plush thoroughly for 15 minutes with large amounts of clean water, occasionally lifting upper and lower lids. Seek medical attention if irritation persiats- skin Wash thoroughly with soap and water. Remove contaminatdd clothing, wash or clean before Wearing again. Inhalation Remove to fresh aix, if breathing has stopped, start artificial respiration, Seek medical attention if discomfort persists. Ingestion if person is conscious, give a large auwurit of water to drink, and make person vomit. Seek medical attention. On nor force an unconscious person to drink er vNni.t . SECTION VI. SAFE HANDLING AND USE Hygienic Practices - It i9 advisable to wash promptly if skin becomes conraminatad, before eating or smoking, before using toilet facilities, and at the end of the work shift before leaving worksite. Page q or 6 Apr-24-2002 02:43pm From -NC Correction Enterprises Administration 9197163974 T-484 P.008/014 F-052 PRODUCT; 11-31-0 SECTION VIT. PMONAL PROTECTION Ventilation None required under normal concarj ores. Appropriate goggles should he used whexe splashing ►nay 4Cgvr and when tzan5ferring liquid fertilizer. Skin Wear rubber gloves for transfer operations or whera splashing may occur. If irritation occurs, impervious clothing and gloves should be worn. Respiratory None required under normal conditions. SECTION VIII. TRANSPORATION REQUIREMENTS POT Proper Shipping Name; Not applicable DOT KazaTd Class: This solution not regulated by DOT Label/Placard Required: None 1IN/NA No. Not listed FOR TRANSPORATION ZMRGMT95 CbLL CHNMTRZC 1-800-424-9300 SECTION IX. ENVIRONMENTAL PROTECTION Procedures for Cleanup of Spills and Leaks ,Ammonium phosphate solutions are plant foods. ftowever, large spills could possibly kill vegetation or cause illness in ani;nta0s. Contamination of waterways could possibly cause fishkills. Prevent large quantities from contacting vagatati.on or waterways. Keep animals away fzvm large spills. Dike spill area if possible To prevent spra4a. Reportable Quantity (CERCIA) None Established ISARA Title III) None Established Page 5 of 6 Apr-24-2002 02:43pm From -NC Correction Enterprises Administration 9197163974 T-494 P.0091014 PRODUCT: 11 •- 3 7 - n F-052 WA5TR DISPOSAL METHOD: if uncontaMn nated, recover and reuse as product, if contamn nated with other materials, tha nAture and extent of contamination rAy zequxX'® US$ of specialized disposal methods. Consult local, state, or federal regulatory agenci®a for acceptable Uspo3al procedures and disposal loc:atiolkm . F➢A NATTANAI, RESPOWSE CENTER 1-800-424-8802 SECTION X, PRCPARATION DATA DATE PREPARED; December 20, 1990 NW OF RESPONSIBLE PARTY: NATTCF. Robert F. Enos Western Farm Service, Inc. P.O. sox 1168 Fresno, California 93715 (209) 436-0450 (209) 661-6139 All infp,rmation appearing in this document i9 based on data provided by third party sources and is coiled to comply with the Federal Hazard communication standard and the California HazardouII Substance9 Information and Training Act. The information is believed t0 be accurate as of the preparation date but is not warranted as being the final authority in the use of this product. This information does not purport to be legal or medical, advice. Western Farm Service, Inc., n%akes no Warranty of merchantability, fitnes* for any purpose or otherwise, express or implied, concerning this product or its uses Which extend beyond the use of the pxodtArt under normal conditions in accord with the statezents made on the label. Page 6 of 6 Copyright CDXS, Inc. 1994 Apr-24-2002 02;43pm From -NC Correction Enterprises Administration 9197163974 T-484 P.0101014 F-052 J. R. Simplot company .,MCC, Group Trade Name:nonium Thiosulate'Solution M1113U Registzation No. rccccc-.�==mrraccccc.��=�nr®cc=�—===aarorcc=ccccco��=====merrrcccccccc=== SECTION I CHEMICAL PRODUCT AND COMPANY INFORMATION Manufactures' or FOMUlator: J,R. Simplot COZpany P.O. Roc 912 Pocatello, ID 83204 Emergency Phone - Chamtrec: 1-000-424-9300 kroduct Name: ,Aauaonium Thiosulfate solution Comon Name: 15-0-0-20 Chemical Type: Fertilizer .r�=ooarrm=cc��.�===mrrrrmcccz,,,.—====o�rr®occcccc=c�=�==_=====m�.rrrrc mccccc SECTION 2 COMPOSITION INFOAM'ATION chemical, Name C.A.S. No- Chemical WTI, TLv PEL and synonyms Formula Hazardoua Ammonium Nitrate 6494-52-2 NH4NO3 8-10 Not Not listed listed - Non-I�axardous Ammonium Thiosulfare 7783-18-e (NM4)25,03 balance snlUri c,n Urea 57-13-6 CO(Nxz)2 6-9 2 ppm SO` and 25 ppm HN3 35 ppm STEL NH., 10 MOM, Not listed NOTE; Ure4 Ammonium Nitrate is added to the Ammonium Th.ioaulfate solution (12-0-0-26) to keep the p.roduct"fzom C,;ystalli2itxg in cold temperatures, q�====a®rrrccccccccc.,=======mmmrrrsocccccccc=—Rq=====___=====Camrrrrrrmco SECTION 3 HAZARDS IDENTIFICATION aWRmArr®cc=cs=cT======mmrrrrrrrrmcccc=cc .ingestion: oral toXicity'due' to the Aapwnium Nitrate solution is listed as slight to moderate. No oral toXiCc t y listed fez Ammonium Thiosulfate. Thiopul,fare salts are essentially non -toxic. Sulfite sai,ts are slight to moderately toxic and are used as a Food preservative. Small repeated doses by =uth can cause headaches and mental tMpaiMent. Large Amounts taken by mouth may have serious effects from ammonia and n)-trate salts. Ten ppm of nitrate ion"is Considered a safe upper limit. Inhalation: Not considered a problem by Inhalation. No t.nxiCity listed, Eye Contact: May cause discomfort to ayes. skin Absoxpcion: No dermal toxicity listed. Skin Contact: May Cause aggravation to Skin With prolgnged contact_ Effects of ovexdose; Ingestion cf.extremely large amounts may cause gastrointestinal discomfort and salivation, nausea, vomiting, diarrhea, May cause aggravation of skin and eyes. Apr-24-2002 02:44pm From -NC Correction Enterprises Administration 9197163974 T-484 P.011/014 F-052 Registration No: None =e===m=�� ______=====m=mr®mmrwmmpwwam�vwmwwwawmawea�me�rsw wwwmmwA m�mgaw�wwa� ewes SECTION 4 FIRST AID MEASURES ------------------ ingestion: Give 2-3 glasses of water. induce vomiting and call a doctor. Tnhalation; Remova person to fresh air and, if necessary, support .respiration and call a doctor. Eyes: Flush eyes with fresh running water for 15 minutes. If discomfort persists, call a doctor. Skin; Wash skin with mild soap and water. If discomfort persists, call a doctor. ®m�remmmmmmmmoccc=�cccccccc �cc.:=�.==ccc=cccccc�ccccccc�cmmmrrmmmrmr�e as®®m SECTION 5 FIRE FTGHTTNG MEASURES ---- ---------------------------- E,xtinguishing Media: Use media suitable to extinguish source of fire. Special Fire Fighting procedures: Applicable only when liquid goes to Oryness. Approach fire upwind• wear self-contained breathing apparatus anti protective clorhing. Flood fire with straight stream o,£ watar. in advanced stages of fire, use unmanned hose nozzles at remote locations. Unusual fire and Explosion hazards: Acaaonium Thiosul£ate is a moderate reducing agent, xixtures with uran oz Ammonium Nitrate solutions should not be allowed to dry. Dry mixtuxes of these components, or other o4idizers, constitute a potential fire of explosion hazard. SECTION 6 ACCIDRNTAI+ RELEASE MEASURES WAXf7-;4------Z------�•----cT==�,. �,m.r.��,m=�.�.,»� _-------_._-----c»mmmaiam rm®m nm=C Environmental Precautions: Keep out of waterways and all bodies of watez. Fertilizers may promote eutrophicetion in waterways. Do not contaminate drinking water. Steps to be taken in case material is released ox spill,ed: Shut off source of leak or spill. Avoid contact with strong acids. Reclaim if possible. Absorb with sand or kitty litter. Keep public away and advise local agencies if substance has entered a water course or sewer, Could be used as a fertilizer using good agronomic practices. m �1"^"a m mmrmmmmmm mmm a mmmrrmrrmaerelrwmmc-�—e=======���q�,gp,�ca�e7c®CG=mmr mrm rm SECTION 7 HANDLING AND STORAGE e mmOme®mom®emaemyemrmmeeomommmmrmmmmmmumwwaaw=maammm�sa�z+�ema �,�=acccccc==e®®o Pzeeautian5 to be taken in handling and storing: Do not heat over 190QF (89°C) as it tends to decomposes. Do not contact with brags or copper materials. Store away from high heat ,sources or etrong acids. Storage temperatures should be between 300F ('J°C) and 10008' (38-c) to keep solution liquid and pumpable• Avoid contact with skin and eyes. Do not m1x or apply with Apr-24-2002 02;44pm From -NC Correction Enterprises Administration 9197163074 T-494 P.0121014 F-052 - - ..... . , .111... I.... .,.. , Registration No: Nye c=vccgTP==crosogccgqMfkScqT===am�snmmecccecccccc=qq-pgmapmroQemaao�ceecccc=cc anhydrous ammnoni.a, phosphaT3 c acid, or any other strong acid. Mild steel storage is adequate. Storm blends of aquaa amonia plus ammonium ttaiosulf'ate ,in lined, coated or icainlesr equipment. Do not install immersipn heaters rn storm" tanks. DO NOT ALLOW TO DRY. Conditions of Reactivity: Heat and fire. con react with terrain reducing agents under heat conditions. ,Acids decompose ammonium nitrate at any temperature. =ccc c=�,�===m®�m¢eeccee.aa,rw•-••w--MR•eeasa�iemomo=ocev== �ceeeo=ec==,.����„��_______ SECTION 8 EXPOSUP.E CONTROLS/PERSONAL PROTECTION c ccc==r,=�.�==9ms�®mccc=cccr,�r��====Ro�Pgyry n,�wM�tOieatCl�cE►�cSccccc==:.cc.:=�.-.�!-T�� ventilation Protection: No local exhaust is naedod. Natuxal ventilation sufficient under normal conditions, Respiratory Protection; None usually required. If needed, respirator 3uitabl,Q, for ammonia or sulfur dioxide. PratectivQ clothing: Chemicsi clothing if necessary to avoid skin contact. tyc PrULULC�QXJ; Chemical splash -proof goggles. Other: Eyewash fountain and/or safety shower in area £or washing akin and eyos. T�"r,===oe=ei���®,aeaFe�=FRw'F �nwereq=�cem,rsa�so�ar�o=ecceccccccc c===.ar,-�� � ______ sEc l-JUN 9 PHYSICAL AND CMMICAL PROPERTIES Boiling Point: 2120F (100,C) Freezing Point; -31°F (-350C) specific Gravity: 1.325 at 60OF (15.60C) Flashpoinr: Non-flammable Appearance: Clear white solution with slight ammonia odor. Fxtingui5hing Media: use media suitable for extinguishing source of giro. Solubility in Water: Complete vapor Pressure, mm Hq: Not applicable Reactian with Water: Not listed pH: 7.0 7..5_.(l0� aqueous solution) -00 �FF+4c SECTION 10 9TARZLITX AND REACTIVITY -----------=caaer�ns®®se c cccriOlMF�t{e1F��mcccccc=-cccco==eeccaom--eymm,ea rorr� �e �mi Stability (Normal Conditions): stable Conditions to Avo�d; Unstable above 302vF (15011C). Avoid Incompatibility (Material to Avoid): llazardous Dccompgsi.tion Products; Hagardous Polymerization: fire conditions. Dry Amnoniuii Nitrate or oxs djze,rs. Anhydraue Ammonia, strong acids, or acid solutions above pH B.S. Zinc Sulfate, Ammonium Polysulfide solution. In combination with ammonia, it wall precipitate, and rolease heat. In combination with acids, it precipitates sulfur and liberates Sulfur Dioxide gas. $egins ro decompose over 190OF (88^C) Will not occur, Apr-24-2002 02:44pm From -NC Correction Enterprises Administration 9197163974 T-464 P.013/0)4 F-052 Trade )lame! Ammoni= ThiFSa'ti Uate 's41.ut;Lon .- Registration No: Norte cr,.:..�==ems®r►����c.�,=-moearooeeac+P�c �.=c=�mmsrrruv®������3P �.r�--=Wm�rrr®�JiA c��e conditions to Avoid: Do not mix with anhydrous ammonia, phoaphoxie acid, other strong acids or zinc sulfAte. ,.. �. r,===snre•+rr ccc=c r.� -"Om nrrr====aW=T _=•^==neeo®rarr rafi�eeeccc=NFa�.�. =��=�P===�=_ s�cTloN 17 TOXICOLOGY WORMATION Aquatic ToXicity Rating: TLza 96; 100o - 1.00 ppm. Low toxicicy to aquatic life, ea r r a ====V RX=p====OrrMaac�cc�cc�=��s>F�ses®rsmdlP�P���o=c�MP wi'.T ��======-cc===- sRCTION 12 ECOLOGICAL INFORMATION fee=Prre==acc�,��.�===ear rat ClQFocecc=qr,�=gyp= None listed. =mm==-=m 0rm®®cscWG7e=cccc 5ECTi0N 13 DISPOSAL CONSaDERATIoNS wasteAisposal Procedures: Reclaim if possible. Disposal Should follow federal, state and local xequlata.ons. could be used as a fertilizer using good agronomic prdctices. 0==saWDZZ.= bssrsr®dYPGNPr=.-..,-,=q=;==M=== SECTION li TRANSPORT INFORMATION) Shipping name: Nor regulated by DO'S Hazard C1aod: None C,A,S. Number: See "Ingredients" Reportable Quantity (Rp); None A.G.T. Number: Nona Labels Required: Nonce Haz waste No: None placard: None EPA Regist Np. Norte SECTION 15 REGULATORY INFORMATION rKrfa� cccc=cccT=====omrrrrrcmc�3�aRtF=��====T=====___=====omcarwOeAraYrrrrores Carcinogenicl6y: by IARr-?: Yes { ) No (X) by NTP?: Yes { ) No (X) Not on the SARA 302 list of reportable quantities, SECTION 16 OTHAR INFORMATION Flash Point (Teat Method): Not applicable Fla=Anable Limit$ LovER UPPER Autoigt:a�On Temperature: Not applicable (% 9Y 'VOLUME) N/A N/A NFPA Hazard Ratinq: Health: 1 Fire: 0 Reactivity: 0 Specific: Not applicable This NFPA t4 ting is a recommendation by the manufacturer us3.nq the guidelines or published evaluations prepared by zhe National. Fire aroreceion Association 1NFaA,). Msps varsion Nwnber-: 3 (revisions to Section 15) Apr-24-2002 02:44pm From -NC Correction Enterprises Administration 91971639T4 T-484 P.0141014 F-052 Registration No: None • �-c�����K-....,.,�y1G �--o�aodmmev�e,e�uastllas���/SO���wwa��a®ells ms�mi����r��rurmm.a�-moo Disclaimer: This information relates Lo the specific material dess,gnated and may not be valid for such 'material, used in combination with any other materials or in any process. Such information is to the best: of our knowledge and belief, accurate and reliable as of the date compiled. However, no rep,resex%tat:iop, warranty or guarantee is made as to its accuracy, reliability of completeness. No WARRANTY OF MRRC1TAWA,51LTTY, MX&55 FOR ANY PARTICUIJkR PURPOSE, OR ANY OTHER WARRANTY, $XPR$Ss OR TMPLZED, is MAY3Z CONCERNING THE INFORMATION HEREIN PROVID4D. It is tha user's responsibility to satisfy himself as to the suitability and completeness of such information ,for h.is own particular use. we do not accept liabi3i,ty for any loss or damage that may occur from the us6 of this lnfomation nor do we offer warranty against patent infringement. Reviewed by: The Aepartmen% of Regulatory Affairs May 1999 (200) 239-2100 Copyright CDMs, Inc. 1994-1999