Loading...
HomeMy WebLinkAbout20050427 Ver 1_Complete File_20050308 !"."..~ \ 05- D l\ -dtl Permit Class l.'.'EW Permit Number 76-05 1.1 STATE OF NORTH CAROLL~A .~ Department of Environment and Nafural Resources and Coastal Resources Commission ~ @@@DW@@ ~trmit MAY 3 1 2005 fur 0 1'&n.i.!.N..R. WATER Q l Major Development in an Area of Environment~~RMWA~~/JY . pursuant to NCGS 113A-118 RANcH l. E~cav.ati~n ancyorfil1ii1~pursuant to NCGS',113..229 , Issued to Melvin H.Cooper, Jr., P.O. Box 100S', Elizabeth City, NC 27906 Authorizing development in Perquimans County at adi. Albemarle Sound. off State Road 1433. Harvey Neck Community , as requested in the permittee's application dated 2/1/05. including the attached work{>lan drawings (3). 2 dated 2/1/05 & 1 dated'I/7/0S This permit, issued on M~y 26) 200~ , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization 1) The alignment of the permitted bulkhead shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re-staked by DCM within a maximum of 30 days prior to the new expected start of construction. i I I I~ This pennit action may be appealed by the permittee or I.. other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or i continuance as the case may be. I I 2) The bulkhead shall be constructed in strict accordance with the alignment indicated on the attached workplan drawing dated 1/7/05. 3) The bulkhead shall be constructed prior to any backfilling activities. (See attached sheets for Additional Conditions) Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. This pennit must be accessible on-site to Department personnel when the project is inspected for compliance. ? (//1 Any maintenance work or project modification not covered hereunder requires further Division approval. ~ Ch' s S. Jones, Director Division of Coastal Management All work must cease when the penn it expires on This pennit and its conditions are hereby accepted. December 31, 200S In issuing this penn it, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal ~w:::~~~~,t:~~~~,~~~~.~>>><:,::::::::,x:: lOll:::::'::::::::::: :::~~::~~~~,~~~~~~i~~~~.J I .-'- :: :l:: =:: l~ l: .::::: X~::: l~QQa :,c~: :::c::::::::::~: >>>>: J:;: ::=l=C~ :=~=a II ::a llC::~'::';~ ell::::::::: :--~ Melvin H. Cooper, Jr. Permit #76-05 Page 2 of3 4) I 5) 6) 7) . 8) . 19) ~ I ~ 10) 11) 12) .' 113) 14) ADDITIONAL CONDITIONS The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation shall be permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. All backflll'rrlat.erial shall bicl~~~d'freeof any pollui~ts except intface quantitie~: All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. No backfill material shall be placed within 30 feet of the normal water line, except that which will be used to backfill the area behind the permitted bulkhead. Docking Facility The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout ,: the entire existence of the permitted structure. The pier, boathouse and associated mooring pilings shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner to the west riparian access corridor, which is determined by drawing a line parallel to the channel or deep water, then drawing a line perpendicular to the channel that intersects with the shore at the point where the upland property line meets the water's edge. ~ This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the attached permit application and workplat drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or * over public trust waters without permit modification. The boathouse shall not be completely enclosed or have side coverage more than one-half the height of the side, from the roof waterward. The authorized boathouse shall be single story and shall not be designed to allow for second story use. *>>>*X::::::::::::a,:::::::~~~~Y>>.~~~:::l::::joo'~~' "-'-, , Melvin H. Cooper, Jr. Permit #76-05 Page 3 of 3 ADDITIONAL CONDITIONS 15) The authorized structure and associated activity shall not cause and unacceptable interference with navigation. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 16) The permittee shall maintain the authorized work in good condition and. in conformance with the terms and conditions of this permit. The permittee shall not be relieved of this requirement if he abandons the permitted activity without h~ving it transferred to a !bird party. ..: . . -.".0-' _ __._ ;, ;BoatR~~"/' ,; 17) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. , 18) ~ i I ~ 19) NOTE: NOTE: ~ , NOTE: NOTE: General The permittee understands and agrees that, if future operations by the United States requires the remoyal, relocation, or other alteration of the structure or work authorized by this permit, or if in the ., opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. No vegetated wetlands shall be excavated or filled, even temporarily. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal water level The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3490 (nwQ Project No. 050427), which was issued on 4/12/05. The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 200510622. :-X-X::::::::l::~::::::l:::~~'~:~::::::::::::~'~'~X_:::::::::::::~~>>~~~""':-~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality April 12, 2005 DWQ Project # 05-0427 Perquimans County , Melvin H. Cooper, Jr. P.O. Box 1008 Elizabeth City, NC, 27906 Subject Property: Lot 12 Goose Nest Lane Albemarle Sound, 30, Class SB Approval of 401 Water Quality Certification (GC3490) with Additional Conditions Dear Mr. Cooper: You have our approval, in accordance with the attached conditions, to place fill material within or otherwise impact by shading 0.147 acres of waters to construct a bulkhead, ramp, pier, boathous~, boatlift and mooring pilings as described in your application received by the Division of Water Quality (DWQ) Wetlands/40 1 Unit on March 8, 2005. After reviewing your application, we have determined that the Division of Water Quality (DWQ) General Water Quality Certification Number 3490 covers these water impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers (USACE). In addition, you should get or otherwise comply with any other federal, state and 10cal requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with yonr proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all ofthe other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 404/CAMA Wetlands Plan Location or Reference _~.oDe C . Nc arolina 'Ilttlrll//!I 401 We~ands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786/ FAX 919.733-6893/lntemet: htto://h20.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Melvin H. Cooper, Jr. Page 2 of2 April 12, 2005 2. Certificate of Completion Upon completion of all work apprpved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 40 1/W etlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 3. Water Quality Certification The proposed proj ect must comply with all of the conditions of General Water Quality Certification (GC) 3490. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any ofthe conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a Written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrati~e Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions\,are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Tom Steffens in the DWQ Washington Regional Office at 252-946-6481. Sincerely, ~'~ Alan W. Klimek, P.E. AWKJcbk I Enclosures: GC 3490 Certification of Completion cc: Doug Huggett, DCM USACE Washington Regulatory Field Office DWQ Washington Regional Office File Copy Central Files Filename: 050427Cooper(Perquimans)401 MEMORANDUM TO: John Dorney Non-Discharge Branch Regional Contact: WQ Supervisor: Date: tom steffens ;:JlhorlgA SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Melvin H. Cooper Jr Project Number 05 0427 Recvd From nCM Received Date 3/8/05 Recvd By Region Project Type Boat house, ramp, bulkhead, pier County Perquimans County2 Regic)n Washington Certificates Permit Wetland Wetland Wetland Stream Type Type Impact Score Index Stream Class Prim. Supp. Acres Basin Req. Feet Req. ICAMAI lay @N 1 I 30 rsBl 130,152. I I I I IOY ON 1 I.. r--I I I I l ; .. Mitigation MitigationType Wetland Type Acres Feet r Is Wetland Rating Sheet Attached? 0 YON Did you request more info? 0 YON Have Project Changes/Conditions Been Discussed With Applicant? 0 YON Is Mitigation required? 0 YON Recommendation: 0 Issue 0 Issue/Cond 0 Deny Provided by Region: Latitude (ddmmss) 360506 Longitude (ddmmss) 762232 Comments: Issue n/c cc: Regional Office Central Office Page Number 1 DS- olf 2.1 .l IN REPLY REFER TO DEPARTMENT OF THE ARMY W'LMINGTON DISTRICT, CORPS OF ENG'NEERS Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889-1000 April 28, 2005 Regulatory Division Action ID No. 200510622 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 ~@@[gllW~@ tvlAY 2 2005 DENR - W"TER WETl..ANDSAND ~~O'J"';t?UAUTY ,-" "" VATER BP,JJ;CI1 Dear Mr. Huggett: Reference the application of Melvin Cooper for a Department of the Army permit to construct a pier, boatramp, boathouse, and bulkhead, on property located off State Road 1433, in the Harvey Neck Community, adjacent to the Albemarle Sound, in Perquimans County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (US ACE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAAJNATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. -2- 3. Unless otherwise authorized by this permit, all fIll material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 4. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 5. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Field Office, Regulatory Division, telephone (252) 975-1616, extension 23. Sincerely, ~~ Raleigh Bland, P.W.S. Regulatory Project Manager Copies Furnished: Ms. Cyndi Karoly Division of Water Quality North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 '. -3- Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Ron Sechler National Marine Fisheries Service Habitat Conservation Service Pivers Island Beaufort, North Carolina 28516 Mr. David Rackley NMFS, Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Ronald J. Mikulak, Chief Wetlands Regulatory Section Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Ted Sampson, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 US 17 South Elizabeth City, North Carolina 27909 t I Michael F. Easley, Governor ~W'A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Charles S. Jones, Director 050421 William G. Ross Jr., Secretary March 1, 2005 MEMORANDUM: ~@@@nw@@ MAR 0 8 2005 DENR-WA' WEnANosANO S7iTER QUALITY Doug Huggett ORMWATER BRANcH Major Permits Processing Coordinator TO: Mr. John R. Dorney Environmental Biological Supervisor Division of Water Quality FROM: SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Melvin H. Cooper, Jr. Project Location: Lot 12 Goose Nest Lane in Harvey Neck community, Perquimans Co. Proposed Project: Construct bulkhead, boat ramp, pier, platform, boathouse, boatlift, pilings Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 22,2005, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Kim Hedrick at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested; REPLY: _ This agency has no objection to the project as proposed. _ This agency has no comment on the proposed project. _ This agency approves of the project only if the recommended changes are incorporated. See attached. : ! _ This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX: 252-264-3723 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer - 30% Recycled by Fiber Weight '{ DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: Melvin H. Cooper, Jr. 2. LOCATION OF PROJECT SITE: End of SR 1433, Goose Nest Lane, Hertford, Harvey Neck Community, Perquimans County, adjacent to Albemarle Sound. Photo Index - 2000: 157-1789 (J-10) 1995: 157-1614 (P-10,11) 1989: 116-8 (B-14) 1984: 114-790 (B-9) 1979: 126-1582 (I-8) State Plane Coordinates - X: 2,780,300 Y: 861,600 Harvey Neck, NC U.L. GPS - B021014A 3. INVESTIGATION TYPE: CAMA, D&F 4. INVESTIGATIVE PROCEDURE: Date of Site Visit - 2/10/2005 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received Complete - 2/9/2005 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Perquimans County Land Classification From LUP - Conservation (B) AEC(s) Involved - PTA, EW, and ES (C) Water Dependent - Yes (D) Intended Use - Private, Residential (E) Wastewater Treatment: Existing - None Planned - septic system (F) Type of Structures: Existing - Bulkhead wing wall from eastern riparian neighbor and remnants of old bulkhead extending from western riparian neighbor. Planned - Bulkhead, boat ramp, pier, platform, boathouse, boatlift, and 2 mooring pilings. (G) Estimated Annual Rate of Erosion - 6 feet/year Source - Applicant 7. HABITAT DESCRIPTION: [AREA] FILLED SHADED DREDGED (A) Vegetated Wetlands pier (B) Public Trust Area, Estuarine Waters 2,550 sq. ft. 1,608 sq. ft. (C) Uplands in Estuarine Shoreline AEC 2,250 sq. ft. (D) Total Area Disturbed - 6,408 sq. ft. (0.147 acres) (E) Primary Nursery Area - No (F) Water Classification - SB Open - No Melvin Cooper, Jr. Field Investigation Report Page 2 " ~ 8. PROJECT SUMMARY: The applicant proposes to construct a 145-ft. long wooden bulkhead, 15 ft. wide by 40 ft. long boat ramp, and pier with platform, boathouse, boatlift and two mooring pilings on his property located at Lot 12 Goose Nest Lane, Harvey Neck Community, Perquimans Countyt and on the Albemarle Sound. PROJECT SETTING The property is a 43,119 sq. ft. (0.99 acre) lot located at Lot 12 Goose Nest Lane (private), Harvey Neck Community, off SR 1433 in Perquimans County and adjacent to Albemarle Sound. The property has an elevation of approximately 7 ft. above normal water level (NWL) and has Roanoke soils. Vegetation on the property consists of pine, live oak, and other indigenous trees and grasses. The applicant has applied for a minor permit to clear the lot in preparation for the construction of a single- family dwelling. Adjacent property consists of similar size building lots. Both lots to the east and west have been developed with single-family dwellings on them. Both adjacent lots are bulkheaded and the applicant's property has experienced considerable erosion along the shoreline. The wing wall for the bulkhead on the east side has been extended approximately 20 ft. landward and approximately 5 ft. into the applicant's property to prevent further erosion, resulting in accelerated erosion on the applicant's lot. The property on the west side has a functioning bulkhead that extends into the applicant's lot in the open water where bulkhead remnants remain. The lack of a wing wall for this bulkhead resulted in an erosion escarpment on the applicant's property and behind the bulkhead of the western riparian owner's property. The water depth close to shore ranges from 1-2 ft. and gradually deepens to 5 ft. at waterward end of pier. The waters of the Albemarle Sound in this area are classified as SB by the Division of Environmental Management and are closed to shellfish harvesting. DEVELOPMENT PROPOSAL In order to prevent further erosion, the applicant proposes to construct a 145 ft. long wooden bulkhead to connect with the corner of the adjacent lots and have a straight alignment. The proposed bulkhead alignment will have a maximum distance of 20 ft. from the shoreline and an average distance of 15 ft. Clean, dry fill will be used for backfill from an upland pit. The applicant proposes to use the wing wall that the property owner to the east built on his property and install a 15 ft. wide by 40 ft. long concrete boat ramp directly west of it. The applicant proposes to construct another wing wall bordering the west side of the boat ramp to join into the proposed bulkhead. The applicant is requesting this bulkhead alignment because trash and debris collect in the eroded area. The applicant proposes to construct a 6 ft. wide pier with a 30 ft. by 20 ft. "T" head platform. The total length of the pier structure will be 140 ft. The applicant proposes to construct a 12 ft. wide by 24 ft. long boathouse with boatlift. The applicant proposes to place two pilings east of the "T" in order to create a 12 ft. by 20 ft. slip. With the addition of cleats, the applicant proposes to create 4 slips in total. There are two 200 ft. long piers along the same shoreline, one is 200 feet east and the other is 300 feet west of the applicant's property. Melvin Cooper, Jr. Field Investigation Report Page 3 -t ANTICIPATED IMPACTS The proposed bulkhead alignment with backfill and boat ramp will result in the filling of approximately 2,550 sq. ft. of Public Trust Area (PTA) and Estuarine Waters (EW) Areas of Environmental Concern (AECs). Approximately 101 cubic yards of fill material will be placed below NWL for the backfill and boat ramp. To match grade, approximately 2,250 sq. ft. (100 cu. yds.) of f1l1 material will be placed in the upland Estuarine Shoreline (ES) AEC. The proposed pier will shade 720 sq. ft., the "T" platform will shade 600 sq. ft., and the boathouse with boatlift will shade 288 sq. ft. of PTA and EW AECs. There are no expected navigational impacts due to the pier structure. Temporary water turbidity will occur during construction. The use of a f1lter cloth behind the bulkhead will minimize future erosion and turbidity. Submitted by: Date: Kimberly A. Hedrick 02/24/05 .t Form DCM-MP-l lh\ ~~~u \J ~ (!l) MAR 0 8 2005 050421 ....",.~~.>.'>~ APPLICA~ '. . ". _1_) FEB C~j ~ . .....; 20' I' 1.. ,~, ..'. u5 ;~j/v '.' <;' 1. ...1.'i~f1 .....,<<, .:.;, ;:::, Vr1 ~ ....,.:; :..;../ -:"~fI_,<f'" . C/'...l.....;':'~).". I '" ~, , (fo be completed by all applicants) 1. APPLICANT a. Landowner: N~e~!\fi n t-\, COO\px-..~. Address --:PrJ 'BC0L- J (Ie! <6 city[llT~~f)rthC bkj StatellL . , Zip ct1 qOu Day Phone (:JtfJJ,08L~-05~/7 Fax (~~J);i) ,38c{~O:-387 b. Authorized Agent: ".?).An0E t4-~ f+/:Je;uz-/ ~,.~-~ Name Address City State Zip Day Phone Fax c. Project Dame (if any) NOTE: Permit will be iSlutd in name oflaNJqwner(s), and/or projea name. 2. LOCATION OF PROPOSED PROJECT a. County Y((n LL~rrV:i1\J1- Revised 03/95 J-..ail e... d. Is proposed work within city ~its or planning jurisdiction? Yes No e. Name of body of water Peat. . est project (:56 river, . creek, sound, bay) AI/1 Q 1'1'7 f( r le " 1(111 C{ 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT b, Is the proposed activity maintenance of an existing project, new work, or both? i~/,zd~'U {).)oj'$- ft c. Will the project be for public, private or commercial . I use? /J It-, t/.:: Toe I d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is Deeded, please attach additional pages. c I ~q/~ i.,~ r /,'lJ; -r A. 11f""zt'...... L r...vs.rA.t....c.r.,(;;" e.;1.I;h"~d~ {J...llch...."'.~ . ' . ",' t:' ..1- u,'i+h t..'.::...,z,tJjed. (I"'.... ri2ufcll .O.;-.?- '1. F;"jJ vv / -Ii nit 0./ L.! <!. rt;.J ;:;"/ ( ------rc." 'P/L<:. ve",'7 fl.' ,...I'L. ~(D.s:..OA.-~ tf (~"':~ )~ "d~~;'_L.,t -'2 l _ i.. _" '-It; J'''I -h.7 ( ~---'- , ~ ,.." Form DCM.MP.l 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract L/3 , / / l' 5;::; / b. Size of individuallot(s) ~. //f ~ 1tI,/ }f c. Approximate elevation of tract above' MHW or NWL '7/Cv/ . d. Soil type(s) and texturei~~ qf tract . kt d/j4/.< te-<L :>~I J e. Vegetation on tract II/.q. /;' fr-e.- 77Z-""'-"-....... j) /11 n -h I J I 1 W(~C f . jl'AtJ , f. Man-made features now on tract fJ<'i12 17 o..-l. (..'71 tfJ fL 1(-( h ec.,J :~ g. What is the CAMA Land Use Plan land classification of the site? (CoruuIl the toea/land use plan,) ~nservation _ Transitional _ Developed _ Community _ Rural _ Other h. How is the tract zoned by local government? )vI A- i, Is the proposed pr~ consistent with the applicable zoning? ~es _ No (Attach toning compliance ctmficau, if cppUcabu) j. Has a professional archaeological assessment been done for the tract? _ Yes -~ If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or ,eli~~e property? _ Yes --I.L'NO 1. Are there wetlands on the site? _ Yes ~/ Coastal (marsh) Other If yes, bas a delineation been conducted? (Attach docwnenzalion, if availabu) Rp.vi.~d 03/95 . -, . m. Describe existing wastewater treatment facilities. A.JOIV~ n., Describe location and type of discharges to waters " of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, .wash down" and r~identia1 discharges.) S(.,tft.FrlCf; Rt;l}V'{) Fr o. Describe existing drinking water supply source. (! () &.l. Pry' f_AJ'I"fT r;~ S It" oS Q~M' 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: ~ copy or the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property. then forward a copy of the deed or other instrument under which the owner claimS title, plus Written permission from the owner to carry out the project. ",. An accurate, dated work plat (including plan view "and cross-sectional drawings) drawn to scale in black ink on an~ 8 112" by 11. white paper. (Refer to Coastal Resources C(lmmission Rule 7J .0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable ooIy if an adequate Dumber of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings,) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the . Form DeM-Mr-I site. Include highway or secondary road (SR) numbers, landmarks, and the like. ", J N Stormwatel' Certification, if Doe is necessary. -="~. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Nam'e }1' J'II~'dt!,' 11 ~~ LI"" Address Y2-t 9 1h;/IIlc>,','fi AW't:',7?I-AI,[/<5.,:J3J.3? Phone' j ~:.?bY.S 9 ~ -...;81'( / Name ;-roJ./'J ..5"rY'~6t./ Address 'J.;rJ .~()(.:Stt.p{je5 r /~/)eftrlil~p.AlC ):-?y~ Phone L-x')-y..l.f 'J...b- PEl Name Address Phone -.:;:,. . A llst oC previous state or Cederal permits issued for work on the project tract. Include permit numbers, pennittee, and iss'uing dates. ,!i'linn! f(t'(Y1;1 Clf/'/U/ (", ~ tfoo ~ ~ . A check ror $1& made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. X A signed ABC . hlWU"d Dolice for projects in oceanfront and inlet areas. N 1 ~ _.~'><!' A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to IO) If the project involves the expenditure of public funds or use of public lands,' attach a statement documenting compliance with the North Carolina Environmental Policy Act. l\i If\ Revised 03/95 r--~'-- < 'ii' :'; . b""') FE8 - ~1. 2005 COASTAL ~.:1ANAGEM~NT ELIZA13ETH err! 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any, permit issued in response to this application will allow. only the development described in the application. The project will be subject to conditions and restrictions contained i'1 the permit. I certify that to the best of my knowledge, the proPosed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federai . review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the infonnation provided in this application is truthful to the best of my knowledge. j~' -- f ._~ .or' ,This is the ( day of /cJi,-. , tr'--==-~ Print Name Pi e./",,".,, II... (I0t''l' ~p - \~ Signature !}l)jJL.., Jf-. ~r ~ LandaWl'!er Dr Auzhori1.ta Ag PI~e indicate attachments pertaining to your proposed proJect. ...J.e'DCM MP-2 Excavation and Filllnformation ..L DCM MP-3 Upland Deyelopment L DeM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts _ OCM MP-6 Marina Development NOTE: Please sIgn and date each attachment in the space provided at the bottom of each form. : Fomi'~2l:";1i": ~E":: ,:~,:"7~~::~C'~:~;:;~"" :A:'.:~".:\V" AT'I' ;O'N . .".', 1~~: ..~.,. ,.' . .' 0:'".., . ' , . . . . - . . ,.. ~ ~, . . . ~ -.', .," . #> ~ :...._'11'"1.." i".. "~. AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Length Width Average Existing Depth FiDa1 Project Depth .; 4 0 , 5 -2 S - l i~~i!~ l~~~; ~~fi~; 'I~(. ..... Access channel (MLW) or (NWL) Canal Boat basin Boat ramp' Rock groin Rock breakwater Other (Excluding shoreline stabili.zation) .,.,~ :fJ~~ ~~ r'''''' .^' .. .; ",;z:._ _". . ,~ ., ." ....~. -' ,..~ '-'-8 ~. !:. ~ 2005 ::'.:r:;J~,~ 1'/~.;. ._-::,.;.~_N;1.r:::=~,,;~;:,,~"r L:."r~,..,'::,::T;"~ {~rt/ -1. EXCAVATION l~w.~. a. Amount of material to be excavated from below MHW or NWL in cubic yards ,;V I J:1.. b. Type of material to be excavated /7/'/# c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SA Vs) or other wetlands? t.:!./A Yes _ No d. Highground excavation in cubic yards ;VIA 2. DISPOSAL OF EX<JAVA~D MAT~RIAL IN ( r.\ ) a. Location of disposal area 1')1 A b. Dimensions of disposal area /11)/ fl c. Do you,claim title, to disposal area? NIP- ., Yes _ No tf no; attach a letter granting permission from the owner. d. Will a disposal., area be available for future maintenance? ~ -7r'iYjf1t - No If yes, where? IV f H e. Does the disposal area include any coastal wetlands A/~marsh). SA Vs or other wetlands? (V /fl...- Yes _ No f. Does the disposal include any area in tht: water? [V'1~Yes _No Form DCM-MP-2. . 3. SHORELINE STABILIZATION a. Type qf shoreline stabilization -L Bulkhead Riprap b; Length ---1lJ2 1= r c. Aver~ge distance waterward of MHW or NWL .t- ,.1- ~ a;r- d. Maximum distance waterward of MHW or NWL ~ F~-r- e. Shoreline erosion during preceding 12 months . 6"" ,ce~-} (Source ofinformarion) t'D.sei'~v,d..,-( L?:V of 11(1f'1I (/-lI'JT f. Type of bulkhead or riprap material 11,'N,l '-.19'1//;::), e...-f! IAHf 1'ht7,n,''''' -I Ci-rr-lI4/;'J g. Amount of fill in cubic yards to be placed below water level (1) Riprap (2) Bulkhead backfill /O/~ c!.<,...{/'C' 'FQ~J'i J . h. Type of fill material CL t;. i'4AJ J f) t "1 1=,1 J i. Source of fill material fA ~ InJ-fJlJ PIT"' fr/CJsrt.Y I f v~ "tn/c,,,nC OA' ;PAb~"'7 { / 4. OTHER FILL ACTIVITIES' (Excluding Shoreline Stabilization)! a. Will till material be brought to site? ~Yes _No If yes. (1) (2) - 'r b. Will fill material be placed in coastal wetlands (Il13r<:h), SA Vs o~ther wetlands? " ;_ Yes _No If yes, . .' . (1) Dimensions of fill area - .: ~ _.... (2) Purpose of fill__ ...___,'. _-J,_ 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? f!- .y. /J . If l "1914'#. '!, /"-/(i t,'"" C, (J4? """..-11I"'.I1 ~, -1",," C\" A:.:' cd',;-.I' r;' 11 c,j ;' " ;..-> e,,;J 771. c (I....{ t.<./.:.t1. i~ N>'-; fit. ({(j. "" () ,I1"u'/r-/l/l/Q"...... To /7-7 ;=;;'"1/ b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? /).1.s-k 1,<..'!- j -;r1Z~&7C>t!) ,p'h'..-;. L.,..720~. FMff1,"7i1..,..!<, c. Will wetlands be crossed in transp~l1ing equipment to project site? _ Yes ~ No If yes, explain steps that will be taken to lessen environmental impacts. /h<<:jv/fl..,/ #. d~c..I""..l1 " .. Applic:1nt or Project N::j,me $1 ~ /) f\L~ (/ -r ~;;;'l" (;'r. &tl"v___~ -:J-.- J - ~-S- Date Amount of material to be placed in the water _5.S3cLI. ~ds.. Dimensions of fill area_ 21" 'I.. \ 5=/:>< (),. .7.~. ~::_, ~. &'3 ('^ . '1rf .~ (3) Purpose of fill C':\'1(){.e~..b04+ VI:1 VVip Revised 03/95 UPLAND DEVELOPMENT Form DCM-MP-3 -f ,/ - - 'I " (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings. facjJi~ies, un;' _ or structures proposed _ .~" '... . _. _ _ _ ... ,irA b. Number oflots or parcels 1 c. Density (give the number of residential units and the units per acre) ~ d. Size of area to be graded, fil!!.d or disturbed including roads, diiches, etc. _',Z;.) 1-50 _,<n. +.+, .f-O 1{ -+ :q~ d. - ~ e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Yes ,No If yes, date submitted ~ f. List the materials (such as marlt paver stone, asphalt, or concretr'\- to be us~ for paved surfaces. ... .... _ _ -:...:..... L ~rA g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildingst rooftops, or to be used for vehicular driveways or parking. !J 111 Revised 03/95 \, .J I , I " ," , h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes )( No If yes, date submitted i. Describe proposed method of sewage disposal. S'k"f-f;'" j-fA-n/ Ie j. Have the facilities described in Item i. above received state or local approval? )I e. ) (Attach appropriate documentation) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "was.h down" an~ residenp~ discharges). \\!lrfa U 'rIA 1'\ Dd::!: 1. Describe proposed drinking water supply source (e.g. well, community, public system, etc.) r-u M'<".~L.U:r.Q.A'K. I - m. Will water be impounded? _ Yes 't- No If yes, how many acres? n. If the project is a oceanfront developIl}ent, when was the lot(s) platted and recorded? t!.. J P, . /)','7 _ /. 1.1 ~ '"\ II +::1 V./'''' I'T. t!:'-6?o/.'e(L./L APPli~t or ~Oj~.ct N8ID! I ~ /lieL~//-~ ~/.-5 Signature ;2-, /- Z;...J' Date Form DCM-MP-4 I STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) _ Commercial _Community ~Private (2) Number / f7/....(l.... (3) Length / if.. (.) FI (4) Width C. FT (5) Finger Piers _ Yes -I::=:- No (i) Number N \ v'\ (H) Length ~ I'" (Hi) Width N ll\ (6) Platform(s) ...J::::::::... Yes _ No (i) Number / (ii) Length :3 t:."> FT (iii) Width .:2-~ FT (7) Number of slips proposed Y (8) Proximity of structure to adjacent riparian property lines 6'c> .F r (cen-hl(j (9) Width of water body 3 J'h j)~5 (10) Water depth at waterward end of pier at ML W or NWL ....r FI b. Boathouse (including covered lifts) (1) Commercial v- Private (2) Length .2.. V' (3) Width I ;L- c. Groin (e.g. woodt sheetpiIe, etc.) (1) Number IV I,e;- (2) Length(s) M ) H;- I . d. Breakwater (e.g. woodl ,~heetpiIet etc.) (1) Length IV I )Lf- (2) Average distance from MHW, NWL or wetlands N) !'f (3) Maximum distance beyond MHW, NWL or wetlands }Y 1,4 . Revised 03/95 - -,-:: ..............~. ... -,... ~ rEn ,~ 1 2005 '. >\,.:;..>';t!t.ZT:/::.r e. Mooring buoys l ~ l~ (1) _ Commercial _Community _:. Private (2) Number . -. (3) Description of buoy (Color t inscription, size, anchor, etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline -f. Mooring structure (boatliftt InooringPilin~~ . etc.l #111\ (1) _ Commerchil _Commumty _ _ Privat~ IJ (2) Number (3) Length (4) Width g. Other (Give complete d#lcription) ::t Of' Ji JS f or a.. (7) . ( JJ?e}Y/N ff. C~"\/?o;,,r:.... J;,. Applicant or Project Name ,~(/L fi. ~~ Signature ;L /- vS- Date MAJOR PERMIT FEE MATRIX Applicant: Melvin H. Cooper. Jr. Selection Development Type Fee DCM% DWQ% (14300160143510009316256253) (24300 1602 435100095 2341) I. Private, non-commercial 0 development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial 0 development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or 0 below applies: II I (A). For Private non- D commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3301 (see attached) can be applied: \II(B). For public or D commercial development, if $400 100% ($400) 0% ($0) General Water Quality Certification No. 3301 (see attached) can be applied: III(C). If General Water 0 Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached) could be applied, but OCM staff determined that additional review and written OWQ concurrence is needed because of concerns related to water quality or aquatic life: 111(0). If General Water [gJ Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached) cannot ;<"""'" be applied: IV. For development that 0 involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or open water areas: .. .. .. :! EXISTING BULKHEAD .J PROPERTY UNE ADJOINING PROPERTY UNES - - - - - UnUTY POlE <Q., FIRE HYDRANT f BENCHMARK P-K NAIL . CONTROL MONUMENT . 1* HARVEY POINT RD -3'Jtt.r ALBEMARLE VICINITY MAP n.t.s. t REMNANTS OF OLD BULKHEAD 150.10' / \ ___S'8r01'~~"E 150.32' ----------+8 \ EXISTING BULKHEAD i'(~r"StlAREA TO BE FILLED 4,964 S.F. -: 0.11 ACRE z ~ -: fJS Af. e 0 0 ~ Pi 0 AREA TO BE q FILLED :::E AREA LOT 11 38,155 S.F. (EXISTING) LOT 13 4,964 S.F. (FILL) 43,119 S.F. TOTAL G,t' N lO 9 N fro tift) OJ m ;I>- st~ yo/\ O!. VACANT v.I ~ fro r(+1 WOODED LOT ~I ~ "'" A PIPE ~r--S88-:45'OO"W - 299 ii'- PIPE . N88-45'OO"E 149.98' REBAR N88'45'OO"E- 449.88'- ~E GOOSE NEST LANE 60' SURVEY LOT 12, GOOSE NEST LANE FOR MELVIN COOPER RECORDED IN PE. 6, P. 69 ell FLOOD lONE: X DA TE: 01/07/2005 FILE # 5002 BETHEL TOWNSHIP F.I.R.M. 370315 7866 J OCT 5, 2005 PERQUIMANS COUNTY, NORTH CAROLINA 60 0 30 60 ~II SCALE: 1 IN = 60 FT I. STEPHEN L. CARDWELL. PLS, CERTIFY TIiAT TIiIS PLAT WAS DRAWN FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION; THAT THE DEED DESCRIP- 110N IS RECORDED IN DEED BOOK 233. PAGE 263; THAT TIiE RATIO OF PRECISION IS 1: 10,000+; THAT TIiIS PLAT WAS PREPARED lAW NCAC 11TLE 21. CHAPTER 56, SECTION .1600. WITNESS MY ORIG. SIGNATURE, UCENSE NUMBER, AND SEAL TIiIS 08 DAY OF JANUARY. 2005. s. ' . CARDI SURVEYlNiC '-' 1206 FRANCIS STREET ELIZABETH CITY, NC 27909 252.338.6328 .ajo( \"e'(V'\'~ '"l,,\iCA110fl ~( I ~~e\ \I i" Coofev 4\) lo -\- \'2. GOOStI\1.s+ L,. e(~.fo(J I \\.Ie. Z79"l 2/ \ / 2.005 L .. , ..: ~ W '..2 .;~.' -~p ~ 1 '2.CLj ~. t.~) ... _ . ;.::r,~"l',(""~:'..' .. .'~ cO,t{2" li~.l.. ;;' ~.;~.,rj"':'~ .! t::...C:.t..~~~ '~,.~ ~., ~ .' ~. . ( Nor+h (,voss Sec+\o0 Vi ~VV O~ ~u \ \<. heA-J 1-- ---- I 20. 81"6 . 6kv'i-t QA ~' AlbeMarle ,S:,\A() NWL Sc.. a \ t.. r \" = 5' I~y Purnil '"lp1i(A ti 0('\ {Or '-'\e,i vi ,,'1 GtT~ r Y 5 Lu \- 12 Gwo>{ I\l..! { Ln. [U r ~/cQ I Nt ~7~ t.1 Y ~/l /2DoS (;toss. ~c..-tiO(\ \/\t?-vJ o~~~+ \(t\Wl.f ~ - . .'. 20" I - ------- I -:-: ~ 2-/ ~_ 0 El'cdeJ A.fU~ .-\-0 b~ t~II..J--:::'~""- .. -- ~.. 1'.r\~/ ~. i,e,;-t V'.:A.M.f' <r-- I FIll ~reA ~\tlW NWL (""':'+1'10\ l 'tioeJ ~c(de; \".:;:: }O' NWL ( f'-.lDv.+h AlkmdH./e ':::au () cl <.:.1 c. 10 ";:i'=,' "y\ W~ ~~ -' N CJ C_J C.Y ~._..JtIo, ~- '-.t, .! ,,"-:- 04 05 Waterside Ii , ,: " i ~ _";'_J Os reY .. . ~'~.'n.~"',.' . ~..'~ '" ~-fl~hd "':':~~~~1" "mirJ.ond oint ~...~;~~,~ . (54" ....; . r f- ~r {I " r'" . III ~~L. ;,... ' ........\ :.'" ~ ,"~~~ .. . ~......... ~ ~'",._..-. _ .""'J:~.~f't~I.f!.l:.(~:t~. ..;I'!l~, . ,$..,-:, ,.-. _'.'~"'~'.. .",'":Ji~...:,.'.", ~;V:~',.", :'" . . . . ~.. ,,,. :' ~ :., ',l , Harvey Poi"t ~ "2 C 05 I- .~ '. ( ..... .... . . :~.~; '. :.. .. ,~~., l:... . ".q .~, ."\ ,.,."r"d:~ ...~.."':'\.. .,l~,.,:.'" 4.~"'tA ~'fr"'" "",' . "!-t,. .. ~'J " .1. .f~ '... 'f' 1/. .I I r~ .-," ~.jo;:..:t I~ ~;. ..-": ~t;F':'!i".' fi .1:,: !~ ,"'~":,,~ .~. ;11' ~.t .,c't ;.~ JJ' :i~/{. ;.~.'~*~. ~,:; .2 ~: .~.;.1t1 SJ fi ~t .' .1' ~.f;" I~\','.~: ':.~: j . " ..~ '-.:.. ~" , --.,~~ ""~~,," ,; ,'"i[: _ . , y',"'," ~ ". . ,.... ,~!,,~ -..... / J /-::.' "."W '0) CIO ~J ~'. '" . "";'" ~ ...:/ · .~:!" 8P ,I: ~ 11~~"=--~~'9~ /'~~CPC~I CIO r:N I~ I]} N~/;'.I/~ -, ....~\I~\I\I\\I\I\llm~ ~~ y~'lI ~ ?~~^:J.# ~ ~ J 1/2f / li' '" ".:Vf ~... .,~ ~~\\'( N '- ,,~c ' "~ ~= ~~ y\~ N( ~~. /' j .<' / ~.. ~ . ~\\\~\\I\\I\1I1111 :q .:i~~""::::::::- r.:i:' " '/<tf.... ~ N'l / / CIO "~- ~l1.\\\~\"\ \ I I PI.'?fltlt(;I(;{(~~1II Cl';: N'l.-/"h<,\:CZj:, I fa J?-#,~",!!!'", /~~ \ \ .. ""7" v ,r I ~~ ~i ,~':l ,~.,p, ~ \ a.. a. co N ~ Q ~ W k:'''-:'~ " .-.\ g'\ ~ ~ U / /~ l ~,.-:! " . \ 1'.> .3 ~or: " co 15 w -: ~ 'I ~ Sli ... t, in ... ~ ~r(-",-j:JI<t/~V ~ cl{- lJ" ~III/ ~~~- "1",it!!J,1 20L5 ~~ ~ ." il))~~ ~ ' ~ ~ VJr.... ---.~ ~"-:}':':~I;;:L~"'; '.:,".r,-"!!! ~ ~ - .l; '1 N - ..... ~ == i.:a;,:' t; """~y" . .g co ~ a: \\ ' u -g .;~,-~~ 0" ,,' ',' ::1: '~! 2" ~... ::> II N w!!! ~ ~ ~ ~ '! -, , ~\ ~ 17 ..../,~I"\.'r. ex ~ "J/ Q ~ J1Cl '" I ~ ~..;.. ~\ 1::::::".:'" 1} ,[,1 "- f- (ID, \ 4: ~ It - ill ~ ~ \, -: " ~ ri t~'t ~ ~ ~ er\ N 1 ~ , ~ ~ ;""~ / <l',.~ Ii"'" g ~~ II ...,~ y ~ -,--,~ I :5 ~ ~~~ 1 ~f,o~..?,-:\ t: I bl' ~ ~ \ ~ J r- ~(;.#: A~~., "~- 'I ~ ~~ "Z~ ~ ~ "''I~tlllr/ I I I I ~~' -t~: fEY ij.. ~o.:;:; -!-> : ~ ~ EC08 1//111/111 1111111"" (i) j,' ~ ..~~ -/ ~-c. ~E~"" - - -g ~- ~ "1r'~~I,I//, ~ ~ \~ M...... = J ..--.... ~ -~ ~ \' "lfllll. 0 ~ ~,~ ) .. ~ 11 U (~~ ~r c, " ')"c,.:~o N'l ?;" \~' \0 co 0' '/1/111111f11/" '. ;~~ "j ~r'C' (M ~ -=~~fh~d~ JJ ."l~'~il ~ ~ ... .~ ~ cID 1~'\.9 ' en - ~ I.... - - ~ is \w~~~( ~~. 0>- 1_'" ~! .......- ~Q ~ ~ I ~C>~~~ '- r " A /~ IL ~ "'f-- ...- ~ '~V ~'---...~::f IP ,/::1 ~~~~~~...,-_..-X~ ~ ~j~ ,,~:'0~d .~~ I ~ ~l , .; _ 1/ VVJ\f1J ~ !:1 ~~ A l~\... \ ~ CI ; ~/~ JL ~I ~o. v g ,~~, ?, \ \ 41 '" ~ Uy "" tID.-' N;; \IV ~ I~ ,- ~. 6 ,. ~ ~-~" ~ ~ i ".. \ f)>> ";~,, · ~~. · ~ i · C\I .~- \~:ij ~-s U:I~': ?.. II ,~ \? I N ~ ' oo.ft'~ - '~,~~!~ ~r ~ ~ ~ :~r ~ '. ~~ N'l ~I (;\ t---~ .0- ~, v Cl -EJ \ ~" LJ;,} 4 ,.') ~:/) ~,~ ..)..~ ~ f\' ~ ---~] ~nt~ '" :;. S"~~ -/J ~ =~~~#f\ I ]", .--i v 0 ~~~, ~ -?- ~i~'~" ~~ m~l ~~ __~, ;; 0 :1 (: ~I - '\ :<~JV~~" ~A~~mr-f\J ([QjjrJJ;:!~ \~\ ~l.~ , ~ / ~/., IZlo/' k,~ ~'k;J.(-~~):;) ~\' illl f? 1I If.... ~tl;~. cok..1 ~~~- ~....~ )~~} pj ~. ~,r],ta: ~ .ti~"\~"f "~';> )E~ 9 ~ ""?f ~~01~~ IJ~ J.2g ~l ' ~.~ , A CY _ >> Us-.. ... ~ ~ ~ CJ d J.: cl.~ <0 / j,.,.,c:~" r. T ~ ) . ~ '1 ~'1 I ~ N /h r""'-o . v- &'0 .. M- O'l IN o Co+ o Mf-. o -<><0 o ~ ~ in 9 pOll::J su/or:.::" in M MO 0 0 D~- aLt2.1 IN REPLY REFER TO DEPARTMENTOFTHEARMY WilMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office P.O. Box 1000 Washington. North Carolina 27889-1000 March 14, 2005 Regulatory Division Action ID No. 200510622 Melvin H. Cooper, Jr. Post Office Box 1008 Elizabeth City, North Carolina 27906 fo)@,@@,~~@,~ \l\\ MAR 1 5 1.005 ~D QUA\..\it' OE.NR. w"'~M1~'ttR B~ ~>>ID SiVl'''''' Dear Mr. Cooper: On January 1, 2005, we renewed general permit No. 198000291 (copy enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received March 3, 2005, for Department of the Army authorization to construct a boatramp, pier, boathouse, and boatlift, on property located off State Road 1433, in the Harvey Neck Community, adjacent to the Albemarle Sound, in Perquimans County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State-Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. Only after receiving such confirmation should you begin work. -2- Your application, pursuant to Section 10 of the River and Harbor Act and Section 404 of the Clean Water Act, has been assigned Action ID No. 200510622 and will be coordinated by Mr. Raleigh Bland in our Washington Regulatory Field Office. Mr. Bland is available at telephone (252) 975:-1616, extension 23. --SIhcerely-;------- --- - ~~ Raleigh Bland, P.W.S. Regulatory Project Manager Copies Furnished (without enclosure): Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Ms. Cyndi Karoly Division of Water Quality N 61th Carolina-Department of-Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Ted Sampson, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 0>- 04 al ..... ) IN REPLY REFER TO DEPARTMENT OF THE ARMY WilMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889-1000 March 14,2005 Regulatory Division Action ID No. 200510622 Ms. Cyndi Karoly Division of Water Quality North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 ~@@@llW@@ M1R 1 5 2005 WJ:Tr ~f!R" WATER QU ....f~ANoSTORMWA~/~ Dear Ms. Karoly: Please reference the application of Melvin Cooper for Department of the Army authorization and a State Water Quality Certification to construct a pier, boatramp, boathouse, and boatlift, on property located off State Road 1433, in the Harvey Neck Community, adjacent to the Albemarle Sound, in Perquimans County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. Weare considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, in most cases, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request, or asked for an extension oftime, by May 13, 2005, the District Engineer will deem that waiver has: occurred. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, Regulatory Branch, telephone (252) 975-1616, extension 23. .~:o~l~ ::;~d, P.W.S. Regulatory Project Manager -. - . Copies Furnished (without enclosure): Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 I -2-