Loading...
HomeMy WebLinkAbout20190628 Ver 1_PCN Form Submission_20190510DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20190628 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Kevin Barnett:eads\khbarnett Information for Initial Review 1a. Name of project: US276 Shoulder Repair on Davidson 1a. Who is the Primary Contact?* Dave McHenry 1b. Primary Contact Email:* dgmchenry@ncdot.gov Date Submitted 5/10/2019 Nearest Body of Water Davidson Basin French Broad Water Classification WS-V, B, TR, HQW Version# * 1 Reviewing Office* Asheville Regional Office - (828) 296-4500 1c. Primary Contact Phone:* (828)586-2141 Site Coordinates Latitude: Longitude: 35.289243-82.761569 FA. Processing Information U County (or Counties) where the project is located: Transylvania Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r' No (NCDOT only) T.I.P. or state project number: WBS#M 14.108711 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? t' Yes r No Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r- Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r- Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No F. Applicant Information 1d. Who is applying for the permit? [J Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? f Yes r- No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT, Division 14 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 253 Webster Road Address Line 2 city Sylva Postal / Zip Aide 28779 2e. Telephone Number: (828)586-2141 2g. Email Address:* State / Frwinre / R�gion NC Q�untry USA 2f. Fax Number: * r Yes r No r Yes r No dgmchenry@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (i appropriate) 1c. Nearest municipality/ town: Brevard 2. Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address US 276 Address Line 2 City State / Province / legion Postal / Zip Cade Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Davidson 3b. Water Resources Classification of nearest receiving water:* WS-V, B, TR, HQW 3c. What river basin(s) is your project located in?* French Broad 3d. Please provide the 12-digit HUC in which the project is located. 060101050100 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* National Forest along US 276 and Davidson River. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) US 276 Davidson April 2019_verified Maps.pdf 676.67KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 20190510_15074403974_10_Hydric_Rating_by_Map_Unit.pdf 282.99KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 100 4h. Explain the purpose of the proposed project:* The purpose of the Hark is to repair an eroding river bank that may eventually cause the collapse of pull -off along US276. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* A track hoe will be used to carefully pull soil back from edge of river to point where solid ground is hit. Large shot rock and class 1 will then be used to rebuild the river bank. There are no drawings, but attached is a photo that generally shows the type of repair. 4j. Please upload project drawings for the proposed project. Typical shoulder repair.pdf 880.79KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r^ Yes r No C Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? DProposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): F Wetlands 7 Streams -tributaries F Buffers r- Open Waters r- Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* I bank repair Permanent Bank Stabilization Davidson River Perennial Both 75 E(0_1:_) 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 80 0 3i. Total stream and ditch impacts: 80 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The trees stumps adjoining the failure will not be removed to avoid destabilizing the bank further. A minimal amount of rock will be used for the repair. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Eroding soil will be gradually scraped back and hauled off to minimize soil loss to the river. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent toprotected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Not subject. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments: This maintenance work is categorically excluded from environmental documentation. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * r Yes r No 2b Provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This is bank stabilization work only. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No r' Unknown What Federal Agency is involved? USFS 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Field Review by qualified staff Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT HEU 7c. Historic or Prehistoric Information Upload US 276 Davidson archaeology quick screen.pdf 78.48KB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: This will repair an existing eroded bank along comparable contours to pre -damage conditions. 8c. What source(s) did you use to make the floodplain determination?* FEMA Miscellaneous v Comments Pictures of existing damage are attached. Miscellaneous attachments not previously requested. US276 slide Davidson.pdf 1.01 MB US276 slide Davidson_2.pdf 1020.97KB US 276 Davidson USFS comment.pdf 82.9KB F Signature * W By checking the box and signing below, I certify that: I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Dave McHenry Signature Date 5/10/2019