Loading...
HomeMy WebLinkAbout20071134 Ver 7_Quartz Corp Reclamation Plan_201905133/2013 Reclamation Plan for Contracted Projects Waste Site Date: 4/7/2017 Contract Number: C203358 TIP No: R-2519B Project No/VMS Element: 35609.3.S2 County: Yancy & Mitchell Contractor: Wright Brothers Construction Co Inc Responsible Person: Tanya Ball Contractor Address: 1365 US Hwy 19, Mars Hill, NC 28754 Property Owner: The Quartz Corp USA Phone Number: 828-765-5500 Ext 7891 Property Owner Address: PO Box 309, Spruce Pine, NC 28777 Property Address: Pine Mountain Mine Rd, Spruce Pine, NC 28777 Total acreage of proposed site: See Permit No. 61-06, Mitchell Co. Expected depth of waste: See Permit No. 61-06, Mitchell Co. Present use of land: See Permit No. 61-06, Mitchell Co. Proposed use after reclamation: See Permit Yancey County - Permit No. 00-29 Expected type of waste that will be placed in the site (examples: asphalt, concrete, soil, stone): See Permit No. 61-06, Mitchell Co. Proposed sequence of placing waste (include proposed slope rates): See Permit No. 61-06, Mitchell Co. Did the Environmental Evaluation indicate the presence of any wetlands or endangered species?(if yes, briefly list findings and physical means by which area will be delineated): See Permit No. 61-06, Mitchell Co. Borrow and Waste Site Reclamation Plan Procedures for Contracted Projects 15 3/2013 Is any portion of the pit within a watershed with riparian buffer zone regulations? (if yes indicate physical means by which buffer will be delineated and how diffuse flow will be maintained): See Permit No. 61-06, Mitchell Co. Is the site adjacent to High Quality Waters as defined by the Department of Environment and Natural Resources? (if yes, note how the devices have been designed to meet DENR requirements): See Permit No. 61-06, Mitchell Co. Are there any conditions identified on the State Historic Preservation Office Review Form for waste activities? Explain: Describe the intended plan for the reclamation and subsequent use of all affected lands, and indicate the general methods to be used in reclaiming this land, including any stockpile areas, haul roads and ditches. Describe the sequence for reclaiming the site. Attach a map illustrating this plan, showing the location and design of all temporary and permanent erosion control devices. All features must comply with the appropriate specifications, standards and reflect Best Management Practices (BMP). The plan must indicate setbacks to adjacent properties, buffer zones and wetlands. See Permit No. 61-06, Mitchell Co. Describe the proposed schedule of permanent seeding and mulching. Detail the frequency of permanent seeding and mulching. Note that a permanent stand of vegetation is required prior to a final inspection: See Permit No. 61-06, Mitchell Co. Borrow and Waste Site Reclamation Plan Procedures for Contracted Projects 16 3!2013 Property Owner's Statement: I hereby certify that I am in agreement with this development, use, and reclamation plan, and any exceptions noted when approved by the Engineer, and that I understand that I will be responsible for the site upon completion of its use in the construction of the project noted in the map legend. I understand that this plan, when approved, will serve as a guide in controlling erosion and sediment in accordance with the Mining Act and the Sediment and Pollution Control Act and as enforced by the North Carolina Department of Environment and Natural Resources (DENR), I understand that any work exceeding the minimum necessary for compliance with DENR requirement-, Should be negotiated between the Contractor and the Property Owner. My signature below authorizes The Department of Transportation (DOT). the Department of Environment and Natural Resources (DENR) or its agents, to enter upon my property for a period of one year from the date of final acceptance of the project for which this site plan is executed. If necessary, the DOT will be allowed to have the Contractor repair any areas that are not in compliance with DENR requirements. After a one year inspection is held, I will be solely responsible for assuring that the site is in compliance with DENR regulations. I have the right to change the condition OfIbC site after the final inspection and prior to the one vear f6flow-up inspection. However, irl make such changes, I acknowledge that DOT is released from all obligations and conditions of this agreement and I will become solely responsible for the condition of the site beginning on the date that I change the final inspection condition. L- Sig ,natures: L Contractor's Representative: A1 61 U//; J) I - (aut=- 'ed To sign suplenienval agreements / date) Owners of record: C421-5.24J it. 'L q /111 s naturWre,date (si-Z77n'atuTcTda-V,�� / 7 (signature/date) (signature/date) (signature/date) (signal urci -date) Resident Engineer: (signature ;hate) Borrow and Waste Site Reclamation Phan Procedures for Contracted Pro' 17 Projects 3/2013 Exceptions N/A Concurrence with exceptions: Property Owner: (signature/date) Attachments: Site map with details Environmental Evaluation Cc: Contractor: (signature/date) Borrow and Waste Site Reclamation Plan Procedures for Contracted Projects 19 DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT for the operation of a mining activity In accordance with the provisions of G.S. 74-46 through 68, "The Mining Act of 1971," Mining Permit Rule 15A NCAC 5 B, and other applicable laws, rules and regulations Permission is hereby granted to: The Quartz Corp, USA Pine Mountain Mine Mitchell County - Permit No. 61-06 for the operation of a Feldspar, Quartz and Mica Mine which shall provide that the usefulness, productivity and scenic values of all lands and waters affected by this mining operation will receive the greatest practical degree of protection and restoration. MINING PERMIT EXPIRATION DATE: June 3 2026