Loading...
HomeMy WebLinkAbout20071134 Ver 7_Restoration Plan_20190513Restoration Plan At Boone -Woody Mining Company, Inc. NCDOT Contract: C203358 Yancey County Prepared by: Tanya Ball W IGW BROTHERS c�ridThut,�xtQwrs,r.r TABLE OF CONTENTS 1.0 PROJECT AND SiTE DESCRiPTiON..........................................................................2 2.0 GENERAL WORK ACTIVITY OVERViEW................................................................2 2.1 WORK HOURS AND SCHEDULE......................................................................2 2.2 EQUIPMENT /MATERIAL STAGING AND PARKING..................................2 2.3 DEBRIS/STOCKPILE STAGiNG.........................................................................2 2.4 HAUL ROUTE / ESTIMATED VEHICULAR TRAFFIC..................................2 3.0 HEALTH AND SAFETY..................................................................................................2-3 4.0 RESTORATION ACTiViTiES...........................................................................................3 4.1 PRE -RESTORATION SURVEY..............................................................................3 4.2 GENERAL RESTORATION ACTiViTiES...........................................................3 5.0 STRUCTURAL RESTORATION ACTiViTiES...............................................................3 6.0 MATERIAL RECYCLING AND RESTORATION DEBRIS DiSPOSAL......................3 7.0 STORMWATER POLLUTION PREVENTION (SWPPP) AND EROSION CONTROLPLANS(ECP)........................................................................................................4 8.0 RESTORATION EQUiPMENT...................................................................4 1.0 PROJECT AND SITE DESCRIPTION Wright Brothers Construction Co Inc. has prepared this Restoration Plan, hereafter referred to as the "Workplan", for the purpose of providing a detailed description of removal procedures, which we will be implementing during the offite removal of the material placed at Boone - Woody Mining Co Inc (Pin: 085003002620000), located on NCDOT Project C203358, Yancey, NC. 2.0 GENERAL WORK ACTIVITY OVERVIEW The work covered under this Workplan will be conducted in a sequential manner, with some activities being conducted concurrently with others. Restoration work will be performed in accordance with OSHA, NCDOT, and the requirements of the federal agencies. A summary of the general sequence for the work activities is outlined as follows: • Pre -inspection of the site to confirm the area of disposal • Pre -construction measurements of the area • Installation of the turbidity curtain • Excavation of the material placed at the site • Removal of material to appropriate offsite disposal/recycling facilities. 2.1 WORK HOURS AND SCHEDULE Restoration activity shall be conducted between 7:00 a.m. and 6:00 p.m. on weekdays and weekends. Restoration work is expected to take approximately one week. 2.2 EQUIPMENT /MATERIAL STAGING AND PARKING Vehicle and equipment parking will initially be located at the excavation site; however, staging and parking may occur in other areas of the site during the course of Restoration activities. 2.3 DEBRIS/STOCKPILE STAGING Soil and debris stockpiles will initially be staged in the existing roadway area of the site within the terminated roadway; however, staging may be rotated to other site area during the course of Restoration activities. 2.4 VEHICULAR TRAFFIC Public vehicular traffic will be protected from the Restoration area. Flaggers will be used as needed. 3.0 HEALTH AND SAFETY Wright Brothers shall consider safety and the prevention of accidents an integral part of its operation. Under Federal, State and local laws, Wright Brothers is responsible to provide a safe working environment, and to protect life, health and safety of its employees and subcontractor's personnel. Although providing safe working conditions is primarily a management responsibility, safety and accident prevention can be accomplished only through coordinated efforts of all employees and subcontractor personnel. If the task or service being undertaken cannot be done safely, we shall discontinue work until proper controls can be established. Wright Brothers will hold daily tailgate meetings for its employees prior to work commencement. These meetings are designed to discuss the projected work schedule and prepare each worker for any potential hazards associated with the work activities. All personnel attending the safety meeting will be required to sign the safety -meeting log upon completion of the tailgate safety meeting. During the tailgate meetings, personnel will be reminded of site conditions and are encouraged to participate with health and safety concerns. 4.0 RESTORATION ACTIVITIES 4.1 PRE -RESTORATION SURVEY Prior to commencement of Restoration, a thorough walkthrough and evaluation of the site will be conducted to confirm that all appropriate measures have been completed to ensure that the area is ready for commencement of Restoration activities. 4.2 GENERAL RESTORATION ACTIVITIES In general, the tasks will include a variety of procedures. The most important aspect in the development of these procedures will be the safe conduct of the work. Wright Brother's procedures will limit the use of labor to the most controlled and safe conditions and rely upon mechanized means of removal wherever possible. Excavator and haul equipment will be utilitzed to haul offsite and recycled accordingly. Restoration will be conducted in a manner that does not interfere with or encroach upon the existing surrounding. 5.0 EXCAVATION RESTORATION ACTIVITIES Wright Brothers will install turbidity curtains around the work area. We will excavate from existing ground level down to reclaim the material. Stabilization surrounding area will be done as needed. 6.0 MATERIAL RECYCLING AND RESTORATION DEBRIS DISPOSAL In accordance with the Waste Management Plan, all Restoration debris will be loaded into semi - end dumps and hauled to an approved reclamation site. 7.0 STORMWATER POLLUTION PREVENTION (SWPPP) AND EROSION CONTROL PLANS (ECP) Wright Brothers will follow requirements for stormwater management and erosion control as specified in the SWWPP. All equipment will be checked for leaks and drive train cleaned before getting in proximity of the water. If additional reach is required to work safety, crane mats will be available to assist in the positioning of equipment. 8.0 RESTORATION EQUIPMENT The following will be the major pieces of equipment used in the Restoration, additional equipment may be necessary based on conditions. • Cat 336 Excavator • Semi -end dumps 4 .� ±► lk •t• ,:apt ' � �� i r