Loading...
HomeMy WebLinkAbout330030_PERMIT FILE_20171231Feb 10 10 12:08p p,1 Tarboro Field Office 201 St. Andrew Street Tarboro NC 27886 252-823-8187 ext. 130 252- i41-7902-FAX rom the desk of Margaret Knig t To: Buster Towell Division of Water Quality Fax: 1-919-571-4716 Pages: 5 including cover Phone: 1-919-791-42 D0 Date: 211 D/2 010 Ree CC: Z6i0ud13f 0 Urgent 0 For Review 0 Please Comment © Please Reply ❑ Please Recycle • Comments: This is the plan of action for Robert L. Johnson. Feb 10 1012:08p p.2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: ^33 - 30 County: Edgecombe Facility Name: Johnson Livestock Certified Operator Name: Lary Johnson Operator ff t. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Namelidentifier (ID): 1 Spillway (Yes or No): 0 Level (inches): —17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. _X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed. sites with related facility number(s), number acres and receiving crop information, Contact and secure appraval from the Division of Water Quality prior to -transfer of waste to a site not cohered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2112/2010 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Larry Johnson Garility CluunarlMananear f nrintl oA Cover Page (262)903-2640 Phone: Date* 2/812010 Feb 10 10 12:09p 0 p.3 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD L TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Sturcture Name/Identifier (ID): Larry Johnson 33 - 30 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18 inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c, line b - line a (inches in red zone) 1 inches d, top of dike surface area according to design (area at below structural freeboard elevation) 68043.4 ftz e. line c x line d x 7.48 gallons = 42413.7 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g, volume of waste produced according to structural design 63298.1 ft3 h. actual waste produced = 1920 current herd# x line g = 44193.6 ft3 2750 certified herd# i. volume of wash water according to strucutural design 0 ft3 j. excess rainfall over evaporation according to design 81410.8 ft3 k. (lines h + i + j) x 7.48 x 30 days = 156587 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 3/18/2009 2.6 Ib/1000 gal. m. (lines e+ K) x line I = 517.401 lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Feb 101012:09p p 4 1. structure 10: line m = 517.401 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line rn = lb PAN 5. structure ID: line m = Ib PAN 6. structure ID: line m = lb PAN n. lines 1+2+3+4+5+6= 517.401 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD, o, tract # P. field # q, crap r. acres s. remaining IRR - 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s U. application window' 2012 15 o/s sm gr 7.4 50 370 10/1- 3/31 2012 6 o/s sm gr 5 50 250 10/1 - 3/31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 IState current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period V. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE 620 Ib/PAN PA Feb 1010 12:10p p,5 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (3D) DAY DRAW DOWN PERIOD w. Total PAN to be land applied (linen from section ll) X. Crop's remaining PAN balance (line v from section III) y. Overall PAN balance (w - x) _ 517.401 lb. PAN 620 lb. PAN (102.60) lb. PAN Line y must show as a deficit. if line y does not show as a deficit, list course of action here including pump and haul, depopulaton, nerd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Narrative: POA (30 Day) 2/21/00 3 q + DiVisid'n ©f Watee Resiiu`rces" ...,; t�Iw�uHntIIIHH Hlt��ls�§lt I,€ �rrrt�(ltllllill Elul ' i 11190111ty Nutnber - I Di sion of;Sall and Water Conserr+atian 0 Other Agencyd Type of Visit: Com cc Inspection Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: = Routine O Complaint O Follow-up Q Referral p Emergency Q Other Q Denied Access Date of Visit: -2 �1 1_ Arrival Time: Departure Time: �7 County: Region: Farm Name: I I"Z h Lf +4 Je1%- Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: ! ' aad. p,C Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: gn Current 79f• t F�Pcb" Design VIR[ rl", CurrentDesign li§:9 ]I v 1 }ly� pd'�I Curyr�ent 1IIEd`�XliSwine. city Pop. Wet Poultry Gapacity� U26P19IUIHIISEn Pop. Cattle Capacity s 0 iiHll r 13ii}i;lr Nl EllJlpll itl}Ib#Fd$l#311i1 EE 16 €III lH 1 INk� M111lf[ iff I Wean to Finish La er DairyCow W an to Feeder Non -Layer DairyCalf Feeder to Finish ��� i�� DairyHeifer Farrow to Wean Design Current+ D Cow Farrow to Feeder D Poult . Ca ae �Po� . Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other, Turkey Puults Other Other NipFs€.€Ek€s€!f!€! t I € €?€>€�t€pptlinn.wNt:pRl€SnidlillYlmfiiu lVK3kilAlh`MalYrw.YUWgheiy€q�€%llu.iilMlWfMSiF.t3Yff>iEi3i�l!!N!i!ul.l.ux................ I Discharges and Stream Impacts 1. is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA rN ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes 90106 oNA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 214,12015 Continued Facility .Number: - ?,A Date of Inspection: . 2 .�, Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [] Yes NA rNo ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): a4 el' o� Q 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ YesZNo NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No [] NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta rest, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No [] NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN [] PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): r $ part C1 ` 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? 0Yes V ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes VNoNA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? El Yes NA [] NE 18. Is there,a lack of properly operating waste application equipment? ❑ Yes NA ❑ NE Re aired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ YesgNo o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the a ro riate box pp p ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [] Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA [] NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continues! F'aeili Number: - Date of Inspection: —2- 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �N ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA [j NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ Ni Comments ■!r'efe"r`E:to+(yy°uestion'i#l■ Ez'"lain"any.'-YES,a'nswersi'and/or(lanY°'additioral'lrecommendation's%'r°an 1,'other"comments:{``tir I+II ji ,;$`-1i i a6.. Q. 1. \Ei€'-5-11.1i "il illlll .II.' o t:, III'IIEYif`ei I.I� f f' PIE�P 51adl +f. E€:. ,ti ,€ I' f.l.k:!;,ligl�l,l.1:3€�3,,L I,., ve.�ll . II'Qil.� .<tiI!II".ftE,l.l !, .. I,.dNt. Nt d.rawrngs,o%iailatyi to. better.,ex .lain! s>tuatiolns (use ,add�tJonaf ages as; necessa _ry),Ilt Il a ill !il 1E.. orb-��.,� 5 urn � v` C� � o ReviewerAnspector Name: Reviewer/Inspector Signature: s4iw - Page 3 of 3 Phone: 7 9 ' q sac? Date: Y 2 I 21412015 5,- (Type of Visit: .0 Co ance Inspection O Operation Review O Structure Evaluation p Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergenev O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: i jj J % Farm Name: [?J✓� J� n Itw f&1 Oner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: &%'4-2i Certified Operator: Back-up Operator: Title: Location of Farm: Latitude: Phone: Phone: _ Integrator: Certification Number: Certification Number: Longitude: Region: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capcity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Dairy Calf DairyHeifer Wean to Feeder Non -La er I Feeder to Finish Farrow to Wean D . P■aultr, Design Ca acit Current Dry Cow Farrow to Feeder P■o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -La ers Beef Feeder Beef Brood Cow Boars Pullets keys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes e No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? / d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesrN ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued 1FAcilit y N mbar: - Date of Inspection: r 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes��No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [] Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes IN ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes V A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [] Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑NA ❑NE ❑ NA ❑ NE ❑NA ❑NE Comments (refer to question #): Explain any -YES answers and/or any additional recommend466s or any other comments: ` Use drawings of facility .to better explain situations (use additional pages as necessary). /) �,3 � 2-61 6 ��ti%� 5�rr'r2y vo cv 59 Reviewer/Inspector Name: i?_'! —/� r a- ( 11 di Fps Aq5 - zoa-� Phone: Reviewer/Inspector Signature: �j , jPiJ� ((�f,� P Date: r— Page 3 of 3 21412015 lFacility Number: - Date of Inspection: If Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate'? ❑ Yes N NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): f/ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes;No No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment eat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ YesVNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No .❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area s 12. Crop Type(s): . SC49- A; 4?-rAA7,,rr 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes ,EnXb ❑ NA ❑ NE ❑Yes L] No ❑NA ❑NE ❑ Yes J `VU ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ YesjNo 0 NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes g �No ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code. ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall InspectiFNo Sludge Survey 22. Did the facility fail to install and maintain a rain gauge'? El❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA ❑ NE Page 2 of 3 21412015 Continued c Type of Visit: CO ConwHance Inspection 0 Operation Review p Structure Evaluation Q Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: 1 46 �:M County: Farm Name: 'T_ 60�iOwner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: �L `fir Integrator: Certified Operator: Back-up Operator: Location of Farm: Certification Number: Certification Number: Latitude: Longitude: Region: Design Current Design Current Design C►urgent Swine Capacity Pop. Wet Poultry CapacityCattle Capacity Pop. Wean to Finish La er DairyCow Wean to FeederL Non -Layer DairyCalf Feeder to Finish DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder D . Poultry,Ca aci Layers Po Non-Dai Beef Stocker Farrow to Finish Gilts EIFPNon-Layers Beef Feeder BoarsH Pullets Beef Brood Cow Turkeys Qther Turkey Poults Other Other Discharses and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes �No❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes N ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesVNoE] A ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesA ❑ NE of the State other than from a discharge? Page 1 of 3 21412014 Continued Facili Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Identifier: Spillway?: Designed Freeboard (in): No — NA ❑ NE O ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Observed Freeboard (in): 02 p t.,1311 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes gNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes C'No 0 NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN M PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): �"� st",l� . �� gip_& 'V4- 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes 0 ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes 7] No ❑ NA ❑ NE ❑ Yes � ❑ NA ❑ NE ❑ Yes n No ❑ NA ❑ NE ❑ WUP ❑ Checklists ❑ Design ❑ Maps [D Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No [] NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes g24No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412014 Continued 1. Facili Number: -3 113ate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �� No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes rNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [] No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments refer to question # •°Ex lainTan �YES'answers�andlor an additional recoinmeridations'o>•an other.comments:; 'I" Use drawings of facility to better explain'situations (use additional pages as necessary). 2 - rR -r- is _#-/ 0 55 r-;,- -3 ez,-- ct�-L b r e!94 t- P�'-- i - Zt - t 1/ 3- Zfrr V �� �e S c` ��•a,• zo i � Reviewer/Inspector Name: A�nv��� 22 �^ �— Reviewer/Inspector Signature: ��]G�.S' V �� �a-tj -0-- L Page 3 of 3, Phone: Date: 5- iC 21412014 W, jType of Visit: rQ Compl' nspection U Operation Review Q Structure Evaluation Q Technical Assistance I (Reason for Visit: 0 Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access }[ Date of Visit: [ l Arrival Time: Departure Time: County: Farm Name: fgtnr ,/ —_ _ ��-+ Jz Q-N �.— Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: r , Onsite Representative: Certified Operator: �l Back-up Operator: Operator: Location of Farm: Title: Latitude: Phone: Phone: Integrator: �n 6r ­.x Certification Number: Certification Number: ' Longitude: Region: De11,s1114ign Current MMURIVA.IIDesign t ry Current Design Current Swine Capacity Pop. lt.ry Capacity Pap. Cattle Capacity Pop. Wean to Finish La erI Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder IQ). P._ouitr, Ca acit P,o ,. Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars I Il'uIlets Beef Brood Cow Turkeys Other TurkeyPoults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes VrNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No _ ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesF0_ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued ' I lFaellity Nuntber: - 3 Date of Inspection: X13( L- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �3 Structure 2 Structure 3 Structure 4 �r 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Structure 5 No NA ❑ NE No ❑ NA ❑ NE Structure 6 0 Yes No ❑ NA ❑ Yes ZrNo ❑ NA ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes WNo ; ❑ ❑ ❑ NA ❑ NE ❑ ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable CropWindow❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): r in, 4'1 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 1� 0 NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes N ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists []Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued f � , Facili Number: - -3 jDate of Inspection: j r 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [7 s10 ❑ NA ❑ NE the appropriate box(cs) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Vo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes a<o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately, 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No [DNA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [] No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No [] NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments, (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawinss of facility to better explain situations (use additional pages as necessary). ra L t'b � --� P 20-t <( Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: % ! �- L/ Date: 21412011 Date of Visit: �� Arrival Time: Departure Time: County: Region: Farm Name: �} jr�J�,,(a„r— �y� rtS bi+ ilei+��. Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: /% I'� Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Wean to Finish La er Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Farrow to Wean Design Current Drt Poult . Ca aci Po La ers Dairy Heifer Dry Cow Farrow to Feeder Farrow to Finish Non -Dairy Beef Stocker Gilts Non -La ers jBeefFeeder Boars 1pullets I Beef Brood Cow Poults Other Discharges and Stream lml)acts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes gNo 0 NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ YesWNo[:] ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facility Nu3nber: - ,3 a Date of Inspection: -3 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. if yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 dNo NA ❑ NE 2-No ❑ NA ❑ NE Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No 0 NA (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �Noo NA waste management or closure plan? ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t eat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �jrNo NA NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 0 3 P'►—n, t' .1,o 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA D NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �No ❑ NA ❑ NE l6. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No -❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ffNo ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [:]Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall InspectirNo Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA ❑ NE Page 2 of 3 21412011 Continued F701ity NUmber: jDate of Inspection: 3 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �l "' NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ No A NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [] Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems; over -application) 3 t. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). � Z ow ( Y paka/� Reviewer/Inspector Name: - Z'g� / L/ olL ?_ze�-iy i —U-f V �-zl--( `j Reviewer/Inspector Signature: 1•� e S'�'1'� -t' Page 3 of 3 Phone: `J v -7-0 t> Date: 21412011 FE Type of Visit: Co nee Inspection Operation Review 0 Structure Evaluation O Technical Assistance Reason for Visit: Routine Q Complaint O Follow-up O Referral O Ememency O Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: ILCi}- — r. p.� fir} (2- �_- Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Phone: Onsite Representative: Certified Operator: ( & Qt tL- Back-up Operator: Integrator: Certification Number: Certification Number: Location of Farm: Latitude: Longitude: Region: Design Current Design Current Design Current Swine Capacity Pop.. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf ceder to Finish )L Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dr. Youltr. Ca ci I?,o Non -Dairy Farrow to Finish La ers Beef Stocker Gilts on -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? [—]Yes: No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? [-]Yes VNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d: Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ YesFNo [] NA [3 NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [:]Yes C-oro NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes �No[] NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): it .� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes N ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes OeNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes <No NA ❑ NE maintenance or improvement? 1. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑Yes No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑t Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYpe(s): lgsCA, 130—c- e^ +� G' 4 ,T''r,S' 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? [:]Yes N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes VNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes Q/ NN ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes rNA ❑ NE the appropriate box. '.❑ WUP ❑Checklists ❑ Design ❑Maps ❑Lease Agreements Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis IV ❑ Waste Transfers Weather Code ❑ Rainfall ❑Stocking ❑Crop Yield ❑ 120 Minute Inspections ❑Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued • Facili Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes PNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE []Yes ❑ No ❑ Yes 0 No [:]Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or.any other comments. Use drawings of facility to better explain situations (use additional pages as necessar }: P: _43 7 I Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 Phone: )If - q 2 L" 4 i-ifi?z e Grp i f Date: f V 21412011 for Visit: (0 Routine U Complaint rw v arrucrure r vaivanon �,.J i ecnmcai zLssisrance 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Timer Departure Time: Q County: Farm Name: �[��,�j ►�Is'n Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Phone: r r Onsite Representative: } ✓r 4ji *--i o A.,, —Integrator: )K 1 r7 T Certified Operator: Back-up Operator: Location of Farm: Latitude: Certification Number: Certification Number: Longitude: Region: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry amity Pap. Cattle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish SIR DairyHeifer Farrow to Wean Design C•nrrent D Cow Farrow to Feeder Dr, Pooutt , _Ca aci Pao , Non-Dai Farrow to Finish La ers Beef Stocker Gilts ayers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ZNO NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes o ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? i d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑YesrNoo NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesNA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facility Number: 3 -^3 tj Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 o NA ❑ NE No Q NA ❑ NE Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta neat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes��No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ZfNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes M No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 1bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes <NoE]NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Mo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes N ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA [] NE the appropriate box. ❑WUP El Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers j ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspecti&No Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yeso ❑ NA [3NE, 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: 33- Date of Inspection: 3 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ZNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes O o ❑ NA 0 NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [—]Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 0 NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) /No 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes eo'o NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ YesjNcoj)/[:] NA ❑ NE Comments to question #); Explain any YES answers and/or any additional recommendations or. any other comments g Use drawings of facility.to better explain situations (use additional pages as necessa.ty):, < Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 Phone: / ! l' y z o () Date: -S Of 21412011 3r2z(t-2-- Type of Visit: 14 Cance Inspection U Operation Review Q Structure Evaluation U Technical Assistance I Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other Q Denied Access Date of Visit: }} Arrival Time: Departure Time: County: Region: Farm Name: P1 Ys Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: �� r Title: Phone: Phone: Integrator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Ca P c ty Pop. CattleM(. MPop. Wean to Finish La er Dairy Cow Wean to Feeder Non -La er Daia Calf Feeder to Finish fi 3 ;` " DairyHeifer Farrow to Wean Farrow to Feeder Dr. P,oult . Design Current (Gtea paci P.a P. Dry Cow Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers I jBeef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes o ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWQ) ❑ Yes o ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facili Number: - Date of Inspection: 3 112, t Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): [�J 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta reat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 0 N ❑ NA ❑ NE maintenance or improvement? 1 I. Is there evidence of incorrect land application? If yes, check the appropriate box below, ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑"Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): k3Q r M h,J_ 114 _S A r_ r4 i •� _.,. _ IF 13. Soil Type(s): . 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes RI o ❑ NA ❑ NE ❑ Yes No. ❑ NA ❑ NE ❑ Yes Ff No ❑ NA ❑ NE ❑ Yes VNo ❑ Yes ❑ Yes �rNo ❑ Yes ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili NuMber: - Date of Inspection: / 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes rNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes Vo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the [—]Yes ❑ No ❑ NA [] NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to,question #): Explain any YES answers and/or any, additional recommendations or;any other comments: Use 'draiwings of facility to better explain situations`(use additional pages as necessary). x, :, , r 5/ CA 0 _r /V P Reviewer/Inspector Name: Phone: 77 I L1 Z 0 0 Reviewer/Inspector Signature: 1� i V w C L I- Page 3 of 3 Date: J ! ou �- 2/4/2011 Ibl [Q 19 Type of Visit (j C pliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visi 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit:! Arrival Time: Departure Time: County: Region: Farm Name: L h I 063yn, Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative:: / Certified Operator: Lftr`3 ekkn=50 Back-up Operator: Location of Farm: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: ❑ e = I Longitude: = ° = , = " Design Current Swine CapacityPopulation Wet Poultry Design C►urrent Capacity Population Design Current apacLty Population E]WeanjeFinish ❑ Layer ❑ Daia Cow ❑ an to Feeder ❑ Non -Layer ❑ Dairy Calf Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Layers ❑ Non -Layers ❑ Dry Cow ElNon-Dairy ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Beef Stocker El Beef Feeder ❑ Pullets ❑ Turkeys ❑Turke Puults ❑ Other ❑ Boars Other ❑ Other ❑ Beef Brood Cow Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b..Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? [Dyes No ❑ NA ❑ NE ❑ Yes o []NA ❑ NE ❑ Yes No JZI NA, ❑ NE ❑ Yes 17A UNA ❑ NE ❑ Yes �No El NA [-INE ❑ Yes o ❑ NA ❑ NE Page 1 of 3 12128104 Continued Facility Number: j Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes "NoNA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z f t 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA [INE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ElYes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �`No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes dNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑Yes 0 No ❑ NA ❑ NE maintenance/improvement? r 11. Is there evidence of incorrect application? if yes, check the appropriate box below. [:]Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area ✓ 1 12. Crop type(s)r �t,pc�/ rM� dlGi 13. Soil type(s) l 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17, Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE No ❑ NA ❑ NE V❑ NA ❑ NE 7N ❑ NA ❑ NE No ❑ NA ❑ NE Comments (refer toquestion :#). ExplaananyYES answers and/or any: recommendations or any other comments,, 3Use drawings of facility to better, explainsituations. (use adchtio.nal pages as necessarsyt): i .6 . .: s:, wx ..:t•Il�t.lt.1:I.`..i " .4i'` t Reviewer/Ins ector Name t t Phone: Z�-t7 P f<< ...1. �' Reviewer/Inspector Signature: .e Date: Q4,4 Z0 Page 2 of 3 12128104 Continued Facility Number: ` —j Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes!No No El NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists El ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate. box below. El Yes ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ An al Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections Bather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes o ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional' Comment's'and/orDrawings Page 3 of 3 12128104 Type of Visit QJC/outine ce Inspection 0 Operation Review 0 Lagoon Evaluation Reason for yisit 0 0 Complaint 0 Follow up 0 Emergency Notification Number I Date of Visit: Permitted [3 Certifi d [] Conditionally Certified D Registered Farm Name: JIA Owner Name: Mailing Address: Facility Contact: 0 Other ❑ Denied Access ime: Date Last Operated or Above Threshold: _ County: .tom Phone No: Title: Phone No: Onsite Representative: I Integrator: e, Cy . Certified Operator: Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ` I& Longitude 0• 06 « Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): .31b I f 05103101 Structure 6 Continued 0 Facility Number: 3j 5 D Date of inspection 0 Y 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) b. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (if any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type "+µ cl�L (SCs�. S'­4 r..n,..-> 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? e) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Reauired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑`No ❑ Yes ON'. ❑ Yes El No ❑ Yes [2'<o ❑ Yes No ❑ Yes Q N ❑ Yes No ❑ Yes N ❑ Yes a ❑ Yes Najd, ❑ Yes [fNo ❑ Yes DNo ❑ Yes El No ❑ Yes Q No,,,".. o,, • ❑ Yes p No ❑ Yes [j No ❑ Yes No ' ❑ Yes'Nq' ❑ Yes o ❑ Yes Vo ❑ Yes [A No ❑ Yes ❑ No No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. .,Sa1*W iy '. -, .. e. .;..... � ec � 4 .<� 3.y.•xk, �...:iTha�f3 d'.cc. Co o enz6ttsn(r`efer toey uestioit.#) Explain any YES answers aad/or'any recommendations or any other comments . Use drawings of facility b better explain situatitiiisr (use additional pages us necessary) :% w [] Field Copy ❑ Final Notes �� Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 05103101 Continued Facility Number: ' — Date of Inspection Odor Issues 26. hoes the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? M Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Additional Comments and/or Drawings:: 05103101 ❑ Yes No ElYes;No ❑ Yes ❑ Yes No ❑❑ Yes V YesElYes Facility Number Division of Water Quality 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit Com nee Inspection Q Operation Review 0 Structure Evaluation Q Technical Assistance Reason for Visit Routine 0 Complaint O Follow up Q Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Z ii Arrival Time: i--;� v Departur Time: County: Region: Farm Name: _ o Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: Certified Operator: leget 11-0 A57 U" 1 Back-up Operator: Location of Farm: Design Current Swine ;:.Capacity Population ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Integrator: Operator Certification Number: Back-up Certification Number: Latitude: = e = 4 = Longitude: 0 ° = ` = Design Current Wet Poultry Capacity Population ❑ Layer ❑ Non -La et Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turke s ❑ Turkey Poults ❑ Other Dischames & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made'? Design Current Cattle Capacity Population_,. ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocket ❑ Beef Feeder ❑ Beef Brood Ca Number of Structures:. �L b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes E No NA ❑ NE ❑ Yes 90<o ❑ NA ❑ NE ❑ Yes No ❑.NA El NE El Yes �❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued 1 c Facility Number: 3 Date of Inspection I & t2_ Vt O Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): ❑ Yes ❑ NA ❑ NE ❑ Yes 9No ❑ NA ❑ NE Structure 5 Structure 6 Observed Freeboard (in): O L 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No -NA ElNE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ElYes o ❑ NA [I NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre t, notify DWQ 7. Do any of the structures need maintenance or improvement? [:]Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑Yes No El NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ZfNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No "NA ❑ NE maintenance/improvement'? 11. is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) -a' �•�_ __, - 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 1p"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 7�w ElNA ElNE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes NA ❑ NE 17. Does the facility lack adequate acreage for land application? El NA [INE 18. Is there a lack of properly operating waste application equipment? El Yes NA ❑ NE Comments (refer to question ##): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: r�j4.,S Date: 12128104 Continued Facility Number: 30 Date of Inspection Required Records & Documents "NoNA 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21, Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �NoClNA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ,2""' D<o ❑ NA ❑ NI; 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ElNA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes _NA A�o[01 ElNE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes NNA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE AdditionalCoirimeiits and/oriDrawingsr �1 1p YP p fl tl: Y#�' ,�• Y"� i`-3' £ ;1 �F. �' Ca? .s Env."i Page 3 of 3 12128104 Page 3 of 3 12128104 IType of Visit 6 Compl' a Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint Q Follow up Q Referral O Emergency 0 Other ❑ Denied Access Date of Visit: �/, Arrival Time: Departure Time: County: Region: Farm Name: SO.d"N t ✓QS Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: 44T4G y ��^s' 0-"_ Back-up Operator: Phone: Title: Phone No: Integrator: da,,_ 5-k — A 3 Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = e 0. 0 Longitude: = ° 0 i 0 Design Current De�stg>i Current Design Current iE#; Swine Capacity Populat�to�n Wet�Prly `Capacity Population Cattle C►apa�cilty Pop non ❑ Wean to Finish ❑ La er ❑Dai Cow ❑ an to Feeder -Layer ❑Dai Calf ❑ Feeder to Finish ❑ Dairy Heifer Dry Poultry ❑ Dry Cow ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Non -Dairy ❑ La ers ❑ Beef Stocker ❑ Farrow to Finish ❑ Gilts ❑Non -La ers ❑ Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys Other ❑ Turkey Poults ❑ Other Number of Structures: ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes eNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ Yes A El NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA rNo [I NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State El Yes NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued Facility Number: — 3 Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: 8 (d rV&IJ Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 2 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes gNo A ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No A ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat ify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes Eo ❑ A El NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes ❑ NA El NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes "NoNA ❑ NE maintenance/improvement'? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes - N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE �Gomments (refer to9'questinn;'#) "Explain,any�YES_fanswers`and/lor,atiy§r6commenda nns or R. any other comments. v.F a - a e pill [:Use', drawings of iacihtyto better explamsttuahons: (use;additional pageshasnecessary): Reviewer/Inspector Name Phone: 7 Reviewer/inspector Signature: Date: I ta Page 2 of 3 12128104 Continued Y Facility Number: —3 p Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ YesVNo NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other 21. Does record keeping need improvement? If es check the appropriate box below. P g P Y ❑ Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YesV NA ❑ NE 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesNA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesNA ❑ NE 26, Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? [I Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did ReviewerMnspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional`Comments`;_andlor DraWings _ It ' }' k':. ' `_� :: Page 3 of 3 12128104 Page 3 of 3 12128104 R (Division of Water Quality y - f %-O Facility Number 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit Com nce inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency Q Other ❑Denied Access Date of Visit: 76 Q Arrival Time: CTI] Departure Time: County: Region: Farm Name: a Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: ,4 Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Other ❑ Other Phone No: Integrator: PR67-A` ` Operator Certification Number: Back-up Certification Number: Latitude: 0 c = I = N Longitude: 0 ° = t = « Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non -La et Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ urkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made`? Design Current. Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co Number of Structures: b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d, Does discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes Y103 NA ❑ NE El YesNA ❑ NE !Yes No NA ❑ NE o A ❑ NE N ❑ NA ❑ NE o ❑ NA ❑ NE 12128104 Continued Facility Ikumber: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes No NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre tNA 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ YesFNo o ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes ❑ NA ❑ NE maintenance or improvement'? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ A ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifi ❑ Application Outside of Area r 12. Crop type(s) Yp S /,� Z 13. Sod type(s) 14. Do the receiving crops differ from those d%signated in the CAWMP? ❑ Yes ❑ NVEI- 4A ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes 17. Does the facility lack adequate acreage for land application? V.,.. 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ Yes ❑ NE No NA ❑NE o ❑NA ❑NE No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: 12128104 Continued Facility Number: — Date of Inspection A Required Records & Documents 19, Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes o ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V eather Code Rain InspectioZNo 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit`? ❑ YesA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑YesA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 3 I. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments and/or Drawings: 12128104 sion of Water Quality 0. 1W Y Facility Number O Division of Soil and Water Conservation - — Q Other Agency Type cf Visit Compli ce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 4DRoutine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: U % Arrival Time- Time: County: Farm Name: _J `-�h"S �'-► Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: &'`I ems- > h `S 0-,' Back-up Operator: Location of Farm: .wine ❑ Wean to Finish ❑ Wqan to Feeder Feeder to Finish JcZ ?,-)-b IA ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ ❑ Gilts Boars Other Phone ,No: Integrator• Pfa K. 544 4 Operator Certification Number: Back-up Certification Number: Region: Latitude: = e 0 { = « Longitude: = ° = ' = Design Current Design Current. E Capacity Population Wet Poultry Capacity PopulationCattle F `Cs ❑ Layer ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Puults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? n; Current ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder 'a ElBeef Brood Cowl I Number of Structures n� b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes 2<o ❑ NA ❑ NE ❑ Yes No NA ❑ NE ElYes No ❑ NA ❑ NE El Yes No NA ❑ NE ❑ Yes No NA ❑ NE ElYes No ❑ NA ❑ NE 12128104 Continued Facility Number:_� -13 — Date of Inspection 1 D f7 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes rZNo NA El NE ❑ Yes ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes 2No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes:No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes "NoNA ❑ NE maintenance/improvement? 11. is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) k" e S Gw � t j i7r, GJq y r, s r g l„ t 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes r A ❑ NE A ❑NE PNVO NA ❑ NE NA ❑ NE No NA ❑ NE Comments (refer to question ft Explain any YES'answers and/or any recommendations�or any other,:comments Use;drawiugs.of facility to better explain situations. (use additional pages as necess'ary): ,= ReviewerlInspectorName � � -� ��-- _ -__ - -- _ _ _--- � 1 Phone: Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number:-3 -3Date of Inspection f r� Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes "NoNA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ElYes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 2No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes��No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesNA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or. Drawings: i Page 3 of 3 12128104 10FRoutine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow -tom ofDSWC review 0 Other Number Date of Inspection p p Time of Inspection r M& 24 hr. (hh:mm) ermitted [] Certified [3 Conditionally Certified © Registered Not O erational Date Last Operated: . .......................... Farm Name Ji4RS01 �'i',�5 SIC .. County: L � ................................................................................................................................................................................I....... OwnerName: ..................1.. i................................................................................................ Phone No:....................................................................................... Facility Contact: ...:......................... . ..J.:P... ..... Q tl ...... . �`.�.. �"?.........Title:........................................................... Phone No: Mailing Address: l� 6 2 �/ 00..G.. 7............................. ` g.................R...........,........................................... ..................................................................................... .......................... Onsite Representative:...... t A.k1..�.y.. �a..�.'.`..:�°ti- Integrator: ...................................................................................... ...... ....... ..... .-%... .................................... Certified Operator: .......... 1 G✓. L ` ..................Qh........................ Operator Certification Number: . Location of Farm: S'jZ /Z 2 1/ Latitude • ©F—J« Longitude ®• �� ��� egt_" g _Garrent � € � Destgn .Current SwnPoultry e Gon>Caaci;Po ulat,onCaacit Pio, C ❑Wean to Feeder ❑ Layer"„ ❑Dairy eeder to Finish D ❑ Non -Layer "❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑Other 3: ❑ Farrow to Finish Total Design Capacity ❑ Gilts 3 ❑ Boars TotaISSLW:r€'' „a Number of,Lagoons ❑Subsurface Drains Present ❑Lagoon Area ❑Spray Field Area „Holding Panels-1 Sohd Traps [I Na Liquid Waste Management System DischarLes & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon systctr3? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than.from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): ..........Z ..... ry `! ......../`:.�........................I........................... ❑ Yes ;� zo ❑ Yes o ElYes VNo ❑ Yes VNoIZ El Yes El Yes ❑ Yes No Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed'? (ie/ trees, severe erosion, ❑ Yes o seepage, etc.) 3/23/99 Continued on hack acility amber: — J 0 1 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, sevcrc'crosion, ❑ Yes seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes VNo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any patt of the waste management system other than waste structures require maintenance/improvement? ❑ Yes E_d'N0 9.. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? ❑ Yes No Waste Application i 1 10. Are there any buffers that need maintenance/improvement? ❑Yes No 11. Is there evidence of over application? ❑ Ponding ❑ Nitro,en ❑ Yes No 2. Crop type. .............................. 1. 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes 14. Does the facility lack wettable acreage for land application? {footprint} ❑Yes o f 15. Does the receiving crop need improvement'? ❑ Yes No lb. Is there a lack of adequate waste application equipment? ❑Yes Required Records &_Documents 17. Fail to have Certificate of Coverage & Generai Permit readily available? ❑ Yes o 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ic/ WUP, checklists, design, maps, etc.) <No 19. Does record keeping need improvement'? (ic/ irrigation, frechoard, waste analysis & soil sample reports} ee!s ❑ 20. Is facility not in compliance with any applicable setback criteria in cl'fect at the time of design? ❑ Yes LdNo 21. Did the facility fail to have a certified operator in responsible charge? ❑ Yes o 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ic/ discharge, freeboard problems, over application) ❑ Yes N 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes N 24. Does facility require a follow-up visit by same agency? ElYes No NA.v11Wations:or deficiencies .were noted. during. his -visit; - You �vlll.re�ceive n0' further.:.: . egrresbiHidenee: about; this visit.; Comments (refer to question #): Explain.any YES answers and/or any=recommendations or any.ottier'comments. 4 r" 666 dwings of facility, to, bFtter explain situations. (use additional pages as necessary)-',, mot Vl/Ge ,.4 )., t,� rCcc p n 1„reeJr�7 lr�! s Go-t t . For Reviewer/Inspector Name Reviewer/Inspector Signature: �,�Date: (� 1 /6/99 Facility Number: -- Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes o liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes o 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes 31. Do the animals feed storage bins fail to have appropriate cover? ElYes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover' ❑ Yes o Additional'Cornments and/orDrawings: ' e: I r' t " _ZVru li Lb _ v 11107 6oil?� Z�irr i 3/23/99 Type of Visit JU CompliartWinspection O Operation Review O Lagoon Evaluation Reason for Visit Qo foutine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Number Date of Visit: welrmi tted [3 Certifiiedl� 13 Conditionally Certified © Registered Farm Name:.....r71�t`�/.............!!......i.h s?%1"!......................... .......................... 7 D � Time 0 Q Not Operational C Below Threshold Date Last Operated or Above Threshold: County:..................................................................................... OwnerName:........................................................................................................................... Phone No: MailingAddress: ..................................................................................................................... ..................................................................................... .......................... FacilityContact: .......................................................... ........ ............ Title: ................................................................ Phone No:................................................. Onsite Representative:.... .`�.......... . .'" S rr!......................... Integrator: ...A M .:.... 5 t �:...................................... Certified Operator: .............. .................... .........d-r).'?.''S..................................... Operator Certification Number:.... ...................................... Location of Farm: rI ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • 4 " Longitude • 4 64 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c, If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Struture 2 Structure ; Structure 4 Structure 5 Identifier: .................. .......1......----•.---................... -1...............' .....................................I.... ............................... .... ....... fl � ► Freeboard (inches): _ 12112103 ❑Yes ❑ Yes <No.. ❑ Yes � �o ❑ Yes no ❑ Yes ❑ Yes o ❑ Yes o Structure 6 Continued :i Facility Number: 33 — •3 D 1 Date of Inspection 7 2Z 5. Are there any immediate threats to the integrity of any of the structures observed? (iel trees, severe erosion, ❑ Yes seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes 214 closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenancelimprovement? ❑ Yes �No S. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes o elevation markings? Waste APplieation 10. Are there any buffers that need maintenance/improvement? ❑ Yes eNo 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ❑ Excessive Ponding ❑ PAIN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type ,��O�in� o � S�i-i r1 r �1 9 S 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑ Yes �JO ❑ Yes ❑ Yes V9�1_ 0 ❑ Yes ❑ Yes ❑ Yes ❑ Yes o ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No •r e^•� •:.u• r ,� - ��c .�,�. �� ; s•.�:r, var. mrn,q "r•� n+ s�ssxw� •^nrr�•r° •nuir,��r.• •,h •^ aetr-°s: .rrKrr , r•-����s,µ-:� -�<,!r;:; Rttt w^Bu...�rrr�rr, n r s.� y 'vi t � �:r'� � �Camments,(refer tld questron #) '3pp3�,Explatnany,YFSs�ap�swecs and/�<or any{ t�eeommertdations ar3aaydatieerCcomments. aa- E tft�#t r ,, ,�¢�, ,:a.i 3, �, ;p ,..., iEt{�.-::':i1:i}°',ri � �...•s,.d E� riff,, iE.-.."��66�6k1.i #`3��i333 .6�4:&@!$� 2^. r:i�5,.a odb iE�fl5iaad..{". ...�&`.li.rx.sEf.etHi�'n, t' gsm"a ..t,..iP,{s;v8ti �.! d$i..k.E{ei:�(r" a^�¢e Beriei {{' ,J. °:1�f:1��: ii 'i5kro#d';;kw'6..,.f x:#b4..5;<N'A,F3ifU , .I-. ,::,4..MI�i!{8e1&i.IEsrf�$it$t f-��:�3y 9�P,�� `Use dra�nngs of,facility`'to,better expla�ir s�Wattorts: (use�adtlitronayN pages as necessary) r �, ,° ❑Field COPY ❑Final Notes � � ` �`' +r�� ;..i..., 3ar ,_� ..,:., t,...Is.........:.Etal�f!,zt...asedr#..�t�(�..EaR -�N....,i%��S.. .f:.r• ..i :.�i.'r',. ,.il �....�. . d.�i@4.,a..u;�RIXt ,�..iis���...�...a�. r,Et.a„!ki'il�t�.']Y,..�}r.:.n rt�,..�3. ?""S',a."l.�F,"��59'� ����`.'.1�,',..� 6k'�'L��§?��.fa,-t,l..rri;�!W� ., r. _�i1i A6 Reviewer/Inspector Name i ' it' .,i`;€ 'EE Ear a :,r? �p fury E s�3 !.t i,Et.!IR"F' @;�#1� r#rii' • l '�l.J!fi' e ', Reviewer/Inspector Signature: Date: Z Z D 12112103 Continued II Facility Number: 3S ,3 Z> Date of Inspection 2Z Required Records & Document.~ 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes Inc 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ic/ WUP, checklists, design, maps, etc.) ❑ Yes o 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes o 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes ❑ No 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ElYes o 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes N 28. Does facility require a follow-up visit by same agency? ❑ Yes No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes o NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) es ❑ No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes []dNo 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes o 34. Did the facility fail to calibrate waste application equipment? ❑ Yes o 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After 1 " Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 tom. .� •�V vivision of Soil and;Water Conservation °,r" ail _.Other AlenCy.- # r' p . r I d t S B C N E# Type of Visit Compli Inspection O Operation Review O Lagoon Evaluation Reason for Visit Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access F tty Number hate of Visit: M" Time: Q Not Operational C Below Threshold ermitted [3 Certified [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name:. 17-ir.. ��.. `�.`1. `°.....12/.:!--:................................. County:. G.�r� '................................................. Owner Name: ........................................................................................................................... Phone No: - Facility Contact: .....................................................Title:.................. Phone No: MailingAddress: ..................................................................................................................... ....................................................................—.................. ........................... Onsite Representative:........................................................................................................... Integrator:...... P 5.6. f. �...!...................................... Certified Operator:.......:��r4.� ` ... --Operator Certification Number: .......................................... ......`�J...t.nf'b~.''........................................... of r: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude Longitude �• �� �" Swine Ca ❑ We Feeder eeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars 1�.9 Niixnber of Lagoons Er a Holding Ponds;'% Solid'Traps . Design Current' Poultry CaDac'ity 'Population Cattle ❑ Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? b. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) c. [f discharge is observed, what is the estimated flow in gal/Inin? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 3 I Structure 3 Structure 4 Structure 5 Identifier: L II . t2 ...... ........................................................................................... Freeboard (inches): 5100 ❑ Yes ❑ Yes LJ No ❑ Yes Q"No ❑ Yes ETfNo ❑ Yes Now ❑ Yes 0 {o ❑ Yes ❑ No Structure 6 Continued on back 6 Facility Number:, j Date of Inspection /L b Printed on: 1/9/200 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type J g.e , z„4f 9 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/discharge, freeboard pr Iems, over application) 23. Did Reviewer/Insp or fail to discuss review/inspection with on -site representative? 24. Does facilityquire a follow-up visit by same agency? 25. Wer�ny additional problems noted which cause noncompliance of the Certified AWMP? *"io jatioos'e r• 000cleolH -wore bkod 0�tl` 119 this;vlsX.- ;Y0 011-�e 0*6 0t fotthgr corresnoridence: about this :visit: .................................. . 1 ❑ Yes ❑ Yes a o ❑ Yes 011O ❑ Yes 1d'No ❑ Yes Lama ❑ Yes .2r �o ElYes td't�o ❑ Yes !moo ❑ Yes Jd'No� ❑ Yes � o ❑ Yes ❑ Yes ❑Yesi- ❑ Yes 0 ❑ Yes;N�o� ❑ YesVNo,,-- El ❑ Yes Yes o ❑ Yes o ❑ Yes o ❑ Yes o 9: ❑ Yes o 3 -,lr.d 79 ex' - P�11' �f ➢, Fsn 1 E? 1n1!',il°`:1�y""�7,°." Reviewer/Inspector Name ;E�°�j !f , sl+: t i € �; i i Y,6F:l' .�..i. } ��.. f?.il 3>' 8� �.�°'��� E!< ,i}° , Reviewer/Inspector Signature: Date: j 7- sm, Facility Number: — Date of Inspection J Z V Printed on: 1/9/2001 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes o ❑ Yes :ZNo. ❑ Yes ❑ Yes No ❑ Yes ❑ Yes;0--�z ElYes Elo 5100 ■ F ity Number Date of Visit: Z C Time: 10 Not O erational 0 Below Threshold Permitted [3 Certified [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: 1 D_r7 6 ns 0_1 County: Owner Name: Mailing Address: Facility Contact: Onsite Representative: Certified Operator: G6&g,4 1 �`— Location of Farm: Title: Phone No: Phone No: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0a 06 44 Longitude • �• « SOUND n Current Design Current i e Design Current Swine Ca aci P,o ulation Poultry Ga aci ,iP,o upon Cattle t Ca aci Po ulation ❑ W to Feeder: ❑ La er ❑ Dairy eeder to Finish 5' ❑ Non -Layer 1 10 Non -Dairy ❑ Farrow to Wean ❑Other ❑ Farrow to Feeder ❑ Farrow to Finish T L Design Capacity ❑ Gilts " ❑ Boars Total SSl W Number of Lagoons © ❑ Subsurface Drains Present ❑ La oon Area ❑ Spray Field Area Holding Ponds / Solid Traps 0 ❑ No Liquid Waste Management SystemINIM Discharges & Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. if discharge is observed, did it reach Water of the State? (if yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): 7s � �t _ 7, 311 05103101 ❑ Yes No ❑ Yes No ElYes No ❑ Yes Y ElYes ❑ Yes N V ❑ Yes No Structure 6 Continued Facility Number: 3ji — Date of Inspection ri 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type ;' 7 ,. 13. Do the receiving crops differ Cith those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18, Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes Z_No ❑ Yes No ❑ Yes No ❑ Yes to ❑ Yes No ❑ Yes LI N ❑ Yes No ❑ Yes �No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes No ❑ Yes LQ N ❑ Yes � ❑ Yes ❑ Yes No ❑ Yes ❑ Yes LI N ❑ Yes ❑ Yes No 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. �, q } P y, y Comments, refer ta:" ueshon# Ez lain ati ,YI✓S"answers aniar an .recommendations ornan �other�enmments " ��, Y Use tlrawitigs�of facilityttMitteefex'Platn situations: (use additional pages as,necessaff �. ❑Field Copv ❑Final Notes Reviewer/Inspector Name r,(� Reviewer/Inspector Signature: Date: O 05103101 Continued Type of Visit .0 Com ce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visi Routine 0 Complaint 0 Fallow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Z > Arrival Time: 11.3 i5 Departure Time: County: Region: 2 1 � Farm Name: 1.7>) �t i �� A __S o n Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: ` ���'`-�y p.� Back-up Operator: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: 0 0 = = Longitude: = o ❑ Design Current Swine Capacity Population Design Wet Pouy . C+apa`city ;Current; P�opu stun �Design. Current Cattle Opacity P elation ❑ Wean to Finish ❑ La er ❑Nan -La ei ❑ Dair Cow ❑ Wetin to Feeder ❑Dai Calf Feeder to Finish ❑ La ers ❑ Non -Layers El Pullets £" "' ❑ ❑ Dairy Heifei ❑ Farrow to WeanPoultry,'-q" D Cow ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Non -Dairy ❑ ❑Beef ❑ Beef Stocker Feeder Beef Brood Cow Numa of Structures: ❑ Gilts ❑ Boars ❑ Turkeys ❑ Turke Po Its! Other ❑ Other 11 JE1 Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZrNo ❑ NA ❑ NE Discharge originated at; ❑ Structure ❑ Application Field ❑ Other � a. Was the conveyance man-made'? ElYes. M<o ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes �No❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes NA nNo El NE 2. Is there evidence of a past discharge from any part of the operation? El YesNA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes o ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: — 0 Date of Inspection 7 1 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o NA El NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No[01 NA ElNE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ElYes NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes /No El NA El NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑yesEl NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes No ❑ NA ❑ NE maintenance or improvement? _Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Na ❑ NA [IN E maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) P CG.O 1� C'_f .►.. �w4— �/�,Q . a. ��� f 13. Soil type(s) P'H lA- r fA1- Ar 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �6 No .❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? El Yes Ll N — ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination, El Yes -f N ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? El Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ 1�6/11 NA ❑ NE Reviewer/Inspector Name ( T Phone: ReviewerlInspector Signature: Date: 12128104 Continued Facility Number: Date of Inspection L O� Reutuired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes FNOo NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check El Yes ❑ NA ❑ NE the appropriate box. ❑ WUP (IChecklists El Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain InspectionZN eather Code 22. Did the facility fail to install and maintain a rain gauge'? El YesNA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes N El NA El NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesZEJ ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes PNo NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Add ,ltibhal;Corn rrients and/or Drawings: 12128104 12128104 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office .fames B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager ffl7XA �EHNR DIVISION OF ENVIRONMENTAL MANAGEMENT August 8, 1995 Mr. Robert Johnson Route 2, Box 284 Rocky Mount, North Carolina 27801 Subject: Compliance Evaluation Inspection Swine Operation State Road 1224 Edgecombe County Dear Mr. Johnson: On August 4, 1995, Mr. Eric Fleek from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine potential problems associated with liquid waste disposal systems. Mr. Fleek's site visit determined that wastewater from your facility was not discharging to the surface waters of the state. Nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. As a result, your facility was found to be in compliance during this visit. Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District, 3800 Barrett Drive, Suite 101. Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 6M recycled/ 10% post -consumer paper Robert Johnson Compliance Evaluation Inspection Page 2 The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Eric Fleek at (919) 571-4700. Sincerely, 'j, ca,,Y- J y E. Garrett Water Quality Supervisor /ds H:\animdn cc: Edgecombe County Health Department Edgecombe County Soil and Water Conservation District Steve Bennett - Regional Coordinator, Division of Soil and Water Conservation • JUL-14-1995 15:2e FROM DEM WATER QUALITY SECT IDN TO R-RO r.02/02 Site Requires Immediate Atten!�nn Facility No. _ 3 1 - 3d DIVTSION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERAII VISITATION RECORD S DATE: �" , 1995 Tune: Farm Na Mailing . County: Integrator. Phone: On Site Representative: _._ _ _ —__ _ Phone: Physical Address/Locadon: _ S E ) 2- Q 4` Type of Operation: Swine Poultry Cattle ,I Design Capacity: Number of Animals on Site: ' je9 /b-Y Ci d DEM Cerdfi lion Number: ACE DEM Certification Number: ACNEW Latitude: � Longitude:'" Elevation: _Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboard of l Fv 45 ear 24 hour storm event ��- (approximately l Foot + 7 inches) Yes or No Acrual Freeboard:�X�L. Inche Ll/cy Was any seepage observed from the lagoou(s)? Yes or Z Was any erosion observed? Yes o No Is adequate land available for sprz 9 es No Is the cover crop adequate? Ges� or No Crop(s) being utilized: CfC-.- Does the facility meet SCS minimum setback criteria'! 200 Feet from Dwellings? or No 100 Feet from Wells? Y or No _ r a_nirnal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes or a:iimal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes No animal waste discharged into waters of the state by man-made ditch, flusbing system, or other ;irni;ar man-made devices? Yes or eo if Yes. Please Explain. r)i,cs iht Facility wasntain adequate waste matiagernctit records (volumes of manure, land applied spray irrigated on specific acrcaF wi cover p)'? Ye or� t Additional Comments: AI I t� 40 C�. Signature cc: Facility Assessment Unit Use Attachments if Needed TOTAL F.02 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary am� 1:�EHNR DIVISION OF WATER QUALITY July 28, 1997 Mr. Robert Johnson Route 2, Box 111 Rocky Mount, North Carolina 27801 Subject: Compliance Evaluation Inspection Facility # 33-30 Robert Johnson Swine Farm Edgecombe County Dear Mr. Johnson: I On July 23, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. The inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the operation was not discharging wastewater 'into waters of the State and that operations were proceeding according to your approved Animal Waste Management' Plan. As a result of the inspection, the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. The Raleigh Regional Office appreciates your cooperation and compliance. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, ,lu Garrett, Water Quality Section Supervisor cc: Edgecombe County Health Department Mr. A.B. Whitley, Edgecombe Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC-RRO DWQ Compliance Group RRO Files 3800 Barrett Drive, Suite 101, A!' FAX 919-571-4718 Raleigh, North Carolina 27609 N� o C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10°.6 post -consumer paper Facility Number Date of Inspection Time of inspection ® 24 hr. (hh:mm) Total Time (in fraction of hours �� Farm Status: ❑ stered ❑ Applied for Permit (ex:.1.25 for I hr 15 min)) Spent on Review LYE Certified ❑ Permitted or Inspection includes travel andprocessing) ❑ Not Operational Date Last Operated* ....................................................................................................................................................... Farm Name: .... ...'?rS.J1'......L'..S�.P..'.<...G........................................ County:.A,�r...4'�ilrP �.......... ................... Land Owner Namc:. +� ..... � ,0 s. �.................................... Phone No: ..l.r. ....-y. (!.......` j. .................. Facility Conctact:............ 5!:..Q.............................................. Title: ........ Phone No: Mailing Address:....&. ...'. 7.............6s 1................... A.�/vt Gkc n, T...... Z7.�..R.i.................................................... .......................... Onsite Representative: ..... .......... Integrator: i'�`'�7�✓ 9 Certified Operator:...... � ll.py. T.,........ r.� H .! . V -........`'. R......... ............. I Operator Certification Number:.......................................... Location of Farm: S /2- 1 2 2 V Latitude ' 6 ;6 Longitude 0 L{ G neral 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? . Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/97 maintenance/improvement? [:]Yes No ❑ Yes No Cl Yes ❑ Yes No ❑ Yes ❑ Yes ❑ Yes ❑ Yes rNo Continued on back Facility Number:... 6. Facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons and/or Holding Ponds) 9. Is storage capacity.(freeboard plus storm storage) less than adequate? Freeboard (ft): Structure 1 Structure 2 Structure 3 !....'..:__.. �....`l .......... ...... .......... 10. Is seepage observed from any of the structures? Structure 4 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes ;No '14 ❑ Yes El Yes Z� O ❑ Yes No Structure 5 Structure 6 Waste Appligation 14. Is there physical evidence of over application? (If in excess of W—MP, or runoff entering waters of the State, notify DWQ) 15. Crop type O- ...........f.4., �.............................................................................................................. 1 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19, Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? FprCertified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? ❑ Yes IL[ !v o es ❑ No ❑ Yes [a'N0 ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes ZVNQ- 0, ❑ Yes Yes ❑ Yes 1N,1 ❑ Yes l.d 1vo/ ❑ Yes jNo Comrrients,{refer to question`#} Explain any YES answers and/or'a" recommendations of any other comments 3 Use drawings of facrhty to better explain situations. (use "additional pages as necessary} 4 ! "_ & W 4__q b K rt S to Wz,/. Reviewer/Inspector Name ,., r N MA Reviewer/Inspector Signature: Date:? -- - J % cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 of Soil and Water Conservation ❑ Other Agency of Water Quality -- — I Date of ]Inspection w 7X Facility Number Time of Inspection 24 hr. (hh:mm) 13 Registered O ce/rtified E3 Applied for Permit D Permitted JE3 Not Operational I I Date Last Operated: . .......................... Farm Name:..cJ.lpp?' L.!.cSl<r.`.......... ................................................. County:..fqaw`q e.................. ....................... Owner Name:.......1? V.l......t t...� n. f_................................................... Phone No:...../..r'. 1....'...7� G - S 3 % FacilityContact: 1 "o ..ay.n I `.......Title: ................................................................ Phone No: ................................................... Mailing Address: ... Z :...... ..�........... ... t( ��0 t � pK w <✓ L Z % t) ........ ...... .....................................................................�............................................... ..... ..� ... n L / Onsite Representative: ....... 1./A.:.�?.g(L .:....S1ci fit_^ S G\............................. Integrator......................�. a..�-.......................................... Certified Operator; .............) S_��.a,� I,,.....c/ J..�'t K. (.. .............................. Operator Certification Number .......................................... Location of Farm: Latitude Longitude 1 ',"`Design Current Design Current Design Current Capacity Populati=on_' Poultry a�nCapacity P_apula_tion `Cattle r ; ,Capacity `Population ❑ Wean to Feeder ❑ Layer ❑ Dairy .E= ceder to Finish 27 J D ❑Non -Layer I 1 10Non-Dairy ❑ Farrow, to Wean = = ❑ Farrow to Feeder JE1 Other �;�.. ❑ Farrow to Finish ,Total Design I CapBci=ty ❑Gilts ❑ soars .Total SSLW w` n= l❑ No General 1. Are there any buffers that need maimcnance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gaVmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3: Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste. management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7/25/97 ❑ Yes Er No •❑ Yes No ❑ Yes !, �vo ❑ Yes ;a O ❑ Yes ❑ Yes ❑ Yes ❑ Yes VNo ❑ Yes No ❑ Y No Continued on back .Pacilit�iNumhcr: --3 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes a<o Structures (Lagoons,I110lding Ponds, Plush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes 0 No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ..- ..................................................................................................... Freeboard(fty ......... Zc................ .,,..,............................... t0. Is seepage observed from any of the structures'? ❑ Yes I\u 11, Is erosion, or any ether threats to the integrity of any of the structures observed'? Cl Yes o 12. Do any of the structures need maintenance/inil)rovement7 ❑ Yes o (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do.any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes z0 Waste Application 14. Is there physical evidence of over application'? ❑ Yes `0 1 (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type r!............. ;3 /!z^t- !.!.T........ ....................... .. ................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes NO 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes -N 18. Does the receiving crop need improvement? 19. tIs there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certirted or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AW,MP? 25. e any additional problems noted which cause noncompliance of the Permit? r. s; •;. ' ,,..` :. ` la 0 No.violations or deficiencies were•noted during' this. visit. will receive no further correspondence ab::oiit this.visit: ' ❑ Yes , o ❑ Yes No" ❑ Yes N0 ❑ 1'cs :Nol 'o ❑ Yeti ❑ Yes No ❑ Yes No ❑ Yes o !fex to:question #): Explaidany YES answers and/or any recommendations or_any,`other cornmet of fiilcility-to better explaiti `situaticins(use' additional pales as nece5tih`ry): 7/25/97 Reviewer/Inspector Name : Reviewer/inspector Signature: i� 7: Date: I ine O [:omolaint O Follow-up of DWO inspection 0 I Facility Number I Registered 0 Certified E3 Applied for Permit 13 Permitted FarmName: ........................................................................................................... OwnerName: ................................................... .................................................... FacilityContact:..............................................................................'Title................. llow-up of DSWC, review Q Other Date of Inspection 1 Time of Inspection � 2-t hr. (hh:mrn) 113 Not Operational Date Last Operated: County: ... i .t..�................................. .......... Phone No:.............................................................................. ..... ................................................ Phone No:......................................... MailingAddress: ......................................... ............ ..................... .................. ........... I .... .............. .... .......................... Onsite Representative:,�d ,/.�..y..f.............. ..d� r�,?. t `�......................... lntcgr:►tor;... JV� !`..._.......................................... Certified Operator................................................................................................................ Operator Certification Number,........................... Location of Farm: E ii i� iiiiii ii iiii ii III C ME Latitude • i [—::—] " Longitude ° 6, Design Current Design Current Design Current Swine . Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars ❑ Layer ❑ Dairy ❑ Non -Laver ❑ Non-Daii� ❑ Other Total Design Capacity. Total SSLW NumberofLagoons / Holdm'g P(►: ds, JE1 Subsurface Drains Present ❑ Lagot)n Area 10 Spray Field Area { ❑ No Liquid Waste. anagement System General 1. Are there any buffers that need maintenance/improvement? ❑ Yes,(:�No 2. is any discharge observed from any part of the operation? ❑ YesNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes "D No b. If discharge is observed, did it reach Surface Water'? (If vea. notifv DWQ) ❑ Yes O! No i c. If discharge is observed, what is the estimated flow in cal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes 'dNo 3. Is there evidence of past discharge from any part of the operation? ❑ Yes ,© No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes �No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes '[TNo maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design'? ❑ Yes © No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes q1I10 // 7/25/97 Continuedran back x Facility Number: 7j — 8. Are there lagoons or storage ponds on site which need to be property closed? Structures (Lagoons,Holdine Ponds, Flush Pits, et 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure 1 Structure 2 Structure 3 identifier:�j; ......................................................................... Freeboard(ft): ............................... ............................ ........ 10. Is seepage observed from any of the structures? Structure 4 11, Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? ❑ Yes [;/l10 ❑ Yes 9*11-10 Structure 5 Structure 6 .................................... ......... I ...... ....... I ......... ... ❑ Yes No ❑ Yes ///0 No �es ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? //�� ElYes Z No Waste Application 14. Is there physical evidence of over application? ❑ Yes (If in excess of WMP, or runoff enter' g waters of the State, notify DWQ) /,I'INo 15. Crop type ���..t{A.......... ...�.r'............... ...................................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes [ No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 6No 18. Does the receiving crop need improvement? ❑ Yes V�No 19. Is there a lack of available waste application equipment? ❑ Yes No ///No 20. Does facility require a follow-up visit by same agency? ❑ Yes 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes J21"No 22. Does record keeping need improvement? ❑ Yes Z"No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Permit? ❑ Yes No 0 - No.violations or deficiencies. we're' no' te'd- during' this.' visit.- :You.will t•ecei:ve na ftirther : correspondence about this'. visit.,'.'. A- . 7/25/97 Reviewer/Inspector Name Reviewer/Inspector Signature: llff%l f_,�,IAlt f Date: 7, Ren•iscd January 22 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number 3 D Farm Name: _75_ol�n� avn On -Site Representative:_ ! d✓'1f 5o ff�-c� Inspector/Reviewer's Name: l,Pwe-i ( Date of site visit: 71- �� ! Date of most recent WUP: 1 -13- 9 1 Operation is'flagged for a wettable acre determination due to failure of ZPa'eligibility items) F1 F2 F3 F4 tion not required to secure WA determination a r time based on exemption E1 t EV E3 E4 Annual farm PAN deficit: Z J'J pounds Irrigation System(s) - circl � d-hose traveler; 2. enter -pivot system; 3. linear -move system; sta long s rin er sys em w permanent pipe 5. s a ionary sprinkler system wlportable pipe, 6. stationary gun system w perman e; stationary gun system wlportable pipe PART 1. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D2ID3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and sign d by an I or PE. E3 Adequate D, irrigation operating parameter heet, including map depicting wettable acres, is complete and * ned by a A� E4 75% rule exemption s erife i P rt 1. (\NOTE: 75 % exemption cannot be applied to farms that it �ii�' i it hecklist in Part H. Complete eligibility checklist, Part 11 - F1 FQ F 'CS/eop ompleting computational table in Part Ill) PART 11. 75% Rule Eligibility Checklist an oation of WA Determination Requirements. WA Determination required becaeration failsone of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of informationlmap. F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. Sc C t, � -<' Revised 1anuan, 22, 1999 r #y Number 33 --3 o _ art 111. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT FIELD NUMBER NUMBER` TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 2r, z 13 4-i 4Y*, P"' s- z I I I I I I I I i 1 I I I I I I I I 4 I FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWI IF and type of irrigation system. If pulls, etc, cross more than one field, inspectcrlreviewer will have to combine fields to calculate 75% field by field determination for exemption if possible; otherwise operation will be subiect to WA determination. FIELD NUMBER` - must be clearly delineated on map. COMMENTS' - back-up fields with CAW1v1P acreage exceeding 75% of its total acres and having received less than 501/o of its annual PAN as documented in the farms previous two years' (1997 & 1998) of irrigation, records, cannot se7,ve as the sole basis for requiring a WA Determination. Back-uo fields must be noted in the comment section and must be accessibie by irrigation system. )---, i j � - :ram.. .Division of Soi d Water Conservation = Operation Reviewe,j yz '99 r. O-Di o Soil and Water Conservation - Compliance In spec ivisibn.of Water Quality - Compliance Inspection Other, Agency - Operation Review outine O Com taint O hollow-u of DW? ins action Q FolloNti'-u of DSLvC rcvic►v Q Other Facility Number 3 Date of Inspection 'I'itne of Inspection pp 24 hr. (hh:mm) \, © Permitted `Certified © Conditionally Certified © Registered JE3 Not O er:rtional (D�•a�tree Last Operated: Farm Name: ...�1.!`,� ...�'4..tR.S....A..t f.�-... County:.L..fg—.' L Q......................................... Owner Name: .............. d �,, s o,.I ..Phone iNro:....2' .Z- --- Yyta -� 73 ..............f-.... o. ......................... ............................... FacilityContact: S h^........................................... .ritle:........................................................... Phone No:................................................... Mailing Address: D >� P... 1Z K/ C— �- 7 a Onsilc Representative: . J� �rJ !1`� Integrator: !,. ........................................................ .... .................................................................... .... Certified Operator: � � ��'`f v�, Operator Certification Number: .......................................... ............................. °.......................... ......., Location of Farm: _�> l% 1 2 Z (— latitude Longitude � • �0°° Design Current Swine Capacity Population ❑ WearLW, Feeder ❑ eeder to Finish Z 7 ~p ❑ Farrow to Wean ❑ Farrow to Feeder El Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer F= 1[] Dairy ❑ Non -Layer I I I[] Non -Dairy I I, ❑ Other f Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area JE1 Spray Field Area Holding Ponds/ Solid Traps ID No Liquid Waste Management System Discharges & Stream Impacts I. Is any discharge observed from any part of the operation (lf' yes, notify DWQ)? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. 11'disc•harge is observed, was the conveyance inan-tn:tde? i). If discharge is observed. did it reach: ❑ Surface Waters []Waters of the State c. If discharge is observed. what is the estinialed How in Lal/niin? d. Does discharge bypass a lagoon system? 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No ❑ Yes ❑ Yes No , ❑ Yes TNo% ❑ Yes ❑ Yes El Yes Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Z C tt Freeboard(inches): .............`. LA..+1.......... ............................................ ....................................................................................... .......................................... 1/6/99 Continued on back Facility Number: 33 — 3 Bate of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan'? (it any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any pact of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? Waste ADDIication ❑ Yes -C to ❑ Yes ❑ Yes tQt�o ❑ Yes r es �0N 10. Are there any buffers that need maintenance/improvement? ❑ Yes 2'No 11. Is there evidence of over application? ❑ Ponding ❑ Nitrogen ❑ Yes IGl too 12. Crop type f °.)......s ...¢ten-r�6.-�.............................................................................................................................................................kNo 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes 14. Does the facility lack wettable acreage for land application? (footprint) ❑ Yes 15. Does the receiving crop need improvement? El Yes ;No 16. Is there a lack of adequate waste application equipment? ElYes o Renuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes 2To 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, traps, etc.) ❑ Y No 19. Does record keeping need improvement? (ic/ irrigation, freeboard, waste analysis & soil sample reports) Yes ❑ No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑Yes o 21. Did the facility fail to have a certified operator in responsible charge? ❑ Yes 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ic/ discharge, freeboard problems, over application) ❑ Yes o er/Inspector fail to discuss review/inspection with on -site representative? 23. Did �Revii,` ❑ Yes N 24. D city require a follow-up visit by same agency? ❑ Yes No NA.violatioits.or. deficiencies .were noted. during .Hiis,visii:..Y.ou W* flfre� eive nar furiher .: . .. .. ...... .. .... ...... . coriresporidence; about; this visit.: ...... ; • : • . • . • . • . • . . . • . • : • ; • Coronients,'(refer- to question #)­ Explain any YES answers and/or any.recommendations r any outer comments ,�`j� y } Use drawings of facility to betier explain situations. (use additional page' as necessary): i ., `. r 1 .` ;;' j w roc .' �� ►� rla c� s A`, ,e_ w� P �gr�,./� e/�, g 4 & f v i to G..h,b A, t} 4J Rr a. ls� r7v`¢wfee d �i}f Tq7 4-6 12r'r.J, " 0 17ke"70 "-. cLcrtl` r e- [n� � e 'j-o ;;� It O r r r-*- 11 L,' -4 A- ,;,,O/d L'ejp-Vrh 06-% f1 a• t Gfwe . rr la i4c,-es SA v,'l c r 4F-4 ,4 Fr i/dIl pb'// ,T 3/ Vv K1c4t,4*/ 4 c-G-4-r' � o % F,,e leis /3 a--- - /4 Fw-C.1. t � 11 'as p •� f��-- G�+� .e�/ �Q-�'�.. -- Sti �.l ra SQ.f C v.. ••� �r��,..r J,o l� Y ► a.s� m--� j., Goy p °' "�" r' ^ �I.` Icy w � / Reviewer/Inspector Name 11/6/99 Reviewer/Inspector Signature: Date- 7 / 0� w A TF9 `off Q� C r 0 CERTIFIED MAIL RETURN RECEIPT REQUESTED ROBERTJOHNSON RT 2 Box 284 ROCKY MOUNT NC.27801 Dear Robert Johnson: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality November 7, 2002 Subject: Notice of Violation and Revocation for Nonpayment Johnson Livestock Permit Number: AWS330030 Edgecombe County In accordance with North Carolina General Statute 143-215.1OG, all animal operations who receive an animal waste management system permit will be charged in each year of the term an annual permit fee. Annual permit fees are billed following the issuance of the permit and then annually thereafter on the anniversary of that date. Your animal waste management system permit was issued on 8/6/1999. Your annual permit fee for the period of 8/6/2002 - 8/5/2003 is $150.00. Your payment was due 10/12/2002, Because this fee was not fully paid within 30 days after being billed, this letter initiates action to revoke the subject permit, pursuant to 15 NCAC 211.0205 (c) (4). and G.S. 143-215.1 (b) (3). Effective 60 days from receipt of this notice, the subject permit is hereby revoked unless the required Annual Animal Waste Management System Permit fee for your animal operation is received within that time. Operation of an animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and is subject to the assessment of a civil penalty of up to $10,000 per day. Your payment should be sent to: N.C. Department of Environment and Natural Resources Division of Water Quality Budget Office 1617 Mail Service Center Raleigh, North Carolina 27699-1617 If you have any questions, please contact Fran McPherson at (919) 733-7015 ext. 210. Sincerely, I+ 1 / t 3 s: �.,..=sue` Alan W. Klimek, P.E. cc: Non -Discharge Branch Compliance/Enforcement Unit Raleigh Regional Office Edgecombe County Health Department Permit File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled / 10% post -consumer paper Nutrient Management Plan For Animal Waste Utilization 06-25-2003 This plan has been prepared for: Robert L. Johnson 'Robert L. Johnson 33,36 Route 2 Box 284 Rocky Mount, NC 27801 252-446-5374 Thi&plan has been developed by: Margaret Knight Edgecombe SWCD 201 St. Andrew Street RECEIVED 1 Dl:NR I DWQ P 4 Box IO AQiljFFR-PRCITFrTInN SF_CTf Qf Tarboro, NC 27886 MAR 72009 zOR9 lo De toper Signature Type of Plan: Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. - Signature (owner) Date Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil.and Water Conservation Commission. Plan Approved By: T cal Specialist Signature Date ----- - ---- ---- •-- g 588650 Database Version 2.0 Date Printed: 06-25-2003 1 Cover Pa e 1 !r' Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 2,549,250 gals/year by a 2,750 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 5871 Incorporated 10084 Injected 11105 Irrigated 6382 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 7,821.50 3,124,228 -574,978 Note: In source ID, S means standard source, I1 means user defined source. 588650 Database Version 2.0 Date Printed: 06-25-2003 Source Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crops Summ Tract Field Leaching Index (LI) Soil Series Crop Sequence RYE 2012 13 NIA Norfolk Fescue Pasture 3.5 Tons 2012 l4a N/A Goldsboro Fescue Pasture 4,0 Tons 2012 14b NIA Goldsboro Fescue Pasture 4.0 Tons 2012 14c N/A Goldsboro Fescue Pasture 4.0 Tons 2012 15 NIA Norfolk Hybrid Bermudagrass Hay 6.5 Tons Small Grain Overseed 1.0 Tons 2012 6 N/A Marlboro Hybrid Bermudagrass Hay 6.5 Tons Small Grain Ovetseed 1.0 Tans LI Potential Leaching Technical Guidance Low potential to contribute to None < 2 soluble nutrient leaching below the root zone. > = 2 & Moderate potential to contribute Nutrient Management (590) should be planned. < = 10 to soluble nutrient leaching beiow the root zone. High potential to contribute to Nutrient Management (590) should be planned. Other conservation practices that soluble nutrient leaching below improve the soils available water holding capacity and improve nutrient use > 10 the root zone. efficiency should be considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). ------------------- - -------- -- - -- 588650. Database Version 2.0 Date Printed: 06-25-2003 PCS Page 1 of 1 NOTE: Symbol * means user entered data. The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on' each field in order to supply the indicated quantity of nitrogen from each source is also included. 'A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Depending on the requirements of the crop and the nutrient content of the waste, some nutrients will likely be over or under applied if animal waste is being utilized. Waste should be analyzed before each application cycle and annual soil tests are required if animal waste is being applied. Soil tests should be used to balance the nutrient application amounts with the realistic yields of the crop to be grown. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. Waste Utilization Table Year l Tract I Field Source I.D. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (lbs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 al/A tons 1000 gals Ions 2012 13 S7 Norfolk 8.20 8.20 Fescue Pasture 3.5 Tons 8/1-7/31 *130 0 0 brig. 130 5L93 0 425.80 0.00 2012 t4a S7 Goldsboro 7.60 7.60 Fescue Pasture 4.0 Tons 8/1-7/31 *160 0 0 brig. 160 63.91 0 485.72 0.00 2012 14b S7 Goldsboro 4.60 4.60 Fescue Pasture 4.0 Tons 8/1-7/31 *160 0 0 Irrig. 160 6191 0 293.99 0.00 2012 14t S7 Goldsboro 6.40 6.401 Fescue Pasture 4.0 ions 8/1-7/31 * 160 0 01 Irrig. 1601 63.91 0 409.03 0.00 2012 15 S7 Norfolk 7.40 7.40 Hybrid Bermudagrass Hay 6.5 Tons 3/1-9130 296 0 0 brig. 296 118.24 0 874.94 0.00 2012 15, S7 Norfolk 7.40 7.40 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 brig. 50 19.97 0 147.79 0.00 2012 6 S7 Marlboro 5.10 5.10 Hybrid Bermudagrass Hay 6.5 Tons 3/1-9/30 *300 0 0 Irrig. 300 119.83 0 611.15 0.00 2012 6 S7 Marlboro 5-10 5. 10 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 19.97 0 101.86 0.00 ---- - - ----------- ------------------------------------------------------------------------------ Preview Database Version 2.0 Date Printed: 6/25/03 WUT Page t Waste Utilization Table Year Tract Field Source I 1-17. Soil Series Total Acre Use. Acres Cro RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (Ibs/A) Applic, Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 al/A tons 1000 gals tons Total Applied, 1000 gallons 3,350.27 Lagoon Liquids Total Produced, 1000 gallons 2,549.25 Balance, 1000 gallons -80L02 Total Applied, tans 0.00 Manure Solids Total Produced, tons 0.00 Balance, tons 0.00 Notes: 1. In the tract column, symbol -- means leased, otherwise, owned. 2. Symbol • means user entered data. - -- - ----- ------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------- -------------- Preview Database Version 2.0 Date Printed: 6/25/03 WUT Page 2 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field soil Series Application Rate (inches/hour) Application Amount (incites) 2012 13 Norfolk 0.50 0.96 2012 14a Goldsboro 0.50 0.96 2012 14b Goldsboro 0.50 0.96 2012 14c Goldsboro 0.50 0.96 2012 15 Norfolk 0.50 0.96 2012 6 Marlboro 0,40 0.96 ------------------•------------•-......------------------------------------- ------------------------- - I---- --- 588650 Database Version 2.0 Date Printed: 06-25-2003 IAF Page 1 of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gallac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 34.48 68.95 103.43 Hay 6 ton R.Y.E. 300 26.32 17.24 34.48 51.71 Soybean 40 bu 160 14,04 32.32 64.64 96.96 ----------------------...---------------------------------------..-...-. ..------------------.- . -. --- --- g----.------------- 588650 Database Version 2.0 Date Printed: 06-25-2003 Sludge Page 1 of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. if the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Stora2e Cavacity Source Name Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 12/15 180 Plan Year Month Available Storage Capacity (Days) 1 1 149 1 2 180 1 3 180 1 4 150 1 5 119 1 6 89 1 7 142 1 8 180 1 9 150 1 10 133 1 11 103 1 12 72 * Available Storage Capacity is calculated as of the end of each month. --._ .. ... _ ..--- - - -... 588650 Database Version 2.0 Date Printed: 06-25-2003 Capacity Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that .reaches surface water is prohibited. 2. There must be documentation -in the design folder. that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by 'injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate. in North Carolina" for guidance). -------------- ---------------------.-----------------------------------------------------------------------------------.--- 588650 Database Version 2.0 Date Printed: 6125/03 Specification Page i 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal.waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted drops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients: Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. ------------------------------------------------------------------------------------------------------------------------------------- ----------------- 588650 Database Version 2.0 Date Printed: 6/25/03 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only. be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. --------------- ---------------------------------------------------------------------------------------------------- 588650 Database Version 2.0 Date Printed: 6/25/03 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at.crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on,other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper Ievels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. -------------- - 588650 Database Version 2.0 Date Printed: 6/25/03 Specification rage 4 Crop Notes . The following crop note applies to field(s): 6 Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs I" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundeover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and mi cronutri ents to apply preplant and for annual maintenance. Apply 60 to 1001b/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N, annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 15 Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. I to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. -------------------------- ----- - • ------------------------ ---•---- 588650 Database Version 2.0 Date Printed: 06-25-2003 CropNote Page 1 of 3 The following crop note applies to field(s): 14a, 14b, 14c Fescue: Coastal Plain, Mineral Soil, Poorly Drained to Somewhat Poorly Drained. Adaptation: Moderate to Marginal. In the Coastal Plain, tall fescue can be planted Sept. 1 to Oct. 15 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb/ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Tall fescue will tolerate soil wetness but not flooding or prolonged saturation; use ladino clover for mixtures on these soils. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 13 Fescue: Coastal Plain, Mineral Soil, Moderately Well Drained Adaptation: Marginal. In the Coastal Plain, tall fescue can be planted Sept. 1 to Oct. 15 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 301b/ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Tall fescue requires adequate soil moisture for persistence and production. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 6 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 1544ovember 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. --------------------------------------------- - --- ------ ------------------------------- -... 588650 Database Version 2.0 Date Printed: 06-25-2003 Crop Note Page 2 of 3 The following crop note applies to field(s): 15 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October I5-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbslacre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. ------------------------------------------------------------- ---------- ------------------..---------- -- ---- -- ----- -- 58865o Database Version 2.0 Date Printed: 06-25-2003 -Crop Note Page 3 of 3. Nutrient Management Plan For Animal Waste Utilization This plan has been prepared for: Robert L. Johnson Robert L. Johnson Route 2 Box 284 Rocky Mount, NC 27801 252-446-5374 06-25-2003 This plan has been developed by: Margaret Knight/42�5/4�1 Edgecombe SWCD201 St. Andrew StreetP O Box 10Tarboro, NC 27886252-641-7900 Type of Plan: Nitr gen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Signature (owner) Signature (manager or producer) Date Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. 1 .. Plan Approved T ca Specialist Signature Date ----------- •------------------------------------------------------------------------------------------------------------------- 588650 Database Version 2.0 Date Printed: 06-25-2003 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 2,549,250 gals/year by a 2,750 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 5871 Incorporated 10084 Injected 11105 Irrigated 6382 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 7,821.50 3,124,228 -574,978 ------------------- ---------------------------------------------------------- ..... ......... .-. ---------- Note: In source ID, S means standard source, U means user defined source. 588650 Database Version 2.0 Date Printed: 06-25-2003 Source Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching index for each field is shown, where available. Planned Crops Summary Tract Field Leaching Index (LI) Soil Series Crop Sequence RYE 2012 13 NIA Norfolk Fescue Pasture 3.5 Tons 2012 14a NIA Goldsboro Fescue Pasture 4.0 Tons 2012 14b NIA 10oldsboro Fescue Pasture 4.0 Tons 2012 14c NIA Goldsboro Fescue Pasture 4.0 Tons 2012 15 N/A Norfolk Hybrid Bermudagrass Hay 6.5 Tons Small Grain Overseed 1.0 Tans 2012 6 NIA Marlboro Hybrid Bermudagrass Hay 6.5 Tons Small Grain Overseed 1.0 Tons LI Potential Leach* Technical Guidance Low potential to contribute to None < 2 soluble nutrient leaching below the root zone. > = 2 & Moderate potential to contribute Nutrient Management (590) should be planned. < = 10 to soluble nutrient leaching below the root zone. High potential to contribute to Nutrient Management (590) should be planned. Other conservation practices that soluble nutrient leaching below improve the soils available water holding capacity and improve nutrient use > 10 the root zone. efficiency should be considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of --field practices such as Filter Strips (393) and Riparian Forest Buffers (391). ----- ----------------------------------------------------- 588650 Database Version 2.0 NOTE: Symbol * means user entered data. ------------------------------------------------------------------------------------------------------------------------------- Date Printed: 06-25-2003 PCS Page I of 1 The Waste Utilizafion table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Depending on the requirements of the crop and the nutrient content of the waste, some nutrients will likely be over or under applied if animal waste is being utilized. Waste should be analyzed before each application cycle and annual soil tests are required if animal waste is being applied. Soil tests should be used to balance the nutrient application amounts with the realistic yields of the crop to be grown. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. Waste Utilization Table Tract Field source I.D. Soil Series Total Acre Use. Acres crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (lbs/A) Applies Method Manure PA Nutrient Applied liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 i/A tons 1000 gals tons 2012 13 S7 Norfolk 8.20 8.20 Fescue Pasture 3.5 Tons 8/1-7/31 *130 0 0 brig. 130 51.93 0 425.80 0.00 2012 14a S7 Goldsboro 7.60 7.60 Fescue Pasture 4.0 Tons 8/1-7/31 *160 0 0 brig. 160 63.91 0 485.72 0.00 2012 14b S7 Goldsboro 4.60 4.60 Fescue Pasture 4.01 8/1-7/31 *160 0 0 brig. 160 63.91 0 293.99 0.00 20121 14c S7 Goldsboro 6.40 6.40 Fescue Pasture 4.0 Tons 8/1-7/31 *160 0 0 1 brig. 160 63.91 0 409.03 0.00 2012 15 S7 Norfolk 7.40 7.40 Hybrid Bermudagrass Hay 6.5 Tons 3/1-9/30 296 0 0 Irrig. 296 118.24 0 874.94 0.00 2012 15 S7 Norfolk 7.40 7.40 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 50 19.97 0 147.79 0.00 2012 6 S7 Marlboro 5.10 5.10 Hybrid Bermudagrass Hay 6.5 Tons 3/1-9/30 *300 0 0 Irrig. 300 119.83 0 611.15 0.00 2012 6 S7 Marlboro 1 5.10 5.10 Small Grain Overseed 1.0 Tons 10/I -3/31 50 0 0 brig. 50 19.97 0 101.86 0.00 ------------------------------- ------------ ---------------- ---- ------------------ ---- ---------- ------------------- ---------------------------------------- Preview Database Version 2:0 Date Printed: 6/25/03 W JT Page 1 Waste Utilization Table Year I Tract Field Source I.D. Soil Series Total Acre Use, Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. pbs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 I gaVA I tons 1000 gals I tons Total Applied, 1000 gallons 3,350.27 Lagoon Liquids Total Produced, 1000 gallons 2,549.25 Balance, 1000 gallons -801.02 Total Applied, tons 0.00 Manure Solids Total Produced, tons o.00 Balance, tons 0.00 Notes: 1. In the tract column, symbol means leased, otherwise, owned- 2. Symbol * means user entered data. -------- --- --------- ---- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ --------------------------------------------------------- Preview Database Version 2.0 Date Printed: 6/25/03 WUT Page 2 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per how' that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors 'tract Field Soil series Application Rate (inches/hour) Application Amount (inches) 2012 13 Norfolk 0.50 0.96 2012 l4a Goldsboro 0.50 0.96 2012 l4b Goldsboro 0.50 0.96 2012 14c Goldsboro 0.50 0.96 2012 15 Norfolk 0.50 0.96 2012 6 Marlboro 0.40 0.96 -------- - ------------------ ------------------------------------------------------------------------•--------------------------------------------------------- 588650 Database Version 2.0 Date Printed: 06-25-2003 IAF Page 1. of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 34.48 68.95 103.43 Hay 6 ton R.Y.E. 300 26.32 17.24 34.48 51.71 Soybean 40 bu 160 14.04 32.32 64.64 96.96 -------------------------------------•--.---------...-----------------------------------------------•-------------•- --------------------•------------------------------------- 588650 Database Version 2.0 Date Printed: 06-25-2003 Sludge Page 1 of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste StoraLye Canacitv Source Name I Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 12/15 180 Plan Year Month Available Storage Capacity (Days) 1 1 149 1 2 180 1 3 180 1 4 150 1 5 119 1 6 89 1 7 142 1 8 180 1 9 150 1 10 133 1 11 103 1 12 72, * Available Storage Capacity is calculated as of the end of each month. ------- ----- - ----. -------------------- --- •-------------------...-------------- 588650 Database Version 2.0 Date Printed: 06-25-2003 Capacity Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). --------------------- ._.....------------ ------------------------------------------ ---------------------------- 588650 Database Version 2.0 Date Printed: 6/25/03 Specification Page 1 7. Liquid waste shall be applied at rates not to exceed the soil inf ltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 588650 Database Version 10 Date Printed: 6/25/03 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. ------ ...----------------------------- ----------- ............................... . - - 588650 Database Version 2.0 Date Printed: 6/25/03 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. -- ----•-•- •--------•--- - •-----------•---- --- ------ - --- ..------. 588650 Database Version 2.0 Date Printed: 6/25/03 Specification Page 4 Crop Notes The following crop note applies to field(s): 6 Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. I to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced V to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 15 Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 kb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. ....----•----------- ....---- ------ ... 8 588650 Database Version 2.0 Date Printed: 06-25-2003 Crop Note Page 1 of 3 The following crop note applies to field(s): I4a, 14b, I4c Fescue: Coastal Plain, Mineral Soil, Poorly Drained to Somewhat Poorly Drained. Adaptation: Moderate to Marginal. In the Coastal Plain, tall fescue can be planted Sept. 1 to Oct. 15 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb1ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Tall fescue will tolerate soil wetness but not flooding or prolonged saturation; use ladino clover for mixtures on these soils. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 ]b/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 13 Fescue: Coastal Plain, Mineral Soil, Moderately Well Drained Adaptation: Marginal. In the Coastal Plain, tall fescue can be planted Sept. 1 to Oct. 15 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb1ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Tall fescue requires adequate soil moisture for persistence and production. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 6 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/driIl row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbslacre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. 598650 Database Version 2.0 Date Printed: 06-25-2003 Crop Note Page 2 of 3 m The following crop note applies to field(s): 15 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 Ibs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. ------ --- --- ----------.- . .-- .. .._-. 588650 Database Version 2.0 Date Printed: 06-25-2003 Crop Note Page 3 of 3 ROBERT L. JOHNSON RFD 2, Box 284 Rocky Mount, NC 27801 Tel. 252-446-5374 Mr. Kenneth Schuster, P.E. Regional Water Quality Supervision NCDENR 1628 Mail Service Center Raleigh, NC 27699-1628 Dear Mr. Schuster: June 28, 2000 4d� In response to your letter to me dated June 21, 2000 regarding failure to read and record freeboard levels, I have taken the following measure: I began taking freeboard level readings on Monday, June 26`s and will read them every Monday from this point on. These readings will be a part of my waste management records and available for Buster or whomever to check on their next visits. I am sorry for the lapse. Best regards, Robert L. Johnson RLP/j CC: A. B. Whitley Edgecombe Soil & Water Conservation District Tarboro, NC 27886 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REGIONAL. OFFICE Division of Water Quality June 21, 2000 CERTIFIED MAIL RETTTRN RECEIPT REQUESTED Mr. Bobby Johnson Route 2, Box 284 Rocky Mount, North Carolina 27801 Subject: Notice of Violation rJohnson-L`ivestack CA.W..S33 0 r-Edgecombe-County Dear Mr. Johnson: On June 8, 2000, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection of the subject swine facility. The inspection revealed the following violation of your Certificate of Coverage under General Permit AWG100000: Your permit requires that lagoon freeboard levels be recorded on a weekly basis. While there were some records on site, the inspection noted a lapse of several months for this condition of your General Permit. Please note that violations of your Certificate of Coverage (COC) AWS330030 under General Permit AWG100000 can be subject to civil penalties of up to S 10,000.00 per day, per violation. Please respond to this Notice in writing within fourteen days of receipt. Your response should indicate your intentions to correct the referenced violation. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this Notice please contact Buster Towell at (919) 571-4700-.- Sincerely, r Kenneth uster, P.E. Regio Water Quality Supervisor cc: Edgecombe Health Department Mr. A.B. Whitley, Edgecombe Soil & Water Conservation District DWQ Nondischarge Compliance Group Ms. Margaret O'Ke-fe, RRO-DSWC MAILING Aa OREss: 1628 MAIL SERVICE CENTER, RALEIGH, NORTH CAROL]NA 27699-t 628 LOCATION: 3800 BARRETT DRIVE, SUITE 101, RALEIGH, NC 27609 PHONE 919.571-4700 FAX 919-571-471a AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REGIONAL OFFICE Division of Water Quality June 21, 2000 CERTIFIED MAIL REILMN RECEIPT REQUESTED Mr. Bobby Johnson Route 2, Box 284 Rocky Mount, North Carolina 27801 Subject: Notice of Violation Johnson Livestock AWS330030 Edgecombe County Dear Mr. Johnson: On June 8, 2000, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection of the subject swine facility. The inspection revealed the following violation of your Certificate of Coverage under General Permit AWG100000: Your permit requires that lagoon freeboard levels be recorded on a weekly basis. While there were some records on site, the inspection noted a lapse of several months for this condition of your General Permit. Please note that violations of your Certificate of Coverage (COC) AWS330030 under General Permit AWG100000 can be subject to civil penalties of up to S 10,000.00 per day, per violation. Please respond to this Notice in writing within fourteen days of receipt. Your response should indicate your intentions to correct the referenced violation. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this Notice please contact Buster Towell at (919) 571-4700. Sincerely,, -1. r Kenneth uster, P.E. Regio Water Quality Supervisor cc: Edgecombe Health Department Mr. A.B. Whitley, Edgecombe Soil & Water Conservation District DWQ Nondischarge Compliance Group Ms. Margaret O'Keefe, RRO-DSWC MAILING AoDRESS: 1628 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1620 LOCATION: 3800 BARRETT DRIVE, SUITE 101, RALEIGH, NC 27609 PHONE 919-671-A700 FAX 919-1371-4716 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER • 50% RECYCLEO/10% POST -CONSUMER PAPER State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Robert Johnson Johnson Livestock Rt 2 Box 284 Rocky Mount NC 27801 Dear Robert Johnson: 4 • AdOIIII NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 30, 1999 `f v f ? Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 33 30--,= Edgecombe:County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRYI, DRY2, DRY3, SLURI, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerely, Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Edgecombe County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715.6048 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper ODivrsion of Soil and Water Conservation - Operation Review i /C Division•of Soil and Water Conservation - Compliance Inspection 3, [3 Divisioii-of Water Quality - Compliance Inspection p © Othet'Agency -Operation Review �16 Routine O Complaint O Follow-up of DNVQ il]speetion__ 0 Ft)llow-tipof DSWC review- Q Other Facility Number Date of Inspection Z j Time of Inspectiou 24 hr. (hh:mm) [j Permitted 13 Certified © Conditionally Certified Cj Registered 113 Not O erational Date Last Operated: FarmName: ......................................................................................... ............... County:..................................................................................... Owner Name: .......................................... Phone No: Facilitv Contact: .............................................................................. Title:.............................. . Phone No: N-lailing Address: ..................................................................... I.............................. .......................... Onsite Representative:.1�a.... ............. .. ,......................................... Intel;rotor:..... / Ji g.......... ............................. ...... .... Certified Operator:................................................................................................................ Operator Certification Number:.......................................... Location of Farm: Latitude 0 & 'r Longitude ' �° �• Design Current 3wrne Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer I I Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present 110 Lagoon Area 10 Spray Field Area Holding Ponds 1 Solid Traps ❑ No Liquid Waste Management System Dischari!vs & Stream Imt>acts 1. Is any discharge observed from any part of the operation'? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? h. If discharge is observed, did it reach Water of the State? (Ifyes, notify DWQ) c. If discharge is observed. what is the estinnatcd flow in gathnin'? d. Dees discharge bypass a lagoon system'? ([[' yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation'! 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate'? [:1 Spillway Structure I Structure 2 Structure 3 StRIULure 4 Structure 5 [dcntil'icr: 1, 44,5-,c-- freeboard cinches)' El Yes n No El Yes (]' No Yes / `No / % El Yes 7No Structure 0 _ . ............ ........................................................ ................ ... ...................................................................... f 5. Are there any immediate threats to the intcacity of any of the structures observed? (icl trees, severe erosion, ❑Yes No seepage. etc.) 3/23/99 Continued on back Facility Number: Date of Inspvction L ✓/,f J • 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ElYes 10 8. Does any part of the waste management system other than waste structures require maintenance/improvement'? ❑ Yes/�o 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? [-]Yes VNO . Waste Application I 10. Are there any buffers that need maintenance/improvement? ❑ Yes ff No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes /No 12, Crop type �j /110 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes vrNo 14. a} Does the facility lack adequate acreage for land application`? ❑ Yes /XNo b) Does the facility need a wettable acre determination? ❑ Yes ANo c) This facility is pended for a wettable acre determination? ❑ Yes [;3No 15. Does the receiving crop need improvement? ❑ Yes No 16. Is there a lack of adequate waste application equipment? ❑ Yes �*O Required Records & Documents 17. Fail to have -Tr Certi t� of C_gvCr e & �cneral `rmit �Nicjily available? El Yes �] No 18. Does the facility ail to have (aFll components o tie Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) ❑ Yes �' o 19. Does record keeping need improvement? (ic/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes�No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 'P�No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes 0 No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes VNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes VNo 24. Does facility require a follow-up visit by same agency? ❑ Yes ['No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes [ No i'Vo yiolaticjris;or iieficiencies vtFere inbteii iiirring this visit; Yorx will reeeiye tio: fukther. • ;correspondence: about: this :visit: • '.' .'' :: ' . ' . • . :.: ' ::.. ' ::: ' : ' :. ' :: Comments {refer to question #} Explain airy YES answers acid/or atij%'recommendattotis�or,4any�,€other comments Usedrawtags of facility to better eXplatn `situations. {use additronah pages ¢as necessaiy) 3 r� E �`+ 1��';' J2,v T ,UO C`405 .off ¢ pod c 6 � �ztzr � }{-�v� �b �' C ,a SP �l l3� G-,P-,ss I s c cvC�l/� tvt E- / v a l NC.,e F-&s c- I N Ego !""'V FiGowl l_4 47 Reviewer/inspector Name 1 Reviewer/Inspector Signature: `t� Date: 3/23/99 Facility Number: , Date of Inspection �T (Wor Issues f 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes No liquid level of lagoon or storage pond with no agitation? 27, Are there any dead animals not disposed of properly within 24 hours? ❑ Yes qO A, 28. Is there any evidence of'wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes �No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes IVNo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 3/23/99 RFD 2, Box 284 RocKy Mount, NC 27501 Tel. (252) 4465374 MAAAI Tb: Buster Towel From: Bobby Johnson Fax: (919) 571-4718 Pages:-2-- f Phone- Date: 5/10199 Re: CC: Urgent ❑ For Review ❑ Please Comment ❑ Please Reply O PIease Recycle I am faxing you a copy ofthc map with irrigation lanes designated and also a revised copy of a waste management plan - AB has signed off on both of these_ I am still waiting to get the documentation &am Billy Gillam an field 15 which has the solid set risers. I was in touch with Billy twice and he said he would get it done but he is really busy and will get to it very shortly_ Billy has also talked to AB and knows what is needed. As soon as I receive something from Billy I will send it can to you but I just wanted you to know I am trying to gel the information you requested. BJr Enclosures 100(n 0D Uado Ilysuvad PTT8L9O9SU% OVL0 66/01/30 PEARSALL OPER CO Q 002 05/10/99 07;49 '&2529378114 r --6- Tit AM * Ily J7 / L OFF 16 r -t 7z Vt. OL 10 i.,. 4F. W4 -, ZZ k A ANIMAL WASTE UTILIZATION PLAN Producer: ROBERT L, JOHNSON Location: ROUTE 2 BOX 284 ROCKY NOVNT NC 27801 Telephone: 252-446-537+4 Type Operation: Existing Feeder to Finish swiie Number of Animals: 2750,00 hags (Design Capacity) STORAGE STRUCTURE! Anaerobic Waste Treatment Lagoon APPLICATION METHOD: Yrrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater_ The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer. required for the crap in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximizo the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilise. 2. Soil types are important as they have different infiltration rates, lea4hing potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DW¢ regulations. Page: 1 coo in 0D HHJO 11dSUV3d VURLU99Z$ 09:L0 WOT/90 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6_ To maximize the value -of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based an the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range far specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental management Commission. AMOUNT of WASTE PRODUCED PER YEAR (gallons, ft3w tons, etc.) 2750 hogs x 1.9 tons waste/hogs/year = 5225 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 275o hags x 2.3 lbs PAN/hogs/year = 637,5 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. page: 2 6000 00 Had0 llysuad 6TT9LC6ZSZ$ TS:L0 66/OT/50 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS Comm N ** * LBS DETERMINING PHASE CODE AFT N PER ACRES AW N PER AC AC USED ---- or ------ APPLY RESID. APPLIC METH N 8.2 TIME 2012 13 NoA FP 2.6 130 1066 I SEP-APR 2012 I 114C 1GoA �FP �3.2 1160 16.4 11024APR 2012 FP 3.2 160 4.6 736 J149 ]GOA I 1 1 1 1 ISEP-APR 2012 14A FP 3.2 lGc)A 1160 17.6 11216 SEP-APR 2012 15 NoA BF 4.6 I 1 1172.5 17.4 11276.5 APR-SEP 2012 15 NOA WA 1 I 150 17.4_]370 SEP-MAR 2012 6 BH 6.0 30d 1530 ` jMdA Y 15.1 IAPR-SEP END T I I TOTAL17218.5 - - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3/ I f S000 V Uad0 'I'Iysuvdd bTT9LV692ZQ T5=L0 66/ovs0 NOON ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERN LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS Comm N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AG AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END Whtilow:1"[l Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen} equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY TONS 50 BP HYBRID BERMUDAGRASS-PASTURE' TONS 37.5 FP TALL FESCUE -PASTURE TONS so WA WINTER ANNUALS (I.E. Small Grains, etc.) 50 TOTALS FROM TABLES 1 AND 2 ACRES I LBS AW N USED Page: 4 9001a 0D 13d0 11VSHyad tTT8L96Z9Z.$ T5:L0 66/OT/SO TABLE 1 TABLE 2 TOTAL ANIMAL WASTE UTILIZATION PLAN 39.3 0 39.3 *** BALANCE 7218.5 0 721.8.5 -893.5 1 --------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. page: 5 Looq� 00 2iad0 livsUYdd PTTRL9699ZZ ZS'LO 66/OT/30 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter straps along ditches, odd areas'unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICA`1'ION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rash and will require precautionary measures to prevent over application of nutrients or -other elements. Your production facility will produce approximately 1017.5 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 5087.5 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will nead 16.9583333333 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 40.7 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, sail structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen deeds of the crop. if surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 6 900in 0D Nad0 IlysNyad rTT8LC6Z5Z$ Z5=L0 66/0T/90 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The.following table is provided as a guide for establishing application rates and amounts, I I I (Application RatelApplic. Amount Tract I Field l Soil Type I crop I (in/hr) I (inches) 2012 113 I l I *1 NOA I FP 2012 114A I ! l *1 GOA FP 2012 114B l I I *1 GOA l FP 2012 i 14C I ! I *1 GoA l FP 2012 115 ! I BP NoA 2012 1 6 I I I *1 MaA l BH 2012 I -15 I I I *1 NOA I WA This is the maximum application amount allowed for the soil assuming the amount of nitrogen. allowed for the crop is not over appliea. in many situations, the application amount shown cannvt be applied because of the nitrogen limitation_ The maximum application amount shown can be.applied under optimum soil conditions. Page: 7 6000 Oa uad0 livsUvad VTT8LC6Z9Z$. Z5:LO 66/01/20 ANIMAL WASTE UTILIZATION PLAN Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no .instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF„OPERATION Page: 8 OTOO 00 Uad© "Ilysuvdd VTT8LCUZSZ.$ CS=LO 66/OT/90 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of. the owner of the facility to secure an update of the waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than to tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. B. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 9 Me 0D Hdd0 ZZys2Idad 6TT8LC6Z5Z$ C5*L0 66/OT/20 WASTE UTILIZATION PLAN REQUIRED SFECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a mi.n4,"um and a suitable winter cover crop planted to take up released nutrients_ Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1. 1995 shall comply with the following: vhe. outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters_ (See Standard 393 - Filter strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 15. Domestic and industrial waste from washdowa facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 10 ZTO[a 00 4H40 livsUvad VTTRLC6Z5ZQ ML0 66/OT/50 WASTE UTILIZATION PLAN REQUIRED SPECTFICAT19M is. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plane which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a"rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element_ Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 11 STOIJ 0D Hddo 11VSHVad VTTSLV6959,Q 65=L0 66/0T/90 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION_ PLAN AG$EE ENT Name of Farm: Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be Submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm avent Less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and -at the office of the local, Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner; ROBERT L. JOHNSON (Please print) signature: ate: r Name of Manager (If different from owner) : Signature: Date: Name of Person Preparing Plan: (Please print)MARGARET KNIGHT AffiliatiOW EDGECOBME SWCD phone No. 919-641-7900 Address (Agency): P O Box 14 TARBORO NC 27886-0010 Signature: nat a. Page: 12 I'Too 00 MddO Ilysuvad VTT9LC699Z4; fi9:L0 06/OT/90 -� _ • y4r x' ? +. �i�i�Lll"•' • , ,SIP sir'_ _ ��•' 'S.. �:.-'� :.]� ''A4 -' i ;;;°-�`�;.a f'.,y"�-• „�i +s -•. Ri � fir•^ -•fit• •t 7y yitc,.[�,. � ll RK� r� •� r.:j 4 ''R.'.,e�. Td e A ��1r� � ° � ,e F,i., .-I;: ', -.y1 i.r `" ~ , ,�'• NOT TO SCALE irr!��`�a �� �r'r: �'.. .� � �' �•-"��;i' fir. .J•'., '�'{' ., ��.��,� ' �! �•r. t' . •�'• ��, � ��';� li 5ii�'' r f '. �1''1t1'�y:l �y '.Ci�11Md� , " SiJ.y{=::i: ,rt�,l �.sr Y+ �a• `, i'�"!• '-+''- , i ,T ��yy i • ' St��.' i n a ' � �y,� �•,.•.. • �'...f �: i•� kw A 1.3 7.4 jr fL Ia a L !{ L a i � r � R.<<r 00 tiE[d0 '['IVSgV3d irZZ8L�6ZSZ.Q• 1 9Zll01 06/02/99 07:46 6/2/99 Buster, '&2529378114 PEARSALL OPER CO Here is the wettable acre documentation that is under solid set sprinklers. Robert L. Johnson ra 001 N 0 0 64.90Q0 R4r,6aoa wettalo�e acres 6.4 ac, Nelson F-70 /9/32 n,oz,l maximun spacing at 65%_ field design Installed :at scale 1' = 200' design by Wiley F. GiUa-m 60 psi =17k8 gpm & 64' rad, = 832, 80' spacings I1- State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL REQUESTED Robert Johnson Johnson Livestock Rt 2 Box 284 Rocky Mount NC 27801 Farm Number: 33 - 30 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES July 31, 1998 \ 1V Dear Robert Johnson: You are hereby notified that Johnson Livestock, in accordance with G.S. 143-215.10C;,must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has sixty 60 days to submit the attached application and all supporting documentation. In' accordance with apter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call Sue Homewood at (919)733-5083 extension 502 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700. Sine ly, q6 jor A. reston Howard, Jr., P.E. cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycle& 10% past -consumer paper i State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B, Howes, Secretary Mr. Bobby Johnson Rt. 2 Box 284 Rocky Mount, NC 27801 ffl?WA IDIEHNFZ Division of Soil and Water Conservation May 13, 1997 SUBJECT: Operation Review Summary and Corrective Action Recommendation for Johnson Farm Facility No. 33-30 Edgecombe County Dear Mr. Johnson, On May 2, an Operation Review was conducted of the Johnson Farm, facility no. 33-30. This Review, undertaken in accordance with G.S. 143-215.100, was one of two visits scheduled for all registered livestock operations during the 1997 calendar year. The Division of Water Quality will conduct a second site inspection. During the Review, it was determined that waste was at being discharged to the waters of the State, and the animal waste collection, treatment, storage and disposal systems were properly maintained and operated under the responsible charge of a certified operator. A copy of the completed review form is enclosed for your information. The following items were discovered and noted for corrective action or response: There was no start/stop pumping marker in the lagoon but on S&WC district list. Please ensure that the marker is inserted before 1998. The lagoon sides had some small rat burrows that need to be filled and the vegetation present requires maintenance. The Division of Soil and Water Conservation appreciates your cooperation with this Operation Review. Please do not hesitate to call me at 919/571-4700 ext. 208 if you have any questions, concems or need additional information. Sincerely, Margar O'Keefe Environmental Engineer I cc: Edgecombe Soil and Water Conservation District Judy Garrett, Water Quality Regional Supervisor John College, Hanor Farms DSWC Regional Files 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, North Carolina 27b09 N%q f C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Robert Johnson Johnson Livestock Rt 2 Box 284 Rocky Mount NC 27801 e�� C3EHNR November 13, 1996 SUBJECT: Operator In Charge Designation Facility: Johnson Livestock Facility ID#: 33-30 Edgecombe County Dear Mr. Johnson: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 91gn33-0026. Sincerely, A. Preston Howard, Jr., ctor Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files 04 P.O. Box 27687, W Raleigh, North Carolina 27611-7687 r�C An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director August 6, 1999 Robert Johnson Johnson Livestock Rt 2 Box 284 Rocky Mount NC 27801 1 •1fflZW'A IT • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWS330030 Johnson Livestock Swine Waste Collection, Treatment, Storage and Application System Edgecombe County Dear Robert Johnson: In accordance with your application received on September 22, 1998, we are forwarding this Certificate of Coverage (COC) issued to Robert Johnson, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Johnson Livestock, located in Edgecombe County, with an animal capacity of no greater than 2750 Feeder to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for. this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper N, ,icate of Coverage AWS330030 ,son Livestock .ge 2 If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final, and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. Sincere 1 Kerr T. Stevens cc: (Certificate of Coverage only for all cc's) Edgecombe County Health Department 4R6l;eigh'Regional-Office -Wiia er-Quality;Section:::> �y Edgecombe County Soil and Water Conservation District, Permit File / NDPU Files �� State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director July 31, 1998 CERTIFIED MAIL RETURN RECEIPT REQUESTED Robert Johnson Johnson Livestock Rt 2 Box 284 Rocky Mount NC 27801 Farm Number: 33 - 30 Dear Robert Johnson: A • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES You are hereby notified that Johnson Livestock, in accordance with G.S. 143-215.1 OC, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has six 60 days to submit the attached application and all supporting documentation. In accordance Chapterwit626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any 'owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality' Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call Sue Homewood at (919)733-5083 extension 502 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700. Since ly, v for A. Preston Howard, Jr., P.E. cc: Permit file (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper T _ v V State of North Carolina Department of Environment and Natural Resources Division of Water Quality Non -Discharge Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Existing Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for.completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: 1.1 Facility Name: Johnson Livestock 1.2 Print Land Owner's name: Robert Johnson 1.3 Mailing address: Rt 2 Box 284 City, State: Rocky Mount NC T Zip: 27801 Telephone Number (include area code): 919-446-5374 1.4 County where facility is located: Edgecombe 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): 5 miles SE of Rocky Mt. NC on RR 1224 1.6 Print Farm Manager's name (if different from Land Owner): scram 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): 1.8 Date Facility Originally Began Operation: 01/01/78 1.9 Date(s) of Facility Expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility No.: 33 (county number);O (facility number). p2.2 Operation Description: f nSwine operation Feedeer to Finish 2750- Certified Design Capacity Is the above information correct? Wyes; no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum num er for which the waste management structures were designed. Type of Swine No. of Animals Type of Pouktry No. of Animals Type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm: (,q 41 �e_ No. of Animals: q U FORM: AWO-G-E 5/28/98 Page 1 of 4 33 - 30 0 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 40.00 . Required Acreage (as listed in the AWMP): 18 2.4 Number of agoons storage ponds (circle which is applicable):_ 2.5 Are subsurface drains present within 100' of any of the application fields? YES or (please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or ®O (please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) (& or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? 19 7q _ What was the date that this facility's land application areas were sited? q 71 REQUIRED -ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicants Initials 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste, application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.11 Emergency Action Plan. 3.3. l2 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. FORM: AWO-G-E 5/28/98 Page 2 of 4 33 - 30 -wl3i'RCiI.a'�� Facility Number: 33 - 30 Facility Name: Johnson Livestock 4. APPLICANT'S CERTIFICATION: (Land Owner's name listed in question 1.2), attest that this application for S3:0 C A (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete tot the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as inconM*te. Signature Date y lJ-- j�✓�J/ 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) I, 1 C es )a e__*r 7-To \n , (Manager's name listed in question l .6), attest that this application for >r,1.r`�o1 L_ ✓� S }d C ✓ (Facility name listed in question 1.1} has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplater-) - ' I/ THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPOI!tFING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 5/28/98 Page 3 of 4 33 - 30 ATTACHMZaz _a r. U ! . :t • :i Agri -Waste Ma--nagement Biological and Agricultural Engineering North Carolina State University LIVESTOCK VASTLY SA1fFLL`iG. AHALYSIS AND CALCULATION OF LAND APPLICATION BATES James C. Barker* 1. SAXYLB COLLECTION A. Semi -Solid Lac Manure I. Scraped directly from lot inca.spteader a. From loaded spreader, collect about 2 lbs of manure from different locations using nonmetallic collectors. ii. From storage a. Collect about 2 lbs of manure from under the surface cruse avoiding bedding materials and using nonmetallic collectors. A. Liquid Manure Slurry I. Under -slotted -floor pit a. Extend a 1/2' nonmetallic conduit open on both ends into manure co pi: floor. b. Saal upper end of conduit {e.g., by placing a thumb over end of conduit) trapping manure that has entered lover end, remove and empty slurry into plastic bucket. or nonmetallic container. c. Take subsamples from S or more locations or ac least I quart. d. MU and add about 3/L pint to nonmetallic sample container. IL. Exterior storage basin or tank a. :take sure manure has been veil mixed vich a liquid manure chopper•agi:acor pump or propeller agirazor. b. lake subsarzzles from about 5 pic. locations, from agitator pu=P or .`_om manure spreader and place '_n a plasc:c bucket. * Professor and Extension Specialist, Biological and Agr:cultural :ngincering Department, ;torch Carolina Scate University. Raleigh. :;C. AT T AC KkENT B 2 of 3 C. Mix and add 3/4 pint to a nonmetallic sample container. C. Lagoon Liquid L. Collect about 3/4 pint of recycled lagoon liquid from inflow pipe to flush Banks in a nonmetallic sample container. Si. From lagoon a. Place a small bottle (1/2 pine or less) on end of 10-15' pole. b. Extend bottle 10-15' away from bank edge. c. Brush away floating scum or debris. d. Submerge bottle within l' of liquid surface. e. Empty into a plastic bucket, repeat about 5 times around lagoon, mix, and add 3/4 pint to nonmetallic sample container. D. Broiler or Turkey Litcer I. House litter a. Visually inspect litter for areas of varying quality, e.g.. areas around feeders and waterers, and estimate percent of floor surface in each area. b. Take about 5 litter subsasmplas at locations proportionate to item a. E.g.. if 20% of litter of similar visual'qualicy is around feeders and waterers, cake 1 subsample there and the other 4 subsampLes from remainder of floor surface. c. At each location, collect liete.r from a 6" by 6" area down to earth Floor and place in a plastic bucket. d. After 5 subsamples have been added to the bucket. mix. and add about-2-3 lbs litter cc a nonmetallic sample container such as a 1-gallon freezer bag and seal. U. From stockpile a. Take subsamples from about 5 locations ac lease 18' into pile. b. Mix, add 2-3 lbs cc nonmetallic sample container and seal. t P:17LAI� .KMZN.T kf- �' 3 of 3 II. SAME PREPARATION AND TRANSFER A. Place sample into.an expandable container that can be scaled. Rinse residues from container with clean water but do not use disinfectants, soaps, or treat in any ocher Way, B. Pack sample in ice, refrigerate, freeze, or transfer ea Lab quickly. C. Hand -delivery is most reliable way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and tape. E. Commercial sample containers and mailers are also available. Contacts: I. AAL Eastern Agricultural Lab, Inc. iii. Polyfoam Packers Corp. 7621 Vhitepine Road 2320 S. Foster Avenue Richmond. VA 23237 Wheeling. IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 ii. Fisher Scientific Co. 3315 Vinton Road Raleigh. NC 27604 Ph: (919)876-2351 iv. NASCO 901 Janesville Avenue Fort Atkinson, VI 53538 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NCDA provides this service for North Carolina residents. I. Address: North Carolina Department of Agriculture Agronomic Division Plahc/Vaste/Solution Advisory Section Blue Ridge Road Center P.O. Box Z7647 Raleigh, NC 27611 Ph: (919)733-2655 Attn: Dr. Ray Campbell U. Forward $4 along with the sample. ILL. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, ecc.) b. Livestock usage (swine -nursery, finishing; turkey -breeders, brooderhouse, grower, number flocks grown on 'litter: etc.) c. Wasce type (dais' -lot scraped manure, Liquid slurry: swine -pit slur:f, la3oor. 1:qu:d, sludge: broiler -house liz:er. stockpile iv. Routine analyses performed on all samples: N. P, K, Ca. Mg. Ma. S. Fe, fin, Zn, Cu, B v. Additional analyses performed upon request: Dh. ho, Cd, Ni, Pb SCs ..,** • - 11110193 - LAGOON SUMMARY SHEET & TYPICAL -CROSS=SECTION SINGLE STAGE"LAGOON Top Width Z Settled Top. of Dam: .$ �. �, �- s! Construct Top' of Dam • � rk �klc r, c k;�" 1 Fill Yardage: 2,CMG II 5 td Slope f ' Slope 2 15,9oTy�-' Natural Ground-Elev. Cut-off Trench w�t.;,yr Depth determined by SCS on site Width depends on equipment-- rn Start land application Stop land application r 9� elev. y F, elev. y'f," Bent T --Temporary Storage -Volume / 5---4---cu. ft. -- Support------------------------------------------- Treatment Volume 28'64-�p4 cu. ft. 3 Top of sludge elev.- lev. ~--� ------------------------------I-- Sludge Volume. / sottom elev. 3 5 �` = `'' Lagoon size (inside top): Length 3 2 S Width 22 5 Cu. Yds. Excay. Bench Mark Description: C (, cx_ j 2 we s f C.oei. r4 (, Q C. Elevation: 0,e0 General Information Engineering Job Class: ly Hazard Class: Animal Type: (.J + ►ti) E Type Operation: p )LS , J_ Number of Animals: I p TE: If construction is not started .thin one year, this plan is not valid until a re-evaluation of the design and flood plain safety hazards are made. Lagoon for Animal Waste Farm County �'Al Q�� t., co Ica a - State U. S. Department of Agriculture Soil Conservation Service Designed Approved Title: _ Date: by: by: wvv�C Suma4- �3obs+� �Ju� i3u"(l ;v5 Re' d yd 3 5 J y c. o cju�— r �;( y( v e�a-5 `- 171 q'g l d .s 3 `� Y f L P f •` t N 1` `!• i *' . f G GH (� I [J %` PL. .�S' ! -0/10 f. -.1 } U. S. DEPARTMENT OF AGRICULTURE � NC--ENG-12 Soil Conservation Service 6-82 EARTHWORK COMPUTATION SHEET EARTH EMBANKKENT Dame PyAce f Jo�hSy ti - Address Embankment: Top Width Z Side Slopes STATION FILL HEIGHT ( Feet) END AREA (Sq. Ft.) SUM OF END AREAS (Sq. Ft.) DISTANCE ( Feet) DOUBLE VOLUME (Cu. Ft. ) HN 3 2 I32- 100 3 00 i1w r31 1 314 2,S 1 !0(� pzBL . 3 y 7 D a T7ao 3 3162 2 � S� 2. 300 3. 3 7 G 3,2 13 3I L!2 S ? 2. 151 l r.5 Iv0 S L% 1. Double Volume of Fill t 2 = 7%, a S) Cu. Ft. 2. Volume of embankment fill (line 1 - 27) l- / Cu. Yds. 3. Allowance for settlement (5 or LO% of line 2)1- Cu. Yds. 4. Total cubic yards (line 2 + line 3) = Cu. Yds. Computed by (/lam Date N 2 ram• Checked by Date 1 /1 Ll z G s�7 r i THIS DESIGN IS FOR A SINGLE STAGE LAGOON CLIENTS NAME _-----_------____----___> Bobby Johnson COUNTY ==--___-________-___--_-_____--_> Edgecombe TODAYS DATEOct. 5,1994 DISTANCE TO NEAREST NONFARM RESIDENCE —> 1600 FEET NUMBER -OF PIGS WEANLING TO FEEDER =====> 0 NUMBER OF PIGS FEEDER TO FINISH =---===> 1920 NUMBER -OF SOWS FARROW TO WEANLING =====> 0 NUMBER OF SOWS FARROW TO FEEDER =__====> 0 NUMBER OF SOWS FARROW TO FINISH =-=--==> 0 DEGREE OF ODOR CONTROL 1.0 (minimum 1.0 cu. ft. per lb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > 5.0 YEARS TOP LENGTH AT NORMAL WATER LEVEL =---___> .300.0 FEET TOP WIDTH AT NORMAL WATER LEVEL = =_-__> 200.0 FEET NORMAL WATER LEVEL ELEVATION =-_____--_> 47.5 FEET SEASONAL HIGH WATER TABLE ELEVATION =__> 47.0 FEET LAGOON BOTTOM ELEVATION --_____--______=> 39.5 FEET Depth of Permanent Water 8.0 feet (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES3.0:1 Permanent Volume Required 362880.0 cubic feet Permanent Volume Provided 390144.0 cubic feet ADDITIONAL DRAINAGE AREA IN SQUARE FEET> 0 SQUARE FEET (i.e. pumpout pond & other outside area) LENGTH OF PUMPING CYCLE _______________> 180 DAYS GALLONS OF FRESH WATER ADDED DAILY ====> 0 GALLONS EXCESS RAINFALL ABOVE EVAPORATION =====> 13.4 INCHES 25YR/24HR STORM RAINFALL =_____-_______> 6.7 INCHES FREEBOARD--W==________________________> 1.0 FEET ESTIMATED TOP OF DAM ELEVATION ===---==> 51.6 FEET Temporary Storage Volume 185414.2 cubic feet Top of Dam Elevation = 51.6 feet Inside Dimensions of Lagoon at Top of Dam Length = 324.6 feet Width = 224.6 feet Begin Pumping Elevation = 49.9 feet Stop Pumping Elevation = 47.5 feet Volume To Be Pumped -- 144708.9 cubic feet SCS-IN{r-538 U. S. DEPARTMENT OF AGRICULTURE Re,. 5-10 SOIL CONSERVATION SERVICE SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE FARMER'S NAME_P 6 DISTRICT DATE COUNTY— S. C. S. PH TO SHEET NO. WORK UNIT _— a.-L,ero WATERSHED AREA MEASUREMEIN"IS CROPLAND ACRES PASTURE ACRES WOODLAND —ACRES TOTAL. ACRES PAfkt3 CLASS WORK UNIT CONSER TIT: IST SKETCH OF PROPOSED POND SHOWING WHERE BORINGS WERE MADE (Approx. scale 111-feet) Locate reference point in center line of dam and 1denNly on skelck I I i 311 1 I I I SHOW 1 1 LIP, 2 f_t - -q , 7 BORING `UMBER AND PROFILE � 3 y�• ie and list dam•eitt 4SJ tvillway bn�npf frrff • then pondrd area and borrvw pit bormos • separate with yer cal rod fine. DEPTIT! tCnnfrnurd an back wAt" necesta:li Shaw wafer table elevatin-a nn dam -site bo inps. l�lm . rWE'Nowulm"MIMMIU MIMIM gLYAM'9� �IOMINI■IZINSIMEARNE10 10 IM IME1010 I®1�;�'1•IMI0 SIMON "MMINIM01,01 Milo 1®I�I�I�i I®i ' . �l0rSim � �° Sm Bf1R1tif;S 'SSA BSIGNATURE & TITLE Q 1. STEADY STATE LIVE WEIGHT 0 head weanling to feeder x 30 lbs. = 0 lbs 1920 head feeder to finishing x 135 lbs. 259200 lbs 0 sows farrow to weanling x 433 lbs. 0 lbs 0 sows farrow to feeder x 522 lbs. = 0 lbs 0 sows farrow to finish x 1417 lbs. - 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 259200 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of slud4e accumulation in design? 5.0 Sludge Volume = 103680.0 cubic feet 3. REQUIRED LIQUID VOLUME OF. LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 362880.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 47.5 feet Construct lagoon bottom elevation 39.5 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 3.0 3.0 3.0 3.0 8.0 AREA OF TOP LENGTH *WIDTH = 300.0 200.0 60000.0 (AREA OF TOP) AREA OF BOTTOM Lb * Wb = 252.0 152.0 38304.0 (AREA OF BOTTOM) AREA OF MIDSECTION (Lm * Wm) 276.0 176.0 48576.0 (AREA OF MIDSECTION) CU. YD. = (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 60000.0 194304.0 38304.0 1.333 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL=90144.0 CU. FT. VOLUME NEEDED 362880.0 CU. FT. THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 300.0 FEET LONG BY . 200.0 FEET WIDE 5. DIKE Place spoil as a continuous dike to elevation 51.6 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width 324.6 224.6 72905 square feet Additional Drainage Area 0 square feet TOTAL DA 72905 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 259200 SSLW * 0.0101481 gallon/lb. SSLW/day in the pumping cycle / 7.48 gallons per cu. ft. Volume = 63298.1 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 13.4 inches Volume = 13.4 inches * DA / 12 inches per foot Volume = 81410.8 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.7 inches * DA / 12 inches per foot Volume = 40705.4 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 63298.1 cubic feet 6B. 0.0 cubic feet 6C. 81410.8 cubic feet 6D. 40705.4 cubic feet TOTAL TEMPORARY STORAGE 185414.2 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. Depth required = 185414 cu.ft. / 60000 sq. ft. Depth required = 3.1 feet Normal_ lagoon liquid elevation = 47.5 feet Depth required = 3.1 feet Freeboard = 1.0 feet Top of Dam -- 51.6 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 51.6 ARE 324.6 FEET BY 224.6 FEET 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 63298.1 cubic feet 6B. 0.0 cubic feet 6C. 81410.8 cubic feet TOTAL PUMPED VOLUME = 144708.9 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 144708.9 cu.ft. / 60000.0 sq. ft. Depth required = 2.4 feet DESIGNED BY: APPROVED BY:' DATE: DATE: SPECIFICATIONS FOR CONSTRIICTION OF WASTE TREATMENT LAGOON Producer: �� 0 b �ac.' J 0_4i It se 11 Clearing: "All trees and brush shall be removed from the impoundment area before construction is started: The foundation of the lagoon shall be cleared of all trees, stumps, roots, brush, sod, organic soil, and debris. All stumps and all roots exceeding 1 inch in diameter shall be removed to a minimum depth of 1 foot. Satisfactory disposition will be made of all debris. After clearing is completed the foundation area shall be loosened thoroughly and roughly leveled, with suitable equipment, before placement of any embankment material. Cutoff Trench: A cutoff trench shall be excavated to a minimum depth of If inches under the embankment. The exact depth shall be determined on site by SCS. The trench side slopes shall be 1:1 or flatter and the width will be a minimum of 6 feet, but will depend on the a uipment being used. The cutoff trench shall be backfilled with Se- material. The trench shall be backfilled in 9 inch layers and compacted with a sheepsfoot roller with a minimum of 4 passes per unit width of fill lift. If sheepsfoot roller is not used, the trench shall be backfilled in 4 inch layers and compaction shall be equivalent to or better than the routing of the hauling and spreading equipment over the fill in such a manner that every point on the surface of each layer of fill will be traversed by not less than one tread track of the loaded equipment traveling in a direction parallel to the main axis of the fill. All standing water shall be removed from the trench before backfilling is started. Existing Tile Drains: When tile drains are encountered, the the will be dug up and removed. The tile trench shall be backfilled with a compacted layer of CL or CH material. Excavation: Topsoil shall be stocked piled separately for later use. The bottom of the lagoon shall be excavated as shown on the plans. Where pervious material (SP �Mquartz veins, etc.) is exposed during excavation, it shall be undercut a kfilled with a compacted layer of highly plastic (CL, CH)materia �'- 1eA✓y 5C approximately one foot in thickness. Scarify and compact the bottom and, where practicable, the side slopes of the lagoon to decrease the permeability of the soil in the lagoon. 6oz56,? � Pa�sr(o/y ,�l �%C i�r,d� u�hem r/� d n c4 v Oslo �/ ;.�% h e EdMk�enCd%s�suction: The ma��p1 ce °fin the embani�menaC/e. shall be free of sod, roots, stones over six (6) inches in diameter, and other objectionable materials. S'G,GL materials shall be used in the embankment. Pervious material shall not be used in the embankment. Construction of the embankment shall be made in layers not to exceed 4 inches in thickness. Compaction shall be equivalent to or better than the routing of the hauling and spreading equipment over the fill in such a manner that every point -on the surface of each layer of fill will be traversed by not less than one tread track of the 1 r SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOON loaded equipment traveling in a direction parallel to the main axis of the fill. If pans are not used, construction of the embankment shall be made in layers not to exceed 9 inches in thickness and compacted with a sheepsfoot roller with a minimum of 4 passes per unit width of fill lift. At any time the embankment surface becomes "slickened" such that the succeeding layer'will not bond to the previous layer, scarify the previous layer sufficiently to.assure bonding of the surfaces before continuing with the fill operation. Construction of the fill shall be undertaken only at such times that the moisture content of the fill material will permit a reasonable degree of compaction. Construction of the embankment shall allow an additional .9 % for settlement. Stock piled topsoil shall be spread over top of embankment and outside side slopes for the establishment of vegetation. Pollution Control During. Construction: . Stripping of embankment and borrow areas shall be done as they are needed in a normal sequence of construction.' Use temporary mulch protection on all disturbed areas that are subject to erosion and will not have substantial additional work performed for 30 days. Vegetation: Vegetation shall be established on the slopes, embankment top and all other disturbed areas, except the area that will be inundated, as specified in the plans as soon as possible after construction. Necessary steps shall be taken to ensure that a good stand of vegetation is established in a reasonable amount of time. Seeding rates are: So lb. /3ac'-it_ lea rS � Q lb. F!�.rr _ K lb. 10-10-10 �Gr 'e— tons lime tons wheat straw Permanent Stake: A permanent stake (CCA salt treated 411x4" post or 1 inch diameter PVC pipe with tee) marked t,o indicate pumping level elevations, shall be placed in the inside slope at one end of the lagoon. 2 OPERATION AND MAINTENANCE PLAN _FOR _SWINE WASTE MANAGEMENT SYSTEM Producer: I J d b qc, c i 0 h I U vL The purpose of -this plan is to provide guidelines for carrying out the routine operation and maintenance work. needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, -usefulness, and permanence. A. Maintenance The routine maintenance of the lagoon involves the following: 1. Maintenance of a vegetative cover on the embankment top and side slopes: 13ak;a fescut cou.. P,7 t .`Cmg is being established on these areas. Beginning in 199s and each year thereafter, the embankment should be fertilized with 800 pounds of 10-10--10 per acre to maintain a vigorous stand. 2. control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be done at least once each year and possibly twice in years favorable to heavy growth of vegetation. Maintenance inspections of the lagoon should be made during the initial filling of the lagoon and at least annually. Items to be checked should include, as a minimum, the following: 1. Waste Inlet Pipes, Overflow Pipes a. condition of pipes (1) separation of joints (2) cracks or breaks 2. Pool Area a. undesirable vegetative growth b. floating or lodged debris 3. Embankment a. settlement, cracking or "jug" holes b. side slope stability - slumps or bulges C. erosion and rodent damage 1 OPERATION AND MAINTENANCE PLAN FOR SWINE WASTE MANAGEMENT SYSTEM B. Operation Your animal waste management facility was designed for a total of o Q; *e8- (e«de ' to TQg ) . The lagoon contains both permane t and temporary 'stora e. 'The permanent storage is not to be pumped in order to ensure that anaerobic action will occur. The. design includes permanent storage of one cubic foot per pound of steady state live weight. The temporary storage portion of the lagoon includes capacity for the volume of waste produced over 180 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 180 days of temporary storage; therefore, it will need to be pumped every six months. Begin pump - out of the lagoon when fluid level reaches elevation Lj__�_tr as marked by permanent markers. Stop pump -out when the fluid level reaches elevation 4'7, r . The attached waste management plan should be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. The waste material should be analyzed before each application cycle to determine its nutrient content. A soil test of the area of application should be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. It is strongly recommended that the treatment lagoon be pre -charged to 1/2 its capacity to prevent excessive odors during start-up. Pre - charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environmental Management, has the responsibility for enforcing this law. 2 Telephone: Type operation: -Number of Animal Units: 3A14i, Teltiliot, s:,I- G 'M 1,2 z,q sie a x G Ills. 27(�lJl 1 it1 r •e � ��.f�t' �1v — — �yzv The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste should be analyzed before each application cycle and annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crops.to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements may be more or less based on the waste analysis report from your waste management facility. Amount of waste produced per year J9 2 Q animal units X .2 7 waste/animal unit/year = 779 B 4 D waste/year If I Amount _of_nitrogen produced per year / 2 O animal units X lbs . N/year 2,3 lbs. N/animal unit/year = Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. page 1 The following acreage will be needed for waste application based on the crop to be grown and surface application: 0K-1,r� Table 1: ACRES OWNED BY PRODUCER Tract Field Soil Crop Real. Lbs. N Acres Lbs. N Month of if Type Yield Per Ac Utilized Application alz I Gad r'sr�e 4, o4 i F� 3 i. q s d sz Z- N ISr.^ NO 4 4 Bey �,d 6;04-to 270 3. zr 3 3 GJW �`� �� .o ,s 2 7 d [ `f 378 `l &A �. 404c4,, z7v 3.5 Umat 150 .z v 3 1 G U .Total Table 1 %3 3Y8 Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE Tract Field Soil Crop Real. Lbs. N Acres. Lbs. N Month of # Type Yield Per Ac Utilized Application Total Table 1 Total Table 2 Total Amount of N Produced Surplus of Deficit y /� c3 2- Your facility is designed for lXi�7 days of temporary storage and needs to have the temporary storage removed every months. Wt+wACA Tewtlx� �V. rZ, D5w L Page 2 Where owners of animal operations do not have adequate amounts of land to -apply the waste, the producer must provide a written agreement whereby another landowner has agreed to land apply or' allow land application - on his or her land. Call -the Soil Conservation Service or Soil and Water Conservation District office after you receive the waste analysis report to obtain the amount per acre to apply and the application rate prior to applying the waste. Narrative Operation:. See attached map showing the fields to be used for the disposal of waste water. Application of Waste by Irrigation Field No. Soil Type Crop Application Rate(In/Hr) Application Amount(In.) Z Lon O 2.12 U 614� Page 3 WASTE MANAGEMENT LAN AGREEMENT I agree to carry out. this waste management plan according to the terms of the agreement. Failure to comply with the waste management plan will automatically require any cost share funds to be refunded to their source. I understand that Mr./Mrs. � does not have ample land to apply the animal waste produced from his/her animal operation. I have agreed to utilize the waste produced from the operation and agree to carry out this waste management plan on land that I own or operate. Recipient Landowner: Date: `+-��'' System Designer: Date: ? 3� 9 SWCD Representative: Date: Design Approval: Date: Page 4 EMERGENCY RESPONSE PLAN ROBERT L. JOHNSON ROUTE 2, BOX 284 ROCKY MOUNT, NC 27801 252/446-5374 THE HANOR COMPANY 876 Country Club road Rocky Mount, NC 27804 ", EMERGENCY RESPONSE PLAN LAGOON/PIPELINE FAILURE: 1. Contact Person (s): • Office: • Pager 7 • Home if 2. NI)Ifft • Office a/ • Pager • Home 3. 9 • Office • Pager • Home • Office • Pager • Home H. Situation Evaluation and Solution: 1. Assess situation at hand. Contact the appropriate above personnel to notify of situation. 2. Contact secondary personnel essential for required corrective action. A list of contact numbers for employees that should be available is attached. 3. Obtain needed equipment. See list of equipment suppliers attached. (bulldozers, backhoe, pumps and portable pipe) ` 4. Contain discharge. Prevent any discharge from entering surface waters or leaving facility property, if possible. 1 5. Temporarily repair/stop source of problem. (breach damaged pipe, and leaks). Keep in mind these repairs are temporary and will need to be properly repaired at a later time. 6. Note details of incident, location or direction of movement of spill, weather and wind conditions, corrective measures taken and situation seriousness. III. Notify Appropriate Agencies: 1. Division of Water Quality (DWC) Contact Person: • Office Q/p ` 221 ` :s('ZGb • After Hours -- - • Needed information: Name, facility telephone number, details of incident, exact location of facility, location or direction of movement of spill, weather/wind conditions, corrective measures taken, and situation seriousness. 2. Local EMS and police (in the event of spill leaving property or entering surface waters). • County: Edgecombe Phone #: 252/641-7511 3. Contact Local Health Department • County: Edgecombe Phone #: 252/641-7511 IV. Permanently Repair Problem: 1. The problem must be repaired to a state equal to or exceeding that prior to discharge. This may require a redesign of the component in the system. Contact AWT as questions arise. 2. Properly note repairs that are performed at the facility for future reference. 3. AWT should inspect any lagoon breach repair prior to lagoon being placed back into service. V. - Official Reports and Responses: 1. Send written notice to DWQ explaining situation and how it is being handled. 2 2. Draft needed reports for the governing agencies. Contact AWT for any needed assistance. Request written responses from governing agencies that indicate situation and resulting actions are concluded. EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919-571 - 4700 EMERGENCY MANAGEMENT SYSTEM 919-641 7843 SWCD 919-641-7900 NRCS 919-641--7900 This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow --possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. C. Stop all additional flow to the lagoon. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field- actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close valves to eliminate further discharge. D: Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Make sure no siphon occurs. 14 E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks -possible action: a. Dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? C. Any damage noted, such as employee injury, fish kills, or property damage? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone 919-571-4700• After hours, emergency number: 919- 733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters. surface waters, call local EMS Phone number 919-641--7843• n C. Instruct EMS to contact local Health Department. d. Contact CES,�phone number 919-641-7915, local SWCD office phone number 919-641-7900, and local NRCS office for advice/technical assistance phone number 919-641-7900. 4: If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site -damage. a. Contractors Name: F"er Anderqon _ ^ b. Contractors Adress: Tarboro. NC c . Contractors Phone: 823-1021 6: Contact the technical specialist who certified lagoon (NRCS, Consulting Engineer, etc.) a. Name: _ A, Ya. W�-LL'n-&y, - b. Phone: GAI--1gno the 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. .-r ..--.?r � ,�+ ;•e�.�,5�, "i r�r3ri 1t�,,N��� �t„�r}�C+,�4 xf,;� �aV,SJ��'t ,�'✓� •.�'��r � �. .,� '� t{r �.�': '. , ��-f;r" .•� r i� A 4,'[. r�+F h�l' i 1' , 'r '.F`'�r * Y '�,'1 l '" � °� hs � • � r � ` ,My } J Y'l,^+ •+ilYU� . '+'` �'' ,,, w � '� � ��+ '�� '' ��'x {�e[�J 7 ' .4 �' `'���� Jr ,,' .,►r �' 1sa� i�"; '�'i)• '• �+k� K• s" ' .. � r�v'� � 7 1 � �r,�1ti' r * + ,� r A � r t [t ,a'ti � {* l�` Y �x..' � � •,�.;tn , � • 1',• ..;.�y,rc•�s,;'"�oy • "�. S,dr':�s�•;t' ��yr.` g'y 1' �''�' '�':�y: , .Yr.�s. .. .:,�..,_ ;�r 1L ,.416 ,,, 1+%�. a � fay •��+ sr•`r�LL+p: L ' ':'./i� ! �, - .� ? , �,/L�•�.r�,,� .. -•�, r ;iwi } Ayr f , c S [' aP YZ t'P j i" dde 3 '1, ' f 44rt, NOT TO SCALE IN Man 14( 3r�i- .L i•!� J,7 i 11r -�,�' `fir„# # 6 w �Lti x 1 � •jL„w J r i J lr e 1 1yA�y� k'�# � r�,�v ,�>� �i ' '�;• ' ' .. ♦. rh,�.ie'rt ' Y• ..Y1', a. 417rr7,y,� ,�.�j;�i61 t,i:'' J �' ��"� i1',..�-,:r.A-,_�!�' �� rLa� ; ' ,�.. ���'�" . r Ia' • '�`'r1C1r,y, • �:� �7 • ' � (r j ' r'\."t, h.a ..{;...,. f ysr , 1'�+�+j�;y�,„;i ±,�.,' L fJ��y'M � � �i � �ri'� �'+t * �5. taj�'{ �d•i I r'� 2 •'� �!, � +t3 '`.• •. J �T J � } • ,��'( tl �l�T't� I�`r.: F �wx:� ���"J.t �,A:.�'.:,M�: .. ;F,r,�: r.•rF"'', ,1,x4,f`(iriiy{1l/).Y�trJ�G���s+w' rye.�,r�'{,,y'z."St`,"+3a'g;y?�;; --�'��� + �t, e+, ,. �t •.}.P1w_ „�r 11}4 �.! f_'s,,��6Y•�'7+•4�1i'y` `1i,lt, f�� k.l. G }� /y� .. �y�A` ' i � � '�;' v'f. }1 ti•' Ih�'� it 011 S, �, r 'f ,�• i .}! i � i � ,t��,rj','1'SrrPI'�� .'i�/ 7R �� ,{'. I S• ' } ... 14 I ' 27.3 J� 44 �• —i'`` �. 1` r tt•9r'� r • + + �� r � � ,. fir'. ,r 1.4 ri 145 l ` 1 L q... � � . ire �4si • [ r� orr 1 t r "iIyETBr 1biGh.y.�Ok'1F,t - .s4' _ � - �' - ,; Sy' ' ` ,tt6 ;' i�'`�i `i{ ,.. \ � l 'U" " s�,� f i�- 44 � t t �...-� ' ��'� •. �"„-'- +" t_ if i� `.*:-__•+ '.--�,_. i33{{ I.y �t a wW '�' aka �5 {,-A'r ��"'�^Y E :� 1 k s;�!i',�. gi'y*'St1+..�+1g� LA H rg '�Tp '"! fir/ .�%Y ! 1''y Yq ti• ,a O ,�%'-'r7 -' j l f '� t ``{' '.- "y w ��` i. �+ 1 •t i' Y- ,`i�£ �� -• y 'f wt,. Ada `a it f '^tn\k- 4�, • s rT.i= �' � Jyth !11 ,}'� � .+ '.'�JZ 5`•�' 'ff' �y�� f I �1�7 , i '�'. `• 1 ���^., J,6i� �.�'��� � �+. �^�r�. 1 � `'Y¢ z�:� a$� 1' 1 t`'.�',yvi:. ? x� +"�`N � i"v'SS+Y,ytiC+'.� ti^,?r fi `� � �f � x.. 1s� ^ _. • µ • ! {\j�J "'i. - � tii'. :y`9a: rl 4�^ -�Il"r f u-+V!'J''��' r/ '�""t' F iet ¢ � ,,'r' fs.i1�'s d.• xf(j� " ` L If � �,.; yV^ �"�'" L � (' �t''5 l�" V"�' �, k� kf A— �' :.--e:il �A _ •.•li• n >• £ q "� t,. aL .,a 11 %jr� - � �. ! i _..'_ �. a 2' r 1 i ' '4 ..� ��S'q I�}�� `µ 5 �' ���.n '� "�. I r.:: • lrr- -.; tiL,'s �yy�:.l, if0�f P�:s ��'.�+Y,�`��a� � EA ^' �....�- _ P-, � .•�.. f �i'' 'N., y��p. `•r.r_ y rt' cw• a � - t..l. � � � T .� � a 1 Y � S o mac¢—��- � � ✓, � rr '� i' �'�r� ,[Apt � � :i 1 y,1'�yrh.Z,fsl a��y� f4 4 A•S ty P �`c�'Al �'��..'�} y'��Y� �._"r".� _ _- .+%: � - hA� s+• �''�:i �`:iF �: �� � it }�'� Tt , 4i rFi1' �� S� '1.•.. nn��y�cl F�R�{. S _ Y `��T: M, �S' saw' ✓ S� _ _ .uF+... �/5. � i y;� �Ns. i {1 n ••y. u }4 r, �' tt�r h ^ ,v Mb 1 i }� ta.� � { na " f sfir� h�`•'< 'y IF.d.! A `'e�.t/ �-„� !`fi- � 1 �3,:- �M 4��lk �/0 _ . - �a �•_ 'fit ,. l; +t y d d •�1;.�� : - yi, `� y � \\. \��r � m - ,,�jh. 1t,� ��I r�r��5�; k. "`,;,}�+. if M V.0� r.i'-F yV.� }, _1 a r ht��� ��h._ i �IY,Q 3-.�3� s' '�-s., fis *s - � �� • �� r"ir...l+ ... -', ..- s'r"�'- 1H 4e1� p I F I ^;:,'I � ;� ° + r `'4'r � i-f-V�;t"F�' --f p� �pr'�' 4 r t, �.: 1( '''J Y,-t •..`a 4�.' � 1 -. i>S�"��. ��r`�� .F�rs�'.,, - ` .r} Lr,a ��zk' _N•-' • 1 m)4"+; 1,11 �'1 €{x �',s16 1P -. '� 1 W) "`` a.°'�' d�a dt t '�,�,w�, i'- r a t,'�s� ^, O ``� rp .i SS Yd �:' i'c �» S'/i -_'� A � 1 � ��' ,., ..i'• \ '. � - r 2 r„v !.' � • '._a_ a^0 - • 1 !"' �_}{ i.' -��� hk T 1` �'� i C ,� aglsv �S a� �` � .k'�T� �I, S , ( �� t� i�Yl A.li S�?.-•. t .'ter. \ r •;� t w s u ,jr/ J � -�i �'� �i•i 'fir l�i+ �-_ 9 � �'k k fs al u r IF' h� r111taS 1 .d IGt� �i .�.#` G �,, YY4. I � �'�=-- , I '� - --� _-d• � •`'1' � t 'ram '•1 '•f' rt �s„ �•'� . �` �' 61 r 5i �u� t �p ��s,�� � '�,r€ � �. j''l' Y 'fpy F.Y vr C: }r. 5j�rrF+�t�' %4 -CfYhh- ... _tl I \\ V \` 1 `l sr 1 x '�¢Ifwry �.4'�'S °f d�h 1. � �•3F}yV4 f 017s+� i A+� 5� L ,. T kt �• 1r" �--5r �i J'', '",�i5` '� ( , �i�� r7 S1� 4„^"°,"t� �,vr ++'y0�ro,tt YET s sks, •-,. �S zfi { -'ng 14,E - - �f _,.. - - ki y� �r�.� �'� l• ii ' ,�'� ,'~� ° '� `` 3"+` s �,.. 1 41 1 l5"',t` .�. ;1.� t� -F' ��.lCf( Z �" I .G II • k'•" a ,��(= ; . ' fYi rl`7 w`YMR p �Yt� rx`��,h�i: � ��f,rr'� �: �� : 3z ns ��, y�, •�� �. v n'ga . ���������� .'J � ����"'.j •�.� .._ '`fp 11,, y'\ ' - I �}� �"'���£:k�'a3 + if>.-4 � �' 2� �, ,yr ^} 8 J � r` s �S-�� -5.{, - - � -.�'d` �� �� 7msarr�� 7 ¢ r tYhy. ./%✓ �" \ � ' f �. /� ��-,!'� � ,� a. � � 1\��i�r�1� hsOM'-ti',s+ ���:?:���. l.,i �•• I� .. .:r' .I ,� 1' '-�': ur,!'r�: xt9 � 1 -?Y� ,I�. 1+a 1 aL ,� h: 4 ,w�� (j�,'c'fy, 1 ��J ""n-'i• I � a,,..-- • C? f•t v �y • � w +.1 as ayy iu isi aFk I.k Kc "p+k Y113" ,' ,.ry,, -�;yK f^.e.. �� y. y, ! tj w M +.r ' .^'_"�j.,',"h. _ I Tom 4 � /.�� a � s r � � �� � - �t>t[S' _ �j � toot '�g�J�- r5L.� r% �� r'"f ry!}I lyy 4,ya{ r`Ic4r? l4,L �,�7f.F �1 t �- f`r I ' � rt1. ,-f ,�.^yy':, `Y�5�(wS�*''Y- s-- - a �1 > ���.�,•..iIl `4�i� r '`+, ✓-��` t'. .�� .� ./ r ?„� m, sNr c e � y^ 1 1 �rTl -- �:# � { i• —=---�-'�Insect'Control Checklist for Animal Operations Source Cause [IMPS to Control [Bisects Site SIIccific Praclims - — F1us11 butlers • Accumulation of ds o 11 O !:lush sysleni is designed and operated sufficiently to remove accumulated solids front gutters as designed, ,lternove bridging of accumulated solids at Lagoons and fits • Crusted Solids 19 Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the cnisling of solids to a depth of no snore than 6 - $ inches over more than 3R% of surface. I_xccssivc Vegetative . Decaying vegetaliun r-sr Maintain vegetative control along banks of t 1invill lagoons and other impoundments to prevent accumulation of decaying vegetative utalter along waives edge on iniponndmenl's perimeter. Dry Systems I cc�I�rs • Feed spillage _ Resign, uperale und,maiwain feed systems (c.g., bunkers and Iroubbs) to minimize the _/�ccluuulation of decaying wastage. G� Clean tip spillage on a routine basis (e.g., 7 - 10 day interval during sulmner 15-36 day interval Suring winter). ecd Storage r Accumulations of feed residues f_* Itcdoce Moisture 11CCaatllaIIalion wilhiu and around itnnicciiate perimeter of Ii cd slorage areas by insuring drainage away front silt andlor providing adctImile contaimtent (e.g., covered bin for brewer's grain and similar high loislure grain pruducls). w! Inspect for and reniove: or break up accumid ated solids in filter strips around feed storage as 11ceded. AMIC - November 11, 1996, Page I Saurcc Cause Urvirs to Unntrol Insects Nile Niecllic l'racliceY Animal I lolding Areas + Accumulations of animal wastes 13 Eliminate low areas that trap moisture along and feed wastage fences and other locations where waste accumulates and disturbance by animals is minimal. : O Maintain fence rows and filter strips around animal bolding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed). Diy h1amire I laudling Accumulations of animal wastes CI Remove spillage on a routine basis (c % - 10 Sy'r��us day interval during summer, 15-30 day interval during winter) where manure is loaded for IURLI application or disposal. 0 Provide for adequate drainage around manure stockpiles. O Inspect for and remove or breakup accumulated wastes in filter strips around stockpiles and manure Handling areas as needed. For nwre iulurmation contact the Cooperative Extension Service, Department of Entomology, Flux 7613, North Carolina Scala: l luiversity, Italcigh. NC, 27695.7613. 7 Swine Farm Waste Management Odor' Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Farmstead !o Swine production egetWve or wooded buffers; Recommended best management practices; GY" Good judgment and common sense Animal body surfaces �b Dirty manure -covered animals ,,Pry floors Floor surfaces • Wet manure -covered floors Vlotted floors; Waterers located over slotted floors; �eeders at high end of solid floors; Scrape manure buildup from floors; O underfloor ventilation for drying Manure collection pits • Urine; far Frequent manure removal by flush, pit recharge, • Partial microbial decomposition -or scrape; ' ❑ Underfloor ventilation Ventilation exhaust fans • Volatile gases; Gr an maintenance; Dust VEff'icient air movement Indoor surfaces • Dust Washdown between groups of animals; Feed additives; ❑' ceder covers; ®Feed delivery downspout extenders to feeder covers ~ Flush tanks • Agitation of recycled lagoon �I ` O Flush tank covets; liquid while tanks are filling I K p Extend fill lines to near bottom of tanks with anti -siphon vents Flush alleys • Agitation during wastewater A��� ❑ Underfloor hush with underfloor ventilation conveyance 1" Pit recharge points • Agitation of recycled lagoon liquid filling 01k C] Extend recharge lines to near bottom of pits while pits are with anti -siphon vents Lift stations • Agitation during slurp tank .1i,4 ❑ Sump tank covers filling and drawdown 1' Outside drain collection • Agitation during wastewater ❑ Sox covers or junction boxes conveyance AMOC -November 11, 1996, Page 3 Source Cause BMPs to Minimize Od6r Site Specific Practices End of drainpipes at a Agitation during wastewater 13 Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emissions; Gr VQ oper lagoon liquid capacity; • Biological mixing, rrect lagoon startup procedures; • Agitation surface area -to -volume ratio; ❑ Minimum agitation when.pumping; ❑ Mechanical aeration; � roven biological additives Irrigation sprinkler • High pressure agitation; Gr VA rrigate on dry days with little or no wind; nozzles . Wind driftmimurn recommended operating pressure; VPu*mp intake near lagoon liquid surface; ❑ Pump from second -stage lagoon Storage tank or basin • Partial microbial decomposition; ❑ Boaom,or midlevel loading; surface • Mixing while filling; ❑ Tank covers; • Agitation when emptying 0 Basin surface mats of solids; ❑ Proven biological additives or oxidants Settling basin surface Partial microbial decomposition; ❑ Extend drainpipe outlets underneath liquid • Mixing while filling; level; • Agitation when emptying ❑ Remove settled solids regularly Manure, slurry or sludge • Agitation when spreading; ❑ Soil injection of slurry/sludges; spreader outlets . Volatile gas emissions ❑ Wash residual manure from spreader after use; ❑ proven biological additives or oxidants Uncovered manure, • • Volatile gas emissions while ❑ Soil injection of slurry/sludges slurry or sludge on field drying ❑ Soil incorporation within 48 hrs.; surfaces ❑ Spread in thin uniform layers for rapid drying; ❑ Yroven biological additives or oxidants Dead animals • Carcass decomposition 2" Proper disposition of carcasses Dead animal disposal • Carcass decomposition ❑ Complete covering of carcasses in burial pits; pits Incinerators • Incomplete combustion AMOC - November 11, 1996, Page 4 I ❑ Proper location/construction of disposal pits 0 Secondary stack bumers Source . Cause BMPs to Minimize Odor Site Specific Practices Standing water around • improper drainage; Ur Grade and landscape such that water drains - - - facilities . Microbial decomposition of away from facilities organic matter Manure tracked onto • Poorly maintained access roads Farm access road maintenance T - public roads from farm access Additional Information: Available From : Swint Manure Management; 0200 Rule/BMP Packet NCSU, County Extension Center Swine Production Farm Potential Odor Sources and Remedies; EBAE Fact Sheet NCSU - BAE Swine Production Facility Manure Management: Pit Recharge - Lagoon Treatment; EBAE 128-88 NCSU - BAE Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment; EBAE 129-89 NCSU - BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU - BAE Calibration of Manure and Wastewater Application Equipment ; EBAE Fact Sheet NCSU - BAE Controlling Odors from Swine Buildings; PIH-33 NCSU - Swine Extension Environmental Assurance Program ; NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO 107, 1995 Conference Proceedings Florida Cooperative Extension AMOC - November 11, 1996, Page 5 Mortality Management Methods (check which method(s) are being implemented) ❑ Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300..feet from any Bowing stream or public body of water. Rendering at a rendering plant licensed under G.S. 106-168.7 ❑ Complete incineration ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture ❑ Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) December 18, 1996 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Robert Johnson Johnson Livestock Rt 2 Box 284 Rocky Mount NC 27801 Dear Robert Johnson: 4 • NCDEINR NORTH CAROUNA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 22, 1998 Subject: Application No. AWS330030 Additional Information Request Johnson Livestock Animal Waste Operation Edgecombe County The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by January 21, 1999: The lagoon capacity documentation and Waste Utilization Plan provided appear to only be for 1920 Feeder to Finish animals, however the permit application and certification for this facility is for 2750 Feeder to Finish animals. Please submit additional lagoon capacity documentation and a Waste Utilization Plan for 2750 animals if you wish to be permitted for 2750 Feeder to Finish animals. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter, must be submitted on or before January 21, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject .animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission: If you have any questions regarding this request, please call me at (919) 733-5083, extension 502. Sue ^Hornewood - 1 . Environmental Engineer Non -Discharge Permitting Unit cc: Raleigh Regional Office, Water Quality. Permit File P.O. Box 29535, Raleigh, North Carolina 27665-0535 Telephone 919-733-5083 µ:FAX 919-733-0719 An Equal Opportunity AMrmative-Action Employer w' -. " '50% recycled/ 10% post -consumer paper ........................ ........ ...... WASTE UTILIZATION PLAN ...................... 1-1- ............................ ............................. ................................................................................................... .......... .......... - ........ ............ Producer: �� v ��` `F L o M s o v\� Location: �e- c S� 2 Z Rk73�4pu� &r.�, 2-�o1 Telephone: (2 s z.) 4 y 6 `S 3 7 q Type Operation: Number of Anhnal Units: 1 7 s U The waste from your animal facility must be .land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities.. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission 0 WASTE UTILIZATION PLAN Amount of Waste Produced Per Ye_arLgallons,_ tons,_etc_.)_ Z 75yq► _ animals X / 2 1 gal. waste/animal/year = I5 q9 I , 2-SO gals. waste/year. Amount of Plant Available Nitrogen (PAN) Produced Per Year 2750 animals X2, 3 lbs. PAN/animal/year = 413 2 lbs. PAN/year. (PAN from N. C. Tech. Guide Std. 633) Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown and surface application: Table 1: ACRES OWNED BY PRODUCER Tract Field Soil Crop Lbs. N Acres Lbs. N Month of # No. Type " Per Ac.* Utilized Application * This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is.cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996, the Costal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. NOTE: 1 WASTE UTILIZATION PLAN Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land [see Required Specification 2)) Tract Field Soil Crop Lbs. N Acres Lbs. N Month of # Type Per Ac.* Utilized Application *See footnote for Table 1. Totals from above Tables Acres Lbs. N Utilized Table 1 41.1 11 GO Table 2 Total Amount of N Produced ,3 2 Deficit +— rjg NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. See attached map showing the fields to be used for the utilization of waste water. WASTE UTILIZATION PLAN Application of Waste by Irrigation Field No. Soil Type Crop Application Rate(In/Hr) Application' Amount(In.) J3 L4 NDi- IVd e-SC a e a C,� I,U /3ev,,uudgi G 4 0- This table is not needed it waste Is not being applied by irrigation. however a siritila r table will be needed for dry litter or sludge. Your facility is designed for V/g-0da s of temporary storage and the temporary storage must be removed on the average of once every JO J1040 dAcoS In no instance should the volume of waste being stored in your strAicture exceed FEET BELOW THE LOWEST POINT IN THE DIKE. Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. Narrative of Operation: 7TLe. old oveva4,'o''� ��s 9� d�� s1�ov��� 7� �lGw aP�ra �� has �8D da�s .s'F-srdc� F cjeS"gAte.{ WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has long term access to adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide NRCS with a copy of a written agreement (sample enclosed) with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet but not exceed, the Nitrogen needs for realistic crop yields on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application of other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing that grassfilter strips are installed where runoff leaves the field. (See FOTG Standard 393 - Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the Technical Reference - Environment file for guidance.) 7. Liquid Waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur off site or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. .............................................................................................................................................................................................................................................................................. WASTE UTILIZATION LIZATI O N PLAN 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crops planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal). Animal waste other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by overspraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharges directly into water .courses, and on other grassed waterways, waste shall beapplied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to.be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. ..................................................................................................................................................................................................................................................... WASTE UTILIZATION PLAN ...._....................................................................................................................................................................................................................................:............................................. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills, A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should be applied preplant with no further applications of animal waste during the cropping season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within GO days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North carolina regulations. WASTE UTILIZATION PLAN a WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Rv4o eN`E' L . T o kotL ati Owner/Manager Agreement I (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24- hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner. (Please print) i?u Ae v4 L ' J C S o Signature:r Name of Manager (If different from owner: Signature: r Technical Representative:Rease print) R • �_ Lc�� ,`� (erg Date: Date: Affiliation: L- USDA,NATURAL RESOURCES CONSERVATION SERVICE Address (Agency):_ P.O. Box 10 -- Tarboro, NORTH CAROLINA 27886 Signature: V1 v�����c.�(�,r� Date: ✓ �"� ,���� �•. L, r i "s �s itt, ff s .? '��q�1]�'��,"rS33Sf�� ,3 y ' .. 11; a �{ fJ;)liy_�4 �' 1��� '- . - ,i •S'V..x•+� �xi'$����:' 7V. ..-.,wfii .. ... -clx }JiNOT r' y;f�''C• F ` ; >r, -':ti1j i;t L`='•iL ///� VII To SCALE ,,�e_'.``�`�'��}: �'• s ��' �,' ,dry,.. ..,+ *���,�t 'M}�"� '�� �� VI Ile 14 13 }y.�[',r.'lr ,y �': ,y}y�a �i�'1'' hIl .S�`, .t;�a•�. 5:.n r�i•k �m: �3-`, L4t' ..�*�C�• t r `v "rap M 14 IS Ur 7.4 r I r+ 10.1 5.4 )•`. is � � .' � ' �t N' State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director March 19, 1999 Robert Johnson Johnson Livestock Rt 2 Box 284 Rocky Mount NC 27801 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANp NATURAL RESOURCES Subject: Application No. AWS330030 Additional Information Request Johnson Livestock Animal Waste Operation Edgecombe County Dear Robert Johnson: The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by April 18, 1999: 1. The lagoon capacity documentation provided appears to only be for 1920 Feeder to Finish animals, however the permit application and certification for this facility is for 2750 Feeder to Finish animals. Please submit additional lagoon capacity documentation if you wish to be permitted for 2750 Feeder to Finish animals. 2. Your Waste Utilization Plan (WUP) shows the application window for Fescue as April — October. This does not appear to correspond with information that the Division of Water Quality has regarding Fescue application windows. Please have a technical specialist verify that the Fescue application window is accurate as written in your current WUP or revise it as necessary. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter, must be submitted on or before April 18, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1. and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 502. Sincerely, ue Homewood Environmental Engineer Non -Discharge Permitting Unit cc: Raleigh Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper RFD 2, Box 284 Rocky Mount, NC 27801 May 5, 1999 Ms. Sue Homewood Environmental Engineer Non -Discharge Permitting Unit P. O. Box 29535 Raleigh, NC 27626-0535 SUBJECT: Application No. AWS330030 Additional Information Request Johnson Livestock Animal Waste Operation Edgecombe County Dear Ms. Homewood: Please find enclosed information on my old lagoon and revised Waste Management Plan as per A. B. Whitley. I hope this will take care of the information you need, if not, please let me know. I am sorry for the delay in sending this information to you. Sincerely, Robert L. Johnson J Enclosures Sp 6661 L sZ, o• o� r e z '9 -Z ¢e4 ng L f Z. . zr r`_ Z /+oz v '-A .01 C,7 & :Cis 6 � _zn r 6 z�G" B6 �z Iz � l.s ` 1 z' lz A i A. T3.01 78M = 50, DD NO l /r/ 6" of fw,,4 oa% 4ree. 0/uN9 060"4 ( R, 9, q 7, z) Iv� o50,4 7o7 Ld lo9oon4 Vvlu��. =8� I (IVve,-'� 6''� ] SPi��W��%t.l1a�l 00N = 3 S1ape: EJCCA VAT70t4 /'(3�OOAJ: 2�v x 60 x12, = µ S CApA,:)r y 8 ! a 6 o x IX .. / y !,a _7�� know: zyb x66 x 13. _ , j/0 x 64 x 13.5 = 17 51 7�fG/ �c1s3 ANIMAL WASTE UTILIZATION PLAN Producer: Location: Telephone: Type Operation: Number of Animals: (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: ROBERT L. JOHNSON ROUTE 2 BOX 284 ROCKY MOUNT NC 27801 j� f I J 1 252-446-5379 FU: Existing Feeder to Finish swine 2750.00 hogs Anaerobic Waste Treatment Lagoon Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at-5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission.. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2750 hogs x 1.9 tons waste/hogs/year = 5225 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2750 hogs x 2.3 lbs PAN/hogs/year = 6325 lbs. PAN/year Applying the above amount of waste is a big job.• You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE Z: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME 2012 13 NoA FP 2.6 130 8.2 1066 I SEP-APR 2012 14C GOA FP 3.2 I 1 1160 1 16.4 11024 SEP-APR 2012 14B FP 3.2 IGOA I 1 1160 1 14.6 1736 SEP-APR 2012 14A FP 3.2 IGOA I 1160 1 17.6 11216 SEP-APR 2012 15 NoA BP 4.6 172.5 I 1 1 1 17.4 11276.5 APR-SEP 2012 -15 1 4 INOA IWA I 150 17. 1370 SEP-MAR 2012 6 BH 6.0 1MaA I 1300 1 15.1 11530 APR-SEP END I TOTAL17218.5 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL 10 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY TONS .50 BP HYBRID BERMUDAGRASS-PASTURE TONS 37.5 FP TALL FESCUE -PASTURE TONS 50 WA WINTER ANNUALS (I.E. Small Grains, etc.), 50 TOTALS FROM TABLES 1 AND 2 ACRES I LBS AW N USED Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 1 39.3 TABLE 2 0 TOTAL 39.3 *** BALANCE 7218.5 C 7218.5 -893.5 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1017.5 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 5087.5 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 16.9583333333 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 40.7 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 6 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. I I I jApplication RatelApplic. Amount Tract l Field l I I Soil Type l Crop ! l (in/hr) l (inches) I I 2012 l 13 l NoA I FP l l *1 2012 I I l 14A l GoA I I FP I I l I *1 2012 l I I 14B I GoA I l FP I I l l *1 2012 l I 114C l GoA 1 l FP I I l l *1 I 2012 115 I l NoA I l BP I ! l l *1 2012 l I 6 l MaA I l BH k I l l *1 ! 2012 l I I --15 I I NoA I i WA I I I l i *1 I * This is the maximum application amount allowed for the soil assuming the amount of nitrogen.allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page: 7 ANIMAL WASTE UTILIZATION PLAN Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. I£ the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (see Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into.the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 11 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm: owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: ROBERT L. JOHNSON (Please print) Signature: T Name of Manager(If different from owner): Signature: Name of Person Preparing Plan: Aff iliation:EDGECOBME SWCD Address (Agency): P O BOX 10 Date: (Please print)MARGARET KNIGHT Phone No. 919-641-7900 TARBORO NC 27886-0010 �. Signature: Date: 4/4 10' Page: 12 MEW ej _3- 3 NOT TO SCALE Z ��L4 mww q On*. --V W-2 4-T 4 7.3 Mnl it 1.4 1.4 46 D9`-9 (64 I OV. 14.6