Loading...
HomeMy WebLinkAbout190016_PERMIT FILE_2017123120 — r 1f (Type of Visit: iQ Co Lance Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance !!Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: �%%7 1 �-�' C� Lr'�1 ���� / Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Certified Operator: Integrator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Wean to Finish I Layer I I Dairy Cow Wean to Feeder Non -La er I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design C•ur'rent Dry Cow Farrow to Feeder Dt, P.ouItt: Ca aci P.o Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Region: Discharges and Stream ImQacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes 2rNo NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes 0 No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes rNo[D NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesNA CD NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesNA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facility Number: 1 Date of inspection: —Y tl Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No A ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: C— Designed Freeboard (in): Observed Freeboard (in): �tothe 5. Are there any immediate thregrity of any of the structures observed? ❑ Yes No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No " NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? Yes _ No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2TNo ❑ NA ❑ NE maintenance or improvement? _Waste Application 10_Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes NA ❑ NE maintenance or improvement? VNoD 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ YesNA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crap Type(s): 2 5'C4-f /!1 p ,✓L� 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes VNo NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes NA eN5o ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes NA VNo ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:. 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transf s ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall InspectioSludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes�Vo" ❑NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued [Facility Number: 7-7 Date of Inspection: Z 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes [] No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Gomrn6ts (mfer,to question '.#) Explain any YES answers and/or any additionat recommendations or any other comments,.., _ Use dearvings of facility tobetter�'i ilairi situations (use additional pages as necessary). i 46 Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: Page 3 of 3 Date: 6-2— f� 21412011 Zr/ Reason for Visit: J2rRoutine 0 on 0 Follow-up C) Referral 0 E 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: Liu County: Farm Name:_ r / �d C �, Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: 'I L:F L Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Region: lillllllllllllllllllill!l OldDesign Current Swine EICapacity Pop. Wean to Finish Design Current Wet Poultry Capacity Pop. - er Design Current Cattle Capacity Pop. airyCow Q a Wean to Feeder IlNon-Layer Dairy Calf Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Design Current Dr. P,oult . Ca aci P,o Layers Dairy Heifer Dry Cow Non -Da* Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other Turke s Turke Pouets Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ONo 0 NA ❑ NE [—]Yes No ❑ NA ❑ NE [:]Yes rNo ❑ NA ❑ NE c. What 1s the estimated volume that reached waters of the State (gallons). 1.11 d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes eN ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesVNN❑NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued (Facility Number: jDate of Inspection: Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes VNo NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes waste management or closure plan? Structure 6 �5No NA ❑ NE No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental rent, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ }-Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop T e s �GQ 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Zr N ❑ NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ NA VN ❑ NE ❑ Yes❑ NA ❑ NE ❑Other: ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: q - Zr jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes jNo No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box(es) below, ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the ReviewerlInspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE D Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any,YES.answers and/or any additional recommendations or any, other eomments �'k- Use drawings of facility to better.explain situations (use additional pages as necessary)..,_. A �;` , _ ,�,�, �a, ReviewerlInspector Name: Phone: 791- 7 2- to Reviewer/Inspector Signature: Page 3 of 3 Date: (y Z 214120.11 6 (II I IY1 1 (Type of Visit: Q Compute Inspection Q Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: ORoRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Timed Departure Time: County: Farm Name: %� !� P L �Q �� �� t �—� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: #? ct t'2 e e I J le- 4 Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Region: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I ILayer I Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D . POula Ca aci P,o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other dTurkeyPouets Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZrNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes NA gNo ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ YesVoF A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? [3YesA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesA ❑ NE of theState other than from a discharge? Page 1 of 3 21412011 Condnued Vacility Number: t 1 - Date of I nspection:C0r Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): ❑ Yes Structure 4 Structure 5 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? N NA No ❑ NA Structure 6 ❑ Yes EfNo ❑ NA ❑ Yes No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental th at, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Da any of the structures lack adequate markers as required by the permit? ❑Yes No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Af n 5'i e_re ec , ��' �'� f q j ,2 1, 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑Yes No NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Vo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage &Permit readily available? Yes ❑ No NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need im ment? If yes, check the appropriate box below, es ❑ No ❑ NA ❑ NE ❑ Waste Application Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections []Monthly and I" Rainfall Inspections ludgc Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes wl�o NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE Page 2 of 3 21412011 Continued ]Facility Number: - Date of Ins ection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ��Yeso No ❑ NA NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [] No A ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No [] NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations;or= any other comments., Use drawings of facility to better explain` situations (use additional=pages as necessary). A, �Ay ',�►_;�' f S a le- ri'1 4 Curr2 7 �t 4+71s-k /,Oj 2- m j 4 NO 4nia,,( t"k&, t f ash S 1 jq-.,R. Cj t9 Reviewer/Inspector Name: r-1 Reviewer/Inspector Signature: Page 3 of 3 t,'-y 2fy Phone: 91 - 7 2 d Date: 61 t -8 / (9 21412011 Type of Visit: 0 Compliance Inspection U Operation Review U Structure Evaluation U Technical Assistance I Reason for Visit: fZrRoutine O Complaint O Follow-up p Referral Q Emergency Q Other O Denied Access Date of Visit: 9//a /j Arrival Time: ¢bi `, ce Departure Time: G County: C''hcn Farm Name: Alke LX24 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Region: 4-, / NEM&Uesi Current Design Current Design Current Swine Capacity Pop. Wet Poaltry " Capacity Pop. Cattle Capacity Pop. Wean to Finish La er DairyCow lac Wean to Feeder on -Layer Dai Calf Feeder to Finish, DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder I)r. P,oultr, Ca .acit P.o Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets 113cef Brood Cow Turke s iff Other Turkey Poults Other Other di Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made'? b. Did the discharge reach waters of the State'? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes O<o ❑ NA ❑ NE ❑ Yes ,,a]No ❑ NA ❑ NE ❑ Yes YTNo ❑ NA ❑ NE []Yes � No ❑ NA ❑ NE Page 1 of 3 21412011 Continued Facility Number: - le 7 1 Date of Inspection: r 1v /i Wast6 Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2 "No ❑ NA ❑ NE I a. If yes, is waste level into the structural freeboard? ❑ Yes �No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ;D-No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ETNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 0No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes JC2-No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [] Yes E2rlqo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes <o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload 0 Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate ManurelStudge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ;Ef No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ;2T-No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ZNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes XNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ZNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes VNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZfNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ,KNo ❑ NA ❑ NE 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 2 No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes J'No ❑ NA ❑ NE 2,. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes Prl�o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ,[a No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Zo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes fo ❑ NA ❑ NE and report mortality rates that were higher than normal? r 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes PIN�o ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ;aSNo ❑ NA ❑ NE permit'? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ,rNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32, Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ZNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes i -- 0 NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes O No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or.any other;comments� ' Use drawings of facility to. better explain: situations (use additional pages as necessary) g' s /, CI'c'G/car L..>otP G?.rllysp �w d `h ���df Reviewer/inspector Name: Phone:' Reviewer/Inspector Signature: Page 3 of 3 Date: 7 " le,>-- // 21412011 jr i ype or visit fd"Gompliance Inspection V Operation Review U Structure Evaluation U Technical Assistance Reason for Visit Q'Routine Q Complaint Q Follow up Q Referral Q Emergency Q Other El Denied Access Date of Visit:ii�,, /- Arrival Time: C% [G Departure 'rime: Z; G County: Region: /«S5 Farm Name: Mee Owner Email: Owner Name: Prone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: _ Back-up Operator: _ Location of Farm: Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: = O = 1 = Longitude: = e ❑ i = {1 Design C►urrent Design Current Design C**urrent Swine Capacity Population Wet Paaltry Capacity Population Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ DairyCow f ❑ Wean to Feeder ❑Non -La Non -Layer Dry Poultry ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Gilts ❑ Non -La ers El Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys Other IF] Other ❑Turke Poults ❑ Other Number of Structures: Discharges ❑Dai Calf ❑ Feeder to Finish El Dairy Heifer ❑ Farrow to Wean ❑ D Cow &Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: El Structure ❑Application Field El Other a. Was the conveyance man-made'? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes Fe'>\io ❑ NA ❑ NE ❑ Yes 21�o ❑ NA ❑ NE ❑ Yes Page No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ;?I -No ❑ Yes ;�J'No ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE 1 0f3 11/28/04 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes Q'No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Z Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ;ZrNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ZNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ,❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes PNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes J] No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ,/No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, ,Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ;3"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �Er`&o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes O No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ZNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ZNo ❑ NA ❑ NE Comments {refyr ¢y`ptoqu�st]iponp#)ptExplka�n`a �ygYES aynswc�rsand,or atpy�r�ecoyrmtmle"ndations or:any other cotnmenfs: 1 Y i l .. • 3®+F t '5''i i •i) 4 i... @'R'F+�:�•�Y': _'. drawings of facilityf to better explarn,sttuattgns: (use add►tional�ages as necessary): Use ,...'t. Reviewer/Inspector Name :�s� %'jPhone: %�9 75� ylaG Reviewer/Inspector Signature: Date: z I L page 2 of 3 12128104 Continued Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ,0No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ET'No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists El Design ❑Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below, ❑ Yes PrNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0 to ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 0 No ❑ NA ❑ NE 24, Did the facility fail to calibrate waste application equipment as required by the permit`? ❑ Yes 2 No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes FLINo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes �3No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes PIN ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes O—No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes FerNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ;alNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes O-No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes PIN ❑ NA ❑ NE Additional4Comme'tits and/or' Drawin s ✓ Lrt/l�� �� � C��Gr�rP d Page 3 of 3 12128104 i f R: Fael I,ty�NUmbe'r _ -f' _. � __ I UiviWafer QuOltty ),DivisionWSoil, and,Water Conserya ):Other Agency Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit PIRoutine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: J3'o9 Arrival Time: Z.Of/ Departure'Hme: � County: �1/ Farm Name: 7d f Ahp r l Owner Email: Owner Name: Mailing; Address: Phone: Physical Address: Facility Contact: /in 'k �'Title: Phone No: Onsite Representative: Integrator: Certified Operator: Back-up Operator: Location of Farm: es "Swine �' Caps J❑ Wean to Finish n ❑ Wean to Feeder k° ❑ Feeder to Finish i' ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts " ❑ Boars Pthcr, R ��' ,� ' •: ❑ Others Operator Certification Number: Back-up Certification Number: Region:zi'7a Latitude: [=o =6 Longitude: =o=, = Current I' �; Design Current,fi, ? POE Wet Poultry Capacity ,Po ulagson 5 Catt c�{� fat ❑ Layer ❑ Dair Cow ❑ Non -Laver ❑ Dairy Calf x * 1 • [] Dairy Heifer ODry Cow Dry- Poultry ❑ La ers ❑ Non -La ers ❑ Pullets ❑ Turke s ❑ Turkey POU Its ❑ Other Dischart=es & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure []Application Field ❑ Other a. Was the conveyance man-made'? t, on -Darr ❑ Beef'Stocker ❑ Beef Feeder ❑ Beef Brood C �� a ;: �Nz.umberofiE b. Did the discharge reach waters of the State? (Ifyes, notify DWQ) c. What is the estimated volume that reached waters ol'the State (gallons)? d. Does discharge bypass the waste management system'? (if yes, notify DWQ) 2. is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters orthe State other than from a discharge? Page I of 3 ❑ Yes ONo ❑ NA ❑ NE ❑ Yes 12'No ❑ NA ❑ NE ❑ Yes P No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes RrNo ❑ Yes ON ❑ NA ❑ NE ❑ Yes I'No ❑ NA ❑ NE 12128104 Continued Facility Number: �� — B� Date of Inspection r Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ;2rNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ZNo ❑ NA ❑ NE Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed'? ❑ Yes Lallo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ZrNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement'? ❑ Yes 2rNO ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 2No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes .TNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. []Yes [21No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14, Do the receiving crops differ from those designated in the CAWMP? ❑ Yes WNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E!fNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes P No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application'? ❑ Yes ;'No ❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE RifA}G' . .']1 LV Ijq iAT -3 Comments1(refer to question.,#) Eicplatn any IJS answers and/or anyxecom;me dat oas or anotcomment Xsgdrawings of=facility to better�ezplAih',situations (use 'additiona! pages astnecessary) , 1 `.l�t16; 11%lkl ",�i ? or - #s 1�11 sue} _= a.lia F _ _- � r^ yt�. ' ax �� _ Reviewer/inspector Name-- l,- CJ Phone: 7/y 7 00 Reviewer/inspector Signature: Date: i/�13'Oq Page 2 of 3 12128104 Continued z Facility Number: % --Q Date of Inspection�� -O Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes FzMo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes i❑'No ❑ NA ❑ NE the appropirate box. ❑ WUP El Checklists El Design [I Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ,-No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 12No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �allo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes O No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 21No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes O—No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,21'No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes Z_No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 0"No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes /❑No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ZrNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes WNo ❑ NA ❑ NE Page 3 of 3 12128104 �7 r 2 1 73 ti? Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit A! Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: A fJ Farm Name: «� L c/l Q �. Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: _ Back-up Operator: _ Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = e = i = Longitude: ❑ n = 6 ❑ fi Will Design Current Design Current Design Current Swine Capacity Population Wet Poultry Cpcity Population Cattle Capacity Population ❑ Layer airy Cow ❑ Wean to Finish ❑ Wean to Feeder ❑ Non -Layer ❑Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer Dry Poultry ❑ Dry Cow ❑ Farrow to Wean ❑ Farrow to Feeder ElNon-Dairy ❑ Farrow to Finish ❑ Laers ❑ Beef Stocker ❑Non -La ers❑ Beef Feeder PE]Gilts Boars Pullets❑ ❑ Beef Brood Cow - Turkeys Other r[Turkey Poults ME] Other ❑ Other Number of Structures: Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ONo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes No NA ElNE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ElYes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ yes N ❑ A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ❑ No ❑ NA ❑ NE other than from a discharge'? Page 1 of 3 12128104 Continued i Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): l 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No NA El NE ❑ Yes o ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes o NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa otify DWQ 7. Do any of the structures need maintenance or improvement`? ❑ Yes No ❑.NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ yes LdN0 NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 4. Does any part of the waste management system other than the waste structures require ❑ yes ONo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes P4o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [-]PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 01=k1k , 'j ,,� e, r $! �► S �}�� 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes o NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes NA ❑ NE 17. Does the facility lack adequate acreage for land application? ElTNo NA El NA 18. Is there a lack of properly operating waste application equipment? El Yes NA ❑ NE .e tr&s..s. t. .. c. _. ,ve_x _...._i ew�2e.:Cts.�'F'�a'w^a.x�.'d'LxvY...iig .:�:-Zn .4 L'�-�. h.ai '�3X a'1:8-4'§C's a4ie',YAefiffiffiPI@y'9'Y1�ID' -_ Y.fiiiC6Q'i'4',v�=Y 5Nti16irJW'.,B&'�_lY�a��Q'BaffiY�ffi1'�q� Reviewer/Inspector Name -- - — --� — --- - - -- Phone: Reviewer/Inspector Signature: 7o—Date: Page 2 of 3 12128104 Continued Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes .❑'No (J NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ StockingI ❑Crop Yield ❑ ! 20 Minute Inspections ❑Monthly and 1" Rain Inspections ❑ her Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes�V�No'NA ❑NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ YesA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes �NoO A ❑ NE El Yes NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/orrDiawings' Page 3 of 3 12128104 Division of Water Quality ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 190016 Facility Status: Active Permit: AWC190016 ❑ Denied Access Inspection Type: Compliance Inspection _ _ Inactive or Closed Date: Reason for Visit: Routine County: Chatham Region: Raleiah Date of Visit: QZ(07/2007 Entry Time:11:30 AM Exit Time: Incident #: Farm Name: James Mike Lindley Farm Owner Email: Owner: James M Lindley Phone: 919-663-2639 Mailing Address: 614 Mike Lindley Rd Snow Camp NC 27349 Physical Address: Facility Status: ❑ Compliant ❑ Not Compliant Integrator: Location of Farm: Latitude: 35°4 '42" Longitude: 79°22'46" County Road 1336, 1116 mi. south of the intersection of county roads 1336 and 1337. Johnny Lindley Road. Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: James M Lindley Secondary OIC(s): On -Site Representative(s): Name On -site representative Mike Lindley Operator Certification Number: 20967 Title Phone: 24 hour contact name Mike Lindley Phone: Primary Inspector: Joseph Gyamfi Phone: Inspector Signature: Date: Secondary Inspector(s): Phone Page: 1 Permit: AWC190016 Owner- Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Inspection Summary: " WUP dated 12/18/97 * Waste analysis: 12/11/06 = 5.2 417l06= 7.4 • Reviewed waste application records - - please go back and charge the waste applied in September 2006 to Small Grain(wheat) instead of Corn on SLUR-1 and SLUR-2 - Also be sure that waste application dates are within 60 days of waste analysis dates (before or after) • Lagoon levels have been recorded weekly # 21. No rainfall records were available - Need to keep daily rainfall records #21. Stocking and mortality records need to be kept. Producer has STOCK-1 form to use. #24. Missing waste application equipment calibration - Producer says calibration will be done during next waste application. He could not find his previous calibration and did not remember when it was done " Crop yield records available Page: 2 Permit: AWC190016 Owner - Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current Population Cattle O Cattle -Milk Cow 170 156 Total Design Capacity: 170 Total SSLW: 238,000 Waste Structures Type Identifier Closed Data Start Date Designed Freeboard Observed Freeboard Laste Pond MAIN 36.00 44.00 Page: 3 Permit: AWC190016 Owner -Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 1 Were there any adverse impacts or potential adverse impacts"to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? 6. Are there structures on -sits that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste.Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 4 Permit: AWC190016 Owner - Facility: James M Lindley Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Facility Number: 190016 Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Corn (Silage) Crop Type 2 Small Grain (Wheat, Barley, Oats) Crop Type 3 Fescue (Pasture) Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Sail Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14, Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17. Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■. ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ■ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Page: 5 Permit. AWC190016 Owner - Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents ............................................................................................................. Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ■ ❑ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ■ Inspections after> 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ■ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ❑ ■ Cl 24. Did the facility fail to calibrate waste application equipment as required by the permit? ■ ❑ ❑ ❑ 25, Did the facility fail to conduct a sludge survey as required by the permit? ❑ ❑ ■ Cl 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ■ ❑ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours andlor document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 6 Permit: AWC190016 Owner - Facility: James M Lindley Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Other Issues 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 33. Does facility require a follow-up visit by same agency? Facility Number: 190016 Reason for Visit: Routine Page: 7 Type of Visit 10 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit IrRoutine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: L.�L_L.L" r� Arrival Time: • A Departure Time: County: Region: ' `P,d Farm Name: 'lolrn er Nl P- L) ncl )�W +,:�kYyv� OwnerEmail: 7 Owner Name: Phone: �� Phone: l 4J ZOO Mailing Address: �p �,,, 1 e _ G Physical Address: Facility Contact: Title: Phone No: Onsite Representative olwe1- M t E n e' Integrator: Certified Operator: m Qf 6A ''� Operator Certification Number: `2,0 Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: n o n & n 1{ Longitude: n ° n & n Discharges & Stream Impacts i. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation'? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes 1PNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes FINo ❑ NA ❑ NE 12128104 Continued Facility Number: — Date of Inspection 1' P Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �io ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ff❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? [--]Yes 'M No El NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes EPo El NA ❑ NE through a waste management or closure plan? 11 If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [�No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit'? ❑ Yes PNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crooj�Vindp i] Evidence of Wir�l�rifl ❑ Application Outside of Area 12. Crop types) b W, [ I 10 3 94,) , 'f 52iC-2 3. Soil type(s) Z3'Z 3C!, C� 13� 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes {� No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 'tl No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): �� ;AAA b� I, e � y re-vo 6 Reviewer/inspector Name ~� Phone: 119 Reviewer/Inspector Signature: Date: 12128104 Continued Facility Number: — Date of Inspection Required Records &Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ElNA [INE the appropirate box. ElWUp ❑ Checklists ElDesign [I Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. 1P Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification Rainfall Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �4 No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? F1 Yes ❑ No PINA ❑ NE F] Yes El No El NA ❑ NE I❑` Yes ❑ No gNA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes _MNo ❑ NA El NE ❑ Yes �No ElNA [INE ElYes 9No ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE ❑ Yes 5No ❑ NA ❑ NE ❑ Yes `P No ❑ NA ❑ NE Additional Comments and/or Drawings: / N d� r^� m off r� ek ,-ems G\j0.A 12128104 ❑ Division of Water Quality E Division of Soil and Water Conservation ❑ Other Agency Facility Number: 190016 Facility Status: Active Permit: AWC190016 ❑ Denied Access Inspection Type: Operations Review Inactive or Closed Date: Reason for Visit: Routine County: Chatham Region: Raleigh Date of Visit: 10/10/2006 Entry Time:10000 AM Exit Time: 11:00 AM Incident #: Farm Name: James Mike Lindley Farm Owner Email: Owner: James M Lindlffv Phone: 919-663-2639 Mailing Address: 614 Mike Lindley Rd Snow Camp NC 27349 Physical Address: Facility Status: 0 Compliant ❑ Not Compliant Integrator: Location of Farm: Latitude: 35°49'42" Longitude: 79°22'46" County Road 1336, 1116 mi. south of the intersection of county roads 1336 and 1337. Johnny Lindley Road. Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: James M Lindley Operator Certification Number: 20967 Secondary OIC(s): On -Site Representative(s): Name Title Phone Primary Inspector: Carl Henry Outz Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: all records up to date. Mr. Lindley has fixed feedlots by pouring concrete berm to direct runoff from the stock trail to the holding pond Page: 1 Permit: AWC190016 Owner - Facility: James M Lindley Facility Number : 190016 Inspection Data: 10/10/2006 Inspection Type: Operations Review Reason for Visit: Routine Waste Structures Type Identifier Ctosed Date Start Data Designed Freeboard Observed Freeboard kaste Pond MAIN 36.00 96.00 Page: 2 Permit: AWC190016 Owner -Facility: James M Lindley Facility Number: 190016 Inspection Date: 10/10/2006 Inspection Type: Operations Review Reason for Visit: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ B. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 3 Permit: AWC190016 Owner - Facility: James M Lindley Facility Number : 190016 Inspection Date: 10/10/2006 Inspection Type: Operations Review Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manurelsludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Small Grain (Wheat, Barley, Oats) Crop Type 2 Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Georgeville Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17. Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ■ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Page: 4 Permit: AWC190016 Owner • Facility: James Mt Lindley Facility Number : 190016 Inspection Date: 10/10/2006 Inspection Type: Operations Review Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ❑ Inspections after > 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ❑ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ■ ❑ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ■ Cl ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ■ ❑ ❑ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to property dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 5 Permit: AWC190016 Owner - Facility: James M Lindley Inspection Date: 10/10/2006 Inspection Type: Operations Review Facility Number. 190016 Reason for Visit: Routine Other issues Yes No NA NE 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ ■ ❑ ❑ 32. Did Reviewertinspector fail to discuss reviewlinspection with on -site representative? Q ■ 33. Does facility require a follow-up visit by same agency? ❑ ■ ❑ ❑ Page: 6 Yahoo! Mail-joegyamfi@yahoo.com http://us.f320.mail.yahoo.com/ym/ShowLetter?box=Inbox&Msgtd=2... _J%kIOQ?+MAIL S„bfecl: ASCE LY0ch000 NOLMe,'Undtnunddp North Cerollne'e Weennd,leveam Reeul"mry P.—.dnq F ...' . February 15, 2007 Oep[ Mon, 12 Feb 70e7 e7;e7:e7 -0600 From: 'N"u , Roderick" r nndSvick®NNTB.com ASCE LUNCHEON NOTICE DATE: Thursday, February 15, 2007 LOCATION: NC State University Club 4200 Nillaborough Street Raleigh, NC PROGRAM: "Understanding North Carolina's Wetlands/Stroam Regulatory Permitting Process" SPEAKER: Budd Tittow, PWS, PWB - BSC Rice TIME: 12:00 PM • 1:70 PM rA41I $ 20,00 per MEMBER $ 25,00 per NON-MEMBER $ 6.00 per STUDENT or LIFE MEMBER (Pay by cash or check at meeting) Print - Close Window �u d This program will provide on overview of the complexities of North Carolina's wetland7streamlbuffer zone regulatory process ,The presentation explains the following key topics: Wetland delineations o Field Data Sheets: hydrology, hydric soils, & hydrophytic vegetation o Jurisdictional Determinations (JD's) Stream Assessment Forms o Perennial, intermittent & ephemeral o Buffer "calls" Impact avoidance o Design thresholds Mitigation options o Restoration o Enhancement o Creation o Preservation a EEP In -lieu -fee program Section 404/401 Applications o Designing for Nationwide/General Permits o Avoiding Individual Permits Isolated Wetland Permits Buffer Protection Plans and Permits Stormwater Management Plans & Permits Erosion & Sedimentation Control Plans & Permits NPDES Permits & SWPPP's Professional Weiland Sciontist, Wildlife Ecologist and Aquatic Biologist, Budd Titlow has 33 years of experience in regulatory compliance and permitting. During his career, he has worked on more then 1,000 projects, ranging from regional mal Is, "big box' retail plazas, international airports and interstate highways to wind 'farms", wild and scenic rivers and statelnational parks. Please make your reservations by 12.00 PM, Tuesday February 13s' by emailing', Natasha Rodevick(nrodevick@hntb.aom) Please note that if you make a reservation and cannot attend, you must cancel before the lunch meeting or send a MPlOWMent to avoid being charged. We will be sending out invoices after the meeting for anyone who does not attend. of 1 2/14/2007 8:57 AM Division of Water Quality ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 19001Q Facility Status: Active _ Permit: AWC190QIQ _ ❑ Denied Access Inspection Type: Compliance Inspection Inactive or Closed Date: Reason for Visit: Routine County: Chatham Region: Raleigh Date of Visit: 02/07/2007 Entry Time: 11:30 AM Exit Time: Farm Name: James Mike Lindley Farm Owner: Jgmg§ M Lindley_ Incident #: Owner Email: Phone:919-663-2639_ _ Mailing Address: 614 Mike Lindley Rd ,SnowCaMp NC 27349 Physical Address: Facility Status: ❑ Compliant ❑ Not Compliant Integrator: Location of Farm: Latitude: 35'4942" Longitude: 79°22'46" County Road 1336, 1116 mi. south of the intersection of county roads 1336 and 1337. Johnny Lindley Road. Question Areas: R Discharges & Stream Impacts Waste Collection & Treatment Waste Application jj Records and Documents Other Issues Certified Operator: James M Lindley Operator Certification Number: 20967 Secondary OIC(s): On -Site Representative(s): Name Title Phone On -site representative Mike Lindley Phone: 24 hour contact name Mike Lindley Phone: Primary Inspector: Joseph Gyamfr Phone: Inspector Signature: Date: Secondary Inspector(s): Page: 1 Permit: AWC190016 Owner- Facility: James M Lindley Facility Number: 190016 inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Inspection Summary: * WUP dated 12/18/97 ` Waste analysis: 12/11/06 = 5.2 4/7/06= 7.4 ` Reviewed waste application records - - please go back and charge the waste applied in September 2006 to Small Grain(wheat) instead of Corn on SLUR-1 and SLUR-2 - Also be sure that waste application dates are within 60 days of waste analysis dates (before or after) " Lagoon levels have been recorded weekly # 21. No rainfall records were available - Need to keep daily rainfall records #21. Stocking and mortality records need to be kept. Producer has STOCK-1 form to use. #24. Missing waste application equipment calibration - Producer says calibration will be done during next waste application. He could not find his previous calibration and did not remember when it was done Crop yield records available Page: 2 Permit: AWC190016 Owner - Facility: James M Lindley Inspection Date: 02/07I2007 Inspection Type: Compliance Inspection Facility Number: 190016 Reason for Visit: Routine Regulated Operations Design Capacity Current Population Cattle Cattle -Milk Cow 170 156 Total Design Capacity: 170 Total SSLW: 238,000 Waste Structures Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard aste Pond MAIN 36.00 44.00 Page: 3 Permit: AWC190016 Owner - Facility: James M Lindley Facility Number : 190016 inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a Cl ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc,)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste Application Yes No NA NE 14. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu. Zn, etc)? ❑ Page: 4 Permit: AWC190016 Owner - Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07l2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Tota I P205? ❑ Failure to incorporate manurelsludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Corn (Silage) Crop Type 2 Small Grain (Wheat, Barley, Oats) Crop Type 3 Fescue (Pasture) Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the'Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? 110 ❑ ❑ 17. Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ 0-0 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ■ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Page: 5 Permit: AWC190016 owner - Facility: James M Lindley Facility Number : 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ■ ❑ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ■ Inspections after > 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ■ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ❑ ■ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ■ ❑ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ❑ ■ ❑ 26. Did the facility fail to have an actively certified operator in charge? Cl ■ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ■ ❑ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 6 Permit: AWC190015 Owner -Facility: James M Lindley Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Other Issues 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? 32. Did Reviewerllnspector fail to discuss reviewlinspection with on -site representative? 33. Does facility require a follow-up visit by same agency? Facility Number: 190016 Reason for Visit: Routine Yes No NA NE ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ Page: 7 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality October 1, 2004 James Mike Lindley James Mike Lindley Farm 614 Mike Lindley Road Snow Camp NC 27349 Subject: Certificate of Coverage No. AWC190016 James Mike Lindley Farm Cattle Waste Collection, Treatment, Storage and Application System Chatham County Dear James Mike Lindley: On June 11, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on February 11, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to James Mike Lindley, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG200000. The issuance of this COC supercedes and terminates your previous COC Number AWC 190016 which expires October 1, 2004, This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the James Mike Lindley Farm, located in Chatham County, with an animal capacity of no greater than an annual average of 170 Dairy cattle and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this permit. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. Aquifer Protection Section —Animal Feeding Operations Unit 1636 Mail Service Center, Raleigh, North Carolina 27699-1638 One NorthCarolina Phone: 919.733-3221 / FAX: 919-715-0588 / Internet: h2o.enr.state.nc.us �lxtlfrl�001� An Equal Opportunity/Affirmative Action Employer— 50% Recycledl10% Post Consumer Paper The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil pcnalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact J.R. Joshi at (919) 715-6698. Sincerely, vd6 /L for Alan W. Klimek, P.E. Enclosures (General Permit AWG200000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Aquifer Protection Section Chatham County Health Department Chatham County Soil and Water Conservation District Permit File AWC190016 APS Central Files Type of Visit QKCo ance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: aL Arrival Time: Departure Time: County: Region: Farm Name: ;(�} �y..Qs 1� Q _L 1 �r Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: '/�' �' '�GJ,� Certified Operator: ` �`� Back-up Operator: Location of Farm: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: 0 o Q g= Longitude: = o=` = q JU Wean to Finish I 1[—j Layer I I LJI)airy Cow ❑ Wean to Feeder 11 j[] Non -Layer I I ❑ Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish Gilts ❑ Dry Poultry ❑ D Cow ❑ Non -Dairy ❑ La ers El Stocker Non -La ers ❑ Pullets ❑ Beef Feeder _.. ❑ Beef Brood Cow ❑ Boars Poults Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made'? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d, Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes [No ❑ NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes o] NA ❑ NE ❑ Yes ❑ Yes ❑ Yes NA ❑ NE NA ❑ NE NA ❑ NE 12128104 Continued J , Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes "NoNA El NE a. If yes, is waste level into the structural freeboard`? El o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): �-- Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N NA El 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes No NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNoNA ❑ NE maintenance/improvement? I t . Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) '" I `v%A ��tR c ✓! S �r 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes VN ❑NA ONE A NE A ❑ NE N ❑ NA ❑ NE No ❑ NA ❑ NE Comments (refer to question #): Explain. any YES answers and/or any recommendahorisoraany other�comments Use drawings of facility to better explain situations. use additional a esi.as necessa g tY p ( p g r Y)�. T Reviewerllnspector Name �- --�- --^ - - --- ----- - --- - ---- - � � Phone: Reviewer/inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number: d— Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes "NoE01 NA El 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check El Yes NA ❑ NE the appropriate box. ❑ WUP El Checklists [3 Design El Maps El Other 21. Does record keeping need improvement? if yes, check the appropriate box below, ❑ Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections Weather Code 22. Did the facility fail to install and maintain a rain gauge? El Yes No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Did the facility fait to conduct a sludge survey as required by the permit? ❑ Yes o NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes o NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification`? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document [] Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31, Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3 12128104 0 Division of Water LI Quality Facility Number 101!Diggi=04 Soil and Water ConseOther Agency Type of Visit I-^oLmpliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit outine O Complaint Q Follow up O Referral Q Emergency O Other ❑ Denied Access Date of Visit: %Z Zb ArrivalTime. Departure Time: County: c'tl h" Region: e4t�)- Farm Name: '___ __ - __ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: $ Q- is 3.�- Phone: 3 , Z 6► 3 f 1F�' Phone No: Integrator: Operator Certification Number: q6 % _ _ __ Back-up Certification Number: Latitude: 0 0= Longitude: = 0 0 A Design Swine ' C•apacity ❑ Wean to Finish C►urrent Population ❑ Destgri. Current S �Ma Wet Poultry" C,apaci Po Design Current a acity Population Laver iry Cow p v ❑ Wean to Feeder ❑ Non -La et + ❑ Dair Calf ❑ Feeder to Finish ElFarrow to Wean >- Dry Poultr, Layers -La Non -Layers ,. ❑Dairy Heifer D Cow ❑ Nan-Dai El Beef Stocker ❑Beef Feeder ❑ Beef Brood Cow Number of Structures: Xw' Ely Farrow to Feeder El Farrow to Finish ❑ ❑ Gilts ❑Non Pullets ❑ Boars El Turkeys - Other ❑ ❑ Turkey Poults ❑ Other JEI Other "I .. Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation`? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge`? ❑ Yes PNo ❑ NA ❑ NE ❑ Yes ❑ No PNA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes PfNo ❑ NA ❑ NE ❑ YesZZ No [DNA ❑ NE 12128104 Continued K Facility Number: — (ti Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA El NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 0 No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmentZNo eat, notify DWQ 7. Do any of the structures need maintenance or improvement`? El Ye ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes /qNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) / 9. Does any part of the waste management system other than the waste structures require ❑ yes 4 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No [INA ElNE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE El Excessive Ponding ❑ Hydraulic Overload El Frozen Ground El Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area ZI . Zo r jo 12. Croptype(s) C--"bPA S. �SG �Sc-Qq-- 13. Soil type(s) jt,c , co, 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement'? ❑ Yes 1�z No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes �ZNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes P No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [:jNo ❑ NA ❑ NE Z a Reviewer/InsT7, tr- �ilPhone: ale! 79J Reviewer/Inspector Name P Reviewer/Inspector Signature: Date: I 'Z Z� 12128104 Continued Facility Number: r q — Date of Inspection i z Za a Reuuired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes )No ❑ NA ❑ NE rZ CAW 20. Does the facility fail to have all components of the P }eadily available? If yes, check ❑ Yes [Z No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box belowf I /y{o3 El Yes ,�,/ IQ No ❑ NA ❑ NE ❑ Wast�Application ElWee�y F!!r-eeboa�d",/3uu Waste Analysis ❑ Soii!(,Anal%.ysis ❑Waste Transfers El Annual Certification El Rainfall El Stoking ElCrop/Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22, Did the facility fail to install and ma nta' in a rain gauge? ❑ Yes JZ/No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes A No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes �f] No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [�o El NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document El Yes /� No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 1XNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ErNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes �No ❑ NA El NE 33. Does facility require a follow-up visit by same agency? ❑ YeSXNo ❑ NA ❑ NE Add�ttonal Coriiments ai�d/o`r Drawin s i r°7 �'". 3) d Stu) S tj TO rMYR��14- v,Ji7FP f �,2i;'JA G' ; E C a j S i L.A-G 'E_ F+o �2.rat c� cA+Arl'aQL. A-P-4vJO L-A-Cob-1 �`��T IA' Pa; M�.1'r S W T't �o I EA r; A _ LAJ IN- -T5— cx,.j TP-c.'r C14 4 T S .,,E4b T ze-- A-5S'5'-turd Cst- rZ.i l� C= l — P+ Cr.r F r3 rA ` G t°V`�" 1 i!£.:l` 'T � Ro �I C��'� S�pck.- -rP� i � A• N9 Co � .' rL'-l� Ci G•r '� t V r'c ha Li 1` �'(. L�j+�y !i. 'VE: ';'a ,967 rn,. •�(>✓.� - ) �o 12128104 Type of Visit ,0 Compliance inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility NumberEn=Date of visit: L Time: A O Not Operational Q Below Threshold �rmitted Certified [3 Conditionally QCertified [3 Registered Date Last Operaate or Above Threshold: Farm Name: ......�. A , . �`.....�'.+4R.---- ���!4el!------. County: ..4 j.. OwnerName : .............. ...'C (/) �/a .......... ....... Phone No:...................................................................................... MailingAddress:....tSl "�..... f :'............................................................................................................................................... .......................... Facility Contact:................................................................ .. Title: Phone No: OnsiteRepresentative: ............................................................................. .............................. Integrator:...................................................................................... Certifed Operator:............................................-----....».----.................................................... Operator Certification Number:..................................----.... Location of Farm: ❑ Swine ❑ Poultry 2(cattle ❑ Horse Latitude • ' 49 Longitude • 4 4� Swine Desrgn,�f, Current r Deslp ' Curre Canacitv Poyulation`:. r'°. etde ,°Caaactty: iPonulal ❑ Wean to Feeder 0. ❑ Layer ❑ Feeder to Finish Ei ❑ Non -Layer Farrow to Wean ❑ Other ❑ Farrow to Feeder El Farrow to Finish E E �'� . Tolt�1 �BSII E ❑Gilts ❑ Boars ''.He Discharges & Stream lmnacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min'? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: } ❑ Yes yNo ❑ Yes JVNo ElYes 11EI No ❑ Yes PrF;o ❑ Yes ANo ❑ Yes ;2fNo ❑ Yes rio Structure b .................................................................. .................................... ................................... ................................... ................................... >,n u Freeboard (inches): 12112103 Continued Facility Number: ! -.� Date of Inspection Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes 9410 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) ❑ Yes No 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes /❑ No ❑ Waste pl' ation ❑ Freeboard ❑ Waste Analysis ❑ 5oil Sampling 2. 24. Is facility p t i compliance with any applicable setback trite � nn�4tec't at the time of design? ❑ Yes 0No (/ rr /p 25. Did the f di �f it to, ave a actively certified operator in charge7A ❑ Yes PNo 26. Fail to noti y t'c ionai AVQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes VN0 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No 28. Does facility require a follow-up visit by same agency? ❑ Yes �No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes �No NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) ❑ Yes PNo 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form [:]Rainfall [:]Inspection After 1" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 Facility Number: — Date of Inspection i ]Z 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ yes P N seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes <0 closure plan? (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes io 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes � No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes 0<0 elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes �To 11. Is there evidence of over application? if yes, check the appropriate box below. ❑ Yes No [:]Excessive Ponding [:]PAN [:]Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type ('DLj , SM C.. P2 ksrjAr 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes L2,No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes PMO 16. Is there a lack of adequate waste application equipment? []Yes No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes " o liquid level of lagoon or storage pond with no agitation? '.P No 18, Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ;3 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes IVo roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ;21<0 Air Quality representative immediately. irk lilt yli Reviewer/Inspector Name Reviewer/Inspector Signature: Field Copy ❑ Final Notes Date: 11/11/ul Lonnnued Type of Visit Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit Q Routine O Complaint O Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number 1 Date of visit: L S Time: 1 •d rO Not O erational 0 Below Threshold Pillermitted 9 Certified [3 Conditionally Certified 0 Registered Date Last IT or Above Threshold: CL � Farm Name: ��"e5 ; & County: � Owner Name: Phone No: Mailing Address: �'`! '� 604 S X73yl Facility Contact: Title: Phone No: Onsite Representative: Jf Integrator: Certified Operator: AlxO UOperator Certification Number: Location of Farm: AL ❑ Swine ❑ Poultry dcattle ❑ Horse Latitude �° °° Longitude Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattip Capacity Population ❑ Wean to Feeder ❑ Layer I I ET5airy1 ❑ Feeder to Finish ❑ Non -Layer I I ii JE1 Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of lagoons ❑Subsurface Drains Pi rig Ponds I Solid Traps 0', ❑ No Liquid Waste Ma Discharges & Stream Impacts 1, Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? K If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ;2<pillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: ?L _ Freeboard (inches): 0 05103101 ] Spray Field Area ❑ Yes ❑'No ❑ Yes ONO ❑ Yes 2(No ❑ Yes 2fNo ❑ Yes dNo ❑ Yes FfNo ❑ Yes P'<o Structure 6 Continued I Facility Number: I — 1l Date of [wilivetioin Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. is there any evidence of wind drift during land application" (i,e, residue on neighboring vegetation, asphalt, roads, building structure. and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (ix, broken fan belts, missing or or broken fan blad c(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32, Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Additional 05103101 ❑ Yes 2TNo El Yes -ETNo 0 Yes ZN10 ❑ Yes 'Fe <0 ❑ Yes ZN�o El Yes Z No 0 Yes P'No Facility Number: 4, Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental tbreat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenancelimprovement? 11. Is there evidence of over application? ❑ Excessive Pending ❑ PAN ❑ Hydraulic Overload 12. Crop type C' IA) �. 6,14 (a &,_ 6 iiu mm 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. is there a lack of adequate waste application equipment? Required Records & Documents 17, Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of thCertified Animal Va4e Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) i// // 19. Does record keeping need improvement? (ie/ irrigation, freeboard, wa a analysis & si sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ;W0 ❑ Yes eNo P-1-le's ❑ No ❑ Yes to ❑ Yes <0 ❑ Yes sT ❑ Yes ❑ No ❑ Yes ANo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes �No ❑ Yes .1 "01 C Yes ZNoo ❑ Yes ,D4 �s ❑ No ❑ Yes �Nio ❑ Yes NN0 ❑ Yes Ind o Te Yes o ❑ Yes , o ❑ Yes P "" No violations or deficiencies were noted during this visit. will receive no further correspondence about this visit. �You Comments' refei torn n�Stion�#` ;I�.X"Iain'aaa� 7. 1'rA Y[$�w�.�3�r�W 0r am r€e��:ittn�tTt��llOns�;�rfFEa���th@r,€e�m�inents.'{ &3tE#E�{i {y �1�1� E fl 3 y � ry }, .-wNl�} l" 6F$ rF �lSE drawings of facllity3to better expiaaw�1situations (use additional pages.is hecessar}) f' q } Field Conv ❑ Final Notes 1yp 'i{y:,1v,lE1i { y F %91S'b..a} Y {EE 1 id 6 t j"{❑ w s . E ::, i C elY 1 , J. A.,E a ,2 „� .3 . "1; k { 6 rri, U I rtc�µ. Air=- ��1 iW�S . J4•)U.A1 If a "TD 4rfL 111) IVI0� 5A4y4 �n -;/o ` 3l�, ArA•w -f ;U #"T 13" I % �lZ� �1 5 ,/ f G� lJ (.d s 1- i; T � fz -78 -- e_P,o--_w �,.,, rte.� , ►f t' ,."04 �,- 7 A t, (. ,v W "A4 Ge. *moo . �Pr Gam/1 vt - G4U�w 114 ." jWd4_1 k 04f'4 C,,f Hy s E. , .';eviewrinspecter Name ,eRwrlInspector Re, Signature: Date: 3 05103101 Continued �J s Type of Visit CFCorppliance Inspection 0 Operation Review () Lagoon Evaluation Reason for Visit _}/Routine 0 Complaint O Follow up O Emergency Notification 0 Other ❑ Denied Access Facility Number i Date of visit: 2 2 e Time: 70 rO / Not O erational Below Threshold ['Permitted Certified 0 Conditionally Certified 0 Registered Date Last Operated%r tve Threshold: /Farm Name: � '"' P6 t ff County: C ` Owner Name: Sows !� Phone No: Mailing Address: 111 ( C- 73 C15 Facility Contact: Title: Phone No: Onsite Representative: Certified Operator: Location of Farm: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry xattie ❑ Horse Latitude 0 ° " Longitude 0 4 11 Design Current Design Current Design Current; Swine Capacity Po ulation Poultry Capacitv. Poptulation Ca e- CHPUCitV Po fulatibn ❑ Wean to Feeder ❑ Layer DairyO ElFeeder to Finish I ❑ Non -Lay FLE]Non-Dai El Farrow to Wean -- -el - ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars TOtal,SSLW Number of Lagoons' ❑Subsurface Drains Present ❑ La oon Area I❑ Spray Field Area a -s 'Holdang`:Ponds I Wid Traps .' ❑ No Liquid Waste Management System ` �'W- w.. Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes �No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes 0] No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes xbNo 2. Is there evidence of past discharge from any part of the operation? ❑ Yes No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ONo Waste Collection 8& Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes Z No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): 05103101 Continued Facility Number: J� — Date of Inspection 942r IssI es 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc,) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ONo 11Y ❑ Yes VNo P/4- ❑ Yes El No ❑ Yes F.�fNo ❑ Yes 6Xo ❑ Yes Z NNoo El Yes <1` 05103101 Facility Number: — f b Date of inspection 2 2 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑�No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes [�1Vo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes P No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes P No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes ;iNo Waste Aunlication 10. Are there any buffers that need maintenance/improvement? ❑ Yes ;2'No 11. is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload (I Yes DNo 12. Crop type co."j r .�M %,rrJ [ Lam¢ N' 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes P - - 16. Is there a lack of adequate waste application equipment? [:]Yes P O Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes [; io 18. Does the facility fail to have all components of the Certified Ani 1 W g/g/to priagement Plan readily available? [ 9 El Yes No e/ WUP, checklists, design, maps, etc.) / (r t v�V C/ �I tLylat O 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sa pie reports) co Yes [__1 N i 20. is facility not in compliance with any applicable setback criteria in effect at the time of design? El Yes 21. Did the facility fail to have a actively certified operator in charge? ❑Yes��No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes 4f No 23, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes E]'No 24. Does facility require a follow-up visit by same agency? ❑ Yes Po 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 6<0 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. s ... MomctientsArefer to question #) Explain any YES, answers@andlor any" recommendations or any other coinT drawings, "situations. Use of facility tobetter explain (use additional pages as necessary ) ❑Field Copy El Final .#. " Notes 'lily �Lp Y -�D �� It d �/Lt.Lrc , l-t ` e // I Reviewer/Inspector Name c,is�-`-7] •- di7 Reviewer/Inspector Signature: Date: i) 7 05103101 ' Continued . , w Division of Water Q.Drviision of,Soffand O Other Agency ,, �.. , n Type of Visit Complignce Inspection O Operation Review O Lagoon Evaluation Beason for Visit Q Aoutine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number I I I Date of Visit.: © Permitted © Certified ❑ Conditionally Certified [3 Registered e Farm Name: a.'laos......�' :!.........IL.;.j .................'.."`"^'� /(o a Time: d+- 1 Printers on: 10/26/2000 0 Not Operational Q Below Threshold Date Last Operated or Above Threshold: County ......f.Ld .......................... OwnerName: ................................................... ............................................................... Phone No:....................................................................................... FacilityContact: ............................. "hitle................................................. Phone No:................................................... ,'Mailing Address: ..................................................................................................................... ..................................................................................... .......................... Onsite Representative; ......................................................................................... Integrator:.................... Certified Operator:..... ..................................................— Operator Certification Number:.......................................... Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0 4 « Longitude 0 ' « Design Current Swine Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer I I airy J p I I Z 6 ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present 1111 Lagoon Area ❑ Spray Field Area Holding Ponds / Solid Traps 10 No Liquid Waste Management System Discharees & Stream ImpacLS 1. Is any discharge observed from any part of the operation? ❑ Yes ❑�No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other l a. If discharge is ohserved, was the conveyance man-made'? ❑ Yes o h. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) ElYes No c. if discharge is observed. what is the estimated flow in galhnin? d. Does discharge bypass a lagoon tiystem? (If yes, notify DWQ) ❑ Yes No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes o 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ElYes No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes 9/No StrUCtUrc l Structure 2 Structure , Structure 4 Structure S Structure h Identifier: qn*0i .............. .— ................................ ....... - ....... .................. .................................... .................................................................................................. Freehoard (inches): i tt 5/00 Continued on back r Facility Number: f — Date of Inspection G Printed on: 10/26/2000 5. Are there any immediate threats to the integrity of any of the structures obs rved? (iel trees, severe erosion, ❑ Yes )dNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Yes (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes OJNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings'? ❑ Yes INO Waste Application 10. Are there any buffers that need maintenance/improvement? El Yes o 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes ZNo 12, Crop type %o (2.n.1 / SM 4-4 G fA,) C, W 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)•? ❑ Yes )D No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes,,;6No b) Does the facility need a wettable acre determination? ❑ Yes �No c) This facility is pended for a wettable acre determination? ❑ Yes )EfNo 15. Does the receiving crop need improvement'? ❑ Yes N 16. Is there a lack of adequate waste application equipment? ❑ Yes No Required Records & Documents 17, Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes filNo 18. Does the facility fail to have all components of the Certified Animal W to a agement an adily available? (ie/ WUP, checklists, design, maps, etc.) / _ �rc�f l ❑YesNo V pp ?0 � 11d��5 �c� 19, Does record keeping need improvement? (ie/ irrigation, freeboard, wart alysis & soirsz;m`pl reports) 'Yes ❑ No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? /❑ Yes 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes N 1`u 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No 24, Does facility require a follow-up visit by same agency? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes �No �'Vo a>GiQris:ojr ciencies wire po(ed• i3>jrritig �his'visit'. • Y:oir Will•ree0ive t)4 fu>fth ; ' , rorres�oridence: A66f this 'visit:.... • . • . • .... • . .... • . • . ." y y y t Comments (refer to uestyan #): Ezplain im YES answers and/or an recommendations or an other comments ,l s E t+ dra wingsof facilrty to better explain situations. {use adt honaI pages as necessary} Use Reviewer/Inspector Name coon Reviewer/Inspector Signature: (,&"—( LOH 14/)-- Date: i�_ //hA) 5100 Facility Number: Date of Inspection ra a ( Printed on: 10/26/2000 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes �No li -id level of In oon or stora a and with no a itation? q g g p g 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31, Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes `Y "0" ❑ Yes Vo ❑ Yes 9<0 ❑ Yes �o ❑ Yes No ❑ Yes �XNo Additional, Comments andfor' ra ngs:, - ," ;'' , {. AL 1 5/00 State of North Carolina Department of Environment and Naturat Rescyurces Raleigh Regional Office Michael F. Easley, Governor William G. Ross, Jr., Secretary CERTTFIED MAIL RETURN RECEIPT REQUESTED Mr. James Mike Lindley 614 Mike Lindley Rd. Snow Camp, North Carolina 27349 AL NCDENR NORTH CAROLINA C1113P4RTMENT OF ENVIRONMENT ANa NATURAL RESOURCES DIVISION OF WATER QUALITY May 17, 2001 Subject: Notice Of Deficiency Lindley Farm COC AWC190016 Chatham County Dear Mr. Lindley: On May 16, 2001, Mr. JD Hester from the Raleigh Regional Office conducted a compliance inspection of the subject animal operation. This inspection is a part of the Division's effort to determine compliance with the State's Animal Waste Management Regulation. An inspection of your facility revealed that wastewater from your facility was not actively discharging to waters of the State, nor were any manmade pipes, ditches or other prohibited conveyances observed. However as a result of the inspection the following deficiency was observed: As a permitted animal facility, you are required to have a copy of your weekly freeboard records, readily available for inspection to determine compliance with conditions in your general permit Please respond to this Notice within 30 days of receipt. You should include in your response the actions that you will take to address this deficiency. The Raleigh regional office appreciates your cooperation in this matter. If you have any further questions regarding this inspection, please call Mr. JD Hester at (919) 571-4700. /S'cerely, Kenneth Schuster, P.E. Regional Supervisor cc: Chatham County Health Department Chatham County Soil and Water Conservation District Ms. Margaret O'Keefe/ DSWC-RRO RRO Files 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)671-4700 FAX (919)671.4718 An Equal Opportunity AHinmative Action Employer 50% recycledllD% post -consumer paper of Water Quality ft' L f .Division ODivision of Soil and Water Conservattom .:; C Other Agency } . a 3,i Type of Visit 0 Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Date (if Visit-, q tO Tune: Ea � Printed on: 7/21/2000 Facility NumberNot O eratl Q Below Threshold © Permitted,Certified ❑ Conditionally Certified 0 Registered Date Last Operated or Above Threshold: ......................... ! 444 A T4+A rv% Farm Name: .................... �!Jgr1..� &.A.....� .......... .................... .......... County:............................. Owner Name:....... ;PS .... % -,:), ,,,`f a..9... ~S - Phone No. Facility Contact: ...............................................................................Title:...................... ....... Phone No: MailingAddress: ........................................................................................ .►i� t...; r1 4 L� Onsite Representative:......../........................................ .�..+...................................... Integrator:...................................................................................... V Certified Operator:,........ ... Operator Certification Number: ..................... Location of Farm: ❑ Swine ❑ Poultry A-C"attle ❑ Horse Latitude Longitude F7T7• Swine Design Current Canacitv Ponulation ❑ Wean to Feeder ❑ Feeder to Finish ❑ FarroW to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer airy I ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present 110 Lag--,-n Area 10 Spray Field Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ONo Discharge originated -w ❑ Lagoon ❑ Spray Field ❑ Other a. I[discharge is observed, was the convevancc man-rnade? ❑Yes eNo b. If discharge is observed. did it reach Water (if the State'? (If yes, notify DWQ) []Yes I�o cf. Idischarge is obsdrvcd. what is the estimated flow in gal/min'? )`in d. Does discharge hypass a lagoon system? (if yes, notify DWQ) ❑ Yes 2�No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes ZNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes FzNo Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes ffNo Structure I Struc:tUre 2 Structure Structure 4 Structure 5 Structure 6 Identifier: ............ ................... ........... ................... ........ ................... ..................... ...,........................... .:....... .... ................................ Freehnard (inches): 5100 Continued on back Facility Number: i1 — A Date of Inspection Printed on: 7/21/2000 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, ❑ Yes No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes�o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ❑ O 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings' ❑ Yes �To Waste Application � 10. Are there any buffers that need maintenancelimprovement'? ❑ YeszNo 11. Is there evidence of over application'? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes �o 12. Crop type C , , 94.f, C:., S r G P A; . j f:rc S C U e, 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need it wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records _& Documents 17. Fail to have Certificate of Coverage & Getieral Permit readily available? 19. Does the facility fail to have all components of the Certified Animal Waste Managet ent an readily available? (ic/ WUP, checklists, design, maps, ctc.) 'eli,l/-, 0 ��13r on� 19. Does record keeping need improvement'? (ic/ irrig , freeboard, waste analysis & soil sat le reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design'? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ic/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'? 24. Does facility require a follow-up visit by same agency'? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? �No.viofafi6ris'oe. deiiciencles .'ere noted• during thisMsit.' • Y64 Will viogiye ;tW further corie ondence: about. this visit. ' ❑ Yes �No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes [-]No ❑ Yes XrNo ❑ Yes A: No ❑ Yes �No ❑ Yes JD -No ❑ Yes �No ❑ Yes �o ❑ Yes No ❑ Yes ❑Yes eNo []Yes Ja "o Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): MAEN>r"q,iJ A ^,F-?- q RAF_AaAa-aP V-> G Cx, P �� .'3' cr► i [Y�I Q..T t: Ttti �' >✓c.a�CL.ps 1 7) M n T-�' `�•►` r�.� �f£�•}-�,_ ` r) , p;,s �, C ATCA 43 9s f w 7 Reviewer/Inspector Name Reviewer/Inspector Signature: (J u iJ, 4J --T Date: 9 /,9/3 5/00 Facility Number: i Date of inspection Printed on: 7/21/2000 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or hielow ❑ Yes No liquid level of lagoon or storage pond with no agitation? 27, Are there any dead animals not disposed of properly within 24 hours? ❑ Yes EfNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes EfNo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes/] No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover'? g�les �Co 32. Do the flush tanks lack a submerged fill pipe or a permanentltemporary cover? ❑ Yes o 'Additional Comments and/or Drawings: A6 '3 � l d•i �ilV CS Ly i � �i,W W VLl"'�� r 7 5100 7zll ql* ' { 0 Division of Soil and Water Conservation Operation ReviewE ' '; i�ti 'i E a _riF a [ s - I, r!tih r I I,.. j'ra� '� t o,g r " r - r I t { P Division of Soil and Water�Conservation -'Compliance Inspection i ,� ;�r, �('; v lill��s .°'pl'€Ez:'�r ! �1VlStOn�Of Water QUahty Compliance Inspection t a , 'j'{ftH, S Other Agency. - Operation�RevieW JRoutine 0 Complaint 0 Follow-up of DWQ inspection 0 Followu: op f DSWC review 0 Other Facility Number Date of Inspection 7 z 4 Time of Inspection J 24 hr. (hh:mm) E3 Permitted U Certified © Conditionally Certified [3 Registered113 Not O erational Date Last Operated: P .......................... Farm Name: 11.4'kQ. 4,iJ�y................. FV Al County:.....CJ1,• 49" ................................... Owner Name:......... .......... t.. ! Phone No• �63 ....... :k�........................................ -. ., ..,,.,.................................. Facility Contact: .............. !64 y............ ..Title 0I Phone No: ............................... Mailing Address �..� + �f � �� C.c.wi�/.............................. .2 �..1.. b .........5 ............. ..J............. �1...... 7N.,....................... Onsite Representative: ... e.;lee.MIN.-. 1-.;,g .� Integrator: ................... ........................... Certified Operator: ............M.Ike..............L r �e.�1................ Operator Certification Number 'Z4 ah-� . Location of Farm: U Latitude ' 6 Longitude ` �_�9 « a 'I Design Current Swine •CaDaCitV Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts, ❑ Boars �i.,> �Nurnber of, Lagoons,, u HoldingIPonds / Solid Traps Design ''Curren t ' Design Cu'rr'ent Poultry` , y Ca acit . Po ulation, , Cat e" , Capacity Population'!.,, ❑ Layer Dairy 1 :, ❑ Non -Layer ElNon-Dairy ❑ Other i Total Design Capacity Total SSLW I' r ❑ Subsurface Drains Present ❑ Lagoon Area I0 Spray Field Area '. ❑ No Liquid Waste Management System ; Discharaes & Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? h. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (ll'yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: If Freeboard (inches): . .......................................................... ....................................................................................................... ...... ...... .. 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes P<0 seepage, etc.) 3123/99 Continued on back ❑ Yes 2'No ❑ Yes E?fqo ❑ Yes 21<0 ❑ Yes No ❑ Yes 52'1to ❑ Yes Lo ❑ Yes 2<0 Structure 6 Facility Number: — Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ��//' closure plan'? ❑ Yes B"No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) T Do any of the structures need maintenance/improvement? ❑ Yes ER'<o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes 2'�40 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes DKo Waste ADDHCOtiOn 10. Are there any buffers that need maintenance/improvement? ❑ Yes [_D-I�o 11. Is there evidence of over application? []Excessive Ponding ❑ PAN ❑ Yes F--q* Vo 12. Croptype C'p_Y`n1 5& ct•rv, 41 -re Scu Q_' 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes OyKo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes U No b) Does the facility need a wettable acre determination? ❑ Yes QINo c) This facility is pended for a wettable acre determination? ❑ Yes 2/No t5. Does the receiving crop need improvement? ❑ Yes &/No 16. Is there a lack of adequate waste application equipment? ❑ Yes 19<0 Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? .. Rio yi. a�itj . . . iie;iieiel�cies mere noted d>Gx ing fbis:visit; • Y'oi} Witi•r, eeeiye iio fuf tier ; ,corres oricl�e' 'e: ab' f this visit... .:: • • • • • • • • • 9 glii._.,,,idY' 39ve.".,..1:'36._ ...i l,.ft�--.ri. •� .'. °: ., .l. .. �'_.e: ".< ,.'�, ,._:': t.'E .. �).E �.N f ai�,� �r:.:...Y.i• rings of tacilityiU) r Need fa 14. a An ap nr rilu f lie tre c JtsM /j,ecS fev used Reviewer/Inspector Name 1""' Reviewer/Inspector Signature: EMM ❑ Yes ❑ No 10`4 ❑ Yes [R'1�i0 ❑ Yes R(No "he ❑ Yes [/io ❑ Yes Q~No ❑ Yes ❑ Yes ❑ Yes ❑ Yes r f.'eM 5; 2e. ..ar Date: IF9 3/23/99 Facility Number:. — Date of Inspection 7 Z Odor Issues 26, Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30, Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover'? ❑ Yes [y No /J14 ❑ Yes 5xO ❑ Yes dNo ❑ Yes [/No ❑ Yes [ZINo ❑ Yes jdNo ❑ Yes WNo 1 /A 3/23/99 ` Division of Soil and Water Conservation - Operation Review [j Division of Soil and Water Conservation - Compliance Inspection Q Division of Water Quality - Compliance Inspection 13 Other Agency - Operation Review on 1-facilily Number Y W < N-� I>im of In.,q)eC iol Time of Inspection 24 hr. (hh:mm) Q Permitted Q Certified 0 Conditionally Certified © Registered JE3 Not OperaDate Last Operated: Harm Narne: C 6�! .. ..:$/1�.........Y`[.!�.Ia..�.t*..y..... f�. ............ C'uunty: C.. .7 � .. -� ..................................... Owner Name: ................................ Phone No: Facility Contact: ................... l'itle:................................................................ Phone No: ............... MailingAddress:..................................................•...........................•..•..•.. ..................................................•.................................................... ..........•............... Onsite Intearator:...................................................................................... ............. ......... Certified Operator:................................................... .!................... ....................................... Operator Certification Number: Location of .� .......................................................................................................................................................................................................................................................................... Latitude Longitude �• �` ��� Design Current. Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Populatio ❑ Wean to Feeder ❑ Layer airy ❑ Feeder to Finish ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder JE1 Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Roars Total SSLW Number of Lagoons ❑ Subsurface Drains ['resent ❑ Lagoon Area ❑ Spray Field Area Holding Ponds / SoIid 'Traps 10 No Liquid Waste Management System Discharges S Stream Impacts 1. Is any discharge observed from any part of the operation (If ycs, notify DWQ)'? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance incsn-mc€dc? h, if ilkchargc is observed. did it reach: ❑ Surface Waters ❑ Waters of the State e. 11' discharge is observed. what is the estim.,ac;d 116w in a]/min? d. Docs discharge hypass a lagoon system? 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than From a discharge? Waste Collection & Treatment ❑ Yes No ❑ Yes ,lam! No [:]Yes No ❑ Yes ,VNo ❑ Yes] No ❑ Yes No 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes o r Structure 1 Structure 2 Structt€rc 3 Structure 4 Structure 5 Slruclure 6 / .I Identifier: �j �% A Ereehon.d (inches)= .....•I•D.........................................................I........ x ] /6/99 Continued o Facility Number: - Date of Inspection ITT 5..Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes 0 seepage, etc.) 6. Are there structures on -site which are not properly addresscd and/or manag*ed through a waste management or immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement'? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenancelimprovemcm? ❑ Yes No 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation inarkings? ❑ Yes JkINo Waste r1l)pEication 10. Are there any huffers that need maintenance/iIII pro vemcnl? ❑ Yes [ No 11. Is there evidence of over application? ❑ Pondin, ❑ Nitro -en El Yes �No 12. Crop type U 5 G' 13. Do the receiving crops differ with those dcsi-Inatcd in the Certified Animal Waste Management Plan (CAWMP)'? ❑ Yes WNo 14. Does the facility lack wettable acreag*e for land application'? (footprint) [I Yes ,�No 15. Does the receivinv crop need improvement? ❑ Yes 91N0 16. Is there a lack of adequate waste application equipment? ❑ Yes INo / Required Records t\ Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑Yes VNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design. maps, etc.) ❑ Yes ON 19. Does record keeping need improvement? Oe/ irrigation, freehoard, waste analysis & soil sample reports) ❑ Yes 2:�IQo 20. Is facility not in compliance with any applicable setback criteria in effect at the lime of design? ❑ YesZKNo 21. Did the facility fail to have a certified operator in responsible charge? ❑ Yes �10 / 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes [�N0 /j 23. Did Rcvicwer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No 24 Does facility require a follow-up visit by same agency? ❑ Yes ONo 1Vo.vialations or defciencie5 .�s:ere Hated dv.ring.t ii.s.visi .'. V-ati v'M1.rerceive na Mrtiiei- .:. ; eorrespixidence: boot;this;visit,,,;,,;,,;;;;;,;;;;;;;,;;;;;;;;; ;;; Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments.. Use drawings of facility to better explain situations. (use additional pages as necessary): P� N TZ) IQop7 p mar PV,p � r, s rNL6 4-145— l EP3i2 . 05 7- /E1 _TT VA) ,-tom T l� � � f� wr � �. IC � � P Q t cd►�v�s �� r�-X �7 `��� � � a- �„�� ti i/ Reviewer/Inspector Name /'! A t4-r D 4-c f Z_�AqlJ y L Reviewer/Inspector Signature: 116 Q, Date: Revised January 22, 1999 JUSTIFICATION & nOCUMI=NTATION FnR MA.Nine.T04v ►non nMr=DRnFnTnT1r11A Facility Number A`411F r Operation is'flagged for a wettable Farm Name: NF! "�`�.� R iy Li A) p L. cz: i ��IR ,,� acre determination due to failure of On -Site Representative: Part 11 eligibility item(s) F1 F2 F3 F4 Inspector/Reviewer's Name: Date of site visit: _V 4/ Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Date of most recent WUP: i Annual farm PAN deficit: c pounds Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system wlpermanent pipe; 5. stationary sprinkler system wlportable pipe; 6. stationary gun system wlpermanent pipe; 7. stationary gun system wlportable pipe 4)jE� w�&0 n/ PART I. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D2/D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part III. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part II - F1 F2 F3, before completing computational table in Part I11). PART II. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less thr 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits fieid(s)'s acreagelir' of 75% of the respective field's total acreage as noted in table in Part/' s 3 tvision of Sail and Water Conservation [] Other Agency Division of Water Quality 143 Routine O Complaint O Follow-up of DWQ inspection O Follow-up of .DSWC review O Other Facility Number Date of Inspection ��--� Time of Inspection qi0 3 24 hr. (hh:mm) 0 Registered 0 Certified 0 Applied for Permit 0 Permitted 10 Not Opera Date Last Operated: Farm Name: ...... J.�Pn!�+�!?.�i�51........................... �►.)OJ.I�. County:................................................................................. Owner Name Phone No: �1.� 6�1... ZG3R ........................ r Facility Contact: .i"1�kL�.......�.;,�.1 . 1. �l ............................... (Title .......p............................1........................... Phone No:................................................... Mailing Address:....... 4. � y....... ............0 +�1� .................M. iP LJ N� I tSl�..........(. on�.M,P. �.......G..... ... �1..................... ...... Onsite Representative:.. Nkg. .... LL . dg)y. .... Integrator:................................................................... Certified Operator;........],!lkit.............................. L..1. y .......... Operator Certification Number-_209A..?............... Lnrsftinn of Farrn: / A :......................................................................i................................................................................................. ....... .. .. ......... .. � ..... .. ... t Latitude ©' ®' " Longitude ® • Z z— 1 44 General No 1. Are there any buffers that need maintenance/improvement? ❑ Yes &I 2. Is any discharge observed from any part of the operation? ❑ Yes r�No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes [To b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes Q04 c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes CK0 3. Is there evidence of past discharge from any part of the operation? ❑ Yes 9<0 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes Ltd No M/N S. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes o maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes L) No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes O No 7/2S/97 Facility Number: q9 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes N(No Structures_(Lagoons.Holdine Ponds. Flush -Pits. etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes LKNo 3- 6- ) Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6, Identifier: ................................................................................................................................................................................................................... rr/ Freeb�d (ft):......... ..?................ ................ I .... ............... ................................... ..................................... .................................... .................................... 10. Is seepage observed from any of the structures? ❑ Yes 54 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 04 12. Do any of the structures need maintenance/improvement? ❑ Yes Ei?/No (If any of questions 9-12 was answered yes, and the situation poses 13. an immediate public health or environmental threat, notify DWQ) Do ZNo any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes Waste Application 2N0 14. Is there physical evidence of over application? ❑ Yes (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type ............... C a F..#........................ ..........A.34A ............................ ... iM ..................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 9No 18. Does the receiving crop need improvement? ❑ Yes 3No 19, Is there a lack of available waste application equipment? ❑ Yes 14 20. Does facility require a follow-up visit by same agency? ❑ Yes I/No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes PrNo 22. Does record keeping need improvement? ❑ Yes PNo For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes WNo 24, Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 8 N 25. Wgre any additional problems noted 'which cause noncompliance of the Permit? ❑ Yes 63 No EffNo violatio'nsor deficiencies:werenotedduring this; visit'- Nou.will receive-n&furth`er-. cvrr006fidekci dhoti this:visit:-:::: :.: ::. ; . ` ' : : Reviewer/Inspector Name Reviewer/tnspector Signature: Date: jQ-1f4utine'g0,Complaint_�O,Follow=up of DW .inspection - O Follow-up of DSWC review O Other j Facility Number E" , a ' — Date of Inspection . Time of Inspection 24 hr. (hh ;mm) f4 4 D Registered ,Ceitefiedw:.D'Applied for Permiitl D.Permitted IGNotOperational Date Last Operated: Farm Name:,....:;,. , .a T! "11:... L-.t h ... County:....... f!.1�t�'ClE?'�.............................. tft Owner Name:........:�......lr ^`14# ......................................... Phone No:.......:1.1.2.........3a. �............. tFacility Contact:...i,L.t3Ja-! j................ Title:................... .. Phone No:................ ....................... MailingAddress: ................ ... ........... ....................................................................................................................................................... .......................... Oncite Representative: .......1—�[ , .-.. .......................................... Integrator:......................................................... Certified Operator;..........Nt� 1-,�i.t.� �] .. Operator Certification Number;.--------- ..... ....... �...----'----'--...---'---".................. ....................... Location of Farm. 0 Latitude • 1 '6 Longitude • i {{ Mz'sDeSlgn� `� Currents Desr n Current ;� g LS1gII v a k rCIIt� Swrrie „� ,Capacity Populatrori Poultry Capacity' P,opulatianCa le a Caprxty ;I'opuiatrvIIi' ❑ Layer Dairy # ` ❑Nan Layer ❑Non Dairy E;ean to Feeder to Finish 2 ❑ Farrow t0 Wean. ❑ Farrow to Feeder a. ': vs; r,, x�g ?' ❑Other , .a , ;t. El Farrow to Finish El Gilts j t:.Tata1D#�stgti"Capacity w Boars Nuruber�ofLagoonsl�HoldrngnPonds ❑ Subsurface Drains Present ❑ Lagoon Area 10 , wXi Spray Field Area M'° ❑ Na Liquid Waste Management System A General 1. Are there any buffers that need maintenancelimprovement? ❑ Yes No 2. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. If discharge is observed, did it reach Surface Water? (if yes, notify DWQ) ❑ Yes No c. If discharge is observed, what is the estimated flow in gaVmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes Q] No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes 00 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes xNo maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes VNo 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes l3No 9,nCM17 7 Facility�N;;mb_r: jq — 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures ons ldin -Ponds, Fig sh fits, VIS.), 9. Isstorage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No ❑ Yes eNo Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:............................................................................................................................................. ................................... Freeboard(ft): .............................................................................................................................................................................................................. 10. Is seepage observed from any of the structures? ❑ Yes ONO 11. is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes No t� 12. Do any of the structures need maintenance/improvement? ❑ Yes No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes [;KNo Waste Application 14. Is there physical evidence of over application? ❑ Yes VNo (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type Cll.'N...........I.r;; : �,`.F....v..�.................................................. .................................... :......................... ..................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes [INO 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 16 No 18. Does the receiving crop need improvement? ❑ Yes 0 No 19. Is there a lack of available waste application equipment? ❑ Yes O No-. 20. Does facility require a follow-up visit by same agency? s„❑ Yes 0 No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes Q(No 22. Does record keeping need improvement? ❑ Yes FN 0 For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes 5�.,3�<o 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes �o 25. Were any additional problems noted which cause noncompliance of the Permit? ElL'IYes �L�J 'No No.Vlolatiori5'Or deficiencies. Were noted, during' this.Vi h.- Yoil:mill receive'no•further' : - correspondehO dtiout-this:visit: .:..:.: . 4d an ,U LUW /Q 7/25/97 Reviewer/Inspector Name Reviewer/[nspector Signature: /I II Ir,.l �}!% r , V-,,) ff /�r , . '✓ 0. - — : { ).." P i 4)4: /h r1.5 -1 IQ Q State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office JamSeptember 25, 1997 es B. Hunt, Jr., Governor DIVISION WATER QUALITY Wayne McDevitt, Secretary Mr. Jonathan Lindley 614 Mike Lindley Road Snow Camp, North Carolina 27349 Subject: Compliance Evaluation Inspection Facility 4 19-16 Jonathan Lindley Farm Chatham County Dear Mr. Lindley: On July 28, 1997, Terri Hollingsworth from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection deternuned that the cattle operation was not discharging wastewater into waters of the State and that the waste holding pond had the required amount of freeboard. As a result of the inspection, the facility was found to be in compliance with the State's animal nondischarge regulations, l would lilac to renlind you of the requirement to have an approved Animal Waste Management Plan by December 31, 1997. This plan must be certified by a designated technical specialist or a professional engineer. I understand you are currently working with the local Soil and Water Consen-ation District to establish appropriate buffers, stock trails, fencing, and revegetation. I encourage you to continue in your efforts to ensure necessary modifications to your facitlity are implemented and certified prior to the statutory deadline. For a listing of certified technical specialists or assistance with your waste management plan contact your local Soil and Water Consmalion District office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Terri Hollingsworth at (919) 571-4700. Sincerely, Jul Garrett Water Quality Section Supervisor cc: Chatham County Health Department Mike Sturdivant, Chatham Soil and Water Conservation District Margaret O'Keefe, DSWC-RRO DWQ Compliance Group RRO Files 3800 Barrett Drive, Suite 101 • Raleigh, NC 27609 Voice (919)5714700 " FAX (919)5714718 An Equal Opportunity AMrmadve Action Employer 50% recycled / 10% poq{onmumer paper wrp _r i€ a C* ❑DSWC Animal Feedlot Operation'Review �� 1 _� ®'bWQAnimal Feedlot Operation SIt��„Inspechonfi� .Routine O Cum laint O Follow-up of DWQ ins ection O Follow-uR of DSWC review O Other Facility Number l Date of Inspection "L Time of Inspection VS'.VSM 24 hr. (hh:mtn) Total Time (in fraction of hours Farm Status. (916stered ❑ Applied for Permit (ex:.1.25 for I hr 15 min)) Spent on Review ❑ Certified ❑ Permitted or Inspection includes travel andprocessing) ❑ Not Operational Date Last Operated: ............................................................................................... . ...... . ....... . ....... . . ...... ................. Farm Name:.�1. Y� �. rlrtaln....Ll ld!...... .. �ar.r�'1................... County: -!r�. a ........................................ LandOwner Name:..- 9.1r..a. 1 ........4 ...& .. Phone No k.o ........................... ....................... Facility Conctact:... �.� ....,.. :��qPhone No.3� Mailing Address:..;; .`. ...... +. ... ......... '! ..` .:.....Sh,S1 .. !h! ?......i4�....... .A111% .......................... Onsite Representative: ll.�� V4 L\ ...... Certified Operator: .....± _' ... Location of Farm:' {- �32,e Integrator: Operator Certification Number: ............................. ....... . ... eaf �Ck, 1i3& C41A Latitude Longitude �• �� Type of Operation and Design Caaacity Wean to Feeder I r *'U Layer '. lld'Dair Feeder to Finish «❑ Non -Layer: ❑ Non -Dairy b. If discharge is observed, did it reach Surface Water`? (If yes, notify DWQ) ❑ Yes M-No e. If discharge is observed, what is the estimated flow in gaVinin? Q Al d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes a o 3. Is there evidence of past discharge from any part of the operation? ❑ Yes �o 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes B-<0 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes 09Ko 4/30/97 maintenance/improvement? Continued on back ' Facility Number: 6, Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes M o 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures f l,aagoons and/or Holding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes t] vo ❑ Yes 920 o ❑ Yes R'1vo Structure 5 Structure 6 ............................ ............................ ............................ ............................ 10. Is seepage observed from any of the structures? ❑ Yes ®"No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 2-go 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? SW4 t�.. Waite Application(� 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering iwaters �of the State, notify DWQ) 15. Crop typeL:`'n�....V�!�Pz4,t�.a....•5..:�......................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? h co 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19, Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? Fpr Cgrfified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? ❑ Yes 62-1Q0 [Yes ❑ No ❑ Yes 21�o ❑ Yes ❑ No ❑ Yes 0<o ❑ Yes M-NO, ❑ Yes G-No ❑ Yes [D-Ko ❑ Yes ®-N—o ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Reviewer/Inspector Name a ''1 1�, �.. � ` �` ` u." Reviewer/Inspector Signature: CPS! y�4s.vG,ld�i Date: `i -2_g 4 �r�i uru rr..��rrw ■nr iri __ cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 r DSu'C Animal Feedlot Operation Review ❑ DWQ Animal Feedlot Operation Site Inspection Routine O Com lnint O Follniv-uu of DwvQ inspection O Follow•-un of 1),SWC review O tither Facility Number 9 Farm Status: ® Registered ❑ Applied for Permit ❑ Certified ❑ Permitted Date of Inspection Time of Inspection �24 hr. (hh:mm) Total Time (in fraction of hours (es:1.25 for 1 hr 15 min)) Spent on Review [i or Inspection (includes travel and arocessin2) m❑ Not Operational IDate Last Operated: ...... ....... . ......................... . ............................... ............................................... ........................ Farm. ame:..... .l.!.J.! it � .° � -�1=}� �it�i. ........._ . ...... Count}:.....hPt #ter .m......_ ...... ......................... —.. ++ ! fr Owner :Name: rn. 1 ?l..sr. �iu � ._ ka id1. ....... Phone Na: �z�'3 ..;�k3% c 5`f - 1_ ......................... Facwtv Conctact: � .. � C��,nl ._ Title:.-J2_LjsU.vc.l........................ Phone r1o:�C?�! ? ` �?.. +?_.-�I51---.. J } Mailing address: �� ?�?4.. Y��r~.. r jn�cv.1 n/� ��i c,. �.. � s� — .Fan. �1 �..._......L....���_..�����.� ..-�'..�Y..�L�'1.�� rt �:..3i 1.1. _t.,�r1.�C ..... ..._..... Onsite Representative: i..�. ..i�. ....... Inreb„ratar:..... ».... »„ Certified Operator: r I! t �'.:`�� O eratar Certification Number: p _....................... ....._.`.._......_................_...---................ p Location of Farm: Latitude • 6 " Longitude • �. 6. Ntttnber o€L`agootzstlHoldtng Ponds Q ❑Subsurface Drains Present ❑ Lagoan Area ❑Spray Field Area R1. ;-: . General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in _aL min? d. Does discharge bypass a lagoon system? (If yes, notify D% Q) 3. Is there evidence of past discharge from any part of the operation'? 4. Were there any adverse impacts to the waters of the State other than from a discharge? S. Does any part of the waste management systcm (other than lagoons/holdine ponds) require 4!30i')7 maintenance/improvement'.' M Yes ❑ No ❑ Yes 159 No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes W No ❑ Yes 9No ❑ Yes KNo Continued on back ....... . ....—^.... ...........`. t a .cilicv not in compiiance with any applicable setback criteria in effect at the time of .iesign? ❑ Yes Z No P. Did the facility fail to have a certified operator in responsible charge? ❑ Yes 9 No ` S. Are there lagoons or storage ponds on site which need to be properly closed? _ _ ._.. ❑ Yes JE No Structures f 1_a;;oons and;or TIoldin2 Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes V) No Freeboard (ft): Structure 1 Structure 2 Structure 3 Strucn:.re 4 Strtcture S Structure 6 .__..... _............... ...... ......... _........ .. ._ .__....... .......... __....-._............. ................ _........ _ 10. Is seepage observed from any of the structures? ❑ Yes J�g No 11. Is erosion, or any other threats to the integrity of any of the structures observed? [:]Yes ® No 12. Do any of the structures need maintenance!lmprovement? ❑ Yes [9 No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level. markers? ® Yes ❑ No Waste Application 14. Is there physical evidence of over application? ❑ Yes [J No (If in excess of IN-114P, or runoff entering waters of the State, notify DWQ) 15. Crop type .�S}}.�I�l...l lkl.... �m. �. ....... .._... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AW-.%1P)1 ❑ Yes ® No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes N No 18. Does the receiving crop need improvement? ❑ Yes No 19. Is there a lack of available waste application equipment? ❑ Yes No 20. Does facility require a follow-up visit by same agency? Cl Yes ® No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes m No For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ONO 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No Comments (refer to question #): ' Explain any YES answers and/or any recommendations or any other comments. — Use drawings of facility to better explain situations. (use additional pages as- necessary): lemporAr"{ m02� �� 4o 6e ;,�� IIed, I�'ACSP mts; oc%s 90t� b.5 as� -lV �� rr�1 t I r r c A rr ctrc�a StK�;.J Aid 1 ✓c��zxl c E zi,cs, c�nl , ��Z�n 0& Qck� C� Rid prod l t C1I 1 u-tia q� � ort /marker. Jr� fl 4-lc rj� Reviewer/Inspector wer/lnspector \amekr` " I Ifni; Revielver/InspectorSignature:J LL44 Date: 4i J62 11-7 :c: Divivion of Water Ouulity. Water Ounlity Section, Facility ; .. essnr nt Utz it al NO7 it 0 DSWC Animal Feedlot Operation Review ❑ DWQ Animal Feedlot Operation Site InspeAMlr— M I-aRoutine 0 Complaint 0 Follow-up of DNVQ inspection 0 Follow-up of I SNVC revibi_10 (W1 1 -1 IJ�11 I iJ I 1 t Facility Number Dare of Inspection H REG10l�fAE OFf ICE Time of Inspection Total Time (in fraction ot'hours Farm Status: ® Rea stered ❑ Applied for Permit (ex:l.'-5 for 1 hr 15 min)) Spent on Review ❑ Certified ❑ Permitted or Inspection (includes travel and rocessin2) ❑ Not Operational Date Last Operated: .... --......................................................... - .r Farm Name: �� a-5_!,�i.��Cs ...... Counn:.... ... ........ ....... _............ ............. Owner Name: L�l.i� li -- _ 1 � ... L.4dtoq.................. ... Phone tio:L�3 �ra���._,�`!�. �'}��................ ............ Facility Conctact: •..� . .�ucn �nl;�� . -_ .. Title: _.lac.au.w. ....................... Phone No:rc��.�lv�j�1 Mailinu Address: .... _...... ..... Y(�/K�f : ': J/l<:`1,��1� f �.7.1..X C '( i-.rC17G1' 1.� �� �..1.J./f.S�S.� � l'C.... ........... _...... Onsite Representadve:.%s�n�l N.. ¢: c.fr(�r'���.� . f:L... �!!! ��` ........ Integrator: ............................ Certified Operator:_ M �'.I.-: `........ Operator Certification Number: �............................... .. Location of Farm: w Latitude [�•[�� �� Longitude �• �• �• Type of Operation a;M. Design `Currents`' Design Design K= : Current Swine pPoultry Ca acity. Po Matron. 'Cattle ` Ca acitv;Po 'ulation..:. Current Ca acity 'I?o `illation [] Wean to Feeder Laver ❑ Dairy ElFeeder to Finish JE1 ❑Non -Laver ❑ Non -Dairy Farrow to Wean ^ Farrow to Feedery Total DeStgn:.Capaeity = , rr Farrow to Finish' " ❑Other flI^� Total SSL T Wf w 1 plumber v€ agaoas J Hoo WAng,Ponds . ❑.Subsurface Drains Present ❑ Lagoon Area 10 Spray Field Area General 1. Are there any buffers that need maintenance/improvement?,[ Yes ❑ No 2. Is any discharge observed from any part of the operation? ❑ Yes 12 No Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Surface Water? (If yes. notify DWQ ❑ Yes ❑ No c. If discharge is obsm,cd, what is the estimated flow in galfiiiin? d. Does discharge bypass a lagoon system? (If yes. notify D%VQ) ❑ Yes ❑ No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes f9 No 4, Were there anv adverse impacts to the waters of the State other than from a discharge? ❑ Yes gNo S. Dora any pan of the waste management system (other than lagoons/ho[ding ponds) require ❑ Yes KNo msiotcnance/improvcrncnt.' 4/30i97 Cwrrinmed otr back [ i)tr:....1...l..... ......SY...... .acility not in compliance with anv applicable setback criteria in effect at the time oFdcsi,n? 7. Did the facility fail to have a certified operator in responsible chargre? ❑ Yes 19 No ❑ Yes jK No- S. Aire there lagoons or storage ponds on site which need to be properly closed? Structures f I,atTnonc and/or lloldin�y Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure I Stricture 2 Structure 3 --. ..- ............... ........ ------.-....... 10. Is seepage observed from any of the structures? - - ❑ Yes JE No ❑ Yes JR No Structure 4 St7LCtLire Structure 6 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was ansivered yes, and the situation poses an immediate pubiie health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of W-,,v1P, or runoff entt�e{{ring waters of the �State, notify DWQ) 15, Crop type S�.II i>i ..`..�jalr4l.l.... ......... ................. ..... -........ - ......... _..-� .._.. Q 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AW-MP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? r Certified Facilities OnIv 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? ❑ Yes J91 No ❑ Yes N No ❑ Yes 0 No 2 Yes ❑ No ❑ Yes (f No ❑ Yes ® No ❑ Yes ® No ❑ Yes EN No ❑ Yes X No ❑ Yes ® No ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Comments (refer to question #): 'Explain. any YES answers and/or any recommendations -or any other comments. Use drawings of facility to better explain situations. (use additional pages ­as nt:cessary):..: V TE ry) Po r•-A rLi rraOZ tA40 6E j,44A d, P nvao cs 9�'"� 6E r � tics ►/! 4 5�Cx�G +rA r C'r- r .1; c e-) I carCn Se6di� pad ✓e64L& ex a- LO e a,LQ .-k_, r-e_� � L'- Q � ��rd 61f p t-o v�) 4-7 o r\t .rr,ark i Reviewer/InspectorName Reviewer/Inspector Signature: Date: c: DivLvinn of Iifulcr Duulitr. {Muter (Juulity Section. Fncilirn :.. —W lit Unit 4/30/97 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary DE H NR DIVISION OF ENVIRONMENTAL MANAGEMENT October 20, 1995 Mr. Jonathan Lindley 1800 Johnny Lindley Road Snow Camp, NC 27349 Subject: Compliance Inspection _Johnny Lindley Dairy Farm Facility No. 19-16 Chatham County Dear Mr. Lindley: On October 10, 1995, Mr. Ted Cashion from this office conducted a compliance inspection of the subject facility. This inspection is a part of the Division's efforts to determine potential problems associated with waste disposal systems. Mr. Cashion's site visit determined that wastewater from this facility was not discharging to the surface waters of the State. No manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) were observed. The facility appeared well operated and maintained. Effective wastewater treatment and facility stewardship are a responsibility of all animal facility operators. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. This office also reminds you that an approved animal waste management plan must be incorporated by December 1997. This plan must be certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Mr. Cashion at 919-571-4700. Sincerely, Judy Garrett Regional Water Quality Supervisor cc: Chatham County Health Department 'Chatham County Soil and Water Conservation District Facilities Assessment Unit h:\animal\iindleyj.ine 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, North Carolina 27609 NO C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper JUL-J �-195� 15 26 FP.Ur I GE�I 6JATER QUAL I T`�' SECTION T J PRO, P.02/02 Site Requires Immediate A lien ,�nr Facility No. 4/DIVISION OF ENVIRONMENTAL MANAGEMENT ANl•MAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: 4C f 0 ,1995 Time: Farm Na.rnc/Osvncr- ,1ah-Tli ,yj - " 1 "_ Mailing Address: fg0a J 4hn County: 7ntegratar _ Phone: d' 39 6 9- On Site Representative: Jo4„h�r _��'�t�y— - — Phone:._ Physical Addres�ation: Type of Operation: Swine Poultry Cattle Design Capacity: Number of Animals an Site: DENT Certification Number: ACE DEM Certification Number: ACNEW Latitude: Longitude: Elevation: Feet Circle Yes or No Dcc,s the An.imai Waste Lagoon have sufficient &aeboard of 1 Foot + 25 year 24 hour storro event (approximately 1 Foot + 7 inches) Yes or No Acrual Freeboard: Ft. 4 inches Was any seepage observed ftm the lagoou(s)? Yes OiFWas any erosion observed? Yes off�) Is adequate land available for spray'? v or No is the cover crop adequate? es r No Crop(s) being utilized: Does the facility meet SCS rzu=um setback criteria'? 200 Feet from Dwellings? es No 100 Feet from. Wells? �or No �t animal waste stockpiled within 100 Feet of USGS Blue Line So-eam? Yes o Do a usnal waste land applied or spray irrigated within 25 Feet of a liSGS kfap Blue Line? Yes `r& T animal waste discharged into waters of the state by man-made ditch, flushing system, or other :;irri;a_r matt -made device-0 Yes or No If yes, Please Explain. rk�cs trio Facility watntam adequate Waste a=ageracnt rCcordS (VOIUMtS Of Manure, land applicd_ spray irrigated on spccific i cage with cover crop)'? Yes or No Additional Comments: on� ye CPS, �� e Signature cc: Facility ASsessmemt Unit Use Attachments if Needed. TOTAL P.02 O�OF W A rFgQG Michael F. Easley, Governor William G. Ross Jr„ Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality AQUIFER PROTECTION SECTION February 14, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED CM4 7006 0810 0002 6049 0131 Mr. James M. Lindley James Mike Lindley Farm 614 Mike Lindley Rd Snow Camp, NC 27349 RE: Notice of Violation (NOV-2007-PC-0106) James Mike Lindley Farm Facility No. 19-16 Chatham County Dear Mr. Lindley: On February 7, 2007 our office conducted an annual compliance inspection of your facility 51-38 in Johnston County to verify that (1) the facility is complying with the requirements of State Rules 15A NCAC 2T.1300 and its Certified Animal Waste Management Plan (CAWMP); (2) the farm's waste management structures are being operated properly under the direction of a Certified Operator; (3) the required records are being kept; and that (4) there are no signs of seepage, erosion, and/or runoff. Attached is a copy of the inspection report for your review. The following violations were noted: In accordance with Condition 11.24 of your General Permit, all waste application equipment must be tested and calibrated once n. the first two years after issuance of the Certificate of Coverage (COC) and then at least once every two years thereafter. The results must be documented on forms provided by, or approved by, the Division. o No calibration results were available for review, and producer could not ascertain if and when it was performed • In accordance with Condition 111.3 of your General Permit, precipitation events at facilities issued with a COC to operate under the General Permit shall be monitored and recorded. The precipitation type and amount shall be recorded daily for all precipitation events and maintained on site for Department review. e Daily rainfall records have not been kept In accordance with Condition 111.8 of your General Permit, the Permittee must maintain monthly stocking records for the facility (except for pastured animals not contributing waste to the animal Aquifer Protection Section - Raleigh Regional Office One NorthCaroli 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 7914200 Customer Service 1-877-623-6748 ;Vaturalt 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 57 1 -4718 Internet: http://www.ncwaterquality.org An Equal Opportunit /Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Cont. Page Two February 14, 2007 James M Lindley Farm Facility # 19-16 waste management system), and make them available to the Department of Environment and Natural Resources. o Stocking records were not available for review Required Action: • Please complete the irrigation equipment calibration during your next waste application event, and submit copy of the results to the address at the bottom of the first page • Beginning the day of inspection, please record and maintain daily rainfall and monthly stocking records as stipulated in the above -stated conditions in your permit. • The Permittee shall provide to this office within thirty (30) days from receipt of this violation notice, a ,written explanation and a plan that will ensure that the problem does not recur. Your explanation will be reviewed, and be advised that if this violation continues, the Division will send recommendation to the Director of the Division of Water Quality for the appropriate enforcement action to be taken. It is very important as the owner and/or the Operator in Charge that the aforementioned violation(s) and any other problems that may arise be resolved, as soon as possible. Thank you for your assistance and cooperation during the inspection. If you have any questions, please contact me at 919-7914232 or Joseph Gyamfi at 919-791-4234. Sincerely, S. J mmerman, L.G. Cc: Mr. Henry Outz, Chatham County DSWC Office Mr. John Hunt, DSWC-RRO APS Central Animal Files RRO File (19-16) Division of Water Quality ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 120016__ _,_ Facility Status: Active Permit: AWC190016 ❑ Denied Access Inspection Type: Comgliance Inspection Inactive or Closed Date: Reason for Visit: Routine County: Chatham Region: Raleigh Date of Visit: 02/0712007 Entry Time: 11:30 AM Exit Time: Incident #: Farm Name: James Mike Lindley F Owner; James M Lindlev Owner Email: Phone: 919-663-2639 Mailing Address: 614 M& Lindley Rd Snow Camp NC 27349 Physical Address: Facility Status: ❑ Compliant ❑ Not Compliant Location of Farm: Integrator: Latitude " Longitude: 79°22'46" County Road 1336, 111E mi. south of the intersection of county roads 1336 and 1337. Johnny Lindley Road Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: James M Lindley Operator Certification Number: 20967 Secondary OIC(s): On -Site Representative(s): Name Title Phone On -site representative Mike Lindley Phone: 24 hour contact name Mike Lindley Phone: Primary Inspector: Joseph Gyamfi Phone: Inspector Signature: Date: Secondary Inspector(s): Page: 1 Permit: AWC190016 Owner- Facility: James M Lindley Facility Number: 190016 Inspection pate: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Inspection. Summary: • WUP dated 12/18/97 • Waste analysis: 12/11/06 = 5.2 417106= 7.4 ' Reviewed waste application records - - please go back and charge the waste applied in September 2006 to Small Grain(wheat) instead of Corn on SLUR-1 and SLUR-2 - Also be sure that waste application dates are within 60 days of waste analysis dates (before or after) • Lagoon levels have been recorded weekly # 21. No rainfall records were available -!Need to keep daily rainfall records #21. Stocking and mortality records need to be kept. Producer has STOCK-1 form to use. #24. Missing waste application equipment calibration - Producer says calibration will be done during next waste application. He could not find his previous calibration and did not remember when it was done " Crop yield records available Page: 2 Permit: AWC190016 Owner- Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current Population Cattle Cattle -Milk Cow 170 156 Total Design Capacity: 170 Total SSLW: 238,000 Waste Structures Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard kaste Pond MAIN 36.00 54.D0 Page: 3 Permit: AWC190016 Owner - Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ Cl ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ M ❑ ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 4 Permit: AWC190016 Owner - Facility: James M Lindley Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Facility Number: 190016 Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Corn (Silage) Crop Type 2 Small Grain (Wheat, Barley, Oats) Crop Type 3 Fescue (Pasture) Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15, Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17, Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ■ ❑ ❑ If yes, check the appropriate box below. WU P? ❑ Page: 5 Permit: AWC190016 Owner- Facility: James M Lindley Facility Number: 190016 Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ■ ❑ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ■ Inspections after > 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ■ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23, If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ❑ ■ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ■ ❑ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ❑ ■ ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ■ ❑ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air Cl ■ ❑ ❑ Quality representative immediately. Page: 6 Permit: AWC190016 Owner - Facility: James M Lindley Inspection Date: 02/07/2007 Inspection Type: Compliance Inspection Other issues 31. Did the facility fail to notify regional DWO of emergency situations as required by Permit? 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 33. Does facility require a follow-up visit by same agency? Facility Number: 190016 Reason for Visit: Routine Page: 7 p�pF W ATF,9oG Michael F. Easley, Governor William G. Ross Jr., Secretary co North Carolina Department of Environment and Natural Resources 0 Alan W. Klimek, P.E. Director Division of Water Quality AQUIFER PROTECTION SECTION February 19, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED CM# 7006 0810 0002 6049 0148 Mr. Julius Neil Lindley Lindale Farm 1156 Moon -Lindley Rd. Snow Camp, NC 27349 RE: Notice of Violation (NOV-2007-PC-0115) Lindale Farm Facility No. 19-23 Chatham County Dear Mr. Lindley: On February 16, 2007 our office conducted a compliance inspection of the subject animal operation in Chatham County to verify that (1) the facility is complying with requirements of the State Rules 15A NCAC 2T.1300 and its Certified Animal Waste Management Plan (CAWMP); (2) the farm's waste management structures are being operated properly under the direction of a Certified Operator; (3) the required records are being kept; and that (4) there are no signs of seepage, erosion, and/or runoff. Attached is a copy of the inspection report for your review. The following violations were noted: • In accordance with Condition 11.24 of your General Permit, all waste application equipment must be tested and calibrated once in the first two years after issuance of the COC and then at least once every two years thereafter. The results must be documented on forms provided by, or approved by, the Division. Your waste application equipment has not been calibrated since 1998 • In accordance with Condition 111.3 of your General Permit, precipitation events at facilities issued with a COC to operate under the General Permit shall be monitored and recorded. The precipitation type and amount shall be recorded daily for all precipitation events and maintained on site for Department review. o Daily rainfall records have not been kept • In accordance with Condition III.5 of your General Permit, an analysis of the animal waste shall be conducted according to recommended laboratory sampling procedures as close to the time of application as practical and at least within sixty (60) days (before or after) of the date of application. Aquifer Protection Section - Raleigh Regional Office None hCaroli 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748 ;atunl 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: http,l/www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper Cont. Page Two February 19, 2007 Lindale Farm Facility # 19-23 o It was determined that no waste analysis was conducted for waste applications on October 10, 2006 and December 11, 2006. • In accordance with Condition UA of your General Permit, land application rates shall be in accordance with the Certified Animal Waste Management Plan (CAWMP), of which the Waste Utilization Plan (WUP) is part. In no case shall land application rates exceed the nutrient agronomic rate of the receiving crop and/or shall result in excessive ponding or runoff during any application event. o It was determined during the inspection that all fields on tract 1623 were combined into two fields, and one PAN value (not stated in the WUP) used for each field. This means that the recommended PAN values for the different fields on tract 1623 (which could be based on soil type and slope even for same crop type) were not adhered to. Our recommendation is that the f elds can only be combined if the PAN resulting in the lowest application amount (inches) is used. Required Action: + Please complete the land application equipment calibration during your next waste application event, and submit copy of the results to the address at the bottom of the first page. • Beginning the day of inspection, please record and maintain daily rainfall amounts, and conduct waste analysis as close to the time of waste application as possible. Please begin to keep monthly stocking records as well. • The Permittee shall provide to this office within thirty (30) days from receipt of this violation notice, a written explanation and a plan that will ensure that the problem does not recur. Your explanation will be reviewed, and be advised that if these violations continue, the Division will send recommendation to the Director of the Division of Water Quality for the appropriate enforcement action to be taken. Thank you for your assistance and cooperation during the inspection. If you have any questions, please contact me at 919-791-4232 or Joseph Gyamfi at 919-791-4234. Sincerely, S. J Z mmennan, L.G. Cc: Mr. Carl Henry Outz, Chatham County NRCS/DSWC Mr. John Hunt, DSWC-RRO APS Central Animal Files RRO File (1944) o�0,� W A rF90G 7 DUG 4 `C Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources AQUIFER PROTECTION SECTION February 19, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED CM# 7006 0810 0002 6049 0148 Mr. Julius Neil Lindley Lindale Farm 1156 Moon -Lindley Rd. Snow Camp, NC 27349 RE: Notice of Violation (NOV-2007-PC-0115) Lindale Farm Facility No. 19-23 Chatham County Dear Mr. Lindley: Alan W. Klimek, P.E. Director Division of Water Quality On February 16, 2007 our office conducted a compliance inspection of the subject animal operation in Chatham County to verify that (1) the facility is complying with requirements of the State Rules 15A NCAC 2T.1300 and its Certified Animal Waste Management Plan (CAWMP); (2) the farm's waste management structures are being operated properly under the direction of a Certified Operator; (3) the required records are being kept; and that (4) there are no signs of seepage, erosion, and/or runoff. Attached is a copy of the inspection report for your review. The following violations were noted: • In accordance with Condition I1.24 of your General Permit, all waste application equipment must be tested and calibrated once in the first two years after issuance of the COC and then at least once every two years thereafter. The results must be documented on forms provided by, or approved by, the Division. Your waste application equipment has not been calibrated since 1998 • In accordance with Condition 111.3 of your General Permit, precipitation events at facilities issued with a COC to operate under the General Permit shall be monitored and recorded. The precipitation type and amount shall be recorded daily for all precipitation events and maintained on site for Department review. o Daily rainfall records have not been kept • In accordance with Condition III.5 of your General Permit, an analysis of the animal waste shall be conducted according to recommended laboratory sampling procedures as close to the time of application as practical and at least within sixty (60) days (before or after) of the date of application. Aquifer Protection Section - Raleigh Regional Office one NCaroh 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748 ff// Vtuml� 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: http:llwww.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Cont. Page Two February 19, 2007 Lindale Farm Facility # 19-23 o It was determined that no waste analysis was conducted for waste applications on October 10, 2006 and December 11, 2006. • In accordance with Condition HA of your General Permit, land application rates shall be in accordance with the Certified Animal Waste Management Plan (CAWMP), of which the Waste Utilization Plan (WUP) is part. In no case shall land application rates exceed the nutrient agronomic rate of the receiving crop and/or shall result in excessive ponding or runoff during any application event. o It was determined during the inspection that all fields on tract 1623 were combined into two fields, and one PAN value (not stated in the WUP) used for each field. This means that the recommended PAN values for the different fields on tract 1623 (which could be based on soil type and slope even for same crop type) were not adhered to. Our recommendation is that the fields can only be combined if the PAN resulting in the lowest application amount (inches) is used. Required Action: • Please complete the land application equipment calibration during your next waste application event, and submit copy of the results to the address at the bottom of the first page. • Beginning the day of inspection, please record and maintain daily rainfall amounts, and conduct waste analysis as close to the time of waste application as possible. Please begin to keep monthly stocking records as well. • The Permittee shall provide to this office within thirty (30) days from receipt of this violation notice, a written explanation and a plan that will ensure that the problem does not recur. Your explanation will be reviewed, and be advised that if these violations continue, the Division will send recommendation to the Director of the Division of Water Quality for the appropriate enforcement action to be taken. Thank you for your assistance and cooperation during the inspection. If you have any questions, please contact me at 919-791-4232 or Joseph Gyamfi at 919-791-4234. Sincerely, zmenrian, S. J ZL.G. Cc: Mr. Carl Henry Outz, Chatham County NRCS/DSWC Mr. John Hunt, DSWC-RRO APS Central Animal Files RRO File (19-44) O�OF wAT�gpG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 0 Alan W. Klimek, P.E. Director Division of Water Quality AQUIFER PROTECTION SECTION February 19, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED CM# 7006 0810 0002 6049 0148 Mr. Julius Neil Lindley Lindale Farm 1156 Moon -Lindley Rd. Snow Camp, NC 27349 RE: Notice of Violation (NOV-2007-PC-0115) Lindale Farm Facility No. 19-23 Chatham County Dear Mr. Lindley: On February 16, 2007 our office conducted a compliance inspection of the subject animal operation in Chatham County to verify that (1) the facility is complying with requirements of the State Rules 15A NCAC 2T.1300 and its Certified Animal Waste Management Plan (CAWMP); (2) the farm's waste management structures are being operated properly under the direction of a Certified Operator; (3) the required records are being kept; and that (4) there are no signs of seepage, erosion, and/or runoff. Attached is a copy of the inspection report for your review. The following violations were noted: In accordance with Condition 11.24 of your General Permit, all waste application equipment must be tested and calibrated once in the first two years after issuance of the COC and then at least once every two years thereafter. The results must be documented on forms provided by, or approved by, the Division. Your waste application equipment has not been calibrated since 1998 • In accordance with Condition 111.3 of your General Permit, precipitation events at facilities issued with a COC to operate under the General Permit shall be monitored and recorded. The precipitation type and amount shall be recorded daily for all precipitation events and maintained on site for Department review. o Daily rainfall records have not been kept • In accordance with Condition III.5 of your General Permit, an analysis of the animal waste shall be conducted according to recommended laboratory sampling procedures as close to the time of application as practical and at least within sixty (60) days (before or after) of the date of application. Aquifer Protection Section - Raleigh Regional Office Noe Caroli 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748 �turait 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: htlpJlwww,ncwalerqualily,org An Equal Opportunity]Affirmative Action Employer — 50% Recycledl10% Post Consumer Paper Cont. Page Two February 19, 2007 Lindale Farm Facility # 19-23 o It was determined that no waste analysis was conducted for waste applications on October 10, 2006 and December 11, 2006. In accordance with Condition 11.4 of your General Permit, land application rates shall be in accordance with the Certified Animal Waste Management Plan (CAWMP), of which the Waste Utilization Plan (WUP) is part. In no case shall land application rates exceed the nutrient agronomic rate of the receiving crop and/or shall result in excessive ponding or runoff during any application event. o It was determined during the inspection that all fields on tract 1623 were combined into two fields, and one PAN value (not stated in the WUP) used for each field. This means that the recommended PAN values for the different fields on tract 1623 (which could be based on soil type and slope even for same crop type) were not adhered to. Our recommendation is that the fields can only be combined if the PAN resulting in the lowest application amount (inches) is used. Required Action: • Please complete the land application equipment calibration during your next waste application event, and submit copy of the results to the address at the bottom of the first page. • Beginning the day of inspection, please record and maintain daily rainfall amounts, and conduct waste analysis as close to the time of waste application as possible. Please begin to keep monthly stocking records as well. • The Permittee shall provide to this office within thirty (30) days from receipt of this violation notice, a written explanation and a plan that will ensure that the problem does not recur. Your explanation will be reviewed, and be advised that if these violations continue, the Division will send recommendation to the Director of the Division of Water Quality for the appropriate enforcement action to be taken. Thank you for your assistance and cooperation during the inspection. If you have any questions, please contact me at 919-791-4232 or Joseph Gyamfi at 919-791-4234. Sincerely, mmerman, L.G. Cc: Mr, Carl Henry Outz, Chatham County MRCS/DSWC Mr. John Hunt, DSWC-RRO APS Central Animal Files RRO File (19-44) I ., 0 Division of Water Quality ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 190027 Facility Status: Active Permit: AWC190027 ❑ Denied Access Inspection Type: Compliance Inspection Inactive or Closed Date: Reason for Visit: Routine County: Chatham Region: Raleigh Date of Visit: 02/16/2007 Entry Time:12:1Q.QM _ Exit Time: Farm Name: Cloer Farms Owner: Warren L Cloer Incident #: Owner Email: Mailing Address: 2864 Tom Stevens Rd Snow Camp NC 273499467 Physical Address: Facility Status: ❑ Compliant ❑ Not Compliant Integrator: Location of Farm: Latitude:35'49'52" Longitude:79°23'29" Location: located on county road 1343 approx. 800 feet south of the intersection of county road 1342 and 1343. Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: Warren L Cloer Operator Certification Number: 20931 Secondary OIC(s): On -Site Representative(s): Name On -site representative Lee Cloer Title Phone: 24 hour contact name Lee Cloer Phone: Primary Inspector, Joseph Gyamfi Phone: Inspector Signature: Date: Secondary Inspector(s): Phone Inspection Summary: WUP dated 8113/05 No waste application since 2005 Waste levels and rainfall records are kept. Need to initial rain events greater than or equal to 1" Spreader calibrated in August 2005, Needs to be calibrated again this year Soil test for 2006 dated 6/10/06. Will take another one for this year. Producer needs to apply waste sooner or later, since waste level in holding pond is 2" below the start pump mark. - Remember to take waste sample for next application Need to keep monthly stocking records. Producer given FRBD form. Page: 1 Permit: AWC190027 Owner - Facility: Warren L Cloer Facility Number : 190027 Inspection Date: 02/16/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current Population Cattle Cattle - Milk Cow 100 50 Total Design Capacity: 100 Total SSLW: 140,000 Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard torage 1 37.00 39.0 Page: 2 Permit: AWC190027 Owner - Facility: Warren L Cloer Facility Number : 190027 Inspection Date: 02/16/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? Cl ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑. 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (LeJ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ MOO or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ Q ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 3 J Permit: AWC190027 Owner - Facility: Warren L Cloer Facility Number : 190027 Inspection Date: 021i6/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Waste_Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Fescue (Hay, Pasture) Crop Type 2 Small Grain (Wheat, Barley, Oats) Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Georgeville Soil Type 2 Cid Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17. Does the facility tack adequate acreage for land application? ❑ ■ ❑ ❑ 18, Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ■ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Page: 4 • 6 r Permit: AWC190027 Owner - Facility: Warren L Cloer Facility Number : 190027 Inspection Date: 02/16/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents ..,.,._........................................................................... Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ■ ❑ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ❑ Inspections after > 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ■ Annual Certification Form (NPDES only)? ❑ 22, Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ Cl ■ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ❑ ■ ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ■ ❑ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ IN ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 5 Permit: AWC190027 Owner • Facility: Warren L Cloer Facility Number: 190027 Inspection Date: 02/16/2007 Inspection Type. Compliance Inspection Reason for Visit: Routine Other Issues Yes No NA NE 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ ■ ❑ ❑ 32. Did Reviewer/Inspector fail to discuss reviewlinspection with on -site representative? ❑ M Q ❑ 33. Does facility require a follow-up visit by same agency? ❑ ■ ❑ ❑ Page: 6 W A 7'F9 Michael F. Easley. Governor O� Q William G. Ross Jr., Secretary 0 7 North Carolina Department of Environment and Natural Resources j Alan W. Klimek, P. E., Director Division of Water Quality October 1, 2004 James Mike Lindley James Mike Lindley Farm 614 Mike Lindley Road Snow Camp NC 27349 Subject: Certificate of Coverage No. AWC190016 James Mike Lindley Farm Cattle Waste Collection, Treatment, Storage and Application System Chatham County Dear James Mike Lindley: On June 11, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on February 11, 2003 and in accordance with the directive of Senate Bill 733, we are hereby -forwarding to you this Certificate of Coverage (COC) issued to James Mike Lindley, authorizing the operation of the subject animal waste collection, treatment, storage and • land application system in accordance with General Permit AWG200000. The issuance of this COC supercedes and terminates your previous COC Number AWC190016 which expires October 1, 2004. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the James Mike Lindley Farm, located in Chatham County, with an animal capacity of no greater than an annual average of 170 Dairy cattle and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keening and monitoring conditions in this permit. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. Aquifer Protection Section - Animal Feeding Operations Unit 1636 Mail Service Center, Raleigh, North Carolina 27699-1638 One NorthCarohna Phone: 919-733-3221 1 FAX: 919-715-05881 Internet: h2o.enr.stale.nc.us An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper Aqturally The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable �. laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current MRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per MRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed.below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 5714700. If you need additional information concerning this COC . or the General Permit, please contact J.R. Joshi at (919) 715-6698. Sincerely, U � . for Alan W. Klimek, P.E. Enclosures (General Permit AWG200000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Aquifer Protection Section Chatham County Health Department Chatham County Soil and Water Conservation District Permit File AWC 190016 APS Central Files 0 *I Producer: C, e e l j�_ I F-U Location: - r l ol.-; (L W-349 R MOMI • Lei in R s Type Operation : Number of Animals:_ 00 (Design capacity) The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed to determine nutrient content before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe • manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 0 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per acre per year. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under North Carolina Division of Environmental Management (NCDEM) .4200 regulations. S. wind conditions should also be considered to avoid drift and downwind odor problems. 1 . 6. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. 0 i The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. FA • Amount of Waste Produced Per Year(gallons, ft3, tons, etc.) 1�1animals X.11 amt.) waste/animal/year = il$'gO +v-J_ (amt.) waste/year Amount of Plant Available Nitrogen (PAN) Produced Per Year JJ0 animals X- J(g _lbs. PAN/animal/year = O .lbs. PAN/year. (PAN from N. C. Tech. Guide Std. 633) Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the nitrogen (N) requirements of the crop to be grown and assuming surface application: Table 1: ACRES OWNED BY PRODUCER Tract Field Soil Crop Lbs. N Acres Lbs. N Month of # No. Type Per Ac.* Utilized Application MOM Total � J Sy.'.3l 1_�1038 j * This N is from animal waste only. Xf nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. i NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 2996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient Management plan that addresses all nutrients. This plan only addresses Nitrogen. 3 tOi -T, T. s.:�txis.m•:r:�:y�io$w; •: :cor:.wv <r a»�+.o:.<L }�u-aby .a:t'iir .•.: o�". ro...:ri:• sra S3�`,C��� r $ 9..i'ro. _5.`:.r; a a v:�4,?G.::tc.. -.,.:. .:-.. - - �.�.,�:.,�,:.,:: �:.;,,rr i•: �.:.x.:I•o3 t a.:cha}:oa. v ::.r:,: ,a z•o' "S; 0 ,. .'.�p �S .<'rYi :Ai;:f;}?:}.`,5 `: i^!t.'�Y.SN'•#.0 >r::ocrr„ko:+:•:2: ft .>r • #r' :m}}, tao',;4y?:: E. .,rt.•.cv.n:rs]',]S•?o3•.`•`i•Y�'S'Yc:,�...r �lC:i:r'''::{ii:rG•.; ., rir''iwv 'T?c oo'� #c.. s.t:,3>:o.a.wc�w'�'aa):,: �:: ..:.:ad:;S}.},::;w.,r. .. ->�. :. ': .::- .. ..'.:::: ......... ........h fR:I .:...,.t•.r..o-.Y. xvx..: «„a?,,....,.rlc,...,,we.ac,:.w,v,,:.,,Ras,...,,:..w.,r Table 2: ACRES (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land [see Required Specification 21) Traci. Field Soil # Type Crop Lbs. N Acres Lbs. N Month of Per Ac.* Utilized Application rs �o.a1 59 a7 o c IrNlp ►a-1 t o a . S" 1 a,a i a 154 a 7 7 1 o%tl 1'7 = 9 J O 7 Vb To+A A �,. °F. '`Y. ��#q.'��sk.:,d ? ":•.'c:SAP, ]a'i' i°t ,/'G.. S'. r fd-4 ''..1 . -i. d ��,, �.F,'. y�.F: ��•b.:� ' .IJ .J fy`+Ypl.. v.)t. -'4 ':+V 2L. ,.'d. :i-%-t`SA�+' �:•. 1. +d�j .'a}'x� Y �.{..+f�k7.: �„r`aFa... '.". !C � � n,� �sl -.">T`,� �y a� }y :t'�C rf'}Y+���G '�y.�. y�ry�•y�y '(:� �.��-� •-..�T1i.' i a^ 'F�f��t i ,•r boa. !-:vEr"n ;��r r`L' i "'',�aS�, ' 't J i ,� >! k'?s ��.... 5" i�, hv"(a:� I 1s �:',: } t T '•'lI.,'. 1, )`i!•. ,'�.. i F' S.: "iy�� VL ,} i.i a.lk �:r �.;:. �. . .IA-. - .' .^:7� . �..yy.k, � t a ..f �`. �.�e :�: =•' �ri ,. ; 1Jr �.R �1' .J...,�'3; zmr �1 �`,i L tLi �.p _����, t..- �^ ,. �. .4 ,: ' I � �-Nv7yy,t�� f � � � . ':''i:t - £ t� '�+.-. �i+, ,, :, ..�, '" iL,,• -'[ � '"�' H:� 4 �<.�:: � '' rR -. �'� j, .,w, .� a�:"tr� �3f �c �•j�3 rGA�; ' .S`.t.�f r• . �. �.�+�}y. ' ti•..�1" -,: .t - sf ,f.Y r'�• �:'r;.re -r•': .i8+':��t>- `fir ;sl,r a- ; Total I 113Lz51 _1 30,0x-S__T' t. See footnote for Table 1. IL 'Al .2 0ar P. IN X. .34, ?5t AND i 0 (Needed only if additional land has to be 2eaaed, etc.) I, hereby give A'�e 4, permission Zo apply animal waste from his Waste Utilization System on :J 0 — acres of my land for the duration of time shown below. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landow Waste Producer: Technical Repre SWCD Representative: Date: Term of Agreement: t , IRI to fxlnimv of Tan roars on Coat 9 ed Itama) - (See Required Specification No. 2.) 2 OLO 12 , 0 0 Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) !Required only if operator does not own adequate land [see Required Specification 21) Tract Field Soil Crop Lbs. N Acres Lbs.' N Month of # Type Per Ac.* Utilized Application See footnote for Table 1. Totals from above Tables Acres Lbs. N Utilized Table 1 11 O Table 2 Total Amount of N Produced la 420 Surplus or eficit j7 3 NOTE: The Waste Utilization Plan must contain provisions '.for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. 4 • Your facility is designed for ' days of temporary storage and the temporary storage must be removed on the average of once every __MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation • i Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION (Use additional sheets as needed to describe the operation of the Dsystem within the context of the livestock operation) End 9 fl4d 19 _ ,mot I t P ! � - s i ►J -�► �7a � �e rr► Ag E- m 6 V4 A r4 J LDS C- E rk�:- A i Sk, C, Ci i E tdS �L e4 G-A 5 Nitrogen Application Rate Calculated Using Soil Type and . Realistic Yield Table For Chatham County SOIL TYPE 205B2 r11ww"Rua APPL. DATE ON to KIMU Era 'Me �I�W.301110111 1 �.l� . . ► :� :._ i • ► • •' . • a w' I- • ► :._. 1 :.. : a� • _:. _ • ► -•U• 1 : • • • rill S-nall wai-t for grazing i � . ;.�. SOIL TYPE 50D APPL. DATE 1r :._ f :1 i L i I!.i Ir _ - • f 1 •• • L si 1i =11 1110010 mtlzntoml! -f= Ir fv .1_- •• i -f 19 sorelum w.f 1- :.I Ir SoJbeans i � , io -� IrSmall grain hay I 10 lbs N/ac Aug -April Ir i.rass for i ' i Srtall grain. for grazing 82 lbs Vac IrRveurass fori � Ir Matua forgrazing i • SOIL TYPE 130B APPL. DATE 1: . f-! INUMM Welor.itnZ VMS : Barlev for-!N-art i 1! I/ 1 : . WON 0911 ' i tl. • e'f.it. i M ! •Sorghum silage April -July 1: f i-+ . 11f f . f 11 i e -11 i i.• tl: i-.t�. .- - i -11 ., .. t1:Fescue- , i_k! , 0 C� J 1� • 0 AMYL. VALL DA7 L 19 n NOTE. THESE ARE THE RECOMMENDED REALISTIC YIELD NITROGEN APPLICATION RATES FOR THE SOIL TYPES LISTED ON THE PRECEEDING PAGES. WHEN A CROP IS PLANTED THAT VARIES FROM THE WASTE MANAGEMENT PLAN, THE NITROGEN APPLICATION RATES FROM ABOVE MUST BE USED IN ORDER TO COMPLY WITH .0200 REGULATIONS. IF HAYLAND IS USED FOR GRAZING, THE HAYLAND APPLICATION RATE MUST BE REDUCED BY 25 PERCENT. IF YOU HAVE ANY QUESTIONS PLEASE CALL OUR OFFICE, THE PHONE NUMBER IS 545-8353, OR 542-2244 EXT 3. 20 WASTE UTILIZATION PLAN . REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has a notarized agreement for use of adequate Iand on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of a notarized agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. Actual yields may be used in lieu of realistic yield tables at the discretion of the planner. 4. Animal waste shall be applied on land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at more than 5 tons but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393-Filter Strips) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste should be applied on actively growing crops in such a manner that the crop is not covered with waste to depth that would prohibit growth. The potential for salt damage from animal waste should also be considered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop or forages breaking dormancy.. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river other than an irrigation ditch or canal. MRCS, NC JUKE, 1996 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) Animal waste other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet from wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animals waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by over - spraying. Animal waste may be applied to prior converted cropland provided it has been approved as a land applications site by a "technical specialise". Animal waste applied on grassed waterways shall be at agronomic rates and in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoonn berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. . 18. If animal production at the facility is terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible permanent markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Soil tests shall be made every two years and a liquid waste analysis be taken at least twice each year consistent with waste utilization plan. Poultry litter shall be tested prior to application. Soil and waste analysis records shall be kept for five years_ 23. Dead animals will be disposed of in a manner that meets NC regulations. MRCS, NC JUNE, 1996 r • WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Environmental Management (NCDEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface wasters of the state from a storm event less severe than the 25- year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDEM upon request. • Name of Facility Owner: C (Please print) Signature: Name of Manager(I r,1 Signature: Name of Technical Date: 1ci.! jb )q—r er) Date: _ 1,� I is I q-7 Specialist:(please print) Affiliation: Address (Agency) Signature: COurDate: 11 Agricuitural Ext,- lion SerJice Iof 3 Management • Biologic l Gr c: , gr cul oral Engineering North Carolina State University LIVESTOCK WASTE SAMPLING, ANALYSIS AND CALCULATION OF LAND APPLICATION RATES ,lames C. Barker* I. SAMPLE COLLECTION A. Semi -Solid Lot Manure i. Scraped directly from lot into spreader a. From loaded spreader, collect about 2 lbs of manure from different locations using nonmetallic collectors. ii. From storage a. Collect about 2 lbs of manure from under the surface crust avoiding bedding materials and using nonmetallic collectors. B. Liquid Manure Slurry • i. Under -slotted -floor pit a. Extend a 1/2" nonmetallic conduit open on both ends into manure to pit floor. b. Seal upper end of conduit (e.g., by placing a thumb over end of conduit) trapping manure that has entered lower end, remove and empty slurry into plastic bucket or nonmetallic container. c. Take subsamples from 5 or more locations or at least 1 quart. d. Mix and add about 3/4 pint to nonmetallic sample container. ii. Exterior storage basin or tank a. Make sure manure has been well mixed with a liquid manure chopper -agitator pump or propeller agitator. b. Take subsamples from about 5 pit locations, from agitator pump or from manure spreader and place in a plastic bucket. * Professor and Extension Specialist, Biological and Agricultural Engineering . Department, North Carolina State University, Raleigh, NC. 1-iL4cct;iiJll�AIL 1J 2 of 3 2- c. Mix and add 3/4 pint to a nonmetallic sample container. C. Lagoon Liquid i. Collect about 3/4 pint of recycled lagoon liquid from inflow pipe to flush tanks in a nonmetallic sample container. ii. From lagoon a. Place a small bottle (1/2 pint or less) on end of 10-15, pole. b. Extend bottle 10-15' away from bank edge. c. Brush away floating scum or debris. d. Submerge bottle within l' of liquid surface. e. Empty into a plastic bucket, repeat about 5 times around lagoon, mix, and add 3/4 pint to nonmetallic sample container. D. Broiler or Turkey Litter i. House litter a. Visually inspect litter for areas of varying quality, e.g., areas around feeders and waterers, and estimate percent of floor surface in each area. • b. Take about 5 litter subsamples at locations proportionate to item a. E.g., if 20% of litter of similar visual quality is around feeders and waterers, take Y subsample there and the other 4 subsamples from remainder of floor surface. c. At each location, collect litter from a 6" by 6" area down to earth floor and place in a plastic bucket. d. After 5 subsamples have been added toa the bucket, affix, and add about 2-3 lbs litter to a'nonmetallic sample container such as a 1-gallon freezer bag and seal. ii. From stockpile a. Take subsamples from about 5 locations at least 18" into pile. b. Mix, add 2-3 lbs to nonmetallic sample container and seal. - 3 - II. SAHPLE PREPAkaTION AND TRANSFER ' 3 of 3 n LJ 0 0 A. Place sample into an expandable container that can be sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or treat in any other way. B. Pack sample in ice, refrigerate, freeze, or transfer to lab quickly. C. Hand -delivery is most reliable way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and tape. E. Commercial sample containers and mailers are also available. Contacts: i. A&L Eastern Agricultural Lab, Inc. iii. Polyfoam Packers Corp. 7621 Whitepine Road 2320 S. Foster Avenue Richmond, VA 23237 Wheeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 ii. Fisher Scientific Co. 3315 'Tinton Road Raleigh, NC 27604 Ph: (919)876-2351 iv. NASCO 901 Janesville Avenue Fort Atkinson, WI 53538 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NCDA_provides this service for North Carolina residents. i. Address: North Carolina Department of Agriculture Agronomic Division Plant/Waste/Solution Advisory Section Blue Ridge Road Center P.O. Box 27647 Raleigh, NC 27611 Ph: (919)733-2655 Attn: Dr. Ray Campbell ii. Forward $4 along with the sample. iii. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine -nursery, finishing; turkey -breeders, brooderhouse, grower, number flocks grown on litter; etc.) c. Waste type (dairy -lot scraped manure, liquid slurry; swine -pit slurry, lagoon liquid, sludge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N, P, K, Ca. Mg, Na. S, Fe, Mn, Zn, Cu, B v. Additional analyses performed upon request: DM, No, Cd, Ni, Pb , CALIBRATION Applicators can apply manure, litter and wastewater at varying rates and patterns. depending on forward travel and/or PTO speed, gear box sertinas, gate openings, operating pressures, spread widths and overlaps. Calibration detines the combination of settings and travel speed needed to apply manure, litter or wastewater at a desired rate and to ensure uniform aonlication. Spreader Caoaciry Liquid spreader capacities are normally rated by the manufacturer in gallons. Multiply gallons by 0.0042 to get tons. Solid and semi -solid spreaders are rated by the manufacturer either in bushels or cubic feet (multiply bushels by 1.24 to get cubic feet). Nfost spreaders have rwo rating capacities: 1) struck or level full, and 2) heaped. Since manures and Iitters have different densities, an on -farm test should be done. Fill a five -gallon bucket level full with material to be spread. Do not pack the material in the bucket but ensure that it settles similar to a loaded spreader. Weigh the bucket full and then empty. Multiply the weight of the contents by 1.5 to get pounds per cubic feet. Nfultiply this value times the cubic feet capacity of the spreader and divide by 2000 to get the tons of material in a spreader load. manure weight, Ibs x 1.5 x spreader capacity, ft ; 2000 = spreader load, tons Spreader Calibration Calibration Method 1: This method is most useful for liquid spreaders but can be used for all types. Spread at least one frill load of manure preferably in a square or rectangular field pattern for ease of measuring with normal overlaps. Nfeasure the length and width of coverage recognizing that the outer fringe areas of the coverage wiII receive touch lighter applications than the overlapped areas. Nfultiply the length by the width and divide by 43560 to determine the coverage area in acres. Divide the tons of manure in the spreader by the acres covered to determine the application rate in tons per acre. spreader manure, tons ; (coverage length, ft x width, ft - 43560) = application rate, tons/acre Repeat the procedure at different speeds and/or spreader settings until the desired application rate is achieved. DPL%[P - Dcc_;Roer o- E996. ?»et - i ` it 1. E.Tamale: • What forvard speed would be needed to apply 6.0 tons litter per acre from a sc_ reader with a 6-ton capacity, a 5-minute spreading time. and a 25-xet spreading width? Forward speed. mph capacity, tons x -'95 time (ruin) x width x rate. tons 'per acre = 6 tons x 495 5 min x 25 ft x 6 ton per acre 4 miles per hcur Calibration Method 2: This method is often used for solid and semi -solid spreaders. A tang or Plastic sheet of about 100 square feet (9'x12', 10'x10', etc.) should be measured for exact surface area (length x width), weighed using a set of spring -tension or platform scales, then spread and pinned on the field surface. The spreader should be operated at its normal settings, sped and overlap. With a rear discharge spreader, three passes should be made: the first directly over the center of the shee't, the other two on opposite sides of the center at the normal spreader overlap spacing. The sheet with the collected manure should again be weighed. Subtract the empty sheet weight from the total weight to get the weight of the collected manure. Multiply the pounds of collected manure by 21.8 and divide by the collection area of the sheet in square feet to get the . application rate in tons per acre. collected manure, lbs x 21.8 / collection area, ft2 = application rate, tons/acre • Repeat the procedure using different settings or speeds to obtain the desired application rate. S r_ p eader Pattern Unifotznity To determine the uniformity of spread and the amount of overlap needed, place a line of small pans or trays equally spaced (2-4 feet apart) across the spreader path. The pans should be a minimum of 12" by 12" or 15" diameter, no more than 24" by 24", and 2"-4" deep. Make one spreading pass directly over the center pan. Weigh the contents caught in each pan or pour the contents into equally sized glass cylinders or clear plastic tubes and compare the amount in each. The effective spread width can be found by locating the point on either side of the path center where the manure contents caught in the containers is half of what it is in the center. The distance between these points is the effective spread width. The outer fringes of the coverage area beyond these points should be overlapped on the next path to ensure a uniform rate over the area. "1411 , "W", "steeple", or "lopside" patterns are not satisfactory and one or more of the spreader adjustments should be made. DP! MP - Decc^ic. i, 1496. - i3 EMERGENCY ACTION PLAN PHONE NT MBERS MVQ 511- H foo EtiTER GENTCY �i_��1AGE: NT YSTE11 NI r — 91 S W CD 919 5�1a�8a o N-RCS T'nis plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reacts surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. I. Stop the release of wastes. Depending on the situation. this may or may not be possible. Suggested responses to some possible problems are listed be]ow. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. • d. Call a pumping contractor. e. lviake sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C, Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close vafves to eliminate further discharge. d. Repair all leaks prior to restartin_ pumps. D: Leakage from flush systems. houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. . c. 11a1;e sure no il�non ocz:.lrs. U. S[op -111 tl��u ;a ilie house_ tIu_�h s\'sterls. _e,iLI separa(ors. De__.: _. 1 S. ."C6 e. Repair all leaks prior to restarting pumps. • E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage. put in a submersible pump, and pump back to lagoon. b. if holes are caused by burrowing animals. trap or remove animals and fiil holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2_ Assess the extent of the spill and note any obvious damages. a. Did the waste reach anv surface waters? b. Approximately how much was released and for what duration? c. Anv damage noted, such as employer injury, fish }:ills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters'? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters" 3: Contact appropriate agencies. ia. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - - After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , locaI SWCD office phone number and local NRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. b. 0 Contractors Name:_ Contractors :address: Contractors Phone: 6: Contact the technical specialist who certified the lagoon MRCS, Consulting . Engineer, etc.) _ a. Name: ; 1= b. Phone: y0 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify° the damage. repair the system. and reassess the waste management plan to ke:p problems with release of wastes from happening again- 0 n LJ Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Farmstead • Dairy production Gf Vegetative or wooded buffers 0 Recommended best management practices W Good judgment and common sense Paved lots or barn • Wet manure -covered Scrape or flush daily alley surfaces surfaces E. Promote drying with proper ventilation 9( Routine checks and maintenance on waterers, hydrants, pipes, stock tanks Bedded areas • Urine 0 Promote drying with proper ventilation * Partial microbial M/ Replace wet or manure -covered bedding decomposition Manure dry stacks * Partial microbial 0 Provide liquid drainage for stored manure decomposition f �( Storage tank or basin �• Partial microbial 0 Bottom or mid -level loading surface decomposition - 0 Tank covers * Mixing while filling 0 Basin surface mats of solids • Agitation when emptying E/ Minimize lot runoff and liquid additions I( Agitate only prior to manure removal C7 Proven biological additives or oxidants Settling basin • Partial microbial surfaces decomposition 0 Liquid drainage from settled solids 0 Remove solids regularly • Mixing while filling * Agitation when emptying Manure, slurry, or * Agitation when spreading 0 Soil injection of slurry/sludges sludge spreader * Volatile gas emissions 62rWash residual manure from spreader after use outlets 13 Proven biological additives or oxidants Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Uncovered manure, • Volatile gas emissions while C] Soil injection of slurry/sludges slurry, or sludge on drying 0` Soil incorporation within 48 hours field surfaces S" Spread in thin uniform layers for rapid drying Flush tanks + Agitation of recycled lagoon liquid while tanks are filling O Proven biological additives or oxidants C] Flush tank covers C] Extend fill lines to near bottom of tanks with W14 anti -siphon vents Outside drain + Agitation during wastewater Cl Box covers . collection or conveyance's iunction boxes Lift stations • Agitation during sump tank CO Sump tank covers , /� filling and drawdown f`� R End of drainpipes at • Agitation during wastewater 0 Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emission Proper lagoon liquid capacity • Biological mixing M� Correct lagoon startup procedures • Agitation MK� inimum surface area -to -volume ratio [� Minimum agitation when pumping C] Mechanical aeration C] Proven biological additives 0 49 Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Irrigation sprinkler • High pressure agitation CI Irrigate on dry days with little or no wind nozzles • Wind drift 0 Minimum recommended operating procedure 0 Pump intake near lagoon liquid surface 0 Pump from second -stage lagoon 0 Flush residual manure from pipes at end of slurry/sludge pumpings Dead animals • Carcass decomposition Q' Proper disposition of carcasses Standing water • Improper drainage Grade and landscape such that water drains away around facilities • Microbial decomposition of from facilities organic matter Mud tracked onto • Poorly maintained access 0 Farm access road maintenance public roads from roads faun access Additional Information: Cattle Manure Management; .0200 RuleBMP Packet Dairy Educational Unit Manure Management System —Lake Wheeler Road Field Laboratory; EBAE 209-95 igoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 Management of Dairy Wastewater; EBAE 106-83 Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO 107, 1995 Conference Proceedings Available From: NCSU, County Extension Center NCSU—BAE NCSU—BAE NCSU—BAE NCSU—BAE Florida Cooperative Extension 0 Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Flush gutters • solids 0 uid Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed Remove bridging of accumulated solids at WA Lagoons and pits • Crusted solids Cf Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than d to 8 inches over more than 30 percent of surface Excessive vegetative • Decaying vegetation Ef Maintain vegetative control along banks of growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. / Dry Systems T7Peders • Feed spillage Ef Design, operate, and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage Clean up spillage on a routine basis (e.g., 7- to 10- day interval during summer; 15- to 30-day interval during winter) a i i Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Feed storage • Accumulations of feed P" Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by ensuring drainage is away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain phroducts) nspect for and remove or break up accumulated lids in filter strips around feed storage as needed ,Animal holding • Accumulations of animal Li' Eliminate low areas that trap moisture along fences areas wastes and feed wastage and other locations where waste accumulates and /Irlsturbance by animals is minimal Mr Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed) Dry manure • Accumulations of animal 0 Remove spillage on a routine basis (e.g., handling systems wastes 7- to 10-day interval during summer; 15- to 30-day interval during winter) where manure is loaded for land application or disposal 0 Provide for adequate drainage around manure stockpiles C3 Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed For more information contact: Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. • 0 `IortaIity Nlanagement Nlethods fcheck which method(s) are being implemented) Burial three feet beneath the surface of the around within 24 hours after knowledge of the death. The burial must b at least 300 feet from anv flowing stream or public body of water. y� Rendering at a rendering plant licensed un der G.S. 106-I63.7 OpuJj ❑ Complete incineration ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture l:1 Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animaI's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) C't__..bt Form SLUR-1 Slurry and Sludge Application Field Record For Recording Slurry Application Events on Different Fields Farm Owner Facility Number - Spreader Operator Date Field Size Application # of Loads Volume of Loads 2 Tract # Field # r Crop Type i {mmld dty) (acres) Method Per Field (gallons) ' SI = soil incorporat isked); BR = broadcast (surface applied) *2 Can be found in operator's manual for the spreader. Contact a local dealer if you do not have your owners manual. Form SLUR-2 Tract # Field Size (acres) = (A) Farm Owner Owner's Address Owner's Phone # Field # Slurry and Sludge Application Field Record One Form for Each Field Per Crop Cycle Facility Number I- Spreader Operator Spreader Operator's Address Operator's Phone # From Animal Waste Management Plan Recommended PAN Crap Type Loading (lb/acre) = (B) (3) (4) (5) (6) m (8) Dale (mmlddlyr) # of Loads Per Field Volume of Loads i Total Volume (gallons) (2) x (3) Volume Per Acre (gaVac) (4) + (A} Waste Analysis Z PAN (kb11000 gal) PAN Applied (lblac) ((5) x (6)] + 1,000 Nitrogen Balance 3 (lblac) (B) - (7) Crop Cycle Totals Owner's Signature Operator's Signature Certified Operator (Print) Operator Certification # Can be found in tors manual for the spreader. Contact a local dealer if you do not have your ownernual. Y z See your animal a management plan for sampling frequency. At a minimum, waste analysis is requirlWthin 60 days of rand application events. ' Enter the value received by subtracting column (7) from (B). Continue subtracting column (7) from column (8) following each application event. 0 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources December 11, 2003 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. James Mike Lindley 614 Mike Lindley Rd. Snow Camp, North Carolina 27349 Subject: Notice Of Violation Lindley Farm COC AWC 190016 Chatham County Dear Mr. Lindley: Alan W. Klimek, P.E. Director Colleen H. Sullins, Deputy Director Division of Water Quality On December 5, 2003, Mr. JD Hester from the Raleigh Regional Office conducted a compliance inspection of the subject animal operation. This inspection is a part of the Division's effort to determine compliance with the State's Animal Waste Management Regulation. An inspection of your facility revealed that wastewater from your facility was not actively discharging to waters of the State, nor were any manmade pipes, ditches or other prohibited conveyances observed. As a result of the inspection the following was observed: 1) No waste samples were taken for the 3/17/03- 3/21/03 waste applications. A condition of your Certified Waste Management Plan requires waste samples must be taken within (60) days of application of waste to the fields. Wastes are typically applied throughout the year for this type of waste system and thus a minimum of three samples will be required annually. Keep in mind that waste must be applied to actively growing crops. Please respond to this Notice within 30 days of receipt. You should include in your response the actions that you will take to address this deficiency. The Raleigh regional office appreciates your cooperation in this matter. If you have any further questions regarding this inspection, please call Mr. JD Hester at (919) 5714700. Sincerely, Kenneth Schuster, P.E. Regional Supervisor cc: Chatham County Health Department Chatham County Soil and Water Conservation District Ms. Betsy Gerwig/ DSWC-RRO Raleigh Regional Office 1628 Mail Service Center DE-NR phone (919) 571-4700 Customer Service Water Quality Section Raleigh, NC 27699-1628 ne facsimile (919) 571-4718 1-877-623-6748 Nturldy Karolina State of North Carolina Department of Environment and Natural Resources Division of Water Quality - James B. Hunt, Jr., Governar Bill Holman, Secretary Kerr T. Stevens, Director JAMES M. LINDLEY JAMES MIKE LINDLEY FARM 614 MIKE LINDLEY ROAD SNOW CAMP, NC 27349 Dear James M. Lindley: A74 • • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANo NATURAL RESOURCES January 7, 2000 Subject: Certificate of Coverage No. AWC190016 James Mike Lindley Farm Cattle Waste Collection, Treatment, Storage and Application System Chatham County In accordance with your application received on June 6, 1999, we are forwarding this Certificate of Coverage (COC) issued to James Mike Lindley, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG200000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the James Mike Lindley Farm Farm, located in Chatham County, with an animal capacity of no greater than 170 Dairy cows and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP , and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWC190016 James Mike Lindley Farm Page 2 This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Susan Cauley at (919) 733-5083 ext. 546. Sincerely, Kerr T. Stevens cc: (Certificate of Coverage only for all cc's) ChathamCounty Health Department Raleigh Regional Office, Water Quality Section Chatham County Soil and Water Conservation District Permit File NDPU Files rn�Gf� State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director James Mike Lindley James Mike Lindley Farm 614 Mike Lindley Road Snow Camp NC 27349 Dear James Mike Lindley: A 0 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RF-50URCEs December 30, 1999 _1 — L.F.-_-I-c�(:1a l;�ui„ty"'-'_It`• ,E1 Subject: Fertilizer ApplicatiantiRecordkeeping--- Animal Waste i1 ariagement System Facility Number 1-9=1,6.- .Ghatham:County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to Iand receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRRI, 1RR2, .DRYI, DRY2, DRY3, SLURI, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 57 L Z "�' X 4 Kerr T. Stevens, Director '��7 Division of Water Quality cc: Raleigh Regional Office Chatham County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919.715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director James Mike Lindley James Mike Lindley Farm 614 MIKE LINDLEY ROAD SNOW CAMP NC 27349 Dear James Mike Lindley: IT V 1 � • NCDENR NORThi CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES t� e Subject: Application No.GAw -L 5� AdditionaI.Information Request Dames Mike•L-indley-Farm Animal Waste Operation Y 'Chatham.Countyi The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by : Please lease agreement between W. B. Johnson and the Jonathan Lindley Farm does not indicate a term of agreement. Please provide a new lease agreement that includes a term of agreement, and signature of both the landowner and the lessee. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. PIease be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 546. 5incer ly,� Susan Cauley Environmental Engineer Non -Discharge Permitting Unit cc: Raleigh Regional Office, Water Quality Permit File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Y U Producer: Location:04 M E L-Nd Telephone: Type Operation : _� a_-KJ E — Number of Animals: 170 (Design Capacity) The waste `rom your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. waste should be analyzed to determine nutrient content before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per acre per year. 4. Do not apply waste on saturated soils, when it is -raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under North Carolina Division of Environmental Management (NCDEM) .0200 regulations. No 5. Wind conditions should also be considered to avoid drift and downwind odor problems. i K�i:BVED 1 DENR ! DVVQ CC) 1 Aqil fFC rnq�(;#di7!i sec On A 2�Q9 r� 1 QN PLAN 6. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. • r] 0 2 .WASTE UTILIZATION=PLAN �,• • Amount of Waste Produced Per Year(gallons, ft3, tons, etc.) I'10 animals Xiiin4amt.) waste/animal/year = d b7D +0-4 _(amt.) waste/year Amount of Plant Available Nitrogen (PAN) Produced Per Year 1-10 animals X�.(o lbs . PAN/animal/year = fa_9c7C)A5. lbs . PAN/year. (PAN from N. C. Tech. Guide Std. 633) Applying the above amount of waste is a big job. You should plan time and have acpropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the nitrogen (N) requirements of the crop to be grown and assuming surface apolication: • Table 1: ACRES OWNED BY PRODUCER Tract Field Soil Crop Lbs. N Acres Labs. N Month of # No. Type Per Ac.* Utilized Application MWLM Pe Total �f l _54.'3-1 I aR_ _T S * This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. .3 WAS -f.E F: ...... Table 2: ACRES (Agreement with adjacent landowner mast be attached) (Required 'only if operator does not own adequate land [see Required Specification 2)) Tract Fie-16 Sail Crop Lbs. N * Acres Lbs. N Month of # '=y-je Per Ac. Utilized Application i�-�� 11;J1!■ IL7- L 0 Total See footnote for Table 1. Nitrogen Application Rate Calculated Using Soil Tvpe and • Realistic Yield Table For Chatham. County • C] SOIL TYPE 205B APPL. DATE 2.Q5B Oat. grain4 lbs N/ac Aug -April 205B Wheat ain 1 21 s lac 2 5B Barley grain 88 lbs N/ac -Auk-April Auk-ril 205B Rye grain132 lbs N/ac Aug -April B rn f r drain 119 lbs N/ac Feb -Jul 2 5B Com for silage 228 lbs N/ac Feb -Jul 2 SB or hum f Qr grain 144 lbs N ac Aril- ul l2y 2 5B SQrhum-sila-e 228 lb5 NZac April -July 2 5B Soybeans 140 lbs N/ c April -Sept 2 5B Sorghum -Sudangfass for hay 180 lbs N/ c April-Augus 2Q5B Sudangrass for hay 180 lbs N/• c April -August 2 5B Fescue for hay 180 lbs N/ac u u t-july 205B r and a a 180 lbs N/a Au u- ul B -for Small grain for hay 120 lbs N/ac Aug -April 2 5B Ryegrass for hay 180lbsN/ac Feb -May 205. Sudangrass for grazing 135 Ihs N/aApril-August 2 5B Fescue for grazing 135 lbs N/ac August- ul 205B Orchard-,rass for gazing 1 lb N/ c August -July 2 B Small grain for grazing, 90 1 s N/ac ug-April 2 5B Ryegrass f r raz' 1 lbs N a F- a 2 5B Ma ua grass f r ha 1 lbs N c A gu t-July "B Matua for yrazin2 135 lbs N/ac All t- ul SOIL TYPE 205B2 APPL. DATE 205B2 Oat grain 88 lbs N/ac Aug -April 205B2 W t rain 112 i / c Au - ril 205B2 Barley.grain75 lbs N/ac Au.g-April 2Q5B2 e grain 112 N/a -..Aug--April 205 B2 Com ain 10 1 lbs N ac Feb -July 5B2 Com silage194 lbs N/ c Feb -Jul 205B2 s 11 N/ac A ri= e t 205B2 Sorghum grain 122 lbs N/ c April -July 205B2 or hum iflage 194 lbs N/ac April -July 205B2 --Sorghum- Sudangjas5.fr I 5LLbs N AadLA-ugust 205B2 Sudangrass fQr hay 153 lbs N ac April -August B2 escue hay 153 1bs N/ac August- uly 205B2 Orchardgiass hay15 lac August -July grain 102 lbs N/ac Aug-Apffl B2 Rvegrass f r hay 1" 1 s N/ac Fe - a B2 Sudangrass for ain 1APHL-August 82 Fescue for grazing It 5 lbs N/ac A u - uI B2 for gazing 115 lbs N/ac August- ul B2 -.QrchaEd-,rass m l rain for grazing 87 lbs N/ac Aug -April 2-UR2 Ryggrasa f r grazing 11 5 lbs N/ac Feb 5B2 Matua for hay 153 lbs N/ac --May August -July 205B2 Matua forgrazing 115 lbs N/ac August -July SOIL TYPE 205C APPL. DATE t grain 96 1bs N/ac Aug -April Wheat 121 I s N/ rip-y- grain 81 lbs N/ac ain 121 1 s N u - 2 5 o ain 109 1 s N c Feb-July. om silage 210 I s N/ac Fe - I 205C Sorghum'n 1,32, lb5 Mac A 1- ul 205C orghum silage 2 N/ac April -July 2 5C Soy -beans 12 N/ac April -Sept 205C Sorghum- Sudangrass hay166 lbs N/ cApril- u Sudan grass hay 166 lb N/ac April -August Fescug hay 166 lbs N/ac August-Jul 205C Orchardumassa 1 61 sN c August -July Small grain hay I 10 lbs N/ac Aug -April 205C Rye for bay 166 1 / c Feb -May Sudangrass for grazing124 lbs NIac I - Au gust 205C Fescue for grazing 124 lbs N/ac t- ul OrcharduCss for grazing 124 i s N/ c u - u 205C Small-ain for grazing82 lbs N/ac 2 e rgrazing-124 lbs N/ac Feb -May 205C Matua for hay 166 1 s N/ac - ul atua for grazine 124 1bs N/ac Au - ul SOIL TYPE 205C2 APPL. DATE 205C2 Oat grain 84 N/a Aug-April 2 _-W—hea-tgrairi106 lbs N/ac Aug-Apri 5 2 arl ai 72 lbs N/ac Aug-April Rye grain 106 lb N/ac Aug —April 205C2 Com grain 95 lbs N/ac Feb -July 205C2 Com silage 182 lbs N/ac Feb-July 2 jum.. grain120 lbs N/ac April -July 205C2 -,Sprg Sorghum silage1 2 lbs N/ac April -July 205C2 n 2 lbs Nlac April -Sept 205C2 S rghum-S udan grass hay 144 lbs N/ac April -August 205C2 Suclangrass hay 144 lbs N/ ril- u ust 205C2 Fescue hay 144Lbs N/ac August -July 205C2 Orchardgiass hay 144 1 s N/ac August—August-J 1 205C2 Small grain hay 96 Ibs N/acAua-ADril 2 Ryegrass for hay 144 1 s N/acFeb-May2 Suclangrass for grazing10 N/ac April-Augus Fescue r i 1-August-July 205C2 orchardgrass fQr icazing 10 N/ac u u- 1 205C2 Small o f grazing 72 1 /a ril 205C2 for grazing 108 lbs N/a Feb -May 205C2 Matua for hay 144 lbs N/ac August -July 205C2 Matua for in 108 lbs N/a u u- 1 0 • SOIL TYPE 206C2 APPL. DATE 1206C2 Oats for grain84 lbs N/ac Au -April 1206C2 Wheat for giain 106 IN N/ c - 1 • • .7 0 206 2 Barley for ain 72 lbs N/ac Aug-Al2ril 206C2 Rye for grain 106 lbs / c Au -A 'l 206C2 Com for grain 95 l s N/ac Feb -July 206C2 Com for silage 182 lbs N/ac Feb -July 206C2 Sorghum for grain 120 lbs N/ac April-July 2 Sorghum for sila e 182 lbs N/ac Aril- ul 206C2 Sovbeans 1121bs N/ac Aprjl-Sept 2Q6C2 Sorghum -Sudan grilss hay 144 lbs N/ac Al2ril-August 206C2 Sudangrass hay144 N/April-August 206C2 Fescue hay 144 l s N/ac Au u t- ul 206C2 Qrchardass hay 144 I /ac Au ust- ul 206C2 Small rain hay 96 l s WagAu -A 206C2 Ryegjass for hay 144 lbs N/ac Feb -May Sudangra5s for grazing 108 lbs N/ac Aril- u ust 206C2 Fescue for grazing 1 I s N/ac Au ust- u] 206C2 Orchardgrass for grazing 10 1 a August -July 206C2 all in for grazing, 72 lbs N/ac Aug -April 206C2 e a or grazing 108 lbs n/ac Feb -May 206C2 Matua for hay 144 lb N/ac August-july 206C2 Matua for uazinQ 108 lbs N/ac August- ul SOIL TYPE 212B APPL. DATE 212B Oat grain 104 lbs N/ac Aug -April 212B Wheat grain 21 N/ -A r'1 21 ain 88 lbs N/ac Aug -April 212 R ain 132 lbs N/ac Aug -April 212B Com grain 119 lbs N/ac Feb -July 212E Com silage 228 lbs N c -July, 212B Sorghum grain 138 lbs N/• c ...Feb April -July 212E Sorghum silage 228 lbs N/ac April -July 212B Sovbeans 140 lbs N/ac April-Sel2l 212B Sorghum Sudangrass hay 175 lbs N/ac April -August 2 i an graa5 ha 175 l lac -April -August 2 cue hay 175 lbs N/ac August-Jul 212B Orchard s ha 1 s N/ac August-Jul 212B Small ain hay 120 lbs N/ac Aug -April 212B Ryegrass for ha 1 N/ac Feb -Ma 212B Sudan-,risso n 1 1 lbs N/ac April -August 212B Fescue for grazing131 lb N/ac u u- ul 2 2B Orchardgiass for giazing 131 lbs N/ac Augut-july 212B Small giain for grazing 90 lbs N/ac Aug -April 212B Ryegrass for gTazing 131 lbs N c Feli-May 21 ua for hay 175 lbs N/ac August -July B Matua for szrazing 131 lbs N/ c u u - ul SOIL TYPE 212C and 212D APPL. DATE 212C Oat grain 96 lbs N/ac Aug -April 212C Wheat grain 121 lbs N/ac Au -Ap I 212C Barley in 81 lbs N/ac Aug -April 212C Ryg..grain 121 lbs N/ac Aug-Apri 212C 2 Feb -July 212 m uain 127 tbs N/ac Aril- ul sorghum silage 210 lbs NI -July 212C Soybeans 129 lb N/ac -April Aril-Sept 212C S,QrghjjmSudangrass hay 161 lbs N ac ril-Au ust 21-2C Sudang[asshay 1 1 s N/ ril-August 212C 161 lbs N/ac August-Jul 212C 161 lbs N/ac Aujust-july 212C ..QmhaTdgrasshay Small grain hay 110 lbsN/ c Au2-ADnl 212C Ryegrass for hay 161 lbs N/ac F- a 212C-,. S�dangrass for grazing 121 lbs N ac April -August 212C Fescue for grazing 121 lbs Ni/ac August -July 212 rchard a s for gazing 121 lbs N - u u tJuly 2 2 mall ai r ra in lac u - 212 Ryegrass for grazing121 lbs N/ac Fe& -May 212 a f r a 161 lbs N/a-Auguat-luly 212C Mntllq r uazin2 121 l /Allmlvt-lltjv SOIL TYPE 212D2 APPL. DATE 212D2 Oat grain 83 lbs N/ac Aug -April 212D2 Wheat grain 106 lbs N/ -Aug-Apdl 212D2 Barley in 7-Q lbs Wac-A l 212D2 Ryg grain 106 lbs N/ac Aug -April 212D2 ain 95 lbs N/ac Feb -July 212D2 Com silage 1 2 N/ac - ul 212D2 SQrghum grain 110 lbs N/ac-ApriLluly 212 2 Sorghum silage 182 1 s N/ cA6ril-July 212D2 Soybeans 112 lbs N/ac April -Sept 212D2 ..-S-Qrghum Sudangrasshay 140 lbs N/ac April -August 212D2 Sudanglass-hay14 N/ac April -August 212D2 Fescue ha lac August -July 212D2 Orchardgrass hay 14 N/ac - A u tWy 212D2 Small gLaina Wag u -A l 212D2 Ryegrass for hay 14Q lb5 N/ac -Ma 212D2 Sudanassfor grazing 1121 N/ac April -August 212D2 Fescue for -grazing 112 lbs N/ac Au us - ul 212D2 hard for grazing 112 lbs N/ac Au u t- ul 212D2 Small grain for grazing771 /ac Aug -April 212D2 agrazing 112 lbs N/acFeb-May 212 2 o f r hay 140 IN N/ac Augol-July 212D2 Matua for P-Tazin2 112 lbs N/ac Au ust- ul SOIL TYPE 520C APPL. DATE 520C Oatgrain / c Aug-Al2ril 520C W eat grain 99 IbS N/ac Aug -April 520C Barley grain66 lbs N/ac Auj-April 52grain 99 1 / cAug-Apffl 520C Com grain-___ 92 N/acFeb-Julv 520C CQm silage 177 lbs N/acFeb-Juli 520C SQrghum_g[ain 92Uril-July 5 m ilage 177 lbs NIac April-luly 5 92 lbs N/ac ADnl-Sept Qrghum Sudangrasshay 129 lbs N ' l-August 520C Sudangrassa 12 /ac Pril-August Ap r�L .7 Fescue hay 129 l lac 520C Orchardgrasshay 129 l s lac _.Augu5t-jUIy-- August -July 520C Small gjain hay 110 lbs N/ac Aug -April Ryegrass fQrhay129 lbs N/ac Feb -Ma 520C Sudangrassr grazing 97 l / c April —August 520C Fescue for grazing97 1 lac AugusL-july 520C Qrchardgrassf r irazing 97 1 lac August -July Small grain for grqzing 82 lac Aug -April Ryegrass for grazing 97 lbs.NLac e -Ma 2 Matua f r 12 1 ac August -July 2 Matua f r uaziing 97 lbs N/ac AiicFij-,t-JLIIV SOIL TYPE 35B APPL.DATE S B Oat grain 117 I lac Aug -April SB Wheat grain 144 lac Aug -April B BAdley grain 9 / c -A ril SB Rye gLrain 144 lbs N/ac Aug -April 113 1 s N/ac Feb -July 35B —c6m-grain CQm silage 216 lbs N/ac Feb -July 5B hum grain 113 I s N/ac ril- ul 355- Sorg -hum ailage 216 lb5lLac At)ri]-July B Soybeans 14 N/ac A�ril-Sevt 3 B Sorghum Sudangrass hay 150 1 s lac April -August 5 u Ligrass hay1501 lac AVril-August 358 Fescue hay 150 1 s N/ac August- uI B OrchardgLass hay 150 lbs N/ac 3 all gjain bay 120 lbs N/ac -August-July Auj-April 358---- Ry-cgma for hay150 lbs N/ac Feb -Ma 35B S-udangrass for grazing 113 I s N/ac Al2ril-August SB Fescue for grazing 113 lbs N/ac August -July 0-r—ehar-dgrass for gazing 11 /ac August -July 35B S-m—all gjjjj.n for gjazingl / c u -A ril ass for grazing 11 lac Feb -May B Matua for h 15 N/aAugust-July SB Matua r r 'n 11 N/ c Au ust- it SOIL TYPE 57C APPL.DATE 57C Oat gjain 108 lbs Nlac Aug -April 57C Wh6at. grain 132 l I c -A ri 57C Barleyrain 96 1 / c Aug-Al2ril 57 e grain 1321 lac Auer -April orn a 92 lbs N/ac F - ul 57 orn Alage 177 lbs N/ac Feb -July, 57C SQr&hurngrain 92 lb5 N/ac: April -July 57C Sgrghum silage 177 l s lac April -July 57C--.- SDyb&ana 129 l lac April-Sep 57C Sgrgh,um Sudangrass hay 175 lbs N ac-AlAdl-August Sudangrass hay 17 N/ac ADW-Auiust 57 F-ugue hay 175 l ac u t- 1 7C Qr-chaidgiass hay 175 1 ac August -July 57C Small-grain11 /ac Au -A ril Ryegca5s for hay 175 lbs N/ac Feb -May 57C,. Sudangrassfor grazimz 131 i s /ac Aril- ul Fescue for grazing 13 I N/ac 57C Orchardgrassfor grazing 131 lbs N/ac -August-July­ August-JUly 57C Small grain f azin 2 / c -April 7 for grazing t3lJbs N/ac 7 --..Ryggfass Matua for hay --Feb-May 175 1 s N/ac August -July .57C Matim for in 1 1 lac—+AUust- SOIL TYPE 50D APPL. DATE Oat grain4 c Auv-Aoril Wheat grain 99 I c Aug -April Barley ac Au -A ri 50D Rye grain ac Aug -April 50D com graill 104 ac Feb -July D ila e 199 I ac Feb -July 50D or h r' 104 lbs N/ac April-July.- 50D Sor hum ila e 1 lac April -July 50D Soybeans---11 lacApril-Swl r hum ud n ass hay 1 / c April -August D 184 lbs N/ac April —August D —5u(fangiasshay Fescue hay 184 lbs N/acu ust- ul ar hay 1841bs N/ac August -July----...... 50D Small grain hay 110 lbs N/ac Aug -April ass for hay 18 lacTeb-May 50D Sudan ass for grazing 138 lbs N/ac April -August Fescue for grazing 138 1 lac u t-July'--- 50D Orchardgrass for a i 138 lbs N/ac August -July 50D mall gLain for gi7azing 8 2 lb s N/acAuk-April 50D Ryegrass for grazing 138 lbs N/ac Feb -Ma 50D Matua for hay 1 4 lbs lac August -July 50D Matua for grazing 138 lbs N/ac Au ust-Jul SOIL TYPE 130B APPL. DATE 13QB Oat grain 911 acAug-Apfil B Wheat for grain 108l / c -A 130B arle for grain 72 lbs N/ac-A B Rye f r a' 108 1 ac Aug -April orn for grain 113 lbs N/ac Feb -July B Com for silage 2 ac Feb -July B r hum for grain 113 1 /a 130B Sorghum silage 216 lbs N/ac April -July 130B Soybeans 120 lbs N/ac April -Sept 1303 Sorghum Sudanglass bay 200 lbs N/ac April -August 130B Sudangjassa 2 0l ac April -Au ust Fescue for hay 200 1 lac August-Jul 130B hay 20 u t- 1 _Qmhardgrassr grain f r hay 12N/ac Aug -April --Small 130B e a 20 ac Feb -May 130B Sudangrass for grazing 150 lbs N/ac April -August 130B F scue for grazing 15 a 130B Orcharduass for uazin2 15 ac Au u- 1 0 • • • CJ 130B Small trrain or azin 90 lbs N/ac a -A 130B Rvegrass for grazing 150 lsNl -Ma 1 B Nfatua for hay 200 lb N/ac August -July 13 B Matua for araz'n ISO lbs N/ac Uaust-July SOIL TYPE 130C APPL. DATE 130C Qats for gicain 85 lbs N/a Aug -April 13 OC Wheat for grain 99 lbs N/ac Aijg-Apdl.. 130C Barl r ourain 66 lbs N/ac -A 1 130C JfQ Rye for grain 99 1bs N/ac Aug -April 130C Urn fQr grain 104 lbs N/ac Feb -July 1 orn fQr.silage 1 /a Feb -July 130C Sorghum..for grain 104 lbs N/ac April -July 130C Sorghumsilage 199 lbs N/ac April -July 130C Sorghum,Sudan grass for hay 184 lbs lac April -August 130 Soybeans I 10 lbs N/aq April -Sept 130C lbs N/ac--April-August 130C .Sudangrassforhay184 Fescue -for hay 1 U lbs N/ac August-1 130C Qrchardgrass for hay 184 ls N/ac August-Jul 130C Small grain for hay 1 IQ I s N/a -A ril 1 e f r hay 184 lbs NI Feb -May 130C S 6ngrass for ra zin 138 lbs N/ac April -August 130C Fpscue for grazing 138 lbs N/ac-August-July 130C Orchardgrass for grazing 138 1 a N/ac August -July 130C Small grain for grincr 82 lbs N/ac Aug -April 130C Ryegrass for grazing 138 I 5 N/ac Fe - 1a 130C Matua-fQr.hay184 lbs N/ c Au u Quly 130C Matua for ara-zini4 138 lbs N/ c u ust- ul SOIL TYPE 130D APPL. DATE 130D at for grain s N/ac Aug -April 130D Wheat for grain 99 lbs N/ac Au -A r•I 130D Barley for am 66 lbs N/ac Aug -April 130D Rye for grain 99 1 lac u - ril 130D Corn fWgrain 104 lbs N/ac - ul 130D Com for silage 199 lbs / c 13 OD Sorghum for 98 lbs N/ac —Le-b�-Iuly it -Jul 130D -grain Sorg —hum for silage 199 lbs N/ac Aril- ul 130D SQr hum- Sudangrass for hay 184 N/ac A�ril-Auust 130Q Soybeans I 10 lbs N/ac ril- e t 130D Sudang[ass for 184 lbs N/ac April -August 130D Fescue r hay 184 lbs N/ac u ust- ul 130D Orchardgrass for hay 1 4 lbs N/ac August -July 130D Smal.t..grain for hay I 10 lb N/ -A RyeRyegau for hay 184 lbs N/ac -Ma 1 udangrass for grazing N/ac ril- 1 escue razin 1 / c u u t- 13 D rchard ass ain for 1 Ibs N/ac Au ust- ul Small grain grazing for 2 / Au2-Anril 13 DD Ryegrass for grazing 138 lbs N/ac -Ma 130D Matua for hay 184 lbs N/acugust-july 130D __ _Matua for Lyrazin _ _______ 138 .lb N/ac Au u t-Ju.lv_.. SOIL TYPE 51B APPL. DATE 0 51B Qqts for grain 85 lbs N/ac Au -A 51B Wheat f r grain 132 1 s N/a -A ril 51 B Barley for grain 88 lbs. N/ac -A i 518 Rye for grain 132 i s N/a l 51B Com for ain 106 I s N/aQ Feb-Jul 1B rn for silage 204 lbs N/ac Feb -July 1B r h r rai 106 lbs N/acApril-July 51BSorghum silage 2 41 s N/a 1- ul 51B SoLbeans140 I s N/ac '1- e 51B ---Sorghum-Sudangiass for hav 175 lbs / c April -August 51B Siviangrass. for hay j-7-5—Ib5N/ac Aril -Au u t 51B Fescue for ha N/ac August -July 51B hay 175 lbs N/ac Aujust-july 5I B -Qrchardgrassr Small gigain for hay 12 N/ac Aug -April 51B R e f r hay 175 lbs N/a -Ma 51B Sp6ngrass for grazin.g 1 lac April -August 51B F scu azing 131 lbs. N/ac August -July 1 B grazing 131 l a us -luly 51B -Qrchardgrassfor Small gLain for grazing 90 lbs N/ac Aug -April 5I R egrass for grazing 131 lbs N/ac Feb -May 51B Matl4a fQLgrazing N/ac August -July 51B Matu r 2raziniz 131 lb N/ac A t- ul SOIL TYPE 30B APPL. DATE 30B Oats for gain 117 lbs N/ac .—Aug—April 30B Wheat for grain 144 lbs N/ac-A,ug-Aprd OB for grain 96 1 s N/ac Aug-Apri 30B —13-arley Rye forgin 144 1 N/ -A OB rn f ain 119 lbs N/ac Feb -July OB C rn for silage 22 N/ac Feb -July 30B Sorghum for grain 15 1 lac A - ul OB silage 22 N/ac April-july- 30Bbeans .&rghum 14 lac April -Sept B Sofghum Suclangrass for hay 2 /ac Aoril-August 30B Suclangrass for hgy 22 lac April -Au u t OB Fescue for ha 22" 1 s N/ c t- ul B (JTcbardgrass for hay 225 lbs N/ac u st- ul 30B Small gjain for hay 120N/ac Aug -April 30B R e ra for hay 2 N/ac Feb -May OB an s for grazing 1 N/ac April -August B --Lescue for grazing1 s N/ac August-Jul char for grazing 1 l c - ul 30B Small giainr grazing 90 1 lac Aug -April 30B Ryegiiss for grazing169 1 Nlac Feb -May OB iatua for hay 22Ub-sN/ac August-July B atu r jzrazin2 169 lbs N/ac Au-gust-Jul IL TYPE 37B 0 0 C� J • 7B Wheat f r 'rain 144 lb lac ug- riI 7B Barley for ain 96 lb ac Au -A ril 7B Rye for gn6n 144 1 lac Aug-Al2fil 7B Com for ai 113 1 /a F b- uI 7B Com for silage 216 lbs N ac Feb -July 7B Sorghum f r rain 113 1bs N/ac APfil-lulY 7B Sorghum silage 216 l lac fil-July 7B 140 1 /ac AT)HI-Sept 7B -Sutgans SQrghum-Suda ngrass for hay 150 l lac April -August 7B Sudangrass for hay 1.50 1 lac Aril- u u t 7B Fescue for hay 150 1 lac Augu-July B Orchardglass for hay 150 lbs /ac Au2ust-July 7B Small gjain for hay 120 1 / c -A ri 7B Rycgjas5 for hay 150 1 /aF6-May B Sudanarass for grazing 11 3 lbs N/ac April -August 323 FQ_soo f grazing 113 l lac August -July 7 rchar r ss r a ing, 113 lbs NlacAugust-July B Small grain for gfazing90 lbs N/ac Aug -April 7B Ryggrass for grazing 113 lbs N/a Feb -May 7B Matua for hay 150 lb lac Aug 7B I Matua for arazin2113 lb lac SOIL TYPE 20B APPL. DATE 2013 Oats -for Grain l 41bs N/ac, Aug -April 2 B Wheat for Qrain 1 2 1bs N/ac Aug-Al2ril 20B Barley for drain 88 lbs N/ac Aug -April B Rye for grain 132 lb N/ac Au -A ril 2 B orn for rain 119 lbs lac F - ul 2 B Com for silage 228 lbs ac Feb-July2 B SQrghum for grain 150 lbs lac April-july 2013 or m silage 228 lb / cApril- 1 20 Soy can 140 IN lac April -Sept 2 B Sorghum SudangrassJor hay ISO lbs ac-April-Auguat 2 B Sudangiass for hay J 1 lac April -August 2 B Fescue for hay ac Au us - ul 2 B for hay 180 lbs lac August- uly 2 B -Orchardgrass Small Gminfor hay 120 lb lac Aug -April 2 B Ryegrass for hay 180 lb ac Feb -May 2 B Sudatigrass for grazing 13 5 lb3 N/ac. Aril-Augu t Fescue for grazing J IN lac AL12USt-IUIY .20 rc and ass for gjazing 135 lbs lac August-Jul 20B S mall ain f rai n R 90 lbs Nlac Aug -April 2 B a r grazing 1351 s N/acFeb-May B Matua for hay 180 lbs NlacAugust- ul 2 B Matua for zrazina 135 lbs lac A u t- ul SOIL TYPE 20B2 APPL. DATE 2 B2 Oats for Grain 88 lbs N ac Aug -April B2 Wheat for Grain -12 lbs /ac A -A ri1 202.-Barley for ain 75I c 2 B2 RyLfgr grain 112 lbs lac _Aug-Apnl Au -A nl 2 B2 Com far in 101 lbs N ac Fe -Jul 2 B2 om for silage 194 lbs N/ac Feb -Jul 20B2 S r hum for grain 127 lbs N/ac Aril- ul 20B2 Sorghum silage 1 4 1 lac April -July 2082 So eans 119 1 lac April -Sept 20B2 or hu u an a for h 153 lb N/ac April -August B2 Sudangi:ass for hay 153 1 lac Aril- u u t 20B2 FeScue f r 153 lb lac u - 1 20B2 Orchardgrass for hay 153 lbs N/ac August-Jul 20B2- Sall Grain for hay 102 lbs N/ac Auj-April 2 B2 Ryegfass for hay 153 lbs N/ac Feb -May 20B2 Sudangjass for gicazing 11 " lac April -August 20B2 Fe u f r grazing 11 " lb lac August -July 20B2 Orchardgjass for grazing 115 1 lac August-Jul 20B2 Small grain for grazing77 lbs N ac Aug -April 20B2 Ryegrass for grazing 115 lbs N/ac Feb-May-- 20B2 Matua for hay 153 1 lac August -July B2 Matua for ain 1 " lb N/a u - ul SOIL TYPE 20C APPL. DATE 20C Oatsr grain 96 lbs N a Au.g-Ai2ffl Wheat f r gicain 121 lbs lac ril 20C Ba fQr.grain 81 lbs N/ac Aug -April 20 Rye for grain 121 lbs N/ac Aug -April 20C Com for ai 1 lbs lacFeE-July 20C CQm for 5ilage 2 10 lbs lac Feb -July Sorghum for grain 1 /ac April -July 20C Sorghumsilage 2 10 lb lac April -July 20 129 lbs N/ac ril-Sept 2QC SorghumSudangrass for hay 1 lac April -August 20C Sudangrassfor hay 166 lb N/ac April -August 20C F f r hay 166 lb lac Auglj5t-July 20C Orchardgiassr hay 166 lbs lac - ul 20C Small..Crain for hay 110 1 lac Au.g-April 20C Ryegras5for hay 166 lbs NI c Feb -May Sudangrasa for grazing1241b I c April -August 20C Feacuj for grazing 124 /ac August-Jul 20C Orchardgrass for grazing 124 lbs lac August-Jul 20C Small. glain for grazin.g 82 lb lac ug- it 20C Rye-grass for grazing 1241 N/acFeb-May 20 Mat a for hay 166 1bs N/gp August -July M f ina 124 lb lac u u t- ul SOIL TYPE 23B2 APPL. DATE 23B2 Oats for grain lbs N/ac u - ril 2 B2 Wheat a' 112 lbs N/ac ril 23B2 Barley for grain 75 lac Aug-Apfil 23B2 Rye for grain 112 lbs N/ac u -A ril 23B2 Com for grain10 1 lbs N/ac Feb -July 23B2 Com fQuilage 194 lbs Nlac Eeb-July 2382 Sorghum for grain 122 / c Aril- ul 23B2 Sorghum silage 194 1 lac April -July 23.B2 SoAbeans 119 lb N/ac Ai)ril-Se6t 0 rl L 10 0 n U • 23B2Sorghum- u an ass for hay 153 lbs N/ac Aril -A 23B2 Sudangrass for hay 153 lbs N/ac Aphl—August 23132 Fescue for hay 153lbs N/ c August-Jul 23B2 Orchardgjass for hay 153 lbs N/ac Au u t- 23B2 Small Grain for hay 102 lbs MacAug-April 2 B2 Rvegrrass for hay 153 lbs N/ac F- a 23B2 S 6ngrass for grazing l l Ibs lac April -August 23B2 Fescue for grazing 115 IN N/ac Ajjgjj$L_j5jy 23B2 r h f rgrazing.....115 1 s N/a Au ust- u! 23B2 Small grain f r razin 77 lb N/ac Aug-Apfil 2 B2 Ryegrass for grazing 115 lbs N/ac Feb -Ma 23 B2 Matua for 15 1 N/ac August -July 2382 Ma ua f r a ing 115 1 s Nlac Au ust- ul SOIL TYPE 232B APPL. DATE 232B Oats for grain 1 lbs N/ac Aug -April 232B Wh at CQrr in 12 lbs N/ac Aug -April 232E Barley for grain 80 lbs N/ac..Aug-April 232B Rye for grain 120 lbs N/ac Aug -April 232B Com foCgrain 11 3 lb N/ac Feb -July 232B orn for Silage 21.6 1b 5 N—/ac Feb -July 232B um for grain 113 lbs N/ac Aril- ul 232B r h m silage 216 lbs N/ac April -July 232B Sorghum Sudiangrass for hay 175 1bs N/ac Aril -August 232B soybeans 120 lbs N/ac April -Sept 232B Sudangrass. for hay 175 lbs N/ac April— t 232B Fescue for 175 1 / c a- ul OrgbaEdgrass.for hay 175 lbs N/ac August- ul -232-B 232B Small grain f r hay 120 lbs. N/ac Aug -April 232B Rye.grass for hay 175 lbs Nlac Feb -Ma 232B Sudangl:assfor gfazing 131 lbs N/ac April -August 232B Fescue for grazing 1 3 1 / u- ul 232B r hard ass for grazing 131 lbs lac Aug-ust-july 232B Small gaain for grazing 90 lbs N/ac Aug -April 232B Ryegrass for grazing 131 l s N/ac Feb -Ma 232B Matua for hay 175 lbs N/ac August -July 232B Matua for grazina 131 lbs N/ac I Au ust- ul SOIL TYPE 232C APPL. DATE 232C Oatsin 85 lbs N/ac Au -A riI 232C Wheat for grain 110 lbs N/ac Aug -April 232C Barley for gjain 74 Ib N/ Aug -April 232 R e for 110 lbs N/ac Aug -April 232C Com for grain 104 lbs / Feb -July 232C o ila e 199 lbs N/ac Feb -July 232C Sorghum For rain 104 lbs N/ac Aril -Jul 232C Sorghum silage 199 1 ac April -July 232C_ 110 lbs Nlac April -Sept 232C Sorghum Sudangass for hay 161 lbs N/ac Aril -A s 232C for hay 161 lbs N/ c Aril- g1jst -..Sudangxass 232C Fescue for hay 161 lbs N ac Auust-July 232C Orchardglassr hay 161 1 s N/ac August -July 232C I Small grain -for ha 11 0 1 N/ac Au -A ril 232C, Ryegrass for hay 161 lbs N/acFeb-May 32jC- Sudangrassgrazing 21 lbs N/ac April -August 232C Fescue for grazing121 lbs N/ac August-July 2C irazing 121 lbs Nlac Au u t- u] 232Small -Qrchar-dgrassfor in for grazing 82 lbs N/ac u -A ril 232C Ryegrass for grazing 121 lbs lac Feb -Ma 232C Matua for haj 161 lbs N/ac u ust- ul 232C Matua f 21 lbs N/ac AL - u1 SOIL TYPE 232D APPL. DATE 232D 0 ats for grain 85 lbs Nlac Aug -April 32D Wheat for grain 110 lbs N/ac Aug -A ri 32D Barely for krain 7 I N/ac Au -A riI 232D R e for grain 110 lbs Wag Aug -April 32D Com fouraill 104 lbs N/ac Feb -July 232D Com for silage 199lbs lac Eeb-July 2D or u rain 104 lbs /ac April -July 32D Spribum fbriiLame- i 99 lbs lac A - ul 32D S 3Lbeans ii 0 lbs N/ac A ri - e t 2D ud ngl:ass hay 161 lbs N/acAl2ril-August 232 --Sorghum grass r hay 161 lbs N/ac April -August 232D -Sudan FQscue for hay 161 lbs lac u t- ul 232D QTchardgrassa lbs N/ac Au u - 32D Small grain for hay 110lbs N/ac Aug -April 232D Rycgrass for hay 161 lbs N/ac Feb- 232D Sudangrass for grazing 12 L lbs N/acAr)ril-Augusl 232 for grazing 121lbs N/ac u ust- ul 232D -Fcsgue grazing 121 1 N/ac August -July 232D -0-rcha[dgrassfor S all grain for grazing 82 l N/ac Aug-Apn 232D Ryegras$.,fQr grgzing 121 lbs lac Feb-Mqy Mglua for hay 161 Ibs N/ c August -July 232D Matua for uuin2 i 121 lbs N/ c Au u t- ul SOIL TYPE 232B2 APPL. DATE 232 2 Qats for grain 78 lb N/ac Aug -April 232B2 Wheat f6r grain 102 lb N/ac u -A 2 2B2 Barley f a' 8 lbs N/ac Aug -April 2 2 2 R e f r 102 N/ac Aug -April 232B2 rn for goi.n104 lbs N/ac Feb -July 232132 C rn for ' la � 199 lb NI c Feb -Jul 232B2 Sorghum for grain 96 lbs N/ c April -July 232B2 r hum ila e 1991 N/ac A '1- ul 232B2 Spybgans2lb N/ac Al2ril-Sept 232B2 r h - udanor s for hay 14 lbs N/ac A l- u ust 232B2 Sucfangrass for hay 142.1 N/ac Apfil-August 232B2 escue. for -hay 149 lbs N/ac August-july 232B2 for ha 14 lb NI Au us - l 232B2 --Olcbardgrass Small Grain for ha 2 lb N/a u -April 232B2 for hay 149lb Nlac Fe -Ma 232B2 -Rycgjjjss grass a 121b N/acApril-August 232B2 -Sudan Fescue for grazing 112 lb N/ac u ust- 2 2 2 Orchardgra5s for grazing 112 lbs N/ac Au - u1 232B2 S all uain for mazln277 lb N/ c IW-MIXII • 12 C7 0 • 2 2B2 R e rass fQr grilZigg112 lbs / c Fe -Ma 2 2 Matua for ha 149 lbs N/ c A u t- u] 232B2 Matua for era in 112 lbs N/ac Au u t- ul SOIL TYPE_ 232C2 APPL. DATE 2 2 2 Oats for gfain 73 lbs N/a Aug -April 2 2 2 Wheat for "rain 96 lbs N/ac Aug -April 2 2 2 Barley for gjain 641b N/ac Aug -April 212 2 Rye for ¢rain lb N/ac Aug -April 2 rn for grain 90 lb Nlac Feb -July 232 2 rn for silage 173 lbs lac F- ul 232 2 Sorghum for grain 90 lb$ Nlgg April-July 2 --Sorihum for idage J 7 3 1 lac A il-july 232C2 r hum- u an grass for hav 140 lbs N/ac A ri- u u t 2 2 Z Soybeans 96 lbs N/ac April -Sept 2 2 2 Sudangrass for hay 140 lbs N/ac April -August 232C2 Fescue for hay 140 1 August -July 2 2CZ -Qrchardgrass for hay 140 lbs N/ac August -July 2 2 2-Small grain for hay 96 lbs N/ac Aug -April 232C2 R f r hay---.-...140 lbs lac Fgb-May 2 an ass for in 5 1 /ac A r'1-A 232 2 —Fescue for grazinglbs N/ac Au t- u1 232C2 hard grass.f r grazing 105 IN N/ac Augtig-jilly 232 2 _QrQ Small grain for.grazin.g 72 lbs Mac Au -pril 2 2 2 Ryegass for grazing 105 lbs N/ac Fe -May 2 2 2 Matua for grazing 140 1bs N/ac August -July 232C2 Matua for in lb N/ac Au t- 1 SOIL TYPE 232D2 APPL. DATE 232D2 Oats for grain 73 lbs NI Au - 2 2 2 Wheat for gjain lb Nla Aug -April 232D2 for gjain 64 lbs Mac Aug -April 232D2 -BgEigy Rye for grain 96 lbs Nlac A - 232D2 90 lbs NI c F b- ul 2 -Co-mbr-grain Com for silage 173 lb N/ac Feb-July 2D2 Sorghum f r r in 90 lbs Nlac Aril- 2 2D2 r hum for silage 173 lb N/ac April -July 2 2 2 r hum- udan rass for hay 14 1 N/ac April -August 232D2 Sovbeans 96 lbs N/ac. April -Sept 2 2 2 Sudangrass for hay 140 lbs N/ac A - ugust 232D2 Fescue for hay 140 lbs N/ac August -July 232D2 Orchardgrass for hay 140 lbs N/ac Auggst-July 232D2 -Small uain 6 lbs N/ac Aug 232D2 for bay 140 lbs N/ac --April Fe -May 232D2 udan a for grazing 10" lbs N/a Al2ril-August 2 2 2 Fgsgttfor grazi-ng 105 lbs lac August -July 2 2 2 Orchardgrass r grazing105 Ib I c August -July 232D2 Small grain for grazing2 l s N/ac Aug -April 232D2 Ryegjass for grazing 105 lbs Nlac Feb-May MaWa for hay-- 140 lbs N/ac t- ul 232D2 Matua for__ ra in 105 lbsNc Au_u - 1 13 SOIL TYPE 131B APPL. DATE 131B Oatsr graiDL 91 lbs N/ac Aug- April 11B Wheat for gain 108 l s N/ac Auiz-April 131 B B Hey for grazing 72 lbs N/ c Aug -April 131B Rye for ain I OS lbs lac Aug -April 131B Com for in 113 lbs lac Feb -July 131 B CQm for silage 216 lbs N/ac Feb -July 131B Sorghum for 13 lbs N/ac April -July 131 -grain hum for silage 216 lbs N/ac April-july 131 B Sorghum Sudangiass for hay 200 lbs / c April -Au ust 13 1 B So- eans 120 lbs N/ac Aril- e 131 B Sudangrass for hay 200 lb N/ac April -August 131B FQscue for hay 200 lbs N/ac A Qrghudgrass for hay 200 lbs N/ac Au ust- ul 131 B Small grain for hay 120lbs N/ac Aug -April 131 ass for hay 200 lbs N/ac Feb-May B Sudangfass for grazing 150 lbs N/ac A ri -AugUst 131B Fe cue for grazing 150lb /ac August -July 1318 h r ass for grazing 150 lbs N/ac AuauaLluly 1 1 B Small grain f in lbs N/ac Auiz-Aoril 131 R e ass for grazing 150lbs lac Fe -Ma 1 a M tua for ha 200 lbs N/ac AugusLaly 131B Mat a f r grazing 150 lbs N/ac Au ust-July SOIL TYPE 131C APPL. DATE 131C Oats for ain 85 lbs N/ac Aug -April 131C W eat for grain i s N/ag Au.g-April 1 1C for grain 66 lbs N/ac Aug -April 131C .13arley Rye for giain 99 lbs N/ac Aug-April 1 rn for grain 104 lbs N/ac Feb-July iae 199 lbs N/ac Fe - l 1 f r rain 104 lbs N/ac April -July 131CL Sorghum silage 199 lbs N/ac April -July 1l hum- udan ra s for hav 184 lb N/ c A - uQust 131C Soytgans l /ac April -Sept 131C Sudan a s for hay 184lbs Nlac Al2ril-August 131C Fescue for hay 184 lbs N/ac August -July Orchar—dgrassf r hay 184 lbs N/ac August -July 131 a 1 grain for hay I 10 lbs N/ac Aug -April 131C s for hay 184 lbs N/ac Feb-May 1 n ass for grazing 138 lbs N/ac April -August ] E!-,-Kue for grazing 138 lbs N/ac Aueust-July 131C Orchardgrassgrazing. lbs N/ac August-July 1 C Smal.1-grain for grazing ELILs N/ac Aug -April 131C Ry&glass for grazing 138 lbs N/ac Feb -May 131C Matua for hay 184 lbs N/ac August -July 1 for a' lbs lac August -July SOIL TYPE 522A APPL. DATE 522A Oats for grain 78 lbs N/ac Aug -April 72A Wheat for graini s N/ A- '1 522A for grain 72 lbs Nlac Aug -April -.522 Rve for in 9.6 1 N/ac Au - C 0 Is 14 • • • 522A orn for grain 113 Ibs N/ac Feb -July 522A orn fQr ailage192 Ibs N/ac Feb -July 522A Sorghum far rain J 13 Ibs N/ac ril- ul 522A Sorghum for silage 192 Ibs Nlac Aril- ul 22A Sorghum- S a an graujor hay 150 Ibs N/ac Apri I -August 522A So beans 140 lbs N/ac A il- e t 22A SudangraU for hay 150 lbs N/ac April— 22A Fescue for hay 150 lbs N/ac i- f 522A Orchardgfass for hay 150 lbs Nlac Au ust- ul 522A Small gEain for hay 120 lbs N/ac l 522A Rvegrass for bay 150 lbs N/ac Feb -May 22A Su6ngraa&fQr grazin.g 113 lbs N/ac i- u ust 522A Fescue for grazing 113 lbs N/ac u u t- ul 22A Orchardgjass for gi[azing 113 lbs N/ac - 1 22 all gLain for grazing 90 Ibs NI c Aug -April 522A R e rass for grazing •113 lbs N/ac e -lVla 522A Matua for hay 150 Ibs N/ac Augus -July 522A Matua for i4razinit 113 lbs N/ac A u - ul SOIL TYPE 41 B APPL. DATE 41—Oats for grain 78 lbs N/ac Aug -April 4l Wheat f r rain 96 lb N/ac l 41 Barley for grain 72 lbs N/ac Aug-April 41B e for grain 96 lb N/ac Aug-Apd.1 41 B Com for grain 113 1 s N/ac Feb -Jul 41B CQm for silage 192 lbs lac Feb -July 41 B Sorghum for grain 113 lbs N/ac April -July 41B Sor.,ughum for silage 2 1 s N/ac April -July 4113 Sorghum-Sudangra5S-fQr hay 150 lbs N/ac April -August 41 B Soybeans 140 Ibs N/ac April -Sept 41B Sudangra$5f r hay 150 Ibs N/ac ril-Au ust 41 B Fescue for hay 150 Ibs N/ac August-Jul 41 B Orchardgrass for hay 150 lbs N/ac August -July 41 B Small in for hay 120 lbs Nlac u- l 41 B R e f r hay 15 l N/ac Feb -May 41 B S14dangrass for grazing 113 lbs N/ac April -August Fescue for grazing 113 l N/ c Au ust- ul 413 Orchardgrass for grazing 113 lbs N/ac August -July 4I all grain for grazing0 lb N/ac u -AP61 41B Ryegrass for grazing 113 lbs N/ac Fe - a 41 Matua for hay 1501 s N/ac st- ul 41 B Matua for uazin2 113 lbs N/ c Au ust- u] SOIL TYPE 49B APPL._DATE 4 B Oats for grain 91 lb N/ac Aug -April 4 B Vaeat fQr ain 108 lbs N/ac Aug -April 493 Barley for gain 72 lbs N/ac Aug -April 493 Rye fgr.grain 108 lbs N/ac Aug -April 498 Comfor gfain 113 lbs N/ac 4 B Com for silage 216 lbs N/ac Feb -July 4—Sorghum for rain 113 lbs N/ac April -July 4 B Sorghum for silage 216 lbs N/ac April-Jul 4 bean 120 l s N/ac Aril- t 15 • 49 r hurn- dari ra s foLhay 2QO lbs N/ c Aril -Au u t 49B Sudangrass for hay 200 ibsN/ac April -August 493 F ue f r ha 200 bs N a August -July 49 r hard ass for hay 200 lbs N/gc August -Jul 49B Small grain for hay 12 lbs N/ac Au-9--AAu-9--A il 493 Rvegrass for hay 200 lbs N/ac Feb -May 4-9B an as F r azina 150 lbs N/aQ April-Augjjst 49B Fescue f r razi 150 lbs N/ac ugust- ul 49 and j a s for grazin g 150..Ibs N/ac u ust- ul 4 all grai.n for gra iria 90 lbs N/ac o- riI 4913 R rass f r grazing 1 " lbs lac - Ta 49B Matua for ha 0 lbs N ac u ust-Tul 49B Matua- for arazin2 150lbs N/ac Au ust- ul SOIL TYPE 49B2 APPL. DATE 49B2 Qats for rain 7 lbs N/a Aug -April 49132 Wh at for rain 2 lbs N/ac Aug -April 49B2 BIrley for grain 61 1 s N/ac Attg--Apdl 49B2 R (or grzin 92 lbs N a ' 49B2 Com for grain !bs N/ac Feb -July 49B2 Com for ila c 184 lbs N Fe - ul 49B2 r m for grain 96 lbs N/ac April -July 49B2-Sorghum for ila e 184 lbs N/ c April -July 49B2 can 2 lbs / c April -Sept 49B2 hum- udan ass far ha 17 lbs NI April-Augot 49B2 Sudangrass for &y 1701bs N ac Aril -Au 49B2 Fe cue for ha 1 0 lb N/ac gust- ul 49B2 r and a for hay 170 lbs. N/ac Au us - ul 49B2 all ain forbay 102 lbs N • c Aug -April 49B2 Ryegrass for hay 170Jbs /a F- a 49B2 angrass for grazing 127 lbs N/ c April -August 49B2 FQscue f r grazing 127 lbs N/ac u u t- ul 49B2 OrchardgrCss f r a i 127 lbs August -July 49B2 all ain for grazing 76 IN N/ac Aug -April 49B2 R grass f r grazing 127 lb / c Feb -May 49B2 Matua for ha 7-0—lbs N/ac August —July 49B2 Mat —for in 127 lbs Zac Maust-july SOIL TYPE 522B APPL. DATE 522B Qatsfor glain 78 lbs N/ac Aug- rii 522B Wheat for grain 96 lbs N/ac A - ril .522B Barley for grigin 72 lb N/ac Aug -April 522B Rye for a67in 96 lbs N/ac Aug-April- 522B m for ain 113 lbs N/ac Feb-Jufy 522B rn f r ila e 1 2 lbs N/ Fe -Jul 522E um f r rain 113 lbs N ac April -July 522B Sorghum for sliage 192 lbs / cApril- ul 522B Sorghum Sudandrass for hay 150 lb lac ril-Au u t 522B Soybeans 140 Ibs Mac ARdll--Sgpj 22 anafor h 1"lbs N I- u ust r 522B Fescue forh 150 s N a August- 1 522B Orchardgrassfor hay 1 Ibs Nlac AugUSt-july. 522B Small erain for hay 120 1 lac Au - 1 16 " 2B Rveuass for hav 150 Ibs N/ c Feb-May5 2B Sudangiass ing 1.13 Ib s N/ 22B Fescue r grazing1 N/ c -ADrit-Auug - ul 522B r and a r grazing 113lbs N/ c August-Jul 5228 all gain for uazinglbs Mac A -A ri 5 2B foc grazing113 lbs c Feb -May 522B -Rvegrass Matua for hay 150 lbs N/ac 22B Matua for ouazing -��gust-july 113 Ibs / st- 1 SOIL TYPE 525B APPL.DATE 525B Oats for Uginlb lac Aue-ADrit 25B Wh at for grainIbs N/aAug--April 525B arI for -grain 72 IN N/a -A ri 525B e -far graioN/ -Aug-April 525B Co —for umain 113 Ibs Mac Feb -July 25B m f r silage 1 2 s N/ac Feb-hily 52513 Sorghum for 113 Ibs N/ c -Jul 25B -grain Qum Silage 192 lbs N/ c-April-July- 525B Sorg-h—um--,S-u-dan.gLrass for havi s lac ril- u t 525 ans -140 Ibs Nlac April -Sept B S-uda=ass for hay15Q Ibs c '1-A u SB Tescue for bay 1 1 s / c August -July 525B 1bs N/ac August -July 525B .-Qrgh—ardgrassa Small grain for bgy .-1.20 Ibs-Aug--Apri 525B R e asf rha 1 5a i s NZac Feb -May 525B SudawaaLfugwing 11 3 Ibs /aAPHI-August 525B Fcscue or grazingi t s N/ac August-J61Y 525B r hard ras f r grazing13 i s N/ag August-july 525B S all gain—forgrazing-- s N ac -Aug-Ap l 525B Rvegr—ass fQr grazing -113 Ibs NLac F- a L25 B Matua Lor hay 150Ibs NZac ugust-July 525B Matuaf r P-raziniz 113 Ibs N ac 712ust-july SOIL TYPE 526B APPL. DATE 526j3 QjItsIbs NI 526B WheaLLor grain 96ibs NI c -Aug--April- 1 26B B rIgy For io 72 Ibs N/ac u -A ril 26B for grain 96 Ibs N/ac -Au - ril 526B -Ry& CQm for ggrain113 lbs N/ c Fe - ul 26B CQM for 5itage 192 Ib NIaQ F&JUly- 526Br u in 3 N/ac April-July- 526Bu for silage 2 /acAmil-July 526 an s for hay 150 Ibs N aApril-August 2 s 1sNa -et 526B Sudangrass for hay I 501bs N/ac ADn'l-August 26 cuefQr / - 526B OrphardgrasS for hay I 5 bs Y/ac Au.gust-Juty 526B Small,grainr hay A 2N/ac Aug -April 26B RvepLa5s f r hay 150 Ibs 1 -May 26B Su angrassain s N14C Apiit--Augyst B ascj&Jorgrazing-13 Ib N/acAugust-july 2 B Orchardgrass for grazing1 3 lb Mae -Aug-u-st-July 526B Smallai for grazinglac • • CJ 17 • • 11 52 B R e ass for ra in 113 lbs N Feb -Ma 526BL Matua for hAi 150 lbs N/ac Augu t- 1 26B MatoMatua for z_inu 113 lbs N/aac _-ust-Jul A I'_ SOIL TYPE 522C APPL. DATE �222f Qats for grain 72 lbs lac Aug -April 522C. Wheat for grain 88 lbs N/ac Aug -April 522C Barleyr grain 66 lbs N/ac Aug -A ril 522 Rye for grain 88 lbs Nia ..Aug -April 522 for Lrrain 104 1b N/a Fe - ul 522C C rn for silage 177 lbs N/ac Feb -July 522C Sorghumfor grain 104lbs / c April-july 522C S rihurri sila e 177 lbs ac April -July 522C So rghum-S udan grass for hay 138 lb ac April -August 522C Soybeans100 lbs N/gc A ril- "22 u angrass for hay 13S lbs lac April -August 22 or hay 138 l c Au ust- u] 522C —Fgacue for hay 13 lb N/ac August -July _522C. Small gmain f r ha 11 lbs N/ac Aug -April 22 ass f r ha 138 lbs Feb -May 522C Sudangrassfor grazing 103 !bs N/ac A r'1-Au t S 2 scu or r zin 1 lb Augu t- 522 rch d ass or az in 1 lbs c Au u t- 1 5 22C Small grain for grazing 82 lbs N ac Aug -April 522 R ass for ra in 103 I N/ac F -May 522 atua for hay 138 lbs N/ac Au u t- ul 522C Matua for arazini4 103 lbs lac Au st-Jvlv TYPE 525C APPL. DATE 525C Oatsfor gmin 72 lbs /ac Au - ril 25 at f6r.grain 88 lbs N/ac Aug -April 525C Barley for gfain 66 IN NI c A u g -A riI .525C Rye for —grain 88 lb N/a Au -A ril 525C C m foCgrain 1041b N/ac Febjuly 525 for silage 177 lbs N/ac Feb -July 525C SQro,,hijm for grain 104 lb5 N ac April -July 525 ghum ilage 177 lbs N/ c A ri - ul Sorghurn-Sudan-grassLor hay 138 lbs N/ac April -August ...525C. 525C SQybeans129 l I c Aril- t 525C Sudanglass for hay 138 1 c Aril -Au us 525C Fescue for hay 138 1bs N/ac August- ul 525C Orchardograss for hay 138 lbs N/ac Au ust- 1 525C S.mall.grin for hay 110 lbs N/ac Aug -April 52 -C_ RyCgrass for hay 138 lbs N/ac Feb -May 525 dangrass for grazing 103 lbs N/ac April -August 525C F cu or grazing 10 lbs /a August -July 525C Orchard-ums-sor grazing 103 lbs / c Augu - ul 525C Small gjain for grazing 82 lbs N/ac Au -A ril 525 as for aazing 103 lbaNLauc Feb- a 525C Matuafor hay 1 lbs N/ac August-july 525C M tua f r zrazing 103 1 ac Au u t- ul SOIL TYPE 688-C APPL. DATE 68B-C Oatsr grain 68 lbs N c Aug- 'I 68B-C lyheatfor glain 84 l s N/ac Au - ' 1 8 - Barlev for arain 72 lbs N/a Aug -April 68 - R e for grain 84 lbs Nlac Aug -April B- Com for glain 88 1N N/ac Feb -July 68B-C Com for iflage 168 1 s Wac F b- ul 68B-C So ah m f r r i lbs Mac Aril- ul 68B-C Sorghum silage- 168 l s ac Aril- ul .68B-C Sorghum-Sudangrassf r ha 1 0 lb N c Apr-il-August 8B- ns 80.1bs N/ac April-SepL 68B- dan a s for hay 150 l s ac A ril-Augu t 68H--C Fesgue for hay501 s ac u us -July 68B-C Or hardgrass for hay 150.Lbsc August -July 6 B-C Small grain for hay 1201 Aug -April 6$ - for bay 150lac Fe -M 68 - -R—yggr-ass a a s for grazing 113 1 s N ac April—AuApril-Au ust 68B-C Fescue for grazing 113 lb N/ c August -July 6 B-C -QLQLardgrassfor grazing 1 1bs N/ac August -July B- all gain for grazing l la l $B-C Ry!-.glass.for grazing 113 lbs Macftb-May- 68B-C Matugfor a 5 N/ u t- u B- Ma ua fo rar azin 2 113 i s N/ac AuQust-July SOIL TYPE .68D APPL. DATE D Oats f r ain 63 Is N/ac Aug-Al2ril 68D Wheat for grain 77 lb lac Aug -April 6 D B rle f r grain 66lbs lac - AApril 8D R n 771 N a A -A 1 8D rn f r uain 81 lbs N ac F -July 6D Com for silage 15 is NZ c Fe-u D SQ ghum min 81 N Nla April-July- 68D SQrhgi4m siia e 155 Lbs NZacApri.1- ul r hum- u an 138 1 / c April -August D Soybrnans 741b-s N/ac April-Sept udan a s for hay 13 i s lac April -August D F cue ha 13 8 1 lac A us - ul 68 D chard a s ha 13 lbs I c Au u-July 1 ain bay 11 nl s N-/ac Aug -April 8D Ryegrass hay 138 Feb —May 8D Sudan=ss for gazing 1041bs N/ag Aril- u u 68D Fescue for glazing 104 lb / c August -July 68D Orchardur-assfr 104 lbs NAugust-july D ll ain f r grazing 82 1 /a u- i 68 a ass f r i 1 4 N Feb-.May.-D u f r ha 8 August-July Ma ua for g6zing 1 41 / c Aueust-July • • • 19 NOTE: THESE ARE THE RECOMMENDED REALISTIC YIELD NITROGEN . APPLICATION RATES FOR THE SOIL TYPES LISTED ON THE PRECEEDING PAGES. WHEN A CROP IS PLANTED THAT VARIES FROM THE WASTE MANAGEMENT PLAN, THE NITROGEN APPLICATION RATES FROM ABOVE MUST BE USED IN ORDER TO COMPLY WITH .0200 REGULATIONS. IF HAYLAND IS USED FOR GRAZING, THE HAYLAND APPLICATION RATE MUST BE REDUCED BY 25 PERCENT. IF YOU HAVE ANY QUESTIONS PLEASE CALL OUR OFFICE, THE PHONE NUMBER IS 545-8353, OR 542-2244 EXT 3. • • 20 4po, ,.ls c�yT'yn"� �e �. 4 -1 ;• ! ".z l r �. i}d _. J •Iwo-♦ `Js' - rrr" �'�" 5 y 1' •1 ...,;r.r�--��� JayMy. • ` • Q; !+��:;,.y. •.J s ,; c ' ra. a yr ,+..11 1�� '•' a .:� � ,air i -'• � si .z,�, Y, �, a.�; ,r f�w'� tiL t v •r !, z{ �. ,kt �r�, � �r � a - t yv'w' ' �Yr ��^-�:r•� r' # Sv1 K y, �. ,.�� A t r 515; i i� I � v.-M 1►� �, � - 3 Y i ' 1 I P � sa �V g tl t s,�.y! •�„ � �. ,� 1 r 1� •.. ., i '�'i �i—1 s ... 1 r'•\ 'r , ` , 1'�`_ �~ � f s r-�f�� r �tir 1 t�� r �.1- sll..y f' 1 `'1 � 7 H k��. .4 = i as�r � S � i 1��I 1 �Y •� � a �7f ' 1 , i 5.� t '.,,,� �. '� •ri "I,,� .. �i 1 ' ''�. �*'a'I�ar.Mb� ��� �in;,1 � Ir, � ' �� Ylf�� - i5 ',A,ti- '���I 4. r F�'.y� ' '�s I _ a � x f / i 1,.•� k i - x 1.� 14 r DD F € k. r1' �_/�i. _`f+k .........."r','rrA 4 f€ i°•E a" A 0 •Txa 4 I- ,f� ,h •1 9 ,! r �1;», i -- _ f + r t+idIr riY;c s's'h t V'1 °'� �i �`i� i 4 'h� � �JF�cYt'�""'�!, liar r i j ,,4� � r +1f„. 1 �i i� •^� t N.... � �'kt�rr t lu y i v _,Y s }',G`, r 1 r'>R� �` '� ` 5 _�, !� � i � + -3 / I s d < z s t.+ xft'r.i t 8 a� >1 r r ? 4 N � ° • '•v i � .� if , IE; a -t n = i7 8tfti�! ► s S _-;.t�kL - .+ 7 ,} f 1t• -<�� s a ,� er_' r ,i � Tt- r ,fir};z rfr Fr'' "s'•,,sC_���1r .r, a � .`,S-r -'g :tx 1 t,1 t.tr '+ ��d '° "' �` � * � r f r��1 '"i'ix s s fyrYr r, a �5 i M �Ld •r} •�. r+ } ' �`tt t ,`� �:; t s._ '1 ..F :,M'1 �' � ."Y r i4 a .5 J - C ?' "'i a J-,,.'i" ";' •� � 'v�y�,. , >< �.. 'r. tl s t' i r - � a �`� y � s _ r�., �. ,� "fI';y.,� 1� '• w 1, NAN i r r A x `' �et�'r•� f� ro s. �tr �I��.� s'1" �z f fir.. ��� � s 4 }'� � r y. cs' � r "!r t� �� r r, f r tj €• �•±� i -,�- ��..•• YM f J.. 1�.-,.�AT' I �Y..S �,. �, �� ` L" �+ � O'r' - 1 � Fi,y- off �r�_�'1 ,.��'�1 �� I 1 � e if• rt� '�1 r ��r Y7,tY'tlri - rr+i L"� � T~ f. ��, t 1Ll i� '+ 1 a �Y .� � ry�y.F` f. rri. �F .1r4 ,` k� � - '' I (�yzr i r - !�' _ �.2x� k7 i+ �' i k �� r •--x `� �'r •' � - ; +r �Y�• . �r Y �` '•�'�t �4'i '�f f - n gY I �zY'` � F. ii _l r •s a .f �a rQi , �r S ° b°1Y!' � � * +}, �. } l.• -. s �3 tip, .wv f s . Yr r /t .wPr ; y� •"�;�� r f ;e+ s a /'� i it r ffi •r' 1 �' !� �z..%' y T� ' e +z.�s itys Ir, V 'y, i .r '9.- f f i - '.. F' v x is, e _'�• , s v' a �1 A1`r. t 'f; ' fi 1.�!' ' :. .a �,� _ e ��� i mx 7 1 +� • t_ °' '1 ` i 9k '�i s• 1. a s A L a�- } ti : n( l,..w �r2 J- f � 3, 6r r r� � • } r t .r r Alit r r ��. ri a •t,_r - •,�_ �!. :'i ,1'" r i. Fw` 7 r ' r �; uk r "• 1.+ t Cz `d ,� r '>w G•r r * t'r - n i, - % [}�- 7-li w I- i 4G 41 F F' i." 1 1 i _z.,. P'1 •,n F-s _ i?.'¢,�n:il� i• s a' r � ` � r i - ',. �� �►1 ,.,,.st d 1 . � A, r f ca ti ir. ~~ S lti ., !" �' . s^ r I .� �� ,y: L 1 Y@• li+^rr r;,. 'lilj 1}' ".iy3 f �� jL C�-l�,i� �j �_ c1 s • Yn , t, 7 F 'i ce t -'T Y 3" x 'tl' o? ,j k t �t r � x � • � `xtr _ a ' _ r fir_ {.,r pax # Iral fi, '. d ;-Y'•'�t s r , .CJlr .:4 �11k ,- .fir �,�r �'.Sr"; P .r+,,_fi' � t-y6 > '�., ,u c " a ' "a -, 7a r� r d d: i I. 'fs• _'� ��� ��, .,� � ,� ,a �� � ,c^ � �4 � I� r �"3` r '�ll� •o � • � d a , a z�-a a �'• I . � ,� ' �'•� a�� 5 ,�,� � ca �� e#����y��. �' ''sb � r x t d �'i� � '�� � t�" i ' r j , ' Is• �� rr �I Y,S � - s r arr'r { _ ��r.. :rti�t yr s rx*� ° yw i es r t� I � t _ � ram` I 1'r r' � � + +� ,t'r � •'tip ,p 1 e iy e,1i �-,1�i'x � � i r'q �.. ', +► tr F 1 -,I.r ri +'1? r !, r 4 4'Y4 ~ 14 p5, ~ Ex P o r 1 rs �` { iax' xy-'- •�.�' a 't wf .r w i ii r M R 1 ; F} ��,� �Y {,.�r s 1 i V rg.,} 4 Y .�" i j,;, 7� -+". sY,j ,.+ .. d 1 •,Yr� / '..t`3£ rb a ».L r+ S1 t ��•�� �"Z. t' 1 �1 $�• �za�F.i r.y ,.1 �",, z p:Ft. '� t ,s tip, � fi r 'par �,g' �'� 7 •�rt�� :y` :� 1. * w�F++'Sr14r1 1} l - . ` . _ . i`'� .. i� f . � •� �". �..' _tx. �� �'.;���'E+,5 . {Frl. s: j" �aa lP �:. _ . �• I--- . , � .,.., i-. .� LN, Fr'L 2 '�./�r M%w 3a::i-$ :•' 1�, s -A.R •�e t �` t t .iiy 1}i (/1 �l" yi S i4J -iit -i S - YiE'r _ e lb t' b ��--.s�F'C sTn� � i � 1 fv 'i.� -��'�t i; xr� t�. a� "a r•"a'JR�r - s ti rM.,� _>C�w,Y� K/k r6 w la1 # r1,r'S� tiii ` 7 T 1a r y1 c '�•�q�e �T{tt Y tN- �`5. � � i7 . � ••,r Lw.+" t - �y*T ti't t r-4e+� i s++,; 5�r2 ra. # � + � : � �"�' �S ! � ` r 'lJ --y', '� �� -_ Fit. t +� °•d _ 1 �-0 lot a c Gt w r k } t { }^a K k# .:r a 1' � awe' 11 . o � S"ka� t'�l etas �' � tr `'"° - t i1�{� """� r t: �., ,�ir �•W£' r a wa � e it- e i P��. 6' `` �, lw t d c -'+ F. E ° r .s+ ?' ^t•i blx, f 7 1i� + t �tt ; ��Y :.���rr' :.7•t�''w't�iF + � s -; >r � �r r :�• 1�• Y'�,s '•e � s £.-� 1,-� �1 � �1 5�; 'G,s'r ��r t•S t+ r*�.r r..�.re S .•. t-,y. s2z• s 7;i' r 1 -�t ° F a r,F�� t; 1.rr j°k ..1! ,, a :,§ (V f ,. , c � P'�•?• `� 5 `rs 1 � 4 i�i � - .k ("t � j a f. r t` -.s �I.f i rSS x,f �t f tlnl-x, ,t y.•y�'. ti �4h s-y�P{7,5 r.�y r ti�r.. r ��; ,�,� f` � � � �� # j: \�• � �•l� r• a `�u f'tf 2 i v rc :..� � i d ,. -aj� k� .✓� �-1V } ��y � ,n. :ai c i• k, j— � � �[ t �I' t Sin � �. r@�4?a + i • ('Yy �a^77+1.► is J } •.�Pf l • )-f� 7 • t F f:�Y 77, j f_ i r�ri >@I.4C • I t mA _` , 'lr i��', `." IT' r •q 1 a`. 1 - �'t *�1'1r,H : �, ..gym �, r 1 - , 7 - � i :,. e�'r�� r4.' � 9 f - r ` "7 e y,. f y - •d..'�� i 'y. � to - ' r _ 5 r.- 5 I k?.pr1 � A %r t3 ,tl r i "� �� � rr e �>, r.� ,� SA. s�1t • "ati" r � `) 1�,, x� f �� •zx �V-J v J��;�b• � � x � � pM. 4a -: a ! ik,.} o r ; :'�;� .` �; ^c ,.^ +(r ,. f_ ,� rl m �-?� �� fir. •,.,r +. Ft ral. :"trr°rr' s)r+a "tea 1�5'r•. � � per.-, �.Vq iy r3-cEY sla g 'i'fi?..� ii` : a, !.•s 'rx ie �; v+k •ry hln4 t1 3 r, five v r r 4yresi c a# � .r y t%.• r�. l:q„ f _;✓"w7M � .a ��e n. 3 71 1�l IY `�" Fy :� .l r'a: 9 R• 'y' f .ra'�„ r4 ' � � r r 7tir1 r iii x •.} f ' • i S x,- xi?4 ( � J '1 i � Q S 1 ..j��r n. d + M."Y.�' 4 `•i l li: 1 i r;cjli rr,•'4� w r tiv— gg` ::� i�'�� *" fi:_ -t -:3� wF' �` : r'•.w i tt "" 4r'i',,,�.'h;y.� - ;g-,E Y�rn+w fr �x�t'4 f•'}�% 3[�j ,.a,h: '`r:: •3`' k' / 1 •-}r '`E y'Y+r w. ,, f° ✓r g7 '` +7 s'S' s` ( rs'. •r, P#+ • t,, 1;c.•: � � 'fJ < t r , r S'r,.3' ,1 ✓••� { t r f S k,tr s5'a t[ � b::r"f f<�fYi'a `n i•��` � i. t fY r+ { �• l P t r k c "k a� Y +r✓ rM•.w ! i 7t �T $c/� t {� �y ";k ,. L1i .R( �iJ s' � ! '."- •Y- S i r 9• q. ��. tAty 46,f � d _ ! 1 °"y, • i ��.� 4 �i'Nrf'� t, r i �•. F H:„� w prC w, t - � _ {. '� - -}�'• -, L r r ,a `k.�'�, '0. 1 � f*,r� rt 3 r r x �r*l+�'Cr� ' �t L, - .�y-'>� � • 7v.j tom= r.r may <t - ti r '*i •:• a. �. � 3. .,ar�7a 3; QiI c '4 ilr�' 1 c, y ��4 t S. i , !S r � ln�.... • . _� w �'J :�� :�aw� �Ch,��a 1 Y�:,_ 7 r �-}.•� it f _ Kr 2'#,I - �. : � ♦= '!r" -i 4 n Y i ✓. '* d i '^rw - 'r r : µ L •t ,1, •} 1'f•+► .di} y�'t 1� 9 N t t � 1�++. ' t-�Y;� r i - IrFH r s� t *Z'%_'C r F 't� .,d � ',�. r .r.• , .YL.t c t'S, a �' l £•..L w r`�1; 1w tt 4�rLs'e,l� rti`+�#`x - 's.�'�^�..•, ` I .t 7 ,'.�.,Y R.it+"S f t 'yrr4"`+t 3 P ,: k " �.1 : - �_ w I:l ii Air 14 rr -` SQ t r ••i ,I. • 3 I . _,'t i4 �; ZyXr re •` '' + r s '' [ ; tsi'�,y ` �; , s>G r,� r r r x"•iy _ y ✓ f. • e- I'. 1 .rF?•L, •� �'ts�sr}ilr' 1-�+'`: z S ♦,��-ttom' '��y�y�r�' _f - � �'� ,t, t' a� ►.il � .. :�} lrpas,i��: . �i� �.:. V # "I ��:j' ''ram•'. Ft,�a t.:qt 'ieh: rW J"i`''y y`."�r •rr "`kY. J_��•�_' • 1 ;{t If ,,*"Y a _ Is,q ..•--!r�l ,s` f.� rf.._.;X� ee.,� �, C � " _+xt$+ < � 'ta s3,7"a �C ,. t �r� �,•�.'S�J� e � �!w��tvi r d 'i� ' e z. f . j};yy�'v(.i+- ttr f �*vW • ` , . 4 '. `� G� f� .R, gi ➢ _r fx+b "efiit l '^i �lM yc '�°It 7e.,3 �"'F� j "' r j -� �w if � r `� S�t . 4i VF� �'j@+H r] '#+-lF 3 .s _�'.:'•�f{' '#e�� '-fJ�. ,t - 1 . ,,H �•f tis rh:. �' z r,.} r ! £; 5� fr �t �^! a } t + y? i _ irk r ,. ,y�''j x � t 1 , � - r• '��. r' d :} •�'{Yt �"+r�iti i :hire• =e. r^ K , �.. - ; • i. 3 it , +_ � _ `r ay� r:.i� r,'�S-�•CJy�� 1U'!t•ti�' .'t� k � }r i.r:• sy y L .l �� „ t T�r,� f- .� r' �'sYj x . J i' t- >a #` �,- k � { t �� xr q'"rZ`3x�'':� " �_•,� .r` i+1 ,: + ' � t f/.?�� i :. r -rIJ '[ ''�• ` »r it "V'A' t 3 z�'t a � -.!• - .• It" lam. .r:>tir;:i `ia't•Ir 3 t'•i S . y,, -: J � �; a� „, .� •;%� 1 � 1 a �.� sty � r { t.�{{•k �•C a ; r i � t w� 'c'.i � �„J� t �. i w r`f^ ssy1- t _..'? t; tr 'tc% z 1, H1c' Y,i,ij • x .;F: c r w. yM1 tl 'S j1 d • t„rt# 7• h.� t /� i -�1Pr 1 ;, %, 4. z 1 er '`a • v �,r! Yi'+�r�yi,>i # `c! t _ 4. t., ts. rl � f_ t.T 'rid, yi:l,� Y•`T r,g a •t n.`: tl �'t_'� J„r✓ � t nw n t r x 1, 5 r w _ ,;x r4>• Y+L+. r 1�'' � iq f .<!'Ti tI t7 '"'1 -+i�'• � Q i ' N to £_, 6.4 �ettkj�� �.. � 3 � d ��=sf•le f z. "�ed e.��.� j1 � '. i3 e r�•-Jt! r' '. �.: _��+ri l.`;�rw i5 - i rl '�+�'tj •. 9 ��,�C a �'-►'� r�"• " ;et.�"' e' S ^F�'` .�r3S zy.l,�5'1;1 . • 7�° Rr1 ,S •' fr :5 r rg s 4tz�.i eai r3, C •y..rti ^'`.- p { >,,.:'" "' n_. •'� ./� 1 I- 1q. i'rr4Y' {�3.,. •: Y �.. y � } '� ��� �, Iti,.,•� ti r L `"r r +1 4 '��, t° � t_S s��t ,�. �%'` W �' i'` ,, b �H i•�Jr!'4><€'t~' -' �sF 1• rt•z' K;-a 5; 1,- '#`'s a # .y. Is. r-vS 'L.. •'� d� -7.' '#} � � r t.{r x l r. .� y � r F -a t t 1 {-y, �c. � .. rK �'tr'C+ ;t.� _ z�_St:^_.;.r.,. .i .. ra � "���� s yst '� ~ r �ri. it zw 3 � rr-trT'Lt ki a c �r/ -,��+{L�t.-�`�•-;r� �, / I�e lei „'� "�� ��i„ a •.# { }f1 'T# 0 1 ;••Frti 1 y` 1 a �.� #- e > �� x r . � ��J�'c t #"� I3 e.F- I�� Ite, r/ t'• t a Expostxre_ _ P i + r F.. r , V+ -4C. w, Qua d k` -v'•. �.' �Q S r AM $, - I �� •�+•,r'�.'., �� .'t S't'✓. ,�..tt 4-€>�! yr- � - 7;,� y"r �T�4 a. �..., i.r 1 ,� S �! ii .....s.4:1�.��ar-�`., - k-+•. 1!I•. Cti;?,,.��'��':..i t�'N rllnu`S _.v 'v. _�•.a,-:c.a •; M ANIMAL WASTE UTILIZATION AGREEMENT (Needed only It add.i tlomal 2Mnd has to be Seared, etc.) C _ J hereby give permission tvo apply animal waste from his Waste Utilization System on 3 0 acres of my land for the duration of time shown below. I understand _hat this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landow Waste Producer: Technical Repre r- ner• Date: G a Date: I sentat ive : &?j Date: 1.30 SWCD Representative: Date: Term of Agreement; 19171 to (Minimum of Pen Year, oa Coo Q.t.d Itamr) (See Required Sptcification No. 2.) 20 0 12 WASTE UTI.... LIbA�b4N4P�AN . Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land fsee Required specification 21) Tract Field Soil Crop Lbs. N Acres Lbs. N Month of # Type Per Ac.* Utilized Application EVE • K!'_ - _ i See footnote for :able 1. Totals from above Tables Acres Lbs. N Utilized Table 1 3a Table 2 Total Amount of N Produced 1,2 9�20 Surplus or eficit, NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. . 4 • • • ......... ... ... .. ...... WASTE_--,UTILIZAT-ION PLAN Your facili:v _s designed for 1 `% days of temporary storage and the temporary s orage must be removed on the average of once every U, MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation Call the local Natural Resources Conservation Service (formerly soil Conservation 5e�vice) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining cue amount per acre to apply and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION (Use addicicnal sheets as needed to describe the operation of the system within the context of the livestock operation) C� 19 4 I C� P i ��l }}1�� RP�1�� r1 C � f `� Drc� � C� C r�.ST r r43 i M 0.� A�e nn % ►�� �! A A, �,S R ► sk, C, Li, C: G-'lr 5 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade convevances, direct application, or direct discharge during operation or land application. -Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has a notarized agreement for use of adequate land on which to properly apply the waste. 11 the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of a notarized agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. Actual yields may be used in lieu of realistic yield tables at the discretion of the planner. 4. Animal waste shall be applied on land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at more than 5 tons but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393-Filter Strips) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen_ 9. Animal waste should be applied on actively growing crops in such a manner that the crop is not covered with waste to depth that would prohibit growth. The potential for salt damage from animal waste should also be considered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop or forages breaking dormancy.. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river other than an irrigation ditch or canal. t�J MRCS, NC DUNE, 1996 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) Animal waste other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet from wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animals waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by over - spraying. Animal waste may be applied to prior converted cropland provided it has been approved as a land applications site by a "technical specialist". Animal waste applied on grassed waterways shall be at agronomic rates and in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reeIs, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20, Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible permanent markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Soil tests shall be made every two years and a liquid waste analysis be taken at least twice each year consistent with waste utilization plan. Poultry litter shall be tested prior to application. Soil and waste analysis records shall be kept for five years. 23. Dead animals will be disposed of in a manner that meets NC regulations. :7 MRCS, NC JUNE, 1996 WA%F T • WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Environmental Management (NCDEM) before the new animals are stocked. I (we) also understand that there muse be no discharge of animal waste from this system to surface wasters of the state from a storm event less severe than the 25- year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and water Conservation District and will be available for review by NCDEM upon request. Name of Facility Owner: (Please print) Signature ,, / Date: r Name of M'nager(If diff` ent fPom owner): Signature: 'kC' Date: Name of Technical Specialist: (Please print) Ct.� Affiliation: Address (Agency) : Ir P) . NC_ 17:�� Signature: COP —A. V"f Date: ' • 11 I L L 11 L L it ! 1, L lY , t l _AjVaste Management i ' ICE: C:=i , .. _ . , � ': _: ral F t >:eering I",7orth Carolina State U71i;�ersIfy LI�FS :OCK WAS .E SA.HTLING , ANALYSIS AND CALCULATION OF LAND APPLICATION RATES James C. Barker* 1. SAXPLE COLLECTION A. Semi -Solid Lot Manure i. Scraced directly from lot into spreader a. From loaded spreader, collect about 2 lbs of manure from diferent locations using nonmetallic collectors. ii. From storage a. Collect about 2 lbs of manure from under the surface crust avoiding bedding materials and using nonmetallic collectors. B. Liquid Manure Slurry i. under -slotted -floor pit a. Extend a 1/2" nonmetallic conduit open on both ends into manure to pit floor. b. Seal upper end of conduit (e.g., by placing a thumb over end of conduit) trapping manure that has entered lower end, remove and empty slurry into plastic bucket or nonmetallic container. c. Take subsamples from 5 or more locations or at least l quart. d. Mix and add about 3/4 pint to nonmetallic sample container. ii. Exterior storage basin or tank a. Make sure manure has been well mixed with a liquid manure chopper -agitator pump or propeller agitator. b. Take subsamples from about 5 pit locations, from agitator pump or from manure spreader and place in a plastic bucket. Professor and Extension Specialist, Biological and Agricultural Engineering Department, Norn:,. Carolina State University, Raleigh, t4C. -l1 4U...1 - - - - - 2 ' of 3 -2- c. Fix and add 3/4 pint to a nonmetallic sample container. C. iagoon Liquid J. Collect about 3/4 pint of recycled lagoon liquid —cm inflow pipe to flush tanks in a nonmetallic sample container. ii. From lagoon a. Place a small bottle (1/2 pint or less) on end of 10-15' pole. b. Extend bottle 10-15' away from bank edge. c. Brush away floating scum or debris. d. Submerge bottle. within 1' of liquid surface. e. Empty into a plastic bucket, repeat about 5 times around lagoon, mix, and add 3/4 pint to nonmetallic sample container. D. Broiler or Turkey Litter i. House litter a. Visually inspect litter for areas of varying quality, e.g., areas around feeders and waterers, and estimate percent of floor surface in each area. b. Take about 5 litter subsamples at locations proportionate to item a. E.g., if 20% of litter of similar visual quality is around feeders and waterers, take 1 subsample there and the other 4 subsamples from remainder of floor surface. c. At each location, collect litter from a 6" by 6" area down to earth floor and place in a plastic bucket. d. After 5 subsamples have been added to the bucket, mix, and add about 2-3 lbs. litter to a nonmetallic sample container such as a 1-gallon freezer bag and seal. ii. From stockpile a. Take subsamples from about 5 locations at least 18" into pile. b. Mix, add 2-3 lbs to nonmetallic sample container and seal. 0 - 3 - II. SAu'LE' PREPAR,%!ION AUND TRANSFER 0 01 0 A. Place sample into an expandable container that can be sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or treat in any other way. 3. Pack sample in ice, refrigerate, freeze, or transfer to lab quickly- C. Hand -delivery is most reliable -way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and tape. E. Commercial sample containers and mailers are also available, Contacts: i. AFL Eastern Agricultural Lab, Inc. iii. Polyfoam Packers Corp. 7621 Whitepine Road 2320 S. Foster Avenue Richmond, VA 23237 Wheeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 ii. Fisher Scientific Co. iv. NASCO 3315 Winton Road 901 Janesville Avenue Raleigh, NC 27604 Fort Atkinson, WI 53538 Ph: (919)876-2351 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NCDA_provides this service for North Carolina residents. i. Address: North Carolina Department of Agriculture Agronomic Division Plant/Waste/Solution Advisory Section Blue Ridge Road Center P.O. Box 27647 Raleigh, NG 27611 Ph: (919)733-2655 Attn: Dr. Ray Campbell ii. Forward $4 along with the sample. iii. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine -nursery, finishing; turkey -breeders, brooderhouse, grower, number flocks grown on litter; etc.) c. Waste type (dairy -lot scraped manure, liquid slurry; swine -pit slurry, lagoon liquid, sledge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N, P, K, Ca, Mg, Na, S, Fe, Mn, Zn, Cu, B v. Additional analyses performed upon request: DM, Mo, Cd, Ni, Pb 0 CAL :BR-\TI(DN Applicators can apply manure, litter and wastewater at var ing rates and panerns, deaending on • forxard travel and/or PTO speed, gear box settings, gate openings. operating pressures, spread yidLhs grid overlaps. Calibration det_ es tl e cornotnauon of seninCs and travel speed needed to appiv manure, /Muter or %vaste,.vater at a desired rate and to znsu�~e urnforrn application. Spreader Ca�aciry Liquid spreader capacities are no=aHv rated by the manufacturer Ln gallons.-fultiply gallons by 0.0042 to get tons. Solid and semi -solid spreaders are rated by the manufacturer either in bushels or cubic fee: (multiply bushels by 1.24. to get cubic feet). Most spreaders have :%vo rating capacities: 1) struck or level full. and 2) heaped. Since manures and litters have difrerent densities. an on -farm test should be dune. Fill a five -Gallon bucket level full with rnate:ial to be spread. Do not pack the material in the bucket but ensure that it settles similar to a loaded spreader. Weigh the bucket full and then empty. -Multiply the weight of the contents by 1.5 to get pounds per cubic feet. -Multipiv this value times the cubic feet capaciry of the spreader and divide by 2000 to get the tons of material in a spreader load. manure weight, lbs x 1.5 x spreader capacity, ft' 2000 = spreader load. tons Spreader Calibration Calibration -Method 1: This method is most useful for liquid spreaders but can be used for all types. Spread at Ieast one full load of manure preferably in a square or rectangular• field pattern for ease of measuring with normal overlaps. -Measure the length and width of coverage recognizing that the outer fringe areas of the coverage tiviIl receive much lighter applications than the overlapped areas. Nfultiply the length by the width and divide by 43560 to determine the coverage area in acres. Divide the tons of manure in the spreader by the acres covered to determine the application rate in tons per acre. spreader manure, tons - (coverage length, ft x VVzdth, ft _ 43560 } = application rate, tons acre Repeat the procedure at different speeds and/or spreader settings until the desired aonlication rate is achieved. 0 i�,V"nat ion and speed would be [leeded to appiv 6.0 tons lirter per acre frorn a s7:eader %viih a 6-ton capacity. a o-minute spreading _Ariz. and a 25-fee: spreadinQ'.vidth? Fc7vvarG sU:ed, mnn capacity, tons x 9j time (min) x width x rate. tons per acre 6 tons x 495 5 min x 2J ft x 6 ton per acre 4 miles per hour Calibration lvfethod ?: This method is often used for solid and semi -solid spreaders. A tar_ or plastic sheet of about 100 square feet (9'x12'. 10'x10', etc.) should be measured for enact sur ace area (lengTh x wiidth), weighed using a set of sptzng-tension or platform scales, then spread and pinned on the field surface. The spreader should be operated at its normal settings, speed and overlap. +Vith a rear discharge spreader, three passes should be made: the first directly over the center of the sheet, the other ttivo on opposite sides of the center at the normal spreader overiap spacing. The sheet with the collected manure should again be weighed. Subtract the empty sheet • weight from the total weight to get the weight of the collected manure. Multiply the pounds of collected manure by 21.S and divide by the collection area of the sheet in square feat to get the application rate in tons per acre. collected manure, Ibs x 21.3 / collection area, ft' = application rate, tons/acre Repeat the procedure using different settings or speeds to obtain the desired application rate. Spreader Pattern Uniformity To determine the uniformity of spread and the amount of overlap needed, place a line of small pans or trays equally spaced (2-4 feet apart) across the spreader path. The pans should be a minimum of 12' by 12" or 15" diameter. no more than 24" by 24", and 2"-4" deep. Nfa_k— one spreading pass directly over the center pan. Weigh the contents caught in each pan or pour the contents into equally sized glass cvlinders or clear plastic tubes and compare the amount in each. The er ective spread width can be found by locating the point on either side of the path center where the manure contents caught in the containers is half of what it is in the center. The distance between these points is the effective spread width. The outer fringes of the coverage area beyond these points should be overlapped on the ne :L path to ensure a uniform rate over the area. "NI", '�V" "steeple", or "lopside" parte:, s are not satisfac.orr and one or more of the spreader adjustments should be made. 0 �+ ERGENCY ACTION PLAN 0 PHONI NNUNLBERS D`�'Q H 1 1 i 9- Ll r�"'�� E�IERGE�CY �I.��AGEy �T SYSTEM - SWCD MRCS This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave vour propenv to consider that you have a problem. You should make eve-y effort to ensure that this does not happen. This plan should be posted in an accessible location for ail employees at the facility. The following are some action items you should take. 1. Stoo the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to be.-rn to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. • d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b: Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the' application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to elirrunate further discharge. d. Repair all leaks prior to restarting pumps. D: Lcakane from flush systems. houses. solid separators -action include: Sion '-ZCvcie pumc. S[t?n i�ri''"�EiLi� Yur�D. gibe no sl!'non i.� i, ` "I S\'die ;?7�. ��!=:!•.;!i at'y r� StiJl? }FI 0 e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidcxall of lagoon. Often this is seerage as 0000se1 "c Rowing leaks- possible action: Dio a small sump or ditch away from the embankment to catch all set -age. put in a submersible pump, and pump back to lagoon. If holes are caused by burrowing animals. trap or remov.- animals and fill holes and compact with a clay type soil. Have a professional evaluate the condition or the side walls and lagoon bosom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and For what duration? c. Anv damage noted, such as employee injury, fish kills, or property damage`' d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters? a. Are potable water wells in danger {either on or off of the property)? h. How much reached surface waters'? 0 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) resional office: Phone - - After hours, emergency number: 919-f33-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact Iocation of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct ENIS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number - - and local MRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: b. Contractors .�dd�zss: c. Contractors Phone: .7 Comae, the technical specialist who ce~iiTle the lagoon (N� ;Consulting Engineer. e.c.) • a. Name: b °hone: / c, ci " t.lcc Ilk 7: Implement proce,�ures as advised by DWQ and technical assistance agencies to rec,if% the damage. repair the sv stem. and reassess the waste management plan to Keep problems with re'.ease of wastes from happening again. • 0 Dairy Farm Waste Management Odor Control Checklist Source Cause / BMPs to Minimize Odor Site Specific Practices Farmstead • Dairy production Paved lots or barn • Wet manure -covered alley surfaces surfaces Vegetative or wooded buffers 0 Recommended best management practices W Good judgment and common sense Scrape or flush daily C( Promote drying with proper ventilation 62( Routine checks and maintenance on waterers, hydrants, pipes, stock tanks Bedded areas • Urine Promote drying with proper ventilation Partial microbial E� Replace wet or manure -covered bedding decomposition Manure dry stacks • Partial microbial 0 Provide liquid drainage for stored manure decomposition jf p Storage tank or basin • Partial microbial 0 Bottom or mid -level loading surface decomposition O Tank covers • Mixing while filling 0 Basin surface mats of solids Agitation when emptying E( Minimize lot runoff and liquid additions E� Agitate only prior to manure removal 0 Proven biological additives or oxidants Settling basin • Partial -microbial 0 Liquid drainage from settled solids Y surfaces decomposition 0 Remove solids regularly 11 f� • Mixing while filling • Agitation when emptying Manure, slurry, or • Agitation when spreading 0 Soil injection of slurry/sludges sludge spreader . Volatile gas emissions 7"Wash residual manure from spreader after use outlets 0 Proven biological additives or oxidants 0 0 0 Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Uncovered manure, • Volatile gas emissions while ❑ Soil injection of slurry/sludges slurry, or sludge on drying [" Soil incorporation within 48 hours field surfaces G" Spread in thin uniform layers for rapid drying ❑ Proven biological additives or oxidants Flush tanks • Agitation of recycled lagoon ❑ Flush tank covers liquid while tanks are filling ❑ Extend fill lines to near bottom of tanks with W14 anti -siphon vents Outside drain • Agitation during wastewater ❑ Box covers collection or conveyance junction boxes' Lift stations . Agitation during sump tank ❑ Sump tank covers filling and drawdown End of drainpipes at • Agitation during wastewater ❑ Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emission 4 Proper lagoon liquid capacity • Biological mixing l/Correct lagoon startup procedures • Agitation [T inimum surface area -to -volume ratio (J Minimum agitation when pumping ❑ Mechanical aeration ❑ Proven biological additives Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Irrigation sprinkler + High pressure agitation O Irrigate on dry days with little or no wind nozzles + Wind drift O Minimum recommended operating procedure Pump intake near lagoon liquid surface O Pump from second -stage lagoon 0 Flush residual manure from pipes at end of slurry/sludge pumpings Dead animals + Carcass decomposition 9 Proper disposition of carcasses Standing water Improper drainage 9 Grade and landscape such that water drains away around facilities • Microbial decomposition of from facilities organic matter Mud tracked onto • Poorly maintained access 0 Farm access road maintenance public roads from roads farm, access Additional information: Available From : Cattle Manure Management; .0200 RuleBMP Packet NCSU, County Extension Center Dairy Educational Unit Manure Management System —Lake Wheeler Road Field Laboratory; EBAE 209-95 NCSU—BAE igoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU—BAE Management of Dairy Wastewater; EBAE 106-83 NCSU—BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU—BAE Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings Florida Cooperative Extension 0 0 0 0 Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Liquid Systems Flush gutters • Accumulation of solids 0 Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed q 0 Remove bridging of accumulated solids at discharge Lagoons and pits . Crusted solids Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than b to 8 inches over more than 30 percent of surface Excessive vegetative • Decaying vegetation Maintain vegetative control along banks of growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Dry Systems "ceders Feed spillage Design, operate, and maintain feed systems (e.g., bunkers and troughs) to minimize the /d ecumulation of decaying wastage Clean up spillage on a routine basis (e.g., 7- to 10- day interval during summer; 15- to 30-day interval during winter) Insect Control Checklist for Animal Operations Source Cause , BMPs to Control Insects Site Specific Practices Feed storage • Accumulations of feed LY Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by ensuring drainage is away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain Wroducts) nspect for and remove or break up accumulated lids in filter strips around feed storage as needed Animal holding • Accumulations of animal f7r Eliminate low areas that trap moisture along fences areas wastes and feed wastage and other locations where waste accumulates and tsturbance by animals is minimal Gr Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed) Dry manure • Accumulations of animal O Remove spillage on a routine basis (e.g., handling systems wastes 7- to 10-day interval during summer-, 15- to 30-day interval during winter) where manure is loaded for W/O land application or disposal pp p 0 Provide for adequate drainage around manure stockpiles O Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed For more information contact: Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. `lortahty Management Nlethods (cN cl which methods) are beina implemented) 'i�/ Burial three feat beneath the surface of the Around within 2-1 hours after kno-,viedQe of the death. The burial must b at least 300 feet from any flowing stream or public body of water. ve �d Rendering at a rende ina plant licensed under G.S. 106-168.7 J Complete incineration ❑ In the case of dead poultry only. placing in a disposal pit of a size and design approved by the Department of ,�ariculture �1 Anv method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) • Form SLUR-1 Slurry and Sludge Application Field Record For Recording Slurry Application Events on Different Fields Farm Owner Facility Number - Spreader Operator Date Field Size Application # of Loads Volume of Loads 2 Tract # Field # mm/dd! Crop Type t ( r y) (acres) Method Per Field (aallons) SI = soil incor d (disked); SIR = broadcast (surface applied) . z Can be foundOinerator's manual for the spreader. Contact a local dealer if you do not have your is manual. .• Form SLUR-2 Tract # Field Size (acres) = (A) Farm Owner Owner's Address Owner's Phone # II* Slurry and Sludge Application Field Record One Form for Each Field Per Crop Cycle Facility Number Spreader Operator Spreader Operator's Address Operator's Phone # From Animal Waste Management Plan Crop Type Recommended PAN Loading (lb/acre) = (B) (1) (2) (3) (4) (5) (6) (7) (8) Date (mmlddtyr) # of Loads Per Field Volume of Loads t Total Volume (gallons) (2) x (3) Volume Per Acre (gallac) (4) + (A) 2 Waste Analysis PAN (1b11000 gal) PAN Applied (lb/ac) [(5) x (6)] + 1,000 Nitrogen Balance } (Iblac) (B) _ (7) Crop Cycle Totals Owner's Signature Certified Operator (Print) Operator's Signature Operator Certification # ' Can be found in operator's manual for the spreader. Contact a local dealer if you do not have your owner's manual. 7 See your animal waste management plan for sampling frequency. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (7) from (B). Continue subtracting column (7) from column (8) following each application event. J. MIKE LINDLEY 614 Mike Lindley Road Snow Camp, NC 27349 170 COW HOLSTEIN DAIRY 6,460 LBS PAN PRODUCED YEARLY (NRCS) 2 CALUMET LIQUID MANURE SPREADERS MODEL 3750 - 3750 GALLONS CALIBRATION: Each spreader holds about 3 500 gallons when loaded. Attached is a letter from the manufacturer stating that about 6000-7000 gallons are spread per acre. This is based on the farmer driving at 2 mph with a PTO speed of 1000 rpm. Based on information from the manufacturer and the dairy producer/operator in charge, the value of 7,000 gallons/acre is being used. WASTE ANALYSIS: Broadcast - 3.9 lbs/1000 gallons Soil Incorporated - 5.4 lbs/1000 gallons x"TOW Corn Silage - 114.94 acres Wheat Silage - —50 acres (double cropped with corn for silage) 0 NUTRIENT MANAGEMENT PLAN This farm has a total of 114.94 acres that are being used to receive manure. The crops being raised are no -till corn silage on 114.94 acres with about 50 acres per year being planted to small grain silage. The dairy will generate 6,588 lbs PAN/year. The animals on this dairy are only on the lot 50% of the time. Corn Silage/Small Grain Silage Nutrient Management • Corn for silage will be no -till planted in late March, April, and May. The manure used on these fields is broadcast applied. The corn is harvested in August and September. * Small grain for silage is planted in September or October on • approximately 50 acres of the corn land. The manure applied to these fields is soil incorporated. The small grain is harvested in May as silage. Late or tropical corn is then planted in these fields. 0 LINDLEY DAIRY 614 Mike Lindley Farm Snow Camp, NC 27349 Tract # Field # NRCS Farm Field # Acres Soil Type Crop Yield Per Acre Lbs Nitrogen Per Acre Lbs Nitrogen Corn Silage/ Field Lbs Nitrogen Sm.Grain Silage/ Field Maximum Nitrogen per Field 1278 1 2 13.93 232E Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 380.3 526.6 5182.00 1278 2 3 6.3 130C Corn & Small Grain Silage 17T145 bu 204lbs/108 lbs 172 238.1 1965.60 1278 3 4 2.68 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 73.2 101.3 836.16 1278 4 5 5.87 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 160.3 221.9 1831.44 1278 5 6 30.45 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 831.3 1126.7 9500.40 1278 6 7 16.24 130B Corn & Small Grain Silage 18T140 bu 216 Ibs/96lbs 443A 1740.5 5066.88 1278 9 1 10.26 130B Corn & Small Grain Silage 18T/40 bu 216 Ibs/96 lbs 280.1 387.8 3201.12 1310 1 8 7.86 212C Corn & Small Grain Silage 14T/65 bu 168lbs/156 lbs 214.6 297.1 2546.64 1310 2 9 9.93 131 B2 Corn & Small Grain Silage 18T/40 bu 216 Ibs/96 lbs 271.1 375.4 3098.16 1310 3 9 3.12 131 B2 Corn & Small Grain Silage 18T/40 bu 216 Ibs196 lbs 85.2 117.9 973.44 1310 4 10 6 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 163.8 226.8 2232.00 1310 5 10 1.6 232B Corn & Small Grain Silage 18T/65 bu 216lbs1156 lbs 43.7 60.48 595.20 1310 6 8 0.7 232B Corn & Small Grain Silage 18TI65 bu 216lbs/156 Ibs 19.1 26.46 260.40 Totals 114. 1 3138.1 1 5447,04 37289.44 NOTES: • The amount of Nitrogen applied to corn silage and the small grain silage was made using the liquid manure spreader calibration. it was also made assuming that only one application (2 loads) was made over the field. With corn silage this means that a total of 3,128 lbs PAN is applied. if the owners make two passes over the field, then the amount of PAN used is 6,276 lbs PAN which would still not exceed the amount of N that can be applied to the corn. • The amount of N used in the calculations is 12 lbs/ton of corn silage and 2.4 lbs/bu of wheat produced. The values used are from the Chatham and Wake County NRCS offices. • The figures for the small grain fields list all the acres that could be planted and the amount of Nitrogen applied if'one application (2 loads) is made over each field. The owner and/or OIC will determine which fields will be planted to the small grain each year. The values are listed so that they will know the pounds of nitrogen that can be applied based on soil type and yield. • All deficiencies in nitrogen and other nutrients will be supplied by commercial fertilizer. • Any changes to this plan will be discussed and made with the assistance of'a Certified Technical Specialist (CES or NRCS representative). 0 0 0 LINDLEY DAIRY 614 Mike Lindley Farm Snow Camp, NC 27349 Tract # Field # NRCS Farm Field # Acres Soil Type Crop Yield Per Acre Lbs Nitrogen Per Acre Lbs Nitrogen Corn Silage/ Field Lbs Nitrogen Sm.Grain Silage/ Field Maximum Nitrogen per Field 1278 1 2 13.93 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 380.3 526.6 5182.00 1278 2 3 6.3 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 172 238.1 1965.60 1278 3 4 2.68 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 73.2 101.3 836.16 1278 4 5 5.87 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 160.3 221.9 1831.44 1278 5 6 30.45 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 831.3 1126.7 9500.40 1278 6 1 7 16.24 130B Corn & Small Grain Silage 18T/40 bu 216 Ibs/96lbs 443.4 1740.5 5066.88 1278 9 1 10.26 1308 Corn & Small Grain Silage 18T/40 bu 216 lbs/96 lbs 280.1 387.8 3201.12 1310 1 8 7.86 212C Corn & Small Grain Silage 14T/65 bu 168lbs/156 lbs 214.6 297.1 2546.64 1310 2 9 9.93 131 B2 Corn & Small Grain Silage 18T/40 bu 216 lbs/96 lbs 271.1 375.4 3098.16 1310 3 9 3.12 131 B2 Corn & Small Grain Silage 18T/40 bu 216 Ibs/96 lbs 85.2 117.9 973.44 1310 4 10 6 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 163.8 226.8 2232.00 1310 5 10 1.6 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 43.7 60.48 595.20 1310 6 8 0.7 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 19.1 26.46 260.40 Totals 1 3138.1 =5447�04 37289.44 NOTES: • The amount of Nitrogen applied to corn silage and the small grain silage was made using the liquid manure spreader calibration. It was also made assuming that only one application (2 loads) was made over the field. With corn silage this means that a total of 3,128 lbs PAN is applied. if the owners make two passes over the field, then the amount of PAN used is 6,276 lbs PAN which would still not exceed the amount of N that can be applied to the corn. • The amount of N used in the calculations is 12 lbs/ton of corn silage and 2.4 lbs/bu of wheat produced. The values used are from the Chatham and Wake County NRCS offices. • The figures for the small grain fields list all the acres that could be planted and the amount of Nitrogen applied if one application (2 loads) is made over each field. The owner and/or O1C will determine which fields will be planted to the small grain each year. The values are listed so that they will know the pounds of nitrogen that can be applied based on soil type and yield. • All deficiencies in nitrogen and other nutrients will be supplied by commercial fertilizer. • Any changes to this plan will be discussed and made with the assistance of a Certified Technical Specialist (CES or NRCS representative). 0 0 9 0 - Sk INDUSTRIES, INC. P.O. Box 1685 •Wausau, WI 54402-1685 (715) 359-0200 • FAX (715) 355-5349 0 (800) 558-2945 P�� Al I iv v % / ? %a Semis^,L- b r /'i7' /j s'cc; 'q Tom, L't "o L' F- -D h )? 4 e' Z} -1D /p S� /')7 y/A/& ''i T- ye,' i- Plant: 505 Industrial Park Avenue a Mosinee, WI 54455 Animal Waste Management Plan Cert.t:ication (Please type or print all information that does not require a signature) Exi�g � or New - or _ Expanded (please circle one) General Information; Name of Farm: b cL,rL IJCA LG�--t _ _.Facility No: r- Owner(s) Name: Phone No: 1.1 We3_,2�j9 Mailing Address: �� ..JQhr( 1-.i�c�_lC_ 5riyt.) �nir C 7, _ Faun Location: County Farm is located in: Latitude and Longitude:~ Please attach a copy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): 1 f5 47/) - �ocR� A � Ace � xcel r r ! ohd � J 3.3 � i�x eGd 1 ,3 3 % . '%h 1 `-; i .S i+ Oueration Descrintion: Type of Swine No. of Animals Type of Poulin, No. of Animals Type of Cattle No. of Animals J Wean to Feeder 7 Layer A Dairy I `10_ 1 Feeder to Finish ❑ Pullets D Beef J Farrow to Wean J Farrow to Feeder D Farrow to Finish Other Type of Livestock. Number of Animals: Expanding Operation Ouly AW j Previous Design Capacity: Additional Design Capacrty� R F Total Design Capacity•: Acreage Available for Application:_ � `i �+ - - Required Acreage:�� Number of Lagoons 1 Storage Ponds : Total Capaci Cubic Feet Are subsurface drains present on the farm: YES or NO (please circle one) If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one) Owner 1 Manager Agreement I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental ,Management before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal waste. 1 (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. 1 (we) know that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DEVI or a new certification (if the approved plan is chanced) within 60 days of a title transfer. Name of Lan Owner.: F: J t-A Signature: k�' %fEI �.� Date:!i Name of M-anavrif ditferen[ r ow r): i ) " Signature: ✓ Date:_�!'i�. - -- _ • .s WC -- January 1. 1997 Technical Specialist Certification LAs a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005. 1 certify that the animal waste management system for the farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 2H.0217 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001-.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WLT, RC, I), the technical specialist should only certify parts for which they are technically competent. II. Certification of Design A) Collection, Storage, Treatment System Checkthe appropriate box ©/ Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements. D New, expanded or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print):_ �_Jjrl -j-L Jr Affiliation; �i ` Address(Ag cy): OC Phone No..:91�-.5�101 �O Signature: Date: I A 1 B) Land Application Site (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; hydraulic and nutrient loading rates. Name of Technical Affiliation:Cbb Address(Agen ):� Signature: �� C) Runoff Controls from Exterior Lots Check the appropriate box ❑ Facility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print): Affiliation: L._kjR4-kArrx 60'a u,r Address(Aue cv): bpM NIL, •_4-�S LZ Phone No.l�; Signature: v Date: +� AWC -- January 1, 1997 D). Application and Hat«„ing Equipment Check the appropriate box �Exi,tina or expanding facility with existin waste a lication a ui meat (WUP or I) Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the . waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates, a schedule for tinning of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as pan of the plan). ❑ New. expanded. or existing facility without existing waste application eauiprnent for snrav imaatton. (1) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). ❑ New, expanded. or existing facility without existing waste application equipment for land spreading not usinasprairrigation. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as pan of the plan). Name of Technical Specialist (Please Print): To VJ4 A Affiliation: Cciop,' r ch ip &&Pew Y rrvn do ryi U _ Address(A-ency):400 i-t= 061 1 z e, e kok-,L4, 2761 J -11Phone No.:'114 '.In 110 � Signature: "1_rf E) Odor Control, Insect Control, -Mortality Management and Emergency Action Plan -(SD SI, WUP, RC or Il The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality ;Management Plan and the Emergency Action Planare complete and cap be implemented by this facility. Name of Technical S Affiliation: Address(A2e . cy): P. r Signature: alist (Please Print): ate: R• VILi7LlUP-C F) Written Notice of Neµ• or Expanding Sivine Farm The followine signature block is onlv�to be used for new or expanding sine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when -was it constructed or last expanded 1 (we) cenify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street. or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the notice and a list of the property owners notified is attached. I (I. Name of Land Owner. Signature: Name of Manaber(if different from owner): Signature NVC -- January 1, 1997 Date: ate: • III. Certification of Installation A) Collection Storage Treatm nt Installation Ne%v, expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certration is necessary. 1,14 Name of Technical Specialist (Please Print): Affiliation: Add re ss (Agency): Phone No.: Signature: Date: B) Land Application Site (WUP) Check the appropriate box R( The cropping system is in place on all land as specified in the animal waste management plan. ❑ Conditional Approval: all required land as specified in the plan is cleared for planting; the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/year)-, the proposed cover crop is appropriate for compliance with the wasteutilization plan. ❑ Also check this box if appropriate if the cropping system as specified in the plan can not be established on newly cleared land within 30 days of this certification, the owner has comritted to establish an interim crop for erosion control; Nance of Te hnical Specialist (Please Print): 0— r 1 � Affiliation: — t ►c Address(Age cy): Phone No. 2- Signature: G� Date: 1 9 This following signature block is only o be used when the box for conditional approval in III. B above has been checked. I (we) cenify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to D£M a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Alanager(if different from owner): Signature: Date: AWC -- January 1, 1997 C) Runoff Controls from :terior Lots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use areas have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation: 0i Address (Agencv): Signature: ru D) A Check • Vo + .. 7fopriate block Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as pan of the plan. LI Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. ❑ Conditional approval: Animal waste application and handling equipment specified in the plan'has been purchased and will be on site and installed by (monthlday/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): I L A J-dLl AAJ • Afftliation:.C,)oa('rt,-c,f,Ye-nSi�� 52r\/: cz Address(Agency):Lk;ni-& LLr4a _,l?:::�z (zo.�e,�4 z�tc-zy,y —Phone No.:�t� l [ Signature: ';?, •-z'� The following signature block is only to be used when the box for conditional approval in III D above has been checked. 1 (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of 11lanager(if different from owner): Signature: Date: E) Odor Control, Insect Control and Mortality 1llianagement (SD. SI, WUP, RC or I) Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system as specified in the Pla has a50 been installed•and ' operatio ,Nnal. ,Name of Technical Specialist (Please Print):__ Erfr� U_ _ _. Z4 Affiliation: Address(Aaen y): -t'. Signature: WC -- January 1. 1997 is • Please return the completed form to the Division of Water Quality, at the following address: Department of Environment, Health, and Natural Resources Division Of Water Quality Water Quality Section, Compliance Group P.O. Box 29535 Raleigh, NC 27626-0535 Please also remember to submit a copy, of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal NN"aste Management Plan. AAVC -- January ], 1997 MAR - State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director May 14, 1999 CERTIFIED MAIL RE—TURNT REQUESTED Jonathan m ey Jonathan Lindley Farm 1800 Johnny Lindley Road Snow Camp NC_27349 Farm Number:" 19 -16 Dear Jonathan Lindley: ,Tk?W,A IT NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES You are hereby notified that Jonathan Lindley Farm, in accordance with G.S. 143-215.1 OC, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has sixty (60) days to submit the attached application and all supporting documentation. In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit,'the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call J R Joshi at (919)733-5083 extension 363 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700. Sincerely, for Kerr T. Stevens cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Sox 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Wa4I% Producer:ft)E al��� �t� Location Telephone: RECEIVED Type Operation: — ewe WATER QUALITYSFCTION Number of Animals: /70 _ _ _UU1 0 6 1999 (Design Capacity) Non•Disd)arge permitting The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed to determine nutrient content before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrient's can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special, precautions, waste may be applied to land eroding at up to 10 tons per acre per year. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under North Carolina Division of Environmental Management (NCDEM) .0200 regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 1 6. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. F - °�'1 rkr i+'�+'ra _f r I` �h,a :�� �i?•. ��: S�� Ra"y ' F r f,..h hr�� .� 7�, f L, ., �. •, -t�; q fi: i* �i � .. Amount of Waste Produced Per Year(gallons, ft3, tons, etc.) 1 I'10 animals xn&d4amt .) waste/animal/year = O #a,1 (amt .) waste/year Amount of Plant Available Nitrogen {PAN) Produced Per Year 1-10 animals XA & lbs . PAN/animal /year = jam 30 16:L. lbs . PAN/year. . (PAN from N. C. Tech. Guide Std. 633) Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a tamely manner. The following acreage will be needed for waste application based on the nitrogen (N) requirements of the crop to be grown and assuming surface application: Table 1: ACRES OWNED BY PRODUCER Tract Field Soil. Crop Lbs. N Acres Lbs. N Month of # No. Type Per Ac.* Utilized Application i7 • : it •,= �� � � = � -� ice• -�: «� "-- � Total p q: s l 184.3l_ V Q.%&o Z, j * This N is from animal waste only.. If nutrlents from other sources such as commercial fertillzer are applied, they,must be accounted for. N must be based on realistic Yield expectation. a NOTE: The applicator is cautioned that P and:K may be over applied while meeting the N requirements. Beginning in 2996' the Coastal Zone Management Act will require farmers in. some. eastern counties of North. Carolina. to have a nutrient management plan that addresses all nutrients.. This plan only addresses: Nitrogea_ 3 ­ -=,lip Ime *Penn Table '2:ACRES ON. TERM 139*99 fAgreeMent with adjacent landowner must: be attached) (Required only If operator does not own adequate land (see -Required Specification 2)) Tract Field Soil Crop Lbs. N Acres Lbs. N # Type Per Ac.* Utilized Month of Application [a -is 19 1 Zg2 C_ RESCUXl 10-aki tal 11 13 1 Ala a 17 '7all% 14 .521an 0R 1 - GA al'7 tang -0- sagg I ac; .340 lao lais 18 5aSS _911ag adle IWIS 19 su 58 —a..93 3(0& 130 A !JAS aq. oi 4igall 0, Z: W-Fiek 7MW . Via IN 5T45 W.. 7, ;-tip 110_1�16 A - 1:4. mri4mWZ _.."e, 777, _44 Vw tn' •41 :kw, 0 See footnote for., Table, 1'. _ '4 '�` k' � r s •1 Ri�:,�, ti:::4� Vie: � .,�` ..r- t;• �.. 1• . _��.r..� a a1» 'l " tl• '��V•� 9f ��e sr,2r3G-RI .t ''a.5`rk. .t 'err ale Z.. I.r A. ''!.N ar-f{; y� 1 V' p i t 4'� '4'P4� l,R}K�}}�k�f� � 3d� rrixpj +4, S FN k..i 1� ,,,.$� _ � ,,, t';4 .3h �5r r•nl J y Y yJ•Y�,' h�'`G �51 ;w�.cArl•'1 _ rJt� r'rr r r ;� W84 s„ i-�'` r-'r'i��' ri.�d �}"- I'.4. � ,� �n..s+.t1't- �? • l ' 7'tfr�y+ • 1��'"• �• r� • y r r i1 a +:,. • tly r ; �'+�iC �: r 'ze iµt ''mo�d ."'�' f-Rn'+" r+� r`R !'., [0. tS`•��!`yk'1,�f1,!-t�w^S A - y, :a U $y ,�.iy3'J,, ytT "•. �}}g- REV �'il�y6 S •III 5 • ,'S - t �-^�y t t ,1,' >ti 2., _,fir, '3i y, ii F-� r +t{t' Sy,r f1k�:3'�aVl�e� lost � 'e } S`'f i 4 � [s , a 'r^: ~•.,k r, �l r la4 i; 4Ar� '7rFa t4' f r !§ t i es r�t 9 1�k4a �' J H"JCi rif3 r• i ]` ft r{ v 3t� i Ca r{'"' i.(' R"'. 1r� �i err r i-t i{- f r ;�.,[! • /' -s� r�� l Ef t` j,en 1 f r} t i N} �'Fd•' yF.�p. Z [� � �' � { M1 Y� r ,jj l�h,�f�''� y q�iy #�y������� �" - . `�F�.� � ? �'� $ }t+' �+�.� x,� R �i �'i1 d'�1"f'�i r''.'r'i�•�'�t 3: $ �� Y', A4» '� Xi a• #+5. F i41 iT 4 3 ':F` i � +� 3 ""ilv: �1'�ti 'sl ' J r � E✓ a { ° f - �� � s� � 4 � vra 4 C,�/'�•S- a A �4f 3l S5: i3 X' rT1T� S 1 t, a .rr i1sk i P Y. �' ri 7 /a r't 4 p S jLy:Tr "4 3.h" 't.l:•j i 1?� 4 1�r - .�F'�9, '. a'»t'.i�r,', e`.yh.. 1F'�Jy lJJ•+= •,.;,T•s �r-..r}lli 4 �t�ir r Y ei• l.x tw yr 5• L� �)�ft y }.-0 �4 f tx% {p r`°uf�. 9 � � '•fy $ r+'�j�•-f°"^�i � �`r *' a`F�t'f,��✓�,i. �4 r' ���.ii "�hl } ,#'i,`YI� � sh�?�?."..: s< ��, t.�` 1, 351�. {i� L�M' k� y } at" rf'� r� ,a •Q T 't Z� '» 'S 4: ..,rrr .r 1�.3 i t� t �a Ar^'r�-� Y i1 ! ( I,+i� t� .� � 1 `� � �'.oF}3•{ t e:'s .. M..s:..,�Rt.+.`�i`5:.'..������1�i?.a�:C:` •liW.53'� �r+�r:'rJ�T4.�:e�.n.r•Z�'.�'L t.�+f.n�.�'!*�;-t{�'. 'ii.^, � f ` l! 1� -.�'r' i+; C'�""',�',€(4rx .o,i •. ` r '•y'•° rr,,, '"e`y��.�l"k'- -. ' i�' +1 rti"z +r.+i= 3 , �3 Fe.� ,�'. ^• i+ ��. rr<." �� 1. .w E1�'jr'r-;� w r r tr �'? - � ,rf - Fr-i r "�+ a»a .. �• r . ��xr P .-3r - h' A '.vr.`'T � � h �''�•. x, k 'd } •, r �r - j' r!" t q-r rc.,.�» �' ,�. r- ,ui3: ��3�.th •t •$.'. i 'i. r y. W li �t r t, r +, .lr ii/2!.. �'�• r.§`' J ., 70 Yr €1 yrpla SI t i }' �� 1 r r 5 ..''i ' j ir. r ^'i� p fit �^{ 'vE.�,i i„ Is� � i,� 6r �'�` � � - a'.•� t 'Ti4'}�� i' '�lr°J; A.� '?r rr t€4 l +s a y:. r(i.. d`i'7r o-'a.J'Fe.�k,-.+f�yv+.•j r-I `�T' it r✓�{��"r5,r �z "',�•qe•�'��^''. �°` R. .y.r5r f�'?r•. ,^ u j. •Tu"�}; ' �P+• 40'�� �•'� r��-: ..�a�.Y� 1 r f4 y tr. � F r F� �•y1-1�..i x4P.r r`.. r if '^' st � ' r 4: �. '� iA _+ P f ,•:_ L r ls• i4t• K @-'.S'' r�i{.,,t„ r t r n t #•� ti ++,, ` •1N »1' r. r'" b ci ' '!`yf'�r� ih (. T yr k+�.41( r'i�� +y�a'•Y �:- c h �1 » �,• `� �}'�..t.�'• 'r`�,'� " C7 ' y'' 1r� t i 1j�� \•! /( ��d .*y7 �y}/{r-�t�1y� �x !.'; 4. !! 7'Y.b 1d y {{ ~y S 'i";ry �, ;. 1 a •. { iCl i l� l,4 ; y'',` SrJrT 1� P 1 �! " i yS; 1,yiA,y"'•.,y�,�',,t�rF1F.i. 4°'�SN{yt"'}_`�r <+�'I��i �A.0 �7 ,SF'`c�s�•.4y}.e&d '?.rl'�+1. _F r����f�y'r' -I` .+�F q' "a•,-+ :h '�r'ry�i'x r{F,. F11��"€..r I'«•ti�`yir Kr ;. - „'i'.Y `,R'"1, f�.1 u� 1 . rr �+1� y:x:s -.Ff' 1e'3,w it w � ,'•4"�' �. .l�f r. , rr a d.. �w�1`r "� r� � � �; � • iC 7' �- • I ' S ",�i"y� � , � A yT � ? S •. • t 't f f € ], y, � ;# s r �' yfj� �, �,.i ��4i' L..;i '3. � °''7` •,''+�,�i4.�r �`S;w�:�y Ji. "�`j." "�6c,y �" +l ° r rr `� �� �' '`t � r�+i � � rl r t 1' S r � - , �. ; +.Yt/ r ;�;�i� �f i 4, ':7•., f ! a re,'T. t * _l. ?�.. r „ �..ri �t� e }1 T i +-.t:,+ - 0 r r 3 n`•���ir���rz'� ry >rY ri"r�,tg,•SYjr � F 13tn'r�Rr' ; i1 r t � { S :Tr I " r 't �?.t ; s+€yr, yr. Irr ','' .•F rr;. A .• p ""r � } r � 3 'k.0 r `} .G- r �1l�1e:r C B .-i t y r s L ..r„Le.�t U'll"L �� ut�H� ''r/y 1t 4� wr r'°' SsN3 r Y F'i1,r eyet•Pr�K+� a�°q x` =rr � � �• ",t 5 ,n,;°s��` �"i 3�� v °. � d++ ri`�" � •�' }d.r, t.� � nit. �� rr r f � 'li yr rt ; ,`•'"*yy �,_. „sf1'3.t 1;• �' a.r, Y S is ., i ply" r.. 3 y� +t t ` i yay x,,. i ti h i s ti R �' •i� I,r 5.( � T i ,'15: ,e r'rti,].�,' 1 r a '[. ♦ ` 1- ti^5L'•{_.1 ... 4 r f t"a (( y fi _r " 1 "dal - ! Y ,y'• r � •4�. .�1 ,. , .. 1 '�., 1 t," A +-.tva ,; -f. f rM w l r �.�, F9r `^ *• " -•T � • °1.rr7L I € a i wS-r1t '""+ls , y►1".rx »». 'I.fl •L'` i ";. rY -.5 {Wj . 9srar 4rTe'c k y o f " r 'v r J1u t •q�ra r as , ,i hti'yY '�1r^� r '1-.' i, -€ r r!- ':f -r .• • 1` r 1 . , ,h`' t � . � , - r r '. € i i + .j� r y17�� f r+`, ".� "' r5'" il.�, r r �rJ E" t� r w y 3e +z1 r ' S r .� r4 •.l r .�r�. N tr �€ •r r..( "�.-..�' - 14 r 1,y {e~rtt. krr� �1`,}° �', °'r•• `•.. "'.�'4�"r »w�. Y -� �, 'f �•r r i• '� l�r � K�•, 'f YF >. aj -f S3'• � �:. r �J / r s, ty 413 � ��. �T f • �,+ j - Y ��' s ' � , ,`Y1,�1 .r _ f F ` S, _ j Sr •s;' yy 9 c 1. . l a r.�r tT Ir r i •1 ri • w � � Lff• � `'r' H 1i•L'1'� J.r �. � "4tiP" a.�*+1 ! r�,� ,1^Z' r r? '` ,..y"'' j, '� r•-��S „�t i.�i-» rr t'-A• rr � � .�, � � •'t r � = d¢ i th fi � �ti €' 1;y1'�� d a� •?1�1 j�l'r�FCi.A��}�e.�°,€��S'�1� .tid� �r��Fr�����,�_� ','�1 _big. rlit �' ,ye�rqiiF fi . ;u rr � > t ; t1 M1y � A`�;�! rr•f rr-I- PUT +n! y. F •a �e. s y(:�,�?'�r� ' � + F � r �' � :��r �" h A yµ. ` I' I,�� i.• p.� k i.t_• 2a.w. W'^ �r '. •?y �t�� » n.,b'_ : A. �i 9Y "�.. .`k .. ee ih�Ltl. r•^. a �,�Cl . �-.:i �'3 .e.. '`€•'f 7"$:r-ti 0 I N� - - - -,% .1� iwt �Yt Sky p s - PIN f ;J1- 1� All 4�p� "0 4- j, k.-, - 1 a, Al 4� vA Fn my not♦ j , t, . ,., �, .1 . .1, _ . -1 1 1 " � ��. ;. � yis who.• lot I W., 7 ell W�j Qjj1Z Its, j J,7�. 7d.,. NOW 0 RX w; Table 2:. ACRES WITS AGRLEMENT OR LONG TERM LEASE (AgreeWent.with adjacent landowner must be attached) (Required only it operator does not own adequate land toes Required Specification 21) Tract Field Soil Crop Lbs. N Acres Lbs.''N Month of # Type Per Ac.* Utilized Application See footnote for Table I. Totals from above Tables Acres Lbs . , N Utilized Table 1 113,,51 30.0 Table 2 3a. E�: to, D'a 19 Total 1416.11 lib.043 Amount of N Pro uced I /a'9.20 surplus or eficit {Q, V, 1 NOTE: The Waste Utilization Plan must contain provisions for periodic land application of'sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. 4 Your facility is designed for ISO of temporary storage and the temporary storage must be removed on the average of once every MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION, (Use additional sheets as needed to describe the operation of the system within the context of the livestock operation) 9 fled 19 aAC _L"Ct j j Lin ,JA 56--r4 �O 0^ P 5 PO 'Form Qvn L rG Su, r �4t at- L4,JOj01'J- s WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation 'or land application. Any discharge of waste which reaches surface water is prohibited 2. There must be documentation in the design folder that the producer either owns or has a notarized agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of a notarized agreement with a landowner who is within a reasonable proximity, allowing him/her-the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of'utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. Actual yields may be used in lieu of realistic yield tables at the discretion of the planner. 4. Animal waste shall be applied on land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at more than 5 tons but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393-kilter Strips) 5. Odors can be reduced by injecting the waste or disking after waste application: Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste should be applied on actively growing crops in such a manner that the crop is not covered with waste to depth that would prohibit growth. The potential for salt damage from animal waste should also be considered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum'and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop or forages breaking dormancy.. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a Lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any -perennial stream or river other than an irrigation ditch or anal. NRCS, NC JUKE, 1996 WASTE UTELI4ZATION PLAN REQMED SPECIFICATIONS (continued) Anirnal waste other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present (See Standard 393 -Filter Strips), 12. Animal waste shall not be applied closer than I00 feet from wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animals waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by over - spraying. Animal waste may be applied to prior converted cropland provided it has been approved as a land applications site by a "technical specialist". Animal waste applied on grassed waterways shall be at agronomic rates and in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17.. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc, are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19, Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible permanent markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Soil tests shall be made every two years and a liquid waste analysis be taken at least twice each year consistent with waste utilization plan. Poultry litter shall be tested prior to application. Soil and waste analysis records shall be kept for five years. 23. Dead animals will be disposed of in a manner that meets NC regulations. NRCS, NC JUNE, 1996 WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Environmental Management (NCDEM) before the new animals are stocked. I.(we) also understand that there must be no discharge of animal waste from this system to surface wasters of the state from a storm event less severe than the 25- year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDEM upon request. Name of Facility Owner: ePlease print) Signature: Name of Manager(I Signature: Name of Technical Date: a. I �&) 9-1 er) Date:a� !A i97 Specialist: (Please print) �itn nl Affiliation: Address (Agency) : �. ©. 2mC. _a1-a Signatures LOLA C-14—'Date: 11 WAS?E_4J��UZ��fy� Pk -AI ` ANIMAL WASTE UTILIZATION .AGREEMENT (Needed only if additional Iand has to be leased, etc.) I hereby give 3—QX10 PrN1144IL4-yarm permissil to apply animal waste from his Waste Utilization System on� acres of my land for the duration of time shown below. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Date: Waste Producer: J Date: lal IR dqi Technical Representative: _ "r4 �ux� _Date: SWCD Representative:_ Date: Term of Agreement: ,7.9— to (Minimm of Tea rears On Coat Shared Stela) (See Required Specification No. 2.1 2a 12 # No. th C:. Agricultural Ext1 s-ion Service Iof 3 AQ7ri-Waste ,Ma--no'gement. Biologica] Knr Agncui Ural Engineering North Carolhw State University LIVESTOCK WASTE SAMFLING, ANALYSIS AND CALCUTATION OF LAND APPLICATION RATES ' James C. Barker* I. SANTLE COLLECTION A. Semi -Solid Lot Manure i. Scraped directly from lot into spreader a. From loaded spreader, collect about 2 lbs of manure from diflEerent locations using nonmetallic collectors. ii. From storage a. Collect about 2 lbs of manure from under the surface crust avoiding bedding materials and using nonmetallic collectors. B. Liquid Manure Slurry i. Under -slotted -floor pit a. Extend a 1/2" nonmetallic conduit open on both ends into manure to pit floor. b. Seal upper end of conduit (e.g., by placing a thumb over end of conduit) trapping manure that has entered lower end, remove and empty slurry -into plastic bucket or nonmetallic container. c. Take subsamples from 5 or more locations or at least I quart. d. Mix and add about 3/4 pint to nonmetallic sample container. ii. Exterior storage basin or tank a. Make sure manure has been well mixed with a liquid manure chopper -agitator pump or propeller agitator. b, Take subsamples from about 5 pit locations, from agitator pump or from manure spreader and place, in a plastic bucket. Professor and Extension Specialist, Biological and Agricultural Engineering Department, North Carolina State University, kaleigh, NC. -3- 3of3V II. SA21PLE PREPARATION AND TRANSFER A. Place sample into an expandable container.that can be sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or treat in any other way. B. Pack sample in ice, refrigerate, freeze, or transfer to lab quickly. C. Hand -delivery is most reliable way of sample transfer. D. if mailed, protect sample container with packing material such,as newspaper, box or package with wrapping paper, and. tape. E. Commercial sample containers and mailers are also available. Contacts: i. AFL Eastern Agricultural Lab, Inc. iii. Polyfoam Packers Corp. 7621 Whitepine Road 2320 S. Foster Avenue Richmond, VA 23237 Wheeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 ii. Fisher Scientific Co. iv. NASCO 3315 Winton Road 901 Janesville Avenue Raleigh, NC 27604 Fort Atkinson, WI 53538 Ph: (9195876-2351 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NCDA.provides this service for North Carolina residents. i. Address: North Carolina Department of Agriculture Agronomic Division Plant/Waste/Solution Advisory Section Blue Ridge Road Center P.O. Box 27647 Raleigh, NC 27611 Ph: (919)733-2655 Attn: Dr. Ray Campbell ii. Forward $4 along with the sample. iii. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock- usage (swine -nursery, finishing; turkey -breeders, brooderhouse, grower, number flocks grown on litter; etc.) c. Waste type (dairy -lot scraped manure, liquid slurry; swine -pit slurry, lagoon liquid, sludge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N, P, x, Ca, Mg, Na, S, Fe, Mn, Zn, Cu, B v. Additional analyses performed upon request: DM, Mo, Cd, Ni, Pb CALIBRATION Applicators can apply manure, litter and wastewater at varying rates and patterns. depending on forward travel and/or PTO speed, gear box settings, gate openings, operating pressures, spread widths and overlaps. Calibration dell es the combination of settings and travel speed needed to apply manure, litter or %vasiewate, at a desired rate and to ensure uniform application. Spreader Caoacity Liquid spreader capacities are normally rated by the manufacturer in gallons. Multiply gallons by 0.0042 to get tons. Solid and semi -solid spreaders are rated by the manufacturer either in bushels or cubic fee. (multiply bushels by 1.2Y to get cubic feet}. Most spreaders have nvo rating capacities: I) struck or level full, and 2) heaped. Since manures and litters have different densities. an on -farm test should be done. Fill a five -gallon bucket level full with material to be spread. Do not pack the material in the bucket but ensure that it settles similar to'a loaded spreader. Weigh the bucket full and then empty. Nfultiply the weight of the contents by 1.5 to get pounds per cubic feet. Nlultiply this value tunes the cubic feet capacity of the spreader and divide by 2000 to get the tons of material in a spreader load. manure weight, Ibs x I.5 x spreader capacity, ft3 . 2000 = spreader load, tons Spreader Calibration Calibration .Method 1: This method is most useful for liquid spreaders but can be used for all types. Spread at least one full load of manure preferably in a square or rectangular field pattern for ease of measuring with normal overlaps. (Measure the length and width of coverage recognizing that the outer fringe areas of the coverage will receive much lighter applications than the overlapped areas. Multiply the length by the width and divide by 43560 to determine the coverage area in acres. Divide the tons of manure in the spreader by the acres covered to determine the application rate in tons per acre. spreader manure, tons - (coverage length, ft x width, ft � 43560 ) = application rate, tons/acre Repeat the procedure at -different speeds and/or spreader settings until the desired application rate is achieved. t3PLJIP - Ceccm'oer 6. 1996. ?'_,e - i 7 Example: What fonvard speed would be needed to apply 6.0 tons litter per acre from a spreader with a 6-ton capacity. a 5-minute spreading time, and a 25-feet spreading Nvidth? Forward speed. mph capacity, tons x L 95 time (min) x width x rate, tons per acre 6 tons x 495 5 min x 25 ft x 6 ton per ac, e 4 miles per hour Calibration 1Lfethod ?: This method is often used for solid and semi -solid spreaders. A taro or plastic sheet of about 100 square feet (9'x12', 10'x10',,etc.) should be measured for enact surface area (lenmh x width), weighed using a set of spring -tension or platform scales, then spread and pinned on the field surface. The spreader should be operated at its normal settings, speed and overlap. With a rear discharge spreader, three passes should be made: the first directly over the center of the sheet, the other two on opposite sides of the center at the normal spreader overlap spacing. The sheet with the collected manure should again be weighed. Subtract the empty sheet weight from the total weight to get the weight of the collected manure. Multiply the pounds of collected manure by 21.8 and divide by the collection area of the sheet in square feet to get the application rate in tons per acre. collected manure, lbs x 21.3 / collection area, ft'- = application rate, tons/acre Repeat the procedure using different settings or speeds to obtain the desired application rate. S reader Pattern Uniformity To determine the uniformity of spread and the amount of overlap' needed, place a line of small pans or trays equally spaced (2-4 feet apart) across the spreader path. The pans should be a minimum of 12" by 12" or 15" diameter, no more than 24" by 24", and 2"-4" deep. Make one spreading pass directly over the center pan. Weigh the contents caught in each pan or pour the contents into equally sized glass cylinders or clear plastic tubes and compare the amount in each. The effective spread width can be found by locating the point on either side of the path center where the manure contents caught in the containers is half of what it is in the center. The distance beoween these points is the effective spread width. The outer fringes of the coverage area beyond these points should be overlapped on the next path to ensure a uniform rate overthearea. "l.l", "W", "steeple", or "topside" patterns are not satisfactory and one or more of the spread --.- adjustments should be made. DPLti1P - pc:: -csr 6. 1996, Pav- - 13 Form SLUR-1 Slurry and Sludge Application Field Record For Recording Slurry Application Events on Different Fields Farm Owner Facility Dumber Spreader Operator Date Field Size Application # of Loads Volume of Loads 2 Tract # Field # Crop Type i (mmlddlyr) (acres) Method Per Field (gallons) (r ' SI = soil incorporated (disked); BR - broadcast (surface applied) 2 Can be found in operator's manual for the spreader. Contact a local dealer If you do not have your owner's manual. Form SLUR-2 Slurry and Sludge Application Field Record One Form for Each Field Per Crop Cycle Tract # Field # Facility Number Field Size (acres) = (A) Farm Owner Spreader Operator Owners Address Spreader Operator's Address Owners Phone # Operators Phone # From Animal Waste Management Plan Crop Type Recommended PAN Loading (lb/acre) = (B) (1) (2) (3) (4) (5) f61 m rat Date (mMdd/yr) # of Loads Per Field Volume of Loads I Total Volume (gallons) (2) (3) Volume Per Acre () () t4) (A) 2 Waste Analysis PAN (lb/1000 al) g PAN Applied x (Ib/a+) I(5) (6)1 t �000 Nitrogen Balance B) - ( ) (B) - (7) Crop Cycle Totals Owners Signature Certified Operator (Print) Operators Signature Operator Certification # Can be found in operators manual for the spreader. Contact a local dealer K you do not have your owners manual. ' See your animal waste management plan for sampling frequency. At a minimum, waste analysis Is required within 60 days of land application events. Enter the value received by subtracting column (7) from (B). Continue subtracting column (7) from column (8) following each application event. EMERGENCY ACTION PLAN PHONTE 1YUMBERS DwQ S 1- _1 ENIERGEtiCY NIANAGE. v YSTENI — 91 SWCD 9 +9 54a-Sa o NRCS This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait unto wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible Iocation for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation. this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to bean to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is enterina lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b: Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. EvaIuate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include.. a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to elirrunate further discharge. d. Repair all leaks p-ior to restarting pumps. D: Lealcaae from flush systems. houses. solid separators -action. include: a. Stop recycle pump. b. Stop irrigation pump. C. :%U-e sure no >iphon occurs. J. S[op::I1 Ilt)%%; ii1 1l1e house. flush systems. �r seii�i separators. IS. 19910 e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage. put in a submersible pump, and pump back to lagoon. b. if holes are caused by burrowing animals; trap or remove animals and sail holes and compact with a clay type soil. c. Have a professional evaluate -the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters? a. Are potable water wells ih danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - - After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , locaI SWCD office phone number and local NRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and explain vour . problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: b. Contractors address: c. Contractors Phone: i 6: Contact the technical specialist who certified the lagoon N�S, Consulting Engine.-r. etc.) a. Name: rn' tz- v ,•c b. Phone: - y0 7: Implement procedures as advised b%, DWQ and technical assistance agencies to rectih the damage. repair the system. and reassess the waste management plan to keep problems with release of wastes from happening again. Cece„ih�: 1996 Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices =- : Farmstead • Dairy production Vegetative or wooded buffers 0 Recommended best management practices E( Good judgment and common sense Paved lots or barn • Wet manure -covered Scrape or flush daily alley surfaces surfaces r i EI( Promote drying with proper ventilation 5c Routine checks and maintenance on waterers, hydrants, pipes, stock tanks Bedded areas • Urine 11 Promote drying with proper ventilation • Partial microbial i/ Replace wet or manure -covered bedding decomposition Manure dry stacks . Partial microbial Cl Provide liquid drainage for stored manure , decomposition Storage tank or basin • Partial microbial 0 Bottom or mid -level loading surface decomposition 0 Tank covers • Mixing while -filling 0 Basin surface mats of solids • Agitation when emptying E( Minimize lot runoff and liquid additions 17( Agitate only prior to manure removal 0 Proven biological additives or oxidants Settling basin • Partial microbial O Liquid drainage from settled solids surfaces decomposition 0 Remove solids regularly Nl • Mixing while filling • Agitation when emptying Manure, slurry, or • Agitation when spreading CI Soil injection of slurry/sludges sludge spreader • Volatile gas emissions Gd" Wash residual manure from spreader after use outlets O Proven biological additives or oxidants N Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Uncovered manure, • Volatile gas emissions while 0 Soil injection of slurry/sludges slurry, or sludge on drying Soil incorporation within 48 hours field surfaces Q' Spread in thin uniform layers for rapid drying 0 Proven biological additives or oxidants Flush tanks Agitation of recycled lagoon O Flush tank covers r . liquid while tanks are filling 0 Extend fill lines to near bottom of tanks with anti -siphon vents Outside drain • Agitation during wastewater IQ Box covers collection or conveyance's junction boxes Lift stations • Agitation during sump tank 0 Sump tank covers filling and drawdown 141 14 End of drainpipes at • Agitation during wastewater 0 Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emission Proper lagoon liquid capacity • Biological mixing M(/Correct lagoon startup procedures • Agitation l3' inimum surface area -to -volume ratio f_--. Ctl Minimum agitation when pumping 0 Mechanical aeration O Proven biological additives Dairy Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Irrigation sprinkler a High pressure agitation 13 Irrigate on dry days with little or no wind nozzles a Wind drift C3 0 Minimum recommended operating procedure Pump intake lagoon liquid near surface C7. Pump from second -stage lagoon O Flush residual manure from pipes at end of slurry/sludge pumpings Dead animals a Carcass decomposition - Proper disposition of carcasses Standing water_ a Improper drainage Or Grade and landscape such that water drains away around facilities a Microbial decomposition of from facilities organic matter Mud tracked onto a Poorly maintained access C] Farm access road maintenance public roads from roads farm access Additional Information: Available From Cattle Manure Management; .0200 RuleBMP Packet NCSU, County Extension Center Dairy Educational Unit Manure Management System —Lake Wheeler Road Field Laboratory; EBAE 209-95 NCSU—SAE lgoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU—BAE Management of Dairy Wastewater; EBAE 106-83 NCSU—BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU—BAE Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings Florida Cooperative Extension Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects ' Site Specific Practices Liquid Systems Flush gutters • Accumulation of solids ❑ Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed �l ❑ Remove bridging of accumulated solids at - discharge Lagoons and pits • Crusted solids 11 Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 to 8 inches over more than 30 percent of surface Excessive vegetative • Decaying vegetation Maintain vegetative control along banks of growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. _ Dry Systems _ eeders + Feed spillage El Design, operate, and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage Clean up spillage on a routine basis (e.g., 7- to 10- day interval during summer; 15- to 30-day interval during winter) Insect Control Checklist for Animal Operations Source Cause , BMPs to Control Insects Site Specific Practices Feed storage Accumulations of feed 9' Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by ensuring drainage is away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain /�roducts) D In pect for and remove or break up accumulated lids in filter strips around feed storage as needed Animal holding • Accumulations of animal areas wastes and feed wastage LAY Eliminate low areas that trap moisture along fences. and other locations where waste accumulates and isturbance by animals is minimal Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed) Dry manure • Accumulations of animal 0 Remove spillage on a routine basis (e.g., handling systems wastes 7- to 10-day interval during summer; 15- to 30-day interval during winter) where manure is loaded for f� land application or disposal 0 Provide for adequate drainage around manure stockpiles 0 Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed For more information contact: Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. Ni lortality Management Methods (check which methods) are being implemented) Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must b at least 300 feet from any flowinc stream or public body of water. ye, - Rendering at a rendering plant licensed under G.S. I06-168.7 Complete incineration In the case of dead poultry only. placing in a disposal pit of a size and design approved by the Department of Agriculture J Anv method which in the professional opinion of the State Veterinarian would mad e possible the salvage of part of a dead animal's value «without endangering human or animal health. (Written approval of the State Veterinarian must be attached) 0 1 J. MIKE LINDLEY 614 Mike Lindley Road Snow Camp, NC 27349 170 COW HOLSTEIN DAIRY 69460 LBS PAN PRODUCED YEARLY (NRCS) 2 CALUMET LIQUID MANURE SPREADERS MODEL 3750 - 3750 GALLONS CALIBRATION: Each spreader holds about 3500 gallons when loaded: Attached is a letter from the manufacturer stating that about 6000-7000 gallons are spread per acre. This is based on the farmer driving at 2 mph with a PTO speed of 1000 rpm. Based on information from the manufacturer and the dairy producer/operator in charge, the value of 7,000 gallons/acre is being used. WASTE ANALYSIS: Broadcast - 3.9 lbs11000 gallons Soil Incorporated - 5.4 1bs/1000 gallons CROPS: Corn Silage - 114.94 acres Wheat Silage - —50 acres (double cropped with corn for silage) NUTRIENT MANAGEMENT PLAN This farm has a total of 114.94 acres that are being used to receive manure. The crops being raised are no -till corn silage on 114.94 acres with about 50 acres per year being planted to small grain silage. The dairy will generate 6,588 lbs PAN/year. The animals on this dairy are only on the lot 50% of the time. Corn Silage/Small Grain Silage Nutrient Management • Corn for silage will be no -till planted in late March, April, and May. The manure used on these fields is broadcast applied. The corn is harvested in August and September. • Small grain for silage is planted in September or October on approximately 50 acres of the corn land. The manure applied to these fields is soil incorporated. The small grain is harvested in May as silage. Late or tropical corn is then planted in these fields. � w- LINDLEY DAIRY 614 Mike Lindley Farm Snow Camp, NC 27349 Tract # Field # NRCS Farm Field # Acres Soil Type Crop Yield Per Acre Lbs Nitrogen Per Acre Lbs Nitrogen Corn Silage/ Field Lbs Nitrogen Sm.Grain Silage/ Field Maximum Nitrogen per Field 1278 1 2 13.93 232E Corn & Small Grain Silage 18T/65 bu 216lbs/156 fbs 380.3 526.6 5182.00 1278 2. 3 6.3 130C Corn & Small Grain Silage 17T/45 bu 2041bs/108 lbs 172 238.1 1965.60 1278 3 4 2.68 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 Ibs 73.2 101.3 836.16 1278 4 5 5.87 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 160.3 221.9 1831,44 1278 5 6 30.45 130C Corn & Small Grain Silage 17T/45 bu 204lbs/108 lbs 831.3 1126.7 9500.40 1278, 6 7 16.24 130B Corn & Small Grain Silage -18T/40 bu 216 Ibs/96lbs 443.4 1740.5 5066.88 1278 9 1 10.26 130B Corn & Small Grain Silage 18T/40 bu 216 lbs/96 lbs 280.1 . 387.8 3201.12 1310 ' 1 8 7.86 212C Corn & Small Grain Silage 14T/65 bu 168lbs/156 lbs 214.6 297.1 2546.64 1310. 2 9 9.93 131 B2 Corn & Small Grain Silage 18T/40 bu 216 Ibs/96 lbs 271.1 375.4 3098.16 1310 ' 3 9 3.12 131 B2 Corn & Small Grain Silage 18T/40 bu 216 Ibs/96 lbs 85.2 117.9 973.44 1310 4 % 6 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 163.8 226.8 2232.00 -1310 5 10 1.6 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 43.7 60.48 595.20 131.0 6 8 0.7 232B Corn & Small Grain Silage 18T/65 bu 216lbs/156 lbs 19.1 26.46_ 260.40 Totals 114.94 3138.1 5447.04 37289.44_ NOTES: • The amount of Nitrogen applied to corn silage and the small grain silage was made using the liquid manure spreader calibration. It was also made assuming that only one'application (2 loads) was made over the field. With corn silage this means that a total of 3,128 lbs PAN is applied. If the owners make two passes over the field, then the amount of PAN used is 6,276 lbs PAN which would still not exceed the amount of N that can be applied to the corn. i The amount of N used in the calculations is 12 Ibs/ton of corn silage and 2.4 lbs/bu of wheat produced. The values used are from the Chatham and Wake County NRCS offices. • The figures for the small grain fields list all the acres that could be planted and the amount of Nitrogen applied if one application (2 Ioads) is made over each field. The owner and/or OIC will determine which fields will be planted to the small grain each year. The values are listed so that they will know the pounds of nitrogen that can be applied based on soil type and yield. • All deficiencies in nitrogen and other nutrients will be supplied by commercial fertilizer. Any changes to this plan will be discussed and made with the assistance of a Certified Technical Specialist (CES or NRCS representative). r`- _i (Imperl'al 0 INDUSTRIES, INC. v � ! P.O. Box 1685 • Wausau, WI 54402-1685 (715) 359-0200 • FAX (715) 355-5349 • (800) 558-2945 f if .Lz;— C 04� U Ai F /' / ,; ! S,,F k/A L 741 W �,�'�.� Wj1.L SJ`���,�1� /� � ,� Ie�'Ti��� ��J'G�4x : ✓4C��� (�-L, hRee"A")-D Gr�C� TG o G4 Ya L'�q / n" d 'E"t Plant: 505 Industrial Park Avenue • Mosinee, Wl 54455 Realistic Yield Expectations by Soil and Crop 50IL5ERIE5 Cnm- Gram Com Silas Sor- ghum Cotton Wheat Oats Barley Tob, FC Tob. But. Soy- bean Berm P Berm Hay Fes Pas Fes Hay Pasture Alfalfa Over Rye Summer Ana BO AC S • FSL; L.:. • .: 120 . • • 900 45 • • 1900 1900 40 4.7 5.5 • • • + ' OJAC LF5; IS 90 • 730 40 0 0 18D0 1800 30 • + • �B (O( LING FLGOD; NONE; - 120 • • • 60 80 • • • 40 5.4 63 3.4 4.5 + ' • • - BG G gCCAS. Fi OOD. 100 • • • so 6$ • • • 35 • • • ' • • • + G :. - 85 + • 100 2600 26M 30 4.7 3.5 130 29 • so 6.7 6.7 • Ile + • 45 • 3000 4.3 - 4.5 • • $RIWSO .GRAVELLY SS 35 2600 ' • • 3.S 3.5 • •. e • • • . • • • • . . 2.9 4 12 2 • ' • • .. BRA55rOWN 8i • • 60 4 4 - B VARD,,:: t .: 108 • • ' 65 75 • • 2600 • • , • 3.8 3.5 B OO UNORAINED • • • • • . . s + • 3A 4 3. 3.5 • • • • - DO DRAINED- 13e • 55 60 45 • • . • 1$ EAN -.;,_ 7p • . • • s s • . . . 3.1 3.1 COMBS _;--... 60 • 45 • 20 55 • 1700 1700 • • ' ' 2.0 2,0 m MBE OCCAS • • • 1.5 1.5 BUNCOMBEFREQ •6 6 6 0 1.5 1.5 • • - $ 100 ' • ' 50 • • 2400 2400 35 4.7 5.5 • ' • • • •- BYARS DRAINED Ito • • • • 65 • 40 3.4 4 J 3.5 • ' • • - . OY_ c;,.;.,.. 55 • s a • 20 • 20 3.2 3.9 • • . s • _ GITIDOR. ,. 45 • •. • • • 1700 1700 20 4.7 5 r FEAR DRAINED.140 • ' • • 45 • • • • • • • WIPWIINDRAINED • • • • • • 3.4 4 3 - 3.5 • + •� OLINE FSL; S14 L; SIL; ' 115 • • ' 60 ' • • ' 40 5.1 6 3.2 3.8 • • ' _ CAROLING C14 SCL . so • • • 40 • • 34 • • • • • • -- CB..=a;r 95.. • • 750 90 ' 3100 2100 35 3.4 4 3.8 4.5 4.9 ' • ' CECILGRA-VELLY- 70. • ' 500 ' 70 • 16W 1600 25 3.4 4 3.8 4.5 - 3.3 • ' ARY. ;, 6S -•. • • 2000 2DD0 20 4.7 3.5 • + �+ O DRAINED 13D :. • • • 55 • • • • 45 4.7 5.5 3.9. 1 4.5 • -' • 4CHARLESTON. 90 • ! • • • • 40 4.7 5.5 3.7 4.3 • - t AiN.00CAS . 50.... • • • ' ' 25 ' ' 2.5 3 .. • ' 7EE .. 3 b. 135.. 27 ,. 50 . 45 • • . 2,9 ' 75 _ . . • 40 • . • . . . . • 2. 2.8 • • ' ._ CLA RARE; OCCAS ..100 _ • • • 50 70 • • • 35 4.2 5 3.8 06.6.. _ ! ' _ • C ACLA FREQ to • • 30 40 30 0 0 • 4.5 .0 CKAHOMMY D ED 80 • • • 40 • • • 25 • • s 3.5. 4_ - _ , MUMMY Y tftkA &b - • . s . . • • . • • • • 2.7 3.1 • ' " .. -•� _ C 50 • • • • ' 2000 2000 20 4.7 5.5 • • . • • G 90 16 ' • 40 • 45 ' • 35 • • • • 4.8 -,-. • • •.�. "s CLEVELAND 70 s • • • • • • • • • • • CLTWN 100 • • • • • 24DO • ' J.5 3.5 • • •m CODOR S 130 26 ' ' 45 80 • • ' • • ' 4.2 4.2 • • 4.5 _ COLFAX 75 15 • • 40 60 • • 30 L' • 4.9 NCSUINCCES Nutrient Management Manual --- Reference Section 66 W4 rM3: i far Realistic Yield Expectations by Soil and Crop SOIL SERIES n t# Y,; r: ; _•: ;';...:.f Corn- Gain Com Silas Sat- 8hum GAlon Wheal Oars Sisley Tab. FC Tob. Bur. Soy bean Berm P Berm Hay Fes Pas Fes Flay Pasture Alfalfa Over Rye Summer Ahh V bS • • 40 • 30 • • • 3.5 ' • • IOR NONE; RARE .. 100 • • 523 45 • • 2200 2200 40 4.51 5.3 3.8 4.5 • ' IOR OCCAS ,.. • • • 35 a 0J5 • • . • s . N717 '* 5 77`e ! . 50 • • 3.4 4 2.9 3.3 • s DEL UNDRAWED ' • ' • • • • • • ' 3.4 4 3.9 4.5 • , DRAINED'-. 120 • ' 550 • • • • 45 • • • • • • 90 18 ' • 40 40 1 ' • 35 2.3 3 2.5 3 2.LILL ! • + INGTON _ , 80 0 • 650 • 10 1 • 2100 2100 30 3.7 4.3 2.5 3 5 • • ' Tfsr_- 40 • • 400 • 50 • • . . • 2.7 • . • LQNON ►s'i 95 19 « . • • • , _ . • • 3.9 3.9 « .LONON GRAVELLY 90 18 • • • , • • • • • 3.5 3.5 ,LOUISBURG:..;'-; 55 • • • • 70 • • 30 3 3.5 2.5 3 s a ,LOUISB GGRAVELLY 20 • • ' • so • ' 20 3 3.5 2.5 3 ' 'LO ISBUROSTONY • ' ' • ' ' ' ' ' 2.5 3 3 3.5 1.8 BURG VERY STONY ' • • _ ' • • • ' ' • ' ' ' ' ' ' ' LUCYa_„ so • • 650 • • ' • 33 4.7 5.5 ' ' 5.5 • • ' .LUMBER DRAINED. 110 70 45 3.3 4.5 3.8 4.5 • . - CIiBURG �a :, 115 • • 675 • 75 ' 2800 1 2800 45 4.7 5.5 3.9 4.5 • ' ' LYNN HAVEN , 70 • • • ' ' ' • • • 3.4 4 2.4 2.8 iSON 90 ! 55 760 • 85 = 2100 2100 J 3.5 2.5 3 4.5 bLMUSORO 100 ' ' 100o • 2500 2$00 40 5.1 6 3.2 3:8 ' ' • • 'MARLBORO WET 100 • ` 1000 • ' • 2300 2500 40 5.1 6 3.2 3.9 ' • ' VYN � R:. ; . 75 • • 900 ' 50 5.1 6 3.2 1 3.8 • • 20 24 1 0 50 75 5.1 6 3.2 3.8 3.8 ' • 4.5. JdASADAGFLAVELLY 115 22 • • 45 70 ' ' • 5.1 6 32 32 33 • ` 4 M�aAr�SAD.A ERODED; 90 20 • 40 60 2.7 . 2.7 2.7 • 3.8 .. a$=A.STONY ' : • • • • 3.4 4 3.8 4.5 4.5 ONTOWN UNDRAINM, • • • • • • • • • • 25 3 IMASONTOWN DRAINED; •.. 90 • ' • • • • 30 95 ' 55 650 • 85 2100 2100 3.8 .4.3 3.4 4 4.5 • ' .±JAYODAN STONY ' • ' • • • • • • • 3.5 41CCOLL DRAINED 90 • • • • 65 • 35 3.4 4 2.5 3 ----------- ,!AEqKLWOURG :; 90 • 55 550 • 70 ' • ' 40 3.4 4 3.9 4.5 3A) • MEGGV T.NONE; RARE 75 • • • • • ' 40 ' • 2.5 3 . MEGGETT DRAINED 100 • • • • s0 • 60 • 40 • 30 • • • • 20 • • • 3 3 -MOCKSVUIE 85 • • 50 • • • • 35 • ` ' • 5.1 • ' ONACAN DRAINED 120 ' ' • 60 So • • • • ' • • 4 • + 5 ,MQNACAN UNDAAWED • ' 50 So • ' • • 3.5 • • _ 4 , .MONACAN OCCAS 80 • • • 50 50 ' • • 3.3 • • 4 MONACAN FREQ 8o • 50 SO • ' • • ' J.5 • 4 NCSUINCCES Nutrient Management Manual - Reference Section 70 Realistic Yield Expectations by Soil and Crop SOIL SERIES com- Grain Com silat e Sur- Chum Conan Wheat 0215 Barley Tob, FC ' Tab. But. Soy- bean Bens P Berm Hay Fes Pas Fes [Jay Pwturc Alfalfa Over Rye Summer Ann WO-NMN _IA . 3.9 4 4.3 MOUSHAUNEE, 93 40 2300 2300 30 3.2 4.3 W-C •FSL4 4 3.8 4.3 3.4 4 4 MUNDE4 514 L 130 F 50• •1 0 40 5.1 6 3.4 4 4 EN LS-,LFS 105 45 • - 30 bmVIIAL.". 3.4 4 2-4 2.9 A7T NONFti RARE. 115 23 70 35 3.9 4.3 3.9 4.5 WA-77 ONE; RARE; occAs. ,HAHUHTA 120 675 2900 2900 45 4.7 5.5 3.8 4.5 RAW DRAINER 140 * 40 50 4.2 4.3 3 3.5 7RANKRUNDILA1NED so 4 2300 2300 1 35 5-4 6.3 3.4 4 jKAHTAHALA_,o.. 120 2$ 2300 • 4.0 4.0 5 90 LE 45 70 0 30 3 3.5 3A 4 3 ON,GRAVELLY 90 Is • 4$ 70 0 30 3 3.5 3.4 4 4.3 4NASON GRAVELLY, GR-SICL To— 14 30 60 4 23 4 95 45 30 4.2 3.9 "0 14 FSL, SL; DRAINED 130 t 50 a 40 3.9 4.5 3.4 4.2 4NIMMO LS-. LFS. DRAINED 110 0 45 .•35 •NIXONTON. 140 6 55 50 5.4 6.3 3.4 4 5.6 cNOBOCOA.,,!_ 113 0 700 60 3000 3000 45 3.4 6.3 3.4 4 NORFOLK? 110 700 3000 3000 -NORTHCOVEA,. 1-3 13 MAKBOR0 OCCAS. 90 • 43 70 60 • 35 6. ,OAKIMO fUQ - so • so 30 4.8 73_ 2600 2600 35 4.3 5-1 75 30 3.4 4 3A 4 115 2500 2500 40 5.5 6.5 3.7 4.3 so 16 • t 25 2.5 J t 2.4 2.8 It GRAVELLY 80 16. • 45 50 25 .2.5 3 1 2.4 1 2.8 3.1 • t••• ••••2.4 2.9 2.5 1 3 .3 JRO i i., 120 900 • 1400 2400 45 5.4 6.3 3.4 4 • iqWGEBURG LOVERWASH 120 900 2400 2400 45 5,4 6.3 3.4 1 4 70 3.4 4 3.4 1 4 1.0 2,0 70 2.8 2.8 50 20 31 4.5 A so 7D0 2200 2200 6 3 3.5 215 4.2 4.5 ,PACOLET. GRAVELLY; GR-SL-. go t • 700 2200 2200 4 3 3.5 2.5 3.9 4.3 ACO GRAVELLY; GR- j 500 1900 1900 3.3 3.9 • :S, . 65 1800 1990 25 4.7 5.4 'PAMI ICO UNDRAINED FA-AUC-0 DRAINED 115 so 40 PAMUCO LOAMY NcSU/NCCES Nutrient Management Manual - Reference Section 71 k--. Realistic ,.OIL SEP'M- COM- Cain Solt- I Cotten I It M., „ Grain Sills gh ••63 VNI110 25 DOX -.SAUiXT'0-wP -1 W-- ! 0, 4 ,SAW,SL4 OR-Sr-L 75 100 It 105 go 375 ;SHELDCTA 9 Yield Wheat • 35 45 4 40 40 4S 4S Oats 4 ••30 30 40 65 6 Expectations parley 4 * •0 • 1 0 Tob. FC 0 2000 by Soil Tab, Dui. 2800 - -- 2400 2000 1500 1 and Soy - bean 30 25 - 35 30 35 1 crop Venn P 0 0 4,7 1.4 Berm Hay 5.4 3.3 3.9 2.8 1 Fes Pas .5 2.5 1 Fes I Hay 4.4 3.5 0 44 Pasture 4m 4 3.5 3.6 44 Alfalfa I 4 L Over lky4 a • • swumet AM 4 .7E .SP�PAAY. 45 2 5 25 2.7 a 'STALUNGS 100 550 . 2500 2500 2'. 375 4.7 4.7 S.5 7 3.7 43 U Ila • 00 6900 • 75 40 4.9 5.1 NONE; RARE 130 60 30M 3000 45 SA 63 3.4 4 5.1 3.1 %lE , T r OCCAS 110 2700 2700 35 0 5 4.6 SATLeRKONE, RARE 130 55 2400 45 0 318 3.8 I rAM 125 t - 50 2300 45 0 7 3.9 TLEIiFREQ 100 40 3.3 3,5 85 60 6 3.3 51 3.9 3 3.5 SiU 90 so 1600 1600 35 0 5.5 • LS 111 40 _26()0 _1601 30 4 4SL• .L 125 45 2800 2800 35 5.4 6.3 3.4 4 • 75 12 2 2 2:5 330 • 50 2.1 2.4 ti so 20 32 1 4.5 105 65 75 2600 3-5 315. jAn GRAVELLY, 100 60 70 2500 3.5 3.5 & X . .90 so 70 -)o 3.4 4 3 3.5 -3- JAIUMPMVELLY '90 Ig 1 50 70 10 3.4 4 3 3-S 3 90 45 35 6, 6 9 4 .110 RAR1r; 90 • 63 900 3.9 9 75 3.9 .75 t 23 3.8 4.5 3 3.3 • 3 4 A (PONDED 75 23 3.8 4.5 3 35 3 4 75 Soo 2400 2400 23 4.5 3.3 .3 4 &MMUTLEXI)RAINO.; 130 0 6 40 3.3 4.5 3.8 4.5 3, 4 APRHUNTA DR"ED. 120 45 70 0 40 3.8 4.5 2.3 3 . J 4 UWAXIDRAD6D 110 20 5 5 .9 XA 4!.UMPAMM. 3 3 IJWSYLVANA 12-5 24 4.3 4.3 -77-- ,TMU)C NONE; RARF; 30 • 23 .3.7 4.3 3.8 4.5 3 4 NCSU/NCCES Nutrient Management Manual - Reference Section 73 SCS—CONS— 228 low. 6.71 (file Cos. CONS-14) CONSERVATION PLAN Mi. UNITED STATES DEPARTMENT OF AGRICULTURE SOIL CONSERVATIONS WCE cooperating with �� / Conservation District Owner _ L/ D.N/�/G ��i on/ �iN��� 5i _ Pian No. _ - /2 7 g pate 3 -5-9 6 Operator ��� Scale , �= �00 Acres Apprasinwrle Approximate /y, C� Photo No. County Stull Location (community, watershed, road & distance, etc.) --fir-- � Vovl4i'IJ� r e4 od" rt L N, Y ilt. A�, SCS-ENG- TU. S. DEPARTMENT OF AGRICULTURE',* ."Rev. 540 SOIL CONSERVATION CSERVICE S� .1N TOETERMNESUITABIs� i 'ROPOSED POND SITE FARMER'S IJAME' DISTRf&— DATE �Coumff S. C. S. PHOTO SlIgET NO. — WORK UNIT WATERSHED -AREA MEASUREMENTS CROPLAND ACRES PASTURE —ACRES WOODLANDACRESTOTAL' ACRES POND CLASS,, -WORK. IT CONSEEiVATIOi IST..' S SKETCH OF PROPOSED POND SHOWING WHERE BORINGS WERE MADE (ApproX. aisle 1', fiat) Locale reference point in center line of dam and identify an sketch. L % SHOW BORING NUMBER AND PROFILE DEPTH Make and' list dam -site and spillway borfogs first - then Pcmded arm and bo"vw pit borings - separate with wrtical "d line- (ContYromed on back where noccuary) Show um&r table elevations an dam -site barines. SCALE - I j 2 4 5 It 1 7 11 8 1 9 J*�-j 111112 JJA# 14 0 15 116 q_$ 118 1191120 q 21 22 SC WRIMINNINSIMS I Ilia ayse 3JlYf i'-o'd nwV3VIC ;Jf a 4'KATEIR tAL(ENCOUNGS .TEED IN, T IJZ, IIPQ(Use.i.of.systems. ' &t4T _---UNIFIED. CLASSIFICATION-__'rrY'J �.t _VWA.JCLASSjFIPAT1Oq1_,�z__ I A r.*iu sand. iiiiigravel G1W i'd a elii�-jiiv—el—, 7-3'42ri? CIT.01(17. a :t GP- Poorly graded gravels M43KVTk.,.1.TN �XIA GM -Silty gravels; gravel -sand -silt mix I vfs -very fine sand ,-%Clayey_grav6ls;_ graW.Isand-��Y.. mix. GC., ­A­'?7 S W iQ1"Rd­` 4jraivel,mii�--Z ine Nfe-1` j sandyjo --L SP'- Poorly. graded isands,A) SM -Silty sand gi - gravelly loam - SC' -Clayey sands;8- 'a' inid -'c a y M J L a ores r-; 5 ML.% S i Its;. 4 i Iti, fin e ands; s a!ndj.orq jay 'silt" !Sil-sililoam CL -Clays 'of low to medium plasticity cl -clay loam -CH ;--Inccganic clays -of high pla' sicl -silty clay MH - Elastic; silts I scl -sandy clay: loam OL'-Organic silts and ays, pla�iticitiF­ ;'... , _ii" __ sic -silty clay'!" C-S OH -Organic clays, medium to high plasticity _c.-Clay 1. -Suitable material for embankm nt is available Yen No !Indicate wlte. w,located on ih. 3"frA an ruurse side} REMARKS. 2. Explain .ba zarde­ requiring special attention in design (seewo4r, spring, -Fuck &)r.) GENERAL REMARKS. 7:- 24 25 116 27 1281.29 30 j j 31,1321133-1134 .10 11 38 1137 1314 39. 40 41 42, 43 11.44 1 45 1 46 147 148 149 1150 161 h -7 T- IF FT FT -7 1, n 71 7- 7= k � r Cot, 437 tu. SEF, Armr-Hco N C.:-,EN';. 40 1/Ir/N i v�i�.Ile, -. SXo r LX)7%4 -,-� e, XIgo lnys v- ' ,-� U ON LOT ,aHwlaA� - .S AaopW U41e,)- X 170 6> u� 7,y8,'016 If 3 s ZD1- 5_5 # 759 4- `ifs i I- mQ r'c _. 0��r;l 31,45 - _ J. A9 _ ,97 z7 _ ZD, q 3 Div eltPS L :.. � w Z �_..S�arr►� OAJ 4t ON 1,91V1 /- - .. r. {jJ �337 .Aly D•-)i.0 PO Ava/, C �.�� vA Y STORAGE �R�op�:'� ZG .r . �.-78 o. s7' q, zG 5 z /osy/s � 8 x'. - i U. S. Department of Agriculture' NC-EAG-34 Sail Conservation Service. Se tember 1980 Me Code: 210 ^to c J6,4­192110,HAZARD _CLASSIFICATION iQATA qf4t,noqi�s-f nei.i9q -d )'I&y IS 'r. jf�, Landowner �Fouqv Community qr.-Lqrq4p NoConservati on .? -Plan Na. Estimated Ft. bod.-ftdl: .pth of Waterto ToP:6f,Dam_­ �5, t.; Length ofJ1 Date of Field Hazard Investigation. &7LIt, n downstream to the.,point,of.-estimated minor ,,,,effect Evaluation byi-reach.offl , ood.,plai top the --A -1 nnc"�, from sudden­t. am-failuri. Est. ElevFtion Est..Elev. ,,!Kin mprovemen of ts' of Breach p n , Reach: Length: Width:, •Sl�k­' 'Land Use, Im ro eit6i is'', -Above :Floodwater dwa - ter Above '-Flood Plain' :-,"Flo d Plain Ft. �Ft. % Ft. Aj -70 2 30 rd5kZ4L • 7p* poll/el 3 Describe potential for loss of life and damage to existing or probable fu improvements from a sudden breach 411 oij aLe au,Z ___6y r Mt1j __ Hazard Classification of Dam (a, b, c) (see NEM-Part 520.21) Dam Classification (1, 11, 111, IV, V) By Concurred By (name) (title) NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. re downstream 'A. 2 114 --1 Date tZZ Date �-su3f�ot•fpA io 3ns��sGeEi .2 .� - CS2I ^�odrtWd e 30fi7se noi3sv^�saR03 fie? CIS :sboO alf INSTRUCTIONS A11 dams built w thTechriical�assistance'l rom,rthec§ f,1'.-`Conservation Service must have_a hazard classification assigned by the person responsible for ----- approving -the-desi'gnf.'o'Most farm. ponds,_except-'in'borderl.ine-cases:,�can"��€iwobr,r:�:. be classified after a�complete,field investigation without assuming, failure and--making.--breaE •studfesJ'Y fki" data sheet is-to_be_used�for the information obtained through field studies and for documenting the --' hazard' cla"Yfi'catfon.� F�Where there:.i's::..a.-possiail ity for-,1'oss` of'I fferor major property damage from a dam failure, an approved breach routingr procedure is to be used. ---.(Consult•.with -the -area. engi neer:') b' s=5 �.. .':, �, �, -.rl !'"i" i`�'�"--'+n.Xn f."f Li' nr4$ _.'• n:.^.r-at- �, ..1. -. .. ,. .. Hazard 'dlassificatidns- of' -dams -,are made, by evacuating`��the poss�ibi•I"ity for loss of 1 i fe and the extent of damage that would result if ltlfg'dam _;�111`- s.- ,;--should-•suddenly--breach--that is--a-section-of_.the._dam-.be..suddenly_and_ _,._._ ,completely.WasheVout.- It.,is,to.,be assumed that a wall of water Will be . w released equal :to -`the height: of * the dam. 'This flood wave will be 'reduced: ,in -height as :it•"moves down -the'flood plain.'- The Wave',height:(-depth'-f i :flooding)-'shoul'd be-evaluated•.for a. -sufficient -distance downstream until-.:....- _. the estimated flood level will not cause significant damage to'improvements, - -such as -homes, -buildings, roads, utilities,•reservoirs, etc. The breach flood level will be reduced depending on the valley storage, slope, and - openess of the:°flood-plain; however, in a narrow-steep..valley slopes. steeper than 10% should be given special consideration. One method of evaluation is -to compare available valley storage (under flood conditions) to impoundment storage (figured to the top of the dam) for each reach evaluated with a judgment estimate made of the flood wave hei.ght.at all critical points downstream. Should there be any questions about the hazard classification for a dam, -the area engineer should be consulted before making design commitments. rti ZZ 2.Jn'sd7. 1-40'li:L'.�'}:`. U. S. DEPARTMENT 0,- AGRIMTURE Soil Conservation Service LARTHWORK COWMATION SHEET EARTH EMBA1l1Ql,ENT NC-ENG-12 Rev. 6/82 TpP//of z)�Ip 9%' Fo-� 0 YYt S4 , Address /I z Embankment: Top Width lz _ _ Side Slopes STATION FILL HEIGHT ( Peet) SUH OP END AREA END AREAS (Sq. Pt.) (Sq. Ft.) DISTANCE (Feet) DOUBLE VOLUME ICU -Ft.) . 8z5 a ±3 3 z S 3 0 397$0 s 41 3795D 3 0 5 0 z sb 2- -F-� 7 3 z 7 70 / / 7, 56,5 1. Double Volume of Fill t 2g� 7 �Z,S Cu. Ft. 2. Volume of embankment fill (line 1 f 27) z 177 Cu. Yds . 3. Allowance for -settlement (5 or 10X of line 2) _.j O Q Cu. Yds. 4. Total cubic yards (line 2 + line 3) '° 2 Z 8 �_ Cu. Yds. Computed by � Date G 7 93 Checked by ti Date 6- U. S. DEPARTMENT OF AGRICULTURE Soil Conservation Service EARTHWORK COMPUTATION SHEET EARTH EMBANKMENT NC-ENG-12 Rev. 6/82 Name To w4 Y L 1 N D LC Y Address Cw1ATHAM CO. Embankment: Top Width ) 2 Side Slopes 2 3 : 1 T^a nG 71.a nn 44.0 STATION FILL HEIGHT (Feet) END AREA (Sq. Ft.) SUM OF END AREAS (Sq. Ft.) DISTANCE ( Feet) DOUBLE VOLUME (Cu. Ft. ) 0+00 o O 0+33 2.0 3 11zZ 35 42 04- hB �L. D 8 8 2 5 0 37 250 1+ os (D. 0 16z. y-I 8 o z �o � g. o zs� 51Z 5 0 0 i+�10 `�.D �5� 18 S 0 3 4+0 z + So (,.0 to 2- z50 52 3 000 3f OZ �!. a 8R 122 µ3 52d 3+ 2.0 3+ t3�,_ 0 0 q8 1 2 1. Double Volume of Fill + 2 a _49,9 99 1 _ Cu'. Ft. 2. Volume of embankment fill (line 1 + 27) m f. Cu. Yds. 3. Allowance for settlement (5 or 10% of line 2) _ 9� _ Cu. Yds. 4. Total cubic -yards (line 2 + line 3) 9 Cu. Yds. Computed by Date 3 U . S . DEPARTMENT l , 'AGRICULTURE NC--ENG-12 Soil Conservation Service'' Rev.-6/82. EATaMMRK COMPUTATION SHEET I EARTH Name Addre Embankment: TQP_U"taa__ - Side Slopes e z : / 3111 - STATION FILL HEIGHT (Peet) END AREA i 8q. Ft.) sum OF END AREAS (Sq. Ft.) DISTANCE (Feet) DOUBLE VOLUME (Cu. Ft. ) �..I �.�'I: a'I.r•:i •- -- -r D+SS - 5lob �o ;sd o00 tD5 Zo 7 63 o9�Z t 49, z 8 3 s l38 59 1. Double Volume of XUl t Cu._ Ft. 2. Volume -of QV&n a �o fill (line I t 27) Z Co % Cu. Yds. 3. Allowance for- seeclummat- (5 or 10% oKline 2) _ Cu. Yds. 4. Total cubic yards (line 2 + line 3) _ 25 % 7 Cu. Yds. Computed by 4�-to] 3 Checked by yTp Date US`. DEPARTMENT OF AGR1CL . J .� NC-ENG- 40 Soil Conservation Service 5/83 LOCATION CODE PLAN OF EXCAVATED WASTE STORAGE POND NAME ToLINNY Li N DL.EY ACP Ir` DATE 9 3 DISTRICT C N ATH A M LENGTH 81DE SLOPE 2 TO 1 Aj q �V Co` * o ti AVE. TOP ELEV. o fV I i — --- — "— yt,� �� 't3.% MID SECTION CL 1 �m AVE. BOTTOM ELEV. I. LENGTH Al EJt✓a��ati7 91, 3 5.3 " 11+. szcn 9 �7 09 4 8, 02 0 Volume - depth [area of top) + (area of bottom) + (4 x area midsection] - 63 O ZS Cu.Ft. 6 Use of facility Capacity Gallons Volume Cost -sharing Cu. Ft. Soil type B. M. description Elev. SUMMARY Bottom Elev. S(a.O Normal liquid level Elev. 9 1. 3 Storage for normal precip.(Ft) + 0.;0 Maximum liquid level Elev. �. Storage for: 25 yr. freq. precip. (Ft.) + Crest ESW Elev. _ 9T j Stage (Ft.) + Freeboard (Ft.) + Top of Dam Elev. 9 �± Q , Operation and Maintenance Plan For Waste Storage Pond The purpose of this plan is to provide guidelines for carrying out the routine maintenance work needed to keep the waste storage pond operating as planned. Routine maintenance is considered to be normal good care of the waste storage pond and the surrounding area. Good maintenance adds to the usefullness and permanence of the facility. The routine maintenance of this waste storage pond involves but is not limited to the following: 1. Maintenance of a vegetative cover on the embankment and the surrounding areas: FESC E .. is being established on these areas. Beginning in IV * and each year thereafter, the embankment and surrounding areas should be fertilized with .—TDQ pounds of /b -10-10 or ' " inch of effluent from the waste storage pond per acre to maintain a vigorous stand. 2. Control of weeds, brush and trees in the grassed spillway and on the embankment: This may be done by mowing, spraying, or chopping, or a combination of all three. This will be done at least once each year and possibly twice in those years favorable to a heavy growth of vegetation. The local Extension Agent or SCS office can supply the latest information on spray materials and the best time to apply them. 3. Protection of the grass on the embankment. and surrounding areas: Uncontrolled vehicular traffic can create trails or ruts. Runoff from storms can enlarge these ruts into gullies. if ruts appear to be forming, stop the traffic doing the damage. 4. At the end of the designed storaged period 11Bo days, it will be necessary to completely empty this storage facility. This. will be accomplished by agitating, hauling and applying the effluent onto designated areas as noted on the Waste Utilization Plan Map. Spring and early fall applications will maximize the fertillizer benefit of the effluent. A marker will be used in the waste storage pond to show when the maximum liquid level is reached. S. Maintenance inspections of this facility should be made during the initial filling, at least annually, and after every major storm event. 1. Embankment a. settlement, cracking or "jug" holes b. side slope stability- slumps or bulges c. erosion and/or wave action d. rodent damage e. seepage or other leakage f. condition of vegetative cover 2. Reservoir Area a. undesirable vegetative growth b. undesirable floating debris c. check liquid level to determine if disposal of effluent is needed 3. Fences and Gates a. loose or damaged posts b. loose or broken wires c. open or damaged gates 6. Additional specific items of importance for the maintenance this structure are: G ,,\ * � U ,-, rA 1 0' i ,f {:1 ,•yLn ' _ , .�A .f ;< �, f . ' r - �' 7+ F 3 a y u t ,,. �,,•• '9 ,a 55-ty • �8 � xHr � � � i.,,,�� + .y, r r F� �t � "�k a i`•ry„� 1.�t �� ' . ' � .i Ly. -? 5 i���.IIY �_iei�.. N� .r r.t :1.�f. ,,�tr,-.: .�..t..'1,':•GtI..�Gr^.4 1„t.S�%y,.'�F _�x y.'. YES �'�t :g.._hS...:tfi`i,....u: a_t __ %'.^ - a 'f}�"':f. 91 o o z o - T 1 N al, `a o OSu 91 . 4u i o o oo -o 00 $ ' A I OEM==oil . mm i' .f+; 4 � .12t, ,.�V. ��u�■�■�■�■� ���■�ii�®ate ��r s Ill f� m N � x Q I ` \LZI p IV i N 7 rn a� I III I it I i J i I i II I ! I i , I I I 4 ! I a I I ' i 3 . I \ � , 4 1 ' f f _ YY' •i�; -i ' fi t -1t .".i i ..,if �ts'F(' �,4- L x-, 's� f tir�._'_t�,•—.r -..axe -w �• r; �r 5 - 7.•{ita' ,u: N rer.'l•.'' a'•` .r, ME I 1 it i 1 l f 11 11 � i`•, rit ,. # t u ulluluu .:� 1 11111111111 11 v ! k f, 1 " Stat&'ofJNorth°:Carolina `;a �. ' ' ,:Department°off::Environment and Natural. Resources Division" o#'Water'Qualify • . James,B:'Hunt, Jr:, Govemor .a 9.,s Bill. Holman,. Secretary Kerr T.-,Stevens, Director - James Mike Lindley James Mike Lindley Farm 614 MIKE LINDLEY ROAD SNOW CAMP NC 27349 Dear James Mike Lindley: NORTH CAROUNA DEPAR_TE MNT OF ENVIRONMENT ANo NATURAL RESOURCES Subject: Application No. AWC190016 Additional Information Request James Mike Lindley. Farm Animal Waste Operation - Chatham County The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by 1. Please lease agreement between W. B. Johnson and the Jonathan Lindley Farm does not indicate a term of agreement. Please provide a new lease agreement that includes a term of agreement, and signature of both the landowner and the lessee. Please note that all WUP revisions mast be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All, information should be signed, sealed, acid submitted in.duplicate to my attention at the address below. The information requested by this letter must be submitted on or before or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute I43-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 546. cc: Raleigh Regional Office, Water Quality. Permit File r Sincer ly, /") .. Susan Cauley Environmental Engineer Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 An Equal Opportunity Affirmative. Action Employer Telephone 919-733-5083 FAX 919-715-6048 50% recycled/ 10% post -consumer paper (Meadod '=Ij.:i adds tIonal land baa to be le"od. •Lc.) _ I ...:hereby give permission d10 apply'animal waste from his Waste Utilization System �j on J (9 acres of my land for the duration of time shown below. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and wheri properly applied should not harm my land or. crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landow Waste Producer: Technical Repre Date Date: Date: 30An SWCD Representative: Date: Term of Agreement: ,19q� to 20�� . fr+^-•••• er 7'an raara as Coat teau) (See. Required Specification No. 2.1. sC. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPTREQUESTED Jonathan Lindley 1800 JohnnyLindley Rd Snow Camp NC, 27349 Dear Jonathan Lindley: Aploftft 900W1%ft0VRi7)A NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES September 11, 1998 Subject: Special Agreement Certified Animal Waste Management Plan Jonathan Lindley Farm Facility Number: 19-16 Chatham County As per Senate Bill 1217, which was ratified on June 21, 1996, and your application for Special Agreement which was received on March 9, 1998, the Environmental Management Commission (EMC) hereby proposes to enter into a special agreement with Jonathan Lindley in order to allow additional time for Jonathan Lindley to obtain and implement a certified animal waste management plan (CAWMP) for the subject facility. Please find enclosed the proposed Special Agreement. If you agree to abide by the. dates and terms of the attached schedule, you must sign, date and return the enclosed documents to the attention of "Shannon Langley" at the letterhead address within fourteen (14) calendar days of your receipt of this letter. If you have already implemented your CAWMP or do not wish to enter into the Special Agreement, please provide us with a response to Mr. Shannon Langley within fourteen (14) calendar days of your receipt of this letter. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with all terms and conditions of the North Carolina General Statutes 143-215.1 and the relevant rules promulgated thereunder. All dates and conditions of this agreement that are not met shall be subject to civil penalties, criminal penalties, injunctions and all other enforcement tools available to the Division of Water Quality. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Therefore, in order to avoid such enforcement actions, I urge you to read the Agreement carefully, make sure you understand your commitments under the Agreement, and contact Mr. Langley, if you do not understand or are confused about any condition of the agreement. If you have any questions concerning this matter, please do not hesitate to contact Mr. Shannon Langley at (919) 733-5083 ext. 581 or Mr. Steve Lewis at (919) 733-5083 ext. 539. k Attachment Sincerely, A. Preston Howard, Jr. P.E. cc: Facility File — Non -Discharge Compliance/Enforcement Unit RRO Regional Office Dewey Botts — Division of Soil and Water Shannon Langley Central Files NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION COUNTY OF CHATHAM IN THE MATTER OF ) SPECIAL AGREEMENT FACILITY NUMBER: 19-16 JONATHAN LINDLEY Pursuant to provisions of North Carolina General Statutes (G.S.) 143-215.2(a) this Special Agreement is entered into by Jonathan Lindley, hereinafter referred to as "OWNER", and the North Carolina Environmental Management Commission, an agency of the State of North Carolina created by G.S. 143B-282, and hereinafter referred to as the Commission: 1. "OWNER" and the Commission hereby stipulate the following: (a) "OWNER" has previously been deemed permitted in accordance with 15A NCAC 2H .0217 for the operation of an animal waste treatment works, but was unable to comply with 15A NCAC2H .0217 (a)(1)(E) requiring an approved animal waste management plan to be submitted by December 31, 1997. (b) Failure to obtain and implement a Certified Animal Waste Management Plan in accordance with 15A NCAC 2H .0217(a)(1)(E) is a violation of State Water Quality Regulations -and "OWNER" is within the jurisdiction of the Commission as set forth in G.S. Chapter 143, Article 21. (c) "OWNER" desires to continue to operate the animal waste treatment works as a Non -Discharge system. (d) "OWNER" has secured assistance from a certified technical specialist to develop an animal waste management system which, once certified, will meet or exceed all applicable guidelines and standards and will be able to comply with all aspects of the Commissions animal waste general permit. (e) During the term of this Agreement there will be no increase in Steady State Live Weight (SSLW) at the facility. Any new construction will be designed to accommodate only the SSLW for which the facility was registered in accordance with 15A NCAC 2H .0217(a)(1)(D). (e) Since this Special Agreement is by Consent, neither party will file a petition for a contested case or for judicial review concerning its terms. (f). Nothing in this Special Agreement shall be taken as absolving or relieving "OWNER" from any responsibility or liability for discharges of animal waste to surface waters of the State of North Carolina. 2. "OWNER" desiring to comply with the Permit identified in paragraph 1(a) above, hereby agrees to do the following: (a) Undertake all necessary activities in order to obtain and implement a certified animal waste management plan by October 1, 1998. Farm Number: 19-16 Special Agreement Page 2 (b) "OWNER" shall comply with all terms and conditions of the North Carolina General Statutes 143-215.1 and the relevant rules promulgated thereunder except 15A NCAC 2H ,0217(a)(1)(E). (c) No later than fourteen (14) calendar days after the date identified in 2(a) above, submit to the Director of DWQ written notice of compliance or noncompliance therewith. In the case of noncompliance, the notice shall include a statement of the reason(s) for noncompliance, remedial action(s) taken, andd-a statement identifying the extent to which subsequent dates or times for r accomplishment of listed activities may be affected. 3. "OWNER" agrees that unless excused under paragraph four (4), "OWNER" will pay the Director of DWQ, by check payable to the North Carolina Department of Environment and Natural Resources, stipulated penalties according to the following schedule for failure to meet the deadline set out in paragraph 2(a) above. Failure to obtain and fully implement a Certified $100.00 for the first seven days Animal Waste Management Plan by the date past the date identified in 2(a) identified in 2(a) above: $500.00 for each additional day 4. "OWNER" and the Commission agree that stipulated penalties are not due if "OWNER" satisfies the Division of Water Quality that noncompliance was caused solely by: a. An act of God; b. An act of war•, c. An intentional act or omission of a third party, but this defense shall not be available if the act or omission is that of an employee or agent of the defendant or if the act or omission occurs in connection with a contractual relationship with the "OWNER"; d. An extraordinary event beyond the "OWNER'S" control. Contractor delays or failure to obtain funding will not be considered as events beyond the "OWNER's" control; or e. Any combination of the above causes. Failure within thirty (30) days of receipt of written demand to pay the penalties, or challenge them by a contested case petition pursuant to G.S. 150E-23, will be grounds for a collection action, which the Attorney General is hereby authorized to initiate. The only issue in such an action will be whether the thirty (30) days has elapsed. 5. This Special Agreement and any terms and conditions contained herein, hereby supersedes 15A NCAC 2H .0217(a)(1)(E). 6. Noncompliance with the terms of this'Special Agreement are subject to enforcement action in addition to the above stipulated penalties, including injunctive relief pursuant to G.S. 143-215.6(C). Farm Number: 19-16 ` Special Agreement Page 3 7. The "OWNER", upon signature of this Special Agreement, will be expected to comply with all schedule dates, terms, and conditions of this document. 8. This Special Agreement shall expire upon owners submittal of a certified animal waste management plan. For Jonathan Lindley Farm Print Name of Owner Date Signature of Owner For the North Carolina Environmental Management Commission: Date Chairman of the Commission k State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT REOUESTED Jonathan Lindley Jonathan Lindley Farm 1800 JohnnyLindley Rd Snow Camp NC 27349 Dear Jonathan Lindley: 1 � • 10 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES February 11, 1998 [FEB 1719,49 i,-' ...__. I -DEHNR ;,,�EiGH RE:,IOWL 0J L__ Subject: Request for Status Update Certified Animal Waste Management Plan Jonathan Lindley Farm Facility Number: 19-16 Chatham County In accordance with State Regulations (15A NCAC 2H .0217(a)(1)(E)) adopted by the Environmental Management Commission on February 1, 1993, the owner of the subject facility was required to submit a Certification Form for the facility's animal waste management system by December 31, 1997. This letter is to advise you that this office has no record of having received the required Certification for the subject facility. Please provide this office with an explanation as to why this Certification was not submitted as required. This explanation must be received within 30 days following the receipt of this letter. Any existing facility owner which did not submit the required certification by the deadline is no longer deemed permitted to operate their animal waste management system. Therefore, if the certification was not submitted as required and the facility is still in operation, this facility is being operated without a valid permit. N.C.G.S. 143-215.6(b) allows the Secretary of the Department of Environment and Natural Resources to take appropriate enforcement actions for this violation for as long as the violation continues. As per Senate Bill 1217, which was ratified on June 21, 1996, the Environmental Management . Commission (EMC) may enter into a special agreement with facilities that did not meet the December 31, 1997 deadline. These special agreements can only be issued to facility owners which signed up for assistance with their local Soil and Water Conservation District Office by September 1, 1996 and which can demonstrate that they made a good faith effort to meet the December 31, 1997 deadline. The special agreement, if issued, would contain a specific schedule for the facility to follgw to develop and/or implement an approved animal waste management plan. Attached is an application for a special agreement between the EMC and the subject facility. If you can demonstrate that this facility can meet the conditions for a special agreement, you may send this request along with your explanation as to why the plan has not been developed and implemented. This request would also be due within 30 days from receipt of this letter. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919.715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Also attached is a form (Form RR 2198) that must be filled out if the facility is no longer in operation or is below the threshold established inl 5A NCAC 2H .0217(a)(1)(A). Facilities which maintain the number of animals below certain thresholds are not required to be certified. These thresholds are: 100 head of cattle 75 horses 250 swine 1000 sheep 30,000 birds with a liquid system Please submit this form if the subject facility is not operating or is below the threshold limit established in 15A NCAC 2H.0217(a)(1)(A). Please submit all responses to this matter to the following address: Attn: Shannon Langley Division of Water Quality P.O. Box 29535 Raleigh NC 27626-0535 Once your response is received, it will be evaluated in detail along with any supporting information that you may wish to submit. Following this review, you will be advised of the results of the review and of any additional actions that must be taken to bring your facility into compliance. Please he advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with the requirement to develop and implement a certified animal waste management plan by December 31, 1997. Please also be advised that the submittal of a request for a special agreement does not assure that one will be issued. Each facility will be reviewed on a case by case basis and appropriate actions will be taken to bring each facility into compliance. Thank you for your immediate attention to this issue. If you have any questions concerning this matter, please do not hesitate to contact Mr. Shannon Langley of our staff at (919) 733-5083 ext. 581. Sincerely, A. Preston Howard, cc: Facility File — Non -Discharge Compliance/Enforcement Unit DWQ Regional Office Shannon Langley Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycledA0% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT REQUESTED Attn: Jonathon Lindley Jonathon Lindley Farm 1800 Johnny Lindley Road Snow Camp, NC 27349 Dear Mr. Lindley: mcas'A'A IT * 0 A&61a 10 ft%00_ft=W0 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES October 12, 1998 Subject: Special Agreement Facility Number: 19-16 Jonathon Lindley Farm Chatham County Attached for your records is a copy of the signed Special Agreement approved by the Environmental Management Commission. The terms and conditions of the Special Agreement are in full effect. If you have any questions concerning this matter, please contact Mr. Shannon Langley, of our staff, at (919) 733- 5083, extension 581. Sincerely, M I jr'­l /a_� A. Preston Howard, Jr., P.E. ATTACHMENTS cc: Raleigh-Regional-Office-w/attacl ents_l Chatham County Soil and Water Conservation District w/attachments Facility File w/attachments Central Files w/attachments Shannon Langley w/attachments P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733.5083 Fax 919.715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION COUNTY OF CHATHAM IN THE MATTER OF SPECIAL AGREEMENT FACILITY NUMBER: 19-16 JONATHAN LINDLEY Pursuant to provisions of North Carolina General Statutes (G.S.) 143-215.2(a) this Special Agreement is entered into by Jonathan Lindley, hereinafter referred to as "OWNER", and the North Carolina Environmental Management Commission, an agency of the State of North Carolina created by G.S. 143B-282, and hereinafter referred to as the Commission: "OWNER" and the Commission hereby stipulate the following: (a) "OWNER" has previously been deemed permitted in accordance with 15A NCAC 2H .0217 for the operation of an animal waste treatment works, but was unable to comply with 15A NCAC2H .0217 (a)(1)(E) requiring an approved animal waste management plan to be submitted by December 31, 1997. (b) Failure to obtain and implement a Certified Animal Waste Management Plan in accordance with 15A NCAC 2H .0217(a)(1)(E) is a violation of State Water Quality Regulations -and "OWNER" is within the jurisdiction of the Commission as set forth in G.S. Chapter 143, Article 21. (c) "OWNER" desires to continue to operate the animal waste treatment works as a Non -Discharge system. (d) "OWNER" has secured assistance from a certified technical specialist to develop an animal waste management system which, once certified, will meet or exceed all applicable guidelines and standards and will be able to comply with all aspects of the Commissions animal waste general permit. (e) During the tern of this Agreement there will be no increase in Steady State Live Weight (SSLW) at the facility. Any new construction will be designed to accommodate only the SSLW for which the facility was registered in accordance with 15A NCAC 2H .0217(a)(1)(D). (e) Since this Special Agreement is by Consent, neither party will file a petition for a contested case or for judicial review concerning its terms. (f). Nothing in this Special Agreement shall be taken as absolving or relieving "OWNER" from any responsibility or liability for discharges of animal waste to surface waters of the State of North Carolina. 2. "OWNER" desiring to comply with the Permit identified in paragraph l(a) above, hereby agrees to do the following: (a) Undertake all necessary activities in order to obtain and implement a certified animal waste management plan by October 1, 1998. Farm Number: 19-16 Special Agreement Page 2 (b) "OWNER" shall comply with all terms and conditions. of the North Carolina General Statutes 143-215.1 and the relevaiit rules promulgated thereunder except 15A NCAC 2H .0217(a)(1)(E). (c) No later than fourteen (14) calendar days after the date identified in 2(a) above, submit to the Director of DWQ written notice of compliance or noncompliance therewith. In the case of noncompliance, the notice shall include a statement of the reason(s) for noncompliance, remedial action(s) taken, and a statement identifying the extent to which subsequent dates or times for accomplishment of listed activities may be affected. 3. "OWNER" agrees that unless excused under paragraph four (4), "OWNER" will pay the Director of DWQ, by check payable to the North Carolina Department of Environment and Natural Resources, stipulated penalties according to the following schedule for failure to meet the deadline set out in paragraph 2(a) above. Failure to obtain and fully implement a Certified $100.00 for the first seven days Animal Waste Management Plan by the date past the date identified in 2(a) identified in 2(a) above: $500.00 for each additional day 4. "OWNER" and the Commission agree that stipulated penalties are not due if "OWNER" satisfies the Division of Water Quality that noncompliance was caused solely by: a. An act of God; b. An act of war; c. An intentional act or omission of a third party, but this defense shall not be available if the act or omission is that of an employee or agent of the defendant or if the act or omission occurs in connection with a contractual relationship with the "OWNER"; d. An extraordinary event beyond the "OWNER'S" control. Contractor delays or failure to obtain funding will not be considered as events beyond the "OWNER's" control; or e. Any combination of the above causes. Failure within thirty (30) days of receipt of written demand to pay the penalties, or challenge them by a contested case petition pursuant to G.S. 15013-23, will be grounds for a collection action, which the Attorney General is hereby authorized to initiate. The only issue in such an action will be whether the thirty (30) days has elapsed. 5. This Special Agreement and any terms and conditions contained herein, hereby supersedes 15A NCAC 2H .0217(a)(1)(E). 6. Noncompliance with the terms -of this Special Agreement are subject to enforcement action in addition to the above stipulated penalties, including injunctive relief pursuant to G.S. 143-215.6(C). Farm Number: 19-16 Special Agreement Page 3 7. The "OWNER", upon signature of this Special Agreement, will be expected to comply with all schedule dates, terms, and conditions of this document. 8. This Special Agreement shall expire upon owners submittal of a certified animal waste management plan. For Jonathan Lindley Farm j C,4�0, D of •;0111, Date ,#kMint ain7e �n u- 2 . • • For the Noah Carolina Environment a! M4,nagemcn, Commission: Date /4 -z-- 9� e.—Chairman of the Commission ��L r r�r C�—�f��/�fiG.� �'1✓-rc.r�=�.--4 'CI*r r�_tr—� 7" � — - 9 2007 State of North Carolina Department 4- Envjronrnent and' Natural` Resources DWWO' ri,of Water'Quality Non=Discharge°Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General.Pe"rmit -� Existing. Animal' Waste Operations, The following questions have been, completed utilizing information on file with the Division. Please review the. information for completeness and make any corrections that are appropriate. If a . question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. GENERAL INFORMATION: 1.1 Facility Name: lanad.hind " a M a K t I A + -4 rm rrn _ - 1.2 Print Land- Owner's name: Ileg Lo 1.3 Mailing address: 1080 ielfflnj bindiey AooW 1914 D&a U,41A_ QbPA _ T City, State: Snow Camp NC Zip: 27349 Telephone Number (include area code): (919) 663-2639 1.4 County where facility is located: Chatham 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): County Road 1336, 1/16 mi. south of the intersection of coun roads 1336 and 1337. Johnny Lindley Road. 1.6 Print Farm Manager's name (if different from Land Owner): 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): 1.8 Date Facility Originally Began Operation: 01/01/40 1.9 Date(s) of Facility Expansion(s) (if applicable): _ h1 ohtE_ 2. OPERATION INFORMATION: 2.1 Facility No.: 19 (county number); 16 (facility number). 2.2 Operation Descnp for Cattle operation Dairy 170- Certified Design Capacity Is the above information correct? yes; no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the max um num er or which the'waste management structures were designed. Type of Swine No. of Animals _Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 70 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm: No. of Animals: FORM: AWO-G-E 5/28/98 Page I of 4 19 - 16 3. 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application - system): 146 ; Required Acreage (as listed in the AWMP): 36.7 2.4 Number of lagoons/ storage ponds (circle which is applicable): 2.5 Are subsurface drains present within 100' of any of the application fields? YES or NO (please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or N (please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Sitinct, NRCS Standards, etc.) (Swine Only) YES or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? I9 What was the date that this facility's land application areas were sited? I QQ e1. REQUIRED; ITEMS CHECKLIST Please indicate'that you have included the following required items by signing your initials in the space provided next to each item. 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components. Some of these components may not have been required at the time the facility was certified but should be added to the CAWMP for permitting purposes: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.11 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. Applicants Initials 7AI L FORM: AWO-G-E 5/28/98, Page 2 of 4 19 - I6 Facility Number: 19 - 16. Facility Name: Jonathan Lindley Farm 4. APPLICANT'S CERTIFICATION: ff, ke L i c.-A l e" (Land Owner's name listed in question 1.2), attest that this application for 10(nC-s MkE WAA I Imo+ l�Arm (Facility name listed in question 1.1) has been reviewed by me and is accurate and -complete to the of my knowledge. I understand that if all required parts of this application are not completed and that if all re ired supporting information and attachments are not included, this application package willnturned�r�� to me plet SignatureDate 5. MANAGER'S CERTIFICATION:. (complete only if different from the Land Owner) 1, _ (Manager's name listed in question 1.6), attest that this application for (Facility name listed in question I:1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date _ THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 5/28/98 Page 3 of 4 19 -16 Asbeviil a Regional.WQ.Supavisor 59 Woodfin Place Asbrae, NC 29801 (S2g} 251-6208 Fax (sn)251- 452 Avery Macon Buncombe Madison Burke McDoweA Caldwell Mitebell Chemkce Polk Clay Rutherford Graham Swain Haywood Transylvania Henderson Yancey Jackson Fayetteville Regional WQ Supervisor Wachovia Building, Suite 714 Fayetteville, NC 28301 (910) 48&1541 Fax (910) 486-0707 Anson Moore Blades Richmond Cumberland Robeson Harnett Sampson Hoke Scotland Montgomery Wasbistgwe Regional WQ Swavi= 943' Washington Square Mall Washington, NC 27889 (:ts) 946-M I- Fax.(,5t; 975-3716 Beanfart . Jones Bede Lenoir Cbowan Pamlico Craven Pasquotank Gmmtndr Perquimaas Dare Pitt Crates Tynll G:+eeae Washington Hatfad Wayne Hyde Mooresville Regional WQ Supervisor 919 North Main Suraes Mooresville, NC 29115 (704) 663-1699 Fax (704) 663-6M Alexander Lincoln Cabarrus Mecklenburg Catawba Rowan Cleveland Stanly Gaston Union Iredell Winston-Salem Regional WQ SupwAvor 585 Waughtown Street. Winston-Salem, NC 27107 Wiz7714600 Fax L33L) 771-4631 Alammaae Rockingham Allegbany Randolph Asbe Stokes Caswen Surry . Davidson Watauga Davie Wilkes Forsyth Yadkin Guilford Raleigh Regional WQ Supervisor 38W Bata Dr. Raleigh, NC X7611- (919) 571-4700 Fax (919) 733-7072 C3atham Nash Durham " Northampton Edgw= be Orange Franklin Person Granville: Vane' Halifax Wake Johnston Waaen Lee Wilsm Wilmington Region WQ Supervisor 127 Cardinal Drive Extension Wilmington, NC 28405-3845 (910)395-3900 Fax (910) 350-2004 Bnutswick New Hanover Carteret Onslow Columbus Fender Duplin FORM: AWO-G-E 5122&99 Page 4 of 4 1 \NV 6� 617 H �\ x � yo �• s �Plaipfye Sqh �� �� sFx Spa"• .� -�5�� s T!y `Y 4{�.&� -.l .� Caw-� �`, #!1"��� 2� " � � f iC�r�x • F .. } v 3967 ii Co _ TAmEs (n, y rirm 3966 \\ ` i \ws� ��V 1 600 3965 �'• ! a• 3 9! 'fie s, ..,++,. ° , Q. W �LX671,: �r � � ''MA7! I i 4i! yl_ 4. , "� , 'L 'S.Irf� f'.e• •r 1 • .� :}� j`.4 r � h y � � - �. ```, u`a^,ryp 'r }' E.,r..;. ,�i •i�'. � �fr�t.. � 4 C • �1, / 9 ,r'-�� .� r Y." 41 `l[1 1. M f: ./ „ .t � A �} .14�{ g� � 1 .. 4 I �+ .� yriR 'ter L. ryf • •/ ^ rr/. r 1 4vt I- o •' i t w ' µ a' ?.�r�,�, �;41�t• i,, x;$+�h" r � v.+,�c:. J o !r$ ' t, � r _ � ••i 1 � ;i�n x.�l, r r��3i,�"_� f�r'r ,r']�. `S. ci. � :,aY J , � h '�I q •+5", . d�� l �� ��h.•"% r C xm��•1 �V.��C��'" �}.0 �a' � „�M' J+i '� �! Z'zi7 �.� "k L'.. � ��-I.k ,�� �'r ���••y �, �Y'�' ,�,.,;. 335 ,` ,'' 11 �` Ar:T4f1. 396p - -, ,sN, �f• • .P-Z �z 1 o ,a :" c�•; _, J _ _ _ :ds IWINKIRti WE Animal�IAI"te,Management,.Plan: Cer.Y1rkation: J (Pleaseaype:or:prini all inforniation:that'does not require a signature) ... i. { [Existing) or New or *Expanded ' (please circle one) R E C C I v: n General information: vvR f t:H QUAL':TY SECTION Name of Farm: E Facility No: Name:- Mailing Address: N � � �� E�•f IrtiC3• cJl`I Farm Location: County Farm is located in: ii o '0. Latitude and Longitude: 'AID 1 ZF av- 38 Phone N Please attach a copy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): _ -A S farm i s f acAid _A- Ar2-;,4kr sgC_AaW b &XA-H, t .MA 6 133& x�d 13 3 7 . 77ii s i a � do9L nz .Y,. Operation Description: Type of Swine No. of Animals Type of Poultry No. of Animals Tyre of Cattle No. of Animals D Wean to Feeder ❑ Layer A Dairy 11740 :3 Feeder to Finish ❑ Pullets r3 Beef �3 Farrow to Wean Z! Farrow to Feeder 7 Farrow to Finish Other Type of Livestock: Number of Animals. Expanding Operation. Only..; Previous Design Capacity.• Additional Design Capacity �� �A'{ x� -—T'otal Design Ca�racin'.-., . s z fl ql Acreage Available for Application:_ NU - - Required Acreage:_ ��p ►� _ Number of Lagoons I Storage fonds : Total Capaci qD o/ 9 Cubic Feet (ft3•) Are subsurface drains present on the farm: YES or NO (please circle one) If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one) Owner I Manager Agreement 1 (we) verify that all the -above information is correct and will be updated upon changing. i (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less: severe than the 25-year,24-hour storm and there must not be run-off from the application of animal waste. 1 (we) understand that run-off "of'pollutants from lounging and heavy use areas must be minimized- using. technical standards developed by the Natural Resources Conservation Service. The approved plan will be filed. at the farm and at the office of the local Soil and Water Conservation District. I (we) know that any modification must be approved by a technical specialist and submitted to the Soil and. Water Conservation District prior to implementation. A change in land ownership requires written notification to DEM. or a new certification (if the approved plan is changed) within 60 days of a title -transfer. Name of Lan Ownel Signature Name of A hazer& t A«rC -- January 1.1997 Date: Techlriical Specialist• Certif cation . :..:v y .. - .. ' I. As a technical specialist'desigtiated:by the'Norih Carolina Soil and Water Coriservation'Comrrussion pursuant to 15A NCAC' 6F .0005, 1 certify- that the anima waste management system for the farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 2H.021.7 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001-.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, Sl, WUP, RC,'1), the technical specialist should only certify parts for which they are technically competent. IL Certification of Design A) Collection, Storage, Treatment System Checkthe appropriate box a/tin- fac'1�-ity oLbout retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements. ❑ New, expanded or Mtrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): Affiliation:0irla1 rm :�ni l Acld Address(A Signature: My B) Land Application Site (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; hydraulic and nutrient loading rates. Name of Technical Affiliation: O-VP� Address(Agen ) J Signature: C) Runoff Controls from Exterior_ L Check the appropriate box a Faciitv without exterioE 1911 (SD or WUP or RC) This facility does not contain any exterior lots. Facility -with exterior lots (RC) N•tethods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print):, Affiliation: 0-64-kpmn —'X:Ij CL-r . Date -Li �� �. , !.., MRS � l AWC -- January 1, 1997' Tin .t D). Alication AndHariul�nQ Equipment: -� I' . 'Check the, L�l Eisist�n f expandm,g facility' with existing waste aRpIiciltion equipment (WUP or I) Animal waste application equipment specified, in the plan has been either field calibrated' or evaluated in accordance -with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management -plan; (existing application equipment can cover the area required by the plan at rates not to exceed either the -specified hydraulic or nutrient loading rates, a schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). ❑ New. expanded or existing facility without existing, waste application equipment_ _for spray jnr ation. (I) Animal waste application equipment specified -in the plan has been designed to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either .the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). O New expanded.-or—existile_fa_cility withou-texisting wale _app is io Qui=ent_for land spreadingnot using spray_irri atg, ion. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified- hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance arc contained as part of the plan). Name of Technical Specialist (Please Print): b LJAo VJa Affiliation: 606 r r df ►-v1r U Address (Agency) -too [ - ea 1�, _c 14(ej--4, 2.761 �Phone No.:` h?;•Sb - It D Signature: ��,,6, .t.. a..-1 Date: 1 z - ,19 - 4 7 E) Odor Control, Insect Control, Mortality Management and Emergenty_Actiou Plan-(Q. SI, WUP, RC or D The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management PIan and the Emergency Action Plan are complete and calf be implemented by this facility. Name of Technical Specialist (Please Affiliation: M` iie.ILtUtc Signature: F) Written Notice f NeworEx andin-Swine ar The following signature block is only to be used for new or expanding swine farms that begin construction after June 21,1996. If the facility was built before June 21,1996, when was it constructed or last expanded I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street, or highway from this new or expanding swine farm. The notice was in compliance with the. requirements of NCGS 106-805. A copy of the notice and a list of the property owners notified is attached. Name of Land Owner Signature: Date: Name of I1lanager(if different from owner): Signature Date: A1CC -- January 1, 1997 3 71 III C&'ti, ,zeatry f' of Izs'47114 on- A) election, Storage, reatrrient Installation New, expanded or retrofitte&facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certi ation is necessary. Naive of Technical Specialist (Please Print): Affiliation: Address(Agency): Phone No.: Signature: Date: B) X.,and Application Site (�YUP) Check the appropriate box 51 The cropping system is in place on all land as specified in the animal waste management plan. ❑ Conditional Approval: all required land as specified in the plan is cleared for planting; the cropping'system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/year); the proposed cover crop is appropriate for compliance with the wasteutilization plan. ❑ Also check this box if appropriate if the cropping system as specified in the plan can not be established on newly cleared land within 30 days of this certification, the owner has committed to establish an interim crop for erosion control; Name of Te hnical Specialist (Please Print): Affiliation: Address(Ace y): .�• Phone No. 42- Signature: Date: This following signature block is onlyY be used when the box for conditional approval in III. B above has been checked, I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager(if different from owner): Signature: Date: AAVC -- January 1,1997 4 C) Runoff Con trol fr m er b • ts:,(RC), Facility with exterior -lots Methods to miniirtine:ttie.ruri off'of.polluta its -from lounging and heavy use areas have been installed as specified. in the plan. For facilities without- exterior lots, no certification is necessary. Name of Technic Affiliation: Ch t ' Address(Agency): Signature: D} Applicatioll at Check the an onria Animal and adjustment materials have been provided to the owners and are contained as part of the plan. ❑ Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. ❑ Conditional approval: Animal waste application and handling equipment specified in the plan'has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print):5E_I &A A J-QF aA-YJ _ Affiliation: eo neye±,�L Extii3i4, SQrVi ca_ Address(Agency):4!�01-c- itrua Dave PZdAe: „t, to-zgry PhoneNo.: iI-LO-1/0G Si4nature: c Date: A--x4 -q! The following signature block is only to be used when the box for conditional approval in M-D above has been checked. I (we) certify that i (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. 1 (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager(if different from owner): Signature: Date: E) Odor Control, Insect Control and Mortality Management (SD, ST. WUP, RC or )1) Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system as specified in the Plap�has aI<so been installed and }s�opelational. Name of Technical Specialist Tease Print): A , 1 r t _ Affiliation: IN Q:.. .i .� '- Please, return. the completed, form, to' .the"Division"of. Water Quality -at the following address: Department of Environment, Health, and Natural Resources Division Of Water Quality Water Quality Section, Compliance Group P.O. Box 29535 Raleigh, NC 27626-0535 Please also remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your riles with your Animal Waste Management Plan. AVC -- January 1, 1997 6 State of North Carolina Department of Environment, and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director NIEM0RANDUN1 TO: Regional Water Quality Supervisor IJ MAR 1 719% % N FROM: Shannon Lanaley DE1! R RALE1 H1 I'FCIC. 0t SUBJECT: Application for special agreement p Please find attached a copy of application for special agreement for facility number If you have any questions, please call me at 733-5083, ext. 581. ATTACHMENT 16E o t Y �;,,�s f e e 9u v P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity AfTwmative Action Employer 50 % recycled/10 % post -consumer paper State of North Carolina Department of Environment and Natural ResouruS,� {� Division of Water Quality !f APPLICATION FOR A SPECIAL AGREEMENRAR 0 9 1998 (INFORMATION REQUIRED FOR ANIMAL OPERATIONS REQUESTING A SPECIAL AGREE tri.,,i rs' ��lAl.1�Y 5 I. GENERAL INFORMATION: ,, L,iro ComP4Wce Eni. I., Applicant (Owner}} of the F`acility): _ � 2. Facility No.: I — 3. Facility Name: 4. Print or Type Owner's or Signing Official's Name and Title (the person who is legally responsible for the facility and its compliance): M'. � « I : _ ,, 14- r J 5. Mailing Address: LP t` i 1 1 1 i.K L_ Li -1C13 �j KC� City:: rJ DW C AMA State: Zip: y a-7 a 9 Telephone No.: (�) 6 (v a40 �9 6. County where facility is located: 7. Operation Type (Swine, Poultry, 8. Application Date: A h6t:)- ry-1 �attle): L ., .n H. ELIGIBILITY FOR A SPECIAL AGREEMENT: As per Senate Bill 1217 which was ratified on June 21, 1996, the Environmental Management Commission (EMC) may enter into a special agreement with an operator who registered by September 1, 1996 with their local Soil and Water Conservation District office and who makes a good faith effort to obtain an approved animal waste management plan by December 31, 1997. This special agreement shall set forth a schedule for the operator to follow to obtain an approved animal waste management plan by a date certain and shall provide that the EMC shall not issue a notice of violation for failure to have an approved animal waste management plan so long as the operator complies with the special agreement. Operators who did not register by September 1, 1996 with their local Soil and Water Conservation District office or who can not document that they made a good faith effort to obtain an approved animal waste management plan by December 31, 1997, will not receive a Special Agreement from the EMC. These facilities will be subject to civil penalties, criminal penalties, injunctions and all other enforcement tools available to DWQ. 1. Date facility requested assistance from their local Soil & Water Conservation District 01- FORM SPAG 1/98 Page 1 of 4 2. Efforts made since February 1, 1993 to develop and implement a certified animal waste management plan (Use additional sheets if necessary). This summary must include: A. All contacts made with technical specialist B. Dates and types of plans developed C. Contracts signed D. Funds expended E. Improvements made to the system F. Animals removed and not retoacked at the facility G. Other actions taken FORM SPAG 1/98 Page 2 of 4 "The purpose of this attachment is to summarize items II and III of the "Application for a Special Agreement". II. ELIGIBILITY FOR A SPECIAL AGREEMENT 1. Date facility requested assistance from local Soil and Water Conservation District: 05/05/93 2. Efforts made to implement waste management plan: A. All contacts made with technical specialist: 5/5/93, 5/10/93, 5/13/93, 8/25/93, 10/18/93, 12/20/93, 1/14/94, 1/19/94, 5/31/94, 6/2/94, 8/3/94, 11/15/94, 1/25/95, 1/26/95, 2/14/95, 2/27/95, 7/19/95, 8/25/95, 8/21/96, 6/11/97, 6/16/97, 6/18/97, 6/30/97, 9/2/97, 9/11/97, 12/8/97, 1/13/98, 2/18/98, 3/4/98, (Copies'of these notes are attached) B. Dates and types of plans developed: 6/3/93 - Waste Management Plan 12/18/97 - Revised waste Management Plan C. Contracts signed: 5/13/93 - Waste Storage Pond, Push Off Ramp 11/29/93 - Components of Waste Management System, Gutters, Livestock Exclusion 9/2/97 - Stock Trail, Livestock Exclusion, Critical Area Planting 1/13/98 - Waste Application System D. Funds expended: 6/7/94 - Waste Storage Pond 6/7/94.- Roof Runoff Management,'Livestock Exclusion around waste storage structure 12/8/97 - Stock Trail, Livestock Exclusion, Critical Area Planting (Buffers) E. Improvements made to the system: Waste Storage pond and push off ramp constructed, lot runoff diverted into waste storage pond. Roof runoff measures installed to reduce polluted runoff on feedlot. Stock trail, critical areas planted (buffers), these buffers have been fenced to exclude cattle from buffers. Start pump elevation marker has been installed in waste storage pond. F. Animals removed and not restocked at the facility: Animals are present on farm. None have been removed, present milking herd population 170 dairy cattle. III. Proposed schedule for obtaining certification: 1. Livestock exclusion fencing to be installed in IT. PROPOSED SCHEDULE FOR OBTAINING CERTIFICATION: Please list each of the specific things that will be done at your facility to implement a certified animal waste management plan and the date you will have each activity completed. This must include a review of the possibility of not restocking animals that are scheduled to be removed from the facility until such time as a certified plan can be implemented. Please also list the date on which animals were most recently restocked at this facility. The EMC reserves the right to deny any proposed schedules that are excessively long. (Use additional sheets if necessary). Applicant's Certification: I, 0-v k E LtA E u , attest this application for a Special Agreement with the EMC has been revieweb by me and is accurate and complete to the best of my knowledge. I understand if all required parts of this application are not completed and if all required supporting information and attachments are not included, this application package will Print Name of Owner ,eA,-L� 61 Date 3 /S 9 Signature of O er FORM SPAG V98 Page 3 of 4 Required Items: One-(!) original and two (2) codes of the completed and appropriately executed application form, along with any attachments. THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE COMPLIANCE/ENFORCEMENT UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 FORM SPAG 1/98 Page 4 of 4 U.S. DEPARTMENT'OF AGRICULTURE Page 1 of 4 NATURAL RESOURCES CONSERVATION SERVICE Mar 05, 1998 Chatham County, Pittsborc Field Office (919)542-8240 Technical Assistance Notes for Date Range 08/21/96 - 03/05/98 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo Client Address ------------------------------ 1800 Johnny Lindley Rd SNOW CAMP, NC 27349- Client Phone Ext Description Business Address ------------------------------ 1800 Johnny Lindley Rd Snow Camp, NC 27349- Business Phone Ext Description -------------------------------------------------------------------------------- NOTES ---------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: SLM Fund ID: C01 Date: 03/04/98 Note: Henry and I visited Johnathan and Mike Lindley. We went to find out the progress of the livestock exclusion fencing that is to provide a buffer between a lounging area and a stream. The Lindleys had not yet begun work on this fencing and said that they would start on it within the month. Mr Lindley has received the standard letter concerning certification from DWQ. We will be mailing a copy of the waste management plan to Mike as requested. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: SLM Fund ID: 7CS Date: 02/18/98 Note: Mailed copy of Request for Payment to Mr. Lindley for contract 19-98-09-02, approved 12/8/97. U.S. DEPARTMENT OF AGRICULTURE Page 2 of 4 NATURAL RESOURCES CONSERVATION SERVICE Mar 05, 1998 Chatham County, Pittsboro Field Office (919)542-8240 Technical Assistance Notes for Date Range 08/21/96 - 03/05/98 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo Assistance Type: Technical Assistance Assisted By: CHO Fund ID: 7CS Date: 02/11/98 Note: Received pending checklist from the division of soil and water. Corrected item pended and mailed back to the division of soil and water. Assistance Type: Technical Assistance Assisted By: CHO Fund ID: 7CS Date: 01/13/98 Note: Visited farm, ag cost contract application signed by Mr. Lindley, is applying for assistance with waste application equipment. Application number is 19-98-17-02. Discussed certification form and that additional parts needed to be completed, discussed installation of liquid level marker in storage pond, and additional buffer widths needed in lounging area bordering the creek. Also reviewed insect control, odor control, and emergency action plan with Mr. Lindley. Ask if any areas needed to be added or taken off form, there were none. Assistance Type: Technical Assistance Assisted By: CHO Fund ID: 7CS Date: 12/08/97 Note: Visited dairy, request for signed on 98-09, stock trail, fencing, and critical areas sown and are complete. Fencing west of waste storage pond has one strand of high tensile wire on it. Discussed with Micheal Lindley, he stated that additional strands of wire would be strung if needed. Trail that was graded measured 200 ft., cloth and gravel was not used, concrete instead, 190 by 10, figuired 222 sq yd, 53 ton of gravel. Fencing in this area (south of waste storage pond) measured 653 feet in length. Area seeded measured 128 by 115. Area west of waste storage pond fencing measured 333 feet in length. Area seeded measured 260 feet by 75 feet, and 282 feet by 126 feet. Total area seeded equals 1.6 acres. Total amount requested on this date, $2305.00. U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE Chatham County, Pittsboro Field Office (919)542-8240 Technical Assistance Notes for Date Range 08/21/96 - 03/05/98 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo Page 3 of 4 Mar 05, 1998 Assistance Type: Technical Assistance Assisted By: CHO Fund ID: 7CS Date: 09/11/97 Note. Ag cost contract approved by district board. ------------------------------------------------_-------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: 7CS Date: 09/02/97 Note: Ag cost application signed by applicate, contract number 19-98-09-02. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 06/30/97 Note. Visited dairy farm, Micheal nor Sheryld around, Jonathan at farm. Gave Jonathan ag cost contract in order for him to obtain signatures from Micheal and Sheryld. Mr. Lindley is retiring, is going to put operation in Micheal and Sheryld's mames. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By:. CHO Fund ID: ACS Date: 06/18/97 Note: Completed operational review form, made three copies, one for division of water quality, two for division of soil and water, one for Caroll Pierce, the other for Margaret O'keefe. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 06/16/97 Note: Visited dairy farm, present Jonathon Lindley, Mike Lindley, Mike Sturdivant, Bill Woods, and myself. Waste management system looked at, it was decided by all parties involved that stock trail, criticl area, and fencing was needed to comply with .0200 regulations. Additional buffers needed, the fore mentioned items would provide the needed buffers at the feedlot. Operational review completed at farm. A copy was given to i U.S. DEPARTMENT OF AGRICULTURE Page 4 of 4 NATURAL, RESOURCES CONSERVATION SERVICE Mar 05, 1998 Chatham County, Pittsboro Field Office (919)542-8240 Technical Assistance Notes for Date Range 08/21/96 - 03/05/98 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo producer. --------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 06/11/97 Note: Annual spot check by district board conducted today. Present Dallas Hurley, Chuck Miller, and myself. Looked at waste storage pond, livestock exclusion, push off ramp, and guttering system. All systems maintained properly at this time. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 08/21/96 Note: Division of soil and water staff conducted spotcheck on contract 19-94-28-02 and 19-93-34-02, livestock exclusion storage pond, push off ramp, and roof water management. All BMP's checked are being maintained. District board and office staff to be notified by written letter from division. Present on review was Sarah Birdsong, David Cashen, Mike Sturdivant, and myself. No follow up visit or documentation needed on this spotcheck. U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE Chatham County, Pittsboro Field Office (919)542-8240 Technical Assistance Notes for Date Range 05/05/93 - 08/28/95 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo Client Address ------------------------------ 1800 Johnny Lindley Rd SNOW CAMP, NC 27349- Client Phone Ext Description -------------- ------ -------------- Page 1 of 5 Mar 05, 1998 Business Address ------------------------------ 1800 Johnny Lindley Rd Snow Camp, NC 27349- Business Phone Ext Description -------------- -------------------- -------------------------------------------------------------------------------- NOTES -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 08/28/95 Note: Mr. Lindley visited office, brought waste sample by, reported that 233 loads of waste had been pumped from the waste storage pond in the spring and resently. Mr. Lindley stated that each load was approxiamately 3500 gallons. A waste analysis and request for payment were filled out. -------------------------------------------------------------------------------- Assi_stance Type: Technical Assistance Assisted By: MS Fund ID: COI Date: 07/19/95 Note: Animal waste storage facility reviewed by Mike and Henry. Looks good. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 02/27/95 Note: Received waste analysis from waste analysis section. Stapled to request for payment, provided to Brenda Williams to be mailed to the Division of Soil and Water in Raleigh. U.S. DEPARTMENT OF AGRICULTURE Page 2 of 5 NATURAL RESOURCES CONSERVATION SERVICE Mar 05, 1998 Chatham County, Pittsboro Field Office (919)542-8240 Technical Assistance Notes for Date Range 05/05/93 - 08/28/95 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo Assistance Type: Technical Assistance Fund ID: ACS Assisted By: CHO Date: 02/14/95 Note: Visited farm, informed Mr. Lindley that waste analysis needed to be completed before request for payment could be requested. Sample taken from storage pond. Mr. Lindley wrote check for $4.00 to NCDA. Provided sample to Ag Dept in order for sample to be delivered to Raleigh. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 02/14/95 Note: Visited farm, informed Mr. Lindley that waste analysis needed to be completed before request for payment could be honored by the Division of Soil and Water. Samples where taken from storage pond. Mr. Lindley wrote check for $4 to the NCDA. Provided sample to Extension Service in order for it to be delivered to the Waste Analysis Section in Raleigh. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 01/26/95 Note: Mr. Lindley visited office and reported that 200 loads at an average of 3500 gal per load was hauled, filled request for payment out and Mr. Lindley signed it. Amount $2800. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 01/25/95 Note: Mr. Lindley visited office and reported that 200 loads at an average of 3500 gallons per laod was hauled, filled request for payment out and Mr. Lindley signed the request. U.S. DEPARTMENT OF AGRICULTURE Page 3 of 5 NATURAL RESOURCES CONSERVATION SERVICE Mar 05, 1998 Chatham County, Pittsboro Field Office (919)542-8240 Technical Assistance Notes for Date Range 05/05/93 - 08/28/95 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo Assistance Type: Technical Assistance Assisted By: CHO Fund ID: C01 Date: 11/15/94 Note: Frank Evans ENG and Larry Stevenson and myself reviewed waste management system, everything looks goods. Working as designed. --------------------------------_------------------------------------------------ Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 08/03/94 Note: Met with Mr. Lindley, he signed request for payment 19-93-34-02 for $4951.00. Also rode over farm and looked at conservation tillage planted corn. Yield appears to be greater in conservation tillage planted corn. Mr. Lindley at present time appears to be pleased with conservation tillage planting. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 08/03/94 Note: Met with Mr. Lindley, he signed request for payment 19-93-34-02 for waste storage pond. --------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: C01 Date: 06/02/94 Note: Visited and discussed with ASCS payment on waste storage pond. Total payment from ASCS is 3500. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: C01 Date: 05/31/94 Note. Visited farm, drain line from milk room has been covered and compacted. Discussed and reviewed conservation plan with Mr. Lindley. Field 4,5,6,7,8,2,4 have been planted to conservation tillage, 30t residue on soil surface. Reported progress on these fields, waste storage pond and U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE Chatham County, Pittsboro Field Office (919)§42-8240 Technical Assistance Notes for Date Range 05/05/93 - 08/28/95 Client Name: Lindley, Jonathan Business Name: Jonathan Lindley Business ID: lindjo Page 4 of 5 Mar 05, 1998 all parts or items very well constructed and are being maintained at this time. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: C01 Date: 01/19/94 Note. Visited farm, Mr. Lindley and myself reviewed receipts of work completed, he does not have receipts for labor and metal obtained for safety bar, has cancelled check. Got figures for this items from Mr. Lindley, recorded on receipt (Terry's Welding and Repair Shop). -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: C01 Date: 01/14/94 Note: Shots taken on milk room drain line, measured gutters installed, downspouts, drain lines for gutters. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: C01 Date: 12/20/93 Note: Visited farm for scheduled appoint. Mr. Lindley wanted to start installation of milk room drain. Discussed, measured areas needing gutters, also measured fence (wovwn wire) and area seeded. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 10/18/93 Note. Visited farm, staked holding pond, talked to contractor. U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE Chatham County, Pittsboro Field Office (919)542-8240 Technical Assistance Notes for Date Range 05/05/93 - 08/28/95 Client Name:'Lindley', Jonathan Business Name: Jonathan Lindley Business ID: lindjo Assistance Type: Technical Assistance Fund ID: ACS Page 5 of 5 Mar 05, 1998 Assisted By: CHO Date: 08/25/93 Note: Mr. Lindley visited office and would like copy.of design for contractor, made copies of the design and provided to Mr. Lindley. -------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 05/13/93 Note: Met Mr. Lindley at tract. Reviewed ag cost share contract and fsa plan, both were signed by Mr. Lindley. -_-------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 05/10/93 Note: Entered FSA plan into computer, visited farm to start on survey for design purposes. Mr. Lindley would like for us to return tomorrow to give him a chance to put up electric fence to exclude cattle from this area. ---------------------------------------------------------------------------------- Assistance Type: Technical Assistance Assisted By: CHO Fund ID: ACS Date: 05/05/93 Note: Met with Mr. Lindley, DC discussed components of a waste management system, also reviewed conservation cropping sequences needed to treat the fields.