Loading...
HomeMy WebLinkAbout20140762 Ver 4_Site 16 Compliance follow-up_20190513Wetland Inspection Report Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915B) County: Watauga Location: NCDOT- US 221 (R-2915B) Latitude: +35' 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 5/13/2019 Reason for Inspection Follow-up Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: 0 Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Version: 4 Status: Issued Project Type: Road/Highway Widening Region: Central Longitude: -81 ° 30' 10" Title: Phone: ❑ Not Compliant Phone: 336-776-9703 page: 1 Site Number: 20140762 Owner: Thorpe, Gregory Inspection Date: 5/13/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: This follow-up is related to Site 16 (C -Section) where secondary fuel containment was inadequate. DEO sent pictures and an email stating that fuel tanks were indeed now in compliance with fuel containment concerns. page: 2