Loading...
HomeMy WebLinkAbout310478_Compliance Inspection_20180413Division of Water Resources Facility Number.) 1 - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency XOther 0 Denied Access Date of Visit: A(( r��rival Tifine:_ Departure Time: County:I `n Farm Name: 43\JL%rT C-rry) Owner Email: T Owner Name: �ks�ee NV4yK Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feede Farrow to Finish Gilts Boars Other Other Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- La er Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Region: Vtt 1 0 Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes t� No ❑ NA ❑ NE ❑ Yes ❑ No [:]Yes [—]No [:]Yes [-]No ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE NA ❑ NE ❑ NA ❑ NE Page 1 of 3 21412015 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes A No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ No ❑ NA [)(�E waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No ❑ NA NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA VNE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA �I NE ' maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window [:]Evidence of Wind Drift [:]Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA `] K.I NE i = Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 ❑ Yes ❑ No ❑ Yes ❑ No ❑NA NE ❑ Weath r Code ❑ Sludge Survey ❑ NA NE ❑ NA NE 21412015 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a PDA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ No ❑ NA NE ❑ No ❑ - NA NE ❑ Yes ❑ No ❑ NA NE ❑ Yes ❑ No ❑ NA 9 NE ❑ Yes ❑ No ❑ NA NE ❑ Yes ❑ No ❑ NA NE ❑ Yes ❑ No ❑ NA NE ❑ Yes ❑ No ❑ NA V NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA V NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? '4"l Yes No ❑ NA ❑ NE Reviewer/Inspector Name: MA' �2_ Phone: 17d 7 Reviewer/Inspector Signature: Date: 3 Page 3 of 3 21412015