HomeMy WebLinkAboutU-6082 Start of Study Letter.pdfSTATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Roy COOPER
GOVERNOR
May 3, 2019
FROM: Eric Murray
5501 Barbados Blvd
Castle Hayne, NC 28429
SUBJECT: Notification of Start of Study
JAMES H. TROGDON, III
SECRETARY
NCDOT STIP Project U-6082
SR 1308 (Bell Fork Road) and SR 1403 (Country Club Road/Hargett Street)
Intersection Improvements
Onslow County, North Carolina
The North Carolina Department of Transportation (NCDOT), Highway Division 3, plans to
improve the intersection of SR 1308 (Bell Fork Road) and SR 1403 (Country Club Road/Hargett
Street) in Jacksonville, NC. The proposed project is included in NCDOT's 2018-2027 State
Transportation Improvement Program as U-6082. The purpose of project is to improve traffic
operations at the intersection. The project length is approximately 1.0 mile and is state funded.
Right-of-way acquisition is anticipated in NCDOT Fiscal Year (FY) 2025 and construction is
anticipated in FY 2027.
Bell Fork Road, a functionally classified minor arterial, is a four -lane, undivided curb and gutter
facility with 11-foot wide travel lanes. Existing right-of-way width in the project corridor is
approximately 60 feet. The posted speed limit is 35 mph. The 2017 Annual Average Daily
Traffic (AADT) for SR 1308 is 18,000 to 45,000 vehicles per day (vpd). Country Club
Road/Hargett Street is a three -lane undivided shoulder and curb and gutter facility with 11-foot
wide travel lanes. It is a functionally classified minor arterial. Existing right-of-way width along
Bell Fork Road is approximately 60 feet. The posted speed limit is 35 mph. The 2017 AADT for
Country Club Road/Hargett Street is 7,800 to 9,400 vpd.
The proposed typical section includes dedicated right turn lanes for both sides of Bell Fork Road
and an additional left turn lane to southbound Bell Fork Road. A dedicated right turn lane is
proposed to be added at Country Club Road. Sidewalk and bicycle accommodations are
proposed. The proposed right-of-way width along Bell Fork Road is 100 feet.
Land use surrounding the study intersection is mixed. Development within the Project Study
Area (PSA) includes single family homes and commercial development. Commercial
developments include Church's Chicken, Seafood Market Center, Rose Brothers Furniture, and
mixed -use retail. Bell Fork Church of Christ and the Washington Chapel Missionary Baptist
Church are located within the PSA on Bell Fork Road. Based on a review of the North Carolina
Mailing Address:
Telephone: (910) 341-2000
NC DEPARTMENT OF TRANSPORTATION
Fax: (910) 675-0143
DIVISION 3
Customer Service: 1-877-368-4968
5501 Barbados Blvd.
Castle Hayne, NC 28429
Website: www.ncdot.gov
State Historic Preservation Office's GIS Web Service, there are no historic properties listed in or
eligible for listing on the National Register of Historic Places within the PSA. The Jacksonville -
Camp Lejeune Rails -to -Trails path crosses Hargett Street within the PSA. One stream crossing,
Sandy Run Branch, crosses Bell Fork Road and is located in the western quadrant of the PSA.
On behalf of NCDOT, STV Engineers, Inc. will develop a Minimum Criteria Determination
Checklist (MCDC) for this state -funded project. As part of this process, we are soliciting early
input from agencies concerning the features or resources within their jurisdiction and potential
impacts of the proposed project. Attached to this letter are three maps for your information and
reference: a vicinity map, a topographic quadrangle map, and an environmental features map.
The PSA is shown on all maps.
Right-of-way acquisition is currently being evaluated and the need for additional right-of-way is
anticipated. Off -site detours are not expected.
If you have any questions or require any additional information after your review of the enclosed
information, please contact Ms. Elizabeth Scott at (919) 238-6677 or by e-mail at
elizabeth.scott(kstvinc.com. We look forward to receiving your comments on the project and
request that they be submitted by May 31, 2019.
Sincerely,
Eric Murray
Project Manager
NCDOT Division 3
Attachments: Project Data Sheet
Vicinity Map
Topographic Map
Environmental Features Map
Project Development and Environmental Analysis Unit Project Data
Sheets
TIP Nn
WRC' Nn
Federal Aid No.:
Division.
County:
Project Description:
General Project Need:
Metropolitan/Rural
Planning Organization:
U-6082
47471.1.1
N/A
0
Onslow
Sent Date:
5/3/19
NCDOT Division 3 plans to improve the intersection of SR 1308
(Bell Fork Road) and SR 1403 (Country Club Road/Hargett
Street) in Jacksonville, NC.
Identified Need for and Purpose of Project (preliminary):
The primary need for the proposed action is to:
Add capacity at this intersection.
The primary purpose of the proposed action is to:
Improve traffic operations at this intersection.
NEPA / 404 Merger Candidate? ❑ Yes
Jacksonville Urban Metropolitan Planning
Organization (JUMPO)
® No ❑ To Be Determined
Feasibility Completed? ❑ Yes ® No Date of Study:
Project Schedule:
Type of Document Dates:
Environmental Document: I MCDC February 2020
STIP U-6082 1 5/3/19
Right of Way Authorization Date:
Let Date:
FY 2025
FY 2027
Cost Estimates:
Construction: Right -of -Way: Utilities: Total Cost:
TIP Estimate (FY 2019) *: $1,900,000 $1,000,000 $500,000 1 $3,400,000
*Per January 2019 Current STIP
Design Criteria:
Length of Project: 1 mile
Right of Wad Existing: 60 feet
Proposed: 100 feet
Tyne of Access Control: Existing: None
Proposed: None
Roadway ypical Sections:
Speed:
Existing:
Proposed
Bell Fork Road: Four -lane undivided curb and gutter
facility with sidewalk accommodations and
northbound and southbound left turn lanes at the
intersection.
Hargett Street: Three -lane undivided curb and gutter
facility with intermittent bicycle and sidewalk
accommodations and dedicated left and right turn
lanes at the intersection.
County Club Road: Three -lane undivided shoulder
facility with bicycle accommodations and a dedicated
left turn lane at the intersection.
Bell Fork Road: Four -lane undivided curb and gutter
facility with sidewalks and proposed wide outside
lanes to accommodate bicycles with left and right turn
lanes at the intersection.
Hargett Street/Country Club Road:
Three -lane undivided curb and gutter facility with
bicycle and sidewalk accommodations and dedicated
left and right turn lanes at the intersection.
Existing Posted 35 mph
Speed:
STIP U-6082 2 5/3/19
Proposed 40 mph
Design Speed: p
Bridge/Culvert Inventory
Functional Classification
Strategic Transportation Corridor
Information:
CTP/Thoroughfare Plan Designation
(Facility Type):
Air Quality Status: ❑ Non -attainment
None in Project Study Area
Minor Arterial
Not Listed
Boulevard
❑ Maintenance ® Attainment
Horizon Completion Year (Long Range Trans. JUMPO 2040 Long Range Transportation Plan
Plan
Typical Section in Compliance with Conformity Determination? ® Yes ❑ No
Traffic (AADT
Location
Year
Range of Traffic
Bell Fork Road
2017
18,000 - 45,000 vpd
Hargett Street
2017
7,800 vpd
Country Club Road
2017
9,400 vpd
Design Standards Applicable: ® AASHTO ❑ 3R
Railroad Involvement: I No
STIP U-6082 3 5/3/19
Other STIP Projects in the Area (within 2 miles):
Rightof
i i
oI
' i
1
dud to
Begin
Begin
NC 53 (Western Boulevard) to
U-5787
SR 2715 (Trade
McDaniel Drive in Jacksonville.
2020-2021
2022
Street)
Construct roadway on new
location.
Commerce
Commerce Road to SR 1406
U-5878
Road
(Piney Green Road). Construct
2019
2021
roadway on new location.
US 17 At NC 53 (Western Blvd)
U-4007E
US 17
and SR 1406 (Piney Green Rd).
2019
2021
Upgrade intersections.
US 17 (Marine Blvd) to NC 24
U-5736
NC 53
(Lejeune Blvd) in Jacksonville.
2019
2021-2023
(Western Blvd)
Construct access management
improvements.
NC 24 Business (Johnson
U-5741
NC 24 (Lejeune
Boulevard) to NC 172. Construct
2020-2021
2023-2024
Boulevard)
access management
improvements.
U-6081
NC 53
SR 1308 (Gum Branch Rd) to US
2025
2027
(Western Blvd)
17 (Marine Blvd).
US 17 Business (Marine Blvd).
U-5951
US 17
Upgrade at -grade intersection to
2022-2023
2025
partial interchange.
U-5950
US 17 Business
SR 1336 (Henderson Drive).
2022
2024
(Marine Blvd)
Improve intersection.
NC 24 (Lejeune
NC 53 (Western Boulevard) in
U-5508
Boulevard)
Jacksonville. Upgrade
2019
2021
intersection and drainage.
US 17 Business
SR 1308 (Bell Fork Road) in
U-5728
(Marine
Jacksonville. Improve
2018
2020
Boulevard)
intersection.
Source: North Carolina Department of transportation, State Improvement Program (NCDOT Current STIP-
January 2019)
STIP U-6082 4 5/3/19
GrIf I
��f/�✓ohn Ave
r o
O L dui 0-
ell
a�
Grove Ave ?y
5` Puller Dr Hewkslde-'urineP/e
N 00 Vr
< % 0> dr S 2t a
re0 �i
o
c
S Shore�o �Ass� U. 082
f
c c
0
�opliio Dr�(et� L
F�. 4 onk
06
7 "3 C ^ S�
'Q0 sl AN
Or
� 4
Nelson Dr Bell Ork
' ( N p�C3 ��tAet
Q ul
si m` rn
qa > M
c
O x i
3 ap York 3t r�srro�o/Po
tNa $`3�N Cd /r -,.
r
Noah ^ r
Bell
Si Fork
Pa rk
South Dr
P`c
^�
sv
'o
U
rn
West Hut/ Ur
N
Coastal Caro
Communi
College
�L
�N
.0
m
i
S�
$-, fob
t�
�a p rn S
OT,
�\e �a��e
,r
@
Get G
Jay
o
Jonticr! ��
Celetrne• /
o
100 1,000 2,000 Zd
Point d
Vb
Feet
Onslow County, NC
STIP U-6082
o� r+ortttt
Legend
SR 1308 (BELL FORK RD)
AND SR 1403 (COUNTRY
y
17
CLUB RDIHARGETT ST)
U-6082 Project Study Area
5
INTERSECTION
IMPROVEMENTS
53 24
ONSLOW COUNTY
February 2019
OF 7q��.
17
V
FIGURE I -
IJ 1 /loo
Sources: Onslow County GIS Department,
City of Jacksonville GIS,
VICINITY MAP
,/
NC One Map, NC HPO GIS Portal,
& Google Earth