Loading...
HomeMy WebLinkAboutU-6082 Start of Study Letter.pdfSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR May 3, 2019 FROM: Eric Murray 5501 Barbados Blvd Castle Hayne, NC 28429 SUBJECT: Notification of Start of Study JAMES H. TROGDON, III SECRETARY NCDOT STIP Project U-6082 SR 1308 (Bell Fork Road) and SR 1403 (Country Club Road/Hargett Street) Intersection Improvements Onslow County, North Carolina The North Carolina Department of Transportation (NCDOT), Highway Division 3, plans to improve the intersection of SR 1308 (Bell Fork Road) and SR 1403 (Country Club Road/Hargett Street) in Jacksonville, NC. The proposed project is included in NCDOT's 2018-2027 State Transportation Improvement Program as U-6082. The purpose of project is to improve traffic operations at the intersection. The project length is approximately 1.0 mile and is state funded. Right-of-way acquisition is anticipated in NCDOT Fiscal Year (FY) 2025 and construction is anticipated in FY 2027. Bell Fork Road, a functionally classified minor arterial, is a four -lane, undivided curb and gutter facility with 11-foot wide travel lanes. Existing right-of-way width in the project corridor is approximately 60 feet. The posted speed limit is 35 mph. The 2017 Annual Average Daily Traffic (AADT) for SR 1308 is 18,000 to 45,000 vehicles per day (vpd). Country Club Road/Hargett Street is a three -lane undivided shoulder and curb and gutter facility with 11-foot wide travel lanes. It is a functionally classified minor arterial. Existing right-of-way width along Bell Fork Road is approximately 60 feet. The posted speed limit is 35 mph. The 2017 AADT for Country Club Road/Hargett Street is 7,800 to 9,400 vpd. The proposed typical section includes dedicated right turn lanes for both sides of Bell Fork Road and an additional left turn lane to southbound Bell Fork Road. A dedicated right turn lane is proposed to be added at Country Club Road. Sidewalk and bicycle accommodations are proposed. The proposed right-of-way width along Bell Fork Road is 100 feet. Land use surrounding the study intersection is mixed. Development within the Project Study Area (PSA) includes single family homes and commercial development. Commercial developments include Church's Chicken, Seafood Market Center, Rose Brothers Furniture, and mixed -use retail. Bell Fork Church of Christ and the Washington Chapel Missionary Baptist Church are located within the PSA on Bell Fork Road. Based on a review of the North Carolina Mailing Address: Telephone: (910) 341-2000 NC DEPARTMENT OF TRANSPORTATION Fax: (910) 675-0143 DIVISION 3 Customer Service: 1-877-368-4968 5501 Barbados Blvd. Castle Hayne, NC 28429 Website: www.ncdot.gov State Historic Preservation Office's GIS Web Service, there are no historic properties listed in or eligible for listing on the National Register of Historic Places within the PSA. The Jacksonville - Camp Lejeune Rails -to -Trails path crosses Hargett Street within the PSA. One stream crossing, Sandy Run Branch, crosses Bell Fork Road and is located in the western quadrant of the PSA. On behalf of NCDOT, STV Engineers, Inc. will develop a Minimum Criteria Determination Checklist (MCDC) for this state -funded project. As part of this process, we are soliciting early input from agencies concerning the features or resources within their jurisdiction and potential impacts of the proposed project. Attached to this letter are three maps for your information and reference: a vicinity map, a topographic quadrangle map, and an environmental features map. The PSA is shown on all maps. Right-of-way acquisition is currently being evaluated and the need for additional right-of-way is anticipated. Off -site detours are not expected. If you have any questions or require any additional information after your review of the enclosed information, please contact Ms. Elizabeth Scott at (919) 238-6677 or by e-mail at elizabeth.scott(kstvinc.com. We look forward to receiving your comments on the project and request that they be submitted by May 31, 2019. Sincerely, Eric Murray Project Manager NCDOT Division 3 Attachments: Project Data Sheet Vicinity Map Topographic Map Environmental Features Map Project Development and Environmental Analysis Unit Project Data Sheets TIP Nn WRC' Nn Federal Aid No.: Division. County: Project Description: General Project Need: Metropolitan/Rural Planning Organization: U-6082 47471.1.1 N/A 0 Onslow Sent Date: 5/3/19 NCDOT Division 3 plans to improve the intersection of SR 1308 (Bell Fork Road) and SR 1403 (Country Club Road/Hargett Street) in Jacksonville, NC. Identified Need for and Purpose of Project (preliminary): The primary need for the proposed action is to: Add capacity at this intersection. The primary purpose of the proposed action is to: Improve traffic operations at this intersection. NEPA / 404 Merger Candidate? ❑ Yes Jacksonville Urban Metropolitan Planning Organization (JUMPO) ® No ❑ To Be Determined Feasibility Completed? ❑ Yes ® No Date of Study: Project Schedule: Type of Document Dates: Environmental Document: I MCDC February 2020 STIP U-6082 1 5/3/19 Right of Way Authorization Date: Let Date: FY 2025 FY 2027 Cost Estimates: Construction: Right -of -Way: Utilities: Total Cost: TIP Estimate (FY 2019) *: $1,900,000 $1,000,000 $500,000 1 $3,400,000 *Per January 2019 Current STIP Design Criteria: Length of Project: 1 mile Right of Wad Existing: 60 feet Proposed: 100 feet Tyne of Access Control: Existing: None Proposed: None Roadway ypical Sections: Speed: Existing: Proposed Bell Fork Road: Four -lane undivided curb and gutter facility with sidewalk accommodations and northbound and southbound left turn lanes at the intersection. Hargett Street: Three -lane undivided curb and gutter facility with intermittent bicycle and sidewalk accommodations and dedicated left and right turn lanes at the intersection. County Club Road: Three -lane undivided shoulder facility with bicycle accommodations and a dedicated left turn lane at the intersection. Bell Fork Road: Four -lane undivided curb and gutter facility with sidewalks and proposed wide outside lanes to accommodate bicycles with left and right turn lanes at the intersection. Hargett Street/Country Club Road: Three -lane undivided curb and gutter facility with bicycle and sidewalk accommodations and dedicated left and right turn lanes at the intersection. Existing Posted 35 mph Speed: STIP U-6082 2 5/3/19 Proposed 40 mph Design Speed: p Bridge/Culvert Inventory Functional Classification Strategic Transportation Corridor Information: CTP/Thoroughfare Plan Designation (Facility Type): Air Quality Status: ❑ Non -attainment None in Project Study Area Minor Arterial Not Listed Boulevard ❑ Maintenance ® Attainment Horizon Completion Year (Long Range Trans. JUMPO 2040 Long Range Transportation Plan Plan Typical Section in Compliance with Conformity Determination? ® Yes ❑ No Traffic (AADT Location Year Range of Traffic Bell Fork Road 2017 18,000 - 45,000 vpd Hargett Street 2017 7,800 vpd Country Club Road 2017 9,400 vpd Design Standards Applicable: ® AASHTO ❑ 3R Railroad Involvement: I No STIP U-6082 3 5/3/19 Other STIP Projects in the Area (within 2 miles): Rightof i i oI ' i 1 dud to Begin Begin NC 53 (Western Boulevard) to U-5787 SR 2715 (Trade McDaniel Drive in Jacksonville. 2020-2021 2022 Street) Construct roadway on new location. Commerce Commerce Road to SR 1406 U-5878 Road (Piney Green Road). Construct 2019 2021 roadway on new location. US 17 At NC 53 (Western Blvd) U-4007E US 17 and SR 1406 (Piney Green Rd). 2019 2021 Upgrade intersections. US 17 (Marine Blvd) to NC 24 U-5736 NC 53 (Lejeune Blvd) in Jacksonville. 2019 2021-2023 (Western Blvd) Construct access management improvements. NC 24 Business (Johnson U-5741 NC 24 (Lejeune Boulevard) to NC 172. Construct 2020-2021 2023-2024 Boulevard) access management improvements. U-6081 NC 53 SR 1308 (Gum Branch Rd) to US 2025 2027 (Western Blvd) 17 (Marine Blvd). US 17 Business (Marine Blvd). U-5951 US 17 Upgrade at -grade intersection to 2022-2023 2025 partial interchange. U-5950 US 17 Business SR 1336 (Henderson Drive). 2022 2024 (Marine Blvd) Improve intersection. NC 24 (Lejeune NC 53 (Western Boulevard) in U-5508 Boulevard) Jacksonville. Upgrade 2019 2021 intersection and drainage. US 17 Business SR 1308 (Bell Fork Road) in U-5728 (Marine Jacksonville. Improve 2018 2020 Boulevard) intersection. Source: North Carolina Department of transportation, State Improvement Program (NCDOT Current STIP- January 2019) STIP U-6082 4 5/3/19 GrIf I ��f/�✓ohn Ave r o O L dui 0- ell a� Grove Ave ?y 5` Puller Dr Hewkslde-'urineP/e N 00 Vr < % 0> dr S 2t a re0 �i o c S Shore�o �Ass� U. 082 f c c 0 �opliio Dr�(et� L F�. 4 onk 06 7 "3 C ^ S� 'Q0 sl AN Or � 4 Nelson Dr Bell Ork ' ( N p�C3 ��tAet Q ul si m` rn qa > M c O x i 3 ap York 3t r�srro�o/Po tNa $`3�N Cd /r -,. r Noah ^ r Bell Si Fork Pa rk South Dr P`c ^� sv 'o U rn West Hut/ Ur N Coastal Caro Communi College �L �N .0 m i S� $-, fob t� �a p rn S OT, �\e �a��e ,r @ Get G Jay o Jonticr! �� Celetrne• / o 100 1,000 2,000 Zd Point d Vb Feet Onslow County, NC STIP U-6082 o� r+ortttt Legend SR 1308 (BELL FORK RD) AND SR 1403 (COUNTRY y 17 CLUB RDIHARGETT ST) U-6082 Project Study Area 5 INTERSECTION IMPROVEMENTS 53 24 ONSLOW COUNTY February 2019 OF 7q��. 17 V FIGURE I - IJ 1 /loo Sources: Onslow County GIS Department, City of Jacksonville GIS, VICINITY MAP ,/ NC One Map, NC HPO GIS Portal, & Google Earth