Loading...
HomeMy WebLinkAboutWQ0040850_Application (FTSE)_20190510Coastal Engineering & Surveying, Inc. 4425 N Croatan Hyw. Kitty Hawk, North Carolina 27949 Phone (252) 261-4151 Fax (252) 261-1333 LETTER OF TRANSMITTAL To: NCDENR-Water Quality 943 Washington Square Mall Washington, NC 27889 We are sending you the following: ❑ Shop Drawings ❑ Prints ❑ Letter ❑ Specs ❑ Change Order ® Plans Date: 4/26/19 1 Proiect No: P659 Attention: Allen Clark Re: Beacon Quarters at Corolla Light Via: MAIL ❑ Samples ❑ Payment Application ® Other Copies Date No. Descri tion 1 8/28/14 Fast -Track Application (FTA 08-13 1 7/31/14 Flow Tracking for Sewer Extension Applications 1 check for $480.00 -Application These items are transmitted as checked below: ❑For Approval ❑ Reviewed ❑ For Your Use ❑ Reviewed as Noted ® As Requested ❑ Revise & Resubmit ❑ For Review and Comment ❑ Returned No Action ❑ Prints Returned After Loan To Us Remarks: Please let us know if you need anything else. Thank you. Signed: MITCH HALLORAN ITOWNEBANK � SOUTHERN SMOKES, NO 27049 COASTAL ENGINI£ERING & 66RVEYING, INC. PO BOX 1129 jOTT HAWK, NC 27949 PH.262-281-4ib1 PAYTOTHE NC DEQ ORDER OF Four Hundred Eighty and 00/100..*****........*.,*...***.*..*.:**,.*.*...**...........*a:.*.:: i NC Department of Environmental Quality ' 943 Washington Square Mall *11AWashington, NC 27889At MEMO State Sewer Permit h(V Sq Ftg0r1 Q0 0-4-rS AUIHORREDSIGNAT RE n'01198311@ 1:05LL,089-1,91:502842095SO COASTAL ENGINEERING & SURVEYING, INC. NC DEQ State Sewer Permit �1 (9 59 - Ze Q C-otr-� 0-vd-1-t- s 4/26/2019 11983 88-GOV514 WH�%Wl ff 4/26/2019 s **480.00 DOLLARS E 11983 480.00 OBX/Towne Bank *20 State Sewer Permit 480.00 i/ I 1 0 1wk State of North Carolina Department of Environment and Natural Resources Division of Water Resources FAST -TRACK APPLICATION (FTA 08-13) Division of Water Resources for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS General — When submitting this application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. For more information, visit the Surface Water Section's Collection Systems website or; contact the Regional Office serving your county Unless otherwise noted the Applicant shall submit one original and one copy of the application and supporting documentation to the appropriate Regional Office (see page 6) A. Cover Letter: ® Include a brief project narrative describing the final design (i.e system and/or pump station to ultimately serve 500 homes, but flow for only 100 homes being requested now). For modifications, clearly explain the reason for the modification (i.e. adding another phase, changing line size, length, etc). B. Application Form (FTA 08-13): ® Submit the completed and appropriately executed Fast -Track (FTA 08-13) Application. Any unauthorized content changes to this form shall result in the application being returned. If necessary for clarity or due to space restrictions, attachment to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. You do not need to submit detailed ® The Professional Engineer's Certification of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). C. Application Fee: ® Submit a check in the amount of $480 to: North Carolina Department of Environment and Natural Resources (NCDENR). ➢ Checks shall be dated within 90 days of application submittal. D. Certificate of Public Convenience and Necessity (For Privately -Owned Public Utilities Only): ❑ Per 15A NCAC 02T .0115(a)(1), provide two copies of the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ® Provide two copies of a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. ❑ The project name in the CPCN or letter must match that provided in Item A(2)a of this application. E. Operational Agreements (For Home/Property Owners' Associations and Developers of lots to be sold): ➢ Home/Property Owners' Associations ® Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (HOA 08-13). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ➢ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (DEV 08-13). Even if the project may be turned over to a municipality upon completion, Form DEV 01-12 is required. INSTRUCTIONS FOR APPLICATION FTA 08-13 & SUPPORTING DOCUMENTATION Page I of 6 F. Downstream Sewer, WWTF Capacity and Flow Tracking/Acceptance Form (FTSE 08-13) ® Submit the completed and appropriately executed Flow Tracking/Acceptance for Sewer Extension Permit (FTSE 08-13) Form for all applications. ➢ The applicant (and owners of downstream sewers, pump stations and/or treatment facilities submitting form FTSE 08-13 certifies that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving treatment plant, and that the flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving wastewater treatment plant. ➢ Where the applicant is not the owner of the downstream sewer, submit two copies of form FTSE 08-13 from the owner of the downstream sewer and owner of the WWTF, if different. ➢ The flow acceptance indicated in form FTSE 08-13 must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE 08-13 indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). )o Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE 08-13. G. Site Map (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. Each map must include at a minimum: ➢ The location of the sewer line and pump stations and be of reproducible quality. ➢ Downstream connection points and the permit number for the receiving sewer (if known) ➢ Pump Station Locations and the longitude and latitude for each pump station (if applicable) ® Include a street level map showing all relevant project areas. H. Stream Classification (WSCAS 08=13) ® Submit the completed and appropriately executed Watershed Classification Attachment form (WSCAS 08-13) if any portion of the sewer system project is within 100 feet of any surface water or wetlands. ➢ A variance must be requested for encroachment within required setbacks or buffers pursuant to 15A NCAC 02T .0305(f) I. Environmental Assessments (Projects subject to an Environmental Assessment (EA)): ➢ Projects involving an Environmental Assessment per 15A NCAC 01C .0408, must be submitted for a full technical review and must be submitted to the PERCS Unit on application forms provided by the Division. J. Alternative Sewer Systems ➢ Projects involving low pressure sewer systems, vacuum sewer systems and other alternative sewer systems must be submitted for a full technical review and must be submitted to the PERCS Unit on application forms provided by the Division. K. Flow Direction ➢ Many wastewater treatment systems are entering into agreements for regionalization efforts and emergency treatment capacity. Parts of the system are installed so that the wastewater flow can be directed to more than one treatment facility. If this is the case with the project, please indicate in B(12) and give the permit number of the second facility. L. Certifications —Section C ➢ The application must be certified by both the applicant and the design engineer who is a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(1b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC Chapter 2T, The Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. INSTRUCTIONS FOR APPLICATION FTA 08-13 & SUPPORTING DOCUMENTATION Page 2 of 6 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD (to be Application Number: (to be completed by DWR) '►V o6 C J 1. Owner/Permittee: la. DAVID MASO c/o FLORIDA OBX #13 LLC Full Legal Name (company, municipality, HOA, utility, etc.) Z 1b. FLORIDA OBX #13 LLC Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials) Q 1c. The legal entity who will own this system is: ❑ Individual ❑ Federal ❑ Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 0 1d. 4615 GULF BLVD #119 le. ST PETERSBURG LL Mailing Address City Z 1f. FL 1g. 33706 Z State Zip Code 1h. 7274803523 1i. 1j. david4closurefl@gmail.com QTelephone Facsimile E-mail U 2. Project (Facility) Information: J 2a. BEACON QUARTERS AT COROLLA LIGHT, PUD 2b. CURRITUCK d Brief Project Name (permit will refer to this name) County Where Project is Located IL Q 3. Contact Person: 3a. CARLOS F. GOMEZ Q Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 252261 4151 3c. cgomez@coastales.com Phone Number E-mail 1. Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No.: 2. Owner is ❑ Public (skip to Item B(3)) ® Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one ® Retaining Ownership (i.e. store, church, single office, etc.) or ® Public Utility (Instruction D) ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction E) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) Z 3. CAROLINA WATER SERVICES INC OF NC 0 Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. MONTERAY SHORES WWTF 4b. W00009772 Q Name of WWTF WWTF Permit No. 5a. MONTERAY SHORES WWTF5b. 8 inch JE Gravity c. 0 Owner of Downstream Sewer Receiving Sewer Size ® Force Main Permit # of Downstream Sewer (Instruction F) LL Z 6. The origin of this wastewater is (check all that apply): H ❑ Residential Subdivision ❑ Retail (Stores, shopping centers) 100% Domestic/Commercial ® Apartments/Condominiums ❑ Institution % Industrial ❑ Mobile Home Park ❑ Hospital LLI ❑ School ❑ Church (Attach Description) d ❑ Restaurant ❑ Nursing Home % Other ❑ Office ❑ Other (specify): m (Attach Description) 7. Volume of wastewater to be allocated or permitted for this particular project:12,600 gallons per day *Do not include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) FTA 08-13 APPLICATION Page 3 of 6 W Z_ H Z O U Z O O U. Z_ H W a i 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item 13(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item 13(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). The project has 32 units. Each unit has three (3) habitable spaces. At 120 GPD per habitable space this would yeid a flow of 11,520 GPD. 980 GPD was added for the pool. The total allocated flow is 12,500 GPD to wastewater. 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) New Gravity or Additional Force Main 487 NEW GRAVITY 396 Forcemain 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID: Phase 13 (self chosen - as shown on plans/map for reference) Longitude: N36 21' 34.07" Latitude: W 75 49' 29.79" Design Flow (MGD) 0.0125 Pump Station Location ID: Longitude: Operational Point Power Reliability Option GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS 29 gpm @ 64 feet 2-Portable w/MTS Latitude: 09 (self chosen -as shown on plans/map for reference) Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑ Yes N No If Yes, permit number of 2nd treatment facility : (RO — if "yes" to 13,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? N Yes ❑ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance Is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 08-I3 APPLICATION Page 4 of 6 Have the following permits/certifications been submitted for approval for the system or project to be served? N Z O Q F— fY W V Z Wetland/Stream Crossings - General Permit or 401Certification? ❑ Yes ❑ No ® NIA Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ N/A Trout Buffer Waiver? []Yes ❑ No ® N/A Stormwater? ® Yes ❑ No ❑ N/A Does this project Include any high priority lines (15A NCAC 02T .0402 (2)) Involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months If Yes: ❑ and provide details: 1. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) / I, �71 12 /' " 0S o , attest that this application for AC off.+ ,Arm es has been reviewed by me and Is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not Included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68. any personyorb knowingly makes any false statement representation, or certification in any application shall be guilty of a Class Wsdemeanor, which may Include a fine not to exceed $10, 000 as well as civil penalties up to $25,000 per._ -a__ la. S�y 114 Signing Official Signature Dat ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 16A NCAC 02T .0305 2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1, L rt/l L 4o o ^ C 2 ,attest that this application for Refit a+ a&,4r'J1C0Tr has been reviewed by me and is accurate, complete and consistent with the information In the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guldenco. Although other professionals may have developed certain portions of this submittal package, Inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613any person who knowingly mes any false statement representation, or certification in any application shall be guilty of a Class 2 misdemeanor which include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 1 2a. CARLOS F. GOMEZ Professional Engineer Name 2b. COASTAL ENGINEERING AND SURVEYING, INC Engineering Firm 2c PO BOX 1129 Mailing Address 2d KITTY HAWK 2g. 2622614161 h. 26226113 Telephone Facsimile NC 2f 27949 State Zip cgomez@coastales.com E-mail FTA 08-13 APPLICATION Page 5 of 6 THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION (ORIGINAL AND COPY) SHALL BE SUBMITTED TO THE APPROPRIATE REGIONAL OFFCE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue, Suite 301 Alexander, Cabarrus, Catawba, Cleveland, Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Wilmington, North Carolina 28405 Hanover, Onslow, Pander (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 585 Waughtown Street Alamance, Alleghany, Ashe, Caswell, Davidson, Winston-Salem, North Carolina 27107 Davie, Forsyth, Guilford, Rockingham, Randolph, (336) 771-5000 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 771-4630 Fax FTA 08-13 APPLICATION Page 6 of 6 State of North Carolina t)irision ;�t `A'atrr Rvyow,s frs Entity Requesting Allocation: Florida OBX Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Project Name for which flow is being requested: BEACON QUARTERS AT COROLLA More Nnan one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Monteray Shores WWTP b. WWTP Facility Permit #: WQ00097720.520 MGD All flows are in MGD c. WWTP facility's permitted flow 0.720 MGD d. Estimated obligated flow not yet tributary to the e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility It. Percent of permitted flow used WWTP 0.256MGD 0.107 MGD (6/15-5/16) 0.0125 MGD 0.3755 MGD 52.15 % II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / p0, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-18 III. Certification Statement: I T-. / 46#vo Nt+gt,r- certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport d treat the proposed new wastewater. / / C— r L^/ L �/ 412 Signing gfffcial Signature Date VP of 0PG9A-r'bNS Title of Signing Official Page 2 of 6 FTSL 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section Il where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal System. Signing Official Signature Date Page 3 of 6 FTSE 10-18 Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. C. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit d. Estimated obligated flow not yet tributary to the WWTP MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + ] It. Percent of permitted flow used: Equals [(g / c)* 1001 For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f = 0.015 MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 10-18 Section H List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Design Approx. Not Yet Total Current Firm Average Current Avg, Tributary Flow Plus Pump Station (Name or Number) Capacity MGD Daily Flow (Firm / pf) Daily Flow, MGD Daily Flow, MGD Obligated Flow Available Capacity* Kaw Creek PS 0.800 0.320 0.252 0.080 0.332 -0.012 Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 10-18 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section 11 where available capacity is < 0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014 This project is planned to add 0.100 MGD that exceed the firm pump station capacities identified in Section 11 above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 10-18