Loading...
HomeMy WebLinkAboutNCC190256_ESC Approval Submitted_20190511Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY May 10, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: Richard Baker, PE, PMP, Director of Environmental Projects 526 South Church Street, MC EC13K Charlotte, North Carolina 28202 RE: Project Name: Mt. Holly Steam Station - Decommissioning [Express Review] Acres Approved: 29.7 Project ID: GASTO-2019-019 County: Gaston City: Mt. Holly Address: 599 American Street River Basin: Catawba Stream Classification: Other Submitted By: Duke Energy Carolinas, LLC Date Received by LQS: May 9, 2019 Plan Type: New Dear Mr. Baker: ROY COOPER Governor MICHAEL S. REGAN Seeretan, S. DANIEL SMITH Interim Director This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: The approved E&SC plan as well as any approved deviation. State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115 704 663 1699 T Letter of Approval with Modifications Duke Energy Carolinas, LLC May 10, 2019 Page Z of 3 ?. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing, natural resources and adjoining properties. If. following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66). this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, '����� J CPES�J Tamers Eplin, C , Assistant regional Engineer Land Quality Section Enclosures: Certificate of Approval Performance Reservations NCG01 Fact Sheet c via E-mail: Richard Hiner, PE, CPESC, Wood Environment & Infrastructure Solutions, Inc. c: Inspection Department Letter of Approval with Modifications Duke Energy Carolinas, LLC May 10, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Mt. Holly Steam Station - Decommissioning Project ID: GASTO-2019-019 County: Gaston 1. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Additional Comments: 1. The NPDES General Construction Stormwater Permit does not supersede any existing or potential wastewater and/or industrial stormwater permit requirements, or any other applicable regulation. CERTIFICATE OF PLAN APPROVAL STATE �n go �'�F 4unsa ViVE�'/ The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environment and Natural Resources in accordance with North Carolina General Statute 113A - 57 (4) and 113A - 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). �IU Y S��- ��� sS,r�Nf� 16 599 Alm -&ON ST 1�1r, j441t.Y f GY",v ���r Project Name and Location GA576 --2NI rDi9 5 Regional Date of Plan Approval 'f4S.SI %I� Engineer NCDENR