Loading...
HomeMy WebLinkAbout310444_Re: Sludge Survey Testing Dates_20180208ROY COOPER or MCHAEL S. REGAN Secretary LINDA CULPEPPER DLeCar Kevin Bostic Kevin Bostic Farm Sites 399 J.S. Bostic Rd Rose Hill, NC 28458 Dear Kevin Bostic: NORTH CAROLINA Errvfronmental Quality RECEINEMCDENROR FEB 0 8 2019 Water Quality Regional Wil Operations Section February 1, 2019 minOon Regional Office 1&2 Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS310444 Kevin Bostic Farm Sites 1 & 2 Animal Waste Management System Duplin County The Division of Water Resources (Division) received your sludge survey information on January 7, 2019. With the survey results, you requested an extension of the sludge survey requirement for the two lagoons at Kevin Bostic Farm Sites 1 & 2 facility. Due to the amounts of treatment volume available, the Division agrees that a sludge survey is not needed until December 31, 2023 for both lagoons. The next sludge survey for the two lagoons at Kevin Bostic Farm Sites 1 & 2 should be performed before December 31, 2023. Please retain this letter and keep it with your farm records for reference. Please call me at (919) 707-3665 if you have any questions. Sincerely, Miressa D. Garoma Animal Feeding Operations Program cc: WihiungtQtt Regional Office, 3Cater Q uality-RegtQn_al Operations' ecflo Permit File AWSAWSAWS310444 D_EQ�� North Carolina Department ofawkwmentalQualayIDivision ofWater lkes ces SR North Salisbury Street 11636 Mail Service Center I Raldg% North Carolina 27699-1636