HomeMy WebLinkAbout310439_30 day POA_20180606PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name:
31-439 County: Dupl i n
Scott Rivenbark
Certified Operator Name: Scott Rivenbark Operator#:
lagoon to the lowest point on the top of the dam for lagoons without spillways; and from
the current liquid level in the lagoon to the bottom of the spillway for lagoons with
spillways.
Structure 1 Structure 2 Structure 3 Structure 4
Lagoon Name (ID). 1
Spillway (Yes or No) No
Level (inches): 18"
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the -
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 6/10/2018
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Scott Rivenbark Phone: (910) 285-7997
Facility Owner/Manager (print)
Date: 6/6/2018
Facility Owner/Manager (signature)
Cover Page Scott Rivenbark (31-439) PoA30day (6-6-18) Page 1 of 1
J l ,
V
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier (ID), Scott Rivenbark 31-439
2 Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a current liquid level according to marker
b designed 25 yr 124 hr. storm & structural freeboard
c line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7.48 gallons/ft3
3 Projected volume of waste liquid produced during draw down period
18.0 inches
19.0 inches
1.0 inches
52 800 ftZ
32,912 gallons
f temporary storage period according to structural design 180 days
g volume of waste produced according to structural design 243,000 ft3
h current herd # 1,860 certified herd
actual waste produced = current herd # x line g = 243,000 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 34,222 ft3
k (lines h + i +j) x 7.48 x 30 days/line f= 345,603 gallons
4. Total PAN to be land applied during draw down period
I current waste analysis dated 3Y29/2018 1.14 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 431.5 Ibs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 1 Scott Rivenbark (31-439) PoA30day (6-6-18) Page 1 of 1
i
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1 Structure ID Scott Rivenbark 31-439 line m = 4315 lb PAN
2. Structure ID line m = Ito PAN
3 Structure ID,
4. Structure ID
5 Structure ID,
6, Structure ID:
n.lines 1+2+3+4+5+6=
line m = to PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
4315 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 3n DAY PERIOD_
O tract #
p field #
q. crop
_
r acres
s remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u application wndow'
7284
2 3
Fescue
200
5000
1000
8/1 - 7/31
7284
3 4
Fescue
287
50.00
143.5
8/1 - 7/31
7284
3 5
Fescue
287
50.00
1435
8/1 - 7/31
7284
3 6
Fescue
249
50.00
1245
8/1 - 7/31
7284
3 7
Fescue
2.87
50.00
143.5
8/1 - 7/31
7284
4 8
Fescue
1.07
5000
635
8/1 - 7/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
708 5 lb. PAN
431 5 lb. PAN
708 5 lb. PAN
-277 lb. PAN
Summary
Scott Rlvenbark (31-439) PoA30day (6-6-18)
Page 1 of 2
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Waste will be applied as soon as weather permits.
Summary Scott Rrvenbark (31-439) PoA30day (6-6-18) Page 2 of 2