PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-437 County. Duplin
Facility Name: Justin Edwards Farm
Certified Operator Name: Justin Edwards Operator Number. 985734
1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spmllway(Y or N),
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N
18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevation for this structure. A
30 day Plan of Action is attached. Agronomic balance Is within acceptable range.
Waste is to be pumped and hauled to off site locations Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and, receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP. ,
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depopulation
'if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 619/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the Information Is
accurate and correct
Justin Edwards Phone: 910-271-1079
Facility Owner/Manager
(pnnt)
)1 ti/l.�/ t" Date: 6/4/2018
Faci ty Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID. JE1
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 128.5 lb PAN
128.5 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
pFRinn. nn NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. apphcatlon wnd='
71162
1AW
Beans
4.73
133.00
629.1
4/1-9/15
71162
2AW
Beans
17.39
133.00
2312.9
4/1-9/15
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) =
PoA (30 Day) 2/21/00
2942.0 lb. PAN
128 5 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 2942.0 lb. PAN
y. Overall PAN balance (w - x) _ -2813 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowenng lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
Irrigation onto existing spray fields will continue as weather and field conditions permit
Additional Acres Available If Needed.
PoA (30 Day) 2121/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID). 1JE1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c line b - line a (inches in red zone) = 1.0 inches
d top of dike surface area according to design
(area at below structural freeboard elevahon) 52000 ft2
e line c/12 x lined x 7.48 gallons1W 32413 gallons
3 Projected volume of waste liquid produced during draw down period
I. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 85264 ft3
h. current herd # 9600 certified herd # 1760
actual waste produced = current herd # x line g = 77513 fP
certified herd #
i. volume of wash water according to structural design ft3
i. excess rainfall over evaporation according to design 30333 ft9
k. (lines h + i + j) x 7.48 x 30 days/line f= 134448 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 4/13/2018 0.77 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 128.5 Ibs. PAN
PoA (30 Day) 2/21100
NCDABCS Agronomic Division
Phone: (919) 733-2655 Websfte: www.ncagr.gov/agronomU
Report No. FY18-WO06217
a"tlN"o
Predictive
- Client: Charles (JrYJustln Edwards
Advisor. Jon Rlsgaard
°0J
507 Cedar Fork Church Rd.
512 N Salisbury St 6404
fie'
Beulaville, NC 28618
Raleigh, NC 27604
Waste
Report DupltnCounty
N
Sampled: 04/1312018
Links to Helpful
Information
Received: 04/16/2018
Farm: 310437
Completed: 04/23/2018 PALS #: 137064
PALS #- 485612
Sample Information
Nutrient Measurements are given in units of parts per million (ppm), unless utherwise
Nitrogen (N) P K Ca Mg S Fe Mn Zn
specifed.
Cu B
I Other Results
Mo C AI Na Cl
ID: JE1
Code: ALS
Total N:
I 54.0 585 40.9 49.8 33.8 1.09 037 0.29
0.31 0.63
- 4 - 0.16 166 -
Description: Shine
Total KJeldahl N: 183
----- �—
Lagoon Liq.
Inorganic:
-�'-----------------------
Grower Comments:
NH4-N
SS EC pH BD CCE
ALE
C:N DM
Not Provided
NO3-N
( (10 s S/cm) (mS/cm) (Unldess) (Ib/yd3) (%)
(1000 gal)
(Unrtless) (%)
- - 7.47 - -
-
-
Estimate of Nutrients Available for First Year ob/1000 gal)
Other Results ob/1000 gal)
Application Method:
N P205 K20 Ca Mg S Fe Mn Zn
Cu B
Mo AI Na C1
Irrigation
0.17 1.03- 5.85 0.34 0.42 0.28 0.01 T T
T 0.01
- T 1.38 -
J
North
bbx Tnat Fund Coramiwi
Reprogramming of the laboratory -information -management system that makes this report possible is being funded
through a grant from the North Carolina Tobacco Trust Fund Commission.
Thank you for using agronomic services to manage nutrients and safeguard enwronmental quality.
- Steve Troller, Commissioner of Agriculhme.