Loading...
HomeMy WebLinkAbout310437_30 day POA and Waste Report_20180604�kk PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-437 County. Duplin Facility Name: Justin Edwards Farm Certified Operator Name: Justin Edwards Operator Number. 985734 1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spmllway(Y or N), Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevation for this structure. A 30 day Plan of Action is attached. Agronomic balance Is within acceptable range. Waste is to be pumped and hauled to off site locations Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and, receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. , Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 619/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the Information Is accurate and correct Justin Edwards Phone: 910-271-1079 Facility Owner/Manager (pnnt) )1 ti/l.�/ t" Date: 6/4/2018 Faci ty Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID. JE1 n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 128.5 lb PAN 128.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN pFRinn. nn NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. apphcatlon wnd=' 71162 1AW Beans 4.73 133.00 629.1 4/1-9/15 71162 2AW Beans 17.39 133.00 2312.9 4/1-9/15 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = PoA (30 Day) 2/21/00 2942.0 lb. PAN 128 5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2942.0 lb. PAN y. Overall PAN balance (w - x) _ -2813 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowenng lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Irrigation onto existing spray fields will continue as weather and field conditions permit Additional Acres Available If Needed. PoA (30 Day) 2121/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID). 1JE1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c line b - line a (inches in red zone) = 1.0 inches d top of dike surface area according to design (area at below structural freeboard elevahon) 52000 ft2 e line c/12 x lined x 7.48 gallons1W 32413 gallons 3 Projected volume of waste liquid produced during draw down period I. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 85264 ft3 h. current herd # 9600 certified herd # 1760 actual waste produced = current herd # x line g = 77513 fP certified herd # i. volume of wash water according to structural design ft3 i. excess rainfall over evaporation according to design 30333 ft9 k. (lines h + i + j) x 7.48 x 30 days/line f= 134448 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 4/13/2018 0.77 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 128.5 Ibs. PAN PoA (30 Day) 2/21100 NCDABCS Agronomic Division Phone: (919) 733-2655 Websfte: www.ncagr.gov/agronomU Report No. FY18-WO06217 a"tlN"o Predictive - Client: Charles (JrYJustln Edwards Advisor. Jon Rlsgaard °0J 507 Cedar Fork Church Rd. 512 N Salisbury St 6404 fie' Beulaville, NC 28618 Raleigh, NC 27604 Waste Report DupltnCounty N Sampled: 04/1312018 Links to Helpful Information Received: 04/16/2018 Farm: 310437 Completed: 04/23/2018 PALS #: 137064 PALS #- 485612 Sample Information Nutrient Measurements are given in units of parts per million (ppm), unless utherwise Nitrogen (N) P K Ca Mg S Fe Mn Zn specifed. Cu B I Other Results Mo C AI Na Cl ID: JE1 Code: ALS Total N: I 54.0 585 40.9 49.8 33.8 1.09 037 0.29 0.31 0.63 - 4 - 0.16 166 - Description: Shine Total KJeldahl N: 183 ----- �— Lagoon Liq. Inorganic: -�'----------------------- Grower Comments: NH4-N SS EC pH BD CCE ALE C:N DM Not Provided NO3-N ( (10 s S/cm) (mS/cm) (Unldess) (Ib/yd3) (%) (1000 gal) (Unrtless) (%) - - 7.47 - - - - Estimate of Nutrients Available for First Year ob/1000 gal) Other Results ob/1000 gal) Application Method: N P205 K20 Ca Mg S Fe Mn Zn Cu B Mo AI Na C1 Irrigation 0.17 1.03- 5.85 0.34 0.42 0.28 0.01 T T T 0.01 - T 1.38 - J North bbx Tnat Fund Coramiwi Reprogramming of the laboratory -information -management system that makes this report possible is being funded through a grant from the North Carolina Tobacco Trust Fund Commission. Thank you for using agronomic services to manage nutrients and safeguard enwronmental quality. - Steve Troller, Commissioner of Agriculhme. H