Loading...
HomeMy WebLinkAboutU-5785 U-5870 Fire Tower Road Widening Outlet analysis for SB areaCarpenter, Kristi From: Beauregard, Rachelle L Sent: Thursday, March 14, 2019 1:44 PM To: Ward, Garcy Cc: Andy Howell Subject: U-5785/U-5870 Fire Tower Road Widening Outlet analysis for SB area Attachments: Outlet_Analysis_1306_combined.pdf, U5870 _hyd_psh13.pdf G a rcy, As discussed earlier this week, below and attached is the information you requested about the drainage outlet along Stream SB to the west of Eastern Pines Drive on the U-5870 corridor. Current Drainage Plan for PSH 13 o Admittedly, the "Swale Data" could be better organized, but there are some numbers with regards to length of swale provided. o I've provided additional labels in blue to report drainage area at various locations of interest both entering and leaving the ROW. I've also tried to provide some clarification as to what portion of the DA is "offsite" vs. DA coming from the NCDOT ROW. Outlet Analysis for a point just downstream of Structure 1306 (includes both existing 36" drainage outlets) o This is likely more information than you need, but it does provide numbers for existing vs. proposed "paved DA", which corresponds to the additional impervious area added to the drainage outlet by the NCDOT widening project Please let us know your thougths on this and what will be required at this site for buffer rules. Rachelle Rachelle Beauregard Project Manager 252 439 2824 office 919-239-7168 direct rlbeau reaard(cDncdot.aov NCDOT Division 2 1037 W.H. Smith Blvd. GREENVILLE, NC 27834 " Email correspondence @rdwmmGekeGm(ect » the %EPublic Records Law and may way ak&@k @±e.