HomeMy WebLinkAbout20140762 Ver 4_Follow_up inspection_May_20190510Wetland Inspection Report
Project Num: 20140762
Project Name: NCDOT- US 221 (R-2915B)
County: Watauga
Location: NCDOT- US 221 (R-2915B)
Latitude: +35' 16' 05"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 5/8/2019
Reason for Inspection Follow-up
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Version: 4 Status: Issued
Project Type: Road/Highway Widening
Region: Central
Longitude: -81 ° 30' 10"
Title: Phone:
❑ Not Compliant
Phone: 336-776-9703
page: 1
Site Number: 20140762 Owner: Thorpe, Gregory
Inspection Date: 5/8/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ 0 ❑ ❑
Comment: We visited several sites by way of follow-up from our April inspections. Kevin Hining, Heath Slaughter,
Todd Hiatt and other DOT staff/contractors were present. All sites visited last month (13AB, 8, 9, 12, 6
2AB and other stream segments downstream from waste pits) were reviewed and discussed. Site 16 was
a problem as portable fuel tanks had no secondary containment. I requested they provide that and send
photos ASAP. A silt bag was not functioning properly but was repaired as we observed.