Loading...
HomeMy WebLinkAboutNCG190060_Compliance Inspection Report_20190508Compliance Inspection Report Permit: NCG190060 SOC: County: Pender Region: Wilmington Contact Person: Chris Bubin Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 06/02/15 Expiration: 05/31/20 owner: Anchors Away Boat Yard Inc Effective: Expiration: Facility: Anchors Away Boatyard - Hampstead 585 Lewis Rd Inspection Date: 05/08/2019 Primary Inspector: Brian P Lambe Secondary Inspector(s): Title: Entry Time: 11:OOAM Certification: Hampstead NC 28443 Phone: 910-270-4741 Phone: Exit Time: 12:15PM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG190060 Owner - Facility: Anchors Away Boat Yard Inc Inspection Date: 05/08/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Robin, office manager, and Rusty, Yard Manager during inspection. Chris Bubin, general manager, was not present, but later called to clarify issues. The stormwater pollution prevention plan was not available during inspection. Chris Bubin called to assure the inspector that the SWPPP does exist, but needs updating. Sampling has not occured recently. Willis granted ROS to NE outfall. Outfall needs to be labeled in the field. Other identified outfalls should be labeled and qualitative sampling should occur. The boatyard needs housekeeping. Liquids should be stored inside shelter. They do have a storage shipping box that has liner to prevent spills for storage. Used containers must be disposed of properly. Bottom paint procedures must be adhered to by employees and DlYers. The powerwashing that occurs onsite should be reevaluated. The location is adjacent to the water. The drain contains alot of sediment and debris. Rusty said that there is a sock to filter the contaminants. Powerwashing creates wastewater and must be dealt with appropriately. Provide and clearly mark a designated wash down and pressure washing area with an impermeable surface that does not drain to surface waters, or direct wastewater over land and cause infiltration into groundwater. Wash water is considered to be a process wastewater and must be collected pretreated and directed to a sanitary sewer, permitted through non -discharge means such as recycling, or hauled off for proper disposal be a licensed contractor. Discharge to a septic system is prohibited. That being said, find the best solution, but a recycle system is suggested. Page 2 of 3 Permit: NCG190060 Owner - Facility: Anchors Away Boat Yard Inc Inspection Date: 05/08/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Chris Bubin, General Manager, called 5/9/19. He said he did have a SWPPP, though it did need updating. Plan will be reviewed during next inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Please conduct qualitative monitoring per permit protocols. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑ Comment: Please conduct qualitative monitoring per permit protocols. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3