HomeMy WebLinkAbout20190006 Ver 1_USACE Permit_20190509U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2018-01829 County: Guilford U.S.G.S. Quad: NC -Summerfield
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Alcorn Road, LLC
Attn: Buddy Lyons
Address: 5826 Samet Drive, Suite 105
High Point, NC 27265
Size (acres) 22.51 Nearest Town Oak Ridge
Nearest Waterway Reedy Creek River Basin Cape Fear
USGS HUC 03030002 Coordinates 36.157076 N, -79.965619 W
Location description: The proiect area is located in the northwest quadrant of the intersection of Alcorn Road and I-73, at 7776
Alcorn Road, in Oak Ridge, Guilford County, North Carolina.
Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 160 linear feet
of stream channel (128 linear feet are considered a permanent loss of stream) and 0.27 acre of riparian non-riverine wetlands,
and the temporary discharge of fill material into 5 linear feet of stream channel, necessary to install a road crossing for the
Thatcher Woods single-family residential development.
Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 29. Residential Developments
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 2/6/2019, and updated information provided 4/15/2019, and the enclosed plans
"Overall Stream Crossing Plan". "Thatcher Woods Drive Stream Crossing Plan View". and "Thatcher Woods Drive Stream
Crossing Profile". Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to
a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact David E. Bailey at (919) 554-4884, Ext. 30or David.E.Bailey2(a)usace.army.mil.
Corps Regulatory Official:
Expiration Date of Verification: 03/18/2022
Digitally signed by
BAILEY.DAVID.E.1379283736
Date: 2019.05.09 16:32:07 -04'00'
Date: 05/09/2019
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete the Customer Satisfaction Survey located at http://corpsmgpu.usace.army.mil/cm apex/Vp=136:4:0
Copy furnished:
Mary Smith, High Creed Associates, Inc., P.A., 1306 W. Wendover Ave., Greensboro, NC 27408
Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105
SAW -2018-01829
Determination of Jurisdiction:
A. ❑ There are waters, including wetlands on the above described project area that may be subject to Section 404 of the Clean Water
Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part
331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further
instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an
approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work
in waters of the United States and prior to any work that could alter the hydrology of waters of the United States.
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. ❑ There are waters, including wetlands within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. ® The jurisdictional areas within the above described project area have been identified under a previous action. Please
reference jurisdictional determination issued 9/18/2018. Action ID: SAW -2018-01829.
Basis For Determination: See the Preliminary Jurisdictional Determination form dated 9/18/2018.
Date of JD: 9/18/2018 Expiration Date of JD: Not applicable
SAW -2018-01829
SPECIAL CONDITIONS
1. In order to compensate for impacts associated with this permit, mitigation shall be provided in
accordance with the provisions outlined on the most recent version of the attached Compensatory
Mitigation Responsibility Transfer Form. The requirements of this form, including any special
conditions listed on this form, are hereby incorporated as special conditions of this permit
authorization
2. Please note that future impacts and/or phases of the Thatcher Woods development project and
related activities associated with Corps Action ID: SAW -2018-01829 will be considered part of a
single and complete project; these impacts will be considered cumulative with impacts permitted
during earlier phases regarding compensatory mitigation and Nationwide Permit thresholds.
Current cumulative impacts to aquatic resources for this single and complete project include
permanent impacts (loss of waters) to 128 linear feet (0.012 acre) of streams, permanent impacts
(not a loss of waters) to 32 linear feet (0.003 acre) of streams, and permanent impacts (loss of waters)
to 0.27 acre of riparian, non-riverine wetlands. This amounts to a total loss of potential waters of
the US of 128 linear feet and 0.282 acre.
Corps Regulatory Official:
Expiration Date of Verification: 03/18/2022
Date: 05/09/2019
Compensatory Mitigation Responsibility Transfer Form
Permittee: Alcorn Road, LLC, Attn: Buddy Lyons Action ID: SAW -2018-01829
Project Name: Thatcher Woods / 7776 Alcorn Road / Oak Ridge / Guilford County / residential County: Guilford
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
0.54
0.27
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm
Cool
Cold Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
0.54
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from NCDMS, confirming their willing and able to accept the applicants
compensatory mitigation responsibility, dated 3/28/2019 was included with the preconstruction notification.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1 j the Permittee, 2) the USACE
Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls
of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army. mil). Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: David E. Bailey
USACE Field Office: Raleigh Regulatory Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email: David.E.Bailey2@usace.army.mil
USACE Project Manager Signature
05/09/2019
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil
5EE THATGHER WOODS
DRIVE PLAN AND
PROFILE VIEH5 FOR
LOGATION5 OF
HETLAND5, FLOOD
ZONES, AND BUFFERS,
/ CALL NC ONE CALL `
BEFORE YOU DIG
STOP
DIAL 811 or
800-632-4949
AVOID UTIIJTY DAMAGEI
�N CA/�p�%•,o
SEAL
10727
%Z 2:
�L�'P,Q FNGI NEE-1��•�,
Z.�.. Pte.
A111ZA/1Y 6, 019
REV. MARCH 22, 2019
O\/ERALL STREAM GROSSING PLAN
\ �i21PrR,W.P C
\ SrZE:\d30
R
\ \ \ \ \ \ \ i CALL NC ONE CALL
\ \ \ \ \ BEFORE YOU DIG
STOP
,H,
•
0i
STREAM OR0551NO WETLAND IMPAGT
0.27 ACRES
PLAN VIEW W (95±'x120±')
SCALE: 1"=40'
BUFFER IMPACT
ZONE I = 9,408 SQ. FT.
BUFFER IMPACT
ZONE 2 = 4,482 SQ. FT
FLOOD AREA5 NOTED ARE TAKEN FROM
FEMA FIRM MAP #3-7I0-78,Ii00J, 5TREAM IMPACT
MAP REVI5ED 06/18/11. 128 LINEAR FEET
DIAL 811 or
800-632-4949
►AVOID UIIL
OFt;SS/O�9
_ SEAL
10727
GIN
y��•'�
XFeE3Z)RY 6,019
REV MARGH 22, 2019
STREAM GROSS -SECT ION
AT GL THATCHER DRIVE
SCALE: HORIZ 1"=40'
VERT. 1 "=4'
THATCHER WOODS DRIVE
STREAM OR0551 NO ImLAN VIEW
THATCHER WOODS
TP76 ALCORN ROAD
OAK RIDGE TO"*HIP, 6VILFORD COUNTY
NORTH CAROLINA
DATE, 5EP7. IA, 201 WA -Ed' -=40-5—T, 2 OF 3
HUGH CREED ASSOCIATES, INC., P.A.
CONSULTING ENGINEERS & LAND SURVEYORS
P.O. BOX 9623 PHONE:336 275-9826
1306 W. WENDOVER AVE. OR 336 275-8084
GREENSBORO, N.C. 27408 FAX: 336 275-3379
FIRM LICENSE #C-0551 E-MAIL: HCA®HUGHCREEDASSOCIATES.COM
zz
Lu
Lu
V
v
m
8
00
9+
O
10+
o
OFt;SS/O�9
_ SEAL
10727
GIN
y��•'�
XFeE3Z)RY 6,019
REV MARGH 22, 2019
STREAM GROSS -SECT ION
AT GL THATCHER DRIVE
SCALE: HORIZ 1"=40'
VERT. 1 "=4'
THATCHER WOODS DRIVE
STREAM OR0551 NO ImLAN VIEW
THATCHER WOODS
TP76 ALCORN ROAD
OAK RIDGE TO"*HIP, 6VILFORD COUNTY
NORTH CAROLINA
DATE, 5EP7. IA, 201 WA -Ed' -=40-5—T, 2 OF 3
HUGH CREED ASSOCIATES, INC., P.A.
CONSULTING ENGINEERS & LAND SURVEYORS
P.O. BOX 9623 PHONE:336 275-9826
1306 W. WENDOVER AVE. OR 336 275-8084
GREENSBORO, N.C. 27408 FAX: 336 275-3379
FIRM LICENSE #C-0551 E-MAIL: HCA®HUGHCREEDASSOCIATES.COM
LU
CALL NC
E CkL
BEFORE
OU DIG
ILI
o O
Q
O
NOTES:
H
N
O
DEWATERING 1. PRIOR TO INSTALLATION OF
PIPE TO
SANDBAGS, CONTRACTORERIALS
J
O
PUMP I ENSURE ON-
FLOW ST/=E SITE AND READY FOR INSTALLATION.
STREAM DEW TERIN PIPE FLOW WEATHER CONDITIONS SHOULD BE A
FLOW MINIMUM OF FIVE DAYS AFTER ANY
DIAL
11 or
RAIN EVENT AND NO FORECAST OF
RAIN FOR 48-HOURS AFTER
--TRIP-RAP
STO M RAIN TOTAL
800-63
4949
TEMP. INSTALLATION BEGINS.
STONE
INSTALL SANDBAGS INSTALLATION TIME SHOULD BE LESS
DAM
AVOID UIIU
DAMAGE
TO STOP FLOW > THAN EIGHT HOURS.
J 2. INSTALL SANDBAGS TO DEWATER
v7 > CONSTRUCTION AREA.
w< 3. INSTALL PUMP AND DEWATERING
LINES.
0 U Q w 4. CUT OUT STREAMBED AND INSTALL
lU
RIP-RAP OUTLET WITH TOP AT
F
O
w 0 EXISTING STREAMBED LEVEL.
IL
F
z =
w INSTALL TEMPORARY STONE DAM
W
AND FILTER FABRIC.
J
5. BEGIN PUMPING AND CONTINUE
N
PLAN VIEW PUMPING DURING STORM DRAIN
N O
p N
INSTALLATION.
I
D-
O
Q
FOSTORM
8 WITH BCUTIACKH TCH ER LAY STM DRAINDRAINPIPE
W
LU
LU
PIPE ONE FOOT BELOW STREAMBED
Q
LL
-
V W J O
Q Z
INSTALL
Q
0_
AND ENDWALL.
7. IMMEDIATELY REMOVE SANDBAGS TO
LUJ
Q
m
JJ
1O
Q
DIVERT FLOW THROUGH STORM
lL
DRAIN PIPE. SPREAD OUT STONE
RIP-RAP
H
111
0z W
W
�
CL
DAM KEEPING RIP-RAP OUTLET
SANDBAGS PUMP OUTLTEMP ET LEVEL NTH EXISTING
QO
STREA BEAD.
H
+ (L W J
O
O
W
INLET PIPE STONE
DEWATERING DAM 8. SEED CONSTRUCTION SITE AS NEEDED.
z LU
E �� N
W
PIPE
oz
Q
'TL O
GONTRAGTOR 15 TO
n ®
STORM DRAIN NOTIFY EROSION
w
In
5112E VIEW GONTROL IN5PEGTOR
D
® W
BEFORE ANY STREAM
LU
TEMPORARY STREAM DISTURBANCE OCCURS.
3�
GROSSING FOR
W
p
STORM DRAIN INSTALLATION
J
5A'
NO SCALE
�LI
6
X06
z
m
..••�"""'�•., THATCHER WOODS DRIVE
CARo<?o� STREAM GROSSING PROFILE
r
O� OEESS/0� 2 .
THATCHER WOODS
AP
—
SEAL
gul
I E? 6
z-4 10727 1776 ALCORN ROAD
= OAK RIDE+E TONNSHIP, GUILFORD COUNTY
SGAL
NORTH CAROLINA
,'��� FNGI N E
ZHORI
. = 40'
Pl��'� DATB SEPT. I9, 201 SGALE:NOTED SHEET: 5 OF 5
VERT.
= 4'
,z;,,„ ``' HUGH CREED ASSOCIATES, INC., PA
CONSULTING ENGINEERS &LAND SURVEYORS
4�P.O.
I+
O
Oto
I+
O
BOX 9623 PHONE: (336) 275-9826
; 1306 W. WENDOVER AVE. OR (336) 275-8084
JANUA Y b, 2619 GREENSBORO, N.C. 27408 FAX: (336) 275-3379
FIRM LICENSE #C-0551 E-MAIL• HCAOHUGHCREEDASSOCIATES.COM
Action ID Number: SAW -2018-01829 County: Guilford
Permittee: Alcorn Road, LLC, Attn: Buddy Lyons
Project Name: Thatcher Woods / 7776 Alcorn Road / Oak Ridge / Guilford County / residential
Date Verification Issued: 05/09/2019
Project Manager: David E. Bailey
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: David E. Bailey
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
David.E.Bailey2@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date