HomeMy WebLinkAbout310419_30 day POA_20180808PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 31 419
Facility Name: Henry Teachey Farms
Certified Operator Name Kenneth Brown
County: Duplin
Operator Number.
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N
17.5
2 Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X)OC Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates for depopulation
.if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste.
I hereby certify that I have reviewed the Information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct
Kenneth Brown Phone:
Facility Owner/Manager (print)
Kenneth Brown Date: 8/8/2018
Facility Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR: STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Lagoon#1
line m =
88.0 lb PAN
2
Structure ID.
line m =
lb PAN
3
Structure ID,
line m =
lb PAN
4.
Structure ID
line m =
lb PAN
5
Structure ID
line m =
lb PAN
6
Structure ID'
line in =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 880lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PFRInD_
11
�
. . Be .-
11
1111
••111
•�
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) = 4400 0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 88.0 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 4400.0 lb. PAN
y. Overall PAN balance (w - x) = -4312 lb. PAN
PoA (30 Day) 2/21/00
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility
Irrigation onto existing spray fields will continue as weather and field conditions permit This PDA was
completed by Sam Edwards Environmental Specalist with NCDA/Soil and Water on 8/8/2018.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier (ID) I Lagoon #1
2 Current liquid 'volume in 25 yr /24 hr. storm storage & structural freeboard
a current liquid level according to marker
b. designed 25 yr./24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3 Protected volume of waste liquid produced during draw down period
f temporary storage period according to structural design
17.5 inches
19.5 inches
20 inches
43688 ft2
54464 gallons
180 days
g volume of waste produced according to structural design 61320 ft3
h current herd # 1860 certified herd # 1860
actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
t. excess rainfall over evaporation according to design
k (lines h + i + j) x 7.48 x 30 daystline f=
4 Total PAN to be land applied during draw down period
I. current waste analysis dated 6/11/2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
61320 ft'
Oft3
62040 ft3
26314 gallons
1.09 Ibs/1000 gal.
88.0 Ibs PAN
t
PoA (30 Day) 2/21/00