HomeMy WebLinkAbout20180007 Ver 2_May 3 Site Inspection_20190509Wetland Inspection Report
Project Num: 20180007 Version: 2
Project Name: NCDOT - 1-85/SR 1221 Interchange (1-3804)
County: Rowan
Location: NCDOT - 1-85/SR 1221 Interchange (1-3804)
Latitude: +35' 31' 56"
SW Plan Location
Site Owner Name NC DOT Division 9
Inspection Date: 5/3/2019
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Status: Issued
Project Type: New Road/Highway
Region: Winston-Salem
Longitude: -80' 34' 26"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
page: 1
Site Number: 20180007 Owner: Tippett, Lyndo
Inspection Date: 5/3/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC)
Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
0 ❑
❑
❑
Are the culverts and/or filled areas installed properly?
0 ❑
❑
❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
0 ❑
❑
❑
Comment: Site 2 culvert construction was reviewed by DOT staff, consultant and the Corps.
Culvert was still being
worked on and appears to be in compliance at this point. No issues with the pump
around were observed.
The site recently flooded following an intense storm event. All EC measures were repaired and in good
working order.
page: 2