Loading...
HomeMy WebLinkAbout20180007 Ver 2_May 3 Site Inspection_20190509Wetland Inspection Report Project Num: 20180007 Version: 2 Project Name: NCDOT - 1-85/SR 1221 Interchange (1-3804) County: Rowan Location: NCDOT - 1-85/SR 1221 Interchange (1-3804) Latitude: +35' 31' 56" SW Plan Location Site Owner Name NC DOT Division 9 Inspection Date: 5/3/2019 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Status: Issued Project Type: New Road/Highway Region: Winston-Salem Longitude: -80' 34' 26" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: page: 1 Site Number: 20180007 Owner: Tippett, Lyndo Inspection Date: 5/3/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: Site 2 culvert construction was reviewed by DOT staff, consultant and the Corps. Culvert was still being worked on and appears to be in compliance at this point. No issues with the pump around were observed. The site recently flooded following an intense storm event. All EC measures were repaired and in good working order. page: 2