Loading...
HomeMy WebLinkAbout310404_30 day POA_20180802a D vall4l KJ d 41ii� PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-404 CountyDuplin Facility Name Mike Kennedy Farm Certified Operator Name. Mike Kennedy Operator Number AWA17236 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways Lagoon Name/ID: Spillway(Y or N): Level(inches)- Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached. Agronomic balance is within acceptable range Waste is to be pumped and hauled to off site locations Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 9f animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3 Earliest possible date to begin land application of waste, as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Mike Phone 910-934-0511 Date: 8/1/2018 Owner/Manager (signature) It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 26 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID Lagoon 1 line m = 409.3 lb PAN 2 Structure ID line m = lb PAN 3. Structure ID. line m = lb PAN 4. Structure ID. line m = lb PAN 5 Structure ID. line m = lb PAN 6 Structure ID line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 409.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNCT RF APPI IFn 11111RI&M Tuls an nev DFRInn o. tract # p. field # q. crop r acres s remaining IRR 2 PAN balance (Ib/acre) L TOTAL PAN BALANCE FOR FIELD (tbs.) column r x s u. applrcalion wndow' 6B Bermuda 341 187.68 640 0 March - Sept 6C Bermuda 429 145.08 6224 March - Sept 6E Bermuda 354 151.41 536.0 March - Sept estate current crop enamg appucatlon oate or next Crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1798.4 lb. PAN IV. FACILITY S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 409.3 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 1798 4 lb. PAN y. Overall PAN balance (w - x) _ -1389 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul„ depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Irrigation onto existing spray fields will continue as weather and field conditions permit Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/ldenbfier (ID) La oon 1 2. Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a current liquid level according to marker b designed 25 yr /24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7 48 gallons/ft' 3 Projected volume of waste liquid produced during draw down period I. temporary storage period according to structural design 17.0 Inches 19.0 inches 2.0 inches 61593 It, 76786 gallons 180 days g. volume of waste produced according to structural design 65804 ft3 h current herd # 1996 certified herd # 1996 actual waste produced = current herd # x line g = certified herd # i volume of wash water according to structural design j. excess rainfall over evaporation according to design k (lines h+ i +j) x 7 48 x 30 daystline f= 4 Total PAN to be land applied during draw down period I. current waste analysis dated 1 5/28/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 65804 ft' Oft3 35929 ft3 126827 gallons 2.01 Ibs/1000 gal 409.3 Ibs. PAN