Loading...
HomeMy WebLinkAbout310392_30 day POA_20180803ao« OP50 '3i-3clz PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9090 - County: noplln Facility Name: NorlYAmI Ss uc 9,n,A Ftm Certified Operator Name: SrCyc JmA Operator itI I9 RR 1. Current liquid level(s) in inches as measured from the current liquid level In the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 (N52) Lagoon Name/Identifier (ID): ,uoo z Spillway (Yes or No): NO Level (inches): I mdies 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are within acceptable ranges. V/ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action Is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates.for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: RIM I hereby certify that I have reviewed the Information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the Information Is accurate and correct. 57eeheh Cr419 S/1)1/4 Phone: Facility Owner/Manager (print) Date: Owner/Manager (signature) asa-,Sso-o197 • PoA Cover Page 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 199080 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. fine b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7 48 gallons/fe 3 Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 17.0 inches 19.0 Inches 2.0 inches 63558.5 ftz 79236 gallons 180 days g. volume of waste produced according to structural design 71210 fe h. current herd # 2100 certified herd # 2160 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design I. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN,to be land applied during draw down period I. current waste analysis dated 6l15/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 69232 fe Ofe 35262.5 W 130270 gallons` 2.33 Ibs/1000 gal. 488.1 Ibs. PAN PoA (30 Day) 2/21100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDfOR 25 YR.124 HR, STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Ns 1 line m= q "'1 lb PAN 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN y8� Z lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN ,,.1.1.,-r oo ADD! !rD ni IR.nira THIS Sn DAY PERIOD. PERIOD. DU o. tract # NU I Luse FiELuo p. field # i v vvnwn �.+,. q. crop ter•,•,••- , •-�- r. acres • _.-- RR s. remaining bat IRR 2 PAN balance (Iblacre) I ---- - - PAN I. BALANCE BALANCE FOR FIELD (Ibs.) u application window' (� 0 gL 50 Ps G919 b �b a Cog C I 3a oa s3 7.1 8 .rc� ( G9 WWa :3 -s � .as 'State current crop ending application pate or next ciup dPPnodu-i 1 uc 11,111-y �u•� receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = a ,0�a,9a lb. PAN PoA (30 Day) 2121/00 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applled (line n from section II) = qW, 2 lb. PAN x. Crop's remaining PAN balance (line v from section III) lb. PAN y. Overall PAN balance (w - x) = Ib. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new Information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide Information regarding the herd population and lagoon freeboard levels at the 9-; -12 Eve H. Honeycutt Extension Agent Agriculture, Livestock Certified Technical Specialist PoA (30 Day) 2/21100