HomeMy WebLinkAbout310392_30 day POA with Waste Report_20181203PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: - 90$0 -
Facility Name: rVo..frilgn 1 5Temc . SmiA t;en
County: U ek"
Certified Operator Name: _ 9e,VC SMI M Operator # J 997?
Current liquid level(s) in inches as measured from the current liquid. level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ldentifler (ID):
Spillway (Yes or No):
Level (inches):
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
•Ns2
2. Check all applicable items
NO
�1
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to bemoved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby.certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information Is accurate and correct.
S4e
m 1'
Facility Owner/Manager (print)
Owner/Manager (signature)
PoA Cover Page 2/21/00
Phone: aSoZ- Jr50- 0119
Date: /2,'3 '20/r
•J �
Y
ft
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Norman/ Steve Smith Farm 99080
2. Current liquid volume' in 25 yrJ24 hr. storm storage & structural freeboard
a current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 Inches
c. line b - line a Cinches in red zone) = 1.0 Inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 63558.5 ft2
a. line c/12'x line d x 7.48 gallons/W 39618 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 71210 to
h. current herd # 2100 certified herd # 2160
actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
i. current waste analysis dated 1 8116/2018
m. ((lines e + k)/1000) x fine I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
69232 it'
Oft
35262.5 ft'
130270 gallons
1.23 Ibs/1000 gal.
209.0 Ibs. PAN
►" S
09,0
1.
structure ID:
line m = o
lb PAN
2.
structure ID:
line m =
lb PAN
3.
structure ID:
line m =
lb PAN
4.
structure ID:
line m =
lb PAN
5.
structure ID:
line m =
lb PAN
6.
structure ID:
line rn =
lb PAN
pq.L9
n.
lines 1 + 2 + 3 + 4 + 5 + 6 =
lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD_
❑O NOT LIST FIELDS TO WHICH PAN CAN
NOT BE APPLIES DURING THIS 30
DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(Ib/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs.)
column r x s
u.
application
window'
Sod
a
oa
o
a o. o
56
14ot
d.S3
.G�d
3
�o
al3
sGK
P4
o
3a9
'State current crop ending application date or next crop application beginning_ date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) _ !<�/ , l6 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 Day) 2121/00 2
w. Total PAN to be land applied (line n from section 11) _ °�• d lb. PAN 4
x. Crop's remaining PAN balance (line v from section III) lb. PAN
y. Overall PAN balance (w - x) _ - °i 80. I G lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
PoA (30 Day) 2121100 3
NCDA&CS Agronomic Division
Phone: (919) 733-2665 Webske: www.ncagr.govtagronomi/
ReportNo. FY194001017
,C°W Predictive
Client Steve Smith
Advisor
r 6y
142 Woodland Church Rd
='
Albertson, NC 28508
Waste
Report Duplin County
p •.Cr
Links
to Helpful
Information Sampled: 08/14/2018
Receivetl; 08/16/2018
Farm: 99132
Completed: 08/22/2018 PALS #: 404230
PALS #:
Sample Information
Nutrient Measurements are given In units of parts per million (ppm), unless uthenvise
Nitrogen (N) P K Ca Mg S Fe Mn Zn
specifed.
Cu B
Mo
Other Results
C AI Na Cl
ID: 99132
Code: ALS
Total N:
I 278 551 45.6 438 37.9 1.73 0.24 0.42
0.60 0.48
-
- 0.24 133 -
Description: Swine
Total Kgeldahl N: 199 - -
-
- -
- - -
Lagoon Liq.
Inorganic:
Grower Comments:
NH4-N
SS EC pH BD CCE
ALE
C:N
DM
Not Provided
NOe N
(le S/cm) (mS/cm) (Unitless) (lb/yd') N
(1000 gal)
(Unifless)
(%)
- -- 795 - -'
-
-
-
Estimate of Nutrients Available for First Year (Ib/1000 gap
Other Results (lb/1000 gap
Application Method:
- N P205 K20 Ca Mg S Fe Mn Zn
Cu B
Mo
Ai Na Cl
Irrigation
0.83 0.53 551 0.38 0.37 0.32 0.01 T T
0.01 T
-
T 1.11 -
Sample Information
Nutrient Measurements are given in units of parts per million (ppm), unless utherrnse
Nitrogen (N) P K Ca Mg S Fe Mn Zn
specifed.
Cu Q
Mo
Other Results
C AI Na Cl
ID: 99080
Code: ALS-
Total N•
362 424 55.5 43.8 22.9 4.41 0.36 0.85
0.83 043
-
- 1.67 114 -
Description: Swine
Total Igeldahl N. 295
- - - - - - - - - - - - -
- - - -
- -
- - - - - - - - -
Lagoon Uq.
Inorganic.
Grower
Grower Comments:
NH4-N
SS EC PH BD CCE
S/cm)
ALE
CA
DM
N
Not Provided
NO3-N
(1e (mS/an) (Unlitess) (lb/yd3) N
(1000 gal)
(UniVess)
- - 7.60 - -
-
-
-
Estimate of Nutrients Available for First Year (1b/1000 gal)
Other Results (lb/1000 gal)
Application Method:
N P205 K20 Ca Mg S Fe Mn Zn
Cu 8
Mo
Al Na Cl
Irrigation
1.23 069 4.25 0.46 0.37 0,19 0.04 T 001
001 T
-
001 0.95 -
�1
North Carolina
n Tobao Tnm Fund mi i coin sson
Reprogramming -of the laboratory-informabon-management system that makes this report possible is being funded
through a grant from the North Carolina Tobacco Trust Fund Commission.
Thank you for using agronomic services to manage nutrients and safeguard environmental quality
- Steve Troxler, Commissioner ofAgriculture.