Loading...
HomeMy WebLinkAbout310392_30 day POA with Waste Report_20181203PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - 90$0 - Facility Name: rVo..frilgn 1 5Temc . SmiA t;en County: U ek" Certified Operator Name: _ 9e,VC SMI M Operator # J 997? Current liquid level(s) in inches as measured from the current liquid. level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ldentifler (ID): Spillway (Yes or No): Level (inches): Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 •Ns2 2. Check all applicable items NO �1 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to bemoved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby.certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information Is accurate and correct. S4e m 1' Facility Owner/Manager (print) Owner/Manager (signature) PoA Cover Page 2/21/00 Phone: aSoZ- Jr50- 0119 Date: /2,'3 '20/r •J � Y ft PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Norman/ Steve Smith Farm 99080 2. Current liquid volume' in 25 yrJ24 hr. storm storage & structural freeboard a current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 Inches c. line b - line a Cinches in red zone) = 1.0 Inches d. top of dike surface area according to design (area at below structural freeboard elevation) 63558.5 ft2 a. line c/12'x line d x 7.48 gallons/W 39618 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 71210 to h. current herd # 2100 certified herd # 2160 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period i. current waste analysis dated 1 8116/2018 m. ((lines e + k)/1000) x fine I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 69232 it' Oft 35262.5 ft' 130270 gallons 1.23 Ibs/1000 gal. 209.0 Ibs. PAN ►" S 09,0 1. structure ID: line m = o lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line rn = lb PAN pq.L9 n. lines 1 + 2 + 3 + 4 + 5 + 6 = lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD_ ❑O NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' Sod a oa o a o. o 56 14ot d.S3 .G�d 3 �o al3 sGK P4 o 3a9 'State current crop ending application date or next crop application beginning_ date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) _ !<�/ , l6 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2121/00 2 w. Total PAN to be land applied (line n from section 11) _ °�• d lb. PAN 4 x. Crop's remaining PAN balance (line v from section III) lb. PAN y. Overall PAN balance (w - x) _ - °i 80. I G lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2121100 3 NCDA&CS Agronomic Division Phone: (919) 733-2665 Webske: www.ncagr.govtagronomi/ ReportNo. FY194001017 ,C°W Predictive Client Steve Smith Advisor r 6y 142 Woodland Church Rd =' Albertson, NC 28508 Waste Report Duplin County p •.Cr Links to Helpful Information Sampled: 08/14/2018 Receivetl; 08/16/2018 Farm: 99132 Completed: 08/22/2018 PALS #: 404230 PALS #: Sample Information Nutrient Measurements are given In units of parts per million (ppm), unless uthenvise Nitrogen (N) P K Ca Mg S Fe Mn Zn specifed. Cu B Mo Other Results C AI Na Cl ID: 99132 Code: ALS Total N: I 278 551 45.6 438 37.9 1.73 0.24 0.42 0.60 0.48 - - 0.24 133 - Description: Swine Total Kgeldahl N: 199 - - - - - - - - Lagoon Liq. Inorganic: Grower Comments: NH4-N SS EC pH BD CCE ALE C:N DM Not Provided NOe N (le S/cm) (mS/cm) (Unitless) (lb/yd') N (1000 gal) (Unifless) (%) - -- 795 - -' - - - Estimate of Nutrients Available for First Year (Ib/1000 gap Other Results (lb/1000 gap Application Method: - N P205 K20 Ca Mg S Fe Mn Zn Cu B Mo Ai Na Cl Irrigation 0.83 0.53 551 0.38 0.37 0.32 0.01 T T 0.01 T - T 1.11 - Sample Information Nutrient Measurements are given in units of parts per million (ppm), unless utherrnse Nitrogen (N) P K Ca Mg S Fe Mn Zn specifed. Cu Q Mo Other Results C AI Na Cl ID: 99080 Code: ALS- Total N• 362 424 55.5 43.8 22.9 4.41 0.36 0.85 0.83 043 - - 1.67 114 - Description: Swine Total Igeldahl N. 295 - - - - - - - - - - - - - - - - - - - - - - - - - - - - Lagoon Uq. Inorganic. Grower Grower Comments: NH4-N SS EC PH BD CCE S/cm) ALE CA DM N Not Provided NO3-N (1e (mS/an) (Unlitess) (lb/yd3) N (1000 gal) (UniVess) - - 7.60 - - - - - Estimate of Nutrients Available for First Year (1b/1000 gal) Other Results (lb/1000 gal) Application Method: N P205 K20 Ca Mg S Fe Mn Zn Cu 8 Mo Al Na Cl Irrigation 1.23 069 4.25 0.46 0.37 0,19 0.04 T 001 001 T - 001 0.95 - �1 North Carolina n Tobao Tnm Fund mi i coin sson Reprogramming -of the laboratory-informabon-management system that makes this report possible is being funded through a grant from the North Carolina Tobacco Trust Fund Commission. Thank you for using agronomic services to manage nutrients and safeguard environmental quality - Steve Troxler, Commissioner ofAgriculture.