Loading...
HomeMy WebLinkAbout310390_30 day POA_20180813PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: _31_ - _390 County:_Duplin Facility Name:_Earth Right Farms, Inc. — Goshen Farm Certified Operator Name: _Stephen M Williamson Operator #_19128 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): _1 Spillway (Yes or No): _No_ Level (inches) _17. 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Frie and 30 day Plans of Action are attached Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to.another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land applicatidn of waste: 08-18-201 1 hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. I , Earth Right Farms, Inc. / Stephen M Williamson Phone: _(910)296-1513 Facility Owner/Manager (print) (signature) PoA Cover Page V21100 8-13-201 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): _31-390 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker _17 inches b. designed 25 yr./24 hr. storm & structural freeboard _19 inches c. line b - line a (inches in red zone) _ _2 inches d. top of dike surface area according to design _52796_ ftz (area at below structural freeboard elevation) e. line c x line d x 7.48 alp lo3 S = _65819_ gallons 12 ft 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design _180 days g. volume of waste produced according to structural design _71384_ ft3 h. actual waste produced = current herd # x line g = _72097_ ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated _07/17/2018= m. (lines e + k) x line 1 = 1000 0 ft3 32667 ft3 _130553_ gallons _2.25 Ib/1000 gal. 442 lb PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES PoA (30 Day) 2121100 1 1. structure ID: 1 line m = .442 lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN I 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1+2+3+4+5+6 = 442 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs•) column r x s u. application mndow' 3879 1 BH 1.75 140 245 Mar -Oct 3879 2 BH 2.54 210 533 Mar -Oct 3879 3 BH 2.94 90 264 Mar -Oct 3879 4 BH .89 130 _ 115 Mar -Oct 3879 5 BH .46 40 18 Mar -Oct 3879 6 BH .84 80 67 Mar -Oct 3879 7 BH 1.45 _ 75 113 Mar -Oct 73874 1HW BH .87 265 230 Mar -Oct 73874 2HW BH 4.9 120 588 Mar -Oct 73874 13HW BH 1.08 265 286 Mar -Oct 73843 2 BP 9.89 205 2027 Mar -Oct 'State current crop ending application date or next crop application beginning date for avallable receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = _4486 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2121100 2 w. Total PAN to be land applied (line n from section 11) = 442 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 4486 lb. PAN y. Overall PAN balance (w - x) _ <4044> lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new Information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the -overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: The necessary actions are being taken to bring the lagoon level below 19 inches. Mr. David Powell was notified about the lagoon level on 08113/2018. PoA (30 Day) 2121100 3