Loading...
HomeMy WebLinkAbout20190604 Ver 1_CAMA Application_20190503NORTH CAROLINA Environmental Quality May 3, 2019 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg.bodnar(cDncdenr.gov SUBJECT: CAMA / Dredge & Fill Application Review Applicant: James W. Oestreich ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division of Coastal Management Project Location: SR 1319 at 410 Summer Haven Lane Washington North Carolina Proposed Project: Propose to expand and existing boathouse and platform. Additionally, the applicant proposes to replace 92 linear feet of bulkhead. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grow Bodnar at the address above by May 24 2019 If you have any questions regarding the proposed project, contact Kelly Spivey (252) 948-3853 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. PRINT NAME AGENCY SIGNATURE DATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. State ofNorth Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: James W. Oestreich 2. LOCATION OF PROJECT SITE: located off SR 1319 at 140 Summer Haven Lane near the City of Washington in Beaufort County, North Carolina Photo Index —1995; 100-1060, 06 2000; 100-1138, N8 2006; 100-8155, N8 Location - 35° 59' 39" N 760 59'42" W 3. INVESTIGATION TYPE: CAMA & Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 22 March 2019 Was Applicant Present — yes 5. PROCESSING PROCEDURE: Application Received — 3 April 2019 Office— Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan -1997 Beaufort County Land Use Plan Land Classification from LUP - Conservation (water), Rural (land) (B) AEC(s) Involved: Coastal Shoreline, Estuarine Water (C) Water Dependent: Yes (D) Intended Use: private (E) Wastewater Treatment: Existing — septic tank Planned - none (F) Type of Structures: Existing — bulkhead, pier, boathouse, single-family dwelling Planned — boathouse, bulkhead, platform (G) Estimated Annual Rate of Erosion: N/A (H) Source — applicant 7. HABITAT DESCRIPTION: [AREA] DREDGED FIi.LF.D OTHFR (A) Vegetated Wetlands (404) (B) Non -Vegetated Wetlands f150 ft2 1152 ft2 (shaded) River Bottom (bulkhead) (C) Other (Uplands) disturbed f 1,500 ft2 (bulkhead) (D) Total Area Disturbed: ±1,802 ft2 (0.04 acres) (E) Primary Nursery Area: No (F) Water Classification: SB NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to expand an existing boathouse and platform. Additionally, the applicant proposes to replace 92 linear feet of bulkhead. James W. Oestreich 140 Summer Haven Lane, Washington Beaufort County Project setting The project site is located off SR 1319 at 140 Summer Haven Lane near the City of Washington in Beaufort County, North Carolina. The lot is approximately 0.37 acres (16,500 ft) in size and has 92 linear feet of shoreline on the Pamlico River. Man-made features on the lot include a single family residence, bulkhead, pier, platform, boathouse and an uncovered PWC lift. The water depth at the waterward end of the pier is 4.0' below Normal Water Level (NWL). The lot is approximately 13.0' in elevation above the NWL. The lot is mostly vegetated with lawn grasses, ornamental shrubs, and various hardwood trees. Both the downstream and upstream properties are developed with single family dwellings with bulkheaded shorelines. The Pamlico River is classified as SB NSW waters by the Environmental Management Commission at the project location. There are no Coastal Wetlands on-site. Pamlico River is classified as coastal fishing waters at the project location. The property is subject the Tar -Pamlico Riparian Buffer rules enforced by the N.C. Division of Water Resources. No Submerged Aquatic Vegetation was observed during the site visit. Proiect description The applicant proposes to add 4' x 10'to the existing platform. This will increase the size of the platform to a total of 16' x 16'. The applicant also proposes to lengthen the existing 16' x 23' boathouse 7.0', fora total length of 30'. The boathouse will not be relocated, will be no closer to the riparian line on the upstream (west) side and will not extend farther waterward than the existing docking facility. Additionally, the applicant proposes to replace 75 linear feet of bulkhead 2' waterward of the existing bulkhead and 17' of bulkhead (return wall on the east side) in the same footprint. Anticipated impacts The construction of the replacement bulkhead will result in the filling f 150 ft2 of River bottom. The installation of the dead -men and tie back system will result in the high ground disturbance off 1,500 ft. The 112 ft2 expansion of the boathouse will result in a total of 480ft2 of boathouse coverage at the property. It should be noted that the boathouse is located within the 15' setback of the riparian line and the property owner on the west side has waived the 15' setback for this current proposal. The expansion of the platform will result in an additional 40 ft2 of platform for a total of 256 ft2 of platform at the property. The total combined square footage of both the platform and boathouse is 736 ft2, which is the maximum allowed for this property with 92 linear feet of shoreline. Kelly Spivey -17 April 2019 February 12, 2019 Project Narrative for 140 Summer Haven Lane, Washington, NC 27889 Request to replace an existing wooden bulkhead which was built in 1997 with a vinyl type material. Existing bulkhead is approximately 75 feet in length with an "L" shaped portion on the property line pointing inward measuring approximately 17 feet in length, for a total of 92 feet overall. Replacement bulkhead measuring 75 feet to be located approximately 2 feet in front of the existing structure. The "L" shaped portion will have to be dug out and replaced as it is beside a neighbor's existing concrete wall. Also requesting to extend the roofline of existing boathouse with like material from 23 feet in length to 30 feet with the width of the roofline remaining the same. The boathouse was originally built for an 18 foot boat and since that time I have purchased a boat that the existing roofline will not adequately cover. Would further request to increase the length of the existing platform beside the boathouse with like material from 12 feet to 16 feet with the width remaining the same. James W. Oestreich 140 Summer Haven Lane Washington, NC 27889 252-945-1267 Ulu W-1 T P si A Are z y,last revised 12/27106) � -- - V. North Carolina DIVISIONOF • 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name MI / Last Name —/�/Q iEL C Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address !y0 �yit-�/n/CR f�AdCrc� �l�i✓E PO Box City CJi95r1r�/�r's State /�%L' ZIP Country Phone No. FAX No. Street Address (if different from above) City State ZIP Email 2. Agent/ContractorInformation Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City state ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # VE Street Address (if different Imm above) City State ZI 12 2� Email W%0, <Form continues on back> 252-808.2808 :e 1-888-4RCOAST :: www.nccoastalma nagement. net M Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address Stale Rd.# Subdivision Name city %'A✓ Stale �t/G Zip 'Z 7881 SAWW14x-K /iAdC// ❑NHW or PMVV'L e. Vegetation on tract Phone No. Lot No.(s) (d many, attach additional page with list) z54 -9`/S-24'91 ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project F'Wi 1-IC45 PR/"?L/Co c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body/to the proposed project site. QWaatural ❑Manmade ❑Unknown P/9/)%C/C6 A///�� e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed _ ❑Yes Lyrvo _ work falls within. ` if a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 97- 14654nn c. Size of individual lot(s) A_ /q-- 4L d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) 13 � (If many lot sizes, please attach additional page with a list) ❑NHW or PMVV'L e. Vegetation on tract egKd15s/S/m,ue s f. Man-made features and uses now on tract ,4�ri:sc- P . g. Identify and desc ibe the existing la usCe-� add to the proposed project site. �C-S I /zy sa rrr y/�K f��dc--n/ � i✓� y G✓/%5ifi�/G-Tot✓� /�C zf S'61 /sy scs.��.�lc-,e /✓,vdc--.✓ t-/�•�'�: �. o ,� c � ?s8'�' h. How does local government zone the tract? 1. Is the proposed project consiste t with the applicable zoning? (Attach zoning compliance certificate, if applicable) []No [-INA es j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes B<o k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No IJP IQH If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑ta�p� National Register listed or eligible property? �( <Form continues on next page> 252.808.2808 .. i-888.4RCOASY .. www.nccoastaimanagernent.net Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit M. (i) Are there wetlands on the site? ❑Yes .. o� (ii) Are there coastal wetlands on the site? Ely's DKO (iii) If yes to either (I) or (H) above, has a delineation been conducted? ❑Yes []No (Affach documentation, If available) n. Describe existing wastewater breabnent facilities. o. Descdbe existing drinking water supply source. p. Describe existing storm water management or treatment systems. 3w ` 5. Activities,and linp'acts z e ;;;WN �. >,, a. Will the project be for commercial public, or private use? ❑Commercial ❑Public/Govemmenl 9FIr-1vatelCommunity, b. Give a brief description of purpose, use, and daily operations of the project when complete. ,Q� scOc-!�(CG -- Pie,r�iR E CP S� ©1- IBJi:.�C!�r-a, 0 � ',�.2 `�- %✓�ca/FTt/OrLS� c. Describe the proposed construction methodology, types of construction equipment to be used during constmctbn, the number of each type of equipment and where it is to be stored. �/�/dc- !i l ti P�.>/c�s ..>✓ro Ge�x dir< �i�✓�s1cC-Jpa-� �C �c✓r e AWf7l(�j,66 g11,0 �'oi1/iL S rJ5 Io C0005 d. List all development activities you prowe. p /'Z'Fe-O C/ICC Cxrs 1 L�J�i,K/{Cs.�J .5F- ' ,5 .RdO / �i/t ase zz�llGT or Bo urr/�c4sc ,4�r- t rrtate: / � ; v o �rys9it ,- 1/1(GtiGASG .c-t^!/G-'f/i c�iI= ! !✓�Tf ^.��P/YJ /�CX % �G ./J'O/9'% /iytU"E �h'Y�P�1 /Z � TG /E e. Are the proposed activities maintenance of an existing project, newwork, or both? I. What is the approximate total disturbed land area resulting from the proposed project? q.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes 0iTo [INA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. L Will wastewater or slormwater be discharged into a wetland? []Yes o [INA If yes, will this discharged water be of the same salinity as the receiving water? []Yes [Ito [INA J. Is there any mitigation proposed? ❑Yea LKo [INA If yes, attach a mitigation proposal. <Form continues on back> 252.808.2808 -. 1-888-41RCOAs'o .. www-nOcoastalmanagement.net I Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package. to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (Including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name 6:ffOVIJ . /y1r-1-Ci i/0 t+ Phone No.2,� 1 ' <14Y -. %5 '7. Address Pee /)ox 13c� 2-I. Name Phone No. Address Name; /TG" -04) ,/d/k _"' t .�. Phone No. 2.5 2-:" 5"l�-� Address /'Srs � G J rlf Si JsQsll/i%G- 7 1 �� f C Zi 3 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. zi rcq/z_ �y >99 7 x P CoA/ /!? J'ER.211FJoy 'Zoo/ - CP 24 Ji' 'Q --f3 h. Signed consultant or agent authorization form, if applicable. i. Welland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. [-7. GertiflMion and Permissl h^to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date A,,42 Z 9-e)1,2 Print Namer!AiY! - S z.J 7indicate application attachments perh MP -2 Excavation and Fill Information ❑DCM MP -3 Upland Development pfiCM MP -4 Structures Information Signature to your proposed project. ❑DCM MP -5 Bridges and Culverts FE812 tip19 DCM'W Aa0 252.808-2808 :: 1-888.4RCOA5T :: www.nccoastaimanagement.net EXCAVATION and FILL (Except fcr'bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form 06M MP -1, Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please Include all supplemental Information. Describe below the purpose of proposed excavailon andlor fill activities. All values should be given In feet. Length Width Avg. Existing Depth Final Project F _ Depth Access Other Channel (NLW or Canal Boat Basin Boat Ram p Rock Groin Rock (excluding Breakwater shoreline NWL stabilization NA NA NA NA I. EXCAVATION glThis section not applicable a, Amount of matedat to be -cubic yards, below NHW or _. (1) Does the area -lo be excavated include coastal wetlands/marsh (CW), submerged -aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected, ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these. are as: material to be excavated. d. High -ground excavation in cubic yards, ?. DISPOSAL OF EXCA VA TED MATERIAL ®This section not applicable area. b. area. (f) Do you claim title to disposal area? d. (1) Will a disposal area be available for future maintenance? ❑Yes ONO ❑NA - - - ❑Yes ❑No ❑NA (ii) It no, attach a letter granting permission from the owner. (ii) If yes, where? (i) Does the disposal area Include any coastal wetlands/marsh I. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV (:]SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any ar♦ 4 ? Oyes ❑No ❑NA1 - $ �0�9 (If) If yes, how much water area Is affectfV D FA 3. SHORELINE STABILIZATION . (If development Is a wood grolri, use MP -4 — Structures) a. ._. -� R(prop-'-�-'� []f;reaTc`waFer7/Silt ❑"O �lher: c. Average distance waterward of NHW or NWL; O _ e. Type of stabilization material: g. Number of square feet of fill'to be placed below water level. Bulkhead backfllf !EY Fr"kiprap Breakwater/Sill_ - Other_ I. Source of fill material. /L'?CA! emiJYl�i�Cr �AE ❑This section not : .b, Length; O Width: d. Maximum distance waterward of NHW or NWL: f. (1) Has there been shoreline erosion during preceding 12 months? ❑Yes @Ko ❑NA (If) If yes• state amount of erosion and source of erosion amount Information. h, Type of fill material. '-5- &110 4. OTHER FILL ACTIVITIES is section not applicable (Excluding Shoreline Stabilization) a. (i) WIII fill material be brought to the site? ❑Yes ❑No If yes, (if) Amount of material to be placed in the water _ (fit) Dimensions of rill area - (Iv) Purpose of fill 5. GENERAL a. How will excavated or fill ma(edal be kept on site and erosion controlled? C. (1) Willnavig�atiy�I aids be required as a result of the project? ❑Yes LJNo ❑NA (ii) If yes, explain what type and how they will be implemented. Date b.. (1) Will rill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SS), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. - CCW C] SAV _' ❑SB _ ❑WL []None (II) Describe the purpose of the rill in these areas; . What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)7 d. (i) Will wetlands be crossed In transporting equipment to project site? ❑Yes CWo (INA nn (ii) If yes. explain steps that will be yq� 4A{nimize environmental impacts. Applicant Name Project Name - Applicant Signature Forth DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. I- DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑This section not applicable` ❑Commercial b. (i) Will the facility be open to the general public? ❑publir/Government dvate/Community, ❑Yes •to C. (i) Dock(s) and/or pier(s) �✓/,� (ii) Number d. (i) Are Finger Piers included? []Yes 2N6 - Oil) Length If yes: (iv) Width (ii) Number (v) Floating Eyes ❑No (Iii) Length (iv) Width a. (i) Are Platforms included? ZYeS (v) Floating Eyes ❑No ONO If yes: f. (i) Are Boatlifts included? []Yes o (ii) Number � If yes: (iii) Length //-0 1 To77*z ) jUc (ii) Number (iv) Width /G, o / F;a r - (iii) Length (Y) Floating []yes GTO-- (iv) Width Note: Roofed areas are calculated from ddpl/ne dimensions. 9. (!)Number of slips proposed © h. Check all the types of services to be provided. (ii) Number of slips existing ❑ Full service, including travel lift and/or rail, repair or maintenance service —'—' ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips') only, number of slips: _ ❑ Dry storage; number of boats: _ ❑ Boat ramp(s); number of boat ramps: _ 216ther, please describe: �ikocar; E_ i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin 1• Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). and/or channel 21�—pen water; no dredging required ❑Other; please describe: 010 Y/ /' �/,%jcx' 1 - 1v� n��+C 2019 FE6QeG12 k. Typical boat length: Y- 2 3 R� m. (i) Will the facility have tie �t. I. (i) Will the facility bb pen to the general p�� ❑Yes I�fYo pilings? ❑Yes ❑No' (tl) If yes number of tie pilings? 252-808-2808:: t-888-4RCOAST:: www.»oaoasta o@m�nt,net revised: 92/27108 Form DCM MP -4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS --❑This sectrc a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboarddischarge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. _ I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin gushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? M. Is the marina/docking facility proposed within a primary or secondary nursery area? 11yes []No 252.8013-2808 :, 9.880-4RCOAST :: 'vww,nccaasialmanaagmeni.net revisati: 12127/08 Form DC M MP -4 (Structures, Page 8 of 4} n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? Oyes ONO - o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh C (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affect ddaquatic vegetation (SAV), shell bottom OCW OSAV OSB _ OWL — 'X(None P . Is the proposed Marina/docking facility located within or within close proximity to any shellfish leases? Oyes )dNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. a. (i) Is the boathouse structure(s): ❑Commercial OPubli,(Govemment dvate/Community (ii) Number t (if) Length g,—G-xry.,-, ,.,ty 23 (iv) Width �� � r,y� r.� E-+r�Srr.J4 Note: Roofed areas are calculated from ddpline dimensions. (iii) Width a. Length e, etc.) b. Average distance from NHW, NWL, or wetlands C- Maximum distance beyond NHW, NWL or wetlands 6:. MOORING PILINGS and BUOYS a. Is the structure(s): PKis section not applit OCommercial OPublic/Governmentb. Number - ❑Private/Community a Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing _ T. GENERAL zS2-2E>S-2t30t3 _e ?�08f2-A[8C0(i3`i" : mvw_nc� uartalanananomang.n++t AGC�� FEB 122019 revised: 12129fo6 Form DC3M1 MP -4 (Strnactures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines EA 5 'i LeFt- 5r pE _ { S[ AJSST Note: Porbuoy or .mooring piling, use arcofng uof vesselnl C. Width of water body inIi eS e. (i) Will navigational aids be required as a result of the project? ❑Yes *0 ❑NA (ii) If yes, explain what type and how they will be implemented. R. OTHER a. Give complete description: Date Project Name- q kPPh Name. `. licant Signature ?52.808-2808 ;: -1-1388.41RCO AST ; '^-!-' _.P!,ccoastaltnana ament,ne# b. Proximity of structure(s) to adjacent docking facilities. FA S'r' a LJ e S T 4Xr-r5i—��57 Rr6rtr d. Water depth at waterward end of structure at NLW or NWL ' BFGn w ?I/. w .'L . 5 revised: ?2%27!08 r