HomeMy WebLinkAbout20190293 Ver 1_More Info Received_20190507Strickland, Bev
From: David Newton <david@daviscivilsolutions.com>
Sent: Tuesday, May 07, 2019 3:12 PM
To: Price, Zan (George)
Cc: Nick Bowman; Gary Davis
Subject: RE: [External] RE: Request for Additional Information - Robert Lake Park - DWR
2019-0293 - Buncombe County
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hello Zan,
The revisions do reduce the impact length for S2 (Puncheon Branch). The impact length for S1 (Flat Creek) remains
unchanged. The revised impacts lengths are as follows:
S1: 213 ft.
S2: 35 ft.
Also be aware the Corps of Engineers issued the permit on April 29 and construction has commenced. Should you have
any questions, please don't hesitate to call.
Thank you,
DAVID S. NEWTON
FbY is CYYf 1501 LII Ions-rh
Phone: 828.299.9449 Ext. 104
Fax: 828.299.9447
david(cDdaviscivilsolutions.com
info(Maviscivilsolutions.com
From: Price, Zan (George) <Zan.Price@ncdenr.gov>
Sent: Tuesday, May 07, 2019 2:28 PM
To: David Newton <david@daviscivilsolutions.com>; Nick Bowman <Nick@daviscivilsolutions.com>
Subject: RE: [External] RE: Request for Additional Information - Robert Lake Park - DWR 2019-0293 - Buncombe County
Thanks for the new information. Sorry for my delayed response. I have been buried in emergency response activities
lately.
Do the revisions change the impact lengths provided in the original PCN application?
S1 213 ft?
S2 123 ft?
If so, please reply with the updated impact numbers.
Thanks
Zan Price, P.E.
1
Assistant Regional Supervisor — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4662 office
828 231 9634 mobile
zan.pricelc'ancdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: David Newton <david@daviscivilsolutions.com>
Sent: Friday, April 12, 2019 10:19 AM
To: Price, Zan (George) <Zan.Price@ncdenr.gov>
Cc: lohnq@montreat.org; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>; Leslie, Andrea J
<andrea.leslie@ncwildlife.org>; Nick Bowman <Nick@daviscivilsolutions.com>; Gary Davis
<gary@daviscivilsolutions.com>
Subject: [External] RE: Request for Additional Information - Robert Lake Park - DWR 2019-0293 - Buncombe County
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hello Zan,
We have completed the response to your Request for Additional Information. Attached is a letter detailing our
responses, a copy of the revised plans, and pertinent data sheets. Please let us know if you have any questions or need
additional information.
Thank you,
DAVID S. NEWTON
Davis Cit. I1501UIiw, I'h
..44—
Phone: 828.299.9449 Ext. 104
Fax: 828.299.9447
david(cDdaviscivilsolutions.com
info(Maviscivilsolutions.com
From: Price, Zan (George) <Zan.Price@ncdenr.gov>
Sent: Monday, March 25, 2019 2:21 PM
To: Nick Bowman <Nick@daviscivilsolutions.com>; David Newton <david@daviscivilsolutions.com>
Cc: lohnq@montreat.org; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>; Leslie, Andrea J
<andrea.leslie@ncwildlife.org>
Subject: Request for Additional Information - Robert Lake Park - DWR 2019-0293 - Buncombe County
On March 1, 2019, the Division of Water Resources (Division) received your application dated March 1, 2019, requesting
a 401 Water Quality Certification from the Division for the above referenced project. The Division has reviewed the
information and has determined the application is incomplete and cannot be processed. The application will be placed
on hold until the following items are addressed:
1. Please provide the proposed typical channel cross-section for each area where channel substrate will be
excavated and relocated. Please include the proposed channel depth, width, and side slopes based on a stable
reference cross-section or regional curve data.
2. Provide a typical detail for the bank stabilization work proposed on Sheet C8.
3. Based on the site visit on March 21, 2019, it appears the plans might change for the boulder wall repair shown
on Sheet C9. Please provide an updated plan for this area.
Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the
proper consideration of the application. If all of the requested information is not received within 30 days, the Division
will be unable to approve the application and it will be returned.
Zan Price, P.E.
Assistant Regional Supervisor — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4662 office
828 231 9634 mobile
zan.price(cDncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
A