Loading...
HomeMy WebLinkAboutSWA000053_Application_20190508Date Received 05 - 016-Zotd° SW Program(s): ❑ Coastal SA-HQW ❑ Coasts ❑ Non -coastal HQW ❑ Non-c Fee Paid 6 Z5 , ":5 SA-ORW astal ORW Permit Number S vi Pt 0000 5 ,;?5 ❑ Coastal FW-ORW ❑ Coasts ❑ Urbanizing Areas ❑ USMP NC DEQ Division If Energy, Mineral and Land Resources STATE STORR WATER FAST TRACK PROCESS: "AUTHORIZATION TO CON3TRUCT" (ATC) PERMIT APPLICAT Link to Application Instructions MAY Q g 2019 L)ENR-LAND QUALITY A. ELIGIBILITY FOR FAST -TRACK PERMITTING STORMWATER P ERMi7ri To be considered for a Fast Track ATC Permit, all of the items below must be checked. If any item cannot be checked, then the project must apply under the Standard Permitting Process. ® The project and all SCMs (including existing SCMs associated with the project) will meet all applicable requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project completion. ® The project is not proposing an alternative design. ® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's Certification. ® The project is not out of compliance with an existing stormwater permit or any other environmental permit. ® The project is not applying for an offsite Permit, an exemption, or a minor modification (as defined in 15A NCAC 02H .1002(25)) to an existing stag stormwater permit. ® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A or 89C of the NC General Statutes. ® I understand that at project completion, an application with the as -built stormwater plans (as described in 15A NCAC 02H .1044 must be submitted, and DEQ will review the as -built stormwater plans to confirm compliance with the MDC. Approval of the as -built stormwater plans will be required before the Erosion and Sedimentation Control Plan for the project may be closed out. ® I understand that the Fast Track ATC Perit will expire five years after the date of issuance. B. GENERAL INFORMATION 1 Project Name: Baucom's Nursery Phase 3a and 3b 2. Previous Project Name (if applicable): N/A 3 t oc:ation of Project (street address)- 2600 FlgwAs Store .Rd F� City:Concord County:Cabarrus Zip:28025 4. Directions to project (from nearest major intersection): From the intersection of Hwy 24/27 and Hwy 601, head north on Hwy 601. Turn left onto Flowes Store Road East, and the project site will be on the left. This proiect is Phase 3 of the existing Baucom Nursery site, and is accessed from the existing two phases. 5. Latitude:350 17' 44.06" N Cslo147i'f FliLTI&I;7 F_ti;r�fP.l Longitude:80° 31' 49.10" W of the main entrance to the project. 1. Specify whether project is (check one): ® New, no previous application ❑ New, replacing a previous Fast Track ATC Permit -- provide previous permit number: SWA Stormwater Fast Track ATC Application Form Page 1 of 11 Feb. 10. 2018 By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit upon issuance of the new Fast Track ATC Permit. Stormwater Fast Track ATC Application Form Page 2 of 11 Feb. 10, 2018 ❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed Major modifications must be submitted by the original permittee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast Track ATC Permit. ❑ Transfer of existing Fast Track ATC Permit — provide existing ATC permit number: SWA 2. Applicable state stormwater programs) (check all that apply): ❑ Coastal SA-HQW ® Urbanizing Areas (Phase 2) ❑ Coastal SA-ORW ❑ Non -Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? ❑ Yes ❑ No ❑ Non -Coastal ORW ❑ Coastal Freshwater ORW ❑ USMP ❑ Coastal — Other 3. Other Permits (as applicable; write "NA" for those permit types that are not applicable): Project Name Permit/Appl Issue Date Other Information No. CAMA Major N/A Erosion & Baucom's Nursery Phase 3 CABAR- 2/25/2019 Disturbed Area Sedimentation Control 2019-057 40.764 acre NPDES Industrial N/A Stormwater — 404/401 Permit N/A Proposed Impacts If/ac 4. Local jurisdiction for building permits: Cabarrus County Point of Contact:Wayne Krimminger Phone #: (704 ) 920-2148 1. Applicant/Financially Responsible Party (may be an Organization):Baucom's Nursery Company Signing Official Name & Title:Gary Baucom, President/CEO Street Address:28256 City:Charlotte State:NC Zip:28213 Mailing Address (i7different):PO Box 560008 City:Charlotte State:NC Zip:28256 Phone: (704) 506-7349 Fax: ( ) Email: gcb(a)-baucomnursery.com 2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent:Gary C. Baucom Mailing Address:PO Box 560008 City:Charlotte State:NC Zip:28213-0008 Phone: (704) 506-7349 Fax: ( ) Email=b(a).bsucomnursery.com Stormwater Fast Track ATC Application Form Page 3 of 11 Feb. 10, 2018 3. The Applicant is the (check all that apply): ® Property Owner ❑ Lessee (Attach a copy of the lease agreement & complete Item 4.) ❑ Purchaser (Attach a copy of the pending sales agreement & complete Item 4.) ❑ Developer (Attach a copy of the development agreement & complete Item 4.) 4. If the Applicant is NOT the Property Owner (skip to Item 5 if the Applicant IS the Property Owner): Property Owner Name/Organization: Signing Official & Title: Street Address: City: State: Zip: Mailing Address (if applicable): City: Phone- ) Email: State: Zip: Fax: ( ) 5. The licensed Design Professional that will be retained for the duration of the project, who may provide information on the Applicant's behalf, and who will prepare and certify the as -built package: Consulting Engineer/Landscape Architect: Catherine W. Underwood PE Consulting Firm: CESI Inc. Mailing Address:PO Box 268 City:Concord State:NC Zip:28026-0268 Phone: (980 ) 234-7500 Fax: (704) 786-5404 Emall:kateunderwood@cesicgs.com 6. [OPTIONAL] If you would like to designate another person to answer questions about the project: Name & Title: Organization: Mailing Address: City: State: Zip: Phone: ) Fax: ( ) Email: 1. Specify the type of project (check one): ❑ Low Density ® High Density 2. Briefly summarize how the stormwater runoff will be treated/conveyed: Stormwater Fast Track ATC Application Form Page 4 of 11 Feb. 10, 2018 The runoff from the project site is collected in a series of swales which are then collected in a stormwater conveyance system which outfalls to a large forebay and subsequent wet detention stormwater control measure (SCM). This SCM provides water quality and attenuation in accordance with the minimum design criteria as outlined by DEQ for wet pond SCMs. 3. Stormwater runoff from this project drains to the Yadkin Pee -Dee River basin(s). 4. Receiving water information (if more than 3 receiving waters, provide additional information on an attached sheet): Receiving Water 1 Receiving Water 2 Receiving ; Water 3 Receiving Stream Name Anderson Creek Stream Classification C Stream Index Number 13-17-13 Stormwater Fast Track ATC Application Form Page 5 of 11 Feb. 10, 2018 5. Proiect area and densitv information - Total Property Area 3,831,276 sf Total Surface Water Area ' 183,541 sf Considered to include: • the normal pool of impounded structures, • the area between the banks of streams and rivers, and • the area below the Normal High Water (NHW) litre or Mean High Water (MHW) line. Total Coastal Wetlands Area 0 sf Considered to include: coastal wetlands landward from the NHW (or MHW) line. Total Project Area 1,269,185' Excludes the surface water area and coastal wetland area identified above. sf May or may not be the same as Property Area. Built -Upon Area (BUA) associated with Existing Development 0 sf Existing development" means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 918,245 sf ' Includes proposed new BUA that is not associated with existing development. "BUA" is defined in N. C. G. S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking areas, sidewalks, and some gravel are -as The design volume of SC'Ms must take into account that runoff from build out from all surfaces draining to the SCM'in accordance with 15A NCAC 02H .1g50(1). Project Density w/ Existing Development: Project Density = [New BUA]/[Total Project Area — Existing BUA] x 100 or 72.3 % w/o Existing Development. Project Density = [New BUA]/Total Project Area] x 100 6. Anticipated construction start date 6.1.19 7. Is the project located within 5 miles of a public airport? ® No ❑ Yes If'Yes,'see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6 pdf and DEQ Stormwater Design Manual Chapter E-4 Airports. 8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B .0600. Stormwater Fast Track ATC Application Form Page 6 of 11 Feb. 10, 2018 Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEIVILR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only application packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: Initials KWU 1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track Process "Authorization to Construct" (ATC) Permit Application Form. KWU 2. Permit application processing fee of $505 payable to NCDEQ KWU 3. Two hard copies and one electronic copy of a USGS map identifying the project location and GPS coordinates for the project. If the receiving water is Class SA or the receiving water drains to Class SA waters within %Z mile of the project boundary, include the % mile radius on the map. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot radius on the map. KWU 4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary of the project or project phase currently being permitted, including the locations of SCMs, streams, wetlands, and buffers. KWU 5. Two hard copies and one electronic copy of a construction sequence that discusses how any future development on the project may be phased. KWU 6. A copy of the most current property deed. Deed book: 12780 Page No: 0091 KWU 7. [IF Ahf'LICABLE] When the applicant is a corporation or a limited Ilablllty curpuralluri (LLC). Provide two hard copies and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). The corporation or LLC must be listed as an active corporation in good standing with the NC Department of the Secretary of State; otherwise, the application will be returned. https://www.sosnc.gov/search/index/corp NIA 8. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. N/A 9. [IF APPLICABLE] When the applicant is not the property owner: Provide two hard copies and one electronic copy of lease agreements, affidavits, pending sales agreement, development agreement, or other documents showing that the applicant has obtained legal rights to submit a stormwater permit application within the proposed project area. NIA 10. [IF APPLICABLE] Ir modifying an existing permit for completed or partially completed projects, a copy of the designer's certification. Stormwater Fast Track ATC Application Form Page 7 of 11 Feb. 10, 2018 The Applicant, who is also the Financially Responsible Party, identified in Section D of this form must sign and have notarized the following guaranty: i 1, (print or type name of Applicant/Financially Responsible Party)e't certify that the information included on this permit application form is, to the best of my knowledg6l correct and that: 1. the design has been or will be completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, to the best of my knowledge; 2. the completed design meets or will meet the MDC and that the percentage BUA that is the basis for the design shall not be exceeded, to the best of my knowledge; and 3. As the applicant, I shall maintain a licensed professional of record for the duration of the project who will prepare and certify the as -built package. If I retain another licensed professional before the project is complete, then I shall provide an updated guaranty with the current licensed professional's seal. A licensed professional shall inform the Division if he is no longer associated with this project. The above information is true and correct to the best of my knowledge and belief and was provided by me under oath I agree to provide corrected Information should there be any change in the information provide herein. Type or print name Title or Authority I, "CRCr,� -S, V-,, At__ , a Notary Public for the State of timed , County of COO e: r {0S , do hereby certify that Gs�, C_> C personally appeared before me this C2 day of c_ t^i and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires C USAN MARIE SCHWARTZNOTARY PUBLICCabarrus County, North CarolinaCommission Expires Stormwater Fast Track ATC Application Form Page 8 of 11 Feb. 10, 2018 111IM!IIIIIIIIIIIIIIIIII 01=1i MILI I «.• To be completed by the Design Professional identified in Section D.S. I, Catherine Wolf Underwood , attest to the following: 1. This application has been reviewed by me and is accurate and complete, to the best of my knowledge; 2. The design has been completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, as applicable; 3. The percentage built -upon area that is the basis for the design will not be exceeded; and 4. 1 have the expertise, education, and experience required to design the SCMs proposed in this application in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062. 5. 1 will provide all documents and certified as -built plans in hard copy and electronic format related to this permit to a new Applicant/Property Owner and to DEMLR upon transfer of this permit to a new Applicant/Property Owner. Note: In accordance with N.C.G.S. 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. In addition, any person who knowingly makes any false statement, representation, or certification in any application may be reported to the appropriate NC UQfessii"l licensing board. Signature: Date: 05/02/2019 koz = S - 033470 = C� 0= ''�, NFW.tR`�,•�` 05/02/2019 SEAL Stormwater Fast Track ATC Application Form Page 9 of 11 Feb. 10, 2018 1. PROPERTY OWNER'S AUTHORIZATION (IF APPLICANT IS NOT THE PROPERTY OWNEFM 1, (print or type name of the Property Owner) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of Applicant) with (print or type name of Applicant's organization) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: I, . of a Notary Public for the State of do hereby certify that Date: County personally appeared before me this day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Stormwater Fast Track ATC Application Form Page 10 of 11 Feb. 10, 2018 ► p I, (print or type name of the Current Permittee) am submitting this request for a transfer of Fast Track ATC permit # SWA With the submission of this transfer request I am providing a copy of the most recent permit, all related documents and as - built plans certified by my design professional in hard copy and electronic format to the Proposed Permittee/Applicant identified in Section G of this application and to DEMLR . I further attest that this request for a permit transfer is accurate and complete to the best of my knowledge. I assign all rights and obligations as permittee to the proposed permittee named in Section G of this form. Signatu Date: 1, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My comirrission expires Stormwater Fast Track ATC Application Form Page 11 of 11 Feb. 10, 2018