May 8, 2019
Bob Walker, Executive Director
Brunswick Regional Water & Sewer H2GO
PO Box 2230
Leland, NC 28451-2230
Subject: Permit No. WQ0033044 MODIFICATION
Brunswick Regional Water & Sewer H2GO
Compass Pointe Development Master Sewer Permit
Wastewater Collection System Extension
Brunswick County
Dear Mr. Walker:
In accordance with your application received March 20, 2019 and additional information received on April
30th and May 711h, we are forwarding herewith Permit No. WQ0033044 dated May 8, 2019 to Brunswick
Regional Water & Sewer H2GO (Permittee) for the construction and operation upon certification of the
subject wastewater collection system extension. This permit shall be effective from the date of issuance
until rescinded, shall void Permit No. WQ0033044 issued May 21, 2015, and shall be subject to the
conditions and limitations as specified therein. This cover letter shall be considered a part of this permit
and is therefore incorporated therein by reference.
This modification provides for additional flow allocation being tracked under this master permit for
additional connections served by previously approved construction permits for both gravity and
pressure sewer being permitted separately with no flow allocation assigned and for future permit
requests. In addition, it increases the capacity of the Main pump station from 300-gpm to 708-gpm
with the activation of the new force main approved on May 21, 2015 and certified on February 10, 2017.
Please Note: The issuance of this updated permit shall not have any bearing on a potential enforcement
action by exceeding the number of permitted connections within Compass Pointe under
the previous versions of this permit by approximately 460.
Please pay particular attention to the following conditions contained within this permit:
Special Conditions:
Condition 1.1: This permit shall become voidable unless the agreement between Brunswick Regional
Water & Sewer-H2GO and Brunswick County for the collection and final treatment of
wastewater is in full force and effect. [15A NCAC 02T.0304(h)]
D q5
Division of Water Resources —Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
Phone: 910-796-7215\ Internet: www.deg.nc.aov
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
Condition 1.2: No flow in excess of the quantity permitted herein shall be made tributary to the
subject sewer system until an application for permit modification has been submitted
to and approved by the Division. The Permittee shall provide an up-to-date connection
& allocation usage accounting report for each new or modified permit request covered
by this master permit. [15A NCAC 02T.0304(b)]
Condition 1.3: Each pump station shall be clearly and conspicuously posted using a weatherproof sign
with the address, a pump station identifying name/number, 24-Hour Emergency
telephone number, and name of the owner/operator of the sewer system/pump station
and instructions to call the number in the event of alarm activation or other emergency.
Simplex pump stations or vacuum sewer pits serving a single-family residence may have
a placard or sticker without the address placed on the control panel in lieu of a sign. [15A
NCAC 02T .0305(h)(2)]
Standard Conditions:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system
permit issued to the Permittee.
Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities, the
completed Engineering Certification form with checklist attached to this permit shall be
submitted with the required supporting documents to the address provided on the form.
Permit modifications are required for any changes resulting in non-compliance with
this permit, regulations, or the Minimum Design Criteria. [15A NCAC 02T.0116]
Condition 11.13: If the Permittee/Applicant holds a system -side collection system operation,
maintenance and management permit (WQCS-prefix) from the Division, then the
following applies: For all newly constructed, modified and rehabilitated pump stations,
all equipment and components shall be sealed within a corrosion -resistant coating or
encasement to the extent practicable and equivalent to the minimum design criteria
unless the permittee can demonstrate it is not practicable or another form of corrosion
resistance is employed. [15A NCAC 02T .0108 (b)]
It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, INC
27699-6714. Unless such demands are made, this permit shall be final and binding.
Permit No. WQ0033044 May 8, 2019 Page 2 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
If you need additional information concerning this matter, please contact Dean Hunkele at (910) 796-7215
or via e-mail at Dean.Hunkele@ncdenr.gov.
Sincerely,
DocuSigned by:
E3ABA14AC7DC434_
Morella Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Cc: Matt Haley, Cape Fear Engineering
Brunswick County
Upload to Laserfiche
(Laserfiche info via email)
(Laserfiche info via email)
Permit No. WQ0033044 May 8, 2019 Page 3 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
f
t �y
NOR IH �:AgO_IN.4
Envrrortmrrtruf Quality
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
BRUNSWICK REGIONAL WATER & SEWER H2GO
BRUNSWICK COUNTY
For the operation upon certification of the Main Pump Station at an increased capacity of 708-gallon per
minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and on -
site generator with automatic transfer switch based on the activation of new force main approved on May
21, 2015 and pursuant to the application received March 20, 2019;
And for the allocation of an additional 174,690 gpd of flow for additional yet still limited connections
within the development with total flow allocation up to 282,690 gpd. This covers at the time of this May
8, 2019 issuance the systems listed below and those approved under this permit number with some
remaining capacity for future requests:
WQ0034461 Phase 11 up to 44 units WQ0036749 Phase 4 Sec 4 up to 44 units
WQ0036750 Phase 2 Sec 1-C up to 28 units
WQ0037083 Phase 10 Sec 4
up to 13 units
WQ0037084 Phase 11 Sec 3 up to 83 units
WQ0037606 Phase 12
up to 35 units
WQ0037607 Phase 11 Sec 1-D up to 13 units
WQ0037896 West Entrance
no connections
WQ0038004 Phase 13 up to 46 units
WQ0038095 Phase 17 Sec 1
up to 34 units
WQ0038212 Phase 16 up to 51 units
WQ0038259 Clubhouse
3,810 gpd
WQ0038268 Phase 17 Secs 2-5 up to 126 units
WQ0038900 Phase 15
up to 45 units
WQ0040299 Phase 14 permit pending
WQ0040386 Phase 19
permit pending
AND for the continued construction and operation upon certification of the applicable systems below:
May 21, 2015 MODIFICATION VERSION 2.0)
Approximately 10,570 linear feet of 10-inch force main to serve the complete build out of the
development as part of the Force Main Extension and Flow Redirection project with no increase in
wastewater into Brunswick County's existing sewerage system, pursuant to the application received April
17, 2015. Certified complete on February 10, 2017.
August 25, 2014 MODIFICATION VERSION 2.0)
Added 100 single-family unit connections within previously permitted and future infrastructure pursuant
to application/request received July 15, 2014 and additional information received on July 25, 2014.
Permit No. WQ0033044 May 8, 2019 Page 4 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
January 27, 2014 MODIFICATION (VERSION 1.9)
This modification covered allocating flow for more pressure sewer systems within the development. In
addition, it reassigns some flow and number of connections within some of the phases & sections due to
changes in the development's land plan. However, no additional active connections are being approved
for any type of collection system as the downstream sewer limitations still remain as referenced in Special
Condition 1.3.
August 28, 2013 MODIFICATION (VERSION 1.8)
Approximately 2,180 linear feet of 8-inch gravity sewer to eventually serve 46 single-family units as part
of Compass Pointe Phase 4 Section 5 and the discharge of 9,660 gallons per day of collected wastewater
into the Brunswick Regional Water & Sewer H2GO's existing sewerage system pursuant to the application
received July 18, 2013 and additional information received July 24, 2013. Certified complete on July 11,
2014.
April 17, 2013 MODIFICATION (VERSION 1.7)
Approximately 2,490 linear feet of 8-inch gravity sewer to eventually serve 57 single-family units as part
of Compass Pointe Phase 4 Sections 2&3 and the discharge of 11,970 gallons per day of collected
wastewater into the Brunswick Regional Water & Sewer H2GO's existing sewerage system pursuant to
the application received February 19, 2013 and additional information received April 11, 2013. (units
increased from 50 & flow from 10,500 gpd on January 27, 2014) Certified complete on February 14,
2014.
March 19, 2013 MODIFICATION (VERSION 1.6)
This modification increased the number of residences that can be connected from 217 to 340 units and
the associated flow allocation increase from 45,570 gpd to 71,400 gpd. This was done by reducing
allocated flow on the downstream Lincoln School pump station (WQ0016854) which was restricting the
available allocation due to capacity issues.
October 25, 2012 MODIFICATION (VERSION 1.5)
Approximately 2,650 linear feet of 8-inch gravity sewer to serve 40 single-family units as part of the
Compass Pointe Phase 4 Section 1 project and the discharge of 8,400 gallons per day of collected
domestic wastewater into the Brunswick Regional Water & Sewer H2GO's existing sewerage system
pursuant to the application received October 1, 2012. Certified complete on May 22, 2013.
January 28, 2011 MODIFICATION (VERSION 1.4)
Approximately 1,015 linear feet of 8-inch gravity sewer to serve a 700,000 sf amenity center as part of the
Compass Pointe East Amenity Center project with the discharge of 1,440 gallons per day (usage records
from similar facilities) of collected domestic wastewater into the Brunswick Regional Water & Sewer
H2GO's existing sewerage system pursuant to the application received January 14, 2011. This modification
reduces the number of residential sewer connections from 131 units to 127 units to accommodate a
proposed amenity center. Certified complete on June 7, 2011.
December 4, 2009 MODIFICATION (VERSION 1.3)
This modification reduced the number of residential sewer connections from 300 units to 131 units due
to downstream sewer capacity and is part of the Compass Pointe Sewer project, pursuant to the
administration amendment request received November 17, 2009.
Permit No. WQ0033044 May 8, 2019 Page 5 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
February 20, 2009 MODIFICATION (VERSION 1.2)
Approximately 780 linearfeet of 8-inch gravity sewerto serve 12 single-family units as part of the Compass
Pointe Phase 1A, Section 26 project, and the discharge of 2,520 gallons per day (units reduced from 20
and flow from 4,200 gpd on January 27, 2014) of collected domestic wastewater into Brunswick Regional
Water & Sewer-112GO's existing sewerage system, pursuant to the application received January 28, 2009.
Certified as a Partial on October 16, 2013 and updated as a Final based on proiect scope reduction from
1-2014 on May 8, 2019.
October 10, 2008 MODIFICATION (VERSION 1.1)
Approximately 9,440 linear feet of 8-inch gravity sewer, 3,260 linear feet of 10-inch force main (for future
use) to serve 187 single-family units as part of the Compass Pointe Phase 2 Sections 2A & 2113 project, and
the discharge of 39,270 gallons per day of collected domestic wastewater into Brunswick Regional Water
& Sewer-112GO's existing sewerage system, pursuant to the application received September 4, 2008.
(design change removed pump station, reduced gravity sewer from 10,570 ft, reduced units from 224,
and flow from 47,040 gpd on January 27, 2014)
October 3, 2008 (Version 1.0)
Approximately 7,741 linear feet of 8-inch gravity sewer and 6,607 linear feet of 10-inch gravity sewer; a
300—gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms,
telemetry, and on -site generator with automatic transfer switch with approximately 500 linear feet of 4-
inch force main, 6,500 linear feet of 6-inch force main, 1,500 linear feet of 10-inch force main, 1,200 linear
feet of 12-inch force main, and 2,274 linear feet of 10-inch force main (for future use) to serve 222 single-
family units as part of the Compass Pointe Phase 1A & 16 project, and the discharge of 46,620 gallons
per day of collected domestic wastewater into Brunswick Regional Water & Sewer-112GO's existing
sewerage system, pursuant to the revised application received June 1, 2008. (units reduced from 300 and
flow from 63,000 gpd on January 27, 2014)
This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified
conditions and limitations contained therein.
Permit Number: WQ0033044
Issued Today: May 8, 2019
DocuSigned by:
E
t0 S-�'7 6"
E3ABA14AC7DC434_
Morella Sanchez -King, Regional Supervisor
Wilmington Regional Office
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
By Authority of the Director and The Environmental Management Commission
Permit No. WQ0033044 May 8, 2019 Page 6 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
SUPPLEMENT TO PERMIT COVER SHEET
BRUNSWICK REGIONAL WATER & SEWER H2GO is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension. The
sewage and wastewater collected by this system shall be treated in the Northeast Brunswick Regional
Wastewater Treatment Facility in accordance with Permit Number NC0086819.
Permitting of this project does not constitute an acceptance of any part of the project that does not meet
15A NCAC 2T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned
herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed
Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -
constructed project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
1. This permit shall become voidable unless the agreement between Brunswick Regional Water & Sewer-
H2GO and Brunswick County for the collection and final treatment of wastewater is in full force and
effect. [15A NCAC 02T.0304(h)]
2. No flow in excess of the quantity permitted herein shall be made tributary to the subject sewer system
until an application for permit modification has been submitted to and approved by the Division. The
Permittee shall provide an up-to-date connection & allocation usage accounting report for each new
or modified permit request covered by this master permit. [15A NCAC 02T.0304(b)]
3. Each pump station shall be clearly and conspicuously posted using a weatherproof sign with the
address, a pump station identifying name/number, 24-Hour Emergency telephone number, and name
of the owner/operator of the sewer system/pump station and instructions to call the number in the
event of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a
single-family residence may have a placard or sticker without the address placed on the control panel
in lieu of a sign. [15A NCAC 02T .0305(h)(2)]
11111111 IR IIreI►107e1.1oxerel►101111M0E-1
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)]
Permit No. WQ0033044 May 8, 2019 Page 7 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or surface
water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected everyday (i.e. 365
days per year). Pump stations that are connected to a telemetry system shall be inspected at
least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are
documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three
years with exception of the map, which shall be maintained for the life of the system.
Permit No. WQ0033044 May 8, 2019 Page 8 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
5. Noncompliance Notification:
The Permittee shall report by telephone to a water resources staff member at the Wilmington
Regional Office, telephone number (910) 796-7215, as soon as possible, but in no case more than 24
hours or on the next working day, following the occurrence or first knowledge of the occurrence of
either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the initial
verbal report. Overflows and spills occurring outside normal business hours may also be reported to
the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Persons reporting any of the above occurrences shall file a spill report by completing and submitting
Part I of Form CS-SSO (or the most current Division approved form) within five days following first
knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to
ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved
form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form with checklist attached to this permit shall be submitted with the
required supporting documents to the address provided on the form. A complete certification is one
where the form is fully executed and the supporting documents are provided as applicable. Any
wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Engineer's Certification shall be considered a violation of the permit and shall subject the
Permittee to appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles
of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately
filed with the applicable County's Register of Deeds office shall be submitted with the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines & force
mains) of the wastewater collection system extension. Final record drawings should be clear on
the plans or in accepted electronic format and are defined as the design drawings that are marked
up or annotated with after construction information and show required buffers, separation
distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity,
pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge
protection, detention time in the wet well, and force main, ability to flush low points in force
mains with a pump cycle, and downstream sewer capacity analysis.
Permit No. WQ0033044 May 8, 2019 Page 9 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-OF1 9C4A4BF1 E
If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump
stations' storage capacities and the rotation schedule of the portable power source or pump,
include travel timeframes, shall be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in
non-compliance with this permit (including pipe length changes of 10% or greater by type & size,
increased flow, pump station design capacity design increases of 5% or greater, and increases in the
number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications
or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its
own merit. Please note that variances to the Minimum Design Criteria should be requested and
approved during the permitting process prior to construction. After -construction requests are
discouraged by the Division and may not be approved, thus requiring replacement or repair prior to
certification & activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greaterthan ten percent below the minimum required slope perthe Division's
Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until
corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting
the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of
the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's
Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials may subject the Permittee to an enforcement action by
the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C,
construction of additional or replacement wastewater collection facilities, and/or referral of the North
Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T
.0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement facilities.
[15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local
government agencies which have jurisdiction or obtaining other permits which may be required by
the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)]
Permit No. WQ0033044 May 8, 2019 Page 10 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-OF1 9C4A4BF1 E
13. If the Permittee/Applicant holds a system -side collection system operation, maintenance and
management permit (WQCS-prefix) from the Division, then the following applies: For all newly
constructed, modified and rehabilitated pump stations, all equipment and components shall be sealed
within a corrosion -resistant coating or encasement to the extent practicable and equivalent to the
minimum design criteria unless the permittee can demonstrate it is not practicable or another form
of corrosion resistance is employed. [15A NCAC 02T .0108 (b)]
Permit No. WQ0033044 May 8, 2019 Page 11 of 13
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE:
Brunswick Regional Water & Sewer-H2GO
PERMIT #:
WQ0033044
PROJECT:
Compass Pointe Main Pump Station Capacity Increase
ISSUE DATE:
May 8, 2019
COUNTY:
Brunswick
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until
the Division has received this Certification and all required supporting documentation. Consequently, it should be
submitted in a manner that documents the Division's receipt. Send the required documentation to the Wilmington
Regional Supervisor, Water Quality Section at the address at the bottom.
The Permittee is responsible for tracking all partial certifications up until a final certification is received. Partial
Certifications shall include Phase/Section covered. line size & leneths installed. and listine of lots/connections to be served
and pump station design, if applicable. A Final Certification shall be a complete set of record drawings and design
calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable
standards & requirements, the Professional Engineer below has provided applicable design/construction information to
the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein
or portions thereof.
Printed Name, Title Signature Date
ENGINEERS CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North Carolina, having been
authorized to (❑ periodically, ❑ weekly, ❑ full time) observe the construction of the project name and location as
referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the following construction:
708-gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and
on -site generator with automatic transfer switch
such that the construction was observed to be built in compliance of this permit; 15A NCAC 2T; the Division of Water
Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials.
.............................................................
North Carolina Professional Engineer's Seal w/signature & date
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
NC DWR — Water Quality Regional Operations Section 127 Cardinal Drive Extension Wilmington, NC 28405
Wilmington Regional Office Phone: 910-796-7215 FAX: 910-350-2004
DocuSign Envelope ID: 8680FC61-54F7-4BBE-A2E9-0F1 9C4A4BF1 E
SEWER ENGINEERING CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116.
Certifying Engineer:
Certification Review Date:
Project Name:
W Q00
Project County:
1) Has permittee information changed since the permit was issued (or last modified): change of mailing address,
change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No
• If yes, please provide either a change of ownership form or new contact information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ❑ Yes ❑ No
3) Final Engineering certification? ❑ Yes ❑ No
• If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase, what was previously certified (if applicable), and what is left to be certified.
4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines.
• Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches).
5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A
• Ensure power reliability option was selected per 15A NCAC 02T.0305(h).
6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers (latest version), and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other
pertinent information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable, specific language regarding the variance
will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines (15A NCAC 02T .0402(2))? ❑ Yes ❑ No
• If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with
the appropriate language.
8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe
length difference of 10% or greater, change in flow, pump station design capacity design change of 5% or greater, and
change in the number/type of connections)? ❑ Yes ❑ No
• If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.