Loading...
HomeMy WebLinkAboutNCG020045_Compliance Evaluation_20190503Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY May 3, 2019 Martin Marietta Materials, Incorporated Attention: Mr. Richard Broughton 8701 Red Oak Boulevard, Suite 540 Charlotte, North Carolina 28217 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG020045 Mecklenburg County, North Carolina Dear Mr. Broughton: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspections we conducted at Arrowood Quarry on April 25, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at angela.lee@ncdenr.gov. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Compliance Inspection Report Permit: NCG020045 Effective: 05/09/16 Expiration: 09/30/20 Owner: Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta-Arrowwood County: Mecidenburg 11325 Texland Blvd Region: Mooresville ' Charlotte NC 28217 Contact Person: Richard Broughton Title: Phone: 803-978-6275 Diroctions to Facility: System Classifications: Primary URC:: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/25/2019 Entry Time: 09:50AM Exit Time: 11:30AM Primary Inspector: Angela Y Lee Phone: 704-235-2139 Secondary Inspector(s): James D Moore Phone: Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ® Compliant Not Compliant Question Areas: ® Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020045 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 04/25/2019 Inspection Type: Compliance Evaluation . Reason for Visit: Complaint Inspection Summary: This inspection was conducted as a routine annual inspection in conjunction with a mine inspection. Richard Broughton from Martin Marietta present for the inspection. At the time of the inspection, the site was in compliance. Page 2 of 3 Permit: NCG020045 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 04/25/2019 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? N ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ®❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ ■ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan Include a list of Responsible Party(s)? N ❑ ❑ ❑ # Is the Plan reviewed and updated annually? i ❑ ❑ ❑ # Dues [lie Plan include a Sturrnwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ®❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all outfalls observed during the inspection? ®❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ®❑ ❑ ❑ Comment: Page 3 of 3