HomeMy WebLinkAboutNCG020068_Compliance Eval_20190502Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
May 2, 2019
Martin Marietta Materials, Incorporated
Attention: Mr. Jay Nivens
8701 Red Oak Boulevard, Suite 540
Charlotte, North Carolina 28217
Subject: Compliance Evaluation Inspection
NPDES Stormwater Certificate of Coverage- NCG020068
Rowan County, North Carolina
Dear Mr. Nivens:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspections we conducted
at the Kannapolis Quarry on April 16, 2019. The report should be self-explanatory; however, should you have any
questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at
angela.lee@ncdenr.gov.
Sincerely,
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosed: Inspection report
c: Stormwater Permitting Branch
Permit: NCG020068
SOC:
County: Rowan
Region: Mooresville
Contact Person: Jay Nivens
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance Inspection Report
Effective: 05/09/16 Expiration: 09/30/20 Owner: Martin Marietta Materials Inc
Effective: Expiration: Facility: Martin Marietta-Kannapolis
2270 China Grove Rd
China Grove NC 28023
Title: Phone: 704-409-1475
Inspection Date: 04/16/2019
Primary Inspector: Angela Y Lee
Secondary Inspector(s):
Certification: Phone:
Entry Time: 09:30AM Exit Time: 11:10AM
Phone: 704-235-2139
Christopher Graybeal
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge CDC
Facility Status: ® Compliant Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page 1 of 3
Permit: NGG020068 Owner - Facility: Martin Marietta Materials Inc
Inspection Date: 04/1612019 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
This inspection was conducted in conjunction with the Mine inspection. Jay Nivens was present for the inspection. Please
review the comments listed in this report. A follow-up inspection will be needed after areas disturbed from the pit expansion
has been maintained. Jay Nivens updated with photos on areas affected by a recent pit expansion potentially impacting the
pit discharge (sampling area) on 04/30/2019. Jay Nivens notified that rip rap will be added. Please contact me once area is
maintained. No immediate issues have been observed. At the time of the inspection, the site was found to be in compliance.
Page 2 of 3
Permit: NCG020068 Owner - Facility: Martin Marietta Materials Inc
Inspection Date: 04/16/2019 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
M ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
M ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
M ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
M ❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
M ❑ ❑ ❑
# Does the facility provide and document Employee Training?
■ ❑ ❑ ❑
# Does the flan includo a list of Rosponcible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
M ❑ ❑ ❑
# Dot:8 llie (plan include a Slorrnwrater Facility Inspection Program?
� ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
■ ❑ ❑ ❑
Comment:
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®❑ ❑ ❑
Comment:
Analytical Monitoring
Yes No NA NE
Has the facility conducted its Analytical monitoring?
®❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑
# Were all outfalls observed during the inspection? ®❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Comment: Areas disturbed from pit expansion will need immediate maintenance near the pit discharge
where samples are taken.
Page 3 of 3