Loading...
HomeMy WebLinkAboutNCG020068_Compliance Eval_20190502Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY May 2, 2019 Martin Marietta Materials, Incorporated Attention: Mr. Jay Nivens 8701 Red Oak Boulevard, Suite 540 Charlotte, North Carolina 28217 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG020068 Rowan County, North Carolina Dear Mr. Nivens: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspections we conducted at the Kannapolis Quarry on April 16, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at angela.lee@ncdenr.gov. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Permit: NCG020068 SOC: County: Rowan Region: Mooresville Contact Person: Jay Nivens Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 05/09/16 Expiration: 09/30/20 Owner: Martin Marietta Materials Inc Effective: Expiration: Facility: Martin Marietta-Kannapolis 2270 China Grove Rd China Grove NC 28023 Title: Phone: 704-409-1475 Inspection Date: 04/16/2019 Primary Inspector: Angela Y Lee Secondary Inspector(s): Certification: Phone: Entry Time: 09:30AM Exit Time: 11:10AM Phone: 704-235-2139 Christopher Graybeal Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge CDC Facility Status: ® Compliant Not Compliant Question Areas: ® Storm Water (See attachment summary) Page 1 of 3 Permit: NGG020068 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 04/1612019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: This inspection was conducted in conjunction with the Mine inspection. Jay Nivens was present for the inspection. Please review the comments listed in this report. A follow-up inspection will be needed after areas disturbed from the pit expansion has been maintained. Jay Nivens updated with photos on areas affected by a recent pit expansion potentially impacting the pit discharge (sampling area) on 04/30/2019. Jay Nivens notified that rip rap will be added. Please contact me once area is maintained. No immediate issues have been observed. At the time of the inspection, the site was found to be in compliance. Page 2 of 3 Permit: NCG020068 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 04/16/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? M ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? M ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? M ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the flan includo a list of Rosponcible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? M ❑ ❑ ❑ # Dot:8 llie (plan include a Slorrnwrater Facility Inspection Program? � ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ®❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all outfalls observed during the inspection? ®❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Areas disturbed from pit expansion will need immediate maintenance near the pit discharge where samples are taken. Page 3 of 3