Loading...
HomeMy WebLinkAbout20190592 Ver 1_17BP.7.C.14_Permit Drawings 20190418_201905070 See Sheet 9-A For Index of Sheets See Sheet 9-B For Standard Symbology Sheet 2618 2655 2359 " 2531- 2565- ;ssl �2556 2566 BEGIN L— PROJECT 2526 2568 2613 2622 r 2683 2861 2866 2837 2565 / 2891 2832 2943 2835 2877 2912 2833 �\a\ 2832 3 \ END 12946 28 6 PROJECT I °�2897 2 732 2835 -2869 2732\\°0 2824 2832 2937 / 2839 2835 2862 2843 2887 2832 VICINITY MAP BEGIN PROJECT 17BP.7.C.14 —L— STA. 12 + 50.00 TO NICHOLS DR (SR 2839) 12" RCP CLEARING LIMITS ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD H. 1. STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS GUILFORD COUNTY LOCATION: REPLACE PIPE # 40 2134 ON SR 2835 (MCKNIGHT MILL RD) — 0.1 MI. S. JCT. SR 2732 (HINES CHAPEL RD) TYPE OF WORK: GRADING, PAVING, SHOULDER CONSTRUCTION, & CULVERT WETLAND AND SURFACE WATER IMPACTS PERMIT N 4 IV I � I END PROJECT 17BP.7.C.14 —L— STA. 13 + 50.00 � woos TO HOLLYWOOD DR (SR 2865) --0'— �2�835NIGHT MILL RD) DESIGN EXCEPTION REQUIRED FOR VERTICAL ALIGNMENT (SAG). 65% PLANS PRELIMINARY PLANS DO NOT USE MR CONSTRUCTION INCOMPLETE ]PLANS DO NOT USE FOR R/ W ACOUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of, eHYDRAULICS ENGINEER U 20 10 0 20 4o ADT 2016 = 5100 V = 35 MPH FUNC CLASS = TOTAL LENGTH TIP PROJECT 17BP.7.C.14 = 0.019 MI U$I OF CAROLINA, OF CAROLINA, INC. 9140 ARROWPOINT BLVD, SUITE 200 ®� �®�p� � PLANS MAJOR COLLECTOR CHARLOTTE, NORTH CAROLINA 28273 N.C. LICENSE # C-1950 P.E. SIGNATURE: 20 10 0 20 40 2018 STANDARD SPECIFICATIONS ROADWAY DESIGN ENGINEER �d PROFILE (HORIZONTAL) RIGHT OF WAY DATE. SANDRA P. HAYES, PE 4., PROJECT ENGINEER PROJECT op TROA � 4 2 0 4 8 KEITH A. SCHELL, El SIGNATURE. P.E. LETTING DATE. PROFILE (VERTICAL) PROJECT DESIGN ENGINEER 0 DETAIL A TOE PROTECTION ( Not to Scale) N. Natural�bl S�OQ6 Groundd- 2 b= 1 Ft. eotextile Type of Liner= CLASS B Rip -Rap FROM STA. 13 + 10 TO STA. 13 + 30 -L- LT O EXISTING R/W -L- TBM e2 EL=757.76' NAIL SET IN POWER POLE 48' W/W \,/_ lii& \/ EXISTING R/W WETLAND AND SURFACE WATER IMPACTS PERMIT LEGEND DENOTES TEMPORARY IMPACTS IN SURFACE WATER W W DENOTES PERMANENT 114 IV r IMPACTS IN SURFACE WATER N � d 0 a N W — — — 30" DIP - SR 2835 (MCKNIGHT MILL ROAD) 23' BST —T FO— — — —� — 12" RCP I I I SS — — — — TO NICHOLS DRY (SR 2831 / w000s BEGIN PROJECT 17BP.7.C.14 -L- STA. 12 + 50.00 r O TERESA KIM LOWE 401 0' 40 GRAPHIC SCALE \F --- F- O_ 'G PROJECT REFERENCE NO. SHEET NO. O 17BP.7.C.14 4 CHARLES HARRIS & SYLVIA W HARRIS RhS SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL B OU LET CHANNEL BANKS PIPE OUTLET CHANNEL STABILIZATION W/CLASS I RIP RAP (Not to Sale) SEE DETAIL Elwati nBed Elevation EST 20 TONS Natural Natural EST 25 SY GEOTEXTILE Ground Ground P 2' firculTor L W Geotextile H Channel Bed nsTr: nnTt:: N (Variable) DOCUMENT NOT CONSIDERED FINAL H Length 41 F. UNLESS ALL SIGNATURES COMPLETED -In Type of Liner- CL I RipJfap -Keyed-In PERMIT DRAWING STA.12+83 TO STA.13+10 m TO PROTECTION TO HOLLYWOOD DR SHEET 2 OF 4 GLI S E DETAIL A E T 4 TONS (SR 2865) EST 9 Y GEOTEXMLE \ wooDs GRA E TO & EW ' IE� PRELIMINARY Mr NOT USE FO PLANS CONSTRUCTION INC®h'd1�L1E 1C PLANS W NOT USE FOR ®W ACQUISITION — ---- -��_ _-- FS �FOS T END PROJECT 17BP.7.C.14 -L- STA. 13 + 50.00 OUTLET CHANNEL BANKS m rCON�C\�L W/CLAS I RIP RAP w000s SEE DE T IL I" C SS II RIP RAP EST 20 ONS DU1 ST 20 TONS EST 25 Y GEOTEXTILE 0° O N N BOB Y DEAN WIN ARGER, JR Z & ATHERINE K INEBARGER V N I SR 2732 (HINES CHAPEL ROAD) 20' BST CITY OF GREENSBORO INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. �� 752 O- -0- -0- -0- -0- -0- -0- -0- - 0--+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+---+- --- 752 II I / 3I NG LT 748 CE STA. 2 + 98 L— 748 W/HEADWALL & ENDWALL —+ -+ -- -+ -+— - IP/=/4+34. 9 ELEV = 738.40 IS 'SKEW 117" X 79" CAAPA k) 744 SKEW = 90° EL=740.00 ' 744 EXISTING GROUND -END GRADE �� �� BEGIN GRADE— P1=12+2/.03 Ti VC=85J6' (TOTAL) STA. 13 +24.00 11 .EY K=/3.95 STA. 12+71.00 EL=737J4 EL=738.61 EL=738.54 \ VC=215.52'(TOTAL) DS=lS MPH l/� \ � __ _ �—fjG RT INLEPOUTLET 74O \ ��EXIST. --+— i SILL & CHANNEL DETAIL 740 �52,!F.26 I I 20 MPH (+)1.30Y i NOT TO S E \ _ 4� i /I ---"----- \ \ --- ------ x_SECTION vlEw 736 _— = ,' 736 \ \ r PROPOSED GRADE = i I I II i li i li � —� nrzw•cnnPA -- \ I \ \ 1 I I I 732 v v v v 732 " CI5:S 10 r—MP EX. WATER 30 DIP Is:I O \ \ \ 1 TO TOP OF BANK ARMOR OUTLET BED \ � (TO REMAIN) EST 40 TONS WCST 2 Imp w TONS EST ES SY GEOTEXTILE EST ]0 TONS 728 _ 728 NOTE: PROPOSED 117" z 79" CAPA DID NOT ANALYZE AS BURIED. \ I AS PROPOSED INVERT WILL BE SET AT STREAM BED IN ORDER TO \ \ DESIGN EXCEPTION REQUIRED FOR AVOID CONFLICT WITH EXISTING 30" WATER LINE. I w - — -- �3 11 12 14 15 16 0 DETAIL A TOE PROTECTION ( Not to Scale) °#e< Natural 0 S�OQe Ground b F�\ �I d d- 2 Ft. b= 1 Ft. Geote#ile Type of Liner= CLASS B Rip -Rap FROM STA. 13+10 TO STA. 13+30 -L- LT WETLAND AND SURFACE WATER IMPACTS PERMIT I LEGEND DENOTES TEMPORARY IMPACTS IN SURFACE WATER I I DENOTES PERMANENT Dal N IMPACTS IN SURFACE WATER i I � I I N I EXISTING R/W / I ( I \ \ TBM °2 EL=757.76' \\ NAIL SET IN POWER POLE \\\ 48' W/W TO NICHOLS DR / (SR 2839)`v C ` \ j \ I \ I \ I \ I \ I \ I 30" DIP I / 4 I (MCKN�GHT MIL Ij/ ROAD) 23' BST �_ \ \ \ \ \ 112' RCP t I ` EXISTING R/W SS — — \ WOODS \ BEGIN PROJECT 17BP.7.C.14 r i —L— STA. 12 + 50.00 I j I I I II TERESA KIM LOWEI I 401 I 0' 40, GRA,RHIC SCALE SR 2 —T FO=\ — z r 0 a 0 a r JSTh --F ---- I ICI IXI ICI Inl :s■=i �.R■�.L�fl� V I It -I m OUTLET CHANNEL BANKS W/CLAS RAP :RIP SEE DE T IL EST 20 ONS DU1 EST 25 Y GEOTEXTILE 0° IW ®------zt - I N I I II IBO Y DEAN WINEBARGER. JR & ATHERINE K INEBARGER I Z I �N m PROJECT REFERENCE NO. SHEET N0. / 17BP.7.C.14 4 / /// O \ I RW SHEET NO. / CHARD S HARRIS & SYLVIA W HARRIS \ l l / ROADWAY DESIGN HYDRAULICS \ DETAIL B ENGINEER ENGINEER OU LET CHANNEL BANKS'\ PIPE OUTLET CHANNEL STABILIZATION W/CLASS I RIP RAP \ (Not to Scale) \u\x - -- \ \ P— rosI�8I E L` —g T<\ N II I 8Y nPLANS G Natural Bed MNOT USE Mill CONSTRUCTION SEE DETAIL Elm °'°r°I Note 20 TONS Gnl INC®hPLE E P EST 25 SY GEOTEXTILE oun Ground DO NOT USE FOR ®WACQUISITION 2' Geote,dile Channel Bed Length= 41 Ft. (Variable) DOCUMENT NOT CONSIDERED FINAL Type of Liner= CL I Rip -Rap - Keyed -In UNLESS ALL SIGNATURES COMPLETE —D STA. 12+83 TO STA.13 10 PERMIT DRAWING TO EPRDTECTION WOOD DR SHEET 3 OF 4OETAIL A TO HOLLY T4TONS VLnEST 9 YGEOTEXTILE \ (SR 2865) UKA L TO D RCP-� _ — ��2Oq,"--CAA W/HW & EW ------T—�S� END PROJECT 17BP.7.C.14 —L— STA. 13+50.00 SR 27�2 coNc WOODS (HINESCHAPEL ROAD)-- �\- II II 20' BST CLASS II RIP RAP ST 20 TONS CITY OF GREENSBORO \ \ \ N3 N INSTALL P I P E S) I N J U R I S D I C T I O N A L A R E A S WITHOUT I THOUT I M P AC T ING STR EAM UNTIL AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. IIII / / � II�I � /- -// + II�I - --I � /r IIIII -- h+E SIIIIIIT E -- —� —/ i II - II II -- IIII 752 752 —+--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- + --- +-- NG LT 748 STA. �98/ 748CL LO 17X9„ CAAPA W/HEADWAL&ENDWALL - ---- + --- - --- + ---- ---- IP/ /4 34. 9 /--+- 744 EL=740.00 EXISTING GROUND -END GRADE BEGIN GRADE- Pl=12+2/.03 VC=85J6(TOTAL) 744 STA.13+24.00K=/3 95STA.12+71.00 EL=737J4 EL=738.61 DS=lS MPH LETEL=738.54 VC=2/5.52'(TOTAL) - �G RT I UE 740 22EXIST..26 --- SILL & CHANNEL DETAIL 740 DS0 MPH X3 NOT O KALE - - - - 8---/---- -- - �� IpN VIEW 736 4— - PROPOSED GRADE I1)1)9' APA 732 732 EX. WATER 30" DIP @ 1.5:1 OR RFATTER ssIIP AP TO OP OF ACLMOR OUTLT BED 40 TONS WASS II RIP AP(TO REMAIN) 50 SY GEOTXLE EST 20 OS 728 728 NOTE: PROPOSED 117" x 79" CARA DID NOT ANALYZE AS BURIED. AS PROPOSED INVERT WILL BE SET AT STREAM BED IN ORDER TO IDESIGN EXCEPTION REQUIRED FOR AVOID CONFLICT WITH EXISTING 30" WATER LINE. 1411 12 �3 15 16 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS APRIL 18, 2019 GUILFORD COUNTY 17BP.7. C.14 ReAsed September 201a SHEET 4 OF 4 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACT SURFACE WATER IMPACT Site No. Station (From/To) Structure Size /Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 12+92 to 13+03 117" x79" CAAPA 0.001 2 1 -L- 12+83 to 13+10 BANK STABILIZATION 0.112 41 1 -L- 12+92 to 13+02 IMPERVIOUS DIKES 0.018 43 TOTALS*: 0.000 0.000 0.113 0.018 43 43 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS APRIL 18, 2019 GUILFORD COUNTY 17BP.7. C.14 ReAsed September 201a SHEET 4 OF 4 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACT SURFACE WATER IMPACT Site No. Station (From/To) Structure Size /Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 12+92 to 13+03 117" x79" CAAPA 0.001 2 1 -L- 12+83 to 13+10 BANK STABILIZATION 0.112 41 1 -L- 12+92 to 13+02 IMPERVIOUS DIKES 0.018 43 TOTALS*: 0.000 0.000 0.113 0.02 43 43 V V See Sheet 9-A For Index of Sheets See Sheet 9-B For Standard Symbology Sheet 2655 2359 2618'� 2565 2909 ------ -"- 2565 .�— --- -- 2531 � 2566 2832 2943 55 2556 2891 2835 2912 �i2877 2833 2526 -j 2568 2832 3 \\\ 2946 2613 2622 r END ?2683 28 6 PROJECT 2861 2866 ° 2897 2732 2835 2837 2613 -2869 2732\\°0 2824 BEGIN 2838 2832 °o 2732 °o PROJECT 2937 2839 2611 2835 2862 2825 2843 2876� 2842 °\ 2842 2830°0 J 2844 f 2610, 2887 2832 2829 i1 \ VICINITY MAP STATE OF NORTH CA1I$OLINA PERMIT DRAWIN DIVISION OF HIGHWAYSSHEET 1 OF 4 GUILFORD COUNTY LOCATION. REPLACE PIPE # 40 2134 ON SR 2835 (MCKNIGHT MILL RD) — 0.1 MI. S. JCT. SR 2732 (HINES CHAPEL RD) TYPE OF WORK. GRADING, PAVING, SHOULDER CONSTRUCTION, & CULVERT BUFFER IMPACTS PERMIT W N N J O7 w W � IJ 00 N IV END PROJECT 17BP.7.C.14 BEGIN PROJECT 17BP.7.C.14 PROP —L— STA. 13+50.00 —L— STA. 12+50.00 ` cuLvlRr -L- STA. 12+98.00 NWOODS — — - - 30" DIP — V W — I-1 TO NICHOLS DR � x X SR 2835 (MCKNIGILL RD (SR 2839) —L_ --------- —L— SR 2835 (MCKNIGHT MILL RD) m �i 12" RCP -- I I Sr -----� F_ F — _ — — — — — F CONC WO DS 1- `\/ N V1 I� `do � °° SITE 1 z N N o _N TO HOLLYWOOD DR (SR 2865)-------- )w— CLEARING LIMITS ON THIS PROJECT SHALL BE PERFORMED TO DESIGN EXCEPTION REQUIRED FOR VERTICAL ALIGNMENT (SAG). THE LIMITS ESTABLISHED BY METHOD H. 1. 65% PLANS PRELIMINARY PLANS DO NOT USE MR CONSTRUCTION INCOMPLETE ]PLANS DO NOT USE FOR R/ W ACOUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA 01 PROJECT LENGTH Prepared in the Office of: eHYDRAULICS ENGINEER USINFRA 20 10 0 20 4o ADT 2016 = 5100 V = 35 MPH FUNC CLASS = TOTAL LENGTH TIP PROJECT 17BP.7.C.14 = 0.019 MI II$I OF CAROLINALINA,URE INC. 9140 ARROWPOINT BLVD, SUITE 200 R®Np� PLANS CHARLOTTE, NORTH CAROLINA 28273 P.E. � MAJOR COLLECTOR N.C. LICENSE # C-1950 SIGNATURE: 20 10 0 20 40 2018 STANDARD SPECIFICATIONS ROADWAY DESIGN ENGINEER PROFILE (HORIZONTAL) RIGHT OF WAY DATE. SANDRA P. HAYES, PE 4., PROJECT PROJECT ENGINEER op T(ROA 4 2 0 4 8 KEITH A. SCHELL, El SIGNATURE. PE. LETTING DATE. PROFILE (VERTICAL) PROJECT DESIGN ENGINEER 0 DETAIL A TOE PROTECTION ( Not to Scale) \a Natural�bl S�OQ6 Groundd- 2 b= 1 Ft. eotextile Type of Liner= CLASS B Rip -Rap FROM STA. 13 + 10 TO STA. 13 + 30 —L— LT LEGEND BZ 1 RIPARIAN BUFFER ZONE 1 (30') gZ 2 RIPARIAN BUFFER ZONE 2 (20') ALLOWABLE IMPACTS ZONE 1 (CULVERT) ETF EXISTING TRANSPORTATION FACILITY BUFFER IMPACTS PERMIT W W N N N � O � EXISTING R/W N ETF_ — W 30" DIP_ — -L- SR 2835 (MCKNIGHT MILL ROAD) 23' BST -------- TBM e2 EL=757.76' — TFO— --_ i ---�__ — ETF NAIL SET IN POWER POLE 48' W/W 12' RCP — — �F EXISTING R/W TO NICHOLS DR (SR 2839) / WOODS OUTLET CHANNEL BANKS BEGIN PROJECT 17BP.7.C.14 W/CLAS I RIP RAP SEE DE T IL -L- STA. 12 + 50.00 EST 20 ONS r EST 25 Y GEOTEXTILE I s O N N TERESA KIM LOWE N 401 0' 40, BOB Y DEAN WIN LARGER, JR & ATHERINE K INEBARGER GRAPHIC RAPHC S C A L F /I IyN IQ) O ZI PROJECT REFERENCE NO. SHEET NO. O 17BP.7.C.14 4 CHARLES HARRIS & SYLVIA W HARRIS RhS SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL B OU LET CHANNEL BANKS PIPE OUTLET CHANNEL STABILIZATION W/CLASS I RIP RAP (Not to sale) SEE DETAIL Natural Bed Eleva,ian EST 20 TONS Natural Na+� al EST 25 SY GEOTEXTILE Ground 7Gmun W GeH Channel Bed nsre: nnn:: N Length= 41 Ff. (Variable) DOCUMENT NOT CONSIDERED FINAL Type of Liner= CL I RipJtap - Keyed -In UNLESS ALL SIGNATURES COMPLETED N PERMIT DRAWING STA.12+83 TO STA.13+10 TO PROTECTION TO HOLLYWOOD DR SHEET 2 OF 4 GLI S E DETAIL A E T 4 TONS (SR 2865) EST 9 Y GEOTEXTILE � \ wooDs -' � r- J - A E� D IN��fI2° RCP -F E __=-- PRELIMINARY Mr NOT USE FO PLANS CONSTRUCTION INC®h'd1�L1E ]E PLANS W NOT USE FOR ®W ACQUISITION N _ 6 FSS F------------ \ T END PROJECT 17BP.7.C.14 �` \ 5 � " —FS -L- STA. 13 + 50.00 SR 2732 CONC WOODS (HINES CHAPEL ROAD) 20' BST C SS II RIP RAP \ ST 20 TONS O CITY OF GREENSBORO � N H INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL �t I AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. — III I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I �� 752 - - - - - - - - - - - - - - - - - --+--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- +--- + --- +— --- 752 II I / 3I NG LT 748 CE STA. 2 + 98 L- 748 � , B W9 E 17" X 9" CARP ALL —+ -+ - -+ -+— - �/=/4+34.79 G / END J � I I I I I I I I I I I I I I �J•° / i 744 SKEW = 90° EL=740.00 744 EXISTING GROUND -END GRADE BEGIN GRADE— P1=12+21.03 Ti VC=85J6' (TOTAU STA. 13 +24.00 K=/3.95 STA.12+71.00 EL=737J4 EL=738.61 EL=736.sa \ VC=2/552'(TOTAU �� DS=15 MPH / / 740 740 \ \, ( ).26 /ST. 3 ___" / / INLET/OUTLET SCALE \ \ `\\_ _ DS-20 MPH �� _ / SILL & CHANNEL DETAIL --- _---// / / / NOT TO SCALE 8_��_— — 736 \ X�EC ON VIEW 736 \ \ PROPOSED GRADE / — 1 I I 732 v v v v 732 EX. WATER 30" DIP cws1.1 RAP \ / @ 1.5:1 OR FIATIER ' \ /� TO TOP OF BANK ARMOR OUrLET BED \ / / (TO REMAIN) N) EST /0 TONS .'✓CLASS II RIP MR \ i / EST 50 SY GEOTEULE EST 20 TONS 728 _ _ " 728 i NOTE: PROPOSED 117" x 79' CAPA DID NOT ANALYZE AS BURIED. / AS PROPOSED INVERT WILL BE SET AT STREAM BED IN ORDER TO DESIGN EXCEPTION REQUIRED FOR AVOID CONFLICT WITH EXISTING 30" WATER LINE. w - - -- �3 uL 11 12 14 15 16 DETAIL A TOE PROTECTION ( Not to Scale) N. Natural�bl S�OQ6 Groundd- 2 b= 1 Ft. eotextile Type of Liner= CLASS B Rip -Rap BUFFER IMPACTS PERMIT I � I I I I I I I I I I I I I I I N I I II N I I N I I I I I I I I I I I I I I I I I I I I � I - - \ \\ -�- -- ETF- \ \ 30" DIP LEGEND BZ 1 RIPARIAN BUFFER ZONE 1 (30') gZ 2 RIPARIAN BUFFER ZONE 2 (20') ALLOWABLE IMPACTS ZONE 1 (CULVERT) EXISTING TRANSPORTATION FROM STA. 13+10 TO STA. 13+30 -L- LT FACILITY EXISTING R/W / TBM -2 EL=757.76' \� NAIL SET IN POWER POLE 48' W/W TO NICHOLS DR / (SR 2839)vv \ I \ I \ I \ I \ I 752 I \\ SR 2\835 \\(M KN�GHT MILL ROAD) 23' BST —T FO— � \ \ \ \ 1 /2" RCP t ` EXISTING R/W i /I SS— — — — — — \ WOODS \ \\ i l I I OUTLET CHANNEL BANKS W/CLAS RAP BEGIN PROJECT 17BP.7.C.14 :RIP N� SEE DE T IL —L— STA. 12 + 50.00 j I I I I I EST 20 Y G EST 25 EOTEXTILE w —� I --- ®------- TERESA KIM LOWEI I I N 401 ' 0' 40, O W , I G R A H C S C A E/ IBO Y DEAN WIN ARGER. JR &Z ATHERINE �INEBARGER PROJECT REFERENCE NO. SHEET N0. / 17BP,7.C.14 4 / O \ I /// / CHARD S HARRIS & SYLVIA W HARRIS \ I l RW SHEET NO. \\ ROADWAY DESIGN HYDRAULICS DETAIL B ENGINEER ENGINEER OU LET CHANNEL BANKS PIPE OUTLET CHANNEL STABILIZATION W/CLASS I RIP RAP (Not to Scale) Natural Bed SEE DETAIL Elevaean EST 20 TONS \, oI Natural d GroundEST 25 SY GEOTEXTILE 7Gr W \ Gee H Channel Bed \ Length= 41 Ft. (Variable) \ DOCUMENT NOT CONSIDERED FINAL Type of Liner= CL I Rip -Rap - Keyed -In \ UNLESS ALL SIGNATURES COMPLETED N \ STA. TO STA. \ TC PROTECTION HOLLYWOOD DR PERMIT DRAWING SHEET 3 OF 4 GLI S E DETAIL A ` TO TY4TONSGEOTEXTILE \`\\ ($R 286>' EST 9 WOODS A E O D -�fi7�7Etu W/HW & EW — T F _� \ ,y N _F-TE-- F- - - _! � SS WOODS PRELIMINARY MI NOT USE FO PLANS CONSTRUCTION INC®h'd1�L1E ]E PLANS W NOT USE FOR ®W ACQUISITION END PROJECT 17BP.7.C.14 II �� IN -L- STA. 13 + 50.00 1 s �I SR 2732 CHINES CHAPEL IROAD) 20' BST I I I II RIP RAP \ 20 TONS O CITY OF GREENSBORO I 1 INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL AREA STABILIZED AND ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. I I I I I I I I I I I I I I I I I I I I I +— —+— —+— —+— —+— —+— —+— —+— —+— —+— —+— —+— —+— —+— —+— NG LT—+q — \ _\a 1' it 748 \ � STA. 12+98 -L- CL ELEif+= 738.40'+---+---+---+---+---+---+---+---+---+---+---+---+---+---+ EXIST, ��>�+------+--- �z8. 1 @ 117" X 79" CAAPA 744 III 740 736 732 a$$ 728 P Z ow �a e\\- W/HEADWALL 01 ENDWALL SKEW = 90" EL=740.00 EXISTING GROUND BEGIN GRADE— P1=12+2/.03 -END GRADE STA. 13+24.00 I� VC=85J6' (TOTAV STA. 12+71.00 EL-737J4 EL=738.61 �� DS=155 DS=lS MPH / _ -- EL=738.54 v �� VC=215.52'(TOTAL) �� _ / �_tJG EXIST. �,-`-� RT ---------- DS=20 MPH 07 _"`.-- ----- I I I II I II I I I I✓ \ PROPOSED GRADE = / I I I I I I I EX. WATER 30" DIP (TO REMAIN) 12 I / / / / INLET/OUTLET SILL & CHANNEL DETAIL NOT TO SCALE X-SECTION VIEW 11J"-CAAPA -- CLASS I RIP RAP @ 1.51 OR FLATTER TO TOP OF BANK ARMOR OUTLET BED EST AO TONS WCL SS It RIP RAP EST 50 SY TONS EST 20 TONS NOTE: PROPOSED 117" x 79" CAPA DID NOT ANALYZE AS BURIED. \ / / AS PROPOSED INVERT WILL BE SET AT STREAM BED IN ORDER TO / DESIGN EXCEPTION REQUIRED FOR AVOID CONFLICT WITH EXISTING 30" WATER LINE. I - -- 13 14 15 16 752 748 r72 II 740 736 BUFFER IMPACTS SUMMARY IMPACT BUFFER REPLACEMENT SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) TYPE ALLOWABLE MITIGABLE ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft') ZONE 2 (ft) TOTAL (ft) ZONE 1 (ft) ZONE 2 (ft) TOTAL (ft) ZONE 1 (ft) ZONE 2 (ft) S1 11 T x79" CAAPA STA. 12+92 TO 13+03 3395 TOTAL: 3395 1 0 1 0