Loading...
HomeMy WebLinkAbout20170921 Ver 1_MP Append Assets_20190305ADDENDUM TO MITIGATION PLAN Table 1. Project Components and Mitigation Credits Major Hill Restoration Site Overall Assets Summary: Amended Mitigation Plan Stream 3058 SMU Riparian Riverine Wetland: 0.760 WMU *UTI, UT2, and UT3 discrepancies between Mitigation Plan and As -built tables are the result of errors between detailed plan stationing and surveyed construction plan stationing. They are specifically attributed to typographical error, GIS to CAD conversion error, and easement boundary changes between detailed plan development and construction plans. Construction Plan information is consistent from Mitigation Plan to As -Built, and the As - Built table reflects Construction Plan measurement accuratly. Project No. 100015 Major Hill Stream and Wetland Restoration Site Restoration Systems, LLC Alamance County, North Carolina March 2019 MitigationConstructed Stream Existing Restoration or Reach Plan Restoration Mitigation Mitigation Stationing/ Footage/ Footage/ Restoration Comment ID Foage/ Footage/ FootAcreage Level Ratio Credits Wetland Type Acreage Equivalent Acreage UT 1 00+00 to 16+99 1829 1699 1699 Restoration 1699 1:1 1699 UT 1 16+99 to 27+96 1097 1060 1097* EII 1097 2.5:1 439 UT 2 00+00 to 01+68 168 168 168 EII 168 2.5:1 67 UT 2 01+68 to 02+07 39 43 39* Restoration 39 1:1 39 801f and 401f of UT3 are not credit generating due to crossings and drainage UT 3 00+00 to 22+98 2298 2197 2298* EII 2298-80-144- 2'5'1 814 easement. 144 if are not 40=2034 credit generating due to lack of control of south bank and drainage easement. Riparian Wetlands 0.54 0.54 Restoration 0.54 1:1 0.54 Wetland Restoration Riverine Riparian Wetlands 0.52 0.44 0.44 Enhancement 0.44 2:1 0.22 Wetland Enhancement Riverine Overall Assets Summary: Amended Mitigation Plan Stream 3058 SMU Riparian Riverine Wetland: 0.760 WMU *UTI, UT2, and UT3 discrepancies between Mitigation Plan and As -built tables are the result of errors between detailed plan stationing and surveyed construction plan stationing. They are specifically attributed to typographical error, GIS to CAD conversion error, and easement boundary changes between detailed plan development and construction plans. Construction Plan information is consistent from Mitigation Plan to As -Built, and the As - Built table reflects Construction Plan measurement accuratly. Project No. 100015 Major Hill Stream and Wetland Restoration Site Restoration Systems, LLC Alamance County, North Carolina March 2019