HomeMy WebLinkAbout20170921 Ver 1_MP Append Assets_20190305ADDENDUM TO MITIGATION PLAN
Table 1. Project Components and Mitigation Credits Major Hill Restoration Site
Overall Assets Summary: Amended Mitigation Plan
Stream 3058 SMU
Riparian Riverine Wetland: 0.760 WMU
*UTI, UT2, and UT3 discrepancies between Mitigation Plan and As -built tables are the result of errors between detailed plan stationing and surveyed
construction plan stationing. They are specifically attributed to typographical error, GIS to CAD conversion error, and easement boundary changes
between detailed plan development and construction plans. Construction Plan information is consistent from Mitigation Plan to As -Built, and the As -
Built table reflects Construction Plan measurement accuratly.
Project No. 100015
Major Hill Stream and Wetland Restoration Site Restoration Systems, LLC
Alamance County, North Carolina March 2019
MitigationConstructed
Stream
Existing
Restoration or
Reach
Plan
Restoration
Mitigation
Mitigation
Stationing/
Footage/
Footage/
Restoration
Comment
ID
Foage/
Footage/
FootAcreage
Level
Ratio
Credits
Wetland Type
Acreage
Equivalent
Acreage
UT 1
00+00 to 16+99
1829
1699
1699
Restoration
1699
1:1
1699
UT 1
16+99 to 27+96
1097
1060
1097*
EII
1097
2.5:1
439
UT 2
00+00 to 01+68
168
168
168
EII
168
2.5:1
67
UT 2
01+68 to 02+07
39
43
39*
Restoration
39
1:1
39
801f and 401f of UT3 are
not credit generating due
to crossings and drainage
UT 3
00+00 to 22+98
2298
2197
2298*
EII
2298-80-144-
2'5'1
814
easement. 144 if are not
40=2034
credit generating due to
lack of control of south
bank and drainage
easement.
Riparian
Wetlands
0.54
0.54
Restoration
0.54
1:1
0.54
Wetland Restoration
Riverine
Riparian
Wetlands
0.52
0.44
0.44
Enhancement
0.44
2:1
0.22
Wetland Enhancement
Riverine
Overall Assets Summary: Amended Mitigation Plan
Stream 3058 SMU
Riparian Riverine Wetland: 0.760 WMU
*UTI, UT2, and UT3 discrepancies between Mitigation Plan and As -built tables are the result of errors between detailed plan stationing and surveyed
construction plan stationing. They are specifically attributed to typographical error, GIS to CAD conversion error, and easement boundary changes
between detailed plan development and construction plans. Construction Plan information is consistent from Mitigation Plan to As -Built, and the As -
Built table reflects Construction Plan measurement accuratly.
Project No. 100015
Major Hill Stream and Wetland Restoration Site Restoration Systems, LLC
Alamance County, North Carolina March 2019