HomeMy WebLinkAbout20130918 Ver 11_U-2525 B_C Mod and Renewal Guilford May 1 2019_20190507STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Roy COOPER
GOVERNOR
May 1, 2019
U. S. Army Corps of Engineers
Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
ATTN: Mr. Dave Bailey
NCDOT Coordinator
JAMES H. TROGDON, III
SECRETARY
Subject: Request for Modification and Extension to the Section 404 Individual Permit
and Section 401 Water Quality Certification for the proposed Greensboro
Eastern Loop from US 70 Relocation to SR 2303 (Lawndale Drive), Guilford
County, Division 7. Debit $570 from WBS Element No. 34821.1.5, TIP Nos. U-
2525B and U-2525C.
Reference: USACE Individual Permit Action ID SAW-2005-21386, dated April 15, 2014.
USACE Individual Permit Modification Action ID SAW-2005-21386, October 31, 2014.
USACE Individual Permit Modification Action ID SAW-2005-21386, December 4, 2014.
USACE Individual Permit Modification Action ID SAW-2005-21386, March 12, 2015.
USACE Individual Permit Modification Action ID SAW-2005-21386, July 24, 2015.
USACE Individual Permit Modification Action ID SAW-2005-21386, March 18, 2016.
USACE Individual Permit Modification Action ID SAW-2005-21386, August 11, 2016.
USACE Individual Permit Modification Action ID SAW-2005-21386, December 19, 2016.
USACE Individual Permit Modification Action ID SAW-2005-21386, November 28, 2017.
NCDWR Project No. 20130918, Certification No. 3978, February 6, 2014.
NCDWR Project No. 20130918 v2, Modification to Certification No. 3978, June 24, 2014.
NCDWR Project No. 201309180, Modification to Certification No. 3978, October 15, 2014.
NCDWR Project No. 20130918_v4, Modification to Certification No. 3978, December 11, 2014.
NCDWR Project No. 20130918 v5, Modification to Certification No. 3978, March 18, 2015.
NCDWR Project No. 20130918 v6, Modification to Certification No. 3978, July 21, 2015.
NCDWR Project No. 20130918 v7, Modification to Certification No. 3978, March 18, 2016.
NCDWR Project No. 20130918 v8, Modification to Certification No. 3978, August 12, 2016.
NCDWR Project No. 20130918_v9, Modification to Certification No. 3978, December 20, 2016.
NCDWR Project No. 20130918 v10, Modification to Certification No. 3978, December 8, 2017.
Dear Sir:
The purpose of this letter is to request a modification and extension of the United States Army
Corps of Engineers (USACE) Section 404 Individual Permit and North Carolina Division of
Water Resources Section 401 Certification for the above referenced project.
Mailing Address: Telephone: (919) 707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 1000 BIRCH RIDGE DRIVE
ENVIRONMETAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH, NC 27699
1598 MAIL SERVICE CENTER
RALEIGH, NC 27699-1598
Website: www.ncdot.gov
The NCDOT is requesting approval for additional impacts at U-2525C, Permit Site 20. The fill
slope at this site extends further from the roadway than originally anticipated. Therefore, the
reinforced concrete pipe (RCP) carrying this stream will need to be approximately 22 linear feet
(If) longer than previously permitted to accommodate the slope. Bank stabilization at the outlet is
reduced from 30 if to 15 if due to right of way constraints. Impact number changes resulting
from this modification are presented in this application in red.
Please see the enclosed revised Division of Mitigation Services (DMS) mitigation acceptance
letter (dated April 26, 2019) and revised permit drawings for the above -referenced project
reflecting this modification.
In addition to this modification, the Section 404 Individual Permit and 401 Water Quality
Certification currently have an expiration date of December 31, 2019. Since this project was
phased into two sections (B and C) and the original permit issued was only good for 5 years, the
work in jurisdictional areas will not be completed by this expiration date. Therefore, the NCDOT
is requesting an extension of the permit authorization for U-2525 through 2023.
IMPACTS TO WATERS OF THE U.S.
Please see the revised Table 3 and site description below reflecting the modification at U-2525C
Permit Site 20.
Table 3. U-2525C Final Stream Impacts Revised
Site
Stream Name &
Intermittent (I) or
Perennial (P)
Stream
ID
Impact Type
Impact
Length
(linear feet)
Temporary
Impacts (acres)
(feet)
Mitigation
Requirement
(linear feet)
I
UT to Jorden
Branch (P)
SBV2
Perm. Fill
41
--
USACE
Bank Stabilization
5
--
Temp. Fill
--
<0.01 (5')--
2
UT to North
Buffalo Creek (P)
SI
Perm. Fill
362
--
USACE & DWR
Bank Stabilization
--
--
Temp. Fill
--
-
--
Perm. Fill
61
--
USACE
3
UT to North
Buffalo Creek (I)
SG
Bank Stabilization
--
--
--
Temp. Fill
--
<0.01 (10')
--
Perm. Fill
780
--
USACE & DWR
Bank Stabilization
45
--
--
4
UT to North
Buffalo Creek (P)
Sl
Temp. Fill
--
<0.01 (6')
--
Loss of Function
568
--
USACE ( 0.5:1)
Perm. Fill
405
--
USACE
4A
UT to North
Buffalo Creek (I)
Si
Bank Stabilization
--
--
--
Temp. Fill
--
--
--
Perm. Fill
--
--
--
5
UT to UT at Camp
Herman (I)
SBT
Bank Stabilization
--
--
--
Temp. Fill
--
<0.01 (28')
--
6
N/A wetland only)--
--
--
--
--
7
N/A wetland only)--
--
--
--
--
U-2525B&C Individual Permit Modification Application Page 2 of 6
Table 3. continued
Site
Stream Name &
Intermittent (1) or
Perennial (P)
Stream
ID
Impact Type
Impact
Length
(linear feet)
Temporary
Impacts (acres)
(feet)
Mitigation
Requirement
(linear feet)
8
UT to UT at Camp
Herman (P)
SBS
Perm. Fill
489
--
USACE & DWR
Bank Stabilization
16
--
--
Temp. Fill
--
<0.01 14'
--
9
UT to Reedy
Fork/Townsend
Lake (UP)
SBO/
SBP
Perm. Fill (P)
93
--
USACE & DWR
Perm Fill I
342
--
USACE
Bank Stabilization (P)
18
--
Temp. Fill
--
--
--
9A
UT to Reedy
Fork/Townsend
Lake (P)
SBN
Perm. Fill
52
--
USACE
Bank Stabilization
--
--
--
Temp. Fill
--
--
--
10
UT to Reedy
Fork/Townsend
Lake (P)
SBP
Perm. Fill
2126
--
USACE & DWR
Bank Stabilization
--
--
Temp. Fill
--
<0.01 63'
--
l0A
UT to Reedy
Fork/Townsend
Lake (P)
SBQ
Perm. Fill
283
--
USACE
Bank Stabilization
20
--
--
Temp. Fill
--
<0.01 (32')
--
11
N/A wetland only)--
--
--
--
--
12
UT to Richland
Creek (P)
SBA
Perm. Fill
284
--
USACE & DWR
Bank Stabilization
24
--
DWR
Temp. Fill
--
<0.01 (15')
--
13
UT to Reedy
Fork/Townsend
Lake (P)
SBW
Perm. Fill
791
--
USACE & DWR
Bank Stabilization
--
--
--
Temp. Fill
--
0.02 122'
--
13A
UT to Reedy
Fork/Townsend
Lake (P)
SBV
Perm. Fill
225
--
USACE
Bank Stabilization
--
--
Temp. Fill
--
<0.01 (15')--
13B
UT to Reedy
Fork/Townsend
Lake (I)
SBU
Perm. Fill
225
--
USACE
Bank Stabilization
--
--
--
Temp. Fill
--
<0.01 (16')
--
14
UT to Reedy
Fork/Townsend
Lake (I)
SBJ
Perm. Fill
364
--
USACE
Bank Stabilization
71
--
Temp. Fill
--
<0.01 (20')
--
15
UT to Reedy
Fork/Townsend
Lake (P)
SBL
Perm. Fill
518
--
USACE & DWR
Bank Stabilization
--
--
--
Temp. Fill
--
0.01 (88')--
15A
UT to Reedy
Fork/Townsend
Lake (P)
SBM
Perm. Fill
169
--
USACE
Bank Stabilization
--
--
Temp. Fill
--
<0.01 57')
--
16
UT to Reedy
Fork/Townsend
Lake (I)
SBK
Perm. Fill
--
--
Bank Stabilization
--
--
--
Temp. Fill
--
0.01 (46')
--
U-2525B&C Individual Permit Modification Application Page 3 of 6
Table 3. continued
Site
Stream Name &
Intermittent (I) or
Perennial (P)
Stream
ID
Impact Type
Impact
Length
(linear feet)
Temporary
Impacts (acres)
(feet)
Mitigation
Requirement
(linear feet)
17
UT to Richland
Creek/Lake (P)
SBF
Perm. Fill
410
--
USACE & DWR
Bank Stabilization
26
--
Temp. Fill
--
<0.01 51'
--
17A
UT to Richland
Creek/Lake (I)
SBU3
Perm. Fill
--
--
--
Bank Stabilization
--
--
Temp. Fill
--
<0.01 (56')
--
1 S
UT to Richland
Creek/Lake (P)
SBE
Perm. Fill
551
--
USACE & DWR
Bank Stabilization
--
--
Temp. Fill
--
<0.01 15'
--
18A
UT to Richland
Creek/Lake (I)
SBI
Perm. Fill
80
--
USACE
Bank Stabilization
--
--
Temp. Fill
--
<0.01 (10')
--
19
UT to Richland
Creek/Lake (P)
SBF
Perm. Fill
775
--
USACE & DWR
Bank Stabilization
40
--
--
I Temp. Fill
--
0.02 150'
--
Loss of Function
183
--
USACE ( 0.5:1)
19A
UT to Richland
Creek/Lake (P)
SBH
Perm. Fill
61
--
USACE
Bank Stabilization
32
--
--
Temp. Fill
--
0.01 21'
--
20
UT to Richland
Creek/Lake (I)
SBG
Perm. Fill
616
--
USACE
Bank Stabilization
15
--
--
Temp. Fill
--
<0.01 18'
--
21
UT to Richland
Creek/Lake (P)
SBD
Perm. Fill
632
--
USACE & DWR
Bank Stabilization
--
Temp. Fill
--
0.04 (78')
--
22
UT to Richland
Creek/Lake (P)
SBC
Perm. Fill
745
--
USACE & DWR
Bank Stabilization
10
--
Temp.
__
<0.01 3'
23
UT to Richland
Creek/Lake (P)
SBB
Perm. Fill
424
--
USACE & DWR
Bank Stabilization
19
--
Temp. Fill
--
<0.01 (47')
--
Total New Temporary Impacts:
--
0.17 (956')
--
Total Permanent Impacts:
12,245
0.01 (30')
--
Permanent Impacts Requiring DWR Mitigation:
9,004
--
--
Permanent Impacts Requiring USACE Mitigation:
11,904
--
--
Loss of Function Impacts Requiring USACE Mitigation:
751
--
--
Total Impacts Requiring Mitigation:
12,655
--
f — Final mitigation requirement will be up to the USACE and DWR
U-2525B&C Individual Permit Modification Application Page 4 of 6
Permit Site 20 (Revised): The proposed roadway will result in 616 if of permanent stream
impacts, <0.01 ac (18 If) of temporary stream impacts, and 15 if of steam bank stabilization to
stream SBG. Flow from this stream will be carried in a 30" RCP and extended with a 48" RCP at
the outlet (not buried).
COMPENSATORY MITIGATION
U-2525 Compensation:
Please see the mitigation tables below. Table 6 has been revised to account for the modification
at U-2525C, Permit Site 20. The change has been captured in the most recent DMS mitigation
acceptance letter.
Table 5. U-2525B Required Compensatory Mitigation Summary (Final)
Stream Length ft
Riparian Wetland Acreage ac
Impacts Requiring Mitigation
10,193
7.55
Onsite Mitigation Credits
2,055
Total Mitigable Impacts Less
Onsite Mitigation
8,138
7.55
Required DMS Mitigation
5,161 2:1
7.53 2:1
2,977 1:1
0.02 1:1
Total DMS Mitigation
13,299
15.08
Table 6. U-2525C Required Compensatory Mitigation Summary (Final) (Revised)
Stream Length (ft)
Riparian Wetland Acreage (ac)
Impacts Requiring
12,655
2.81'
Mitigation
Required DMS
11,904 @ 2:1
Mitigation
2.81 @ 2:1
751 @ 0.5:1
Total DMS Mitigation
24,183.5
5.62
1 — Total impacts requiring mitigation for U-2525C is 2.96 ac, however 0.15 ac of Permit Site 1 was previously
mitigated for as mechanized clearing under U-2525B - Permit Site 21
REGULATORY APPROVALS
Section 404: Application is hereby made for a modification and extension to of the USACE
Individual 404 Permit as required for the above -described activities and the previously permitted
activities under U-2525B and U-2525C.
Section 401: We are hereby requesting a modification to the 401 Water Quality Certification
from the N. C. Division of Water Resources for the above described activities.
U-2525B&C Individual Permit Modification Application Page 5 of 6
A copy of this permit application and its distribution list will be posted on the NCDOT Website
at: http://connect.ncdot.gov/resources/Environmental. If you have any questions or need
additional information, please call Erin Cheely at (919) 707-6108.
Sincerely,
�2 Philip S. Harris III, P.E., C.P.M.
Environmental Analysis Unit Head
cc:
NCDOT Permit Application Standard Distribution List
U-2525B&C Individual Permit Modification Application Page 6 of 6
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
TIM BAUMGARTNER
Director
NORTH CAROLINA
Environmental Quality
Mr. Philip S. Harris, III, P.E., CPM
Environmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Dear Mr. Harris:
April 26, 2019
Subject: Mitigation Acceptance Letter:
TIP Number U-2525B/C, Greensboro Eastem Loop from US 70 Relocation to
SR 2303 (Lawndale Drive), Guilford County
Reference: USACE 404 Individual Permit issued July 24, 2015 and Individual Modification
issued November 28, 2017 (USACE Action ID 2005-21386)
NCDWR 401 Water Quality Certification (WQC) issued July 21, 2015 and
Modification issued December 8, 2017 (NCDWR ID 2013-0918)
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will
provide the additional stream mitigation for the subject project. Based on the information supplied by
you on April 8, 2019, the stream impacts are located in CU 03030002 of the Cape Fear River Basin in the
Central Piedmont (CP) Eco-Region, and are as follows:
Table 1— Additional
Cape Fear Stream I Wetlands Buffer (Sq. Ft.)
03030002 Non- Coastal Zone 1 Zone 2
Cp Cold Cool Warm Riparian Riparian Marsh (3:1) (1.5:1)
Impacts (feet/acres) 0 0 22.0 1 0 0 1 0 0 1 0
*NOTE: Some of the stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for
details.
These impacts and associated mitigation needs were not projected by the NCDOT in the 2019 impact
data. DMS is currently providing stream, riparian and buffer wetland mitigation for the impacts
associated with this project located in cataloging unit 03030002 of the Cape Fear River basin as required
by the 404 and 401 permits issued in 2015 and modifications issued in 2017, as shown in the below table
(in mitigation credits):
„ a 1E
North Carolina Department of Environmental Quality I Division of Mitigation Services
217 W. Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652
919.707.8976
Mr. Harris
TIP U-2524 B / C
April 26, 2019
Page Two
Table 2 — Current Permitted Impacts and Associated Mitigation Requirements provided by DMS
(based on 2015 and 2017permits) and Revised Anticipated Impacts (based on mitigation request)
Total Permitted
Mitigation Provided by
Additional
Impact Type
Impacts
DMS per Issued
Impact (for
Revised Total
(feet / acre / sq ft)
Permits (Credits)
approval)
Impacts*
Stream
20,771.0
37,438.50
22.0
20,793.0
Riparian Wetland
10.36
20.70
0
10.36
Riparian Buffer ! 142.0 213.0 0' 142.0
*Some of the additional wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for
details. DMS will provide the amount of mitigation as determined by the regulatory agencies.
This impact and associated mitigation need were under projected by the NCDOT in the 2019
impact data. DMS will commit to implement sufficient compensatory mitigation credits to offset the
additional impacts associated with this project as determined by the regulatory agencies using the delivery
timeline listed in Section F.3.c.iii of the In -Lieu Fee Instrument dated July 28, 2010. This mitigation
acceptance letter replaces the mitigation acceptance letters that was issued on September 3 and
October 7, 2013, November 21, 2014, June 16, 2015, November 18, 2016 and November 3, 2017.
If you have any questions or need additional information, please contact Ms. Beth Harmon at
919-707-8420.
Sincerely,
J neTAsset�tanaggement
. Stll
D Supervisor
Cc: Mr. David Bailey, USACE — Raleigh Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: U-2525B/C Additional 2
e:- �-'D— E
NX1F M Cgr�A 414 �•
i++rc.rinr•��..rrC d..i1t�
North Carolina Department of Environmental Quality I Division of Mitigation Services
217 W. Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652
919.707.8976
Dow Sign Envelope ID: 4E032FF4-C487498F-BB35-1327EF839CEE
*Rounded totals are sum of actual impacts
Totals on this sheet include the summed amounts from previous sheet
NOTES:
NC DEPARTMENT OF TRANSPORTATION
Previously Permitted 0.508 0.044 0.062 DIVISION OF HIGHWAYS
New Impacts 1.939 0.154 0.254 10/23/2017
TOTAL IMPACTS 2.447 0.198 0.316 Guilford County
U-2525C
Revised 2016 os os SHEET 70 OF 70
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size /Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
14
415+71/418+52 (L)
Bank Stabilization
< 0.01
71
15
429+04/431+89 (L)
1@8'x8' RCBC
0.60
0.04
0.03
0.08
0.01
518
88
15A
429+08/431+25 (L)
Roadway
0.02
< 0.01
169
57
16
439+20/442+23 (L)
Roadway
< 0.01
0.01
0.01
46
16
439+20/442+23 (L)
Pond
0.93
17
463+00/470+25 (L)
72" conc.
0.05
< 0.01
410
51
17
465+74/466+06 (L)
Bank Stabilization
< 0.01
26
17A
462+70/463+24
Temp Impacts
< 0.01
56
18
16+16/21+69 (Y6)
Roadway
0.05
< 0.01
551
15
18A
14+36/14+72 (Y6)
Roadway
< 0.01
< 0.01
80
10
19
469+29/473+17 (L)
1 @8'x8', 1 @8'x8', 2@72" EXT
0.12
0.02
775
150
19
473+05/473+17 (L)
Bank Stabilization
< 0.01
40
19
472+77/473+38 (L)
Loss of Function
0.02
183
19A
32+24/33+21 (Y6)
dual 60" conc.
0.03
0.01
61
21
19A
32+92/33+13 (Y6)
Bank Stabilization
< 0.01
32
20
481+94/486+19 (L)
Roadway
0.07
< 0.01
616
18
20
481+94/486+19 (L)
Bank Stabilization
< 0.01
15
21
491+15/494+96 (L)
3@11'x11' RCBC
0.11
0.05
0.10
0.19
0.04
632
78
22
505+06/510+10 (L)
Roadway
0.02
0.08
< 0.01
745
3
22
505+06/505+11 (L)
Bank Stabilization
< 0.01
10
23
527+89/531+24 (L)
Roadway
0.02
0.01
0.04
< 0.01
424
47
23
530+94/531+11 (L)
Bank Stabilization
< 0.01
19
Total impacts from previously permitted sites (1,2,3,11, & 12)
0.51
0.04
0.06
0.12
0.01
777
30
Total new impacts
1.94
0.15
0.25
3.02
0.17
12219
956
TOTAL IMPACTS FOR U-2525C*:
2.45
0.20
0.32
3.14
0.18
12996
986