Loading...
HomeMy WebLinkAboutRevised SupplementSUPPLEMENT-EZ COVER PAGE FORMS L, ,AF)ED 'ROJECT INFORMATION 1 Project Name _ 2 _'Project Area (ac) 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac) 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? Stout Landing Subdivision 64.34 :OMPLIANCE WITH 02H .1003(4) _ 7 Width of vegetated setbacks provided (feet)_ n/a 8 Will the vegetated setback remain vegetated? _ 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? 10 Is streambank stabilization proposed on this project? VUMBER AND TYPE OF SCMS: 11 Infiltration System 12 Bioretention Cell 13 1 et Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (IS-FS 20 Disconnected Impervious Surface 21 Treatment Swale 22 Dry Pond _ 23 StormFilter _ 24 Silva Cell 25 Bayflter 26 ;Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: 28 Organization: 29 Street address: 30 City, State,_Zip 31 Phone num_ber(s): 32 Emafl: 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 C. Scott 409 Chicago Dr, Suite 112 Fayetteville, NC 28306 910426-6777 sbrown@4dsitesolutions.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. t'r1rr1rr1".4' �OQ��ESS,p y- .-Y Q SEAL 027452 � •S�NGINE�P,O�?;, COST AAt '8 Nolo Signature of Designer 05 oz- ,' q Date 2008 rules 2017 rules 11 Design storm (inches) 1995 rules SL 20W246 2008 rules 2017 rules 12 Breakdown of new BUA: - Parkin ft - Sidewalk ft - Roof ft - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots ( ft 14 New infiltrating permeable pavement outside of subdivided lots ft 15 F)cisitng BUA that will remain (not subject to 1 permitting)ft 16 _ 1 Existing BUA that is already permitted ft 17 Existing A that will be removed ft 18 Percent BUA 19 Design volume of SCM (cu ft) 20 Calculation method for design volume 4DDITIONAL INFORMATION Please use this space to provide any additional 21 information about the drainage area(s): DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so number of drainage areas/SCMs 1 Is all/part of this project subject to previous rule 3 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total BUA in project (s1ft) 1232562 sf New BUA on subdivided lots (subject to 6 permitting) ft 4500 sf New BUA outside of subdivided lots (subject to 7 permitting) jsf) _ 368562 sf 8 Offsite - total area (sq ft) 402428 sf 9 Offsite BUA (sq ft) sf 10 1Breakdown of new BUA outside subdivided lots: - Parkin ft -Sidewalk sq ft) - RooL ft) - Roadway (sq ft) - Future (sq ft) Other, please specify in the comment box below (sq ft) _.---- - - New infiltrating permeable pavement on subdivided lots ft sf 53262 sf sf 315300 sf 11 sf sf sf New infiltrating permeable pavement outside of 12 subdivided lots ft sf Exisltng BUA that will remain (not subject to 13 Dermittinal (sa ft) s 15 1 Existing BUA that will be removed ft sf 16 Percent BUA 39% 17 1 Design storm (inches) 1 in 18 !Design volume of SCM (cu ft) 105807 19 Calculation method for design volume SA/DA t8 ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): cf DRAINAGE AREA INFORMATION ( Entire Site 4 Type of SCM N/A 5 Total BUA from project (sq ft) ' 6 1 1995 rules SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 20067246 2008 rules 2017 rules Offsite -total area (sq ft) 9 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 WET POND 1 Drainage area number 1 2 Design volume of SCM (cu ft) iENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? 4 Is the SCM located away from contaminated soils? 5 What are the side slopes of the SCM (H:V)? Does the SCM have retaining walls, gabion walls or other engineered 6 side slopes? 105807 of Yes Yes 3:1 No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? I Yes Yes Pump (preferred) Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? 9 10 11, 12 13,General What is the method for dewatering the SCM for maintenance? If applicable, will the SCM be cleaned out after constriction? Does the maintenance access comply with General MDC (8)? Does the drainage easement comply witll General MDC (9)? the SCM is on a single family lot, does (will?) the plat comply with if MDC (10)? Yes Yes 14 is there an O&M Agreement that complies with General MDC (11)? 15 Is there an O&M Plan that complies with General MDC (12)? 16 Poes the SCM follow the deyke specific MDC? 17 Was the SCM designed by an NC licensed professional? 01ET POND MDC FROM 02H .1053 18 Method used 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes Yes I SAIDA Yes Elevation of the excavated main pool depth (bottom of sediment 20 removal) (fmsl) _ _ 201.50 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) Elevation of the bottom of the vegetated shelf (fmsl) Elevation of the permanent pool (fmsl) _ Elevation of the top of the vegetated shelf (fmsl) Elevation of the temporary pool (fmsl) Surface area of the main permanent pool (square feet) IVolume of the main permanent pool (cubic feet) Average depth of the main pool (feet) 1 Averaae depth equation used 1 202.50 22 209.50 23 210.06 24 210.50 25 212.76 26 23268:' 27 151332 1 28 29 6.50 ft Equation 3011 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) _ 32 Volume of the forebay (cubic feet) 29905 cf Is this 15-20% of the volume in the main pool? Yes _331 34 Clean out depth for forebay (inches) _ 12 in 35 Design volume of SCM (cu ft) 105807 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orfice, orifice diameter (inches) 5 in 38 If weir, weir height (inches) _ 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2 ` Are the mle s) and outlet located in a manner that avoids short- 41 circuiting? Yes 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 102 in 44 Depth of forebay at exit (inches) 90 in 451 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 471SIope of vegetated shelf (H:V) 6:1 Does the orfce drawdown from below the top surface of the 48 permanent pool? No Does the pond minimize impacts to the receiving channel from the 1- 49',yr, 24-hrstorm? Yes Are fountains proposed? (If Y, please provide documentation that 50 MDC(9) is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted In non -dumping turf grass? _ Yes 53,soeaiss of turf that will ba used on the dam and embankment Bermuda Grams 1 04Has a piannng plan Deen proviDeD ror cne vcyeieieu W IVII , ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 wet pond(s): Wet Pond 1 7:37 AM 5/2/2019