HomeMy WebLinkAbout20190324 Ver 1_Approval Letter_20190503ROY COOPER.
cu,enm
MICHAEL S. R£CAN
Secretary
LINDA CU LPEPP ER
Director
NORTH CAROLINA
Environmental Quality
` (
May 3L2Dl9
' .
D\NR#l9-O334
!\&ake'County
David H.[ottmn,Sr
' '
9124 Lake Wheeler Road
Fuqua
v-Vahna,NC37536
.
|
�Ronnie E.Cotton ! '
5Manhattan Drive,
Brink,KUO�733-18�5 `
David Cotton, ]c
`
9315LakeWheeler Road .
Fuquav-Varina, NC 27526
'
Donna Hendricks
9300 Lake Wheeler Road '
Fuquav-Vahnz, NC 27528 '
^
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
'
AUTHORIZATION CERTIFICATE PER THE NGUSERIVER, BASIN RIPARIAN BUFFER `
'
PROTECTION RULES (15A NCAC 02b '0233),W|TH ADDITIONAL CONDITIONS
Rutherford, .
`
`
To VVhorn It May Concern: '
`
`
You have our approval for the impacts listed be|oxvforthe purpose, eschbed in your
application received by the Division of Water Resources (Division) on March 12, 3019 and with
payment received on KUan:h lEi 2019. These impacts are covered by the attached Water
Quality General Certification Number 4139 and the conditions -listed below. This, certification is
associated withtheuseofNationwide Permit, Number Z9hnoeitis|ssued.to ' you 6«the U.S.
Army Corps of E i p| thatshould�et ' "other federal,, tateorlocal
ds beforeproceedingwith - |ud limited to)
'` /
Sediment and Erosion Control, Non -Discharge;, and, \A/aterSupply \A/at6r�ked ladons.
.
This ap 'roval requires y6u to follow the conditions listed, in, the enclosed certification and the
fol|mxvnnadditional conditions: i`
'
wo��camxworpaum��men��x�rna��mr|nwm"norv�n�u�vun�s
x�c�`m�mnaonac| xavr�or*,|xox�xwom`caommzNQP N,
n�ov
`
~ "~ .-'-_00_
` .
Rutherford
DWR #19-0324
401 AND BUFFER APPROVAL
Page 2 of 5
1. The following impacts are hereby approved provided that all of the other specific and
general conditions of the Certification and Buffer Rules are met. No other impacts are
approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B
.0233(8)]
Type of Impact
Amount Approved (units)
Permanent
Amount Approved (units)
Temporary
Wetland
W1 -Utility Crossing
0.195 (acres)
0 (acres)
Stream
S1 -Utility Crossing
0 (linear feet)
25 (linear feet)
Buffers — Zone 1
B1 -SCM Discharge Pipe
695 (square feet)
0 (square feet)
B2 -SCM Discharge Pipe
801 (square feet)
0 (square feet)
B3 -SCM Discharge Pipe
905 (square feet)
0 (square feet)
B4 -Offsite Force Main
1,550 (square feet)
0 (square feet)
Buffers — Zone 2
B1 -SCM Discharge Pipe
463 (square feet)
0 (square feet)
B2 -SCM Discharge Pipe
522 (square feet)
0 (square feet)
63 -SCM Discharge Pipe
591 (square feet)
0 (square feet)
B4 -Offsite Force Main
1,134 (square feet)
0 (square feet)
2. Stormwater Management Plan (SMP) Approval from Local Community Required
The stormwater management plan (SMP) must be approved by the Town of Fuquay-Varina
and meet the requirements of this Certification. The SMP may not be modified without
prior written authorization from the Town of Fuquay-Varina. [15A NCAC 02H .OS06(b)(3)]
3. The permittee shall report to the Raleigh Regional Office any noncompliance with this
certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including
but not limited to sediment impacts, and any violation of state regulated riparian buffer
rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the
next business day if a weekend or holiday) from the time the applicant became aware of the
circumstances. A written submission shall also be provided within 5 business days of the
time the applicant becomes aware of the circumstances. The written submission shall
contain a description of the noncompliance, and its causes; the period of noncompliance,
including exact dates and times, if the noncompliance has not been corrected, the
anticipated time compliance is expected to continue; and steps taken or planned to reduce,
eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the
written submission requirement on a case-by-case basis.
Rutherford
DWR #19-0324
401 AND BUFFER APPROVAL
Page 3 of 5
4. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre -Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0501
and .0502]
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within
these boundaries approved under this authorization shall be clearly marked with orange
warning fencing (or similar high visibility material) for the areas that have been approved to
infringe within the buffer, wetland or water prior to any land disturbing activities to ensure
compliance with 15 NCAC 02H .0500. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC
02H .0507 (c)]
6. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification and
Buffer Authorization. If you change your project, you must notify the Division and you may
be required to submit a new application package with the appropriate fee. If the property is
sold, the new owner must be given a copy of this approval letter and General Certification
and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)]
7. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51
This Certification and Buffer Authorization can be contested as provided in General Statute
150B by filing a written petition for an administrative hearing to the Office of Administrative
Hearings (hereby known as OAH) within sixty (60) calendar days.
A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH
Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original
and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal
office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state
holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of
the petition along with any applicable OAH filing fee is received by the OAH within five (5)
business days following the faxed transmission.
Mailing address for the OAH:
If sending by First Class Mail
via the US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Rutherford
DWR #19-0324
401 AND BUFFER APPROVAL
Page 4 of 5
If sending via delivery service
(e.g. UPS, FedEx):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to Department of Environmental Quality:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
Please send one (1) copy of the petition to DWR:
If sending by First Class Mail
via the US Postal Service:
Karen Higgins
NC DWR-401 & Buffer Permitting
Branch
1617 Mail Service Center
Raleigh, NC 27699-1617
If sending via delivery service
(e.g. UPS, FedEx):
Karen Higgins
NC DWR — 401 & Buffer Permitting
Branch
512 N. Salisbury Street
Raleigh, NC 27604
This letter completes the review of the Division under section 401 of the Clean Water Act and
the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0233. Please contact Stephanie
Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any questions or concerns.
Sincerely,
Rick Bolich, LG
Assistant Supervisor, Water Quality Regional Operations Section
Enclosure: GC 4139
Rutherford
DWR #19-.0324
401 AND BUFFER APPROVAL
Page 5 of 5
cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Dr.,
Ste. 105; Wake Forest, NC 27597
DWR RRO 401/Riparian Buffer file
DWR 401 & Buffer Permitting Unit via Laserfiche
Deborah Shirley via e-mail at dshirley@sandec.com
Chris Raughley.via.e-mail at chris.raughely@pultegroup.com