Loading...
HomeMy WebLinkAboutNC0020621_Pretreatment Compliance Inspection_20190315ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality March 29, 2019 Ms. Karen Reece, Pretreatment Coordinator Town of Boone P.O. Drawer 192 Boone, NC 28607 SUBJECT: Pretreatment Audit Inspection Report Boone Jimmy Creek Wastewater Treatment Plant NPDES Permit No. NCO020621 Watauga County Dear Ms. Reece, On March 11, 2019, Paul DiMatteo of this office and Vivien Zhong of PERCS conducted a Pretreatment Audit Inspection at the above referenced wastewater treatment system. Karen Reece, Pretreatment Coordinator, was present for the inspection. The purpose of this inspection was to determine the effectiveness of the pretreatment program, which included: a detailed file review, review of the POTW facility performance, sampling and compliance judgement program, adherence to the enforcement response plan, and observing an industrial user inspection. Background The County operates a 4.82 MGD facility and has two significant industrial users, one of which is categorical. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on May 1, 2017 and was approved on October 26, 2017. The next HWA is due by October 1, 2020. The last Industrial Waste Survey (IWS) was submitted on February 12, 2019 and was approved on March 1, 2019. The next IWS is due by April 1, 2024. The last Long -Term Monitoring Plan (LTMP) was submitted on August 29, 2017 and was approved on September 19, 2017. The Sewer Use Ordinance (SUO) was submitted on November 6, 2012 and approved on November 7, 2012. The Enforcement Response Plan was approved on May 13, 2013. D E Q�p North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 NORTH C. 0LINA o•o•°^•mme""°""•"viu"•i� /� 336.776.9800 LTMP Review The LTMP is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the files for Hospitality Mints (#0003) and Charleston Forge (#0004) revealed that the monitoring data was well organized and the slug control plans were in good order. Industrial Inspection Charleston Forge is a metal furniture manufacturer that has a categorical waste stream regulated under 40 CFR 433.17. The inspection included a thorough review of the plant, sampling practices, and industry self -monitoring. The pretreatment audit is satisfactory. The program is being implemented in an excellent manner. If you should have any questions, please do not hesitate to contact Paul DiMatteo at (336) 776- 9691 or our office at (336) 776-9800. Sincerely, EL DocuSigned<by: -0) , T :5"j(' Lon'fB�Iriic er';`ssistant Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Enclosures — PAI Report CC: PERCS Unit — Vivien Zhong WSRO Files Central Files