HomeMy WebLinkAbout20190586 Ver 1_U-5888_Erosion Control Plans_20190503V
W
O
r
CLEARING
BEGIN TIP PROJECT U-5888
-Ll- STA. IO + 60.00
PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED
" 1111111Mimi,
M I
DIVISION
10 I W4011100 1
?'O
(1�tjSs `r 76
I 10(9 1 ow A
BEGIN CONSTRUCTION
-Y4- STA.14 + 00.00
BEGIN CULVERT
-Y4- STA.14 + 86.10
END CULVERT
-Y4- STA.15 + 11.90
CONSTRUCTION
-YI- STA. 10 + 44.00
METHOD
THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF WAYNESVILLE.
GRAPHIC SCALES
20 10 0 20 40
PLANS
20 10 0 20 40
PROFILE (HORIZONTAL)
4 2 0 4 8
PROFILE (VERTICAL)
THESE EROSION AND SEDIMENT
CONTROL PLANS COMPLY WITH
THE REGULATIONS SET FORTH
BY THE NCG-010000 GENERAL
CONSTRUCTION PERMIT EFFECTIVE
AUGUST 1, 2016 AND ISSUED BY
THE NORTH CAROLINA DEPARTMENT
OF ENVIRONMENT AND NATURAL
RESOURCES DIVISION OF WATER
RESOURCES.
Prepored in the Office of:
CONSTRUCTION
-Y2- STA.17 + 10.00
WETHERILL ENGINEERING INC.
1223 Jones Franklin Road
Raleigh, nc 27606
Designed by .
Jim Davis, PE 3554
NAME LEVEL III CERTIFICATION NO.
III III'`, 1
I 10 1 VUB) I 04M 3 1 C A I E
CONSTRUCTION
-Y3- STA.11 + 50.00
' PROJECT U-5888
-LZ- STA. 22 + 80.00
Reviewed in the Office of:
ROADSIDE ENVIRONMENTAL UNIT
1 South Wilmington St.
Raleigh, NC 27611
2018 STANDARD SPECIFICATIONS
Reviewed by:
SrATB
STATB PROIBCr RBPBRBNCB NQ
1411ur
NQ
TOTAL
SHBBTS
N.C.
U-5888
EN
STATE, PROD. NQ
P.A. PROD. NQ
DBBf.'R FMN
44625.1.1
WA
PE
44625.1.1
WA
R1W /UTIL.
EROSION AND SEDIMENT CONTROL MEASURES
SEd• Description SThol
1630.03 Temporary Silt Ditch ...................... „D
1630.05 Temporary Diversion .............................
1605.01 Temporary Silt Fence ......................
1606.01 Special Sediment Control Fence ........
1622.01 Temporary Berms and Slope Drains ...................
1630.02 Silt Basin Type B.................................
1633.01 Temporary Rock Silt Check Type -A ..................
Temporary Rock Silt Check Type -A with
Matting and Polyacrylamide (PAM)....................
1633.02 Temporary Rock Silt Check Type-B .......... * *
Wattle/ Coir Fiber Wattle ...................................
-
Wattle/ Coir Fiber Wattle
with Polyacrylamide(PAM)......................................
Temporary Rock Sediment Dam
Type -A ............
IM
Temporary Rock Sediment Dam
Type-B ...
:1)
Rock Pipe Inlet Sediment Trap
Type -A ..............
Rock Pipe Inlet Sediment Trap
Type-B......
Stilling Basin ...................................................
Special Stilling Basin .................................
Rock Inlet Sediment Trap:
Type....................................................A
nnnm
Type B.....................................................
B
LJ
TypeC....................................................
C
Skimmer Basin ................................................
Tiered Skimmer Basin .............................
Infiltration Basin .............................................
THIS PROJECT CONTAINS
EROSION CONTROL PLANS
FOR CLEARING AND
GRUBBING PHASE OF
CONSTRUCTION.
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
1604.01
Railroad Erosion Control Detail
1632.01
Rock Inlet Sediment Trap Type A
1605.01
Temporary Silt Fence
1632.02
Rock Inlet Sediment Trap Type B
1606.01
Special Sediment Control Fence
1632.03
Rock Inlet Sediment Trap Type C
1607.01
Gravel Construction Entrance
1633.01
Temporary Rock Silt Check Type A
1622.01
Temporary Berms and Slope Drains
1633.02
Temporary Rock Silt Check Type B
1630.01
Riser Basin
1634.01
Temporary Rock Sediment Dam Type A
1630.02
Silt Basin Type B
1634.02
Temporary Rock Sediment Dam Type B
1630.03
Temporary Silt Ditch
1635.01
Rock Pipe Inlet Sediment Trap Type A
1630.04
Stilling Basin
1635.02
Rock Pipe Inlet Sediment Trap Type B
1630.05
Temporary Diversion
1640.01
Coir Fiber Baffle
1630.06
Special Stilling Basin
1645.01
Temporary Stream Crossing
1631.01
Matting Installation
EXCELSIOR
WATTLE WITH
SLOPE
ISOMETRIC VIEW
POLYAC YLAMIDE
2' ( MAX _ ) 2' UPSLOPE
CROSS SECTION
(PAM)
NOTES:
DETAIL
USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND
WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE
TO WEDGE WATTLE TO BOTTOM OF DITCH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A
U SHAPE NOT LESS THAN 12" IN LENGTH.
EDGE OF PAVEMENT INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE
AND AT EACH END TO SECURE IT TO THE SOIL.
J 1 f-k r\ C
GROUND
VEE DITCH
2 IN. see inset c 2' UPSLOPE
STAKE NATURAL GROUND7
FLOW --
1
1
STAKETTING
CROSS SECTION
TRAPEZOIDAL DITCH
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS.
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT
LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
TO BE APPLIED TO EACH WATTLE.
INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE
WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY
PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN.
INSET A
AM
(1 oz.)
INSET B
OZ
CAI
(1 oz.)
TOP VIEW
INSET C
PROJECT
EFERENCE
O.
uRsaea � ec�za
R/W SHEET NO.
ROADWAY DESIGN HYDRAUL
TEMPORARY ROCK SILT CHECK TYPE 'AWITH ENGINEER `"""°"
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
EXCELSIOR NOTES:
MATTING
FLOW INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633-01.
SEDIMENT CONTROL STONEC 11 1;
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
9 v
ap MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
A �`� �� �Do � n PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
�° �°��
�D° A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
2`0 o $ 20 2`0 o b I
L
o000 20 0 o J MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
° °�° TO BE APPLIED TO EACH ROCK SILT CHECK.
200 o a a�$ �o a�
o ��o o �S o o §' o h o
oo� `��° � INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
oo boo
o �0o ��9� TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
�Do�u<9� EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
STRUCTURAL STONE
B
PAM
(a oz.)
PLAN
00
INSET A
See Inset A
CLASS B STONE
2/3 CHANNEL l, MIN EXCELSIOR
WIDTH �� MATTING
1' MIN 300 0 � 020°0 � 12„
H 2� MIN
0 200 200
rN rN
fIL=11L=IiL=11L=R-IiL=11L=RJiL=11L=1rrIL=f1L=rll�irflL=111= JIL=
EXCELSIOR
MATTING SECTION B-B CLASS B STONE
SECTION A -A
NOT TO SCALE
PROJECT REFERENCE NO. SHEET NO.
U -5888 EC -2B
WW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
SKIMMER BASIN.-WITH.-BAFFLES-DETAI.L.
STEEL POSTS (QUANTITY VAR.) SKIMMER (SIZE VAR.)
2" x 2" (nominal)
SOIL STABILIZATION WOODEN STAKE
GEOTEXTILE
1"
PLASTIC SLOPE DRAIN
PIPE (12 IN°)
1 2 ►►
1-2
MIN.
-' 12-24►►
--- i 4' (MAX.) W
6' (MIN.)
_
MIN. MINLu
ROPE
COIR FIBER MAT #10 STEEL
TEMPORARY OR REINFORCEMENT BAR
2' (MIN.) SOILGEOTEXTILETION
PERMANENT DITCH
rMlti1' (MIN.) rr
•NO, 4
4' (MIN.) STONE PAD WOOD STAKE, IAMETER BEND
METAL POST
W OR STAPLE
4 ;►
PRIMARY SPILLWAY
EARTH DIKE
L = 3W
6 INo
(MINo) 4 3/4L COIR FIBER MAT 24►►
1/2L SOIL STABILIZATION
GEOTEXTILE
1/4L HIN.
18 IN.
1' (MIN.) OVERLAP
\\\
- -
J 1
f ti2 l
1.501 (MINo) °� 1' (MIN.) 12 � 4 IN. (MIN.) 1"nominal
(nominal)
.
I�-q,-�I 4.--______ STAPLE
MAX.
_ 1►►
UNCLASSIFIED EARTH ------
MATERIAL
VARIABLE NATURAL GROUND
COIR FIBER BAFFLE 1 21 i I RIGID
(SEE ROADWAY STD. DWG. NO° 1640°01) COUPLING UNCLASSIFIED EARTH
MATERIAL 12►►
PLACE SEALANT AROUND BARREL PIPE
STEEL POSTS WITH MINIMUM WIDTH OF 6 INo
CLASS B STONE PAD (4' x 4' x 1' MINo)
COIR FIBER MAT
NOTES
ANCHOR OPTIONS
1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES.
2. LIMIT EARTH DIKE HEIGHT TO 5 FT.
3. FOR BASIN DEPTH OF 3 FT., THE MINIMUM BASIN WIDTH SHALL BE 9 FT.
4. DETERMINE PRIMARY SPILLWAY WEIR LENGTH (FT.) USING Q/0.8, WHERE Q IS FLOW RATE (CFS) INTO BASIN.
5. PLASTIC SLOPE DRAIN PIPE AT INLET OF BASIN MAY BE REPLACED BY FILTRATION GEOTEXTILE OR TARP AS DIRECTED.
6. SOIL STABILIZATION GEOTEXTILE FOR PRIMARY SPILLWAY SHALL BE ONE CONTINUOUS PIECE OF MATERIAL OR OVERLAPPED 18 IN. (MIN.). INOT TO SCALE11
COIR FIBER
COIR FIBER WATTLE
POLYACRYLAMIDE (PAM)
EDGE OF PAVEMENT
SLOPE
ISOMETRIC VIEW
2' ( MAX _ ) 2' UPSLOPE
J 1 f-k r\ C
CROSS SECTION
GROUND
VEE DITCH
2 IN. see inset c 2' UPSLOPE
STAKE NATURAL GROUND7
FLOW --
1
1
STAKETTING
CROSS SECTION
TRAPEZOIDAL DITCH
WITH
DETAIL
NOTES:
USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND
WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE
TO WEDGE WATTLE TO BOTTOM OF DITCH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A
U SHAPE NOT LESS THAN 12" IN LENGTH.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE
AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS.
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT
LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
TO BE APPLIED TO EACH WATTLE.
INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE
WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY
PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN.
INSET A
AM
(1 OZ.)
INSET B
oz.
'AI
(1 OZ.)
TOP VIEW
INSET C
OF HIGHWAYS
NORTH CAR
SOIL STABILIZATION
TIMEFRAMES
SITE
DESCRIPTION
STABILIZATION TIME
TIMEFRAME EXCEPTIONS
PERIMETER DIKES,
SWALES, DITCHES AND SLOPES
7
DAYS
NONE
HIGH QUALITY WATER (HOW) ZONES
7
DAYS
NONE
SLOPES STEEPER
THAN 301
7
DAYS
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2019 14 DAYS ARE ALLOWED.
SLOPES 3o1OR FLATTER
14
DAYS
7 DAYS FOR SLOPES GREATER THAN 50'IN
LENGTH.
ALL OTHER AREAS
WITH SLOPES FLATTER THAN 40l
14
DAYS
NONE, EXCEPT FOR PERIMETERS AND HOW ZONES°
DIVISION
OF HIGHWAYS
NORTH CAROLINA
SOIL STABILIZATION
MATTING FOR EROSION CONTROL (DITCHES)
CONST
SHEET NO.
LINE
FROM
STATION
TO
STATION
SIDE
ESTIMATE (SY)
—�—I
II+00
11+50
KTo
50 5Y
—Y-6
11+50
12+00
KTo
50 5Y
5U OTOTAL
li48 5Y
M15GEI.�ANE
U5 MA1TINla 10 6E IN51A
�O A5 PlUl
D 6Y 14
NGINEEK
TOTAL
448 5Y
5AY
500 5Y
SUMMARY SHEET
MATTING FOR
EROSION CONTROL (SLOPES)
CONST
SHEET NO.
LINE
FROM
STATION
TO
STATION
SIDE
ESTIMATE (SY)
—Y —F,
I I +50
12+43
KTo
256
—Y-6
12+00
12+43
["To
92
Z
O
w
/ / — / / 4° P /Q� ss VC G 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEET NO.
/ / / \ \ \ — -- _ �, _" _ — T P / ETHERILL Raleigh, N.C. 27606
CLEARING AND GRUBBING NOTE: \��/I — \ — / / \ \ / I ENGINEERING License No. F-0377 U -5888 EC-4/CONST. 4
EROSION CONTROL FOR PERIMETER EROSION CONTROL MEASURES SHALL BE \ I IMF -us: B919 8518077
CONSTRUCTION SHEET 4 INSTALLED DURING CLEARING AND GRUBBING PHASE. // �" \ \� // \\ — — \ \\ \I // \ Fax: 919 8518107 RW SHEET NO.
—\ \ / / \ ROADWAY DESIGN HYDRAULICS
TRANSPORTATION PLANNING/DESIGN -BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER
CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
� \ ( / / � / / // / // / — ✓ \ \ � � \ / � I \ DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
J
s I
\�o�
/ / \✓ / j // //\ \ / // �\ \\ \ \ \ \ \\ I FIRST CITIZENS BANK TSA - 0 21'
ROBERT FORGA TRUST EX. R�Vd
DB 2001E PG 143 I
/ N 2°°3 �aA �/ j / j /\j / \✓/ �AMES VI� OUEE14 I F- \ \ x I 00
r9l
/ ///a6 440 P� 6261 I \ Y1- +44.0030'& ��I EX. R/W 5o? I E / / � � \ � — / \ \ f BEGIN , NSTR\ TIOK \\ � II \ _ _
/ \ \ Yl + 55.72
/ ➢� �� I � - SM.10 +\44.00\ \ I \ oo \ EX. M FILL TH
/ o \ \ . \ \ \ 30 - + 68.43 7/ I FL BLE F
6 p \ \ \ ISFBUS \\ 1 \ \ \ \ \ I\
-Y2- +34.36
\ �\ \\ \ \ \ \ BST EX. M / I PLUG I I o
V A \ BE TIP PROJECT U-5888 I \ \ v A��o -Y2- +35.12 � /
I— TA.10 + 60.00 I -Y1- +434.00 v v v� R 35' I MOVE
HAY�IfO COUNTY 1 \ fi? o" vINY E I /
� / \ I I I 'EX. RAN �f �o Ff s� ;<� \ CB / \
BOARD OF �L�CT-1ONS / I I I I I \ \ \ �c \ s�c\ \' 139,4\— � 3°03' P . 13
� 1 \ � TOTAL,,, �� \ TO R/W Fio I !�
_DB-4 2 PG 2571� / / \ \ \ I I I I I \ \ / _ I, _— 15, /
\ \ \J I I I \ \ \\ ��� 1 $o� GERALD EGELUS -n \\ RCP_1 EMOV 151 MH/
— — — — / / \ \ \ / i r — — \ / \ \ \\ \ \ \ N, \ 2 \ \ \ o \ DB 898 PG 1186 j \ I EPLA I I REMOV
" \ -Y1- +87.00 \ s \ \�� \ (TOTAL TAKE) / 7 . ^
31.88' Ll- + 2 0 -Y1- + 00.00
45' PUE 30, \ 6° CB moo\ ��\__ of // \ l /\�
PUE \ \ oo� N_, �\ �� \ _ cR CB
\ \ / PUE L1- +20.00
P — v 30/& v v A,- �0� �N— PUE 40 „ �G VECp/ RN/ — /_ — 160' TAP€-R__FROM EXIST. R \ CB �5 Y IS" RCP RCP N REM E I DF 2 P X
esr / — — \ IGN 1 \ \ \ \ REP E Cp-
--77 _------CB
zzz
—
I
o . n
G\ n I
-E ° w R w� �- _ - - - - - - - - - I - - CONC - CB ��\ / / \ \ < I PK NAILS
44!--TFo----
6" CONC CURB \ - - �r Fo- - 0-0Nt - \ \ ✓ \ I \ t _
\ \ \ \ \\ \ 6" CONC CURB \ \ Ex /w CONC / - - - F �B- - - - - - - -BFo- —
� �I U 23 BUS (MAIN STJ\I AR1�gBLE WIDTH BST \ \
N 4/ 59 /8.9 E \ \ \ \ --- I \\ / 0
RCP-�
REMOVE
——1--------_ __ IB ND N NI \
—TC— �� — — — — — — —TC— — — — / — — — — — — OSS L �E / CR I/ n
24" C01 DRIVEWAY C -rc---------rc----�-- _ _ -1-- ___/__ _ / m \
w-\_ _ _ _ - NC CURB - - - 75"-RCP-IV rc J` - - - �- - -Tc- 3� - - FILL W/ CB R 15" RCP -IV CB \
I— J 16�' DUCTILE IRON - - - - - - - - - - - - -� - -w- CB -- - - - - - - - -rc- _ - - - - - E- FILE - c�-
_ -- -- 006000 / I —Tc-------------
GR �s — — — 00 0 00 LE JB
GR \ / - - — — — —w— — _ _ _ R MOVE 0 0 �7171NC DRIVEWAY GUTT�E
10 " DUC*I E IR _� I _ Q _
2GI � \ — \_ \ y \\ � � \ \ � �" C? 1 2GI CLAY ,� RADA° s � ® w 6 Y
A& P — — — — — / \ \ — — — — \ \ / —.cam 1 i _13AIK1 o ST _Y2=+46-" —C� —
F
Y2 + 66.00 E
60.00 — / = 32.7 ' E esr \ \ \ R \ \ ' RADE TO X
\ / \ w �,\ DRAIN iP _ PUE PUE -E---
- PU —
� \\ \_ BRICK LANDSCAPE
B M # 1 //�\\ -EX: I/� \\\\\�� \ \ \ Ll- 00.00 \ \ t _ \ "' \ I I — — —
/ //\�\ \\ \ AREA
40.99' BST ------
/ /� — ///� vv v vvvvvvv �v vv v ✓ V A — 45' RTF-
-
51 \ F
51.
--
-- 45 —
\\\\ \ \ -Y2- + 75.00 ,q \
\ \ — ' lei I
_
/�ce�_/ l/����/�_/�_/\\ —\ \-- \ \\ \ GR P. IV J�� 23'LT
\\\/// ��\ \ \ \ — \ KENNETH L. HARRELL \ m-
-// ISFB DB 188 P 37
MAR -CET O._RATHBONE
END DB 901 PG 292
SPECIAL Cl DITTTTTTT�H \ \ \ \ \ \ \ \ \ \ \\\\\\\ \\\\\\\\\\\\ \ iTR�I O� POSSIBLE B CBI RETAIN / \
SEE DET�CIL Av ----.Y2- STA. IG + 9O.�9iI——SIL
-
i�i BST �, 6---
i
\ i CONC � EXISTING w —� Z— —
/// -Y2- + 37 6" C C CURB -�CONC
\\ i l
\ \ \ \ \ \ \\\\\\\\\\\\ \ \\ \\ l ✓ — \ p� \��o \ 22' Ij (EX.—T—-�- Lr�
�\\�E�T�\K� E�ERH�CRPT \ \ \ \ \ \ \ \\\ \\\\\\ \�\\�\\�\�\ / I I I I RETAIN
\ \ \ DUU�5�7RG1568 \ \ \\\\ \ \ \ \\ N / _ /
it/l/ 11 \ / —\ \\\ \ \\ \ \ g \ \ \ \ \ \ \ \ \\\\\ \\\�\\\\\\\\\�\\\�� Jl �\ / I I / �\ \ II I ABAND 15°HDP \ \\
\ \ \\ \ •\ \�\ \ \\\\\\\\\ PPS
�9 DI I \ SUMMI STREET lT B
\4" BST CURB I U�NO N SIZE ND MAT RIAL
ISBKBUS
—
o —EXISTING R/W � _ � � f — � "ASS
\ \ / _ etA�—
���/I\\\\\
\\ \ \ \ \ \\\\\\�\���\\\\\\\�\\� \ \\� \ \\ I /\ \�_I
o \ \ \ \ \ \\\\ \ \ \\\\\\\\� \� \ \ \� \ \ z I I
L�ND� D. MACLEAN _
D 649 Pc 475 --
\ B
�exl
\\\\�\\ II---
_ I I z / / / / / / / / / / / / /
�� \ \ \ \ \\�� IIIIIIIIIIIIIIIIII\�1\��I�/ / / ! 8� II A i / / / / / / / / / / /
o�
—�-
o
0C3 �'� �v / / ,/ v vv v -- �� v��v. y y y�v, v v� v \ v \� \� v A, \, I I I�Ili�l,Ii\�IIII�<<I,w\����AVA���\�
T,
\
PROJECT REFERENCE NO. SHEET NO.
U -5888 EC -5A
00
O
N
6�
CULVERT CONSTRUCTION SEQUENCE
Q�
C0
J
CIA. 14+ 99,_00 -Y4-
1. INSTALL PROPOSED EROSION CONTROL MEASURES
2. INSTALL SPECIAL STILLING BASIN FOR PUMPED EFFLUENT
3. INSTALL 2@36" TEMPORARY FLEXIBLE PIPES
4. CONSTRUCT IMPERVIOUS DIKES
5. REMOVE EXISTING CULVERT
6. CONSTRUCT CULVERT AND WINGWALLS
7. INSTALL 30" RCP FROM STRUCTURE 0419 TO 0420.
8. INSTALL 42" RCP FROM STRUCTURE 0514 TO 0515.
9. CONSTRUCT INLET AND OUTLET CHANNEL IMPROVEMENTS
10. REMOVE IMPERVIOUS DIKES, REMOVE 36" TEMPORARY FLEXIBLE
11. COMPLETE ROADWAY IMPROVEMENTS
I
i
CB
PIPES AND SPECIAL STILLING BASIN
/;
� / T
I
I
PIED W-qH
CR FL WABLE F
•rr�
Co
n
7C
00Q
O`j- o
NN (
p\N LL
0-)Co C[
1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEET NO.
\ \ \ \ \ \ \ \\ \ \ \ \ / \ \ G License No. F-0377 U -5888
HARRY FI HBACK \
77
Raleigh, N.C. 27606
P \ / ENGINEERING
\ — \ �• 93\ \ \ \ \ \ \ \ \ \\ \ p 788 PG 72 \ \ — — — \ \ \ / EC—6/CONST. 6
\ \� / \ \ Fax: 9198518us: 919 0107 R/W SHEET NO.
/ // \ ROADWAY DESIGN HYDRAULICS
NOTE:
TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER
� � � / / / / / \ PERIMETER EROSION CONTROL MEASURES SHALL BE CIVIL/SITE DESIGN - GIS/GPS -CONSTRUCTION OBSERVATION
\ � \ \ \ � - - � / i / /
INSTALLED DURING CLEARING AND GRUBBING PHASE. DOCUMENT NOT CONSIDERED FINAL
\ V A V / / / UNLESS ALL SIGNATURES COMPLETED
\e POSSIBL Vf�T�R MAIN, WATER VALVEIRIG-H_T SIDE OF ROAD\WITH WHAT APPEARS TO
—T NCH BENEATH THE ASPFi-ALT, UNABLE TO DESIGNA E WATER LINI`WtT-H_RAS_SjV1=S
\LOCATION �F THE WATER�VALVE IS APPROXIMAF� _KNOWN SIZE AND MATERIA
1 \
END GJ�ZADE
/ BEG N MILL 11tD OVERLAY OF EXISTING PAVE ENT \ \ \\\�— / \ \\ \ \\ Z� \ �� — 9` JI \ /Gc \\ ,---------- \� \�
/ INS TA4L NE C&G AND SIDEWALK/LT. SIDE
— J —L— ST'A.19 / 5.00 TO —L— STA. 22 + 80.00
DI
EIP
BST
1 \ \� _ — \ p \ — POSSIBLE D
/ CLIFFORD GOULD LLC \ I / /� \ \ N
/ ISBKBUs J \ \ \ \ 1 — - - - � \—,� \ \9l oo \ \ \ 'RAVED�I-V� / /\ �
/ O I ISBKBUS -@Ei 8\0 PG 1799
END TIP �88
CONC
L2- STA. 0-F-Z�.\00,\_ "B-�T_
EREK S. OATES N I / \ ,o
L/L
PG 700 I I I / / �`' u — \ \ \ \ \ / i R�• i P \ N \\ \
\ L - ^ �\ - \ I / _ \ \\ \ i ASS �R� / I LlJ A C. ANGEL \
1 BST I I V I BST I / / �� A \ I i\P�\� A
� \ � I D6 �756 PG 1367
�II_II 1�
^ -L2- +42.65 \ \ CONC I I -L2- +97. 3 ® I I\ 0. .,� -�� / / 1 " BK WALL \
l 1 BST 40' �P o \ 2640� \ / / I \ I I I I EX.
Z �, /� ,_ >
/ ` \ \ REMOV —
r / R R -
Z F / - — w C \\ C ��� �/�/ / BST F °o°
/ v \ C 52GI
_ _ \ \ BL-5 \ \ \
AY _SS_/ EIP ss - \ \ — — — ox� G R/W \ CONCH \
— — — — — — — — — _ — I \
2 RCP -IV � � o — — �� w
I CP-N Cg CB O60 / / / / GPS� �R�Ni / 0606 B / CB / / I INA CESSIBL� CB / UNKNIOWN SIZE AND MATERIAL \
cn T / NC14 �o �/ REMOVE 2 LF / c o
N / o o US 23 BUS (MAIN STJ VARIABLE WIDTH BST / of c OF 12" CMP / /DO / /
20+00� \ ( �W/ i4 /� // PLUG
< / o b 0 0 o I n
o � i o
70
o — — — — — — —� — — — — 6 " CAST IRON _ I FILL WITH _ —
"\ r W I I 1 ��
r - w - - - o- o w - - / w - - FLOWABLE ftLL- w \ i \ BST END �E\�22
MENT F EXISTING C&G\ 30" CMP \ 0 0 0 _
\< - - - - - - - by - - - - - \ - - _ _ _\ -L2- STA5.00
CID \ N \ r \ POSSIBLE JB 6 "CAST IRON \ /
REMOVE C O \ 10 "DUCTILE IRO _ FILL WITH \ \ \ �� \ \
\ \ \ 10 "DUCTILE ON \ I �S — — — \ lI WITH �/ _ — ss
SI LE CB_ 1 — — — — — w — —� — w — — — — — — — — — — w — — — — — — — — — — F ALE FILL— — RETATN— — w — OWABLE FILL INACC CB JB w/MH \ \ b66C SSI B /
o Ct� �_ _ _ �_ _ _ _ _ _ _ _ _ (Sl_�_ _ �1°O \ \ 1 INACCE SABLE CB
? -- - - =�uTL - =2aiL- - - - - - _- y-� ^ P - - - _ 92"MP-
_ _ _ _ _ _
FxiLw-
CON =-- -_\ =_____ —UUN� - - - c _� _ BM#2
O00 O — — — — — — —TC — — — — — — — — — — �� — — — — — — — — — /— — — — — — — — , — — — — — —� — — — — — —TC— _ _ _ — TC— — — — — — —
0 08 \\P G R \ - c= - - - - - - - -�T- - - - - - - -- ye--_�" - __ _ _ - C�cNC / 601 MOVIE' �,- �- - - - - - �� Tc- - �- - - -=T -- -
N OF 42 CMP Yv / - _ \ - - - - �� = T� �_ \- —13-- - �- - REMOVE \ /
RETAIN __�---__---�� --- -� -_��f�l\_ ��� - —�� // 6 �L2- +2 0
r F STON��WALL — — — — — — _ _ — — — — — / \ / 15" RCP -IV -L2- +42.65 \ \�— � �—
PUE I \ AfUE k FWD_ \�__--- —__—_ Q� TFo-- ��------ \� --- !-_�\STNc / EX. / /� \ /
--_ ��— \ �\ FO— /
N E JJ E /> -L2- +45.00 / I / P \ \ \ —� \ \ _ — — / I \ \ / / / R —T%— — — — — ��/ // / \ 8,�
-L2- + 80 d0 O 41.63 I / 93.'�� - - TOW1cC� - WAYNE� IL-L E� _� _ \ \ _ - - \ - / / / \ �' T
30' \ -L2- +93.27 $B�4b6-P - - - 1 N� R/��� �- CONC / a � \ / \ /
m \ 3�,, I I / / - - C�Z�-5� - - - Exs -LI- +02.00 __ / / £ % _� �� \ \ /
rn \// ���� � \ -Ll- + 0.00 EX. R W' `— - - - � - \ / \ �
/ / / \\ \ �/ / / / / / / / / i _ CUR 00' _ w . ---\� \� \
..
/ / // SHI�RON/B. MASSIF \\ / // J / / / - - _ T b _ i - - \ / I
\ / i all�
U / / $B 72$ �G 557 \ / // / lJ . �i i CON ISTRE\ / / /-_� _ - _ _ �\ \
/ �\ �� \✓j �1�\ BST \ ��� �i /��\� IZ
DI\\
INACCESSIBLE CB \\ \\
- /-
\\ 996IN REPLACEMENT OF EXIT TING eG
lo)�s -L2- STA\22+i0.00 ////
�G UR6 N I/Elm /\\ �9 \ \-_ - / \\\/J�\�\ JOSEPH R. CONARD S��O l
BST /\RABAE10� \ \ ✓ � y � ho
\\D�874_-G-18
— DB 486 PG 383 / \
UNKN
All
ss / \
\ Y
/ \ l / / i / / \ \ \ \\ \ — / / / / \// / / \\� \\\z\ \\
l l=_0L9z�i �\ L-- — \
o / / / / / — / \Tq\—
�/ /
MICHAEL J.SHEEHAN
D /468 PG 1686 / I / / / / / �� �/ / / / / s / / / / / / / / OBERT M. CHAFIDI dR
/ / I C�€tOL-/YN S. CO NERDY / / / /
DB 512 JPG 25 j6 1990E PG 404
---
i
N
Z
O
w
C11\,
_ _ _ —' — (0 / 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. \ \ \ \
� � � \ \ /�ry / � � ETHERILL Raleigh, N.C. 27606
J / / / / I I ENGINEERING License No. F-0377 U-5888 EC-7/CONST.7
Co CLEARING AND GRUBBING NOTE: \ / / / / I I / Bus: 919 8518077 / � J ( / Fax: 919 8518107
107 RNd SHEET NO.
EROSION CONTROL FOR PERIMETER EROSION CONTROL MEASURES SHALL BE _ _ _ _ / I / / / / / \ _ ' / I I ROADWAY DESIGN HYDRAULICS
CONSTRUCTION SHEET 7 INSTALLED DURING CLEARING AND GRUBBING PHASE. \ / / / / / / / // — \ — —O 1 1 I I I TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER
CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
vv v v vv vv
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�O"o„�
j I I HAR Y D. FI�S A
DB 78jPG 7�
/ / / -Y6- +60.00
/ /��6� � 22 DEREK S.OATES
/ / L
\ DB 819 PG 700
EX. RW
/ -Y6- +40.00
=—ExsTwc-sz w /j�� CIII
MOVE
01
/�—— �—\ �__ ---__— �--� \\\\� \ \\ ��\ \\ \ / /� // / /� / // / / // //—// //�--�✓//// /� —�� �°ccs� \, RETAIL II (�
—uu
EXISTING R W ^ /
C)\ \
`V
//�—�j // �/ / / �� — _—�- ��_ /—���\ ��� \\ PLUG %�
/ / / / / —� /� _ \\ ROM
-Y6- + 0 \ \
LnEX-
/\WITH I
o/
630-� \\ ---- ��--- --_ —\�\ \ \\ \ \ \ \ \ ----- / 0- / � SILL
/ �1WICCIAM —L. NORRIS- — — / \ J 00
;Xj—
/ — — \ \ \ \ D` DB 487 P"90 / o .00
/ \ V
\ \\ \ \ \ 4' w DB $70'P966
2SBK3-0S�
�co—
2
/R1;AFDrA0�
/MF01�11
1
DB 456 PG 2128 2620�
BETTE H. EDWARDS — \ — / / / / — /
\ \ \ / / / — \ / MOUNTAIN HIGH
S j / l �/— PROPERTIES & INV/ /
\TIbtOTHY : LIN�iSEY / 1 / // / / / / L / �9 DB 832 M II I '' ^^
\ _ / \ / \
- \ — — \ \\ \ \ \ DB 830'P`G�7§8—263Q�' % /� i / / I — 4,09 e \ Y5 EX. II
\ Uj17
2SFD / \ / LJJ
-Y5 /+00.00 ---
,\ / EECDETAIL A DITCH R — —� JB /
J / I ISFD-Y520+&0 000 \ 1 / 33 /
�— "26 \ \ \ -- —
/ -Y5- +35.00
20'& 30'LT / % O\ W
TCB
BEGIN CONS T CTION W
—YS— ST .10+00.00
G -----� �\\--���------ � GRADE T
"— X \ / -Y5- + 01.09 X I I C-) U
25' I Pb
�
— \ -Y5- + 38 -Y5- + 01.09 /
/ -Y5- +00.00, S -Y5- +40. 0 25' O
& 20' I I o
J 14,& -� \\ \--- 20 C EX.RM/ R C r CB 1
EX. RM/ °'--------------I'1-
v
1E 6.. p � I CBS - 24" RCP -IV
N i C `R /Li
\ / 1 II o o MTL CANOPY I C Y• 4 RCP -NV 1 -1 Q /
co o I GR I _ 2 Vi
REMOVE 58 L'F
��---- 9 IN F _ --- CB — X� I / 53 72„ OF 15" RCP �� Q
CB-----X--/ I v CB
�♦ \ I E
/ I
— — — 371S N�Nn �VRi31� �R1 NMO►� to
— — — — — SSMTABANB� — / — I 18' BST 18" CLAY
— —ulna— — — — — — — — — — 1n-- — — — o `_ _ / SS18"
\ \ TOP=2617.47' / /8 I
INV IN(NE)=2609.I4'
— — \ INV OUT(SW)=2609.10' / SS M — — — — — —
— 18" CLAY /sS - — — 3I1s -Id z — — — — — — —
\ _ _-- -- -- 8� _ \ — W
\\-----\ — // — — — — — Try w F ST1 OF 12" M
_ B _ \ Nc � — z _
\T 0)_ J
-Y57+-00.0 _______
— — — ----_----- SS / �i
— — — — — — ^ — — — 18;DIP— ss 3 TONS CLASS B RIP RAP W/ / /� 5— � / �E \ G U
— — — — — — — — — _ _ _ _ — — — — ® ss — f 11 SY GEOTEXTILE FABRIC / 15' (EX. II / / p�J � \ REM VE � � / boo S�ZF �
— — — — — — _ �F1 0 — —_ SPECIAL LATERAL qN0
----�_---- ---- —� �5f— _ / / -Y5- +05.0 MqT
Sr — — J�S� / / / BASE DITCH / / o l8„ FR1q
SEE DETAIL G \ / / EX.R/W
09°
_ _ / RETAIN
S S M H Sf — — � —S�- — — _ _ / -YS- + 20.00 / j / / -Y5- + 5.00 \ / c g
TOP=26I3.43' �/ lg 45' & / 53' /
— — INV IN(S.W -n07;20' SLR_-- �'"
50' TAPER -EX. Krv� i % / lZ
—
\ /
FROM EXIST. -Y5- +00.00
2610-� , ---- ---- 45'&
// /ice --- -- --- - ---- -- — —
sr
_
Si / i �j T -- - - SSMH(ABAND)
�s—_-i� TQ _=TB / TOP=26I6.02'
Sr TOWN OF WAYNESVILLE / INV 1N(NE)=2609.40' \ ` // /
% INV OUT(SW)=2609.I2' \ / / /a ISBRD BST
DB 376 PG 73 / \ / /� o
DB 411PG 602 / ROCK CROSS VANE ��--�
ISFD
SEE DETAIL H / /
SSMH \ \ \ O 2 w
TOP=26I6.76'
INVVINN1E )2609 �26
INV IN(S )=2608 94' / V
— — — INV OUT(N) 2608.85' SSMH
Q \ \ _ ^ \ \ / / — \ INVOSNW)62 V 9.609' I /
24
�
o� RODNEY D. LOWE
TDB 464 PG 470 \
m LL PB C PG NI
\ �
00
0
N
6�
Co
n
(n
O
LI)
LU
w
Cie
r`
Co
7 C
�Q
E� U
CV(n
ACV i
mco I7
9'15'57"
8.50'
�- 4" Pvc �G ass 4" PVC 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEET NO.
\ -w =" _ - P ETHERILL Raleigh, N.C. 27606
- - License No. F-0377 U-Jc888 EC-8/CONST.4
' I ENGINEERING gus: 919 8518077
RW SHEET NO.
Fax: 919 8518107 \ I ROADWAY DESIGN HYDRAULICS
\ TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER
I CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
\ I
\ DOCUMENT NOT CONSIDERED FINAL
\ I UNLESS ALL SIGNATURES COMPLETED
\
BST I I
\ I FIRST CITIZENS BANK TSA -Y2- +728.00
ROBERT FORGA TRUST
4 DB 2001E PG 143 EX. RxW
JAMES W. QUEEN \ \ I cb
DB 440 PG 626 \ \ -Yl- +44.00 'sue Q
30' & r�
EX. Roo' P
\ \ AW/ °s
,-GIN CONSTRUCTION -Yl- +55.72
� -YI- STA.10 + 44.00 �o \ EX. M '�' I FILL TH
� -Yl- + 68.43 / I FL BLE F
6� p ISFBUS �G 30' / I
-Y2- EX / 4�36I
BST PLUG o
BE TIP PROJECT U-5888 A��o -Y2- +35.12 � /
-Yl- +44.00 R 35' I MOVE
-LI- TA. + 60.00 . R & / \ �F 0" VINYL N 48'45'36" E "� C
HAYWOOD COUNTY Ex. R,W �� �� �f� 00 CB
r7_
BOARD OF ELECTIONS
o '
s �� � � s ��\ \ •� 139.46' TO TA���� � 3.C3' IP TO RAW � °° Co °o
DB 472 PG 2571 c\ i n �- 15" o °�JB w/
GERALD EGELUS i RCP_ EMOV °p15"o°o c MH gST
2 \ r N DB 898 PG 1186 EMO REMOV
LONC \sue RCP GQ�
-Yl- +870\ �I.555BU5 -Ll- +90.00 30' I tp
/ 31.88' -Yl- + 00.00 / ', \ 0 000 O
/ -Ll- +20.00 \ �9. �� GR I 0
/ 45 PUE 30'
0 \ ° NCB �0A \C I 0 CB l.A
-Ll- +60.00 PUE \ CR T
30' & / PUE -Ll- +20.00 °2 \ F I COOA
STONE SIGN
EX. RrW/ s / P 60' TAPER FROM EXIST. 40 \ G 5 �Go VE 3 9�
VA IGN 6 CB \ \ RCp / 151. RGP REM E OF 2 P
BST / - F ------ - - C 0 \ \ \�' REP E I CP
Q - - - ° °O°pp0O n O
C Lp /zc
°o°O 0 OpOt�o V _
�'00
-------=T o-==�=_ --- --- _ CONC o00000 \\ ' PK NAILS
CB
-
6" CONC CURB - - -T FO- _ _ �i
� --C-OIdO - O V
-T - - - - - - I - - F O O B- - - - - - - - - C�n°pOO p
6" CONC CURB Ex /w CONC I - - %
US 23 BUS (MAIN ST.) VARIABLE WIDTH BST
0
N 41° 59' 18.9" E I I pO o RC
N i CR �LQ
_--TC-------- - - - - -- (\�\, OSSIB ND N
/ REMOVE
- TC - - TC - r/-
- - - T - - - - - - - - - - %� O
_ l`/
P L �E CN
_ E4" EONC DRIVEWAY C TC - - - --Tc-�oa000------- --- �-- _ _
- - - -TC-
° 15"RCP-IV TC----------
_ � cR / � 00 0 0000s
__ __ NC CURB --- TC-�B=OAOO-- C _ __ ___ CBo -
FILL W/ �� 15" RCP IV CB $
-w- 10 DUCTILE IRON - - - - - - - - - - - - - - - - - -w °00 0� - �_ - - - - -r _ _ -1 - - - - E-FILL- - c1�� I- - - - - - oo _ 000000 -
_ _ DI / I -rc- ___
_ -TC- _ GR \\------_ GR - _ �s--� - - - _ - -W- - - I R MOVE D C POSSIBLE JB NC DRIVEWAY GUTTER
- o0 0o IO " DUCTILE IR s2 ExisTING _GR - - - _ _ - - - -
6" CLAY s w_ - - w --SS--,,,
0 0 2 ----_ _ IS' RiCP_/V 2G600000 i GRADE T ® OVE 6 Y - - -
A F _ _ _' : a DRAIN O ST -Y2-�+46.9�1 CONC
4.72 �Z� '� RADE TO O°�� - ��� 2 T -Y2- +66.00 EX. R(W -
' -Ll- +60.00 32.73 E BST R PUE PU
30' & E �,' DRAIN X I� x °oo o PUE E
BM 1 EX. M -Ll- +00.00 '� -Ll- +21.00 x� w �tr BRICK LANDSCAPE r0� E
40.99' BST - - - - - - - - -- AREA.
45' RT F
WOODS
-L1- + 86.63 X -L1- + 5145 - Q _ _ _ _ - - - z ° 00
OF 18" HDPE
46.27-Y2- + 75.00
40 RT N ' -Y2- + 78.00
o GR = 23' LT L
o` G P IV J� °°
KENNETH L. F_HARRELL � n I' m
4p9- ? ISFBUS DB 188 PG 37
4 9�, D I FT-1 n
I z o
KENNETH L. HARRELL MARGARET Q. RATHBONE �s
DB 202 PG 72
m
\5��0
END CONSTRUCTION POSSIBLE B CBI RETAIN
DB 901 PG 292
SPECIAL CUT DITCH
SEE DETAIL A -Y2- STA.16 + 90.00 SIL
-Y2- + 10.00 �
F EX. RAW i r -
BST �6' c'
CON- R/R �
Y2- +3 7 _6" CONC CURB CONC
DEETTA K.EBERHARDT
p RETAIN 22' LT (EX. RrW)
DB 557 PG 1568 I I \� ABAND 15" HDPE
DI 4" BST CURB UNKNOWN SIZE AND MATERIAL SUMMIT STREET I71BSi
ISBKBUS I I� ■ EXISTING R/W SS C 6" CLAY SS -
- I ` �S vJ
0
S \�G, �
I� II I� LYNDA D. MACLEAN
II I DB 649 PG 475
m I II I X
Z I m
N 6 II I C'
I
I II I
I I
N 37'56'36' E
72.60'
o�
N
O
w
Cie
6� W
\ S 75°22,00„ E HARRY D. FISHBACK
DB 788 PG 72
co
BST \ -
s/62 °00,//', E
ImUd.»r=JEW.V1ftrmrQ
C�
r
Z
m
r —
N
C
-I -
00
M
�
W
0 -
N
m
N
Z
m
N
SIDEWALK DINL-%Ole - /00R6 N / EIP �6S
I 6 N BST
SS O
6„
EIP
sS o
6,
ss
� 6(69 49X0„ �/
TOT
a
�z z
MICHAEL J. SHEEHAN \
DB 468 PG 1686
CROBERT M. CHAFIN JR
AROLYN S. CONNERLY
\ DB 512 PG 925 DB 1990E PG 404
-1-2- STA. 22+10.00
ROBERT LABRACIO
DB 874 PG 1842
1223 Jones Franklin Rd.
ETHERILL Raleigh, N.C. 27606
ENGINEERING License No. F-0377
Bus: 919 8518077
Fax: 919 8518107
TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN
CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�Q
POSSIBLE WATER MAIN. WATER VALVE ON RIGHT SIDE OF ROAD WITH WHAT APPEARS TO
TRENCH BENEATH THE ASPHALT. UNABLE TO DESIGNATE WATER LINE WITH PASSIVE SWE
THE LOCATION OF THE WATER VALVE IS APPROXIMATE. UNKNOWN SIZE AND MATERIA
CN
DI
JOSEPH R.CONARD
DB 486 PG 383
Ss BL-5
CONC
PROJECT REFERENCE NO.
U -5888
RW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
EC-10/CONST. 6
HYDRAULICS
ENGINEER
LURA C. ANGEL
DB 756 PG 1367
12" BK WALL
/ INACCESSIBLE CB
CMP fl—
® BM#2 ------
— — — — — TC — — — — — — —
TC— — I- — — — — — — — — —
/ \ 9'
00
TF \
Xx
034 \� � \� \
� INACCESSIBLE CB
STONE WALL �
qy �
� O
c
\
6, \ \
\ ss \ \
00<1
06
CVm
O\- ) LL
\N-� JP
mco A
PLANTING DETAILS
SEEDLING / LINER BAREROOT PLANTING DETAIL
HEALING IN
1. Locate a healing -in site in a shady, well
protected area.
2. Excavate a flat bottom trench
12 inches deep and provide drainage.
3. Backfill the trench with 2 inches well
rotted sawdust. Place a 2 inch layer of
well rotted sawdust at a sloping angle
at one end of the trench.
4. Place a single layer of plants
against the sloping end so that
the root collar is at ground level.
5. Place a 2 inch layer of well rotted
sawdust over the roots maintaining
a sloping angle.
6. Repeat layers of plants and sawdust
as necessary and water thoroughly.
DIBBLE PLANTING METHOD
USING THE KBC PLANTING BAR
1. Insert planting bar 2. Remove planting bar
as shown and pull handle and place seedling at
toward planter. correct depth.
00
4. Pull handle of bar 5. Push handle forward
toward planter, firming firming soil at top.
soil at bottom.
PLANTING NOTES:
PLANTING BAG
During planting, seedlings
shall be kept in a moist
canvas bag or similar
container to prevent the
root systems from drying.
KBC PLANTING BAR
Planting bar shall have a
blade with a triangular
cross section, and shall
be 12 inches long,
4 inches wide and
1 inch thick at center.
ROOT PRUNING
All seedlings shall be root
pruned, if necessary, so that
no roots extend more than
10 inches below the
root collar.
3. Insert planting bar
2 inches toward planter
from seedling.
6. Leave compaction
hole open. Water
thoroughly.
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
TOTAL
SHEETS
N.
U-5888
RF-1
STATE PROJ. NO.
F. A. PROJ. NO.
DESCRIPTION
TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING,
AVERAGING 8 FT. ON CENTER, APPROXIMATELY
REFORESTATION
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM
LIRIODENDRON TULIPIFERA
PLATANUS OCCIDENTALIS
FRAXINUS PENNSYLVANICA
BETULA NIGRA
680 PLANTS PER ACRE.
THE FOLLOWING:
TULIP POPLAR
AMERICAN SYCAMORE
GREEN
RIVER BIRCH
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
PLANTING
LIVE STAKES PLANTING DETAIL
LIVE STAKE
SQUARE CUT
BUDS (FACING UP
LIVE CUTTING
(1/2"-2" DIAMETER)
2 - 3 Feet
ANGLE CUT 30'
COIR FIBER MAT
LIVE STAKES
EXISTING/PROPOSED
GROUND
EXISTING/PROPOSED
STREAMBED
BANK STABILIZATION WITH LIVE STAKES
NOTE -
LIVE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET
ON CENTER
LIVE STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY 3/4
OF LIVE STAKE IS WITHIN GROUND
DETAILS
BAREROOT PLANTING DETAIL
DIBBLE PLANTING METHOD
USING THE KBC PLANTING BAR
1. Insert planting bar 2. Remove planting bar
as shown and pull handle and place seedling at
toward planter. correct depth.
AN
4. Pull handle of bar
toward planter, firming
soil at bottom.
5. Push handle forward
firming soil at top.
PLANTING NOTES:
PLANTING BAG
During planting, seedlings
shall be kept in a moist
canvas bag or similar
container to prevent the
root systems from drying.
KBC PLANTING BAR
Planting bar shall have a
blade with a triangular
cross section, and shall
be 12 inches long,
4 inches wide and
1 inch thick at center.
ROOT PRUNING
All seedlings shall be root
pruned, if necessary, so that
no roots extend more than
10 inches below the
root collar.
3. Insert planting bar
2 inches toward planter
from seedling.
6. Leave compaction
hole open. Water
thoroughly.
❑ TYPE 1 STREAMBANK REFORESTATION SHALL BE PLANTED 3 FT. TO 5 FT.
ON CENTER, RANDOM SPACING, AVERAGING 4 FT. ON CENTER,
APPROXIMATELY 2724 PLANTS PER ACRE.
❑ TYPE 2 STREAMBANK REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT.
ON CENTER, RANDOM SPACING, AVERAGING 8 FT. ON CENTER,
APPROXIMATELY 680 PLANTS PER ACRE.
❑ NOTE: TYPE 1 AND TYPE 2 STREAMBANK REFORESTATION SHALL BE
PAID FOR AS "STREAMBANK REFORESTATION"
STREAMBANK REFORESTATION
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING:
TYPE I
50% SALIX NIGRA
50% CORNUS AMOMUM
TYPE 2
25% LIRIODENDRON TULIPIFERA
25% PLATANUS OCCIDENTALIS
25% PRUNUS SEROTINA
25% BETULA NIGRA
BLACK WILLOW 2 ft - 3 ft LIVE STARS
SILKY DOGWOOD 2 ft - 3 ft LIVE STAKES
TULIP POPLAR
SYCAMORE
11] FAIL ►El1III N 3 ty1
RIVER BIRCH
❑ SEE PLAN SHEETS FOR AREAS TO BE PLANTED
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
STREAMBANK REFORESTATION
DETAIL SHEET 1 OF 2
N.0 D.OoT. -ROADSIDE ENVIRONMENTAL UNIT
DIRECTION
OF FLOW
1 CENTERS
COIR FIBER
MATTING
ANCHORS ON
3' CENTERS
EXTEND MATTING
TO NWSEL
STREAM BED
MATTTK1r__
PLAN
A
----------- v -------------------
COIR
VIEW
TYPICAL
18"
(TYP)
ANCHORS ON
1' CENTERS
IN TRENCH
MATTING SHALL BE
PLACED IN TRENCH
AND BACKFILLED
ANCHORS ON
1 CENTERS
CROSS SECTION
FIBER MATTING
11 fil 410
ANCHORS ON
3' CENTERS
ANCHORS ON
1 CENTERS
FLOODPLAIN/
EXISTING
GROUND
MIN
2" x 2" (nominal)
WOODEN STAKE
12
#10 STEEL
REINFORCEMENT BAR
4"
4 ►►
IAMETER
24 It
1 " (nominal)
STAPLE
—11007 1►► —OW—
►►
AA-M,
ANCHOR OPTIONS
STREAMBANK REFORESTATION
DETAIL SHEET 2 OF 2
N.CROoT. —ROADSIDE ENVIRONMENTAL UNIT
NOT TO SCALE