Loading...
HomeMy WebLinkAbout20190586 Ver 1_u5888_Permit Drawings_05022019_PCN submittal_20190503�r 00 00 l� V W O STATE OF NORTH C AROLI A Ih [ ' I . I f l: *I ,. m I G IW i . 4i 1 " HAYWOOD COUNTY LOCATION: WAYNESVILLE - INTERSECTION OF US 23 BUSINESS (N. MAIN ST.) AND WALNUT ST. Q) C IS: TYPE OF WORK: GRADING, DRAINAGE, PAVING, & CULVERT. 0 WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN CONSTRUCTION -Y3- STA.11 +50.00 00 Z76 T U Ca -Y4- STA. 14+00.00 BEGIN CULVERT See Sheet 1-A For Index of Sheets -Y4- sTA1s+.151 1. See Sheet 9-B For Conventional Symbols 4- o�,.TAr ,.,,Ar�TT,T,,,T,,,�, BEGIN TIP PROJECT U-5888 -Ll- STA.10 + 60.00 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF WAYNESVILLE. GRAPHIC SCALES 20 10 0 20 40 PLANS 20 10 0 20 40 PROFILE (HORIZONTAL) 4 2 0 4 8 PROFILE (VERTICAL) DESIGN DATA ADT 2021 = 71800 ADT 2040 = 9,000 K = 9 % D = 50 % T 6 % V 40 MPH TTST = 2% DUAL = 4% FUNC. CLASS = MINOR ARTERIAL PROJECT LENGTH LENGTH ROADWAY TIP PROJECT U-5888 = 0.240 MILES TOTAL LENGTH TIP PROJECT U-5888 = 0.240 MILES NOTE: -Ll- AND -1-2- USED FOR PROJECT LENGTH -Y2- STA. 17+10.00 TrATB TATB PROIBCT RBPBRBNCB NO. NBBT TOTAL NO. BI@BT8 1.�. U-5888 T. PROl. NO. P. A.PROr.N0. D63CR@TION 44625.1.1 WA PE 44625.1.1 WA RW /UTIL. END TIP PROJECT U-5888 -L2- STA. 23 + 25.00 HYDRAULICS ENGINEER Prepared in the Office f Prepared for: ENGENEERING DIVISION OF HIGHWAYS DIVISION 14 1223 Jones Franklin Rd. Raleigh, N.C. 27606 153 Webarer Road License No. F-0377 Bus: 919.851.8077 Fax: 919.851.8107 Sylva NC, 28779 2012 STANDARD SPECIFICATIONS GREG S. PURVIS, PE RIGHT OF WAY DATE: PROJECT ENGINEER June 30 2018 JONATHAN HEFNER, PE LETTING DATE: PROJECT DESIGN ENGINEER February 18, 0020 NCDOT CONTACT: J. SCOTT MILLER, III DIVISION 14 DDC ENGINEER ROADWAY DESIGN ENGINEER P.E. PERMIT DRAWING SHEET 1 OF 8 -Y5- STA. 10+00.00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DETAIL A SPECIAL CUT DITCH ( Not to Scole) Front Slope pt Ditch Ground Min. D= 1 FI. FROM -Ll- STA. 11+00 TO STA. 11+65 RT. - FROM -Y5STA. 13+00 TO STA. 14+29 LT. FROM -Y6- STA. 11+50 TO STA. 12+37 RT. DETAIL G SPECIAL LATERAL BASE DITCH (Notto Scale) NaNrol \ �t Fill Ground 7;� 1' Mgt Slope d D F\o Geot-il. B Min. D= 5 Ft. EST TON CLASS 'I' RIP RAP = 350 TONS Max. d= 5 Ft. EST GEOTEXTILE = A70 SY B= 10 Ft. Type ofLiner- CLASS I Rip -Rap DETAIL D TOE PROTECTION ( Not. Scal.) �.EOO—LE FILL NATURALSLOPE GROUND d d= 1 Ft. Type of Liner= Class B Rip -Rap FROM -Y6- STA. 11+77 TO STA. 12+03 LT. (LT TO RT LOOKING DOWNSTREAM) EXCAVATE NOT TO SCALE RAP 1 �� LE (T1'P.) IVII DEPT VAR O 8' y DETAIL E TOE PROTECTION (Nm to scale) Nafaral Ground d= 1 Ft. 6= 5 Ft. Geotextile Type of Liner= Class B Rip -Rap FROM -Y6- STA. 12+03 TO STA. 12+31 LT. CLASS T RIP W/GEOTEXTI EXCAVATE, NATURAL GROUND V BENCH DEPTH V 5, TO IES TIE 8' CHANNEL WIDTH BENCH WIDTH VARIES FROM 7'TO 10' VARIES FROM 0'TO 11' '.ST TON CLASS T RIP RAP = 130 TONS DDE = 175 CY EST GEOTEXTILE = 185 SY FROM -Y4- STA. 14+38 TO STA. 14+97 RT. 1/3 1/3 1/3 BANKFULL BANKFULL BANKFULL WIDTH I WIDTH I WIDTH 1 DETAIL F SPECIAL CUT DITCH I Not to Scale) at Fmnt NaNral 3', Ditch Graand d 1`' FROM -Y6- STA. 11+50 TO STA. 11+77 LT ac OUTLET TYPICAL (LT TO RT LOOKING DOWNSTREAM) NOT TO SCALE 21 RETAINING WALL PROP. -Y3- I I.,I. TE NATURAL ��EXC GROUND PBENCH CLASS 11' RIP RAP W/GEOTEXTILE (1YP.) CHANNEL WIDTH BENCH WIDTH VARIES FROM VARIES FROM 8' TO 10' 0' TO 11' EST TON CLASS 'I' RIP RAP = 85 TONS DDE = EST GEOTEXIILE = 125 SY DEPTH VARIES 6' TO 9' 220 CY FROM -Y4- STA. 15+12 TO STA. 15+62 LT. HEADETAIL H SEE DPROFILE ER �FOR P FLOW ELEVATION !�AInn//A��n// >V���A��� � BACKFILL, TYP. #57 STONE GEOTEXTILE POOL -HEADER. ROCK FOOTER POOL EXCAVATED PER ROCK DIRECTION OF ENGINEER A KEY IN VANE TO BANK MINIMUM OF AT AN ELEVATION EQUAL TO BANKFULL OR SLIGHTLY LOWER PLAN VIEW #57 STONE .'M2 PERMIT DRAWING SHEET 2 OF 8 SET HEADER ROCK BACK A MINIMUM OF 1/3 WIDTH OF THE FOOTER ROCK ------------ BED EXCAVATED POOL EXCAVATED TRENCH FOR ROCK CROSS VANE — GEOTEXTILE CONSTRUCTION SECTION A -A BANKFULL FLOW 41 TO 10% SLOPE TIE VANE ARM INTO BANKFULL ELEVATION HEADER ROCKS BACKFILL, TYP.___�� -- #57 STONE GEOTEXTILE FOOTER —BED ROCKS 2 ROCKS IN VANE ARM SHOULD MINIMUM NOT BE GAPPED OR HAVE ANY SIGNIFICANT SPACES ROCK CROSS VANE SECTION B-B NOTES: 1) DEEPEST PART OF POOL TO BE IN LINE WITH WHERE VANE ARM TIES INTO BANKFULL. 2) DO NOT EXCAVATE POOL TOO CLOSE TO FOOTER BOULDERS. 3) CLASS "A" STONE CAN BE USED TO REDUCE VOIDS BETWEEN HEADERS AND FOOTERS. DETAIL 4) COMPACT BACKFILL TO EXTENT POSSIBLE OR AT THE DIRECTION OF THE ENGINEER. 5) POOL DEPTH SHOULD BE 2 TO 3 TIMES BANKFULL DEPTH. NOT TO SCALE -Y5- STA. 12+07 RT. ao O Y 90 0 LL PERMIT DRAWING SHEET 5 OF 8 cQ 1223 ]ones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. ETHERILL Raleigh, N.C. 27606 ENGINEERING License No.F-0377 u-5888 7 BUS: 919 S51 8077 RW SHEET NO. PERMIT D RAW I N G ` / / / / �` J 1� 1 Fax: 919 8107 ROADWAY DESIGN HYDRAULICS //r \ � JII /J l I TRANSPORTATION PIANNGING/DESIGN-BRIDGE/STRUCTURE DESIGNIGN ENGINEER ENGINEER SHEET 7 OF 8 OML S ES E DEIGN - S/GPS - CONSTRUCTION OBSERVATION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DENOTES IMPACTS IN � \ / // � � \\\\ > SURFACE WATER �j /� O.F I INC®IUSEFOR W ��.�N� \ \ / / f / DO NOT USE FOR ! W ACQUISITION 630— DENOTES TEMPORARY IMPACTS IN SURFACE WATER \\�f _ — jj �� "6' 1 DEREK s.0ATE5�q gs RFS 40' 0' 40' f LF GRAPHIC SCALE ���� �� � � / / / / ,� / / / UGH � �oN�, -- — RETAI \ y � _ - o 4- PLUG SILL26 / v BETTE H.EDNARDS / / ` ✓ 2/ �— —� 5 yypp���L��yy V — I y / PROPER�ES i NV G / \ I to —26 \ \ W zsFo uj SPECIALCUT DITC A ISFD � � / DEEE DETAIL A V) NO RA E T E OTCB LIJ G \�- 'Ax I N / S ISFD I I CB 0 l I _ MTL CANOPY � 58 GR I CB x Q I /53 /2N`OF 15- RCP GR ����—nnc--------------ima-------__ �_ VRor uIo wTex Lcxe �tl1i31tl 3715 NMONANI ST la^CLAN;IgB�Rss —� ss _ --_ — — --— - _ AY OI1Stlld � Z — _p— — — — — — I I ---------------- ---- e God % W 50� a \ M Z —TB TB �B TB S � -� 2 —14 s� ss / 3 TONS CLASS B RIP RAP W/ // _p�fE DUE"^NS CQ 11 SY GEOTEBTILE FABRIC VDU REMOVE / /'O ?F S l 44 SPECIAL LATERAL / ND —x GR ._. � r 1 $EEBASE I�jGI(� 1,� / /g•C� TFR/A< lJ 1JTLL A`\l�rl / �ETAIN Sr� �— / �[9Z� @ISBRD TDNN DF NAYISVILE BST ROCK CROSS VANE SEE DETAIL H ISFD / / ----------------- 1 RODNEY D. LONE / FOR —YS—, —Y6— PROFILE, SEE SHEET NO. 11 SEE SHEET NO. 2D-1 FOR DRAINAGE DETAILS WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 2@11'X9' RCBC (50' Extension) 50 170 1 Rip Rap, Benching and Retaining Wall 120 2 Cross Vane and Rip Rap Stabilization 155 175 TOTALS*: 1 325 345 1 0 *Rounded totals are sum of actual impacts NOTES: 1024