Loading...
HomeMy WebLinkAbout20190585 Ver 1_B-4593_Lengyel Mitigation Site Debit_20190503Lengyel Mitigation Site ONEID 025-001 The Lengyel Site is in Craven County within the USGS hydrologic unit 03020204 of the Neuse River. NCDOT acquired the 11.9 acre brackish marsh site to mitigate for unavoidable, jurisdictional impacts associated with TIP B-2531. Monitoring requirements were performed from 1999 to 2003 and the site was closed out in 2004. Table 1 shows the final mitigation quantities approved for the site. The site has been placed on the NCDOT On -site Debit Ledger for use within HUC 03020202. Table 2 indicates all mitigation debits that have occurred per regulatory agency approval. In order to offset 0.11 acres of unavoidable brackish marsh impacts associated with B-4593, the Lengyel Mitigation Site will be debited 0.11 acres of brackish marsh mitigation. Table 1. Mitigation Quantities Approved HUC Mitigation Type Starting Amount Additional Notes 3020202 1 Brackish Marsh Restoration 7.2 3020202 113rackish Marsh Preservation 4.7 Do not debit. Table 2. Mitigation Debits — Brackish Marsh Restoration Mitigation Type Debit Amount 11 Status Site TIP Action ID# Notes Brackish Marsh Restoration 1.56 Close Out B-2531 199401568 0.78@2:1 ratio Debited in 03020202 Brackish Marsh Restoration 1994-01568 0.46 acres of these 1.08 Close Out B-2531 Mod impacts were charged to Sawmill Debited in 03020202 Brackish Marsh Restoration 0.18 Close Out B-4598 Impacts were 0.09 @ 2:1 ratio Debited in 03020202 Brackish Marsh Restoration 0.11 Close Out B-4593 Debited in 03020204