Loading...
HomeMy WebLinkAbout20190585 Ver 1_PCN Form Submission_20190503DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20190585 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Garcy Ward:eads\gpward Information for Initial Review 1a. Name of project: B-4593 Bridge No. 38 on NC Highway 55 over Trent Creek (Central) 1a. Who is the Primary Contact?* Gordon Cashin 1b. Primary Contact Email:* gcashin@ncdot.gov Date Submitted 5/3/2019 Nearest Body of Water Trent Creek Basin Neuse Water Classification SC; Sw, NSW Site Coordinates Latitude: 35.104395 Longitude: -76.718223 Version# * 1 Reviewing Office* Washington Regional Office - (252) 946-6481 1c. Primary Contact Phone:* (919)707-6107 FA. Processing Information U County (or Counties) where the project is located: Pamlico Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r' No (NCDOT only) T.I.P. or state project number: B-4593 WBS # (?) 42328.1.2 la. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) W Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: R 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express P Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* (' Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r- No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r- No 11. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? I7 Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Multiple property owners 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 1000 Birch Ridge Dr. Address Line 2 city Raleigh Postal / Zip Code 27612 State / Rwince / fagion NC Country USA * r Yes r No ryes r No 2e. Telephone Number: (919)707-6107 2g. Email Address:* gcashin@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality / town: Merrit 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 city Fbstal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Trent Creek 3b. Water Resources Classification of nearest receiving water:* SC; Sw, NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202040802 4. Project Description and History 2f. Fax Number: 2b. Property size: State / Ftovince/ Fagion Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use in the project area consists of agriculture, residential development along roadways,and forestland along stream corridors. Topography in the vicinity is predominately flat with gentle slopes descending into a wide floodplain along the stream. Elevations in the study area range from sea level to approximately eight feet above sea level. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 6.46 4g. List the total estimated linear feet of all existing streams on the property: 300 4h. Explain the purpose of the proposed project:* The purpose is to replace the deficient bridge No. 38 on NC Highway 55 over Trent Creek. The existing Bridge 38 has a sufficiency rating of 37.89 out of a possible 100. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The wasting bridge will be replaced with a longer bridge (160 feet vs. 145 feet) providing a minimum of 32-foot five -inch clear deck width. The bridge will include two 12-foot lanes with four foot offsets on each side. A temporary on -site detour, on the south side, will be utilized to maintain traffic during construction. Standard road building equipment will be used. 4j. Please upload project drawings for the proposed project. B4593 Buffer Drawings.pdf 1.48MB B4593 Permit Drawings.pdf 5.52MB B4593 Roadway Plans.pdf 4.04MB B4593 Utility Buffer Drawings.pdf 1.36MB B4593 Utility Permit Drawings.pdf 1.67MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Lane Sauls Agency/Consultant Company: Ecological Engineering Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands 9 Streams -tributaries W Buffers W Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W. * 2d. W. name * 2e. Forested* 2f. Type of Jurisdicition*(?) 2g. Impact area* 1 Roadway fill slope P Salt/Brackish Marsh WA & WB No Both 0.090 (acres) 1 Detour fill slope T Salt/Brackish Marsh WB No Both 0.150 (acres) U2 Poles, guy wire, water P Salt/Brackish Marsh WB No Both 0.010 main t (acres) F:=�(acres) Water main JL __] [alUBrackish Marsh WA & WB ��.th J0.010 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.150 0.110 2g. Total Wetland Impact 0.260 2h. Comments: There will be 0.32 acre of hand clearing due to bridge construction and 0.65 of hand clearing due to utility relocations. Additionally there will be 0.09 acre of temporary fill in wetlands in hand clearing areas for erosion control measures. 3. Stream Impacts ❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * r�i name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* ri ra Permanent ��]Fill Trent Creek Perennial Both 100 8 S1 P P Average (feet) (li ear feet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 8 31. Total stream and ditch impacts: 8 3j. Comments: 4. Open Water Impacts 31. Total temporary stream impacts: 0 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area rip rap P Trent Creek Bridge Tributary 0.01 4g. Total temporary open water Impacts: 0.00 4g. Total open water impacts: 0.01 4h. Comments: There will also be >0.01 ac of permanent surface water impacts due to bents. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. V Neuse r Catawba r Goose Creek r Other 4g. Total permanent open water impacts: 0.01 r Tar -Pamlico r Randleman r Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Site 1 Bridge P Trent Creek No 425 373 Site 1 Detour Bridge T Trent Creek No 1,371 880 Site 1 Utilities P Trent Creek No 2,092 1,392 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 1,371.00 880.00 Zone 1 Zone 2 Total Permanent impacts: 2,517.00 1,765.00 Zone 1 Zone 2 Total combined buffer impacts: 3,888.00 2,645.00 6i. Comments: Supporting Documentation E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Bridge No. 38 will be replaced on the existing alignment with a longer bridge. The proposed roadway fill slopes are 2:1.There are no deck drains over Trent Creek. There are two proposed outlets on the beginning and end of the bridge left side to allow proper drainage for the bridge and minimize disturbance in the surrounding wetlands. Rip Rap outlet pads will be utilized to dissipate the flow and minimize erosion. All piping outlets beyond buffer zones. Rip rap toe protection has been added to stabilize fill slopes as needed.The detour has been redesigned using 2:1 fill slopes as well as a sheet pile retaining wall in order to minimize wetland impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Best Management Practices for Construction and Maintenance Activities will apply. Fill material for the temporary detour Will be removed to wetland grade and replanted. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): r" DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank r Payment to in -lieu fee W Permittee Responsible program Mitigation 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan including mitigation credits generated. See attached B-4593 Lengyel Mitigation Site Debit Ledger 5b. Mitigation Plan Upload B-4593_Lengyel Mitigation Site Debit.pdf 153.32KB F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r- Level Spreader r" Vegetated Conveyance (lower SHWT) r- Wetland Swale (higher SHWT) r" Other SCM that removes minimum 30 % nitrogen r- Proposed project will not create concentrated Stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* r Yes r No NEPAor SEPAFinal Approval Letter 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * r Yes r No I Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The proposed project is the replacement of an existing bridge. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes t^ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No r Unknown What Federal Agency is involved? National Marine Fisheries Service 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? FWS website, County lists, coordination with NMFS. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Map review, file search, and fieldwork associated with NEPA documentation. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * r Yes r No 8b. If yes, explain how project meets FEMA requirements: Hydraulics Unit coordination with FEMA. 8c. What source(s) did you use to make the floodplain determination?* FEMA maps Miscellaneous Comments Miscellaneous attachments not previously requested. manatee_guidelines.pdf 116KB Signature U fJ By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark, III Signature yam¢ & Riau. ma , Ill Date 5/3/2019