HomeMy WebLinkAbout20190585 Ver 1_PCN Form Submission_20190503DWR
IDIOM n of Water Resources
Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
21nitial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned
20190585
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Select Project Reviewer*
Garcy Ward:eads\gpward
Information for Initial Review
1a. Name of project:
B-4593 Bridge No. 38 on NC Highway 55 over Trent Creek (Central)
1a. Who is the Primary Contact?*
Gordon Cashin
1b. Primary Contact Email:*
gcashin@ncdot.gov
Date Submitted
5/3/2019
Nearest Body of Water
Trent Creek
Basin
Neuse
Water Classification
SC; Sw, NSW
Site Coordinates
Latitude:
35.104395
Longitude:
-76.718223
Version# *
1
Reviewing Office*
Washington Regional Office - (252) 946-6481
1c. Primary Contact Phone:*
(919)707-6107
FA. Processing Information U
County (or Counties) where the project is located:
Pamlico
Is this project a public transportation project?*
r Yes r' No
Is this a NCDOT Project?*
r Yes r' No
(NCDOT only) T.I.P. or state project number:
B-4593
WBS # (?)
42328.1.2
la. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
W Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What types) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r' Regional General Permit (RGP)
r' Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number: 03 - Maintenance
Nationwide Permit (NWP) Number: 12 - Utility Lines
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
R 401 Water Quality Certification - Regular
F Non-404 Jurisdictional General Permit
r Individual Permit
le. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
P Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
(' Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r- No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r- No
11. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
1j. Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
1d. Who is applying for the permit?
I7 Owner r Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Multiple property owners
2b. Deed book and page no.:
2c. Responsible party:
2d.Address
Street Address
1000 Birch Ridge Dr.
Address Line 2
city
Raleigh
Postal / Zip Code
27612
State / Rwince / fagion
NC
Country
USA
*
r Yes r No
ryes r No
2e. Telephone Number:
(919)707-6107
2g. Email Address:*
gcashin@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(d appropriate)
1c. Nearest municipality / town:
Merrit
2. Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
Address Line 2
city
Fbstal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Trent Creek
3b. Water Resources Classification of nearest receiving water:*
SC; Sw, NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202040802
4. Project Description and History
2f. Fax Number:
2b. Property size:
State / Ftovince/ Fagion
Country
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Land use in the project area consists of agriculture, residential development along roadways,and forestland along stream corridors. Topography in the vicinity is predominately flat with
gentle slopes descending into a wide floodplain along the stream. Elevations in the study area range from sea level to approximately eight feet above sea level.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
4f. List the total estimated acreage of all existing wetlands on the property:
6.46
4g. List the total estimated linear feet of all existing streams on the property:
300
4h. Explain the purpose of the proposed project:*
The purpose is to replace the deficient bridge No. 38 on NC Highway 55 over Trent Creek. The existing Bridge 38 has a sufficiency rating of 37.89 out of a possible 100.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The wasting bridge will be replaced with a longer bridge (160 feet vs. 145 feet) providing a minimum of 32-foot five -inch clear deck width. The bridge will include two 12-foot lanes with
four foot offsets on each side. A temporary on -site detour, on the south side, will be utilized to maintain traffic during construction. Standard road building equipment will be used.
4j. Please upload project drawings for the proposed project.
B4593 Buffer Drawings.pdf
1.48MB
B4593 Permit Drawings.pdf
5.52MB
B4593 Roadway Plans.pdf
4.04MB
B4593 Utility Buffer Drawings.pdf
1.36MB
B4593 Utility Permit Drawings.pdf
1.67MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No r Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Lane Sauls
Agency/Consultant Company: Ecological Engineering
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used,
to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
W Wetlands 9 Streams -tributaries
W Buffers
W Open Waters r Pond Construction
2. Wetland Impacts
2a1 Reason (?)
2b. Impact type * (?)
2c. Type of W. *
2d. W. name *
2e. Forested*
2f. Type of
Jurisdicition*(?)
2g. Impact
area*
1
Roadway fill slope
P
Salt/Brackish Marsh
WA & WB
No
Both
0.090
(acres)
1
Detour fill slope
T
Salt/Brackish Marsh
WB
No
Both
0.150
(acres)
U2
Poles, guy wire, water
P
Salt/Brackish Marsh
WB
No
Both
0.010
main
t
(acres)
F:=�(acres)
Water main JL
__]
[alUBrackish Marsh
WA & WB
��.th
J0.010
2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact
0.150 0.110
2g. Total Wetland Impact
0.260
2h. Comments:
There will be 0.32 acre of hand clearing due to bridge construction and 0.65 of hand clearing due to utility relocations. Additionally there will be 0.09
acre of temporary fill in wetlands in hand clearing areas for erosion control measures.
3. Stream Impacts
❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * r�i name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact
(?) Jurisdiction* length*
ri ra Permanent ��]Fill Trent Creek Perennial Both 100 8
S1 P P Average (feet) (li ear feet)
31. Total jurisdictional ditch impact in square feet:
0
31. Total permanent stream impacts:
8
31. Total stream and ditch impacts:
8
3j. Comments:
4. Open Water Impacts
31. Total temporary stream impacts:
0
4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area
rip rap P Trent Creek Bridge Tributary 0.01
4g. Total temporary open water Impacts:
0.00
4g. Total open water impacts:
0.01
4h. Comments:
There will also be >0.01 ac of permanent surface water impacts due to bents.
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
V Neuse
r Catawba
r Goose Creek
r Other
4g. Total permanent open water impacts:
0.01
r Tar -Pamlico
r Randleman
r Jordan Lake
6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact
Site 1 Bridge
P
Trent Creek
No
425
373
Site 1 Detour Bridge
T
Trent Creek
No
1,371
880
Site 1 Utilities
P
Trent Creek
No
2,092
1,392
6h. Total buffer impacts:
Zone 1
Zone 2
Total Temporary impacts: 1,371.00
880.00
Zone 1
Zone 2
Total Permanent impacts: 2,517.00
1,765.00
Zone 1
Zone 2
Total combined buffer impacts: 3,888.00 2,645.00
6i. Comments:
Supporting Documentation
E. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Bridge No. 38 will be replaced on the existing alignment with a longer bridge. The proposed roadway fill slopes are 2:1.There are no deck drains over
Trent Creek. There are two proposed outlets on the beginning and end of the bridge left side to allow proper drainage for the bridge and minimize
disturbance in the surrounding wetlands. Rip Rap outlet pads will be utilized to dissipate the flow and minimize erosion. All piping outlets beyond buffer
zones. Rip rap toe protection has been added to stabilize fill slopes as needed.The detour has been redesigned using 2:1 fill slopes as well as a sheet
pile retaining wall in order to minimize wetland impacts.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Best Management Practices for Construction and Maintenance Activities will apply. Fill material for the temporary detour Will be removed to wetland
grade and replanted.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2c. If yes, mitigation is required by (check all that apply):
r" DWR W Corps
2d. If yes, which mitigation option(s) will be used for this project?
r Mitigation bank r Payment to in -lieu fee W Permittee Responsible
program Mitigation
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan including mitigation credits generated.
See attached B-4593 Lengyel Mitigation Site Debit Ledger
5b. Mitigation Plan Upload
B-4593_Lengyel Mitigation Site Debit.pdf 153.32KB
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
What type of SCM are you providing?
r- Level Spreader
r" Vegetated Conveyance (lower SHWT)
r- Wetland Swale (higher SHWT)
r" Other SCM that removes minimum 30 % nitrogen
r- Proposed project will not create concentrated Stormwater flow through the buffer
Diffuse Flow Documentation
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)? *
r Yes r No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?*
r Yes r No
NEPAor SEPAFinal Approval Letter
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15ANCAC 2B .0200)? *
r Yes r No
I Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
The proposed project is the replacement of an existing bridge.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
f Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r Yes t^ No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
r Yes r No r Unknown
What Federal Agency is involved?
National Marine Fisheries Service
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
FWS website, County lists, coordination with NMFS.
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
f' Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA website
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Map review, file search, and fieldwork associated with NEPA documentation.
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
r Yes r No
8b. If yes, explain how project meets FEMA requirements:
Hydraulics Unit coordination with FEMA.
8c. What source(s) did you use to make the floodplain determination?*
FEMA maps
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
manatee_guidelines.pdf 116KB
Signature U
fJ By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Mack Christopher Rivenbark, III
Signature
yam¢ & Riau. ma , Ill
Date
5/3/2019