Loading...
HomeMy WebLinkAbout20190143 Ver 1_PCN Edits - 4.17.2019_201904174/17/2019 Resume Submission Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F�1' Wetlands v Streams -tributaries v Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". 2a. Site #* (?) 2a1 Reason * (?) 2b. Impact type* (?) 2c. Type of W.* 2d. W. name* 2e. Forested* 2f. Type of Jurisdicition*(?) 2g. Impact area 3h. Impact length* Stream Crossing P •l�[Riv.rine, Swamp Forest • �FF=h Yes • Both • 0.400 (acres) Add 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.400 2g. Total Wetland Impact 0.400 2h. Comments: This impact is for the installation of a culvert for a road to cross the West Price Creek. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". Add another impact https://edocs.deq.nc.gov/Forms/form/resume/216/19561 6/11 3a. Reason for impact* (?) 3b.lmpact type 3c. Type of impact* 3d. S. name* 3e. Stream Type(?) [3f. Type of urisdiction* 3gSwidth* 3h. Impact length* fl Stream crossing for i Permanent culvert est Price Creek Perennial Both 1" Average (feet) 60 (linear feet) Add another impact https://edocs.deq.nc.gov/Forms/form/resume/216/19561 6/11 4/17/2019 Resume Submission ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 60 3i. Total temporary stream impacts: 0 3i. Total stream and ditch impacts: 60 3j. Comments: Culvert will be buried 1 foot. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)? * Check all that apply. L Neuse Tar -Pamlico D Catawba Randleman D Goose Creek ✓ Jordan Lake D Other 6b. Impact Type* (')r(IC). d. Stream name* 6e. Buffer mitigation required? 6f. Zone 1 impact* 6g. Zone 2 impact* Stream crossing for road P est Price Cre�:::]F-s 2,967 5,009 (square feet) (square feet) Add another impact 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 2,967.00 5,009.00 Zone 1 Zone 2 Total combined buffer impacts: 2,967.00 5,009.00 6i. Comments: https://edocs.deq.nc.gov/Forms/form/resume/216/19561 7/11 4/17/2019 Resume Submission Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Click the upload button or drag and drop files here to attach document Upload File must be PDF E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:" 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No INC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS (https:Hribits.usace.army.mii/ribits_apex/f? p=107:27:2734709611497::NO:RP:P27_BUTTON_KEY:O) website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No For a list of options to meet the diffuse flow requirements, click here (https://files.nc.gov/ncdeq/Water%20Quality/Surface%20Water%20Protection/401 /Buffer%20CIarification°/`20Memos/Options%20for%20Meeting%20Diffuse%20FIow%20Provisions%20( 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No Comments: G. Supplementary Information https://edocs.deq.nc.gov/Forms/form/resume/216/19561 8/11