Loading...
HomeMy WebLinkAbout20190584 Ver 1_PCN Form Submission_20190502DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20190584 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: Br 970105 on SR 1418 over White Swamp replacement 1a. Who is the Primary Contact?* Chad Coggins 1b. Primary Contact Email:* tccoggins@ncdot.gov Date Submitted 5/2/2019 Nearest Body of Water White Swamp Basin Tar -Pamlico Water Classification QNSW Site Coordinates Latitude: Longitude: 35.77811-77.78320 FA. Processina Information County (or Counties) where the project is located: Wilson Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: SF 970105 / State Funded WBS#M 17BP.4.R.95 1a. Type(s) of approval sought from the Corps: Version# * 1 Reviewing Office* Central Office - (919) 707-9000 1c. Primary Contact Phone:* (252)717-8699 W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - Express W Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No FB. Applicant Information 1d. Who is applying for the permit? r- Owner rJ Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: State of North Carolina (NCDOT) 2b. Deed book and page no.: 2c. Responsible party: NCDOT Div 4 2d.Address Street Address P.O. Box 3165 Address Line 2 city Wilson Postal / Zip Code 27828 2e. Telephone Number: (252)717-8699 2g. Email Address:* State / Frwinee / R�gion NC Q�untry USA 2f. Fax Number: * r Yes r No r Yes r No tccoggins@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Chad Coggins 3b. Business Name: NCDOT Div 4 3c.Address Street Address P.O. Box 3165 Address Line 2 CKY Wilson Postal / Zip Cade 27828 3d. Telephone Number: (252)717-8699 3f. Email Address:* tccoggins@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (ff appropriate) 1c. Nearest municipality/town: Pender Crossroads 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 cfty Postal / Zip Cede 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* White Swamp 3b. Water Resources Classification of nearest receiving water:* QNSW 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201030101 4. Project Description and History State / Rovince / P pion NC Country USA 3e. Fax Number: 2b. Property size: State / Fravince / iPogion Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Forestry and Agriculture are the predominant land uses with some rural single-family residential housing. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? r Yes r No r Unknown 4d. Attach an 8 1l/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Br 105 topo map.pdf 2.02MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Br 105 soils map.pdf 1.3MB 4f. List the total estimated acreage of all existing wetlands on the property: 0.02 4g. List the total estimated linear feet of all existing streams on the property: 120 4h. Explain the purpose of the proposed project,* Replace existing Bridge 105 (970105) which is structurally deficient for current NCDOT standards. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Replace existing Bridge 105 (970105) which is structurally deficient for current NCDOT standards with a new bridge meeting these standards in the existing right-of-way with offsite detours. Heavy road and bridge building equipment will be used. 4j. Please upload project drawings for the proposed project. 17BP.4.R.95_HYD_Permit _Package _10-12-2018.pdf 2.31 MB 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Chad Coggins Agency/Consultant Company: NCDOT Div 4 DEO Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No, single and complete linear transportation project with independent utility. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries W Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W. * 2d. W. name * 2e. Forested* 2f. Type of 2g. Impact Jurisdicition*(?) area* Site 1 end bent excavation P Bott omland Hardwood Forest White Swamp Yes Both 0.010 (acres) Site 1 mechanized clearing JP Bottomland Hardwood Forest White Swamp Yes Both 0.010 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.020 2g. Total Wetland Impact 0.020 2h. Comments: Mechanized clearing not included in threshold of impacts requiring compensatory mitigation (i.e. 0.01 acre of mechanized clearing). No hand clearing included in this project. Project includes 0.01 acre of wetland excavation. We are not proposing any mitigation for jurisdictional impacts (i.e. < 0.03 threshold confirmed by Eric Alsmeyer). 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact F (?) Jurisdiction* length* S1 stream relocation Permanent Relocation :1 ffeSwamp Intermittent Both 2 59 Avenge (fee[) (linear feet) S2 dewatering for stream Temporary Dewatering White Swamp Intermittent Both 2 10 relocation Average (feet) (linearfeet) S3 [de:trer'n,ig forend bent Temporary Dewatering White Swamp Perennial Bothuon Average (feet) (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 59 45 3i. Total stream and ditch impacts: 104 3j. Comments: Intermittent stream being relocated in lateral v-ditch associated with road shoulder construction. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. r Neuse P Tar -Pamlico r Catawba r Randleman r Goose Creek r Jordan Lake r Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Allowable bridge bridge & approach constructin P White Swamp No 1,858 1,706 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 1,858.00 1,706.00 Zone 1 Zone 2 Total combined buffer impacts: 1,858.00 1,706.00 6i. Comments: Supporting Documentation 17BPA.R.95_HYD_Permit _Package _10-12-2018.pdf 2.31 MB E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Replace in place with offsite detours. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: All construction equipment will be staged and operated from upland areas. NCDOT will also install silt fencing to protect the streams and wetlands adjacent to the project. Safety fencing will be used to delineate jurisdictional and environmentally sensitive areas from encroachment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Bridge end bent excavation and v-ditch construction falls below NWP condition threshold of wetland impacts / requirement for compensatory mitigation and falls below Regional condition threshold of stream impacts / requirement for compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader W Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen r Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 17BP.4.R.95_HYD_Permit_Package_10-12-2018.pdf 2.31 MB 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments:* MCDC available on request. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Replacing existing two lane bridge with a new two lane bridge. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* f Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r- No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Red -cockaded woodpecker is listed as Historic for Wilson County. Foraging or nesting habitat was not found adjacent to the area. NCNHP database records no element occurrence within a mile of the project area. (No Affect) / Tar River spinymussel is included in the IPaC TE list dated April 30, 2019. However reviewof the 12 digit HUC GIS element occurrence layer shows this species is not included for the project identified 12 digit HUC. Also NCNHP database records no element occurrence within a mile of the project area. Therefore, this project meets the Section 7 Mussel Programmatic protocols for bridge replacement of a Programmatic BO of No Affect for this species. (No Affect) // Atlantic Pigtoe (also included in the referenced IPaC letter) is currently listed as proposed for Wilson Co. Atlantic Pigtoe is also listed has as Historic for Wilson Co. This species is also not included in the project 12 digit HUC. NCNHP database records no element occurrence Within a mile of the project area. Therefore, this species meets the Section 7 Mussel Programmatic protocols for bridge replacement of a Programmatic BO of No Affect for this species if and when the Atlantic Pigtoe is listed and included in this Section 7 Mussel Programmatic Process. (No Affect) /// Michawes sumac is listed as Historic for Wilson Co. NCNHP database records no element occurrence within a mile of the project area. (No Affect) //// Programmatic BO of MALTAA for NLEB Consultation Documentation Upload FWS IpaC TE List revised 4 30 3019.pdf 218.39KB NCNHP elements project review.pdf 583.17KB Wilson Co. TE List.pdf 183.59KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* GIS / NOAA Atlantic Sturgeon proposed rule dated 06/032/2016 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r- No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU concurrence With MOA for Historic Bridge affects call 7c. Historic or Prehistoric Information Upload 17-09-0041 Signed EffectsConcForm.pdf 4.49MB PA 17-09-0041 Wilson (NSR).pdf 7.27MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r' No 8b. If yes, explain how project meets FEMA requirements: FEMA MOA..... New bridge replacement project in compliance with FEMA MOA requirements for no impacts to 100 year flood plain. 8c. What source(s) did you use to make the floodplain determination?* FRIS Miscellaneous Comments Miscellaneous attachments not previously requested. Signature u W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Chad Coggins Signature Date 5/2/2019