HomeMy WebLinkAbout20061804 Ver 25_Publix at Fowers Plantation SMP Approval_20190502 ROY COOPER
Governor
MICtHrAEL S.REGANSe�e
LINDA CULPEPPER NORTH CAROLINA
Dimaor Environmental Quality
May 2, 2019
DWR#2006-1804 v25
Johnston County
Ms. Rebecca Flowers, President
DWF Development
4880 NC Hwy 42 East
Clayton,North Carolina 27527
Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN
Publix at Flowers Plantation
Dear Ms. Flowers:
The Division of Water Resources (Division) recently reviewed the proposed stormwater
management plan (SMP) for the subject project as required by Individual 401 Water Quality
Certification issued by the Division on November 5, 2008. Submittal of the SMP satisfies the
stormwater condition no. 9 of the 401 certification for this phase of the project and is subject to
the requirements below.
The Division approves the SMP for Publix at Flowers Plantation(Lots #1, 5, and 7) consisting of
a wet pond including all associated stormwater conveyances, inlet and outlet structures, and
grading and drainage patterns depicted on plan sheets dated February 8, 2019, which are
incorporated by reference and are enforceable by the Division. The following conditions also
apply [15A NCAC 02H .0506(b)(5)]:
a) The maximum allowable drainage area for the approved wet pond shall be 1,744,297
square feet and the maximum allowable built-upon area within that drainage area shall be
858,546 square feet. Any changes to these allowable maximum areas shall require the
applicant to submit and receive approval from the Division prior to any construction or
modification of the current site.
b) The footprint of all stormwater management device(s)as well as an additional 10-foot wide
area on all sides of the device(s) shall be located in either public rights-of-way, dedicated
common areas or recorded easement areas. The final plats for the project showing such
rights-of-way,common areas and easement areas, shall be in accordance with the approved
plans.
���s,s North Carolina Department of Environmental Quality I Division of Water Resources
D_E J� 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617
o+v� 919.707.9000
Page 2 of 2
DWR#2006-1804 v25
c) The approved SMP shall be constructed and operational before any permanent building or
other structure is occupied at the site.
d) The SMP may not be modified without prior written authorization from the Division.
e) Maintenance activities for stormwater management device(s) shall be performed in
accordance with the notarized O&M agreements signed by Ms. Rebecca Flowers of DWF
Development on January 30, 2019. The O&M agreement shall transfer with the sale of the
land or transfer of ownership/responsibility for the approved diffuse flow plan. The
Division shall be notified promptly of every transfer.
f) The applicant and/or authorized agent shall provide a completed Certificate of Completion
form to the Division within thirty(30) days of project completion or as soon as possible if
the project has already been completed. This form is made available online at
hqs://edocs.dgg.nc.gov/Forms/Certificate-of-Completion.
g) Additional SMP(s) for future phases must receive written authorization from the Division
before any land disturbance, construction, or expansion of the new phase(s)may occur.
Please contact Chonticha McDaniel at (919) 707-3634 or chonticha.mcdanielAncdenr.¢ov if you
have any questions or concerns regarding this matter.
Sincerely,
4k,W
44�%
Karen Higgins, Supervisor
401 & Buffer Permitting Branch
cc: Ethan Averette—Stocks Engineering, P.A. (via email)
DWR, Raleigh Regional Office
DWR 401 &Buffer Permitting Branch File